LHCC TOTEM STATUS REPORT



Similar documents
The TOTEM experiment at the LHC: results and perspective

Running in Luminosity. Mike Lamont Verena Kain

Track Trigger and Modules For the HLT

Reliability and Availability Aspects of. the IPHI Project

FCC JGU WBS_v0034.xlsm

Zero Degree Extraction using an Electrostatic Separator

MICE detectors and first results. M. Bonesini Sezione INFN Milano Bicocca

LHC MACHINE PROTECTION

Precision Tracking Test Beams at the DESY-II Synchrotron. Simon Spannagel DPG 2014 T88.7 Mainz,

CMS Tracker module / hybrid tests and DAQ development for the HL-LHC

& Tunnel Cross Section

Information about the T9 beam line and experimental facilities

Operation and Performance of the CMS Silicon Tracker

Status of the Diamond Storage Ring RF Systems. Morten Jensen on behalf of Diamond Storage Ring RF Group

New Machine Layout in IR3 and IR7

Calorimetry in particle physics experiments

Digital vs. Analogue Control Systems

Large Systems Commissioning

Tune and Chromaticity Tracking in the Tevatron. C.Y. Tan 09 May 2006

PHYSICS WITH LHC EARLY DATA

THE CMS PIXEL DETECTOR: FROM PRODUCTION TO COMMISSIONING

HIGH-ENERGY COLLIDER PARAMETERS: e + e Colliders (I)

Catherine LeCocq, Robert Ruland. February, 2008

Jet Reconstruction in CMS using Charged Tracks only

ATLAS Tile Calorimeter Readout Electronics Upgrade Program for the High Luminosity LHC

Silicon Seminar. Optolinks and Off Detector Electronics in ATLAS Pixel Detector

Proton tracking for medical imaging and dosimetry

Status of the HOM Damped Cavity for the Willy Wien Ring

T(CR)3IC Testbed for Coherent Radio Cherenkov Radiation from Cosmic-Ray Induced Cascades

arxiv: v1 [physics.ins-det] 4 Feb 2014

CMS Level 1 Track Trigger

Large Hadron Collider am CERN

Tracking systems in HEP:

Characterisation of the Timepix Chip for the LHCb VELO Upgrade

Silicon Lab Bonn. Physikalisches Institut Universität Bonn. DEPFET Test System Test DESY

BEPC UPGRADES AND TAU-CHARM FACTORY DESIGN

PROCESS PARTICLE COUNTER (PPC) SENSOR/CONTROLLER FOR OPTIMIZING POWER RECOVERY EXPANDER AND GAS TURBINE PERFORMANCE

Laser diffuse reflection light scanner with background suppression. Dimensioned drawing

Online CMS Web-Based Monitoring. Zongru Wan Kansas State University & Fermilab (On behalf of the CMS Collaboration)

Damping Wigglers in PETRA III

Optical Link ASICs for LHC Upgrades

The main purpose of the study was to answer the three following questions:

Vertex and track reconstruction with the ALICE Inner Tracking System

Measurement of RF Emissions from a Final Coat Electronics Corrosion Module

AUTOMATION OF OPERATIONS ON THE VEPP-4 CONTROL SYSTEM

A Gigabit Transceiver for Data Transmission in Future HEP Experiments and An overview of optoelectronics in HEP

Cathode Ray Tube. Introduction. Functional principle

The LHCb Tracking System. Jeroen van Hunen

The accurate calibration of all detectors is crucial for the subsequent data

Wir schaffen Wissen heute für morgen

Cross section, Flux, Luminosity, Scattering Rates

SpectraTec II. Polarized Multi-Laser Source BLUE SKY RESEARCH WAVELENGTHS. The SpectraTec II

PoS(PhotoDet 2012)068

Synthetic Sensing: Proximity / Distance Sensors

CMS Tracking Performance Results from early LHC Running

CONTENTS 1. IMPORTANT NOTICE 2 2. TECHNICAL SPECIFICATION 3 3. OPERATION DETAILS 4 4. ELECTRICAL SCHEMATIC DIAGRAM EXPLOSION VIEW 16 6

Magnet field- and Radiation Tolerant New Power Supply System PL500F8-12 MARATON

THE TESLA TEST FACILITY AS A PROTOTYPE FOR THE GLOBAL ACCELERATOR NETWORK

LLRF. Digital RF Stabilization System

Coupling Impedance of SIS18 and SIS100 beampipe CERN-GSI-Webmeeting

Calorimeter Upgrades for the High Luminosity LHC

Report on heat production during preliminary tests on the Rossi Ni-H reactor.

Targus Wireless RF Mouse USER S GUIDE. Making Your Mobile Life Easier.

