1 R&D activities at ITA for High Energy Physics F. Arteche
2 OUTLINE 1. Introduction Aragon Institute of Technology (ITA) 2. ITA Activities 2008 & 2009 for HEP 3.R&D project for SLHC: EMC immunity studies for CMS tracker upgrade Motivation Description Working Packages 4. Conclusions 2 de 13
3 1. Introduction The Instituto Tecnológico de Aragón is a nonprofit Technology Centre ITA main objective is: to promote competitiveness in the industrial sector to support the growth of business and technological sectors by means of the development, acquisition, adaptation, transfer and diffusion of innovative technologies in a multi-agent collaborative framework Technological centre founded in 1985 Facilities with more than m2 213 employees More than 180 qualified technicians > 1100 customers / year Equipments average investment > 1.7 Meuro Annual budget 12 M.euro Only 20 % public founding 3 de 13
4 1. Introduction R&D areas Materials Modelling behaviour, life prediction and materials failure. New materials with high functional performance. Welding technologies and surface treatment. New Design Technologies Analysis and simulation of components and systems EMC & Functional Safety Design and Simulation of Mechatronics Systems Logistics, Production and Intelligent Systems Integration of Production Systems Process Engineering and Logistics Intelligent Systems It collaborates actively with other Institutes and Universities National & European projects 4 de 13
5 1. Introduction EMC & Functional safety group R&D EMC complex facilities Simulation & non standard test EMC consulting & testing Equipment & installation Certified Laboratory: ENAC 6 persons + 3 (Tec. support) - (9) EMC Facilities Faraday cage One anechoic chamber (3m) One anechoic chamber (10 m) 10m (Inves. 1.0 M. - End 2010) Spectrum analyzers Current probes Conducted test (DC 400 MHz) Antennas (DC- 2.5 GHz) Surge & Burst & ESD generators Amplifiers (khz-ghz) 5 de 13
6 2. ITA activities 2008 & 2009 for HEP From Jan 2001-April 2007 I carried out EMC studies for CMS HCAL & HF & PS system of CMS: CERN Thesis (1st EMC study in HEP) Tracker & Pre-shower: Post Doc at Imperial College As member of ESSC CMS: Supervisor of EMC issues Reviewer & collaboration with LHCb & ATLAS ITA is collaborating with SLHC project since June 2008 Access to a full equipped EMC lab+ experienced personal HEP experiments & machine background. Our activities have been focused on: Weak points characterization of old FEE:Impact for Upgrades designs Evaluation of new powering schemes FEE characterization old TRACKER: Coupling Mechanisms Project proposal preparation in collaboration with IFCA Noise immunity of CMS Tracker upgrade 6 de 13
7 2. ITA activities 2008 & 2009 for HEP ITA has been a member of CMS tracker power task force Review status and plans for DC-DC conversion systems and Serial Powering systems: Advantages and Dis-Advantages of both systems Nov. 08 & Jan meetings at CERN Members: Peter Sharp (chair), Fernando Arteche, Guido Dirkes, Federico Faccio,Lutz Feld, Frank Hartmann, Roland Horisberger, Marvin Johnson, Katja Klein,Alessandro Marchioro, Beat Meier, Mark Raymond. ITA has been in charge of the study of the noise issues of new powering scheme : EMC emissions of DC-DC converters EMC Issues in DC-DC & serial powering schemes All these activities have been founded by ITA 7 de 13
8 2. ITA activities 2008 & 2009 for HEP Upgrade meetings 3 Contributions CMS tracker power working group January & September 2009 CMS/ATLAS upgrade working group (September 2009) EMC issues for CMS Tracker Upgrade EMC roadmap for CMS Tracker upgrade Conferences 3 Papers TWEEP 2008, September, Naxos (Greece) Detector noise susceptibility issues for the future generation of High Energy Physics Experiments. TWEEP 2009, September, Paris (France) Interference coupling mechanisms in Silicon Strip Detector FEE - CMS tracker wings : A learned lesson for SLHC. DC-DC switching converter based power distribution vs Serial power distribution:emc strategies for tracker upgrade 8 de 13
9 2. ITA activities 2008 & 2009 for HEP Collaborations SLAC EMC studies for experiments upgrades (SLHC) Proposal preparation (some common parts) Several papers IFCA R&D project for National research program: I+D en detectores y estudios fenomenológicos para el Colisionador Lineal Internacional (Ref. FPA ) R&D project for CMS upgrade EMC issues for Tracker Upgrade 1 paper Universidad de Santiago - IGFAE Very recent discussion Collaboration in EMC issues for Belle II 9 de 13
