Grafton Bridge Strengthening Will Pank, Associate Bridges, Beca Infrastructure Ltd



Similar documents
Foundations 65 5 FOUNDATIONS. by Richard Chylinski, FAIA and Timothy P. McCormick, P.E. Seismic Retrofit Training

Safe & Sound Bridge Terminology

Draft Table of Contents. Building Code Requirements for Structural Concrete and Commentary ACI

INCREASE OF DURABILITY AND LIFETIME OF EXISTING BRIDGES. PIARC TC 4.4 EXPERIENCE.

SEISMIC UPGRADE OF OAK STREET BRIDGE WITH GFRP

Field Damage Inspection and Static Load Test Analysis of Jiamusi Highway Prestressed Concrete Bridge in China

Chapter 5 Bridge Deck Slabs. Bridge Engineering 1

REHABILITATION OF THE FIGUEIRA DA FOZ BRIDGE

Design of Steel Structures Prof. S.R.Satish Kumar and Prof. A.R.Santha Kumar. Fig some of the trusses that are used in steel bridges

REPAIR AND STRENGTHENING OF HISTORICAL CONCRETE BRIDGE OVER VENTA RIVER IN LATVIA

ASSESSMENT AND PROPOSED STRUCTURAL REPAIR STRATEGIES FOR BRIDGE PIERS IN TAIWAN DAMAGED BY THE JI-JI EARTHQUAKE ABSTRACT

Shear Strengthening. Sika CarboDur Composite Systems

Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation

Emergency repair of Bridge B421

GARDEN CITY SKYWAY SUBSTRUCTURE REHABILITATION

Bridge Structural Rehabilitation Using FRP Laminates

National Council of Examiners for Engineering and Surveying. Principles and Practice of Engineering Structural Examination

USE OF MICROPILES IN TEXAS BRIDGES. by John G. Delphia, P.E. TxDOT Bridge Division Geotechnical Branch

Numerical modelling of shear connection between concrete slab and sheeting deck

DESIGN OF SLABS. 3) Based on support or boundary condition: Simply supported, Cantilever slab,

Detailing of Reinforcment in Concrete Structures

REPAIR AND RETROFIT OF BRIDGES DAMAGED BY THE 2010 CHILE MAULE EARTHQUAKE

SEISMIC RETROFITTING TECHNIQUE USING CARBON FIBERS FOR REINFORCED CONCRETE BUILDINGS

BRIDGE REHABILITATION TECHNIQUES

The Original Carbon Fiber Reinforced Polymer System

Chapter 3 Pre-Installation, Foundations and Piers

WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12

Analysis and Repair of an Earthquake-Damaged High-rise Building in Santiago, Chile

CHAPTER 9 LONG TERM MONITORING AT THE ROUTE 351 BRIDGE

STRUCTURAL ASSESSMENT REPORT BOLINAS MARINE STATION - BOLINAS, CALIFORNIA

DESIGN OF SLABS. Department of Structures and Materials Engineering Faculty of Civil and Environmental Engineering University Tun Hussein Onn Malaysia

MILMAN & ASSOCIATES STRUCTURAL CONSULTING ENGINEERS/ PROJECT MANAGERS

A Decade of Performance of FRP-Repaired Concrete Structures

APE T CFRP Aslan 500

Performance-based Evaluation of the Seismic Response of Bridges with Foundations Designed to Uplift

STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM

METHOD OF STATEMENT FOR STATIC LOADING TEST

Design of Bridges. Introduction. 3 rd to 4 th July Lecture for SPIN Training at the University of Dar es Salaam

Structural Failures Cost Lives and Time

University of Missouri Hospitals and Clinics. Structural Repair and Protection of Post-tensioned Parking Garage

IH-635 MANAGED LANES PROJECT, SEG. 3.2

SEISMIC RETROFIT DESIGN CRITERIA

US 51 Ohio River Bridge Engineering and Environmental Study

CITY OF TRAIL MEMORANDUM

Successful Approach to the Repair of Reinforced Concrete Support Structures in Delayed Coking Units