FTK the online Fast Tracker for the ATLAS upgrade

The OPERA Emulsions. Jan Lenkeit. Hamburg Student Seminar, 12 June Institut für Experimentalphysik Forschungsgruppe Neutrinophysik

The muon L0 Off Detector Electronics (ODE) for the LHCb experiment

Results: Low current ( ) Worst case: 800 MHz, GeV, 4 turns Energy oscillation amplitude 154 MeV, where

DDX 7000 & Digital Partial Discharge Detectors FEATURES APPLICATIONS

R&D activities at ITA for High Energy Physics. F. Arteche

Simulation of Neutron Backgrounds from the ILC Extraction Line Beam Dump. Siva Darbha. Office of Science, SULI Program. University of Toronto

Big Data Analytics. for the Exploitation of the CERN Accelerator Complex. Antonio Romero Marín

Projects and R&D activities

Development of the electromagnetic calorimeter waveform digitizers for the Fermilab Muon g-2 experiment

Settlement of Precast Culverts Under High Fills; The Influence of Construction Sequence and Structural Effects of Longitudinal Strains

OVERVIEW OF PROTON DRIVERS FOR NEUTRINO SUPER BEAMS AND NEUTRINO FACTORIES*

Standex-Meder Electronics. Custom Engineered Solutions for Tomorrow

EMR-9 Quick Start Guide (00175)D 1

Upgraded Fast Beam Conditions Monitor for CMS online luminosity measurement

(Amplifying) Photo Detectors: Avalanche Photodiodes Silicon Photomultiplier

DIRECTIONAL FIBER OPTIC POWER MONITORS (TAPS/PHOTODIODES)

A.Besson, IPHC-Strasbourg

Salvatore Buontempo. on behalf of the FOS4CMS Group

EH-20 20m antenna. By VE3RGW

Full scale tunnel fire tests of VID Fire-Kill Low Pressure Water Mist Tunnel Fire Protection System in Runehamar test tunnel, spring 2009

ORC TURBOGENERATOR TYPE CHP - Organic Rankine Cycle Turbogenerator fed by thermal oil, for the combined production of electric energy and heat -

Wireless Alarm System. Window/Door Sensor. User s Manual. Choice ALERT. Control all Sensors & accessories from one location

Network Design. Yiannos Mylonas

RF SYSTEM FOR VEPP-5 DAMPING RING

Beam Instrumentation Group, CERN ACAS, Australian Collaboration for Accelerator Science 3. School of Physics, University of Melbourne 4

EMC Basics. Speaker : Alain Lafuente. Alain.lafuente@we-online.com

RL HW / RL HW+ / RL HGW / RL HV / RL HVPW/RL HVPW-G

ROTATING MACHINES. Alignment & Positioning of. Fast, easy and accurate alignment of rotating machines, pumps, drives, foundations, etc.

A Practical Guide to Free Energy Devices

Transcription:

LHCC TOTEM STATUS REPORT Status of Roman Pot Consolidation & Upgrade Program Physics Analysis Highlights 4/9/2013 LHCC TOTEM 13.3.2013 CERN J. Baechler 1

TOTEM Status of Roman Pot Consolidation & Upgrade Program RP 210 m / 220 m (special runs) RP 210 m / 220 m (low β* & high luminosity) Consolidation & upgrade work packages RP integration of tracking / timing detectors RP horizontal insertion at low β* (2012) 4/9/2013 LHCC TOTEM 13.3.2013 CERN J. Baechler 2

Overview Consolidation program: TOTEM (approved by TOTEM management) Upgrade program (proposal) : TOTEM+CMS (under approval by CMS) -> Layout of RP stations - combination of consolidation program with upgrade program Work packages related to consolidation & upgrade -> Status of work packages and schedule issues on critical path Observations during insertion of horizontal RPs in November 2012 (high luminosity, low β*) and impact on consolidation and upgrade work -> Optimization of RP housing (beam heating), ferrite study 4/9/2013 LHCC TOTEM 13.3.2013 CERN J. Baechler 3

Presentation of TOTEM Roman Pot consolidation & upgrade plans in different meetings 1) CMS-TOTEM (management) meeting on 5.10.2012 2) 14 th LTEX meeting on 8.11.2012 3) 1st LHC workshop on Collider Experiment Interface on 30.11.2012 (CERN) 4) Results and prospects of forward physics at the LHC on 12.2. 2013 Implications for the study of diffraction, cosmic ray interactions, and more (CERN) 5) 16 th LTEX meeting 14.2.2013 + several CMS-TOTEM technical meetings, TOTEM collaboration upgrade meetings (2012-2013), ATLAS-AFP (February 2013), ATLAS-ALFA (January 2013) consolidation & upgrade 4/9/2013 LHCC TOTEM 13.3.2013 CERN J. Baechler 4

