Previder Datacenters it starts here



Similar documents
Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management.

Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management.

Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management.

ITB2 Datacenters Informationbrochure 2015 Page: 2

Data Centre Stockholm II, Sweden Flexible, advanced and efficient by design.

Data Centre Southeast AMS 5, Netherlands Highly connected, premium data centre.

Strategic Data Centre Site Profiles Data Centre Co-Location London North

SimSafe Data Centre Standards and Accreditation

World s Greenest High Performance Data Center

About Injazat. Enterprise Cloud Services. Premier Data Center. IT Outsourcing. Learning and Development Services. Enterprise Application Services

Our Hosting Infrastructure. An introduction to our Platform, Data Centres and Data Security.

Technical specifications. Containerized data centre NTR CDC 40f+

Location. Central Business District. Ataturk Airport IFC. Sabiha Gökçen Airport

The Region s Leading Data Center Developer, Manager and Operator

Data Centre Harbour Exchange Square Campus, London Access to unrivalled connectivity.

Site Preparation Management Co., Ltd. March 1st 2013 By Nara Nonnapha, ATD UPTIME

DATACENTER COLOCATION. Flexible, Secure and Connected

Strategic Data Centre Site Profiles. Data Centre Co-Location London East

hong kong//china data center specifications tel: fax: internet + intellectual property + intelligence

OPERATOR - FACILITY ADDRESS - DATE

Datacentre London 1. Dedicated managed environment for mission critical services. Six Degrees Group

N O W A V A I L A B L E

DATACENTER Vienna 1. Scalable, Safe and Innovative

NORTHERN VIRGINIA ONE (NoVa) DATA CENTER OVERVIEW

LEVEL 3 DATA CENTER SERVICES IN OMAHA, NEBRASKA HIGH AVAILABILITY ENTERPRISE COMPUTING BUSINESS DEMANDS IT. LEVEL 3 DELIVERS IT.

Datacentre Studley. Dedicated managed environment for mission critical services. Six Degrees Group

ASX Australian Liquidity Centre. ASXCoLo

Data Centre Basiglio, Milan Flexible, advanced and efficient by design.

TELEDATA DATA CENTRE AND COLOCATION SERVICES IN MANCHESTER

IBM Twin Data Center Complex Ehningen Peter John IBM BS 2011 IBM Corporation

South Datacentre Studley

Europe s greenest data center

Colt Colocation Services Colt Technology Services Group Limited. All rights reserved.

As close to perfection. development and production. Modular data center

Sovereign. The made to measure data centre

Colocation. Introduction. Structure of the service. Service Description

UK regional peering Northern Ireland. Mike Higgins

Data Centre Barrie, Ontario

AT&T Internet Data Center Site Specification - Phoenix Area (Mesa, AZ)

Data Centre Powergate, London Flexible, advanced and efficient by design.

WORLD CLASS, GLOBALLY CERTIFIED, HIGH AVAILABILITY DATA CENTRE INTELLICENTRE 2 MACQUARIE PARK, SYDNEY

singapore//singapore data center specifications tel: fax: internet + intellectual property + intelligence

Datacentre South London Data sheet

South Asia s First Uptime Institute Certified TIER- IV IDC in Mumbai delivering % uptime

Frankfurt Data Centre Overview

DATACENTER ZURICH. Well Positioned for Security

LDeX Group. Colocation Solutions for High Expectations

1. Introduction Availability & types of colocation... 2

Data Centre Infrastructure

BELLE VUE MANCHESTER DATA CENTRE

OCDC. OMNIconnect Data Centre.

Onsite Support: 24/7/365 onsite team. Security: 24/7/365 onsite manned security and CCTV. Monitoring: 24/7/365 Environmental monitoring and management

100 Locust Avenue, Berkeley Heights, New Jersey P R O P E R T Y O F F E R I N G

How green is your data center?

The World s Largest Datacenter

Every business owns precious data and every business should recognise the risk of losing their data. Natural Disaster

Data Centers in Hong Kong Powering business success

Global Data Center & Colocation Facilities

19 Site Location, Design and Attributes. Site Location, Design and Attributes

IT STARTS WITH OPTICAL FIBRE

Eni Green Data Center - Specification

Experience Matters...

