USAF TECHNICAL TRAINING NAS Pensacola Florida Develop America's Airmen Today --- for Tomorrow



Similar documents

SERIES NG 1800 STRUCTURAL STEELWORK

TECHNICAL BULLETIN SUBJECT: AFT FUSELAGE BULKHEAD AT FS 231.4, INTRODUCTION OF.

Water Pump Replacement

Specifications for Programs: 737, 747, 757, 767, 777, 787

Alenia Experiences on Composite Structures Repairs Benedetto Gambino

This Addendum supplements and clarifies the contents of Service Bulletin SB

Easy Six Cube Bookshelf. Copyrighted Material. Page 1

Tools Required: Sawzall, hack saw, or small body saw, drill, ¼ drill bit, ¾ hole saw, tape measure, silicone or epoxy, & 7/16 socket.

TITANIUM FABRICATION CORP.

PIPING SYSTEM - ABRASIVE SLURRIES Engineering Standard Specification. 96 B. Riutta

Autobody/Collision and Repair Technology/Technician CIP Task Grid

7.1 Safety Precautions-Aircraft and Workshop Workshop Practices 3 3 3

LYCOMING O-360. Engine Installation

TUBE-TO-TUBESHEET JOINTS: THE MANY CHOICES ABSTRACT KEYWORDS. Seal welding, tube-to-tubesheet welds, heat exchanger, mock-up, tube expansion

CLICKBOND FASTENER OVERVIEW:

PMCap Local Thin Area Repair and Restoration Component. for Pressure Retaining Items

Figure 1 (end) Updated document to corporate requirements Added text to Paragraph 2.4

INSTRUCTIONS THOROUGHLY BEFORE BEGINNING***************

09/07/07 GLASSFIBER REINFORCED CEMENT (GRC) C. S. I. Spec Master Spec Page 1

Installing the Sno-free Standing Seam System for Metal Roofs

Embedded Parts Introduction - Anchors

Installation Instructions

Acumen Enterprises, Inc.

FPU SYSTEMS OPERATION MANUAL BOH OFFICE MODULE (INCLUDING REPAIR PARTS & SPECIAL TOOL LIST) BOH FPU Field Pack/up Units CHAPTER 5

SAMPLE TEST QUESTIONS MOTOR VEHICLE BODY REPAIRER- ITA WEBSITE

MGB Chrome Bumper Conversion

Modular Locomotive System Instruction Manual for HBK8 George Body Kit

Fire Hydrant Troubleshooting

Precision components from start to finish. Excellence. in performance-critical machining & fabrications

DeZURIK 3-20" BAW AWWA BUTTERFLY VALVES WITH TRANSFER MOLDED SEAT

Dave s Sheet Metal Bending Brake

Installation Instructions

Technical Services & Capabilities

Crevice Corrosion on Stainless Steel Propeller Shafts

How to Build a Poker Table

SECTION CEMENT-MORTAR LINED AND COATED STEEL PIPE

Phosphoric Acid Anodized Aluminum Honeycomb

jbs nfb INSTALLATION INSTRUCTIONS AND OWNERS MANUAL Mechanical Steering for Inboard, Outboard, and Sterndrive Powered Vessels

1. Lay out 2 pieces of 7/8" tubing and mark for bending as shown. Remember that the bend is in the shaded area as shown below in Figure 1.

INTRODUCTION INTERLOCK KIT K-8110

DWG 001. Blueprint Reading. Line Standards Drawing Symbols. Instructor Guide

Use and Maintenance Manual

SECTION COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here)

Slide the new steering column shaft through the steering column from the driver compartment.

Fabricating a chassis from clad PCB board material

CCR274SS. A CRES SOLID FILM LUBE PASSIVATE CCR274CS p e r per per per (MS20604R) AMS 5731 ASTM A-493 MIL-L QQ-P-35 L F

How to Build a Printed Circuit Board. Advanced Circuits Inc 2004

Black Wolf POCKET BILLIARD TABLE INSTALLATION MANUAL. SERVICE DEPARTMENT P.O. BOX 68 BRISTOL, WI 53104

IKG Bar Grating: Anchoring

Heating, Ventilation and Air Conditioning

DRAFTING. Prepared by:

Colonnade Security Pipe

Installation Guide. Bath and Wall Surrounds SERIES B

INDEX. Sec. No. Items Page Nos.

