Configuration Management Plan
|
|
|
- Britton Nelson
- 10 years ago
- Views:
Transcription
1 Project: Version: Prepared by: :
2 Approvals: Submitted By: Project Team Member Review Approvals By: Document Change Log Version Author Description ii
3 Table of Contents 1.0 Scope Configuration Management Resources Organization Responsibilities Facilities Tools Training Configuration Management Elements Configuration Management Planning Configuration Identification Configuration Items Software Builds Release Management Baseline Identification Configuration and Change Control Configuration Change Requests Change Control Authority Controlling Work Products Vendor Commercial-off-the-Shelf (COTS) Software Control Configuration Status Status Records Status Reports Configuration Management Measurements Software Baseline Audits 4 iii
4 1.0 Scope The scope of this project is: Describe whether this Configuration Management Plan is a project-level plan (addressing a specific project) or a group-level plan (addressing more than one project): Identify the system, program, or application to which this plan applies: 2.0 Configuration Management Resources 2.1 Organization Identify the person(s) responsible for implementing CM activities on this project, and explain their relationship with the group manager and the project team: 2.2 Responsibilities Identify roles and individual(s) by name and their CM responsibilities. Role and Name CM Responsibility Group Manager: Project Manager: CM Group: SQA Group: Developer(s): Other: 2.3 Facilities Describe the location (name and address) where all software development activities will take place and projectdeveloped work products will be stored: 2.4 Tools Describe the tools used to support software development and CM activities. Tool Name Version Purpose 2.5 Training Identify all training requirements needed by the software engineering group to implement project CM activities. Training Topic Person in Need of Training 1
5 3.0 Configuration Management Elements 3.1 Configuration Management Planning Configuration Management Plan Preparation procedure: 1. Assign responsibility for preparing the CM Plan 2. Gather data to be used and include in the CM Plan 3. Conduct a peer review of the CM Plan 4. Incorporate changes noted during the peer review 5. Present the updated version of the CM Plan to the peer review group 6. Approve CM Plan for implementation 7. Release the approved CM Plan Identify the software development lifecycle model to be used on this project: Lifecycle Phases, CM Activities, and Work Products: Lifecycle Phase CM Activity Work Product Inception Phase Elaboration Phase Construction Phase Transition Phase Production Phase 3.2 Configuration Identification Configuration Items Identify where all configuration items, including software baselines and work products, are stored in the table below. Configuration Management Library: Contents Responsible Person(s) Location Library Backup Procedure: Configuration Management Log procedure: Describe the DEV environment: Describe the TEST environment: Describe the QUAL environment: Describe the PROD environment: Software Builds Identify the code, files, compilers, development tools, and other components that are needed to create an official build: Release Management Describe the project software migration procedure: Describe how software items are released from the Development library to the Test library: Describe how software items are released from the Test library to the QUAL library: 2
6 Describe how software items are released from the QUAL library to the Production library: Baseline Identification Describe how baselines are established, managed, controlled, and stored: Software Baseline Library: Contents Responsible Person(s) Location Software Baseline Identification: Baseline Contents Requirements Baseline Design Baseline Product Baseline Other: 3.3 Configuration and Change Control Configuration Change Requests Describe how problems are reported and approved using a Change Request: Describe how change impact is assessed: Describe how enhancements are identified, reviewed, and approved: Describe how emergency production fixes are handled involving modules checked out: Describe how each change or problem is peer reviewed: Change Control Authority Change Control Authority Delegated By Responsibilities Primary: Alternate: Describe how unresolved issues are escalated to upper management: Controlling Work Products Describe the Checkout/Check-in procedure: Describe how project-related software baselines and work products are controlled: Describe how configuration items are versioned: Describe labeling, branching, and merging procedures: Vendor Commercial-off-the-Shelf (COTS) Software Control Describe how the CM group controls all vendor-provided and supported (COTS) software, how changes are evaluated for project impact, how the software is approved for use by the customer and project management, and the steps taken by the CM group to maintain a current record of the software: 3.4 Configuration Status Status Records Describe how the status of CM activities is created and maintained: 3
