FLOOD INFORMATION SERVICE EXPLANATORY NOTES



Similar documents
The site is Lot 1 DP Survey of this lot and Willarong Road and Koonya Circuit is given in Figure 2.

Planning for sea level rise. Assessing development in areas prone to tidal inundation from sea level rise in the Port Phillip and Westernport Region

Objective 4: Enhanced community education, flood awareness and preparedness

Floor level for a house on a flood-prone site

Acknowledgments. Feedback and enquiries

11.4 Voluntary Purchase House Raising and Flood Proofing

Flooding in Brisbane

Integrated Local Flood Management and Drainage Strategy OVERVIEW

Council Strategy DOC/15/86752

Updated Federal Emergency Management Agency Flood Insurance Rate Maps and Zoning Ordinance Update. July 16, 2015 Policy Committee

APPENDIX 1 Floodplain Management Strategies & Guidelines

Structural Damage Due to Floods

Guideline: A risk assessment approach to development assessment in coastal hazard areas

Appendix F Benefit-Cost Analysis of Flood Protection Measures

Planning for Casey s Community

R enfrewshire Local Plan. Safe Environment. Page. Flooding & Sustainable Urban Drainage 163 Contaminated Land 175 Noise 177 Major-Accident Hazards 179

How To Get A Flood Immunity

House Code. House Code

Hurricanes and Storm Surge

Appendix A Flood Damages Assessment

Floodplain Development Land Use Review

General Insurance - Domestic Insurance - Home Contents Storm water damage policy exclusion flood damage

Flash Flood Science. Chapter 2. What Is in This Chapter? Flash Flood Processes

Flood Damage Mitigation And Insurance Costs

Flood Emergency Response Planning: How to Protect Your Business from a Natural Disaster RIC005

History of flooding. 12 Flood Management and Drainage Strategy. Riverine flooding

The AIR Inland Flood Model for the United States In Spring 2011, heavy rainfall and snowmelt produced massive flooding along the Mississippi River,

Proposed Re-development, At 321 London Road, Wyberton. Flood Risk Assessment - Revised

FLOOD PLAIN DESIGNATION AND PROTECTION

INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION. Infrastructure Flood Protection Remediation Policies

FLOOD RISK RECENT TRENDS AND POLICY RESPONSES

Melbourne Water Flood Risk Assessment: How flood impacts are assessed in the Port Phillip and Westernport region

Flood Facts 2F.1. Flood Facts

4.14 Netherlands. Interactive flood risk map of a part of the province of Gelderland in the Netherlands. Atlas of Flood Maps

Preliminary Environmental Information Report: Appendix 16.C. Flood Warning and Evacuation Plan

Interactive comment on A simple 2-D inundation model for incorporating flood damage in urban drainage planning by A. Pathirana et al.

New Brunswick s Flood Risk Reduction Strategy. Province of New Brunswick PO 6000, Fredericton NB E3B 5H1.

Appendix C - Risk Assessment: Technical Details. Appendix C - Risk Assessment: Technical Details

CDM. City of Jacksonville Master Stormwater Management Plan (MSMP) Update. December 2008 Update. Agenda. 1. Data Collection. 2.

6 FLOOD DAMAGES ASSESSMENT

Basements and Deep Building Construction Policy 2014

Architectural Processing and Inspections for Home Mortgage Insurance

To prevent increased stormwater runoff entering Council s drainage system and causing overloading of the system that in turn might cause flooding.

Catchment Scale Processes and River Restoration. Dr Jenny Mant The River Restoration Centre therrc.co.uk

Land claims are now being settled in Canterbury.

ADDING VALUE TO BOM FLOOD PREDICTIONS (WITHOUT MESSING AROUND WITH MODELS)

URBAN DRAINAGE CRITERIA

Guidance Notes: GARDEN FLOODING

SUSTAINABLE URBAN DRAINAGE SYSTEMS

The Insurance of Flood Risks

Lisgar District Basement Water Infiltration Investigation Answers to Residents Written Questions Received by Councillors Ward 10 Office

Rational Method Hydrologic Calculations with Excel. Rational Method Hydrologic Calculations with Excel, Course #508. Presented by:

Victoria Planning Provisions

Flooding Fast Facts. flooding), seismic events (tsunami) or large landslides (sometime also called tsunami).

Flood Protection Tips

5.0 OVERVIEW OF FLOOD DAMAGE REDUCTION MEASURES

Storm tide is the water level rise during a storm due to the combination of storm surge and the astronomical tide.

