Surgical Emergency Outpatient Surgical Treatment/Diagnostic Nursing Patient Support Services Medical Offices General Support Services Assisted Living



Similar documents
Surgical Emergency Outpatient Surgical Treatment/Diagnostic Nursing Patient Support Services Medical Offices General Support Services Assisted Living

Surgical Emergency Outpatient Surgical Treatment/Diagnostic Nursing Patient Support Services Medical Offices General Support Services Assisted Living

Performing Arts Research/Lab Campus Life Athletics Student Housing Academics Campus Infrastructure Food Services

UK HOSPITAL. Projects NOT Involving the General Fund, Road Fund, or Agency Bonds* Project Title / Description Total Budget Source(s)

24 Greenway Plaza Suite 601 Houston, Texas Phone Fax

ALBUQUERQUE PUBLIC SCHOOLS Facility Design & Construction / Maintenance & Operations

How To Improve A School In Ancient Ginghamshire

Cx for Enhanced Healthcare Project Delivery. Presentation Format. Project features and timeline

2010 Program Completion Form Registered Providers are responsible for reporting to the AIA/CES the names of ALL AIA members.

Element D Services Plumbing

School District Design and Project Management For Rochester, NY

Campus Energy Efficiency Fund Capital for Projects at Pennsylvania Colleges and Universities

CyberFortress Data Center at Innovation Park Infrastructure and Topology Guide. Innovation Park Charlotte. NC DRAFT V0.

Los Angeles Community College District

MECHANICAL SYSTEMS DESIGN. Team

Understanding Ambulatory Surgical Centers and Office Surgical Suites

Both health-care facility classification and area classification, as per CSA, determine the design requirements.

Guideline for Construction Reimbursement Rates (a) 7. Educational Facility Site, Construction, and Reimbursement

Overview of Outpatient Care Settings and Ambulatory Surgery Centers

Both health-care facility classification and area classification, as per CSA, determine the design requirements.

Defining Quality. Building Comfort. Precision. Air Conditioning

Operating Room Requirements for 2014 and Beyond

Mail: P.O. Box 16511, Jackson, MS Phone: Fax:

SECTION 5 HOSPITAL SERVICES. Free-Standing Ambulatory Surgical Center

Health Care Plan Review Unit

Energy-efficient data center achieves 2N reliability; MTU Onsite Energy generator sets provide critical backup

Engineers Edge, LLC PDH & Professional Training

DIVISION OF HEALTH PLANNING AND RESOURCE DEVELOPMENT AUGUST 2014

Environment of Care Utility Systems Management Plan 2014 Updated

FAST FACTS. Henderson Engineers, Inc. (HEI) is a multidisciplinary engineering firm headquartered in the Kansas City

Infrastructure & Cities Sector

Green Buildings Guidelines for Harvard

The South Carolina Sustainable Universities Initiative and its impact on the University of South Carolina

STRATEGIC ENERGY MANAGEMENT PLAN ENGLEHART AND DISTRICT HOSPITAL

UNIVERSITY OF MISSOURI Heating Ventilating and Air-Conditioning (HVAC) March

9770 CULVER BOULEVARD CULVER CITY, CA Incidental improvements: improvements that do not qualify as minor or

University of Maryland s Gossett Field House College Park, MD

The HVAC manufacturer s new building showcases energy efficiency and sustainability EDCmag.com

Harmonizing the Missions of the Academic Health Center

Presentation to Senate Select Committee on Government Facilities: Deferred Maintenance for State Supported Living Centers and State Hospitals

Total Building Commissioning: Case Study of the U.S. District Courthouse in Salt Lake City, Utah, USA

Building Energy Systems. - HVAC: Heating, Distribution -

Commercial Energy Use Worksheet

SUCCESS STORY ENERGY TO CARE UF HEALTH SHANDS VISTA REHAB & UF HEALTH SHANDS CANCER HOSPITAL (SOUTH TOWER)

Ventilation Standard For Health Care Facilities

TENANT DESIGN MANUAL UPDATED JULY 2015

Clare Broderick, PE, LEED-AP

POLK STATE COLLEGE CHILLER PLANT EVALUATION WINTER HAVEN, FLORIDA APRIL 2, C arastro & A ssociates, C&A# 5747

Upper Southampton Township Department of Licenses and Inspections 939 Street Rd. Southampton, Pa Phone: Fax:

Iron Hill Corporate Center Newark, DE

Become an Inova Fairfax Hospital Volunteer

Cameron S. Parker RN, BSN, CLCP

Deep Energy Savings in Existing Buildings

BASE PERMIT FEE x.80 = PLAN CHECK FEE*: $ BASE PERMIT FEE x.10 = MECHANICAL INSPECTION FEE: $ BASE PERMIT FEE x.12 = ENERGY CODE REVIEW FEE: $

Raising the Bar: A Comparison Study of Iowa s Current and Proposed Energy Code

College and University Services

CITY OF PLANO BUILDING INSPECTION FEE SCHEDULE. Initial Deposit/Fees are due at the time of the submittals. Effective 03/01/10

