Questions & Answers (Q & A) Regarding Asbestos Treatment with the Fire Suppression and Renovation Project



Similar documents
ASBESTOS MANAGEMENT PROGRAM

Asbestos in the Workplace: A Guide to Removal of Friable Asbestos Containing Material

Asbestos Frequently Asked Questions

CONTROL METHODS. There are five ways to control the release of asbestos fibers:

ASBESTOS IN ROOFING SYSTEMS WORK PRACTICES AND DISPOSAL IN ASSOCIATION WITH ROOFING PROJECTS

UI Procedures for Asbestos Management

DESERT RESEARCH INSTITUTE MOLD ASSESSMENT AND REMEDIATEION PROCEDURE

ASBESTOS MANAGEMENT PROGRAM

Lead Exposure Management Plan

University of Pittsburgh Safety Manual. EH&S Guideline Number: ASBESTOS

LEGAL REVIEW & UPDATE

Asbestos Abatement Management Program. Facilities Operations and Development Environmental Health & Safety

Guidelines for Mold Remediation (Removal)

Asbestos WHAT TO DO? Studies of people who were exposed to high levels of asbestos in factories and shipyards, are at increased risk of:

UNOFFICIAL. 1. Owner: Delaware Department of Transportation (DelDOT) WEBSITE

EVERYONE'S RESPONSIBILITY

DIVISION 248 ASBESTOS REQUIREMENTS. Asbestos Emission Standards and Procedural Requirements Asbestos Abatement Project Exemptions

Standards for Asbestos Abatement

UBC Plant Operations Asbestos Work Procedures April 2004

ASBESTOS AWARENESS IN THE WORKPLACE. This easy-to-use Leader s Guide is provided to assist in conducting a successful presentation.

North Carolina State University. Asbestos Management Plan

have been provided with information on whether they do or do not contain asbestos before starting work;

Preparing the Work Area

British Columbia Institute of Technology. BCIT Safety Manual ASBESTOS MANAGEMENT

Sprayed vermiculite ceiling coating management plan, Condell Park High School, Condell Park, NSW

Asbestos Management. 2. Introduction. Contents

ASBESTOS SCIENCE TECHNOLOGIES, INC.

NDSU TABLE OF CONTENTS

Asbestos. from the Home. Removing. Read this booklet for:

ENVIRONMENTAL OPERATIONS & MAINTENANCE GUIDANCE MANUAL BACKGROUND INFORMATION ON ASBESTOS AND LEAD BASED PAINT

Today s topic is Asbestos Safety. This training is a part of OSHA s Asbestos Standard (29 CFR ).

Asbestos: Guidelines for Managing Asbestos in Buildings

Management of Asbestos. Darren Arkins Senior Inspector Occupational Hygiene Unit Chemical Business Services Division

Excerpts from EPA s Mold Remediation in Schools and Commercial Buildings

Specifications for Removal and Replacement of Water Damaged/Mold Impacted Materials

Former National Guard Armory Cherokee, Oklahoma Remediation Final Report

Asbestos abatement Sampling & Analysis. Abatement Project Supervision

DUST AND DEBRIS MANAGEMENT PROCEDURES HPD HOUSING REHABILITATION PROGRAMS

ASBESTOS. Presented by: Samar Khalil Environmental & Chemical Safety Officer

BLR s Safety Training Presentations

SECTION ASBESTOS ABATEMENT

Control Provisions under the Air Pollution Control Ordinance

KEEP ASBESTOS YOUR QUICK GUIDE DON T BE AN EASY TARGET THIS GUIDE

Summary of Georgia s Lead-Based Paint (LBP) Renovation, Repair and Painting (RRP) Rules For Contractors, Property Managers, and Maintenance Personnel

Oakland Unified San Jose Unified Stanford University Santa Ana Unified Newhall Unified Clovis Unified Merced Union High School Grossmont Union High

Asbestos Abatement Work Plan for the Carter Carburetor Superfund Site

Decontamination Units

Mold Response and Remediation Plan

MOLD RESPONSE AND REMEDIATION PLAN

Asbestos Management Plan EC 45 Page 1

ASBESTOS MANAGEMENT PROGRAM RISK MANAGEMENT AND SAFETY 2014 Page 1

ASBESTOS CONTROL PLAN

Mould Mould A Basic Guide

The Richard Stockton University ASBESTOS MANAGEMENT PLAN

Asbestos Procedures. Asbestos Products

Mold Management Plan Operations & Maintenance

Asbestos Work Permit Procedures

ASBESTOS CONTAINING MATERIALS OPERATIONS & MAINTENANCE PLAN 2015

Syracuse University s Guidelines for Work Involving Materials Containing Trace Asbestos (Asbestos at a Concentration Less than 1%)

Asbestos in your home. Information on living with Asbestos

The purpose of this document is to provide guidance on the safe removal and disposal of asbestos and asbestos-containing materials.