10 3. R&D project for SLHC : Motivation Tracker upgrade has decided to establish an EMC strategy to ensure the compatibility of electronics system CMS Tracker power task force has identified EM noise as one of main stoppers Experienced gained in the past have showed that EMC studies may improve the FEE immunity to noise and minimize the commissioning Fix design strategies Fix integration strategies EMC based design has to be part of the experiment with similar importance that the mechanic / thermal design They have to be analyzed and implemented together It requires many EMC studies The EMC studies are focused on the tracker detector at the system level To improve FEE immunity To minimize EM noise levels within the tracker volume To ensure the correct integration of SLHC tracker. 10 de 13
11 3. R&D project for SLHC: Description EMC immunity studies for CMS tracker upgrade IFCA & ITA Approved by CMS MB on 20th of November Long & detailed review process (Tracker & CMS upgrade MB ) Proposal sent 3 June Proposal was welcomed because covers a critical integration issue for the detector First R&D for SLHC focused on EMC issues First stage of the EMC strategy The main goal of the project is: To define preliminary rules to ensure the integration of main components (Detector, FEE, Power network and DC-DC ) To define design strategies that allow increasing the immunity of the Detector-FEE unit. It is divided in two parts: Noise coupling mechanisms New high immunity systems to EM noise 11 de 13
12 3. R&D project for SLHC: Working Packages WP 1: Power network impedance characterization The aim of WP1 is to define and characterize the impedances connected to the DC-DC power converters It defines the emission (conducted and radiated) levels emitted by the DCDC power converters compatible with the FEE immunity levels ITA will conduct this WP Close collaboration with DC-DC group at CERN and Aachen group. WP 2: Noise propagation effects in power network The aim of WP2 is to define the key points that allow designing the power network to minimize the effects of noise currents generated by DC-DC coveters. PCB or Twisted pair cables ITA & IFCA will conduct this WP Very close collaboration with FERMILAB- M.Johnson First prototype tested at ITA as reference institute 12 de 13
13 3. R&D project for SLHC: Working Packages WP 3: Noise immunity test in FEE prototypes The aim WP3 is to define the FEE immunity on prototypes: Impact of integration strategies in the overall design. Conducted & radiated test (ITA facilities). ITA & IFCA will conduct this WP Close collaboration with SLAC (ATLAS) WP 4: Validation of EM immune OFS for temperature, magnetic field and strain: Effect on overall EM noise The purpose of WP4 seeks out the implementation of OFS to substitutes previous measuring systems based on cooper cables and increase the immunity of tracker system. Different methods for attaching the fibres to carbon composites supports Architectures for sensor distribution network EMC factor measurement Noise emissions and immunity with conventional electrical technologies versus Optical Fiber Sensors. IFCA will conduct this WP 13 de 13
14 4. Conclusions ITA R&D activities for HEP experiments has been presented It is mainly focused on experiment upgrades It has been working during last 1.5 years ITA collaborates with several groups IFCA SLAC ITA & IFCA project proposal has been approved by CMS upgrade MB R&D project for CMS upgraded is focused on EMC issues First stage of long strategy to ensure the correct integration of Tracker upgrade It is possible to extend this work to other experiments Belle II (recent discussion with IGFAE) 14 de 13
for Communication Systems Protection EMI CD-ROM INCLUDED
Krešimir Malarić EMI Protection for Communication Systems CD-ROM INCLUDED Contents Preface xiii CHAPTER 1 Communications Systems 1 1.1 Components of Communications Systems 1 1.2 Transmitter Systems 2 1.2.1
PCB Radiation Mechanisms: Using Component-Level Measurements to
Radiation Directly from PCB Structures PCB Radiation Mechanisms: Using Component-Level Measurements to Determine System-Level Radiated Emissions Signal or component voltage appears between two good antenna
