October 30, Mr. & Mrs. Daniel Vick 101 Southwind Cove Benton, AR. Report of Findings, Structural Investigation, Benton, Arkansas, Dear Mr.

We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden window unit.

Foundation Experts, LLC Specializes in Foundation Repair and Waterproofing

March 14, Installation of Bay, Bow and Garden Windows

The Stabilizer TM. Benefits. Supplemental support system for sagging beams and floor joists within a crawl space

Chapter 3 Pre-Installation, Foundations and Piers

P&P GENERAL SESSION. Quality Expectations

Report on Sanctuary/Chancel Crawl Space Inspection. St. John in The Wilderness, 2896 Old Lakeshore Road Bright s Grove. Project No.

POST AND FRAME STRUCTURES (Pole Barns)

SUPER SHED. Indoor shelter for your outdoor tools.

Protecting Your Home From Hurricane Wind Damage

HOME INSPECTION CHECKLIST

Freeze Damage May 21, 2014

INSTALLATION OF A BAY WINDOW

Chapter 10 - Scaffolding Systems

CLIENT. Inspection Report. 271 Front St. Alert Bay, B.C. Island Building Inspections V ANCOUVER I SLAND B. C.

How To Prevent Water Damage To A Home

OSHA GUIDANCE DOCUMENT FALL PROTECTION IN RESIDENTIAL CONSTRUCTION

CONDITION OF QUALITY ITEMS

HfHMD uses LP SmartSide siding and trim.

Lighthouse Engineering, L.L.C.

Superform Products Ltd.

Walls. Add Strength and Water Resistance When Repairing Your. Replace damaged framing members when walls are open

Simpson Engineering A state licensed engineering firm F-1607

Memorandum. July 16, To: Plan Commission City of Madison

Vision Home Inspection

1. Concrete: T W L / 27 = Concrete C.Y. Multiply Feet Thickness x Feet Width x Feet Length / 27 = Cubic Yards.

Estimated Cost of Repair

March 19, Ms. Jean McDonald CAP Management th Street, Suite 1010 Denver, Colorado 80202

Designed and Engineered to Perform

PROFESSIONAL ENGINEERING INSPECTIONS, INC.

Residential Deck Safety, Construction, and Repair

201 WATER STREET FORWARDERS MUSEUM AND VISITORS INFORMATION CENTRE

Building Condition Assessment Report

Inspection Item COMMENTS

Page & Turnbull imagining change in historic environments through design, research, and technology

NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003)

Patio Covers / Carports


Chapter. Earthquake Damage: Types, Process, Categories

EAST LYME HIGH SCHOOL

Self-Home Inspection Checklist

Final inspections are completed by site visit only. Access to fenced yards shall be planned.

STRUCTURAL ASSESSMENT REPORT BOLINAS MARINE STATION - BOLINAS, CALIFORNIA

8/18/14. Introduction to. Framing. Terminology and Concepts

Home Warranty Inspection Report

Proposed Minimum Subterranean Termite Treatment Standards

INSTALLATION INSTRUCTIONS IMPERVIA (Vent and Fixed) AWNING, CASEMENT, and LARGE AWNING WINDOW WITH FINS

Protecting Your Home from Wind Damage

Name of course: Residential Construction Site Management (RCSM) Level 1

STRUCTURAL ASSESSMENT. Full Metal Jacket Building 0 Prince Street, Alexandria, VA

What is Seismic Retrofitting?

6 RETROFITTING POST & PIER HOUSES

IMPROVEMENT COST ESTIMATE powered by HomeFixers

Lighthouse Engineering, L.L.C.

Lighthouse Engineering, L.L.C.

How to secure your property after a disaster

MHI. Overview of Manufactured Home Installation MANUFACTURED HOUSING INSTITUTE. This guide contains an overview. of the HUD-Code manufactured home

We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden window unit.

14 September Sarah Zorn Planning and Economic Development 25 West Fourth Street, Ste St. Paul, MN 55102

AMERICAN GOTHIC PLAYHOUSE

Basement Window Installation Guide Hopper and Sliding

Repair of Earthquake-Damaged Masonry Fireplace Chimneys SOUTH NAPA EARTHQUAKE RECOVERY ADVISORY

Mark Cramer Inspection Services, Inc.

