SA Pipe Relining is dedicated to finding simple, non intrusive

Similar documents
A pipe restoration system for drainage pipes

DRAINAGE PIPE REPAIR & RELINING SOLUTIONS

REPAIRS TO DAMAGED SEWERS

Where life interacts with infrastructure.

Structural Pipe Lining Technology

We love the drains you hate! A partner you can depend on to deliver dedicated drainage maintenance services, 24 hours a day, 365 days a year

ALL YOUR DRAINAGE NEEDS. Tel:

DRAIN BUSTERS PLUMBING SOLUTIONS ~SOLUTIONS THROUGH EXPERIENCE~

Working together to improve beach water quality. Fixing our. public and private. sewers

PRODUCT CATALOGUE. for. SMARTPHONE / WEBSITE / DIGITAL EDITION / BOOK / ipad / GPS

SECTION CLEANING AND CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION OF SEWER PIPE

Drain & Tank Cleaning

Mainline Pipe Rehabilitation Using Cured-in-Place Pipe (CIPP) & Folded Pipe Technology

PROVIDING THE SAFE CHOICE FOR UNDERGROUND PIPE RENEWAL, INTEGRITY MANAGEMENT AND ASSET RELIABILITY

SECTION 810 SEWER LINE CLEANING

Pipeline Replacement using Relining

SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO)

Storm Sewer Trenchless Upgrade Alternatives and Recommendations

Industrial Pipeline Integrity Management & Remote Polyurea Pipe Lining Systems.

LS 2540 SEWER LATERALS AND INSPECTION TEES

1.3.2 Method of construction and restoration of existing water service connections. This shall include:

Water Main Lining A Sustainable Alternative to Open Cut Replacement

PROVIDING SUPPORT TO THE CONSTRUCTION INDUSTRY BY SUPPLYING CURED IN PLACE PIPE (CIPP) LINING TO COVER DRAINS, SEWERS AND PIPELINES

San Antonio Water System Standard Specifications for Construction ITEM NO SLIP-LINING SANITARY SEWERS

SECTION STORM DRAIN SYSTEM

UNDERGROUND INFRASTRUCTURE SPECIALISTS TABLE OF CONTENTS

Home page Previous Next

Relining of Water Mains with. Flexible High Pressure Pipelines. Raedlinger Primus Line, Inc. Ivan Zubiaga Executive Vice President 2014

SASTT contact details:

Superior Pipe Restoration Solutions. Proven, state-of-the-art technology that saves money, time and inconvenience. belcopipe.com

CCTV PIPE INSPECTION AND EVALUATION RUNWAY 17L-35R

INSTALLATION OF INSITUFORM LINER

Let Us Give Utilities the Respect that they Deserve.

Guaranteed Solutions for Solving Sewer Backups

THE BIG FIX: Public works administration would be easy if infrastructure. San Diego s Sewer Renewal Program. By Steve Gibbs

High Density Polyethylene Liners for Rehabilitation of Corroded Pipelines

San Antonio Water System Standard Specifications for Construction ITEM 866 SEWER MAIN TELEVISION INSPECTION

Sewer Line Rehabilitation

REHABILITATION OF UNDERGROUND SEWER LATERAL PIPES WITH CURED-IN-PLACE-PIPE LINER SECTION 02542

ATTACHMENT 3: SPECIFICATION FOR SEWER CLEANING

SPR PE Steel Reinforced Liner

Waste Collection Systems

Reticulation sewers in basements Technical guidelines

SECTION STORM DRAINAGE TABLE OF CONTENTS

TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe

STANDARD SPECIFICATIONS SECTION CLOSED CIRCUIT TELEVISION INSPECTION OF SEWER MAINS, MANHOLES AND LATERALS

Clean drains. Solutions for wetroom showers.

FAULTS FOUND IN SEWER PIPES, CAUSES AND REMEDIES

Precast Manhole Sections and Castings. These items shall conform to Section 31, "Storm Drain Installation," of these Standard Provisions.

Sewer Pipe Lining An Economic Solution for Pipe Rehabilitation By Tawana Albany Nicholas, Virgin Islands Waste Management Authority

CCTV of Stormwater Systems. Cairns Regional Council. Commentary Guidelines #

The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.

INFORMATION PACK. Registered Company Address. Contact Names Robert Hatton Chris Jones. Telephone

PORTLAND BES ADVANCES IN SEWER MAINTENANCE AND REPAIRS BY OPERATING MULTIPLE CIPP CREWS.