EMC Expert System for Architecture Design
EMC Expert System for Architecture Design EMC Expert System for Architecture Design Marcel van Doorn [email protected] Philips Electromagnetics Competence Center High Tech Campus 26, 5656 AE
IC-EMC Simulation of Electromagnetic Compatibility of Integrated Circuits
IC-EMC Simulation of Electromagnetic Compatibility of Integrated Circuits SUMMARY CONTENTS 1. CONTEXT 2. TECHNOLOGY TRENDS 3. MOTIVATION 4. WHAT IS IC-EMC 5. SUPPORTED STANDARD 6. EXAMPLES CONTEXT - WHY
EMC-conform development of a Tablet-PC
EMC-conform development of a Tablet-PC January 21, 2014 Johannes Biner Electrosuisse Montena EMC Bernstrasste 93 CH - 3006 Bern Tel. +41 79 256 21 55 [email protected] www.montenaemc.ch Programm
Rated Power(W) 8W 2. EG-LED0840-01 8W 3. EG-LED1027-01 10W
14713221 001 Seite 2 von 37 Page 2 of 37 Model List: No Model Rated Voltage(V) 1. EG-LED0827-01 Rated Power(W) 8W 2. EG-LED0840-01 8W 3. EG-LED1027-01 10W 4. EG-LED1040-01 AC 100-240V, 10W 5. EG-LED1027-02
47000 SERIES - ELECTRONIC TRANSFORMERS
7000 SERIES - ELECTRONIC TRANSFORMERS MYRRA encapsulated electronic transformers are Switched Mode Power Supplies based on Flyback topology. They constitute an interesting alternative to the traditional
Grounding Demystified
Grounding Demystified 3-1 Importance Of Grounding Techniques 45 40 35 30 25 20 15 10 5 0 Grounding 42% Case 22% Cable 18% Percent Used Filter 12% PCB 6% Grounding 42% Case Shield 22% Cable Shielding 18%
Automotive EMI System
Automotive EMI System Page 1 Model Types Body Variants Car Geometry Board Net, Wire Path, ECU Configuration, Antenna Configurations... Parameters Affecting EMC Car Supply Net Voltage Regulator Signals
Espotel Test Laboratory Services. November 20, 2014
Espotel Test Laboratory Services November 20, 2014 Espotel Laboratory Services EMC, ESD, RF testing EMC chamber for radiated emissions and immunity testing Radiated interoperability for LTE, GSM/3G, WLAN
ELECTRICAL ENGINEERING
EE ELECTRICAL ENGINEERING See beginning of Section H for abbreviations, course numbers and coding. The * denotes labs which are held on alternate weeks. A minimum grade of C is required for all prerequisite
Simulation électromagnétique 3D et câblage, exemples dans l'automobile et aéronautique :
Simulation électromagnétique 3D et câblage, exemples dans l'automobile et aéronautique : CST, Christophe Morin 1 www.cst.com Agenda - Présentation CST - Simulation câblage dans modèle 3D - Exemples automobile
EMC Basics. Speaker : Alain Lafuente. [email protected]
EMC Basics Speaker : lain Lafuente [email protected] WHT IS EMC? 2 CE Marking With the formation of the single European market, standardization was required to remove technical barriers to trade.
Fibre Optic Solutions for your Test and Instrumentation needs
Fibre Optic Solutions for your Test and Instrumentation needs Aerospace Test EMC/EMP Military Industrial Control High Energy Physics Automotive Test Custom www.point2point.co.uk Fibre Optic Solutions for
Pre-Compliance Test Method for Radiated Emissions of Automotive Components Using Scattering Parameter Transfer Functions
PreCompliance Test Method for Radiated Emissions of Automotive Components Using Scattering Parameter Transfer Functions D. Schneider 1*, S. Tenbohlen 1, W. Köhler 1 1 Institute of Power Transmission and
Measurement of RF Emissions from a Final Coat Electronics Corrosion Module
Engineering Test Report No. 37802-02 Rev. A Measurement of RF Emissions from a Final Coat Electronics Corrosion Module For : Canadian Auto Preservation, Inc. 390 Bradwick Drive Concord, Ontario CANADA
EN 301 489-17 v1.2.1 TEST REPORT FOR. 802.11ag/Draft 802.11n WLAN PCI-E Mini Card MODEL NUMBER: BCM94322MC REPORT NUMBER: 07U11529-5
EN 301 489-17 v1.2.1 TEST REPORT FOR 802.11ag/Draft 802.11n WLAN PCI-E Mini Card MODEL NUMBER: BCM94322MC REPORT NUMBER: 07U11529-5 ISSUE DATE: JANUARY 29, 2008 Prepared for BROADCOM CORPORATION 190 MATHILDA
Electromagnetic Compatibility Test Report Test results of Floww equipment
Electromagnetic Compatibility Test Report Test results of Floww equipment Reference number Status test report Brand Model number : 10C00357RPT01.doc : Final : Floww : mobilefloww screenfloww pocketfloww
Panashield, Inc. Facility Solutions For Global Electromagnetic Compatibility