7 Identify each record needed to track CM activities: Status Reports CM Status Report Prepared For Due Configuration Management Measurements CM Measurement Prepared For Due 3.5 Software Baseline Audits Describe the software baseline audit process: Software Baseline Audit Schedule Audit Responsibility Requirements Baseline Design Baseline Product Baseline Other: 4
<Project Name> Configuration Management Plan
Version [Note: The following template is provided for use with the Rational Unified Process. Text enclosed in square brackets and displayed in blue italics (style=infoblue) is included
Theme 1 Software Processes. Software Configuration Management
Theme 1 Software Processes Software Configuration Management 1 Roadmap Software Configuration Management Software configuration management goals SCM Activities Configuration Management Plans Configuration
CONFIGURATION MANAGEMENT PLAN GUIDELINES
I-680 SMART CARPOOL LANE PROJECT SYSTEM ENGINEERING MANAGEMENT PLAN CONFIGURATION MANAGEMENT PLAN GUIDELINE SECTIONS: PLAN GUIDELINES 1. GENERAL 2. ROLES AND RESPONSIBILITIES 3. CONFIGURATION MANAGEMENT
Software Configuration Management
Software Engineering Courses (University of Kansas, Spring 2004) Slide 1 Software Configuration Management Software Configuration: All items that constitute the software while under the development (e.g.,
How To Integrate Software And Systems
September 25, 2014 EFFECTIVE METHODS FOR SOFTWARE AND SYSTEMS INTEGRATION P R E S E N T E D B Y: D R. B O Y D L. S U M M E R S 1 Software Engineer (Quality) Defense and Space The Boeing Company - Seattle,
Department of Administration Portfolio Management System 1.3 June 30, 2010
E 06/ 30/ 2010 EX AM PL 1. 3 06/ 28/ 2010 06/ 24/ 2010 06/ 23/ 2010 06/ 15/ 2010 06/ 18/ 2010 Portfolio System 1.3 June 30, 2010 Contents Section 1. Project Overview... 1 1.1 Project Description... 1 1.2
Your Software Quality is Our Business. INDEPENDENT VERIFICATION AND VALIDATION (IV&V) WHITE PAPER Prepared by Adnet, Inc.
INDEPENDENT VERIFICATION AND VALIDATION (IV&V) WHITE PAPER Prepared by Adnet, Inc. February 2013 1 Executive Summary Adnet is pleased to provide this white paper, describing our approach to performing
Configuration Management Plan (CMP) Template
Configuration Management Plan (CMP) Template T2401 Revision: B Effective Date: January 10, 2011 DOWNLOADED AND/OR HARD COPY UNCONTROLLED Verify that this is the correct version before use. APPROVAL SIGNATURES
Change Management Best Practices
General Change Management Best Practices Practice Area Best Practice Criteria Organization Change management policy, procedures, and standards are integrated with and communicated to IT and business management
Chapter 5. Choose the answer that mostly suits each of the sentences given:
Chapter 5 Software Configuration Management Choose the answer that mostly suits each of the sentences given: 1. No matter where you are in the system lifecycle, the system will change, and the desire to
<name of project> Software Project Management Plan
The document in this file is adapted from the IEEE standards for Software Project Management Plans, 1058-1998, which conforms to the requirements of ISO standard 12207 Software Life Cycle Processes. Tailor
General Platform Criterion Assessment Question
Purpose: [E]nsure that the assets required to deliver services are properly controlled, and that accurate and reliable information about those assets is available when and where it is needed. (ST 4.3.1)
Creating the Conceptual Design by Gathering and Analyzing Business and Technical Requirements
Creating the Conceptual Design by Gathering and Analyzing Business and Technical Requirements Analyze the impact of Active Directory on the existing technical environment. Analyze hardware and software
CHAPTER 7 Software Configuration Management
CHAPTER 7 Software Configuration Management ACRONYMS CCB CM FCA MTBF PCA SCCB SCI SCM SCMP SCR SCSA SEI/CMMI SQA SRS USNRC INTRODUCTION Configuration Control Board Configuration Management Functional Configuration
Administering Team Foundation Server 2013
Course Code: QATFS13 Vendor: Microsoft Course Overview Duration: 3 RRP: 2,039 Administering Team Foundation Server 2013 Overview This three-day, instructor-led course provides delegates with the knowledge
Project Start Up. Start-Up Check List. Why a Project Check List? What is a Project Check List? Initial Release 1.0 Date: January 1997
Why a Project Check List? A good way to ensure that all start-up tasks are completed prior to actually starting the project is to develop a start-up check list. The check list can be developed and then
D R A F T. Resource Ordering and Status System (ROSS) Software Configuration Management Guidelines
TO #GA81 Resource Ordering and Status System (ROSS) D R A F T Resource Ordering and Status System (ROSS) Software Configuration Management Guidelines June 28, 2000 Version 1.1 Contract: GS-35F-4863G Delivery
Table of Contents. Introduction. Audience. At Course Completion
Table of Contents Introduction Audience At Course Completion Prerequisites Microsoft Certified Professional Exams Student Materials Course Outline Introduction This three-day instructor-led course provides
Problems and Measures Regarding Waste 1 Management and 3R Era of public health improvement Situation subsequent to the Meiji Restoration
The purpose of Capacity and Availability Management (CAM) is to plan and monitor the effective provision of resources to support service requirements.