This presentation to be used in conjunction with:

Section 6 Brake Drum Failure Analysis. Brake Drum Wear Conditions. What is Normal Wear? What is Deep or Excessive Wear? WARNING. Deep, Uniform Wear

HEATCON COMPOSITE SYSTEMS COMPLETE COMPOSITE REPAIR SYSTEMS

ENGINEERING SPECIFICATION FIBERGRATE MOLDED GRATING. January 24,

WATER SERVICE 2

Concept document. Section 13 Contract OR Section 28 Registration...

Cellar Tech Containment Well Cellar Systems

TABLE OF CONTENT

GLASTAR SERVICE BULLETIN 36, SUPPLEMENT A

FRP Grating, Handrail, Guidelines for Ladders & the Engineer Structural and Designer Shapes

Introduction to Manufacturing Process

Seismic Installation for Attic Storage System

Service Bulletin No. SB MANDATORY SERVICE BULLETIN. Safetying of standard and flop-type fuel pickup tubes.

SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

R44 SERVICE BULLETIN SB-89 (supersedes R44 Safety Alert dated 23 February 2015)

Aloha Airlines Flight 243 Boeing April 28,1988 Honolulu, HI

How to Build Your Own CornHole Game

Rittal s Comprehensive Family Of... NETWORK RACK SOLUTIONS

Holiday Inn Express & Suites Covington (Newton County) 1. Standing-seam metal roofing, custom fabricated.

BUILDINGA 1/10 SCALE FLATBED TRAILER

NATIONAL INSTITUTE OF BIOLOGICALS

ENGINEERING SPECIFICATION PULTRUDED DYNARAIL FIBERGLASS LADDER & LADDER CAGES

Trillium 40 Axis Spring Tensioner Wire Replacement Instructions

V47 Series Temperature Actuated Modulating Water Valves

AIRWORTHINESS BULLETIN

SECTION SANITARY SEWER AND STORM DRAIN SYSTEMS

Oil and Gas Pipeline Design, Maintenance and Repair

K. D. FRAME ASSEMBLY FOR CLOSED STEEL STUD WALLS...Ins 10. FRAME INSTALLATION DETAILS FOR CLOSED STEEL STUD WALLS...Ins 11

FRICTION MATERIALS & BONDING SERVICES

M/V Eleranta IMO Water Ballast Tank Inspection Report. China Shipping International Shipyard Co. Ltd (CSIS), Changxing Island, Shanghai

Good Boards = Results

Largest Applicator The the Northeast TEL: of Coatings in

Whitepaper. Modular Substation Cable Termination Design. Author: Allan Bozek P.Eng, MBA, EngWorks Inc, Calgary, Canada

Chapter 5 - Aircraft Welding

About Auto Body & Collision Repair Technician Training

03/12/14 19:25:24 IAM 751 PAGE 1 Job Titles by Job Number

ADDENDUM NO. 2. DATE: September 14, 2015 INVITATION FOR BID: IFB J Fire Station #22 Roof Replacement Project DATED: August 25, 2015

RAIL FREE SOLAR ROOF MOUNT

CF-Mesa, CF-Light Mesa, CF-Flute, CF-Metl-Plank, CF-Striated, CF-Santa Fe, CF-Architectural Flat, CF...

I BEAM TRACK INSTALLATION

MAST ARMS & POLES. Ornamental Pole Top & Bases

Load Limiter ULS-60 ULS-80 ULS-100 ULS-125. Table of Contents. Assembly Instructions Load Limiter ULS-60, -80, -100, -125

INSTALLATION OF A BAY WINDOW

We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden window unit.

ASME/ANSI B Cast Iron Pipe Flanges and Flanged Fittings ASME/ANSI B Malleable Iron Threaded Fittings ASME/ANSI B16.