Panashield, Inc. Facility Solutions For Global Electromagnetic Compatibility Absorber Technologies and Its Impact on Anechoic / Semi Anechoic Chambers Peggy Girard November 2012 Discussion Points Brief
CMS Tracker module / hybrid tests and DAQ development for the HL-LHC
CMS Tracker module / hybrid tests and DAQ development for the HL-LHC S. Mersi, G. Auzinger [email protected] 1 Outline Reminder: the Ph2 CMS Tracker upgrade pt Modules: principle, elements, electronics
On One Approach to Scientific CAD/CAE Software Developing Process
ISSN (Online): 1694-0784 ISSN (Print): 1694-0814 9 On One Approach to Scientific CAD/CAE Software Developing Process George Sergia 1, Alexander Demurov 2, George Petrosyan 3, Roman Jobava 4 1 Exact and
Optical Link ASICs for LHC Upgrades
Optical Link ASICs for LHC Upgrades K.K. Gan, H.P. Kagan, R.D. Kass, J. Moore, S. Smith The Ohio State University July 30, 2009 K.K. Gan DPF2009 1 Outline Introduction VCSEL driver chip PIN receiver/decoder
EMC research at the University of Twente
EMC research at the University of Twente Prof.dr.ir. Frank Leferink Chair EMC http://www.utwente.nl/ewi/te/ 1 EMC@THALES Studies: Interference via power supply onboard naval vessels Shielding of composite
EMC Standards: Standards of good EMC engineering
Electromagnetic Compatibility (EMC) IEEE Definition Origin, control, and measurement of electromagnetic effects on electronic and biologic systems. IEEE EMC Society Areas of Interest EMC Standards: Standards
EMC / EMI issues for DSM: new challenges
EMC / EMI issues for DSM: new challenges A. Boyer, S. Ben Dhia, A. C. Ndoye INSA Toulouse Université de Toulouse / LATTIS, France www.ic-emc.org Long Term Reliability in DSM, 3rd October, 2008 www.ic-emc.org
A Gigabit Transceiver for Data Transmission in Future HEP Experiments and An overview of optoelectronics in HEP
A Gigabit Transceiver for Data Transmission in Future HEP Experiments and An overview of optoelectronics in HEP Ken Wyllie, CERN 1 Outline Optoelectronics What? Why? How? Experience in HEP (LHC) & future
Meeting TeTech. Version: 1.8, 15-July-2013, Author: Wim Telkamp, language: English
Meeting TeTech, English version TeTech M.H. Trompstraat 6 3601 HT Maarssen The Netherlands Tel: + 31 (0) 346 284004 Fax: + 31 (0) 346 283691 Email: [email protected] Web: www.tetech.nl CoC: 30169033 VAT:
Electromagnetic Compatibility Considerations for Switching Power Supplies
Electromagnetic Compatibility Considerations Characterization of the EMI problem requires understanding the interference source Switching power supplies generate Electromagnetic Interference (EMI) by virtue
LAB 1 TECHNICAL DOC 3 IN ONE LAB DEVICE. Velleman Legen Heirweg 33 9890 Gavere Belgium
LAB 1 TECHNICAL DOC 3 IN ONE LAB DEVICE Velleman Legen Heirweg 33 9890 Gavere Belgium SPECIFICATIONS DIGITAL MULTIMETER 3 1/2 backlit LCD Automatic polarity indication DC voltage 200mV to 600V in 5 steps
Test Report #: 1981-3 Date: April 8, 2005
Test Report #: 1981-3 Date: April 8, 2005 CERTIFICATE #2316.01 Issued To: Bill Burks American Power Conversion 85 Rangeway Road North Billerica, MA 01862 USA 978-670-2440 Product Name/Description Model
Standard: EN 61000-4-2 :1995, EN 61000-4-3 :1996, ENV 50204 :1993, & EN 61000-4-4 :1995 Solid State Energy Meter
Standard: EN 61000-4-2 :1995, EN 61000-4-3 :1996, ENV 50204 :1993, & EN 61000-4-4 :1995 Model: Solid State Energy Meter Prepared for: Analog Devices, Inc. 804 Woburn Street Wilmington, MA 01887 Date of
R-78xx-0.5 INNOLINE. Features. 0.5 AMP SIP3 Single Output. Derating-Graph (Ambient Temperature) DC/DC-Converter
Features Description Efficiency up to 97%,Non isolated, no need for heatsinks Pin-out compatible with LM78XX Linears Very low profile( L*W*H=11.5*7.5*10.2 ) Wide input range.(4.75v ~ 32V) Short circuit
Workbench EMC Measurements by Henry W. Ott Henry Ott Consultants www.hottconsultants.com
Workbench EMC Measurements by Henry W. Ott Henry Ott Consultants www.hottconsultants.com Workbench EMC measurements are simple, inexpensive precompliance tests that a product designer can perform early
Projects and R&D activities
Projects and R&D activities J.M. Jimenez On behalf of the Vacuum, Surface and Coatings Group (VSC) Vacuum, Surface and Coatings group* Mandate Design, construction, operation, maintenance and upgrade of
Case Study Competition 2013. Be an engineer of the future! Innovating cars using the latest instrumentation!