MEMORANDUM. General: Foundation:

Sun Windows General Information Sun New Construction Window Installation Instructions

Rehab Inspection Report Page 1

Residential Foundations and Basements

Common Problems with Walls

STRUCTURAL ASSESSMENT

ENGINEERED FOUNDATIONS. Department of Public Works Jeff Hill, PE

National Home Builder - Name Wednesday, August 20, 2014 Regional Customer Care Manager 1234 Main Street Houston, Texas 77067

4. ANCHOR BOLTS AND STRAPS a. ½" anchor bolts shall be embedded 7" into concrete a maximum of 6' on center and 12" from corners and ends of plates.

Foundation. Foundation

FLAT ROOF BOX SPAN CARPORTS

Best Barns USA Assembly Book

SAMPLE INSTRUCTIONS. Best Barns USA Assembly Book. the Denver. 12'x 12' or 12'x16' Revised November 29, 2010

Pre-Drywall Inspection Report

A0 SHEET 1 OF LOCUST STREET FRANKFORT, KANSAS FRANKFORT, KANSAS ROOF REPAIR OF THE 400 LOCUST STREET

Estimating Database Checklist

E ER TITAN PRODUCTS. Foundation Repair

Lighthouse Engineering, L.L.C.

What Causes Foundation Leaking?

Uncovered Decks & Porches

Fig. 2 WALL-TO-WALL PANEL CONNECTIONS CORNER WALL CONNECTION

Building Condition Assessment Report

WorkSafe Guidance Document FALL PROTECTION IN RESIDENTIAL CONSTRUCTION

symptoms of a faulty foundation

MAJOR 2015 MN RESIDENTIAL CODE CHANGES Effective Date: January 24 th, 2015

Residential Decks. Planning and Development Services Department

Building Information Packet

Envelope INSULATION BATT (2) Avoid Using Batt Insulation With Metal Framing. Pressure or Friction Fit

Important Information for Installer & Homeowner

Transcription:

Assessing Structural Damages Please note-this presentation is only intended to be used as a basic educational tool and is by no means all encompassing. Each property should be treated on a case by case basis and vendors will be held responsible for any errors made.

Identifying Structural Damage (ext. and foundation) Roof Lines Look for: Sagging or drooping roof lines Foundation Look for: Failing or missing support structures, large cracks in the exterior of the foundation, and bowed/bulging/leaning (> ¼ ) foundation walls In the case of cracks in the foundation or exterior brick work, the interior analysis should begin in the basement or crawl space and work up to the attic. Three main types of foundational cracks: Vertical cracks (also called drying cracks) are not normally a problem unless there is evidence of water intrusion. These cracks are vertical or diagonal in direction and 3/16 or less in width over the full length of the crack. Nothing needs to be done if the is no evidence of water intrusion. If there is evidence of water intrusion or if the crack is ¼ or more in width then crack needs to be repaired. Horizontal cracks (also call buckling cracks) are serious and need to be addressed immediately. These cracks will run along extensive lengths of a foundation wall and be more or less horizontal. Rotational cracks (also called settling cracks) are caused by one section of a foundation settling while another section is stable. This causes the settling section to rotate away from the stable section, as if the bottom of the wall is on a hinge. The cracking will be V shaped from bottom to top with the top of the crack wider than the bottom. This condition will continue to worsen unless correctly dealt with. Step cracks when inspecting a block or stone foundation the cracking involved will usually follow the mortar joints and is called step cracking due to the cracking pattern. Otherwise the cracks will be similar in appearance and pattern to foundation cracks in all other respects. Always call from site if these conditions are noted to report findings and receive direction on how to proceed. Horizontal Crack Step Crack Vertical Crack Rotational Crack