Transcription:

USAF TECHNICAL TRAINING NAS Pensacola Florida Andrew P. Svendsen Instructor, 2A733 Blocks 1-4 361 TRS, Detachment 2 NAS Pensacola, Florida DSN 922-7484 FAX 922-7476 (850) 452-7484 E-Mail Andrew.Svendsen@Tyndall.Af.Mil https://afkm.wpafb.af.mil/asps/cop/opencop.asp?filter=ae-ed-00-23

OVERVIEW 2A733 Aircraft Structural Maintenance (ASM) Apprentice Course 2A735 Low Observable (LO) ASM Apprentice Course Supplemental Courses

TPR (Trained Personnel Requirements) 2A733 Apprentice Course 2011 TPR = 482 2A735 Apprentice Course 2011 TPR = 182 Supplemental Courses 2011 TPR = 325

ASM Apprentice Course JCABP2A733 048C 8 Blocks 76 Days 608 Hours

ASM Block 1 - Fundamentals of ASM 62.5 Hours Federal Hazardous Communication Program AFOSH OPSEC Air Force Basic Doctrine Aircraft Construction Features Metal Identification/Characteristics Metal Layout Non-powered cutting Sharp Bends

ASM Block 2 - Fabrication of Aircraft Parts 64 Hours Setback and Bend Allowance Radius Bends Hand and Machine Forming

ASM Block 3 - Preparation for Structural Assy 84 Hours Power Cutting Rivet Identification and Rivet Pattern Layout Pneumatic Drilling, Countersinking, and Dimpling

ASM Block 4 Research and Repair 66 Hours Technical Orders and Aircraft Documentation Classification of Damage and Stop Drilling Cracks Hazardous Material Storage and Shelf Life Program Corrosion Concepts, Prevention, and Removal Aircraft Tubing and Cable Assemblies

ASM Block 5 Aircraft Structural Repair 64 Hours Pneumatic Riveting Non-flush Repair Sealed Repair Flanged Hole Repair

ASM Block 6 Special Assemblies 76 Hours Combination Repair Access Door/Access Panel Flush repair Trimming/Fitting Aircraft Skins Nutplates and Special Fasteners Blind Rivets

ASM Block 7 Composite Repairs 100 Hours Fiberglass Repairs Bonded Honeycomb Repairs Vacuum Bagging and Hot Bonder Introduction to Advanced Composites Advanced Composite Repairs

ASM Block 8 Corrosion Control 92.5 Hours Coating Application Methods of Coating Removal PMB Booth/Cabinet Application of Primer /Coating

LOASM Apprentice Course JCABP2A735 048A 8 Blocks 76 Days 608 Hours

Blocks similar to 2A733 course. Block 1 (61.5 hours) Same as 2A733 Block 2 (41 hours) No hand forming Block 3 (77 hours) No dimpling Block 5 (55 Hours) No flanged hole repair

LO Block 4 T.O. s, Documentation, Damage Technical Orders and Aircraft Documentation (same as ASM) Classification of Damage and Stop Drilling Cracks (same as ASM) Aircraft Tubing Assemblies (no cable) Blind Rivets Classification & Tubing 42 Hours Nut Plates and High Stress Fasteners

LO Block 6 Composite Repairs 87 Hours Fiberglass Repairs Bonded Honeycomb Repairs (no metal bond) Vacuum Bag and Hot Bonder Introduction to Advanced Composites Advanced Composite Repairs

LO Block 7 Corrosion Control 94 Hours Hazardous Materials and Shelf Life Corrosion Theory/Prevention/Removal Coating Application/Removal Application of Primer/Coatings PMB Booth/Cabinet

LO Block 8 Low Observables 130.5 Hours Fundamentals Theory and Materials Removal/Application Process Racetracking Paint Stack-up Application Coating Removal Filler and RAM Application Fill and Fair Method

Supplemental Courses Course Length 2011 TPR Corrosion Prevention Control MTT Only 3 Days 1 Aircraft Balancing and Fasteners 6 Days 69 Aircraft Metal Bonded Repair 12 Days 97 General Advanced Composites 16 Days 146 Basic Repairs to Advanced Composites MTT Only 7 Days 12

Questions? E-Mail Andrew.Svendsen@tyndall.af.mil 361 TRS/Det 2 CoP: https://afkm.wpafb.af.mil/asps/cop/opencop.asp?filter=ae-ed-00-23