HIGH PERFORMANCE PRE-APPLIED SYSTEM FOR BLIND SIDE & BELOW GRADE WATERPROOFING APPLICATIONS

HIGH LEVEL SEISMIC UPGRADE COST ESTIMATE FOR CENTRE BLOCK, PARLIAMENT HILL

June 2007 CHAPTER 7 - CULVERTS 7.0 CHAPTER 7 - CULVERTS 7.1 GENERAL

ASHULIA APPARELS LTD. Client Summary Report

SEISMIC DESIGN. Various building codes consider the following categories for the analysis and design for earthquake loading:

LEGACY REPORT ER ICC Evaluation Service, Inc. Reissued November 1, Legacy report on the 1997 Uniform Building Code

Challenging Skew: Higgins Road Steel I-Girder Bridge over I-90 OTEC October 27, 2015 Session 26

CONCRETE FLOOR SLAB & CASTING BED CONSTRUCTION

6 RETROFITTING POST & PIER HOUSES

REHABILITATION OF CONCRETE BEAM BRIDGES IN CROATIAN STATE ROAD NETWORK

PERIODIC STRUCTURAL INSPECTION OF EXISTING BUILDINGS GUIDELINES FOR STRUCTURAL ENGINEERS

2015 ODOT Bridge Design Conference May 12, DeJong Rd Bridge High- Seismic Zone Case Study: Bridge Rehab vs. Replacement.

FOUNDATION TECHNICAL CATEGORY 3 (TC3) AUGUST 2012

SEISMIC RETROFITTING OF STRUCTURES

TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE

Murrays Bay Wharf Investigation and Repairs - Options Assessment

REHABILITATION PACKAGE 1-a

STRENGTHENING AND LOAD TESTING OF THREE BRIDGES IN BOONE COUNTY, MO

MEMORANDUM West Swann Avenue, Suite 225 Tampa, Florida Phone (813) Fax (813)

SAFETY FENCES, SAFETY BARRIERS AND PEDESTRIAN GUARDRAILS

Fire Damage Evaluation. Concrete Garage. Vehicular fires in parking garages are not an

Embedded Parts Introduction - Anchors

Design and Construction of Cantilevered Reinforced Concrete Structures

16. Beam-and-Slab Design

Experimental assessment of concrete damage due to exposure to high temperature and efficacy of the repair system

Important Points: Timing: Timing Evaluation Methodology Example Immediate First announcement of building damage

Condition assessment and repair of antenna towers concrete foundations

Photo 2. View showing flour mill, machine shed, veranda and saw mill + storage shed.

Structural Audit of Buildings

8 EXTRA LIGHT GRC SANDWICH ELEMENTS FOR ROOFING IN INDUSTRIAL BUILDINGS

EAST LYME HIGH SCHOOL

Analysis of the Interstate 10 Twin Bridge s Collapse During Hurricane Katrina

Chapter. Restoration of Damaged Structures

FEBRUARY 2014 LRFD BRIDGE DESIGN 4-1

How To Repair A Steel Pier With A Watertight Frame

The unit costs are based on the trend line of the 3 low bids for the average quantity.

SIKA AT WORK THE KAENG KRACHAN ELEPHANT HOUSE AT ZURICH ZOO

4B The stiffness of the floor and roof diaphragms. 3. The relative flexural and shear stiffness of the shear walls and of connections.

Numerical Analysis of the Moving Formwork Bracket Stress during Construction of a Curved Continuous Box Girder Bridge with Variable Width

BRIDGE RESTORATION AND LANDSLIDE CORRECTION USING STRUCTURAL PIER AND GRADE BEAM

Steve Brinkman Alain Pinel Realtors 167 S San Antonio Road Los Altos, CA RE: Foundation Inspection for 162 Del Monte Ave. Los Altos, CA 94022

ENGINEERED FOUNDATIONS. Department of Public Works Jeff Hill, PE

Waterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries

Miss S. S. Nibhorkar 1 1 M. E (Structure) Scholar,

beams columns blast walls slabs pipes protective coatings polymer concrete Solutions Looking for Problems...