ENGINEERED SOLUTIONS. A2 Liner Pipe for Trenchless Technology

PRESSURE PIPE REHABILIATION CIPP TECHNOLOGIES

SECTION 21 REHABILITATION OF SANITARY SEWER MAINS BY THE PIPE BURSTING AND TRENCHLESS PIPE REPLACEMENT METHOD

Rainwater going astray. EPROPOX FC30 epoxy resin system to be prepared for a rainy day

Rehabilitation Alternatives. MWEA Collection System Seminar October 1, 2009

Guide to working on Public Sewers

Ultraviolet (UV) Light Cured Fiberglass Reinforced Cured-In-Place Pipe (CIPP) It is not just for sanitary sewer rehabilitation

UVDB empowered by Achilles

STANDARD SPECIFICATIONS SECTION CLOSED CIRCUIT TELEVISION INSPECTION OF SEWER MAINS, MANHOLES AND LATERALS

Sewer Rehabilitation Design Requirements

INSPECTED FOR Cynthia Sands Teri Court, West Hills February 1, 2012

SECTION IV - TESTS AND INSPECTIONS PART 1 - GENERAL Testing - General

GENERAL SPECIFICATIONS AND GUIDELINES FOR INSTALLATION MASTERLINER CURED-IN-PLACE PIPE SYSTEMS

DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 33 UTILITIES SITE UTILITIES

FY15 Gravity Sewer and Manhole Rehabilitation

Guidelines for closed circuit television (CCTV) inspection of newly constructed sewers

March 2006 DIVISION 3 - CW 2140-R3 TABLE OF CONTENTS

SECTION IX SLIP LINING PIPELINES

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

SEWER BACKUPS & BASEMENT FLOODING PREVENTATIVE SOLUTIONS FOR THE BUILDING OWNER

Leaders within the sewer rehabilitation industry

TABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth

812-3 LIMITATIONS: b. No fire hydrant shall be obstructed or used when there is a fire in the area.

Sewer systems: Failures and rehabilitation

SECTION 6 SANITARY SEWER MAIN 6.01 SCOPE

REVIEW OF TRENCHLESS TECHNIQUES FOR THE REHABILITATION OF SEWERS. Gerhard (Gerry) P. Muenchmeyer, P.E. Muenchmeyer Associates, LLC

SIERRA LAKES COUNTY WATER DISTRICT P.O. Box 1039, Soda Springs, CA (7300 Short Road, Serene Lakes)

Introduction to Pressure Pipe Rehabilitation with CIPP

Sanitary Sewer Smoke Testing

Complete Plumbing. Drainage Solutions Ltd. All aspects of Plumbing & Drainage work undertaken A PARTNER YOU CAN DEPEND ON.

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation

TRENCHLESS TECHNOLOGY GUIDELINES CLOSE FIT THERMOPLASTIC LINING

SERVICE LINE EXTENSION AND SERVICE LINE CONNECTION CONDENSED SANITARY SEWER SYSTEM INSTALLATION SPECIFICATIONS

4 Steps for Quality Sewer Performance in Perpetuity

SECTION ABANDONMENT OF SEWER MAINS

CITY OF COLFAX REQUIREMENTS AND STANDARDS FOR CLOSED CIRCUIT TELEVISION SEWER LATERAL INSPECTIONS

What is water main cleaning & lining

Beacon Hill Sewer District Standard Specifications

SECTION 812 SEWER LINE, MANHOLE AND WET WELL CLEANING

Pipe Bursting. Case Study at Zeeland, MI Collections Seminar September 6, Presentation Agenda. What is Pipe Bursting? What is Pipe Bursting?

Greater Dublin Strategic Drainage Study Regional Drainage Policies - Volume 2 New Development

53.03 MATERIALS FOR SEWER LINER PIPE AND FITTINGS: The following materials are approved for installation in sanitary sewer lines:

CURED-IN-PLACE PIPE MINIMIZING RISK BY DEFECT CODING

STANDARD OPERATING INSTRUCTION SOI-GVW-198 CCTV Inspection of Sewerage Reticulation Works 1 PURPOSE 2 REFERENCES 3 DEFINITIONS

Defense Technical Information Center Compilation Part Notice

Transcription:

SA Pipe Relining is dedicated to finding simple, non intrusive solutions to complex problems using latest technologies and methodical work practises in an environmentally friendly and cost effective manner. Service Streams CCTV inspections High velocity & pressure hydrojetting Pipe and junction relining waste & water*

