Six work packages of three years duration are identified see table 1: 2 CEA, 1 FZJ, 2 KIT, and 1 HAS



Similar documents
Facilities Perspectives

Fusion Engineering and Design

Technical Summary. Contract for Procurement of Piping and Fittings (IO/14/CFT/9560/ACS CP/1)

Design Strategies for High Availability: Accommodating In-Vessel Piping Services and Auxiliary Systems

ITER Organization Future Call for Tenders

Project Management Guidebook

ILO Meeting #20 On-going and main forthcoming CFTs (F4E Business Intelligence-related activities) 20 th March 2013 Toulon/IBF2013

Problems and Measures Regarding Waste 1 Management and 3R Era of public health improvement Situation subsequent to the Meiji Restoration

Chapter 16 The Management of Project Management

HOW TO SET UP AN ACCOUNT AND POST A JOB OR INTERNSHIP ON SYMPLICITY Chaminade Career Services Manager

How to involve Dutch Industry in ITER & DEMO?

MONITORING PERFORMANCE IN WINDOWS 7

ILO Meeting #20 Specific Points raised by ILOs. 20 th March Toulon/IBF2013

F4E needs (facilities and expertise) for ITER construction

DIPLOMA OF PROJECT MANAGEMENT BSB (Classroom Delivery)

Project management. Organizing, planning and scheduling software projects

MINNESOTA STATE POLICY

DIPLOMA OF PROJECT MANAGEMENT BSB (Workplace Delivery)

Deciding the work to be Performed (Work Breakdown Structure)

Clinical Risk Management: Agile Development Implementation Guidance

Course Guide Project Management Package

URBACT III Programme Manual

Decommissioning of German Nuclear Research Facilities under the Governance of the Federal Ministry of Education and Research

Data Management Model. Potential Component of the Thames River Water Management Plan

Project management. Organizing, planning and scheduling software projects. Objectives. Chapter 3. Chapter 3 Project Management. Learning Objective

At the conclusion of this activity, the participant will be able to explain or describe:

Methodical Notes for part-time BMCF TM study course M_SM / PROJECT MANAGEMENT

VELLA (Contract Number: )

Symposium on Fusion Technology

HITT101 H-ITT Audience Response System 101

From the light to the full application form focus on work plan

The Project Management Life Cycle By Jason Westland (A book review by R. Max Wideman)

Project management & implementation activities

Application of software product quality international standards through software development life cycle

How To Become A Climate Corps Bay Area Program Partner

nuclear science and technology

Systems Analysis and Design in a Changing World, Fifth Edition

PROPS Manual for Project Managers

(Refer Slide Time: 01:52)

Solar Home System. User Manual. AEH-SHS01-10W2L Solar Home System 2 Lamps

Gold Solo Whistle Cable Kit

Monitoring Systems Networking Meeting Harmonised Implementation Tools

THE PROJECT MANAGEMENT KNOWLEDGE AREAS

Testing Robots Using the VEXnet Upgrade

Project Management (PMI Based)

HR Capacity Check. Overview of the Capacity Assessment Tool

DVB-T 730. User s Manual

Project Management for Everyone

Competency frameworks COMPUTING AND INTERNET CERTIFICATE (C2i)

User s Manual. BNC Mini-High Res, 75 Ohm Termination Kit Connector Installation Guide ( )

Scientific Cloud Computing Infrastructure for Europe. Bob Jones,

Datalogger Graph Software Help

ECE 297 Design and Communication. Course Syllabus, January 2015

Introductions: Dr. Stephen P. Schultz

The Sustainable Schools Project

Project management. Organising, planning and scheduling software projects. Ian Sommerville 2000 Software Engineering, 6th edition.