Main goals of TOTEM experiment - Measurement of total cross section σ dn EL 2 16π ( hc) dt t=0 TOT = 2 1+ ρ NEL + NINEL TOTEM detectors integrated in CMS (T1, T2) TOTEM detectors integrated in LHC (RP) Using luminosity from CMS Luminosity independent d σ dt EL dn = 1 L dt EL ρ parameter from compete fit - Forward multiplicity - Diffractive physics (soft & hard diffraction, jets) TOTEM (stand alone) TOTEM&CMS at low / highβ*, special runs TOTEM&CMS at low β* and high luminosity consolidation & upgrade 4/9/2013 LHCC TOTEM 13.3.2013 CERN J. Baechler 5

Present RP installation at IP5 TOTEM RP-147 m (near-far) TOTEM RP-220 m (near-far) Near 2 vertical RP top/bottom 1 horizontal RP Far 2 vertical RP top/bottom 1 horizontal RP Near 2 vertical RP top/bottom 1 horizontal RP Far 2 vertical RP top/bottom 1 horizontal RP outgoing beam ~ 1.5 m ~ 5 m Q6 CMS ip5 ~ 147 m CMS ip5 ~ 220 m consolidation & upgrade 4/9/2013 LHCC TOTEM 13.3.2013 CERN J. Baechler 6

Roman Pot consolidation & upgrade strategy CONSOLIDATION - Remove RP147 m stations & patch panel (allows installation of TCL4) - Relocation of RP147 m stations (including Si strip detectors) in +/- 210 m region - Exchange of ferrites of all RPs Consolidation RP147&RP220 -> during LS1 UPGRADE (Roman Pot station) - Installation of additional new RP stations (horizontal) in +/-220 m region (2 new RP stations in each sector (4/5), (5/6)) Upgrade Roman Pot station -> during LS1 or In end of year technical stops after LS1 (break of vacuum) UPGRADE (Roman Pot detector) - Integration of new pixel detectors in the (relocated RP147m) RPs in 210 m region - Integration of new timing detectors in the new horizontal RPs Guideline : Reinstallation of RP 147m stations with Si strip detectors in +/- 210m region (during LS1) The relocated horizontal RP station (147 m) can be equipped with Si pixel detectors The new horizontal RPs could be installed during LS1 and equipped immediately/successively with new timing detectors. The present 220 m stations must not be affected (touched) by any upgrade activity, until the high beta special runs after LS1 are finished. (Research Board approved stand alone program of TOTEM at full LHC energy) The timing detectors are installed downstream relative to the tracking detectors. (high material budget). Depending on the running scenario after LS1 (physics high β*/low β*, calibration, alignment), relevant RPs are inserted or retracted (parking position). LHCC TOTEM 13.3.2013 CERN J. Baechler Upgrade Roman Pot detector -> during LS1 or in short technical stops after LS1 4/9/2013 consolidation & upgrade 7

Remarks on Roman Pot detectors The TOTEM physics program at high β*, special runs and p-a will be performed with the RP detectors at +/- 220 m and optionally in combination with the relocated RP detectors from +/- 147 m in the region of +/- 210 m (vertical) New Si pixel detectors integrated in the horizontal (relocated) RPs in the +/- 210 m region and additional new RP stations equipped with timing detectors in the region of +/- 220 m from IP5 are presently discussed in the framework of detector upgrade studies by TOTEM in collaboration with CMS. (related to diffractive physics at low β* and high luminosities) consolidation & upgrade 4/9/2013 LHCC TOTEM 13.3.2013 CERN J. Baechler 8

Roman Pot consolidation & upgrade overview (schematic) Relocated stations from 147 m Existing TOTEM RP-220 m (near-far) New LHC component New Si pixel tracking detectors in horizontal RPs New RP stations New timing detectors New New LHC component outgoing beam 2 vertical RP 1 horizontal RP TRACKING Detector 2 vertical RP 1 horizontal RP TRACKING Detector Near 2 vertical RP top/bottom 1 horizontal RP 1 horizontal RP TIMING Detector 1 horizontal RP TIMING Detector Far 2 vertical RP top/bottom 1 horizontal RP TCL-4 ~ 5-10 m ~ 5 m shielding TCL-6 Q6 12 RPs can be operated simultaneously! CMS ip5 ~ 220 m consolidation & upgrade 4/9/2013 LHCC TOTEM 13.3.2013 CERN J. Baechler 9