Chapter 6 ROOF-CEILING SYSTEMS

738-B-297 POLYMERIC CONCRETE BRIDGE DECK OVERLAY. (Adopted )

SikaProof A Technology

Evaluation of Appropriate Maintenance, Repair and Rehabilitation Methods for Iowa Bridges

September 1, 2003 CONCRETE MANUAL CONCRETE PAVEMENT REHABILITATION

Transcription:

Grafton Bridge Strengthening Will Pank, Associate Bridges, Beca Infrastructure Ltd SYNOPSIS The strengthening of the Grafton Bridge is a sustainability project to expand the use and extend the life of a historical Auckland landmark. Originally designed to carry pedestrians and horse-drawn traffic in 1906, the bridge had an 8 tonne vehicle weight limit imposed in 1970. This strengthening project aims to upgrade the structure to carry modern traffic loading and become a dedicated bus route as a key link in Auckland City Council s Central Connector a new public transport corridor between Britomart and Newmarket. The structural works will include New Zealand s biggest ever carbon fibre reinforced polymer (FRP) bridge strengthening project. The original design did not cater for earthquake loading and the construction work will include a major seismic retrofit of the bridge piers using techniques sympathetic to the architectural vision of the original designers. This paper outlines the history of previous construction works to this heritage structure, describes material and physical load testing carried out to confirm assessment findings and explains the principles of strengthening proposals now being implemented to preserve the integrity of a beautiful 100 year old piece of architectural engineering. Figure 1 Grafton Bridge looking towards Symonds Street Cemetery 1 Grafton Bridge Strengthening, Pank

1.0 GRAFTON BRIDGE HISTORY 1.1. World Record Breaker Designed in 1906 and built by the Ferrocement Company of Australasia, Grafton Bridge was the longest reinforced concrete span in the world when it was opened in 1910. As a pioneering example of this type of structure a great deal of attention was paid to the record-breaking 98m arch span. The design was checked by Professor Moersch in Germany, and a condition of payment for the turn-key project was that the arch had to be load tested prior to opening. Road aggregate, weighing 5kN/m 2 was placed on half the arch and deflections of 3.5mm measured. Then two 17 tonne steam rollers were moved across the bridge simultaneously proving the load-carrying capacity. The grand opening marked a huge achievement for the city. However, the contractor went bust during construction and it appears not enough attention was paid to the approach spans, since within a decade major shear failures of the 25m span vierendeel girders were seen and the first load restrictions were put in place. Figure 2 Steamrollers load testing Grafton Bridge prior to opening in 1910 1.2. 1936 APPROACH SPAN RECONSTRUCTION Auckland City Council s chief engineer, Mr. A.J. Dickson, described in detail in the proceedings of the 1940 New Zealand Institute of Engineering Conference the reconstruction of the vierendeel girders. The deck was temporarily propped, the lower chord and failed vertical elements demolished, reusing reinforcement where possible, new piers were built in at mid-span, and the main beams reconstructed, greatly improving performance while not compromising appearance of the bridge as a whole. In Mr. Dickson s words once again this vital artery in the traffic routing of the City of Auckland is in full service, after an application of plastic surgery which has removed an inherent weakness The appearance has definitely not been impaired and is considered by many to have been improved This very informative paper on the 1936 reconstruction has provided valuable details of the bridge structure. It was retrieved from the family archives of Andrew Dickson of Beca who was asked to carry our assessment of his grandfather s beam column joints and happily found these to be sufficient. I mention this to illustrate the 2 Grafton Bridge Strengthening, Pank

generational impact of a landmark like Grafton Bridge. As the bridge ages gracefully several waves of engineers have passed and carried out maintenance and repair works to the enduring structure, including: Expansion joint replacement and surfacing 1953 Spandrel column repairs and shotcrete coating 1957 Concrete repairs 1973 Handrail repairs/crack injection 1990 s Parapet screen installation 2000 The original bridge was commissioned by the City Council, not because it was the cheapest or most risk free solution but because it offered an attractive alternative to a steel girder option, and would require less maintenance. I believe the hundred year life so far, and the fact that it is still cherished and ranked as the highest grade heritage monument by the New Zealand Historic Places Trust is a testament to the vision of the city fathers. Figure 3 1936 Reconstruction Drawing of New Pier and Replacement Beams 2.0 STRUCTURAL FORM AND MATERIALS The Grafton Gully motorway has more recently been threaded beneath the 98, span 3 pinned arch, and the 180m of reinforced concrete approach spans. The approach spans are divided into separate structures separated by movement joints and sliding bearings at abutments, with intermediate piers built in carrying loads down to Waitemata Series Sandstone. The big architectural piers either side of the arch span are hollow shell structures with a soft storey of three longitudinal walls at their bases. At Scheme Assessment stage concrete was tested and found to have a cylinder strength of 15.6MPa. Reinforcement is all undeformed mild steel bars with yield strengths between 210 and 250MPa. Carbonation tests were carried out and 3 Grafton Bridge Strengthening, Pank