Relining Using the latest and most advanced Epoxy Pipe Relining Technology - SA Pipe Relining delivers a trenchless cost effective solution to internal wall pipeline repairs. With the added advantage of relining junctions, changes in direction and pipe sizes, as well as start stop relining and sectional repairs, SA Pipe Relining is capable of meeting all pipe repair requirements. Relining repairs to sewer, stormwater, vertical stacks, downpipes or other pipelines in situ without costly excavation or replacement is today s technology and solution to these problems. With SA Pipe Relining s capability of completing sectional repairs or entire main line relines on pipelines from 40mm to 1600mm diameter on sewer, stormwater or mains water lines*, the economic and environmental advantages this technology and systems has to offer has proven very desirable for home owners through to water authorities. Relining System & Technology Trenchless technology has created an alternative to pipeline replacement. SA Pipe Relining is the South Australian approved license holder of Nu Flow Technologies. Using this technology, commonly referred to as Cured-In-Place-Pipe (CIPP) and Pull-In-Place (PIP), SA Pipe Relining has the ability to create a pipe within a pipe. This is achieved using specific environmentally friendly, scientifically tested epoxy resins, creating a new seamless structural strength pipe, junction or sectional repair within the host pipe without damage to structures, floors, landscapes or causing nuisance and inconvenience. The seamless liner is custom made from fabric that is impregnated with specific environmentally friendly two part epoxy resins and a pre inserted bladder spanning the length of the liner. The liner is inserted into the pipeline through an inspection opening or access point and is positioned in the desired location. The bladder is then inflated using compressed air causing the liner to mould to the host pipe, filling cracks, holes and spanning over any voids in the pipeline. The liner can be custom made to length, from 1m upwards allowing small sectional repairs to be carried out or complete mains relined. The Nu Flow Liner will adhere to PVC, Cast Iron, Concrete Pipe, Roll Groove, Galvanised Pipe, Copper, HDPE, Poly Pipe, Zincalume, Cardboard absolutely anything. This particular technology s greatest advantage is the ability to structurally epoxy reline multiple angle bends, junctions and changes in pipe size with the option of only lining the area in need of repair. This provides significant cost savings and flexibility as the need to reline entire lengths of pipe from point of entry to point of repair is not necessarily required. 03

The Benefits of Relining The Relining Process The Relining process consists of four steps: 1. Pipelines are hydrojetted using the appropriate hydrojetting tools for the job. This ensures the internals of each pipeline are thoroughly and uniformly cleaned and all obstructions have been removed. Once clean the pipelines are ready to be inspected. 2. Specific CCTV equipment suited to the application is used to inspect the internals of the pipelines. The footage is recorded in full colour onto DVD and a complete report is created detailing findings. This information may include misalignment or collapse of drains, missing sections, cracks, water ingress, tree root infestation, ageing infrastructure. 3. Once the report has been compiled a decision can be made by the Asset Manager or client on the course of action required. An estimate will be provided by SA Pipe Relining to reline the pipeline or carry out sectional repairs, ultimately restoring the aging infrastructure to equal or better than original condition. 4. The liners are prepared and pulled into place. The result; a creation of a smooth, seamless pipeline or sectional repair resulting in a pipe within a pipe capable of withstanding pressure and root penetration due to the seamless and joinless structure and a smooth bore internal where calcification can no longer occur as deposits will not stick to the inner walls of the new epoxy barrier lined pipe. Solutions Millions of linear meters of pipelines have been restored worldwide using this simple but effective technology. SA Pipe Relining has both the experience, equipment and advanced technical knowledge to meet your specific needs. The applications for relining are endless and regardless of the depth or height of the pipeline or corrosive nature of the environment, SA Pipe Relining has a solution at hand. The benefits of Nu Flow Relining Technology; No destruction, minimal disturbance to finished surfaces No inconvenience or disruption to your routine No traffic tie ups, expensive road excavation and/or damage to paths or landscaping Significant cost savings over traditional pipeline replacement methods CIPP restores structural integrity of existing pipelines and repairs ageing infrastructure Prevents root intrusion in sewer mains or stormwater and stops leaks Prevents water ingress, egress Increases flow capacity Can perform sectional repairs or mainline relines Has the ability to reline junctions and tees in one action creating sealed joins Provides an option to drain replacement Product Guarantee View our website for product / installation guarantees and conditions