Roman Pot (schematic-phase 1) CALIBRATION & Alignment -RUNNING with high β* & low luminosity Possibility to test new timing & tracking detectors in the LHC environment > Tests in combination with existing RP detectors Existing TOTEM RP-220 m (near-far) New horizontal RP equipped with pixel tracking detectors New horizontal RP equipped with timing detectors New New outgoing beam (2 vertical RP top/bottom) 1 horizontal RP TRACKING Detector (2 vertical RP top/bottom) 1 horizontal RP TRACKING Detector Near 2 vertical RP top/bottom 1 horizontal RP 1 horizontal RP TIMING Detector 1 horizontal RP TIMING Detector Far 2 vertical RP top/bottom 1 horizontal RP ~ 5-10 m ~ 5 m shielding TCL-6 Q6 CMS ip5 ~ 220 m consolidation & upgrade 4/9/2013 LHCC TOTEM 13.3.2013 CERN J. Baechler 10

Roman Pot (schematic-phase 1) PHYSICS-RUNNING with low beta* & high luminosity horizontal and vertical RPs (far) are retracted (parking position) & vertical RPs (near) are retracted (parking position) horizontal RP near inserted Existing TOTEM RP-220 m (near-far) outgoing beam (2 vertical RP) 1 horizontal RP TRACKING Detector New horizontal RP equipped with pixel tracking detectors (2 vertical RP) 1 horizontal RP TRACKING Detector h o r I z v e r t optional New horizontal RP equipped with timing detectors 1 horizontal RP TIMING Detector 1 horizontal RP TIMING Detector h o r i z optional v e r t ~ 5-10 m ~ 5 m shielding TCL-6 Q6 CMS ip5 ~ 220 m consolidation & upgrade 4/9/2013 LHCC TOTEM 13.3.2013 CERN J. Baechler 11

Roman Pot (schematic-phase 1) PHYSICS-RUNNING with high β* & low luminosity NEW installed horizontal RPs (timing) are retracted (parking position) Existing TOTEM RP-220 m (near-far) New horizontal RP equipped with pixel tracking detectors New horizontal RP equipped with timing detectors 2 vertical RP 1 horizontal RP TRACKING Detector 2 vertical RP 1 horizontal RP TRACKING Detector 1 horizontal RP TIMING Detector 1 horizontal RP TIMING Detector optional Near 2 vertical RP top/bottom 1 horizontal RP Far 2 vertical RP top/bottom 1 horizontal RP ~ 5-10 m ~ 5 m shielding TCL-6 Q6 outgoing beam CMS ip5 ~ 220 m consolidation & upgrade 4/9/2013 LHCC TOTEM 13.3.2013 CERN J. Baechler 12

Roman Pot (schematic-phase 2) PHYSICS-RUNNING with low β* & high luminosity ALL horizontal RPs are inserted Existing TOTEM RP-220 m (near-far) New horizontal RP equipped with pixel tracking detectors New horizontal RP equipped with timing detectors outgoing beam (2 vertical RP) 1 horizontal RP TRACKING PIXEL/Strip Detector (2 vertical RP) 1 horizontal RP TRACKING PIXEL Detector 1 horizontal RP PIXEL Detector 2 vertical RP tracking 1 horizontal RP TIMING Detector 1 horizontal RP TIMING Detector 1 horizontal RP TIMING Detector 2 vertical RP tracking ~ 5 m-10 m ~5 m shielding TCL-6 Q6 CMS ip5 ~ 220 m consolidation & upgrade 4/9/2013 LHCC TOTEM 13.3.2013 CERN J. Baechler 13

RP Integration study timing & tracking Sector 4/5 Upgrade: new RP station new timing detector Consolidation: 147 m relocated RP station Upgrade: Si-pixel detectors consolidation & upgrade 4/9/2013 LHCC TOTEM 13.3.2013 CERN J. Baechler 14

Overview Consolidation program: TOTEM (approved by TOTEM management) Upgrade program (proposal) : TOTEM+CMS (under approval by CMS) -> Layout of RP stations - combination of consolidation program with upgrade program Work packages related to consolidation & upgrade -> Status of work packages and schedule issues on critical path Observations during insertion of horizontal RPs in November 2012 (high luminosity, low β*) and impact on consolidation and upgrade work -> Optimization of RP housing (beam heating), ferrite study work packages & schedule 4/9/2013 LHCC TOTEM 13.3.2013 CERN J. Baechler 15