Infection Control Risk Assessment Matrix of Precautions for Construction & Renovation

ASBESTOS CONTROL PROGRAM

Asbestos in Your Home

ASBESTOS AWARENESS TRAINING

MOLD REMEDIATION PROCEDURES

SECTION HVAC AIR-DISTRIBUTION SYSTEM CLEANING

EVERYONE'S RESPONSIBILITY

Wellesley College Asbestos Management Program

ASBESTOS. CSEA / Local 1000 AFSCME / AFL-CIO. 143 Washington Avenue, Albany, New York Danny Donohue, President

MOLD REMEDIATION KEY STEPS

Managing your asbestos hazards

Risk Assessment: Biosafety Cabinet

Radford University. Indoor Air Quality Management Plan

Miami University s Asbestos Operations & Maintenance Program Administered by

Asbestos Standard for the Construction Industry. OSHA (Revised)

MANAGING ASBESTOS ABATEMENT FOR DEMOLITION CONTRACTS

Infection Control Risk Assessment Matrix of Precautions for Construction & Renovation

ASBESTOS AWARENESS TRAINING. Title 8, GISO Section 5208

Diamond Environmental Services, Inc. s Most Frequently Asked Questions (FAQs)

University of Tennessee Safety Program

ASBESTOS AWARENESS TRAINING. For workers and building occupants

Final Amendments of 310 CMR 7.15: Asbestos

Transcription:

Questions & Answers (Q & A) Regarding Asbestos Treatment with the Fire Suppression and Renovation Project The Watergate Community is currently in the process with the fire suppression and interior renovations project. Due to the age of construction, many building materials that are scheduled to be disturbed during the fire suppression and renovation project contain asbestos. The asbestos abatement is being conducted by PW Stephens Environmental Inc., a California Licensed Asbestos Abatement Company and the materials are being disposed of as a hazardous waste. Benchmark Environmental Engineering, a third party independent environmental consultant is overseeing the removal activities and providing final clearance inspections and air sampling prior to the contained areas being removed. The materials that contain asbestos that are being impacted during the common area installation of fire sprinkler suppression system, common area lighting replacement, fire alarm adjustment, metal soffit cover and interior renovation process are the acoustical ceilings, wall texture coating and the joint compound located in the wall systems. Below are some general questions and answers associated with asbestos that may assist you with any concerns that you may have: 1. Q: What do I prepare before the abatement work starts in our building? A: No preparation is needed. Notices will be sent to you by WCA prior abatement work. Alternate access will be necessary to avoid work area. 2. Q: What steps take place during the asbestos abatement, will we be exposed since air fans are ventilating outside the lobby? Will this be the same in the corridors? A: a. For lobbies and common areas, all movable objects are moved out of the area. Any vents or other portals (doors, windows, outlets, etc.) leading to the area should be sealed with plastic. These are referred to critical barriers and should be given special attention when sealing, because they are the most likely areas where asbestos fibers would escape during abatement. - 1 -

b. Next, all non-removable objects, which are not part of the structural components to be abated, should also be covered with plastic. Finally, the remaining area should then be covered with plastic to protect all surfaces which are not involved in the abatement. c. At this point, depending on what type of material is to be removed, a three-stage decontamination chamber may be set up. The chamber consists of a series of three rooms. The three rooms are a clean room, a shower room, and a dirty room (in that order). Workers entering the work area should always change out of their street clothes and into disposable overalls, don appropriate respiratory protection, and then enter the work area through the decontamination unit. When leaving the work area, workers must leave the disposable overalls in the dirty room and take a shower, at which time they will also decontaminate their respirator. d. Additionally, there will be a filtration unit set up to create a negative pressure environment within the containment. This simply means that a specially designed air filtration unit will exhaust, through a High Efficiency Particulate Air (HEPA) filter (which is 99.9 % efficient in filtering asbestos fibers down to.3 microns in size), air from the contained area to the outside. This will prevent air from back drafting through decontamination unit into other areas of the building. e. The Asbestos Containing Materials (ACM) will be removed. Then the area will be cleaned by wet wiping and HEPA vacuuming all surfaces within the containment area. f. A visual inspection will be conducted to insure all visible asbestos has been removed. If any material is found it will be removed and the area will be re-cleaned. - 2 -