Identifying Structural Damage (Interior) Attic Inspect the underside of the roof sheeting, ceiling joists, the top of the interior drywall and inside the soffit/fascia area. Look for: Water staining, wood that is rotting on the underside of the sheeting or on the rafters, and light coming through the underside of the roof. If wood rot is suspected, use a screw driver or pen to push into the affected area. If area is soft, then the wood is likely rotted and needs to be addressed by removal and replacement of that area. When starting in the attic look for damaged rafters, or ceiling joists. To inspect ceiling joists it may be necessary to pull or move insulation out of the way. If the rafters or joists are damaged, it is necessary to replace or add rafters or joists as needed. At each floor of the living space and basement, missing or failed headers need to be identified as a structural issue whether there are roof line or exterior issues or not. Once identified, the correct repair needs to be bid. Rooms Inspect walls, windows, ceilings, floors and doors. Look for: Bulges, leaning walls, deep cracks in drywall/plaster (especially around door frames), windows/doors that do not close properly or line up incorrectly, sagging/uneven ceilings, cracks in the ceiling and uneven/rolling floors. Basement Inspect basement beams, columns and poured concrete flooring for failure. Look for: Tilting beams, cracking beams (wood) and sagging due to missing support columns. If issues are found with a beam, it is usually necessary to jack up the floor system to the needed height and complete any beam repairs. Attic Water Damage Deep cracking in door frame

Causes of Structural Damage Common Causes Water intrusion, roof leaks, settling or shifting foundation, humidity and dampness, insect damage, sink holes Support structures or headers Can be caused by foundation cracks, water intrusion, roof leaks. Roof line issues Can be caused by missing/damaged ceiling joists, missing/failing headers, missing/damaged/ tilted support beams, missing/damaged/leaning/sinking support columns, or foundation cracks. Missing beams Can be caused by the removal of beams during remodeling that were not replaced. Foundation Can be caused by shifts in ground soil, water seeping into the property from the outside, uneven ground soil or issues with initial construction of the property. Rotational Cracking Leaning Wall Buckling Wall

Repairing Structural Damage Vertical cracks Can be repaired by epoxy or poly-urethane base products if the hydro-static water pressure from the exterior is 40 PSI or less. If the PSI is more than 40, the work needs to be done from the exterior by excavating down to the foundation footing at the site of the crack and injecting an epoxy or poly-urethane based product into the crack from the exterior side. Although this work can be done by the P&P contractor, the measuring of the hydro-static water pressure should be done by a company specializing in this type of service. Horizontal cracks The cause here is a foundation wall that is about to collapse inward from excessive pressure from the outside. To deal with this type of cracking the interior wall needs to be buttressed (braced) and then the exterior of the wall excavated to relieve the pressure on the wall. Permanent repairs vary according to the situation, but generally the wall needs to be pushed back into place and additional concrete buttressing columns and/or steel strapping need to be poured in place/installed on the inside of the existing wall. This work should be completed by a company specializing in this type of repair. Rotational cracks Patching the crack will fail as the crack will continue to grow in width. The settling section of the foundation needs to be buttressed by concrete or steel column(s) or piers from the exterior. Then the crack can repaired from the exterior in the same manner as a vertical crack (see above). The columns or piers should be completed by a company specializing in this type of repair. Adding Steal Piers Interior Repair Exterior Repair

Repairing Structural Damage Interior Header If an interior header is damaged or missing,the drywall or stucco covering the header needs to be removed. The ceiling structure in the affected area needs to be temporarily braced, then any damaged structure removed. New, correctly sized and assembled header and/or support posts are put in place. The temporary bracing is removed and the affected area is dry walled or stucco is applied as needed. Mudding, sanding, painting and trimming of the area are the finishing steps in the process. Ceiling Joists If ceiling joists are damaged/missing, begin by either pulling the tops of the exterior walls together or jacking up the centerline ridge of the affected roof (or both) to bring the roof line up to the correct height. Then add the ceiling joists as needed and remove jacks. Support Beams If a support beam is tilted, it is necessary to return the beam to a plumb (vertical) position. Ensure that the floor system is jacked up to slightly above the correct height, the beam is adjusted to the correct position and the floor lowered onto the corrected beam. It is always necessary to address the underlying cause of the beam issue to ensure that the beam does not tip again. This is often accomplished with blocking or bracing of the beam. Wood Support Beam If wood support beam (micro-lam or joined dimensional lumber) is cracked, the floor system needs to be jacked up to slightly above the correct height. Then the beam needs to be repaired or replaced as needed. Commonly a beam repair is accomplished by adding additional lumber (micro-lam or dimensional) alongside the damaged area with the repair lumber spanning from support structure to support structure and correctly attached to the damaged beam. It is often necessary to add a support column underneath the damaged area. In this case the concrete floor needs to be cut away and an adequate footing poured underneath the column, the column set in place, and new concrete flooring poured to fill in the removed area of the floor. When all repairs are complete the floor system is lowered on to the repaired beam. Raising a Floor Temporary Bracing