MAIN Work packages LS1 and beyond TOTEM -> consolidation extraction & service of RP147 m re-installation of RP147 m at 210 m (upstream of RP220 m near) extension of services from 147 m to 210 m extraction & re-installation of RP220 m & service work service work on RP 220 m vacuum service work on RP 220 m motor drive (hardware & software) service work on RP (ferrite, RF housing) TOTEM -> upgrade installation of 2new RP horizontal stations on each side of IP5 (downstream of RP 220 m near, upstream of RP 220 m far) adaptation of horizontal RPs to be used for low β* production new RP housing, optimized for RF heating and beam feedback installation of electrical services for new detectors (standard services will be re-used from RP147) installation of new tracking/timing detectors LHC beam line modifications at +/- 220 m -> consolidation + upgrade adaptation of beam line for installation of RP147m at 210m (consolidation) and new horizontal RPs (upgrade) LHC collimators -> consolidation + upgrade installation of TCL4 (4/5, 5/6) installation of TCL6 (4/5, 5/6) + relocation of cooling components close to +/- RP220m far. work packages & schedule 4/9/2013 LHCC TOTEM 13.3.2013 CERN J. Baechler 16

Sharing of work overview with CERN groups (not complete) EN-MEF-LE (coordination, synchronization with LHC planning & scheduling) PH-DT (RP mechanics, vacuum, motor, services, cable production....) PH-ESE (electronic issues, fibers, HV cables ) EN-CV-DC (RP cooling system) EN-MEF-SI (cables) EN-MME-DI (new RP production) EN-ICE-SIC (FESA) TE-VSC-LBV (ferrite vacuum measurements, beam pipe) TE-MPE-PE (LHC machine protection) DGS-RP-AS (radiation protection) PH-UCM (RP engineering, integration, ) BE-ABP-ICE (RP RF study & optimization) BE-OP-LHC (Operation of RP CCC) BE-ABP-LCU (collimators) TOTEM work packages & schedule 4/9/2013 LHCC TOTEM 13.3.2013 CERN J. Baechler 17

Work packages > Roman Pot tunnel installation (CMS, PH-DT, EN-CV, BE-ABP-ICE, LTEX) WP1-T: removal & reinstallation of RP147 m (radio protection, RP storage, machining of flanges, ferrite, anti collision switch?) WP2-T: removal & reinstallation of RP220 m (anti collision switch, ferrite) WP3-T: transfer of supplies from 147 m -> 210 m (motor power lines, patch panel, LV, + new HV cable) WP4-T: installation of new fibres WP5-T: RP@147 m motor & mechanics (preparation for reuse at 210 m) WP6-T: Flanges interface to LHC WP7-T: beam-pipe & TCL work packages & schedule 4/9/2013 LHCC TOTEM 13.3.2013 CERN J. Baechler 18

LS1 activity -> TIMELINE (main activities in tunnel) ferrite study & replacement anti collision system calibration extraction of detector packages 147 m / 220 m March 2013 May 2013 extraction of RP 147 m + RP 220 m station + patch panel June 2013 re installation of RPs 220 m / 147 m installation of services lines in tunnel cables - cooling installation of new RP station ->critical path<- installation of detectorpackages &movement tests & re commissioning of RPs & laser calibration APRIL 2014 1. September 2014 break vacuum 147 m/ 220 m? bake out starts end of work in tunnel work packages & schedule 4/9/2013 LHCC TOTEM 13.3.2013 CERN J. Baechler 19

Roman Pot at 147 m & 220 m patch panel Position of new RPs TCL 6 Relocation of RPs & patch panel from 147m to 200m patch panel (relocated from 147m) work packages & schedule 4/9/2013 LHCC TOTEM 13.3.2013 CERN J. Baechler 20

Roman Pot & detector package Temporary location of RP 147m components in H8 TOTEM test beam line after dismounting work packages & schedule 4/9/2013 LHCC TOTEM 13.3.2013 CERN J. Baechler 21

TOTEM & PH-DT L1 work package -> activities of PH-DT (summarizes not all activities) Main tunnel activities work packages & schedule 4/9/2013 LHCC TOTEM 13.3.2013 CERN J. Baechler 22

Work package EN-CV (maintenance of pumps and prolongation of cooling lines from 147m to 220m) work packages & schedule 4/9/2013 LHCC TOTEM 13.3.2013 CERN J. Baechler 23

COLLIMATOR requirements for forward physics work packages & schedule 4/9/2013 LHCC TOTEM 13.3.2013 CERN J. Baechler 24

COLLIMATOR TCL4 & TCL6 work packages & schedule 4/9/2013 LHCC TOTEM 13.3.2013 CERN J. Baechler 25

Work packages > Detector Sensor CMS-TOTEM WP1-D: Si Pixel WP2-D: Timing-Detector WP3-D: Timing-TDC WP4-D: Timing-Clock distribution WP5-D: Readout board interface to CMS work packages & schedule 4/9/2013 LHCC TOTEM 13.3.2013 CERN J. Baechler 26