CAPACITY AND AVAILABILITY MANAGEMENT A Project Management Process Area at Maturity Level 3 Purpose The purpose of Capacity and Availability Management (CAM) is to plan and monitor the effective provision
5 FAH-5 H-520 LIFE CYCLE MANAGEMENT
5 FAH-5 H-520 LIFE CYCLE MANAGEMENT (CT:ITS-5; 02-05-2013) (Office of Origin: (IRM/BMP/SPO/PM) 5 FAH-5 H-521 CONFIGURATION MANAGEMENT REQUIREMENTS Configuration management (CM) is a function deployed throughout
STAR JPSS Algorithms Integration Team Configuration Management Plan Version 1.2
STAR JPSS Algorithms Integration Team Version 1.2 NOAA Center for Weather and Climate Prediction (NCWCP) NOAA/NESDIS/STAR 5830 University Research Ct College Park, MD 20740 Revisions Version Description
2.2 INFORMATION SERVICES Documentation of computer services, computer system management, and computer network management.
3 Audit Trail Files Data generated during the creation of a master file or database, used to validate a master file or database during a processing cycle. GS 14020 Retain for 3 backup cycles Computer Run
Service Asset & Configuration Management PinkVERIFY
-11-G-001 General Criteria Does the tool use ITIL 2011 Edition process terms and align to ITIL 2011 Edition workflows and process integrations? -11-G-002 Does the tool have security controls in place to
A. Title 44, United States Code, Chapter 35, Coordination of Federal Information Policy
I. Purpose Department of Homeland Security DHS Directives System Directive Number: 138-01 Revision Number: 00 Issue Date: 4/10/2014 ENTERPRISE INFORMATION TECHNOLOGY CONFIGURATION MANAGEMENT This Directive
5 FAH-5 H-510 CONFIGURATION MANAGEMENT
5 FAH-5 H-500 CONFIGURATION MANAGEMENT 5 FAH-5 H-510 PROJECT DEVELOPMENT AND CHANGE CONTROL (CT:ITS-4; 06-21-2012) (Office of Origin: IRM/BMP/GRP/GP) (Updated only to revise Office of Origin) 5 FAH-5 H-511
5 FAM 860 HARDWARE AND SOFTWARE MAINTENANCE
5 FAM 860 HARDWARE AND SOFTWARE MAINTENANCE (Office of Origin: IRM/BMP/GRP/SM) 5 FAM 861 CONFIGURATION MANAGEMENT 5 FAM 861.1 Overall Department Policy a. Configuration management (CM) is the detailed
ISO IEC 27002 2005 (17799 2005) INFORMATION SECURITY AUDIT TOOL
7.1 ESTABLISH RESPONSIBILITY FOR ASSETS 1 GOAL Do you protect your organization s assets? 2 GOAL Do you use controls to protect your assets? 3 GOAL Do you account for your organization s assets? 4 GOAL
SSM6437 DESIGNING A WINDOWS SERVER 2008 APPLICATIONS INFRASTRUCTURE
SSM6437 DESIGNING A WINDOWS SERVER 2008 APPLICATIONS INFRASTRUCTURE Duration 5 Days Course Outline Module 1: Designing IIS Web Farms The students will learn the process of designing IIS Web Farms with
Template K Implementation Requirements Instructions for RFP Response RFP #
Template K Implementation Requirements Instructions for RFP Response Table of Contents 1.0 Project Management Approach... 3 1.1 Program and Project Management... 3 1.2 Change Management Plan... 3 1.3 Relationship
Release & Deployment Management
1. Does the tool facilitate the management of the full lifecycle of Release and Deployment Management? For example, planning, building, testing, quality assurance, scheduling and deployment? Comments:
Server Virtualization with Windows Server Hyper-V and System Center
Course 20409B: Server Virtualization with Windows Server Hyper-V and System Center Course Details Course Outline Module 1: Evaluating the Environment for Virtualization This module provides an overview
GENERAL PLATFORM CRITERIA. General Platform Criterion Assessment Question
GENERAL PLATFORM CRITERIA SACM-V3-G-001 Comment: Does the tool use ITIL V3 process terms and align to ITIL V3 workflows and process integrations? SACM-V3-G-002 (OGC ISS 5.1.10) Access Controls Does the
Course Outline: 6433 _ Planning and Implementing Windows Server 2008 Clustering
Course Outline: 6433 _ Planning and Implementing Windows Server 2008 Clustering Learning Method: Instructor-led Classroom Learning Duration: 5.00 Day(s)/ 40 hrs Overview: This five day course is intended
Release and Deployment Management Software
( Bron: ITG, Integration Technologies Group; zie ook blz 13) (Service Transition) Release and Deployment Management Software 1. Does the tool facilitate the management of the full lifecycle of Release
Managing and Maintaining Windows Server 2008 Servers
Managing and Maintaining Windows Server 2008 Servers Course Number: 6430A Length: 5 Day(s) Certification Exam There are no exams associated with this course. Course Overview This five day instructor led
Practitioner Certificate Software Asset Management Syllabus. Version 2.0
Practitioner Certificate Software Asset Management Syllabus Version 2.0 June 2010 Practitioner Certificate in Software Asset Management The ISEB Practitioner Certificate in Software Asset Management (SAM)
Annex 9: Technical proposal template. Table of contents
UNFCCC/CCNUCC Page 1 Annex 9: Technical proposal template Table of contents Annex 9... 3 9.1 Technical proposal... 3 9.1.1 Vendor s name... 3 9.2 Engagement model... 3 9.2.1 Type of engagement... 3 9.2.2
Course Outline. Create and configure virtual hard disks. Create and configure virtual machines. Install and import virtual machines.
Server Virtualization with Windows Server Hyper-V and System Centre Duration 5 days Course Code SSM20409 Format Instructor Led Overview This five day course will provide you with the knowledge and skills
Project Management Guidelines
Project Management Guidelines 1. INTRODUCTION. This Appendix (Project Management Guidelines) sets forth the detailed Project Management Guidelines. 2. PROJECT MANAGEMENT PLAN POLICY AND GUIDELINES OVERVIEW.