sewer blockage/obstruction typical sewer root infestation cracked/leaking internal pipe wall structure Prevents root intrusion in sewer mains and stops leaks Cured-in-place epoxy lining moulds to the internal diameter of the host pipe creating a structural seamless pipe within a pipe. This seamless technology prevents any further root intrusion and eliminates water ingress or leakages from the sewer mains by lining over any cracks, misaligned joins or separation of pipe. Increases Flow Capacity Newly relined pipelines increase flow capacity due to the new smooth inner lining of the pipelines created by the NU Flow Process. The smoother internal lining prevents calcification deposits from adhering to the inner wall of the pipeline allowing unimpeded flow while minimising the potential of future blockages. This is particularly applicable on Cast Iron, Clay or Concrete Pipes. No destruction Using systemised methods SA Pipe Relining is capable of relining pipelines through inspection openings or any form of access to the pipeline. Liners are launched from access points and pulled into position. This approach is non destructive, quick and effective. Mass trench excavation and backfilling, structural damage, re landscaping, traffic tie ups, hazards and environmental damage are non existent in most cases. BEFORE: damaged PVC pipe beneath major residential extension No inconvenience or disruption to your routine The relining process is non intrusive and clean allowing your routine to be maintained with minimal disruption and maximum cleanliness. No traffic tie ups, expensive road excavation or damage to paths or landscaping Disruptions to traffic and costly expenses involved in excavations, replacement of pipelines and reinstatement of affected areas as well as the environmental impact associated with this process are costly, time consuming, a nuisance and dangerous. Consider SA Pipe Relining s expertise in this area when contemplating the alternatives. Significant cost savings over traditional pipeline replacement methods The lining process reduces the need for costly excavations and replacement of existing pipelines in conjunction with all the other associated costs involved in that process. Consider the following requirements when evaluating a traditional drain replacement. AFTER: smooth internal pipe wall LINING covering all PIPE DAMAGE 05

SA Pipe Relining Method Typical Relining Process Decide on sectional repair or entire main drain reline Manufacture liners Launch liners Allow cure time and test Job completed No mess, no fuss, non intrusive, non destructive, no environmental impact! DAMAGE AND VOID IN HORIZONTAL PIPELINE Traditional Method Council approval or Water Authority approval required Concrete cutting, slab or footing cutting, paver removal and/or landscape destruction imminent Excavation of existing drain, usually with a backhoe commences, generally a messy, very intrusive and dangerous process Existing drain removed No use of facilities until new drain has been laid and connected New drain installed connecting to existing connections Drains require testing Water authority inspection required Trenches backfilled and compacted Concrete and or paving to be reinstated Landscape to be reinstated Site cleanup Job completed LINER IS MANUFACTURED AND RESIN IMPREGNATED LINER INSERTED INTO HOST PIPE *Note - void is bridged without distortion This is an expensive and lengthy process extending into days or weeks as well as very intrusive and destructive. LINER IS INFLATED IN POSITION FORMING A NEW PIPE WITHIN A PIPE

Typical relining of damaged 100mm x 65mm 45 o junction beneath new ensuite bathroom CIPP restores structural integrity of existing pipelines and repairs ageing infrastructure The lining process enhances the structural strength of the host pipe creating a pipe within a pipe. The CIPP liner withstands corrosive environments and the test of time. The perfect solution to ageing infrastructure eliminating the need for costly excavation. Liners can be customised to suit many specific needs. Can perform sectional repairs or mainline relines SA Pipe Relining s versatility extends from sectional repairs to mainline relines. Completing 1m long sectional repairs is not uncommon as the need to reline entire lengths of pipeline in order to complete the repair is not necessary. In high flow and demand situations such as mainline repairs, SA Pipe Relining can use a patented Flow-Through system, allowing the pipeline contents to flow through the lining as it is positioned in place and begins to cure. This technology allows the pipeline to remain in use as the lining is installed. Has the ability to reline Junctions and Tees in one action creating sealed joins This unique method of CIPP lining goes where no other lining system goes. Its capabilities are endless. The ability to line around Junctions, Tee pieces, bends, changes in direction, changes in pipe size, gullies and floor traps without any joins is just one of the product s many advantages. No longer is there a need to core out junctions and insert top hats or the like. The lining process ensures that the Junctions, Tee pieces and bends are all formed in one process, ensuring no joins and perfect pressure tight fittings are formed. Provides a realistic option to drain replacement The patented Nu Flow Process enables SA Pipe Relining to provide its customers and clients with an option. Lost productivity on workshop floors, downtime created in factories, businesses and the like through disturbances associated with pipeline replacements, continual blockages or obstructions are no longer necessary with the implementation of the lining process. 07

