THE PRODUCTION OF ELECTRICITY FROM WOOD AND OTHER SOLID BIOMASS

Assignment 8: Comparison of gasification, pyrolysis and combustion

6 CONSIDERATION OF ALTERNATIVES

Renewable Energy from Biomass. Opportunities in London and Area? Eric Rosen

Waste a source of energy. Regional Solid Waste Management Plan Review: Engaging solutions for tomorrow. Incineration. Incineration

Drying of Woody Biomass. Process Engineering / GEA Barr-Rosin

Biomass Boiler House Best Practices. Irene Coyle & Fernando Preto CanmetENERGY

High-performance steam boiler and hot water boiler plants for industry

Improving Energy Efficiency through Biomass Drying

THE PRACTICAL, PROVEN PATH TO GREEN ENERGY. RTP rapid thermal processing from Envergent Technologies

How To Run A Power Plant In Celje

Well Positioned for the Future

Good Practice Form

MOSS WOOD BOILER SYSTEMS

Gasification as means of Waste-to-Energy - Main Parameters and application -

Business Plan: Wood chip gasifier (Deliverable 5.2)

Commercial Scale Fast Pyrolysis Oil Production and Utilisation. Bert van de Beld, IEA conference - Berlin

Södra Näs Vimmerby Energi AB Biomass District Heating Plant, Sweden

Continuous flow direct water heating for potable hot water

Technologies for small scale Biomass CHP-Plants an actual survey

SEATTLE STEAM COMPANY FREQUENTLY ASKED QUESTIONS

M.Sc. Matti Kivelä Power Plant Manager R&D Lahti Energia Oy P.O. Box 93 FIN Lahti Finland Tel matti.kivela@lahtienergia.

Energise your waste! EU legislation pushes for a reliable alternative to landfilling for residual waste. 13 th September 2011, Birmingham

Bioenergy. A sustainable energy source.

University of Iowa Power Plant

INTEC Engineering GmbH Heating Solutions for the Marine Industry

BIOMASS LOOKING FOR EFFICIENT UTILIZATION THE REHEAT CONCEPT. Jaroslav Lahoda Olaf Arndt Walter Hanstein. Siemens Power Generation (PG)

How To Gasify Wood And Agriculture Biomass

10 Nuclear Power Reactors Figure 10.1

Mount Wachusett Community College. Energy Conservation & Conversion : A Cost Sharing Approach

Outlook on Integrated Gasification Combined Cycle (IGCC) Technology

Energy From Waste or Waste-to-Energy. Pyromex. The Solution to Multiple Energy & Environmental Issues James Pfeiffer, CEM

THE OPTIMISATION OF BIOMASS COMBUSTION IN SMALL BOILERS

Developments and trends shaping the future for Waste-to- Energy technology suppliers

Finanzierung von Erneuerbaren Energie und Energieeffizienz Projekten in Asien. INTEC Engineering GmbH Berlin,

Rule EMISSIONS OF OXIDES OF NITROGEN FROM LARGE WATER HEATERS AND SMALL BOILERS

Electric Thermal Storage (ETS) Heating: Affordable, Dependable Home Heating Options for Mainers

Efficiency Metrics for CHP Systems: Total System and Effective Electric Efficiencies

Enhanced power and heat generation from biomass and municipal waste. Torsten Strand. Siemens Power Generation Industrial Applications

Gasification of Solid Waste: Is this the recipe for trash to treasure?

Presentation Outline. Background

Biomass-to-Fuel-Cell Power For Renewable Distributed Power Generation

Biomass Conversion to Electricity: Stand Alone Power Plants, Co-Generation,

BOILER OPERATORS HANDBOOK

Arecibo Resource Recovery Project

INDEX GENERAL

TGE TECH. Waste and Green Energy Management For a best future TEL HAY JUNE 2008

Generating Current Electricity: Complete the following summary table for each way that electrical energy is generated. Pros:

Half the cost Half the carbon

GreEnergy. Power Plants. ELECTRICAL POWER from CEMENT PLANT WASTE HEAT. for the Cement Industry

Top Technology for Industry, Agriculture, Business and Communities

Weiss A/S Presentation. by Bo Johansen

British Columbia s Clean Energy Vision

Tutkimuksen merkitys menestyvässä liiketoiminnassa- Innovaatiosta tuotteeksi

Cofiring of biomass in coal-fired power plants European experience Dr Colin Henderson IEA Clean Coal Centre

Overview of Integrated Coal Gasification Combined-cycle Technology Using Low-rank Coal

University of Missouri Power Plant Combined Heat and Power Upgrades Columbia, Missouri

Development of Coal Gasification System for Producing Chemical Synthesis Source Gas

ERK Eckrohrkessel GmbH (2016) 1. Powerful First-Class Boiler and Combustion Systems & Complete Engineering Services

JASE-world Waste to Energy Sub WG Masanori Tsukahara Hitachi Zosen Corporation

Siemens Power Generation Innovationstrends bei Anlagen und Komponenten in der Energieerzeugung

Design and Test Operation Performance of 1,500 C Class Gas Turbine Combined-Cycle Power Plant:

BIOMASS RESEARCH at ECN. Bram van der Drift

London Pollution Study Group

Waste to Energy in Düsseldorf. for a clean city.