Administering Microsoft SQL Server Databases
Course Code: M20462 Vendor: Microsoft Course Overview Duration: 5 RRP: 2,025 Administering Microsoft SQL Server Databases Overview This five-day instructor-led course provides delegates with the knowledge
NetSuite Essentials. Course Description. Key Objectives
NetSuite Essentials Key Objectives How do I: Configure NetSuite to meet business requirements? Determine user roles and permissions? Customize the user interface to align with business needs? Plan for
074-8432-552 Page 1 of 7 Effective Date: 12/18/03 Software Supplier Process Requirements
Page 1 of 7 Software Supplier Process Requirements 1.0 QUALITY SYSTEM FRAMEWORK 1.1 QUALITY POLICY The Seller shall document and implement a quality program in the form of Quality manual or detailed Quality
TEMPLATE. U.S. Department of Energy. Project Name. Configuration Management Plan. September 2002 U. S. DEPARTMENT OF ENERGY
U.S. Department of Energy Project Name Configuration Management Plan September 2002 TEMPLATE U. S. DEPARTMENT OF ENERGY Organizational Title 1 Organizational Title 2 Change Control Page The following information
Introductory Certificate. The APM Project Fundamentals Qualification
The syllabus provides a summary of the coverage of the qualification, the details are then found in the learning outcomes and assessment criteria. Both the syllabus and the learning outcomes and assessment
Configuration Management Practices
Safety Critical Software Management Practices Linda Westfall Westfall Team, Inc. International Conference on Software Quality ICSQ 2011 Copyright 1999-2010 Westfall Team, Inc. All Rights Reserved. Management
PSU Hyland OnBase Document Imaging and Workflow Services Level Memorandum of Understanding
PSU Hyland OnBase Document Imaging and Workflow Services Level Memorandum of Understanding Table of Contents -I. Summary -II. Service Description-Scope of OnBase Document Imaging and Workflow Service Integration
How To Write A Contract For Software Quality Assurance
U.S. Department of Energy Washington, D.C. NOTICE DOE N 203.1 Approved: Expires: 06-02-01 SUBJECT: SOFTWARE QUALITY ASSURANCE 1. OBJECTIVES. To define requirements and responsibilities for software quality
Designing and Deploying Messaging Solutions with Microsoft Exchange Server 2010
Course 10233A: Designing and Deploying Messaging Solutions with Microsoft Exchange Server 2010 OVERVIEW About this Course This five-day, instructor-led course provides you with the knowledge and skills
Server Virtualization with Windows Server Hyper-V and System Center
Server Virtualization with Windows Server Hyper-V and System Center About this Course This five day course will provide you with the knowledge and skills required to design and implement Microsoft Server
LEARNING SOLUTIONS website milner.com/learning email [email protected] phone 800 875 5042
Course 6433A: Planning and Implementing Windows Server 2008 Length: 5 Days Published: September 07, 2011 Language(s): English Audience(s): IT Professionals Overview About this Course Level: 300 Technology:
SEI Level 2, 3, 4, & 5 1 Work Breakdown Structure (WBS)
SEI Level 2, 3, 4, & 5 1 Work Breakdown Structure (WBS) 1.0 SEI Product 1.1 SEI Level 2 Product 1.1.1 SEI Level 2 Process 1.1.1.1 Requirements Management Process 1.1.1.2 Software Project Planning Process