penetration of carbon dioxide was discovered up to 40mm into the concrete. Reinforcement cover is generally 50mm. 3.0 STRUCUTURAL ASSESSMENT Beca was appointed in 2004 to design strengthening to enable the bridge to carry HN72 traffic loading in accordance with the NZTA Bridge Manual. Many of the details of this early reinforced concrete structure, however, simply do not comply with current standards. And so methods for assessment of the existing structure had to be adapted from various authorities overseas and verified by material testing. The arch itself was found to be adequate for carrying modern loads, as were Mr. Dickson s 1936 replacement beams. Reinforced concrete design had come a long way since the turn of the 20 th Century, and halving the approach spans was a tidy way of limiting liabilities. Beca did not have that option and so rigorous assessment of each individual element was necessary. The main largely architectural piers were found to rock under earthquake loading with an annual probability of exceedance of 1/1000 years, and to have insufficient lateral shear strength. Similarly the shorter fixed piers were found to attract more horizontal load than the larger more flexible piers and to have insufficient bending reinforcement at depths up to 12m below ground level. Deck beams over the main arch were found to have inadequate strength to carry the design traffic loading, and could fail under maximum bus axle loads. Figure 4 3d Structural Analysis Model 4.0 PHYSICAL LOAD TESTING The deck beams constructed in 1908 have some unusual detailing that defy a code approach to assessment and design. Reinforcement was fixed in so called trusses with top and bottom longitudinal bars held by vertical shear bars with split ends formed into a fish-tail detail around main bars. The spacings of these fish-tailed bars varies with a higher concentration close to supports reducing towards mid-span regions. One or two of these trusses are fixed in beams with additional main bars bent up over supports of continuous beams. 4 Grafton Bridge Strengthening, Pank

Figure 5 Shear Bar Drawing Figure 6 Shear Bar Photo showing exposed reinforcement In order to test the anchorage strength of the fish-tail 24 samples of 12mm, 16mm and 20mm diameter mild steel bars with varying bond lengths were made and tested in Opus laboratories. The tests indicated that the length of bonded plan bars was much less effective than the fish-tail detail and that a very short length of fish-tailed bar could develop the strength of the original steel section. The shear strength of reinforced concrete beams is addressed by different methods with a range of equations in a variety of international standards. The equations for the contributions of concrete and steel to beam shear strength are based upon highly variable empirical data from test results of simply-supported rectangular beams. Codes still largely rely upon a 100 year old strut and tie analogy to evaluate the contribution steel reinforcement makes to the shear strength of beams when reinforced in accordance with current practice. Of course we have standards to help us and we have peer reviewers to check that our designs comply with standards. We had much debate about the theoretical behaviour of these fish-tailed shear reinforcement bars and agreed to carry out physical load testing of beams on the bridge to verify our assessment findings. We also consulted one of the authors of NZS 3101 the Concrete Structures Standard of New Zealand, Professor Richard Fenwick of Auckland Uniservices, and he provided some very useful advice on the testing methodology. We arranged for testing of approach span transverse beams, of which there are approximately 200. If the code approach was followed and the unusual 1906 detailing was rejected as non-compliant these beams would all require strengthening. However, upon testing to ultimate loads no significant cracking was observed in 15 load tests and the secondary beams were accepted as capable of carrying ultimate design loads. 5 Grafton Bridge Strengthening, Pank

Figure 7 Load Test Equipment Above Deck Figure 8 Load Test Reaction Beam Below Deck 6 Grafton Bridge Strengthening, Pank