Assessing the Changes Required by the Industrial Boiler MACT Regulations

Clean Energy Systems, Inc.

Stora Enso Fors Ltd Sweden

NORTH LONDON HEAT AND POWER PROJECT DESIGN OF PLANT, NUMBER OF PLANT LINES

The heat plant Future biorefinery. Panndagarna 2015 Västerås, April

Hybrid Power Generations Systems, LLC

State of the Art (SOTA) Manual for Boilers and Process Heaters

Subsidising Biomass Electricity - Contracts for Difference and what they mean for dedicated and converted biomass power stations

SULFUR RECOVERY UNIT. Thermal Oxidizer

EFFICIENT ENERGY SUPPLY (ELECTRICITY AND DISTRICT HEAT) FOR THE CITY OF LINZ

CHP & ENVIRONMENTAL COMMODITIES: MARKET & POLICY UPDATE FOR MONETIZING RENEWABLE ENERGY CREDITS FROM CHP PROJECTS. Thomas Jacobsen October 2012

Evaluation of mobile storage systems for heat transport. G. Storch, A. Hauer, A. Krönauer ZAE Bayern, Walther-Meißner-Str. 6, Garching, Germany

Power Island. Industrial Power Plants. / energy

RECOVERING RESOURCES FOR ALL. Integra North Energy Recovery Facility

A Weissenbach AUSTRIA Tel. +43/2672/890-0, Fax: Internet: office@polytechnik.at

Quanzhou city Licheng Huangshi Machinery Co., Ltd VANCOUVER ENVIRONMENTAL MACHINERY INVESTMENT LTD TEL:

4 th EU Sout Africa Clean Coal Working Group Meeting

RECOVERING RESOURCES FOR ALL. Integra South East Energy Recovery Facility

POLYCITY. Technical measures and experiences at a 6 MW cogeneration plant with wood chip furnace POLYCITY

Biomass Gasifier: Principle and application

The Technology and Business of Power Andrew Valencia, P.E. Lower Colorado River Authority

Gasification of Sludge and Biosolids A Review of Technology Fundamentals and the Current Commercial Status

Introduction to Waste Treatment Technologies. Contents. Household waste

From today s systems to the future renewable energy systems. Iva Ridjan US-DK summer school AAU Copenhagen 17 August 2015

CEFC financing first for major Western Australian waste-to-gas project

NRG ENERGY, INC. / ALTER NRG CORP. Somerset Power Plant. GTC Annual Conference October 5-8, 2008

Power Generation through Surface Coal Gasification

Conventional Energy Sources

CANADA S RESOURCES: CONVENTIONAL AND ALTERNATIVE ENERGY

Carbon Dioxide Membrane Separation for Carbon Capture using Direct FuelCell Systems

Basics of Kraft Pulping & Recovery Process. Art J. Ragauskas Institute of Paper Science and Technology Georgia Institute of Technology

Work package 3 Comparison of member state approaches

Transcription:

1300-650 West Georgia Street PO Box 11582 Vancouver, BC V6B 4N8 T: 604.637.2501 F: 604.637.2506 www.nexterra.ca www.nexterra.co.uk BIRMINGHAM BIO POWER LTD., TYSELEY, UK RENEWABLE ENERGY 10 MW POWER PLANT