ITIL A guide to service asset and configuration management
ITIL A guide to service asset and configuration management The goal of service asset and configuration management The goals of configuration management are to: Support many of the ITIL processes by providing
Server Virtualization with Windows Server Hyper-V and System Center
Course Code: M20409 Vendor: Microsoft Course Overview Duration: 5 RRP: 2,025 Server Virtualization with Windows Server Hyper-V and System Center Overview This five day course will provide you with the
The course covers Windows server 2008, Windows Server 2008 R2 and Windows Server 2008 R2 sp1.
Course 6433A: Planning and Implementing Windows Server 2008 OVERVIEW About this Course This five day course is intended for IT Professionals who are interested in the knowledge and skills necessary to
Information Technology General Controls (ITGCs) 101
Information Technology General Controls (ITGCs) 101 Presented by Sugako Amasaki (Principal Auditor) University of California, San Francisco December 3, 2015 Internal Audit Webinar Series Webinar Agenda
Master Data Management Decisions Made by the Data Governance Organization. A Whitepaper by First San Francisco Partners
Master Data Management Decisions Made by the Data Governance Organization A Whitepaper by First San Francisco Partners Master Data Management Decisions Made by the Data Governance Organization Master data
Deploying and Managing Microsoft System Center Virtual Machine Manager
Deploying and Managing Microsoft System Center Virtual Machine Manager Overview About this Course This three-day instructor-led course teaches students how to implement a Microsoft System Center Virtual
SOFTWARE CONFIGURATION MANAGEMENT DOCUMENTATION
SOFTWARE CONFIGURATION MANAGEMENT DOCUMENTATION STEVE J. AYER FRANK S. PATRINOSTRO Edited by JACK A. NELSON Technische Hochschule Darmstadt FACH8EREICH INFORMATIK BIBLIOTHEK Inventar-Nr.:, SachgetH9te:
Governance Model: Issue Escalation and Resolution Framework
Governance Model: Issue Escalation and Resolution Framework Project Team Approved: 0/02/2007 Issue Escalation and Resolution Framework Q & A What is an Issue? An issue is a point of system function, feature,
Independent Verification and Validation of SAPHIRE 8 Software Project Plan
INL/EXT-09-17022 Rev. 2 Independent Verification and Validation of SAPHIRE 8 Software Project Plan March 2010 The INL is a U.S. Department of Energy National Laboratory operated by Battelle Energy Alliance
Software Development Standard Deliverables
Software Development Standard Deliverables Lifecycle Methodology Created By Rafael Soultanov Version 1.1 September 19, 20044 Development Lifecycle Methodology Document Control Change Record Date Author
Designing and Deploying Messaging Solutions with Microsoft Exchange Server 2010 Service Pack 2
Microsoft Exchange About this Course This five-day, instructor-led course provides you with the knowledge and skills to design and deploy messaging solutions with Server 2010. This course describes how
VAIL-Plant Asset Integrity Management System. Software Development Process
VAIL-Plant Asset Integrity Management System Software Development Process Document Number: VAIL/SDP/2008/008 Engineering For a Safer World P u b l i c Approved by : Ijaz Ul Karim Rao Revision: 0 Page:2-of-15
Project Type Platform Number of Phases Development Java, Win NT, DB2 Four Phases.