For the main longitudinal beams supported off the arch 40m over the Grafton Gully which could not be tested safely we carried out assessment to the UK Highway Agency s BD44 Assessment of Reinforced Concrete Bridge Structures to find upper and lower bound shear strengths by including or excluding the contribution of the fish-tail bars. The beams in this location were found to have deficiencies in bending and shear strength and we opted to add shear strengthening to cater for the lower bound existing beam capacity. 5.0 DESIGN OF STRENGTHENING FIT FOR A LANDMARK The original construction of the Grafton Bridge was an ambitious historic achievement by Auckland City. The 1936 reconstruction of its approach spans was a major invasive operation that was carried out with great attention to the impact on architectural form and overall proportion. Beca s 2006 design to significantly increase strength and stability had to be even more subtle limiting intervention where possible with the 100 year old structure, while respecting the architectural and heritage value of the landmark bridge. 5.1 FRP Deck Strengthening 110 of the main longitudinal bridge beams required strengthening to increase bending and shear strength. In order to minimise visual impact, while offering a cost effective solution that was appropriate and buildable, carbon fibre reinforced polymer (FRP) strengthening was chosen. Of the two types of FRP: wet lay-up fibre wraps, or prefabricated laminate strips the latter was selected for a number of reasons. Firstly, some of the beams were under strength by a large margin and in order to utilize the full existing beam section for flexure, shear strengthening should be applied across the full depth of the beam, and be anchored into the compression zone at the top of the slab. Secondly, a stubborn shotcrete layer applied in the 1950 s had to be removed prior to applying the FRP to the concrete structure. So in order to limit the extent of removal of shotcrete discrete strips of FRP were favourable to complete wraps of material around beam soffits and webs. Pull-off tests were carried out on the concrete substructure to verify adequate bond strength for the adhesion of the FRP to the concrete surface. Flexural strengthening was designed in accordance with fib Bulletin 14 Externally bonded FRP reinforcement for RC structures. The principles of strain compatibility between reinforced concrete beam and carbon fibre strips were applied in design, bond lengths calculated to avoid peeling off of the new material, and serviceability limit state checks made to account for safe loading of beams in the event of the loss of the FRP material. Shear strengthening comprised L-shaped strips of FRP laminate material that is inserted into slots cut through the deck slab and anchored with strong epoxy adhesive into the top of the beam section. Pairs of L-shaped strips are fixed one over the other to provide discrete U-bars at regular spacings which enhance the shear capacity of the reinforced concrete beam. This type of shear reinforcement has been tested on T-beams in laboratories in Switzerland to verify the equations used in design for additional shear strength. 7 Grafton Bridge Strengthening, Pank

Figure 9 Laboratory Testing of FRP Shear Strengthening 5.2 Seismic Upgrade of Approach Spans No provision was made for earthquake loading in the original design. In the 1936 reconstruction the approach spans were designed for horizontal seismic accelerations of 0.1g. While the bridge is not on a life-line route in the event of a major earthquake, it is an important crossing for the city. It was agreed by Auckland City Council that an annual probability of exceedance of 1 in 1000 years was an appropriate level of earthquake resistance for a bridge that is already 100 years old and whose remaining life is limited. Beca carried out response spectrum analysis of 3 dimensional models of the whole bridge structure. In longitudinal and transverse modes of vibration the stiffer, shorter piers were found to attract large forces. These piers are 3 foot (0.915m) by 5 foot (1.525m) in cross section, extend up to 15 down through soft strata to founding material and are very lightly reinforced. 12 of the approach span piers were found to have insufficient bending strength at depth below ground level. The majority of the piers that need to be strengthened are in the Symonds Street Cemetery. This is another grade A historic place that predates the bridge, and several of the bridge piers were constructed between graves from the 19 th century. In order to avoid damage to the fabric of the cemetery it was decided to strengthen piers by coring down through the existing concrete from deck level, then inserting new reinforcement bars into the section and grouting them in. The tops of the piers are to be extended with new reinforced concrete sections tying the new vertical bars into the longitudinal beams. As well as the works to the piers the seismic upgrade includes provision of shear keys between separate approach and main span structures, and longitudinal ties to reduce potential damage during earthquakes. These small scale reinforced concrete elements will be tucked up bearing shelves under the bridge deck between longitudinal beams hidden from view. 5.3 Main Pier Foundation Another feature of the bridge requiring major work was the main piers on either side of the arch span. The arch itself is founded on separate thrust blocks cast between three walls at the base of the piers. The bearing pressure beneath those large pad foundations are relatively low. However, the piers themselves, although hollow shells 8 Grafton Bridge Strengthening, Pank