Nexterra designer Jeff Steiger works on the design of the renewable energy power plant in Tyseley near Birmingham, UK. Project Description Project Name: Birmingham Bio Power Ltd. (BBPL) Location: Tyseley, UK Project Developer: Carbonarius Project Delivery: MWH will provide balance of plant and EPC services Facility Type: Renewable Power Generation Plant Application: Gasification system will provide high pressure steam for electrical power production Nexterra Scope of Work: Nexterra will supply gasification and steam generation systems from fuel handling to stack (excluding turbine) Investors: Balfour Beatty plc, Eternity Capital Management, Foresight Group s UKWREI fund, Green Investment Bank and GCP Infrastructure Fund Bonding: Provided by Export Development Canada (EDC) System Highlights Start-up: 2016 Capacity: 10 MWe of electricity Fuel: 67,000 tonnes/yr of locally sourced, class A C waste wood diverted from landfills Fuel moisture content: 20 25% This illustration shows the building that will house the Birmingham Bio Power Ltd. plant. Expected System Performance Electricity Production (Gross) Electrical Generation (Home Equivalent) Avoided CO 2 Emissions Avoided CO2 Emissions (Car Equivalent) Waste Wood Diverted from Landfills 10.3 MWe 17,000 homes 107,000 tonnes/yr 45,000 cars off the road/yr 67,000 green tonnes/yr Nexterra has demonstrated that they have a proven, robust gasification platform that will handle the wood waste feedstock available in the UK while still meeting the stringent UK emission regulations. We look forward to working with them on this and other projects in the UK. - Ian Brooking, Director, Carbonarius PROJECT PROFILE 2

Process Fuel delivered to fuel storage and reclaim system. 4 Gasifiers convert woody biomass to combustible syngas. Clean syngas is burned in the oxidizer. The hot flue gas is directed through a steam boiler to produce high pressure steam. Steam is distributed to a condensing steam turbine to produce electricity. An SNCR is utilized to reduce NOx in flue gas. The Baghouse cleans flue gas before exhausting it out the stack. Benefits Generates enough renewable energy to power 17,000 homes. Qualifies as a UK Advanced Conversion Technology (ACT). Project receives the highest level of Renewables Obligation Certificates (ROCs). Project creates 100 engineering, project management and construction jobs, and 19 full-time jobs at the plant once operational. Meets stringent WID emission standards. Nexterra s 1st biomass gasification system in the UK will anchor the 10 MW renewable power plant. This illustration shows the inner workings of the system but is not an accurate representation of the actual project configuration. To execute this project in the UK, we needed a gasification technology that was proven, reliable and bankable. After looking at different technologies we determined that Nexterra s technology and track record was the best fit for the project. - Ian Miller of MWH Global, EPC and project management company for the Birmingham Bio Power Ltd. renewable energy power project in the UK SYSTEM ILLUSTRATION 3

Nexterra technology meets ACT criteria for ROC program Nexterra s gasification technology qualifies as an Advanced Conversion Technology (ACT) under UK legislation, meaning that the power generated by the project will receive the highest band of Renewables Obligation Certificates (ROCs). These designations have assisted the Birmingham Bio Power Ltd. renewable energy project to be more financially viable. Under the Renewables Obligation (RO), licensed electricity suppliers are required to source a percentage of the electricity supplied from eligible renewable sources. Renewables Obligation Certificates (ROCs) are issued for each MWh of renewable electricity generated based on ROC banding. Project managers Kelly O Neill for Nexterra (left) and David Rome for MWH on the site of the Birmingham Bio Power Ltd. renewable energy plant in Tyseley, UK. Tyseley site soon to be transformed The renewable energy plant will be built on the site of Webster and Horsfall factory in Hay Milles. W&H have been on the site since the mid 19th century, when James Horsfall rebuilt a disused blade and sword factory as a steam driven mill beside the River Cole. It was from this site that W&M manufactured the first transatlantic cable which was laid in 1866, comprising 30,000 miles of wire taking 250 workers more than 11 months to manufacture. After a period of decline before and after extensive bombing in World War II, Tyseley is attracting many new companies in a range of industries. The Tyseley site will soon be transformed from a vacant lot to the Birmingham Bio Power Ltd. renewable energy plant, employing over 100 workers during construction and 19 permanent staff once the plant is completed. Nexterra s Gasification Technology Nexterra s core technology is a fixed-bed updraft gasification system. These systems range in output from 2 to 40 MWth (8 to 140 MMBtu/hr) and 2 15 MW electric. Nexterra s systems are simple in design, able to handle a wide-range of feedstocks and produce very low emissions. 1. Fuel In-Feed System - The metering bin provides short-term fuel storage and ensures a constant supply of fuel to the gasifier. Fuel is conveyed by a horizontal auger from the metering bin to a vertical auger that pushes fuel into the base of the fuel pile inside the gasifier. 2. Gasifier - Within the gasifier, the fuel moves through progressive stages of drying, pyrolysis, gasification and reduction to ash. Combustion air (20-30% of stoichiometric), steam and/or oxygen are introduced through the inner and outer cone into the base of the fuel pile. Partial oxidation, pyrolysis and gasification occur at 1500 1800 F (815 980 C), and the fuel is converted into syngas and non-combustible ash. Combustion temperatures in the fuel pile are tightly controlled and kept below the ash melting temperatures to ensure that there is no formation of clinker and that the ash flows freely. 4 3. Automatic Ash Removal System - As the fuel is processed in the system it is reduced to non-combustible ash. The ash migrates to the grate at the base of the gasifier where it is removed intermittently through a set of openings. When hydraulically activated, the rotating grate opens and the ash drops into two ash hoppers. Each ash hopper has two parallel augers to convey the ash to a collection conveyor and an enclosed ash bin. 4. Syngas - Syngas exits the gasifier at 500 700 F (260 370 C). The syngas can be combusted in a close-coupled oxidizer with the resulting flue gas directed to heat recovery equipment (e.g., boilers, thermal oil heaters, air-to-air heat exchangers), fired directly in industrial boilers or kilns, or cleaned for use in the firing of internal combustion engines or the production of higher value gases and chemicals. 1 2 3 SITE INFORMATION 4