Case Study Competition 2013 Be an engineer of the future! Innovating cars using the latest instrumentation! The scenario You are engineers working on a project team that is tasked with the development
USER MANUAL. Kramer Electronics, Ltd. Models:
Kramer Electronics, Ltd. USER MANUAL Models: VP-200N, 1:2 High Resolution XGA DA VP-300N, 1:3 High Resolution XGA DA VP-400N, 1:4 High Resolution XGA DA Contents Contents 1 Introduction 1 2 Getting Started
Uncertainty evaluations in EMC measurements
Uncertainty evaluations in EMC measurements Carlo Carobbi Dipartimento di Elettronica e Telecomunicazioni Università degli Studi di Firenze Politecnico di Milano - 20 Feb. 2009 1 Non - reproducibility
The main purpose of the study was to answer the three following questions:
MEETING DATE: March 19, 2003 SUBJECT: Cellular Phones In The Subway RECOMMENDATION It is recommended that: 1. the Commission authorize staff to issue a Request for Expression of Interest (REOI) to determine
TEST REPORT Rapporto di prova EMC N 060406. Test facility site: via L. da Vinci, 92, Caravaggio (BG), Italy Sede laboratorio
TEST REPORT Rapporto di prova EMC N 060406 EUT: Organic Carbon Analyzer Analiuzzatore Carbonio Organico Model: TOCMETER Serial N : TM602 Client: TRE-ESSE s.r.l. Cliente Piazzale Europa 8 16036 Recco (GE),
Silvertel. Ag5200. 1 Features. 2 Description. Power-over-Ethernet Plus Module. IEEE802.3at and IEEE802.3af compliant. Maximum 30W output power
Silvertel V1.1 November 2012 Datasheet Pb 1 Features IEEE802.3at and IEEE802.3af compliant Maximum 30W output power Dual In-Line (DIL) package size 50.6mm (L) x 30mm (W) Overload, short-circuit and thermal
Forum R.F.& Wireless, Milano il 14 Febbraio 2008 Dr. Emmanuel Leroux Technical Sales Manager for Italy [email protected] 0039 340 3768950
Simulazione 3D elettromagnetica Time e Frequency domain Forum R.F.& Wireless, Milano il 14 Febbraio 2008 Dr. Emmanuel Leroux Technical Sales Manager for Italy [email protected] 0039 340 3768950 1
FIBRE TO THE BTS IMPROVING NETWORK FLEXIBILITY & ENERGY EFFICIENCY
FIBRE TO THE BTS IMPROVING NETWORK FLEXIBILITY & ENERGY EFFICIENCY (Study Paper by FLA Division) Ram Krishna Dy. Director General (FLA) TEC New Delhi, DoT, Govt. of India. E-mail: [email protected] Mrs.
Radiated Emission and Susceptibility
Radiated Emission and Susceptibility Tzong-Lin Wu, Ph.D. EMC Lab Department of Electrical Engineering National Taiwan University Differential-Mode v.s. Common-mode Currents 1 Differential-Mode v.s. Common-mode
Power Rating Simulation of the new QNS connector generation
Power Rating Simulation of the new QNS connector generation IMS Connector Systems is an international, technology driven company specialized in development and production of high frequency connections.
EMC research at the University of Twente. Prof.dr.ir. Frank Leferink Chair EMC http://www.utwente.nl/ewi/te/
EMC research at the University of Twente Prof.dr.ir. Frank Leferink Chair EMC http://www.utwente.nl/ewi/te/ 1 First: EMC@THALES Studies: Interference via power supply onboard naval vessels Shielding of
AN003. Evaluation of Anechoic Chambers For EMC Measurements Using A CNE. Overview. CNE III 9kHz to 2GHz Conducted and radiated output
Evaluation of Anechoic Chambers For EMC Measurements Using A CNE Overview Anechoic chambers are used for EMC testing primarily for radiated emissions (RE) and radiated immunity (RI) in the frequency range
Evaluating Cell Phone and Personal Communications Equipment and their EMC Effects on Automotive Audio and In-Cabin Modules
Evaluating Cell Phone and Personal Communications Equipment and their EMC Effects on Automotive Audio and In-Cabin Modules Craig W. Fanning Elite Electronic Engineering, Inc. 1516 Centre Circle Downers
Data Sheet. HFBR-0600Z Series SERCOS Fiber Optic Transmitters and Receivers
HFBR-0600Z Series SERCOS Fiber Optic Transmitters and Receivers Data Sheet SERCOS SERCOS is a SErial Realtime COmmunication System, a standard digital interface for communication between controls and drives
White paper. Shielded or unshielded network cables A matter of choice, electromagnetic environment and compatibility
White paper Shielded or unshielded network cables A matter of choice, electromagnetic environment and compatibility Table of contents 1. Introduction 3 2. Shielded versus unshielded network cables 3 3.