Closed Circuit Television (CCTV) Inspections ASSORTED HIGH VELOCITY/PRESSURE DRAIN CLEANING NOZZLES AND TOOLS High Velocity & Pressure Hydro-jetting SA Pipe Relining has the capability of hydrojetting bathroom drains through to Mainline drains. With various techniques and equipment SA Pipe Relining is fully prepared to combat a wide variety of situations. SA Pipe Relining has the ability to CCTV inspect and record pipeline internals from 40mm to 600mm diameter, with the most technologically advanced products on the market. Using state of the art technology to capture DVD quality video and digital photos of the pipeline inspection and standard internationally recognised formats (such as Wincan), Asset Managers can be quickly and precisely informed of the condition of their assets. Variable light intensity controls, self levelling camera heads and locating sondes allow extreme versatility and capabilities. Colour DVD inspections and electronic or hardcopy reporting coupled with snapshot photos of problem areas completes an informative and detailed reporting package making the decision process and next step that much easier. CCTV CAMERAS AND DVD RECORDING EQUIPMENT

Our equipment includes: Mini Jet Blaster The Mini Jet Blaster is a German engineered high pressure cleaner capable of delivering 11lpm at 2500psi. Ideal for all internal drains and small diameter pipelines the Mini Jet Blaster penetrates and clears obstructions. The Mini Jet Blaster is capable of cleaning pipelines from 20mm to 100mm. ensures that pipeline internals are thoroughly and uniformly cleaned and de-scaled while obstructions are removed. Razorback Jetter At 5000psi and 24lpm the Razorback Hydrojetter is fully self contained making it ideal for tight access locations such as undercroft carparks, commercial buildings and strata complexes. Used for both stormwater and sewer its high pressure and complete arrangement of nozzles enable roots and obstructions to be quickly and efficiently cleared. A unique oscillating rear firing nozzle allows for intensive internal pipeline cleaning and de-scouring. The Razorback is generally used on 100mm to 300mm sewer and stormwater pipelines. Nozzles and Tools SA Pipe Relining has a comprehensive assortment of nozzles and tools ready to work on some of the most difficult pipeline obstructions and internal pipeline cleaning requirements. Terminator Hydrojet Specifically designed and custom built to be the most versatile and capable Hydrojet rig on the market, the Terminator Hydrojet has the capability of hydro-jetting pipelines from 100mm to 600mm in diameter. Using various techniques and equipment the Terminator Hydrojet can combat a wide variety of situations. Boasting 3045psi pressure, in excess of 100lpm with an array of nozzles and tools the Terminator Hydrojet has the capability to clear pipeline obstructions. 120m of 22mm high pressure hose mounted on a hydraulic variable speed reel 100mm - 300mm 50CC motorised hydraulic cutter 09

OHS&W and the Environment SA Pipe Relining considers OHS&W and the Environment to rate equally with all other business facets. SA Pipe Relining continues to exceed industry requirements with CCF certification and Environmental Accreditation, assuring your assets are in safe hands and the environment is being correctly managed. SA Pipe Relining holds $20,000,000 public liability insurance, can provide Safe Work Method Statements and Environmental Checklist Forms, and is fully equipped with all safety requirements. SA Pipe Relining only uses environmentally friendly products and is conscious of today s ever changing environment. For a copy of SA Pipe Relining OHS&W Policy and Environmental Policy please email enquiries@sapiperelining.com.au or view our website www.sapiperelining.com.au *The Nu Flow Potable Water Lining has been developed and is currently in the process of receiving approval by various State and National authorities. It is anticipated that the Nu Flow Potable Pressure Water Lining will be available for commercial use within six months.

The relining process is capable of adhereing to all pipe products. Pipe Relining Cross Sectional View Indicates the ability to reline multiple changes in direction in the one process

SA PIPE RELINING PTY LTD PO Box 10544 Adelaide BC SA 5000 tel 1300 799 846 fax (08) 8354 1133 SA Pipe Relining is the South Australian licensee of Nu Flow Technologies 2000 Pty Ltd ABN 89 125 590 276 www.sapiperelining.com.au