BIRMINGHAM BIO POWER LTD. BIRMINGHAM BIO POWER LTD. (BBPL), TYSELEY, UK UNIVERSITY OF BRITISH COLUMBIA, VANCOUVER, BC U.S. DEPARTMENT OF ENERGY, OAK RIDGE US DEPARTMENT OF VETERANS AFFAIRS NATIONAL LABORATORY, OAK RIDGE, TN MEDICAL CENTER, BATTLE CREEK, MI UNIVERSITY OF NORTHERN BRITISH COLUMBIA, PRINCE GEORGE, BC DOCKSIDE GREEN RESIDENTIAL DEVELOPMENT, VICTORIA, BC KRUGER PRODUCTS LP, NEW WESTMINSTER, BC TOLKO INDUSTRIES, LTD., HEFFLEY CREEK DIVISION, KAMLOOPS, BC NEXTERRA PROJECTS 5

PLAN VIEW 6

ELEVATION VIEW 7

About Nexterra Systems Corp. Vancouver, British Columbia Nexterra Systems Corp. is a global leader in plant-scale, energy-from-waste gasification systems for the production of clean, renewable heat and power. The company offers a proven gasification technology with over 150,000 hours of commercial operation and uptime of over 90%. Nexterra s gasification technology delivers lower costs, higher reliability, lower emissions and greater fuel flexibility compared to conventional biomass energy systems. Nexterra has completed seven commercial projects in Canada and the US, and is delivering the sale of its first project in the United Kingdom. Projects include: U.S. Department of Veterans Affairs (DVA) Medical Center, Battle Creek, MI University of British Columbia, Vancouver BC U.S. Department of Energy (DOE), Oak Ridge National Laboratory, Oak Ridge, TN University of Northern British Columbia, Prince George, BC Dockside Green Residential and Commercial Development, Victoria, BC Kruger Products Limited Paper Mill, New Westminster, BC Tolko Industries Ltd., Heffley Creek Plywood Mill, Kamloops, BC Nexterra Product Development Centre (PDC), Kamloops, BC For more information: www.nexterra.ca and www.nexterra.co.uk The Birmingham Bio Power Ltd. renewable energy plant will be located in Tyseley, a suburb of Birmingham, UK. Pictured here is the Council House, headquarters of the Birmingham City Council, the largest local authority in Europe. A medium-size market town during the medieval period, Birmingham grew to international prominence in the 18th century during the Industrial Revolution, producing a series of innovations that laid many of the foundations of the modern industrial society. With the invention of the industrial steam engine by James Watt in 1776, it was hailed as the first manufacturing town in the world. The Birmingham Bio Power Ltd. renewable energy plant is located in Tyseley, a suburb of Birmingham, UK. BAE Systems support of Nexterra s entry into the UK renewable energy market is part of a long-term commitment we have to Canadian industry. Nexterra has a fantastic technology and we are delighted it has secured its first project here. We hope this is just the beginning for Nexterra in the UK and we look forward to continuing our support to its growth in this market. - John Rossall, Industrial Participation Director, BAE Systems Project Developer Carbonarius is a joint venture between O-Gen UK and UNA Group. Project Delivery / EPC MWH Global is a strategic consulting, technical engineering, environmental and construction services firm in the infrastructure sector. www.mwhglobal.com Project UK Investors GCP Infrastructure Fund Ltd. Project Bonding Export Development Canada (EDC), Canada s export credit agency, has provided bonding for the project. 1300-650 West Georgia Street PO Box 11582 Vancouver, BC V6B 4N8 T: 604.637.2501 F: 604.637.2506 www.nexterra.ca UK Office: i2office 1st Floor, 2 Snow Hill Birmingham UK B4 6GA Tel: +44 7763 537891 www.nexterra.co.uk BIRMINGHAM BIO POWER LTD., TYSELEY, UK RENEWABLE ENERGY 10 MW POWER PLANT 20140105