TEST REPORT EN 55014-2 (1997) +A1 (2001)
Page 1 of 23 TEST REPORT EN 55014-2 (1997) +A1 (2001) Electromagnetic compatibility - Requirements for household appliances, electric tools and similar apparatus Part 2: Immunity Report Reference No....
A NEAR FIELD INJECTION MODEL FOR SUSCEPTIBILITY PREDICTION IN INTEGRATED CIRCUITS
ICONIC 2007 St. Louis, MO, USA June 27-29, 2007 A NEAR FIELD INJECTION MODEL FOR SUSCEPTIBILITY PREDICTION IN INTEGRATED CIRCUITS Ali Alaeldine 12, Alexandre Boyer 3, Richard Perdriau 1, Sonia Ben Dhia
AN-2 TEN KEY CONSIDERATIONS BEFORE YOU START YOUR DAA OR FXO PHONE LINE INTERFACE DESIGN
AN-2 TEN KEY CONSIDERATIONS BEFORE YOU START YOUR DAA OR FXO PHONE LINE INTERFACE DESIGN By Joe Randolph Introduction The conventional 2-wire analog phone line that telephone companies provide to residential
My first Hirschmann: The SPIDER family of switches.
My first Hirschmann: The SPIDER family of switches. Large selection of entry level switches Compact design Simple rail installation Industry standard 24 V supply voltage Plug & Play gets you up and running
ELECTROMAGNETIC COMPATIBILITY TEST. Report reference N R-255 EMC 2010
ELECTROMAGNETIC COMPATIBILITY TEST Report reference N R-255 EMC 2010 Constructor. Address Reference person. C LUCE S.r.l. Via Marmolada 5/11 20060 Truccazzano (MI) Italy ---- Product....... Model......
RFID Design Principles
RFID Design Principles Harvey Lehpamer ARTECH HOUSE BOSTON LONDON artechhouse.com Contents Introduction 2 2.1 2.1.1 2.1.2 2.1. 2.1.4 2.2 2.2.1 2.2.2 2. 2..1 2..2 2.4 2.4.1 2.4.2 2.5 2.5.1 2.5.2 Comparison
PLAS: Analog memory ASIC Conceptual design & development status
PLAS: Analog memory ASIC Conceptual design & development status Ramón J. Aliaga Instituto de Física Corpuscular (IFIC) Consejo Superior de Investigaciones Científicas (CSIC) Universidad de Valencia Vicente
30 In Compliance October 2014 www.incompliancemag.com
30 In Compliance October 2014 www.incompliancemag.com Medical Devices in a Wireless World BY IVAYLO TANKOV While wireless technology is now an integral component of a wide variety of manufactured products,
WIRELESS SENSORS IN THERMAL PROTECTION SYSTEMS
WIRELESS SENSORS IN THERMAL PROTECTION SYSTEMS Greg Swanson (1), Tye Reid (2), Daren Berk (3), James Wagoner (4), David Atkinson (5) (1) University of Idaho, 1000 Park Ln. Eagle, ID 83616 U.S.A., E-mail:
Time to upgrade your current sensing technology!
Your Imagination. Our Innovation. Time to upgrade your current sensing technology! Second Edition Avago Technologies Optocoupler Current and Voltage Sensing Leading edge current sensing solutions for industrial
40 Years of experience in EMC testing
40 Years of experience in EMC testing Your reference laboratory for tests of generation, propagation and reception of electromagnetic energy in civil, military and industrial applications. CESI has been
LVDS Technology Solves Typical EMI Problems Associated with Cell Phone Cameras and Displays
AN-5059 Fairchild Semiconductor Application Note May 2005 Revised May 2005 LVDS Technology Solves Typical EMI Problems Associated with Cell Phone Cameras and Displays Differential technologies such as
Large Hadron Collider am CERN
The CMS Silicon Tracker Lutz Feld 1. Physikalisches Institut, RWTH Aachen GSI Darmstadt, 18. 4. 2007 Large Hadron Collider am CERN proton proton quarks & gluons circumference 27 km 1200 superconducting
Clamp Filters that Suppress Emission Noise Provide Immunity Against Surge Noise
TDK EMC Technology Product Section Clamp Filters that Suppress Emission Noise Provide Immunity Against Surge Noise TDK Shonai Corporation Satoru Saito Reduce Emission Noise from Cables Even if an electronic
Data Communications Competence Center
Importance of Cable Balance For Improving Noise Susceptibility Data Communications Competence Center DCCC03101702 July 11, 2007 Summary In a study of category 5e and category 6 UTP cables, a strong correlation
Verizon NEBS TM Compliance: Data Center Equipment NEBS Requirements Verizon Technical Purchasing Requirements VZ.TPR.9703 Issue 2, March 2012
Verizon NEBS TM Compliance: Data Center Equipment NEBS Requirements Verizon Technical Purchasing Requirements VZ.TPR.9703 Issue 2, March 2012 CHANGE CONTROL RECORD: Version Date Action* Reason for Revision