TOTEM-RP study of 3D sensors TOTEM-RD50 (G. Pellegrini) [IBL CNM] HPS work packages & schedule 4/9/2013 LHCC TOTEM 13.3.2013 CERN J. Baechler 27

Possible housing for timing detector Flange size big enough to integrate the timing detector Housing rotated by 90 Impedance not favorable work packages & schedule 4/9/2013 LHCC TOTEM 13.3.2013 CERN J. Baechler 28

Roman Pot (rotated by 90 ) Integration of Cherenkov timing detector work packages & schedule 4/9/2013 LHCC TOTEM 13.3.2013 CERN J. Baechler 29

Integration study of C-timing detector in RP (CMS-TOTEM) work packages & schedule 4/9/2013 LHCC TOTEM 13.3.2013 CERN J. Baechler 30

Horizontal RP with Cherenkov timing detector work packages & schedule 4/9/2013 LHCC TOTEM 13.3.2013 CERN J. Baechler 31

4/9/2013 LHCC TOTEM 13.3.2013 CERN J. Baechler 32

Work packages > Optimization WP1-O : optimal position and geometry of new RPs (RF, physics) WP2-O: optimal shape & size of sensors WP3-O: particle timing vertex reconstruction WP4-O: detector position WP5-O: Material budget work packages & schedule 4/9/2013 LHCC TOTEM 13.3.2013 CERN J. Baechler 33

RP Integration study New components Existing components work packages & schedule 4/9/2013 LHCC TOTEM 13.3.2013 CERN J. Baechler 34

Integration study of TCL6 and Roman Pots work packages & schedule 4/9/2013 LHCC TOTEM 13.3.2013 CERN J. Baechler 35

Overview Consolidation program: TOTEM (approved by TOTEM management) Upgrade program (proposal) : TOTEM+CMS (under approval by CMS) -> Layout of RP stations - combination of consolidation program with upgrade program Work packages related to consolidation & upgrade -> Status of work packages and schedule issues on critical path Observations during insertion of horizontal RPs in November 2012 (high luminosity, low β*) and impact on consolidation and upgrade work -> Optimization of RP housing (beam heating), ferrite study insertion at low β* beam heating LHC vacuum RP optimizationrates 4/9/2013 LHCC TOTEM 13.3.2013 CERN J. Baechler 36

Roman Pot (TOTEM) <-> LHC In 2011 and 2012 specific RP tests & insertions were performed at standard LHC settings to study: Roman Pot <-> LHC : RP heating & beam stability Roman Pot detector : rates & background Observations during low β* run (2012): [LHC-MPP M. DEILE, December 2012] Insertion of RP horizontal at 220m -> insertion at low β* beam heating LHC vacuum RP optimizationrates 4/9/2013 LHCC TOTEM 13.3.2013 CERN J. Baechler 37

List of Insertions at β* = 0.6 m Date Pots involved min. dist. Observations, Result Consequence 16.10. all V 12 σ no problem no UFO activity all H 30 σ dump on XRPH.A6R5.B1 (slow losses, 5s) 05.11. all H 30 σ dump on XRPH.A6R5.B1 (slow losses, 5s) 14.11. all H 32mm ~ 270 σ 16.11. H, not A6R5.B1 14 σ 2mm dump on XRPH.A6R5.B1 (fast losses) no problem, beams separated by 4σ no UFO activity UFO activity in 6L5 (*) slow losses (5s) in each ramp until conditioning (heat up) of beam screen in Q6 (*) The (fast) UFOs in 6L5 were later found to originate from TCL5 [Tobias] insertion at low β* beam heating LHC vacuum RP optimizationrates p. 38

05.11.2012 Comparison BLMs & Beam Vacuum Sector 5-6 BLMEI.06R5.B1E10_XRP BLMQI.06R5.B1E30_MQML BLMQI.06R5.B1E10_XRP_MQML BLMQI.06R5.B2I30_MQML BLMQI.06R5.B1E20_MQML BLMQI.06R5.B2I20_MQML BLMQI.06R5.B2I10_MQML VGPB.235.6R5.B.PR (4 m downstream of Far: Q6 entrance) VGI.77.6R5.B.PR (6 m upstream of Near) VGPB.2.6R5.B.PR (14 m upstream of Near: Q5 exit) VGPB.4.6R5.B.PR (14 m upstream of Near: Q5 exit) Note: no pressure increase in any gauge further upstream (cell 5R5). insertion at low β* beam heating LHC vacuum RP optimizationrates p. 39