Given below is a Project Management Plan for a real life project executed by a commercial company. This example is from my book Software Project Management in Practice (2002, Addison Wesley).The project
SuiteCRM Customer Relationship Management System
SuiteCRM Customer Relationship Management System Overview SalesAgility is an ISO9001-accredited professional services consultancy engaged in transforming the business needs of our clients into robust and
System Development and Life-Cycle Management (SDLCM) Methodology
System Development and Life-Cycle Management (SDLCM) Methodology Subject Type Standard Approval CISSCO Program Director A. PURPOSE This standard specifies the content and format requirements for a Software
10233B: Designing and Deploying Messaging Solutions with Microsoft Exchange Server 2010
Course: 10233B: Designing and Deploying Messaging Solutions with Microsoft Exchange Server 2010 Description: About this Course This five-day, instructor-led course provides you with the knowledge and skills
Course 6432A: Managing and Maintaining Windows Server 2008 Active Directory Servers
Course 6432A: Managing and Maintaining Windows Server 2008 Active Directory Servers Length: 2 Days Audience(s): IT Professionals Level: 300 Technology: Windows Server 2008 Type: Course Delivery Method:
Request for Proposal for Application Development and Maintenance Services for XML Store platforms
Request for Proposal for Application Development and Maintenance s for ML Store platforms Annex 4: Application Development & Maintenance Requirements Description TABLE OF CONTENTS Page 1 1.0 s Overview...
Online Program Management Information System. PMI WDC Meeting November 17, 2009
Online Program Management Information System PMI WDC Meeting November 17, 2009 A PMIS Should Answer the Following How can Programs evolve and execute on projects throughout their lifecycles? How can Programs
Oracle Database Security
Oracle Database Security Paul Needham, Senior Director, Product Management, Database Security Target of Data Breaches 2010 Data Breach Investigations Report Type Category % Breaches
Planning, Implementing and Managing a Microsoft SharePoint 2003 Infrastructure
Planning, Implementing and Managing a Microsoft SharePoint 2003 Infrastructure Course 8036 - Three days - Instructor-led - Hands on Introduction This instructor-led course provides students with the knowledge
Enterprise Content Management and Alfresco
ECM and Alfresco 1 Enterprise Content Management and Alfresco Compiled by Russ Danner Architect, Christian Science Publishing Society [email protected] Copyright 2006 Licensed under the Mozilla Public License
Server Virtualization with Windows Server Hyper-V and System Center
Course 20409 Server Virtualization with Windows Server Hyper-V and System Center Length: Language(s): Audience(s): 5 Days English IT Professionals Level: 300 Technology: Windows Server 2012 Type: Delivery
VMware Service Manager: Implementing Incident Problem Management
Delivery Methods Instructor-led training Live-online Onsite training Course Duration Three (3) days Maximum Students Twelve (12) Target Audience System administrators Service desk managers Service desk
Page 1 of 8. Any change, which meets the following criteria, will be managed using IM/IT Change Management Process.