USER MANUAL. Kramer Electronics, Ltd. Models:
Kramer Electronics, Ltd. USER MANUAL Models: VP-200N, 1:2 High Resolution XGA DA VP-300N, 1:3 High Resolution XGA DA VP-400N, 1:4 High Resolution XGA DA Contents Contents 1 Introduction 1 2 Getting Started
TECHNOLOGY RESEARCH AND DEVELOPMENT More Than Alarm Anna Kołodziej-Saramak
TECHNOLOGY RESEARCH AND DEVELOPMENT More Than Alarm Anna Kołodziej-Saramak The purpose of the voice alarm systems (VAS) is to inform people about hazards in a possibly efficient way (which, unfortunately,
Forum R.F.& Wireless, Roma il 21 Ottobre 2008 Dr. Emmanuel Leroux Country Manager for Italy [email protected] 340 3768950
Simulazione 3D elettromagnetica Time e Frequency domain Forum R.F.& Wireless, Roma il 21 Ottobre 2008 Dr. Emmanuel Leroux Country Manager for Italy [email protected] 340 3768950 1 Agenda CST company
THE NARTE EMC ENGINEER CERTIFICATION PROCESS - A PERSONAL EXPERIENCE
THE NARTE EMC ENGINEER CERTIFICATION PROCESS - A PERSONAL EXPERIENCE Sandy Mazzola, NCE, EMC-002506 002506-NE BAE Systems Inc. NARTE NARTE is a worldwide, non-profit, professional telecommunications association
Reducing Electromagnetic Interference (EMI) With Low Voltage Differential Signaling (LVDS)
Application Report SLLA030C September 2000 Revised June 2002 Reducing Electromagnetic Interference (EMI) With Low Voltage Differential Signaling (LVDS) Elliott Cole High-Performance Analog ABSTRACT This
COURSE TITLE Antennas and Electromagnetic Compatibility (ACEM) 1.1. Course area
COURSE TITLE Antennas and Electromagnetic Compatibility (ACEM) 1.1. Course area Transmission Systems 1.2. Year 4º 1.3. Semester 2º 1.4. Faculty data Please add @uam.es to e-mail address below. Coordinator:
Rack mounted telephone- and leased line modem for industrial applications
Rack mounted telephone- and leased line modem for industrial applications TR-6 Rack modem for industrial PSTNand /-wire leased line applications The TR-6 is an analogue V. 9 -rack PSTN modem as well as
Track Trigger and Modules For the HLT
CMS L1 Track Trigger for SLHC Anders Ryd for the CMS Track Trigger Task Force Vertex 2009 Sept. 13-18, 2009 L=1035 cm-2s-1 Outline: SLHC trigger challenge Tracking triggers Track trigger modules Simulation
IEEE Electromagnetic Compatibility Standards (Active & Archive) Collection: VuSpec
IEEE Electromagnetic Compatibility Standards (Active & Archive) Collection: VuSpec This value-packed VuSpec CD-ROM represents the most complete resource available for professional engineers looking for
Silvertel. Ag9800M. 1. Features. 2. Description. Miniature PoE Module. Small SMT package. IEEE802.3af compliant. Low cost
Silvertel V1.2 December 2014 Datasheet Ag9800M Miniature PoE Module Pb 1. Features Small SMT package IEEE802.3af compliant Low cost Input voltage range 36V to 57V Minimal external components required Short-circuit
Application Note Noise Frequently Asked Questions
: What is? is a random signal inherent in all physical components. It directly limits the detection and processing of all information. The common form of noise is white Gaussian due to the many random
For emission and immunity testing according to IEC 61000-4-20
EMC GTEM 500 Gtem Cell For emission and immunity testing according to IEC 61000-4-20 Theory of operation GTEM-cells (Giga-hertz Transversal Electro-Magnetic cells) are waveguide structures intended for
EADS-UC3M JOINT CENTER FOR AEROSPACE AND SECURITY SYSTEMS. Image: UC3M photographic files
EADS-UC3M JOINT CENTER FOR AEROSPACE AND SECURITY SYSTEMS Image: UC3M photographic files 2 The Joint Center for Aerospace Systems Integration is a common platform encompassing university, industry and
ATLAS Tile Calorimeter Readout Electronics Upgrade Program for the High Luminosity LHC
ATLAS Tile Calorimeter Readout Electronics Upgrade Program for the High Luminosity LHC Augusto Santiago Cerqueira On behalf of the ATLAS Tile Calorimeter Group Federal University of Juiz de Fora, Brazil
Waveguide Access Point WGA631. Product Guide
Waveguide Access Point Product Guide Waveguide Access Point Contents 1. Description............................ 3 2. Application............................ 3 3. Technical data... 4 4. Physical interfaces......................