Temperature Sensors on Detector Hybrid Boards: Sector 4-5 (Beam 2) Highest temp. ever measured dump at 13:52 other pots in garage 45-220-F-H moving towards beam 45-220-N-H moving towards beam Readout chips in run mode Readout chips in sleep mode Run mode Run mode Sleep mode Sleep mode insertion at low β* beam heating LHC vacuum RP optimizationrates Main temperature effect from chips changing to run mode; small additional increase (3 deg.) from pots moving very close to the beam. UFOs cannot be resolved. p. 40

Fill 3188 with RP Insertion, Cell 6R5 _ insertion at low β* beam heating LHC vacuum RP optimizationrates BLM and vacuum spike, no dump p. 41

Fill 3188, Cell 7R1 (ALFA) slight vacuum degradation at injection, no spike in ramp insertion at low β* beam heating LHC vacuum RP optimizationrates p. 42

EM coupling of RP (RP in garage position) The temperature in the Roman Pot increases due to the EM coupling with the LHC -> cooling of RPs is mandatory when LHC beam is injected -> modification of evaporative cooling system by integrating a safe mode to operate above dew point in case of vacuum problem Cooling of RP was switched off insertion at low β* beam heating LHC vacuum RP optimizationrates 4/9/2013 43

Summary main observations Temperature increase in RP due to LHC beam LHC vacuum degradation in the region of RP147 m and RP220 m -> Optimization of ferrite -> Optimization of RP housing insertion at low β* beam heating LHC vacuum RP optimizationrates 4/9/2013 LHCC TOTEM 13.3.2013 CERN J. Baechler 44

RP optimization RP optimization ongoing highest priority Ferrite treatment during LS1 TOTEM RP OLD TOTEM RP prototype insertion at low β* beam heating LHC vacuum RP optimization- rates 4/9/2013 LHCC TOTEM 13.3.2013 CERN J. Baechler 45

Optimization of RF characteristics Rectangular (rotated-90 ) RP with ferrite -> ~ 300 W (first preliminary results B. Salvant, BE-ABP-ICE) Present RP housing Study of possible RF shielding for existing RP Study of new RP housing Ideal cylindrical RP (without gap cylinder/flange) no ferrite -> < 10 W Study is ongoing Not all issues are solved yet! insertion at low β* beam heating LHC vacuum RP optimizationrates 4/9/2013 LHCC TOTEM 13.3.2013 CERN J. Baechler 46

Computed power loss present RP box <-> RP cylindrical (B. Salvant) current TOTEM pot (with ferrites) upgraded TOTEM (with ferrites) insertion at low β* beam heating LHC vacuum RP optimizationrates 4/9/2013 LHCC TOTEM 13.3.2013 CERN J. Baechler 47

Comparison of rectangular and cylindrical RP insertion at low β* beam heating LHC vacuum RP optimizationrates 4/9/2013 LHCC TOTEM 13.3.2013 CERN J. Baechler 48

Integration study: cylindrical pot with integrated Cerenkov timing detector / Si detector insertion at low β* beam heating LHC vacuum RP optimizationrates 4/9/2013 LHCC TOTEM 13.3.2013 CERN J. Baechler 49

Rate & background measurement insertion at low β* beam heating LHC vacuum RP optimizationrates 4/9/2013 LHCC TOTEM 13.3.2013 CERN J. Baechler 50

Horizontal RP Rate at 14 σ 56-F 45-N 45-F Rate for 1368 b with beam separation separation lumi factor Rate for 1368 b without separation Rate for 1 b without separation Hits per bx w/o separation 2 MHz 1 MHz 3 MHz (incl. showers from N) 1 / 15.7 1 / 18.6 1 / 22.6 31 MHz 19 MHz 68 MHz (22.6* 3 MHz) 23 khz 14 khz 50 khz 2.0 1.2 4.4 (50 khz/11.2khz) Expected rates after LS1 are different (L, bunch scheme) Beam conditions (fill # 3288): 1.6 x 10 11 p/b E = 4 TeV β* = 0.6 m ε n = 2.8 µm rad µ = 31 (without separation) L = 6.7 x 10 33 Revolution frequency: 11.2 khz average crossing rate : 11.2 * 1368 = 15.3 MHz average interaction rate (without separation) : 15.3 * 31= 47.4 MHz expected SD rate per arm within acceptance: ~ 0.4 / bx (event rate / bunch crossing) insertion at low β* beam heating LHC vacuum RP optimizationrates 4/9/2013 LHCC TOTEM 13.3.2013 CERN J. Baechler 51