Doc Ref: baselayer.com 2015 BASELAYER TECHNOLOGY, LLC

POWERING A CONNECTED ASIA. Pacnet Hong Kong CloudSpace1 Technical Specifications. Asia s Pioneering Facility with Direct Subsea Cable Access

Data Center Solutions

DATA CENTERS. VAZATA Headquarters: 6900 Dallas Parkway, Suite 800 Plano, TX VAZATA.COM

Automation's Modular Containerized Datacenter Solutions

Optimum Climate Control For Datacenter - Case Study. T. Prabu March 17 th 2009

Technical requirements

CARRIER NEUTRAL DATA CENTERS: TERMINOLOGY, SERVICES, OPERATIONS

Data Center CH1. Elk Grove Village, IL

NXDATA 1 Data Center COLOCATION-4 Data Room

How To Visit An Internet Data Center

Upgrading the PRS datacentres: space requirement. S. S. Mathur, GM-IT, CRIS

European Business Reliance Centres when Commodity serves Green IT

Safeguard your critical IT assets in a highly secure, fully redundant, environmentally-conditioned and constantly monitored hosting space to receive

Data Centre Services. JT First Tower Lane Data Centre Facility Product Description

CyberFortress Data Center at Innovation Park Infrastructure and Topology Guide. Innovation Park Charlotte. NC DRAFT V0.

melbourne//australia data center specifications internet + intellectual property + intelligence tel: fax:

COMMODITIZING THE DATA CENTER MARKET

The Region s Leading Data Center Developer, Manager and Operator C O R P O R A T E P R O F I L E

Pacnet Hong Kong CloudSpace2 Technical Specifications. Upholding the Principles of Efficiency and Sustainability in Data Center Design

Green Data Centre Design

Data Centre Services. JT Rue Des Pres Data Centre Facility Product Description

Product description NCC Data Center

National Aluminium Co. Ltd.

European Code of Conduct for Data Centre. Presentation of the Awards 2016

JAWAHARLAL NEHRU UNIVERSITY

DataCenter 2020: first results for energy-optimization at existing data centers

Transcription:

Previder Datacenters it starts here

Previder Datacenters Introduction Previder has two sustainable, energy efficient and carrier-neutral datacenters in the Netherlands. Both datacenters have a number of unique features that ensure an extremely high level of reliability. The power supply, cooling and connectivity are completely redundant. Security is at the highest level and Previder is ISO 27001, ISO 14001 and ISO 9001 and NEN7510 certified. Offering a Twin Datacenter concept provides IT solutions based on the highest possible level of continuity. BREEAM Energy efficiency and sustainability were major factors in the design and set-up of the datacenters. According to BREEAM (a leading independent assessment method for determining the sustainability of buildings), our PDC1 is the very first datacenter in the world to be given the BREEAM "Excellent" designation. This has partly been achieved by the innovative gas engine heat pump that ensures that the heat from the datacenter is used to heat the head office. In addition, sustainable building materials have been used and existing materials reused where possible. Previder contact details Address Previder BV Expolaan 50 7556 BE Hengelo (Ov.) The Netherlands Sat nav: Wegtersweg 65, 7556 BP, Hengelo Telephone no. (+31) 88-332 33 33 Support telephone no. (+31) 88-332 33 44 Fax no. (+31) 88-332 33 34 E-mail info@previder.nl Website www.previder.com Twitter twitter.com/previder page 2 ISO / 9001 / 14001 / 27001

General Datacenter - general info PDC1 PDC2 page 3 Address Expolaan 50 Barnsteenstraat 15 7556 BE Hengelo (Ov.) 7554 TC Hengelo (Ov.) The Netherlands The Netherlands General Box-in-box datacenter Brand new datacenter. Concrete and steel supporting structures with aluminium façade cladding and concrete inner shell. TIER classification TIER 3+ TIER 3+ Certification ISO27001, ISO14001, ISO9001 ISO27001, ISO14001, ISO9001 NEN7510 NEN7510 Sustainability 100% green energy 100% green energy BREEAM-Excellent PUE 1,25 PUE 1,16 Altitude 14.5 metres above sea level 19.2 metres above sea level (Amsterdam Ordnance Datum (Amsterdam Ordnance Datum NAP) NAP) Area 11,000 m 2 2,500 m 2 Data floor area 4,500 m 2 1,600 m 2 Generator room Next to datacenter, containers Separate building Number of rooms 8 + private suites 4 Space per room 540 m 2, 316 racks 400 m 2, 216 racks Other facilities Lounge Lounge Boardrooms Boardrooms Meeting rooms Meeting rooms Work rooms Work rooms Canteen Canteen Wi-Fi Wi-Fi Parking spaces 80 32 Accessibility 24 x 7 access 24 x 7 access Directly off the A1 5 minutes from the A1, off the A35 10 minutes from the 15 minutes from the German border German border 30 minutes from Apeldoorn 35 minutes from Apeldoorn 85 minutes from Amsterdam 90 minutes from Amsterdam Loading and unloading Three secure loading/- Secure loading/unloading area unloading areas Maximum floor load 18 kn/m 2 18 kn/m 2 Clear height above data floor 3 metres 5,5 metres Height of data floor 210 cm, all cables under 105 cm, all cables under the floor the floor Type of data floor Anti static Anti-static Maximum roof load N/A, box-in-box 100 kg/m 2 Racks 19 racks with perforated 19 racks with perforated door (dimensions 600 x door (dimensions 600 x 1000 x 46U) 1000 x 47U) Flexibele co-location Footprint / Private corridor / Footprint / Private corridor / (on request) Private Cage / Private Suite Private Cage on request