Page 1 of 8 1. Introduction This policy describes the Authority s Information Management/Information Technology (IM/IT) change management procedures. IM/IT manages changes to applications, infrastructure
Application Lifecycle Management White Paper. Source Code Management Best Practice: Applying Economic Logic to Migration ALM
ALM Application Lifecycle Management White Paper Source Code Management Best Practice: Applying Economic Logic to Migration Summary: Is there a Business Case for Migration? Ultimately, what is the value
HP Service Manager. Software Version: 9.40 For the supported Windows and Linux operating systems. Processes and Best Practices Guide (Codeless Mode)
HP Service Manager Software Version: 9.40 For the supported Windows and Linux operating systems Processes and Best Practices Guide (Codeless Mode) Document Release Date: December, 2014 Software Release
Course: 10174B: Configuring and Administering Microsoft SharePoint 2010
Course: 10174B: Configuring and Administering Microsoft SharePoint 2010 Description: This five-day instructor-led course teaches students how to install, configure, and administer Microsoft SharePoint
IBM Tivoli and Maximo Asset Management Development Update & Maximo 7.1 Preview
IBM Tivoli and Maximo Asset Management Development Update & Maximo 7.1 Preview Anthony Honaker Maximo Product Strategy & Product Management 2007 IBM Corporation IBM s Commitment to Maximo and Asset Management
How To Understand And Understand The Cmm
W H I T E P A P E R SEI's Capability Maturity Model Integrated (CMMI) Relative to ICM's CMII (Rev B) SUMMARY CMMI is built on a set of integrated processes and includes CM as a supporting process. The
What Are Software Developers Facing?
Configuration Management Tuotteenhallinta ohjelmistoprojektissa 1. Objectives 2. Problems & Motivation 3. CM Concept 4. Making CM system to work 5. Present CM Standards and Terms 6. CM Benefits and Summary
A guide through the concepts of Serena Dimensions. René Steg Steg IT-Engineering, Zurich (Switzerland)
A guide through the concepts of Serena Dimensions René Steg Steg IT-Engineering, Zurich (Switzerland) Introduction About René Steg and Steg IT-Engineering Owner of Steg IT-Engineering since 2000 and contracted
EXHIBIT L. Application Development Processes
EXHIBIT L Application Development Processes Optum Development Methodology Development Overview Figure 1: Development process flow The Development phase consists of activities that include the building,
Benefits to the Quality Management System in implementing an IT Service Management Standard ISO/IEC 20000-1
Benefits to the Quality System in implementing an IT Standard ISO/IEC 20000-1 Presentation to: ASQ North Jersey September 15, 2010 Subrata Guha Director IT s UL DQS Inc. A New Global Alliance for Systems
Course 2788A: Designing High Availability Database Solutions Using Microsoft SQL Server 2005
Course Syllabus Course 2788A: Designing High Availability Database Solutions Using Microsoft SQL Server 2005 About this Course Elements of this syllabus are subject to change. This three-day instructor-led
Software Configuration Management
Steven J Zeil March 17, 2013 Contents 1 Problems 2 2 Common Practices 6 1 1 Problems Software Configuration Management Over time, a software system can exist in many versions: revisions created as developers
The Configuration Management process area involves the following:
CONFIGURATION MANAGEMENT A Support Process Area at Maturity Level 2 Purpose The purpose of is to establish and maintain the integrity of work products using configuration identification, configuration
Exhibit to Data Center Services Service Component Provider Master Services Agreement
Exhibit to Data Center Services Service Component Provider Master Services Agreement DIR Contract No. DIR-DCS-SCP-MSA-002 Between The State of Texas, acting by and through the Texas Department of Information
Nova Software Quality Assurance Process
Nova Software Quality Assurance Process White Paper Atlantic International Building 15F No.2 Ke Yuan Yi Road, Shiqiaopu, Chongqing, P.R.C. 400039 Tel: 86-23- 68795169 Fax: 86-23- 68795169 Quality Assurance
Designing and Deploying Messaging Solutions with Microsoft Exchange Server 2010 Service Pack 2
Course 10233B: Designing and Deploying Messaging Solutions with Microsoft Exchange Server 2010 Service Pack 2 Length: Delivery Method: 5 Days Instructor-led (classroom) About this Course This five-day,