Roman Pot detector system study of combination: Si strip- Si pixel- timing (schematic) RP 200 m RP + 200 m CMS ip5 beam halo SHOWER pileup bunch crossing tracking 40 MHz-VFAT Si-strip detector PIXEL detector timing trigger CMS jet trigger & double arm coincidence trigger insertion at low β* 4/9/2013 LHCC TOTEM 13.3.2013 CERN J. Baechler beam heating LHC vacuum RP 52 optimization- rates

TOTEM standalone operation presented at 1 st LHC workshop on Collider Experiment Interface on 30.11.2012 (CERN) Water cooled cables TOTEM operation with RP +/- 220 m - and optionally in combination with +/-210 m after LS2 in special runs possible (covered by TOTEM consolidation insertion program) at low β* beam heating LHC vacuum RP optimizationrates 4/9/2013 LHCC TOTEM 13.3.2013 CERN J. Baechler 53

Proposal for upgrade 4/9/2013 LHCC TOTEM 13.3.2013 CERN J. Baechler 54

Conclusion (1) TOTEM has confirmed the complete dismounting of RP 147 m stations during LS1 (as early as possible) The removal of the RPs at +/- 147 m allows the installation of TCL4 The RPs of +/- 147 m will be reinstalled in the +/- 210 m region The re-use of service infrastructure (patch panel, cooling) was studied Installation of additional horizontal RPs in region of +/-220 m of ip5 during LS1 is proposed (CMS-TOTEM document submitted to CMS management) These new horizontal RP detectors will allow tracking & timing at low β* and high luminosity Integration studies were performed by TOTEM and CMS to integrate a Cherenkov timing detector in a (horizontal) RP Impedance studies for the horizontal RPs are ongoing Studies are ongoing to improve the RP geometry (RF, material budget) 4/9/2013 LHCC TOTEM 13.3.2013 CERN J. Baechler 55

Conclusion (2) Insertion tests (~2 mm) have shown, that the LHC is not affected by the RP The vacuum in the 147 m and 220 m region is very likely influenced by the ferrites Insertion of the RP lead to a temperature increase (measured on cooled e-cards) The installation of TCL6 is mandatory! The developments of Roman Pots as carriers for tracking and timing detectors with the potential to approach the LHC beam to very close distances are ongoing. (cylindrical RP for timing detector, possible RF shield around existing horizontal RPs) Installation of new RPs during LS1 is realistic The combination of the existing TOTEM RPs (alignment, trigger) with new RPs, equipped with tracking and timing detectors is under study The TOTEM-CMS upgrade program will combine challenging developments : timing detectors ~ 10 ps, TDC ~ 5 ps, low jitter clock distribution, 3D pixel, innovative cooling etc. 4/9/2013 LHCC TOTEM 13.3.2013 CERN J. Baechler 56

4/9/2013 LHCC TOTEM 13.3.2013 CERN J. Baechler 57

LHCC closed session TOTEM would ask the LHCC to endorse the following points: Relocation of 147 RPs (full package as is) upstream of RP220 (major physics impact for free by 8deg rotation) Services and infrastructure for installation of possible new RP stations (to host detector upgrades such as pixels, timing, under discussion also with CMS) Installation of TCL6 during LS1

Cost estimation Consolidation Upgrade Experiment RP-station RP-cylindrical housing RP-timing detector RP 3D Si detector Upgrade LHC Beam line modification TCL4 / TCL6 4/9/2013 LHCC TOTEM 13.3.2013 CERN J. Baechler 59

TDR 4/9/2013 LHCC TOTEM 13.3.2013 CERN J. Baechler 60

Physics Analysis Highlights 4/9/2013 LHCC TOTEM 13.3.2013 CERN J. Baechler 61

Common TOTEM-CMS data & analysis PRELIMINARY At least a charged particle in T2. P T > 40 MeV/c. 4/9/2013 LHCC TOTEM 13.3.2013 CERN J. Baechler 62

Soft single diffraction t-spectra at 7 TeV dσ/dt Ce Bt B = 10.1 GeV -2 p + T2 opposite arm, M SD 3.4 7 GeV dσ/dt Ce Bt 1.8 mb 3.3 mb B = 8.5 GeV -2 p + T1 opposite arm, M SD 7 350 GeV Uncertainty estimated on slope B 15 % dσ/dt Ce Bt 1.4 mb B = 6.8 GeV -2 p + T1 same arm, M SD 0.35 1.1 TeV 4/9/2013 LHCC TOTEM 13.3.2013 CERN J. Baechler 63

Study of Hadronic-Coulomb interference region at low-t (B*=1km) Started theoretical study of phase models and rho evaluation with different methods. 4/9/2013 LHCC TOTEM 13.3.2013 CERN J. Baechler 64