Summary: Introduction

San Diego Integrated Regional Water Management Implementation Grant Proposal Economic Analysis Flood Damage Reduction Costs and Benefits

OURIMBAH FLOOD RESPONSE PLAN

Storm tide is the water level rise during a storm due to the combination of storm surge and the astronomical tide.

Urban Flood Modelling

3.4 DRAINAGE PLAN Characteristics of Existing Drainages Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN

Product 4 (Detailed Flood Risk) for: Sam Murray (Amey) Site: Land at Kingsnorth Reference: KSL KR79 Date: 30 th November 2015.

MIKE 21 FLOW MODEL HINTS AND RECOMMENDATIONS IN APPLICATIONS WITH SIGNIFICANT FLOODING AND DRYING

2011 HYDRAULICS MANUAL

Flood Management and Drainage Strategy

Stormwater Management Functional Servicing Report

WHY HAVE FLOOD INSURANCE PREMIUMS GONE UP?

2D Modeling of Urban Flood Vulnerable Areas

Renfrewshire Strategic Flood Risk Assessment

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE

Managing stormwater flooding risks in Melbourne

Flood warnings. What they are and what they do. A guide to the Environment Agency s flood warning codes

Vital Earth Composting Facility Flood Risk and Drainage Statement


Frequently-Asked Questions about Floodplains and Flood Insurance FLOOD INSURANCE

Managing sewer flood risk

The Boscastle Flood 2004

In addition to the terms defined in this By-law, the following terms shall have the corresponding meanings for the purposes of this Section:

Coastal Risk Management Guide. Incorporating sea level rise benchmarks in coastal risk assessments

DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES. Run-off Analysis Methods

Modelling of Urban Flooding in Dhaka City

CRS 610 Ventura County Flood Warning System Website

Damage Potential of Tropical Cyclone

Emergency Spillways (Sediment basins)

Recommendations for future developments

Modelling Flood Inundation of Urban Areas in the UK Using 2D / 1D Hydraulic Models

PROPOSAL FOR CONTRACTORS ALL RISKS

AZ EGER-PATAK HIDROLÓGIAI VIZSGÁLATA, A FELSZÍNI VÍZKÉSZLETEK VÁRHATÓ VÁLTOZÁSÁBÓL ADÓDÓ MÓDOSULÁSOK AZ ÉGHAJLATVÁLTOZÁS HATÁSÁRA

Challenges. Estimated Damages from 100-Year Flood

Transcription:

FLOOD INFORMATION SERVICE EXPLANATORY NOTES Part 1 About the flood maps Limitations of the mapping What the maps don t show Where to find more information Definitions of words used to describe flooding.

About these maps The default flood event displayed on these maps is the 1% Annual Exceedance Probability (AEP) flood event (also known as the Q100 flood) is. It is the Defined Flood Event for the new Townsville City Council planning scheme adopted in late 2014. The 2% AEP flood (Q50 flood) is also available on these maps as previous planning schemes were based on the 2% AEP flood. Flood information is visible on this mapping system for scales 1:250 to 1:5000 only. Outside these scales, flood maps WILL NOT BE VISIBLE. The flood data shown is primarily for regional flooding. Overland flow and local flooding are not necessarily shown. The maps show data from flood modelling studies, not historical flood levels. Council does not have historical flood level information for properties or flood modelling for all of Townsville. Flood mapping will be added as it becomes available. The flood data is in grids that range in size from 5 x 5 m to 30 x 30 m. This means that the flood extent will not end or begin exactly as it is shown on these maps, rather the flood extent indicates whether regional flooding is likely to be a concern for your property. Limitations of the mapping The flood mapping may not be accurate if there have been substantial changes to the topography of your property of interest or to the catchment it is in, after the topographical data for the flood study was collected. These maps DO NOT show: 1) the absolute worst flooding that could occur. Townsville has experienced floods larger than 1% AEP floods. 2) flooding or inundation due to stormtide. 3) flooding that occurs because a drain is obstructed with debris or otherwise not functioning. 1