Connectivity Connectivity PDC1 PDC2 Physical supply Three geographically- Three geographicallyseparated supply points separated supply points (manholes) (manholes) Meet-me rooms 2, geographically separated 3 separated rooms rooms External connectivity Geographically-separated Geographically-separated (Previder network) fibres to Amsterdam (Nikhef), fibres to Amsterdam (Telecity2) Equinix EN1 and PDC2 and PDC1 Carriers PDC1 is carrier neutral PDC2 is carrier neutral Available carriers Available carriers Tele2 Tele2 TrenT TrenT Relined Relined Eurofiber Eurofiber Ziggo Ziggo KPN KPN Cogas Unet Unet UPC UPC Atrato Atrato Breedband Nederland Breedband Nederland BT Internet Exchanges AMS-IX AMS-IX NLIX NLIX NDIX NDIX DE-CIX DE-CIX Internal connections Managed by Previder in an automated system Power supply Electricity supply PDC1 PDC2 Power supply 10 Megawatts 6 Megawatts Transformers 2 x 1.000 kva per room 2 x 2.500 kva total plant Redundancy 2N 2N Power supply to 230V, via two separate 230V, via two separate the racks paths (2N) paths (2N) Distribution to rooms 10kV ring systems Bus duct system (medium voltage) (low voltage) Power current Three phases / 420V Three phases / 420V available on request available on request Standard capacity 2 * 32 Amps per rack 4 * 16 Amps per rack (room 1) 2 * 32 Amps (room 2) High Density Available on request Available on request UPS 2 x 2 x 320 kva (2N) per room 2 x 2 x 550 kva (2N) per room Diesel generators 8 * 2100 kva (N+1) 4 * 2100 kva (N+1) Diesel tanks 24 hour operational stocks 48 hour operational stocks Contract for 24/7 Contract for 24/7 fuel delivery fuel delivery page 4

Cooling Climate control PDC1 PDC2 Cooling principle Environmentally-friendly Environmentally-friendly free-to-air cooling system free-to-air cooling system with closed-cold corridors on with closed-cold corridors the data floor. Heat reused on the data floor. to heat office premises. Capacity Average 1,2 kw/m 2 Average 2 kw/m 2 Maximum 24 kw/m 2 Maximum 24 kw/m 2 Pipes Fitted with leak detectors, Fitted with leak detectors, placed under the data floor placed under the data floor Cooling N+1 ACUs per room N+2 ACUs per room (N+2 optional) Heat dispersion N+1 chillers N+1 chillers Configured temperature 22 +/- 1 Celsius discharge 22 +/- 1 Celsius discharge air temperature measured air temperature measured at chillers at chillers Absolute humidity 40% +/- 15% 40% +/- 15% High Density Up to 24 kw per rack Up to 24 kw per rack on request on request Security Security PDC1 PDC2 Datacenter surveillance 24*7*365 24*7*365 Physical security High steel fencing around High steel fencing around the site the site Electric sliding gates for Electric sliding gates for incoming and outgoing incoming and outgoing vehicles vehicles Secure loading and Secure loading and unloading areas unloading areas Alarm system Certified security Certified security classification 4 classification 3, structural Closed-circuit television security classification 4 (CCTV) inside and outside Closed-circuit television (CCTV) inside and outside Access control Secure Access List (SAL) Secure Access List (SAL) Electronic card in combi- Electronic card in combination with valid proof nation with valid proof of identity of identity Fire safety page 5 Fire prevention Special steel construction Special steel construction and rooms separated by and rooms separated by fire-retardant walls with a fire-retardant walls with a 60 minute delay 60 minute delay Fire detection Aspiration system with Aspiration system as a presmoke detection alarm with separate smoke detection Extinguishing systems Environmentally-friendly Environmentally-friendly Argonite system in Argonite system in the rooms the rooms Fire hose reels in the Water mist extinguishing corridors system in the emergency power generator room Fire hose reels in the corridors

Building management PDC1 PDC2 Advanced building Stability of the environment Stability of the environment management system Important electrical and Important electrical and (BMS) mechanical systems mechanical systems Interaction between Interaction between various systems various systems Critical parameters, report Critical parameters, report on system performance on system performance Connection of safety Connection of safety systems if fire alarm systems if fire alarm is activated is activated Power consumption meters Power consumption meters Water consumption meters Cooling/heat transport meters Twin-datacenter Twin-datacenter concept Distance between PDC1 and PDC2 Inter-datacenter connectivity 4,7 km as the crow flies Redundant dark fibers WDM Ethernet VLANs page 6