g. A sealant will be applied to all surfaces to lock down any remaining microscopic fibers. h. Air sampling will be conducted to ensure that fibers which cannot be seen, or have not been locked down by the sealant, are not present. The acceptable limit for these air samples are anything below 0.01 fibers per cubic centimeter (f/cc) of air. If the air sample is above this, the area will be re-cleaned and re-sampled. i. Once acceptable air levels are reached, the remaining plastic barriers can be removed and the area can be re-occupied. 3. Q: With abatement work on the corridors, do we have to leave our home? A: No. Unless the work area is in front of your unit and not accessible for 4 6 hours. Once a negative exposure assessment is conducted and established, this work should only take 1 to 1½ hours. 4. Q: What is a Negative Exposure Assessment (NEA)? A: Respirators, protective clothing, decontamination facilities and medical examinations are required by OSHA regulations for working with asbestos-containing material in many situations. However, the Construction Industry Standard (29CFR1926.1101) allows you to dispense with these measures and still remain in compliance if a specific process is followed. This process is called the Negative Exposure Assessment. 5. Q: Will asbestos work in the corridors go into my unit through the door threshold? A: Abatement work will be sealed and no transferable particles will go through your home. This is why the containments are under negative pressure and sampling is being conducted. Negative room pressure is an isolation technique used to prevent cross-contaminations from room to room. It includes a ventilation system that generates negative pressure to allow air to flow into the isolation room but not escape from the room, as air will naturally flow from areas with higher pressure to areas with lower pressure, thereby preventing contaminated air from escaping the room. - 3 -

6. Q: Will asbestos abatement work go through the corridor ventilation system? A: No. Vents will be sealed prior start of work. 7. Q: I read that PW Stephens will drill a hole above my unit door for fire sprinkler pipe to go through. Do I need to leave my home or can I stay home especially if I work at home? A: You can stay home or elect to leave. This work will be done under containment until such time as it is established that the work sequence is not creating an exposure. The containments are typically floor to ceiling until an NEA is developed and then there will be no need for containment. 8. Q: If I elected to stay home, will I get exposed to asbestos while they are drilling a hole? Will there be a smell? A: No asbestos exposure will occur. Benchmark is establishing a Negative Exposure Assessment (NEA) for this work sequence. There will be no odors. 9. Q: What is your assurance that I will not get exposed while the abatement work is done on my unit? A: Laboratory report showing air clearance from Benchmark Engineering and it will be available upon request. The report will discuss the allowable levels and the actual levels found/analyzed. Also, once the NEA is determined for this work sequence, no further air sampling (associated with the work sequence) will be needed; however, random air quality sampling will occur throughout the project. 10. Q: If I decided to leave my unit when can I return to my unit? A: It will take 4-6 hours for the whole process from set up to containment to drill the hole, air clearance and dismantle containment area. Once NEA is established this will be about 1 hour to 1 ½ hours; you will be able to come and go as you please. 11. Q: What other areas besides the lobby and corridor? A: Stair wells will be prepared fire sprinkler installation. Alternate access will be required and notices will be posted. Full floor to ceiling containments will be utilized on the stair well and corridor cutouts. - 4 -

12. Q: What is the difference of abatement work from removing popcorn in the ceiling to drilling holes in wall and ceiling and cutting out openings? A: Lobby ceiling work is considered a Class 1 abatement operation and will require full containment and clearance sampling. Corridor drilling holes and cut out opening at ceiling and walls is Class III which requires containment until a NEA is established and then the work may continue without containment or clearance sampling. During the drilling, the contractor will utilize equipment that contains HEPA filters. The use of wet methods and HEPA filtered equipment, along with Engineering Controls that were established during the NEA will insure that no exposure is being created. 13. Q: If I need additional information about asbestos and effect. What website do you suggest? A: http://www.epa.gov/asbestos/pubs/ashome.html 14. Q: Will this Q& A posted on Watergate Community website? A: Yes it will be posted. 15. Q: If I have additional question in regards to the abatement process for Watergate to whom shall I send my inquiry? A: Please forward your inquiries to WCA Construction Manager: Gus Ferriols (Email: constrmgrwca@aol.com ) and he will distribute your questions to the appropriate consultant - 5 -