Further information For general instructions on how to use this service, including how to print, please download the MOSAIC user guide from: http://www.townsville.qld.gov.au/business/mapping/pages/mosaic.aspx#faq. For examples of how to use and interpret these flood maps, please refer to Explanatory Notes Part 2 For assistance interpreting information for your property of interest, please email To obtain a contour map for your property (for a small fee), please contact council's Customer Service Centre on 1300 878 001 or email For questions relating to planning or building approvals or habitable floor levels, please contact council's Customer Service Centre on 1300 878 001 or email Most of the flood studies on which these maps are based are available for download from: http://www.townsville.qld.gov.au/council/publications/reportdrawplan/engineerrep ort/flood/pages/default.aspx. For maps of modelled 100 year ARI stormtide by suburb and general information relating to stormtide: http://www.townsville.qld.gov.au/council/publications/reportdrawplan/engineerrep ort/stormtide/pages/tsvcot2007.aspx. To obtain stormtide information for your property of interest, please email For stormtide evacuation areas please refer to: http://www.townsville.qld.gov.au/resident/disaster/cyclones/pages/stor m_tide_evacuation.aspx. For general information related to flooding and flood preparation in Townsville: http://www.townsville.qld.gov.au/resident/disaster/cyclones/flooding/pages/default.aspx. 2

Flooding terminology AHD: stands for Australian Height Datum. Metre (m) AHD is a unit of measurement. 0 m AHD is approximately equal to mean sea level. Annual Exceedance Probability (AEP): the probability that a flood event of a particular size will be exceeded in any one year e.g. a flood event with a 1% AEP has a 1 in 100 chance of occurring, or being exceeded, in any year. Average Recurrence Interval (ARI): the statistically average time interval between occurrences of a flood of a given magnitude, or larger. An event of any size could actually occur in any given year. For example, a 50 year ARI flood has a 2% chance of occurring, being met or exceeded, in any particular year. A 50 year ARI flood should not be interpreted as occurring only once every 50 years. A Q50 flood is equivalent to a 2% AEP flood. Q100 Flood: a flood event with a 100 year Average Return Interval (ARI). It has a 1% (1 in 100) chance of occurring, or being exceeded, in any one year. A Q100 flood is equivalent to a 1% AEP flood. A Q100 or 100 year ARI flood should not be interpreted as occurring only once every 100 years. Defined Flood Event: the flood event adopted as a planning standard by a local government for the management of development in a particular locality. For example: The 1% Annual Exceedance Probability (1% AEP) flood event (also known as the Q100 flood) is the Defined Flood Event in the new Townsville City Council planning scheme which was adopted in late 2014. Previous planning schemes for Townsville City Council and the City of Thuringowa were based on the 2% AEP flood (Q50 flood). Flood extent: the area that is inundated by flooding Flood height is the flood level in m AHD above mean sea level at a particular point (see Figures 1.2 and 1.3). Flood height contours represent change in flood height in regular intervals. For these maps the interval is 0.1m (see Figure 1.1 below) 3

Figure 1.1: illustration of flood height contours using in the mapping system Flood depth is the difference between the flood height and the land elevation beneath it (see Figures 1.2 and 1.3). Figure 1.2: illustration of flood depth, flood height, land elevation (topographical height) Figure 1.3: Flood depth = flood height land elevation In this example, the flood height is 11 m AHD and the land elevation is 10 m, so the flood depth is 1 m Flood modelling: the prediction of stormwater flows and flooding heights using computer software packages. It is based on rainfall records for the area, topography, soil types and various parameters. Whilst these models are quite sophisticated, it is difficult to accurately model the variability of rainfall and all surface features across an urban area, so there is some uncertainty in every flood model. 4

Freeboard: a factor of safety usually expressed as a height above the adopted Defined Flood Event level. Freeboard is intended to compensate for factors such as wave action and flood modelling uncertainties. The planning scheme defines how much freeboard habitable floors must have above the Defined Flood Event. With the adoption of the 2014 Planning Scheme, habitable floors in new houses in Townsville must be 300 mm above the 1% AEP flood level. Habitable floor: bedrooms, kitchens and living rooms. Garages, carports, sheds, laundries and storage rooms are not considered habitable floors. Local flooding: an intense burst of rainfall over a short period of time causes excessive run-off that builds up in a small area and causes flooding of local area streets. Inundation lasts for a limited time, typically up to one to two hours. Regional flooding: when rivers, creeks and channels overtop their banks due to continuous heavy rainfall across a number of large catchments within a floodplain. This does not include flows over park residential and rural residential properties or stormwater backing up because a drain is obstructed with debris. Overland flow: stormwater run-off that spreads out over an area at a relatively uniform depth; also known as sheet flow. Storm Surge: an abnormal rise in sea levels caused by strong winds usually associated with a tropical cyclone. Its height is the difference between the observed level of sea surface and the level that would have occurred in the absence of the cyclone. Stormtide: the actual level of sea water resulting from the normal tide plus storm surge. Topography: land surface elevation 5