AC coupled pitch adapters for silicon strip detectors
AC coupled pitch adapters for silicon strip detectors J. Härkönen1), E. Tuovinen1), P. Luukka1), T. Mäenpää1), E. Tuovinen1), E. Tuominen1), Y. Gotra2), L. Spiegel2) Helsinki Institute of Physics, Finland
EMC Countermeasures for In-Vehicle Communication Networks
TDK EMC Technology Practice Section EMC Countermeasures for In-Vehicle Communication Networks TDK Corporation Magnetics Business Group Toshio Tomonari 1 Introduction In recent years, Electronic Control
MSAN-001 X-Band Microwave Motion Sensor Module Application Note
1. Introduction HB Series of microwave motion sensor module are X-Band Mono-static DRO Doppler transceiver front-end module. These modules are designed for movement detection, like intruder alarms, occupancy
AND8229/D. An Introduction to Transient Voltage Suppression Devices APPLICATION NOTE
An Introduction to Transient Voltage Suppression Devices Prepared by: Jim Lepkowski ON Semiconductor APPLICATION NOTE INTRODUCTION Transient Voltage Suppression (TVS) protection devices such as shielded
AMPLIFIED HIGH SPEED FIBER PHOTODETECTOR USER S GUIDE
AMPLIFIED HIGH SPEED FIBER PHOTODETECTOR USER S GUIDE Thank you for purchasing your Amplified High Speed Fiber Photodetector. This user s guide will help answer any questions you may have regarding the
Nexus Technology Review -- Exhibit A
Nexus Technology Review -- Exhibit A Background A. Types of DSL Lines DSL comes in many flavors: ADSL, ADSL2, ADSL2+, VDSL and VDSL2. Each DSL variant respectively operates up a higher frequency level.
How to Self-Certify For the CE Mark A Quick Start Guide by Dennis King - EMI Test Lab
How to Self-Certify For the CE Mark A Quick Start Guide by Dennis King - EMI Test Lab For questions and details contact Dennis at [email protected] Introduction The CE mark (an acronym for the French
Kramer Electronics, Ltd. USER MANUAL. Rack Adapter Models: RK-1T2PT RK-2T1PT RK-3T RK-6T RK-9T RK-3TR RK-4PT RK-T2B RK-T2SB
Kramer Electronics, Ltd. USER MANUAL Rack Adapter Models: RK-1T2PT RK-2T1PT RK-3T RK-6T RK-9T RK-3TR RK-4PT RK-T2B RK-T2SB Contents Contents 1 Introduction 1 2 Getting Started 1 3 Overview 2 4 Your Kramer
Radiated emission measurement of a cell phone processor module using TEM cell
, pp.48-53 http://dx.doi.org/10.14257/astl.2013.28.09 Radiated emission measurement of a cell phone processor module using TEM cell Fayu Wan 1,2*, Qi Liu 3, Jian Shen 3, Jin Wang 3 and Nigel Linge 4 1
SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005
SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005 YANFENG AUTOMOTIVE TRIM SYSTEMS CO. LTD. China Technical Center No. 1001 North Qinzhou Rd. Shanghai, China 200233 Shao Xiong (Test Center Manager/Local Authorized
EMC & Wireless Certification
EMC & Wireless Certification Since 1872, TÜV Rheinland has been a world leader in compliance testing, guaranteeing customer satisfaction with its technical expertise and efficient delivery process. Since
EMC Safety switches January 2008
ABB AB, 2CMC341013N0004 5/29/2009 EMC Safety switches January 2008 Problems with disturbances? Company name - 2 - What is EMC? EMC = Electromagnetic compatibility EMC means interaction without unwanted
White Paper Product Quality Fujitsu ESPRIMO PCs, Fujitsu CELSIUS workstations, Fujitsu FUTRO thin clients
White Paper Product Quality Fujitsu ESPRIMO PCs, Fujitsu CELSIUS workstations, Fujitsu FUTRO thin clients Quality from beginning to end is the principle that guides Fujitsu from the design and planning
US NSF s Scientific Software Innovation Institutes
US NSF s Scientific Software Innovation Institutes S 2 I 2 awards invest in long-term projects which will realize sustained software infrastructure that is integral to doing transformative science. (Can
PoS(PhotoDet 2012)068
Characterization of the Hamamatsu R11265 multi-anode photomultiplier tube with single photon signals Luca CADAMURO, Marta CALVI, Andrea GIACHERO,, Matteo MAINO, Clara MATTEUZZI, Gianluigi PESSINA Dipartimento