are 35m tall and quite massive structures, founded on three strips of wall 1 foot (0.305m) wide. Trial pits were dug at the base of pier 7 in the cemetery to identify and test Waitemata sandstone at the founding level. Boreholes were drilled at pier 11 at the side of the motorway where rock was some 6m below existing ground level. It was found that additional bearing area was needed to support lateral earthquake loading, and that the pier walls themselves required major strengthening to be able to transfer forces to the founding rock layer. At pier 7 access is extremely restricted on the steep slopes of the cemetery, so ground anchors were selected that can be bored using small demountable drilling rigs. Rock is very close to the surface and shallow reinforced concrete beams will be cast within the pier walls to transfer forces to the ground anchors. At pier 11, however, ground levels have been raised to build the motorway and access is not restricted around the base of the structure. Five 900mm diameter piles will be constructed on either side of the pier. Pile caps will be connected through the existing pier walls to a series of beams cast within the shell structure. The only visible signs of this work on completion will be reinforced concrete walls across the front face of the pier bases. The extent of proposed strengthening works is shown in figure 10 below. 9 Grafton Bridge Strengthening, Pank

Figure 10 Grafton Bridge Strengthening Schematic Layout 10 Grafton Bridge Strengthening, Pank

6 Consultation, Consents and Concrete Repairs Our approach to design was to intervene as little as possible to the existing structure to bring it up to standard and all intervention must be done in sympathy with the character of the bridge. We explained our assessment and testing methods to the Heritage division of Auckland City Council, and the New Zealand Historic Places Trust when we presented our design proposals for the strengthening work. Their understanding of this approach to the bridge strengthening, acceptance of the materials to be used, and the construction methods that would be employed was vital in gaining approval for the consents required. As a registered heritage site resource consent is needed to do any upgrade work to the bridge. Much attention was paid to the method of works within the cemetery with restrictions on access and close management and control of works required to ensure the protection of historic graves and protected trees. Close collaboration between a team of heritage architects, planners, arborists, lawyers, bridge engineers and clients made the consenting process run smoothly and successfully. A large part of the proposed work includes restoration of the bridge as well as structural upgrading. A number of parts of the bridge are to be repaired and replaced including: Replacement of corroded steel bearings Replacement of expansion joints Restoration of bridge lighting New thin epoxy footpath surfacing Road re-surfacing Concrete repairs Protective coating of concrete structure For the first time in decades a detailed inspection of the entire bridge structure has been carried out. This involved some innovative access methods such as abseiling for high level areas, large mobile cherry pickers for motorway spans during night-time lane closures, and working off suspended scaffolds where extensive strengthening works are to be carried out. Approximately 300m of crack repairs have been identified during inspections and a few areas of spalled concrete, but relatively little corroded reinforcement for a bridge of this age. However, carbonation of the concrete cover has been found, and in order to prevent further ingress of acidic carbon dioxide into the structure, an anti-carbonation coating is to be applied to all exposed concrete faces below parapet level. We consulted widely on the type of coating to use, have had trial panels approved by the client and heritage architect and have opted for an elastomer-modified cementitious sprayapplied coating that is intended to look like new concrete when finished. 11 Grafton Bridge Strengthening, Pank

Figure 11 High Level Inspection by Rope Access 7 Construction Progress The contract for the strengthening works is currently underway and due for completion at the end of the year. The main contractor is Brian Perry Civil who have sub-contracted a number of specialist abseilers, scaffolding suppliers, drilling subcontractor and concrete repair specialists. FRP strengthening is being installed by Construction Techniques who are the local approved applicators for the Sika Carbodur materials being used. The FRP material has been tested at Auckland University to verify a tensile strength of 2800MPa. Quality Assurance during application is assisted by ongoing pull-off tests on substrate preparation, adhesion tests on samples of installed FRP and Glass Transition Temperature tests on samples of the epoxy adhesive taken from site. At the time of writing coring has commenced inside the cemetery piers and preparations are being made for the main pier foundation works. By the start of 2010 we hope to have completed another chapter in the life story of a living monument. By strengthening for increased road traffic demands, adding robustness and stability to resist earthquakes, restoring the fabric of the bridge and adding an enhanced layer of durability to the structure we hope to extend its working life, and preserve this cherished feature of Auckland s landscape for generations to come. On its 100 th birthday the Grafton Bridge will be re-opened with a new role in a new era as a key link in a new public transport route. The Central Connector will be an important new edition to Auckland s rapidly expanding transport network. 12 Grafton Bridge Strengthening, Pank