Organizational Change Management Standards. Table of Contents

Project Management for econnectivity

How To Understand The Business Analysis Lifecycle

Module 1 - Hardware Acquisition and Installation TABLE OF CONTENTS. Version 3.0

Members of the European Parliament, EC Commissioners, Ladies and Gentlemen,

Modernizing Your IT Systems While Preserving Your Investments & Managing Risk

TrueAlarm Fire Alarm Systems

When is Agile the Best Project Management Method? Lana Tylka

Nuclear Consultancy & Engineering Services

Security Design Patterns

Human Resources Strategy for Researchers. Action Plan

Adapted from slides by John Musser

PROXIMITY CARD READERS C-10, C-20, C60, C70

Processon. Southwestern Program Review TUTORING SERVICES

Aras Corporation Aras Corporation. All rights reserved. Notice of Rights. Notice of Liability

Radius Training. Communication Plans and Campaigns 5/26/2015

Software Engineering. Objectives. Designing, building and maintaining large software systems

SA Tool Kit release life cycle

Configuration Management Plan

Equality and Diversity in Service Planning and Performance Management

How To Write A Project Management Plan

CHAPTER 3: MANAGING IMPLEMENTATION PROJECTS

Polyvalent fuel treatment facility (TCP) : shearing and dissolution of used fuel at La Hague facility

Ústav fyziky plazmatu AV ČR, v.v.i., Praha (Institute of plasma physics AS CR, Prague)

POPP Hub Gateway. Manual

ECONOMIC GROWTH REGION 8 STRATEGIC SKILLS INITIATIVE HEALTHCARE SOLUTIONS. FACULTY SHORTAGE and CLINICAL SIMULATIONS LABORATORY. Request for Proposals

The perfect complement to the Wink app to control and monitor all your connected devices.

Organizing, planning and scheduling software projects

System Consulting. DB International Networking modes, optimizing logistics. For people. For markets. For tomorrow.

CALL FOR INNOVATION PROPOSALS

South East Europe (SEE) Implementation Manual

Project Management for Everyone

Frequently Asked Questions in Project Management

GUIDANCE FOR COMPLETION OF THE ENHANCED FINANCIAL REPORTING TEMPLATE

Introduction to OpenPPM

UNESCO Science Report 2015

PLANNING FOR YOUR PROJECT

S [Report No ] IN THE HOUSE OF REPRESENTATIVES. NOVEMBER 30, 2015 Referred to the Committee on Oversight and Government Reform

Project Management

Outline feasibility study for ORET application in the health care sector

Annual Report H I G H E R E D U C AT I O N C O M M I S S I O N - PA K I S TA N

Canvas Implementation STATUS REPORT FOR FEBRUARY, 2014 PROJECT MANAGEMENT TEAM

Annex 4: Technical and Financial Proposal Template

Comparison. streamlining the intersection of innovation strategy, new product development, and project management. Eric van der Meulen, President

Transcription:

EFDA ITER GOAL ORIENTED TRAINING PROGRAM PORT PLUG ENGINEERING Date: December 7th, 2009; CEA-Cadarache Summary of the meeting: Participants: CEA: Doceul Louis, Martins Jean-Pierre, Salasca Sophie, Keller Delphine FZJ: Neubauer Olaf, Voinchet Romaric FZK: Neuberger Heiko, Scherer Theo, Aiello Gaetano, Zeile Christian HAS: Bede Otto, Nemeth Joszef EFDA: Malaquias Artur 1) Aim of the meeting The aim of this second review meeting is to give the status of the GOT PPE program. To present the work performed within all work packages. To discuss about the events to be organized during the total duration of the task agreement. To give information concerning the required deliverables. 2) Status of the GOT PPE program The thematic of the PPE WP is in the field of Engineering Design and Construction, this training program is associated to the procurement of the ITER Port Plug including: design, structural analysis, neutronics, material requirement, nuclear requirement, safety, manufacturing aspect, assembly aspect, maintainability. The official starting date of the ITER GOT PPE is 1st september 2008 established for 4 years, the first year being devoted to the recruitment of the trainees and elaboration of the personal carrier development plan. Six work packages of three years duration are identified see table 1: 2 CEA, 1 FZJ, 2 KIT, and 1 HAS All the trainees have been recruited for each work package, the starting date of each work package being the official date of each euro-trainee recruitment. WP1 (CEA) Tutor: Sophie Salasca Trainee:Miguel Dapena WP2 (CEA) Tutor: Delphine Keller Trainee: Julien Wagrez WP3 (KIT) Tutor: Theo Scherer Trainee:Gaetano Aiello WP4 (KIT) Tutor: Heiko Neuberger Trainee: Christian Zeile WP5 (HAS) Tutor: Otto Bede Trainee: Jozsef Németh WP6 (FZJ) Tutor: Olaf Neubauer Trainee:RomaricVoinchet Nuclear Requirements in different phases from the engineering design to decommissioning (particular application on ITER diagnostic port plug equatorial 1) Maintainability associated to ITER Component Lifecycle (particular application on ITER diagnostic port plug equatorial 1) Materials, manufacturing and assembly of upper port plug structures (particular application on ITER ECRH upper port plug) Design, manufacturing and integration of ITER relevant structural components (particular application on ITER TBM equatorial port plug) Thermo mechanical Engineering of In-Vessel Components (particular application on ITER diagnostics) Feasibility of manufacturing in the design of ITER in-vessel components (particular application on ITER CXRS diagnostic port plug) 05/01/09 03/06/09 01/09/08 05/06/09 06/07/09 05/01/09 IRFM IRFM/SIPP/GIPM L. Doceul PEFC/CRR-2009.034 #00 15/12/09 2/6