Repairing Structural Damage Steel or Wood Support Column If a support column is out of plumb (correct vertical position) it is often in conjunction with a tilted support beam. The procedure for returning it to a plumb position is the same as when correcting a tilted beam. Once the column is plumb it may need to be braced or blocked in place to prevent further issues. If the bottom of a wood post is rotted the repair is similar to the floor repair (see below). Floor If the floor below a column is cracked around the perimeter of the base of the column and the floor inside the perimeter of the cracking is lower than the surrounding floor, it is an indication of a failing footing underneath the column. In this case the affected area of flooring above the column needs to be jacked up slightly above the correct height, the affected concrete flooring at the base of the column cut and removed and the column taken out. The failed footing underneath the removed concrete is removed and the fill underneath the footing is inspected for possible issues. Any substrate issue below the footing needs to be addressed. A correct footing base is prepared; then a new, adequate footing is poured and the column is then set in place. The flooring above is lowered into place. Remodeled Posts Installing Rebar Cutting Concrete Prep for the Footing

Bidding Structural Damage Once the assessment is completed, the bid is used to communicate the assessment to Safeguard. At Safeguard we can only base our bid analysis on the information given. The following items need to be included when putting a bid into the system: Photos need to be clear (not blurry) and show the damaged area(s). There must be photos showing the issue both at a distance and close up. For example, the close up photos of a foundation crack should include a tape measure to verify the width of a crack. Photos must be correctly labeled with the type of structural damage they show. All damages must be included and described in detail. Any missing items must be described as well. If a support column has been removed and this resulted in damage to the structure, then all damage must be described. The missing column must be included as the probable cause of the damage. A complete material list must be included. The list should include anything to be used. For example, a roof replacement cannot be described as 15 sq.ft. of shingles. It must include all roofing felt, water and ice shield, step flashing, wall flashing, drip edge, quantity of staples and gun nails needed as well as any roof sheeting that might have to be replaced. A complete list of any specialty equipment to be used as well as any supporting documentation is needed. This might include a price list from a rental store for nail guns, hoses and a large capacity compressor to be rented. Bid Fields Eyeball Estimate: How much value does the damage take away from the property? Bid to Remediate Damage: How much do you need to repair it? Locations: Where is the damage located? Size of Affected Area: How many square feet does the damage cover? Source, Cause: What is causing the damage? Did termites destroy the support beams? Is there water intrusion? Description: What is the size of the damage in each affected area? What is the width of the crack? How long is the crack? Does it span the entire room? How deep is the crack? Can you see the insulation in the walls? What materials will you need to repair the damage? Are there any missing items? What equipment will you need to rent? Is the repair work within your capabilities?

Reconvey Example This property was conveyed to HUD with a front foundation that was crumbling and collapsing due to structural damages in the basement. The basement was filled with water, debris and safety issues. The building commissioner inspected the property, found it to be structurally unsound and deemed it uninhabitable. Vendor failed to report there was a basement present. 01/26/12 Winterization completed and basement not reported. 04/21/12 - Securing completed and basement not reported. 06/29/12 Property condition reported and basement not reported. 11/30/12 - Post sale convey maintenance completed and basement not reported. 12/13/12 - Property condition reported and basement not reported.

Reconvey Example Property was acquired with structural damage in the basement 05/06/12 FTV, Structural damage reported 05/18/12 Foundation repair bid for epoxy injection for 8 linear feet, OA submitted and approved 06/19/12 Dry locked basement, filled cracks, photos show some cracks still present after epoxy and dry lock No new damage reported after these orders, property reported ICC 01/08/13, property conveyed 01/24/13 The repair to the cracks was temporary and did not resolve the underlying issue; therefore, the basement wall continued to crack.

Reconvey Example Property was acquired with rotted and unsafe flooring. Vendor failed to report the rotted flooring. There is photo documentation to support the damages were present prior to convey and this is in the FSM s photos. Floors were described as weak in the mortgagor neglect bid, but it was not submitted as structural damage. 01/30/13 Initial secure. Property secured, winterized 02/07/13 CONVEY 02/14/13 Work per bid. Debris removed. No new damages reported