2) Trainee s presentation The presentation of the work performed within each work package has been done (see compilation of slide PEFC/NTT-2009.035 in preparation) 3) Courses and events to be organized During this meeting, courses, events and conferences have been discussed see annex 1. Have been identified in this table: The events effectively done in 2009 (green color), The events postponed in, already done in association or canceled (yellow color) The events to be organized in. For each event an association is in charge of the organization. 4) Sharing within association and industry. During this meeting, sharing within association and industry have been discussed see annex 2 and 3. Number of trainee sharing within associations has been identified for. The entire trainee sharing with industry is postponed in. 5) Deliverable All contracts have already started and all the trainees have been recruited during the first year, the ITER GOT PPE training program will run from the 01 September of 2008 to the 07 july of 2012 First deliverable () Personal Career Development Plan (EFDA form to be filled). Completed in 2009 for each WP. By the beginning of a detailed report is due (by January ) which is a gathering of the individual reports from the associations and a summary report from the leading association mentioning the activities performed and the relation between the due deliverables and expenditures at date. A template will be sent later as EFDA is preparing one possible format at the moment. 6) Next meeting The next meeting should be organized probably end of February, it will be held at the level of the ITER-PPE training management board. in this meeting: The good accordance between the work effectively performed within the different WP and the initial scope of the contract. The sharing within the associations and more accurately the detail of each subject to be done by the shared trainees. IRFM IRFM/SIPP/GIPM L. Doceul PEFC/CRR-2009.034 #00 15/12/09 3/6

Annex 1 Course and events IRFM IRFM/SIPP/GIPM L. Doceul PEFC/CRR-2009.034 #00 15/12/09 4/6

Annex 2 Work Packages WP1/CEA WP2/CEA WP3/KIT WP4/KIT WP5/HAS WP6/FZJ WP1/CEA Neutronics with Heiko WP2/CEA 1 month RH ECRH WP3/KIT WP4/KIT WP5/HAS WP6/FZJ Diagnostics with Sophie Design 4 months Analyses EQPP Diag TBD by Sophie 2 months Design EQPP Diag TBD by Sophie Remote Handling with Delphine Assembly with Theo 1,5 months Analyses EQPP ECRH 1 month Design UPPP ECRH TBD by Theo 1 month RH TBM with Heiko 1,5 months Analyses UPPP TBM TBD by Heiko 1 month Design EQPP TBM TBD by Heiko Diag assembly Diag assembly TBD by Otto Analysis TBD by Otto Manufacturing 2 months Analyses UPPP CXRS IRFM IRFM/SIPP/GIPM L. Doceul PEFC/CRR-2009.034 #00 15/12/09 5/6

Annex 3 Work Packages AREVA TA AREVA NP Cybernetix / CNIM Mecachimie Koppern GmbH MAN DWE University Karlsruhe University Budapest WP1/CEA X WP2/CEA X X X WP3/FZK X X X WP4/FZK X WP5/HAS X WP6/FZJ X IRFM IRFM/SIPP/GIPM L. Doceul PEFC/CRR-2009.034 #00 15/12/09 6/6