NEW YORK STATE MEDICAID PROGRAM REHABILITATION SERVICES PROCEDURE CODES & FEE SCHEDULE

FYI > California Title 24

TANKLESS WATER HEATER INSTALLATION DIAGRAMS

Geothermal Heat Pumps: A Pathway to Zero Net Energy (ZNE) for Schools, Homes and Businesses

SECTION MECHANICAL: ELECTRICAL: PLUMBING

Occupancy: Assembly (A-3) and Business -Includes offices, seminar rooms, classrooms, and café facility. Duke University Medical School

Classification and Qualification STANDARDS

Knowledge Base and Research Report

2012 Operating Room Design Manual

RENOVATION OF SCHOOL #171 SPORT COMPLEX

Tier IV Enterprise - Class Data Center

Statement Of Work. Data Center Power and Cooling Assessment. Service. Professional Services. Table of Contents. 1.0 Executive Summary

AEGIS DATA CENTER SERVICES POWER AND COOLING ANALYSIS SERVICE SUMMARY

MECHANICAL PROJECT PROPOSAL

Building Energy Management: Using Data as a Tool

Data Centres A complete solution to noise control and acoustic packages

Element D Services Plumbing

REGISTERED NURSE AS CIRCULATOR FOR ASC Last updated 5/16/2012

2014 Quality Home Comfort Award Winner: Clean Slate Leads to

IT White Paper MANAGING EXTREME HEAT: COOLING STRATEGIES FOR HIGH-DENSITY SYSTEMS

Infection Control Risk Assessment Matrix of Precautions for Construction & Renovation

Presentation Outline. Common Terms / Concepts HVAC Building Blocks. Links. Plant Level Building Blocks. Air Distribution Building Blocks

Construction Indoor Air Quality Management Plans for LEED. Matt Gregg, PE, LEED AP

THESIS PROJECT PROPOSAL: INTRODUCTION TO DESIGN AND DELIVERY ALTERNATIVES

Infection Control Risk Assessment Matrix of Precautions for Construction & Renovation

T a b l e o f C o n t e n t s

Recommendations for Measuring and Reporting Overall Data Center Efficiency

Students were surveyed by Brailsford & Dunlavey in the fall of 2000 to determine their priorities for Commons program spaces.

GHG Protocol Product Life Cycle Accounting and Reporting Standard ICT Sector Guidance. Chapter 8: 8 Guide for assessing GHG emissions of Data Centers

Aurora Mall. Aurora (Denver), Colorado

Penn Presbyterian Hospital

STATEMENT OF QUALIFICATIONS. Healthcare

Capital One Financial Data Center

HEALTHCARE BULLETIN. January 16, 2008 ALABAMA CON REVIEW BOARD UPDATE

Using Time-of-Day Scheduling To Save Energy

REQUEST FOR QUALIFICATIONS for SURREY PRETRIAL SERVICES CENTRE EXPANSION PROJECT RFQ #3225 VOLUME 1 PROJECT BRIEF

Rhode Island State Fire Marshal Fire Protection Systems Narrative Reports. What is a Narrative Report?

Comprehensive Solutions for Data Centers. Rely on Siemens for maximum uptime, reliability, and efficiency.

Dallas, Texas, is the site of the

FINAL REPORT LIFE-CYCLE COST STUDY OF A GEOTHERMAL HEAT PUMP SYSTEM BIA OFFICE BLDG., WINNEBAGO, NE

The Different Types of Air Conditioning Equipment for IT Environments

34-Bed Post Acute Rehabilitation Hospital at Dover

Transcription:

Surgical Emergency Outpatient Surgical Treatment/Diagnostic Nursing Patient Support Services Medical Offices General Support Services Assisted Living York State College Pittsburgh www.ba-inc.com

Barton Healthcare has provided MEP design services for numerous new and/or renovated outpatient surgical facilities. We understand the design challenges of MEP systems for outpatient surgical facilities and specifically consider the following: - Building Utility Requirements - Life Safety Systems - HVAC System Performance - Cost Effective and Lower Maintenance Solutions

Barton Healthcare understands the specific MEP and clinical requirements of Outpatient Surgical facilities and the significant role they play in delivering safe and efficient care to patients in a highly competitive market. Outpatient Surgical facilities are becoming increasingly complex and require mechanical and electrical systems with similar complexity as those serving surgical suites in acute care hospitals. Providing the level of MEP system performance required for regulatory compliance in outpatient surgical facilities is even more challenging when the facility is constructed in, or as part of, a standard medical office building (MOB). The building utility services (electrical power, natural gas, etc.) designed for standard MOBs often do not have adequate capacity to meet the demands of a licensed surgical facility. Our dedicated project teams evaluate all aspects of the project and building service requirements to ensure that the surgical facility s MEP systems meet the state and federal requirements for licensure. Our teams also understand the budgetary and operational limitations of outpatient facilities and strive to define budget-conscious and lower maintenance MEP solutions. If you are planning an outpatient surgical facility project, you need an experienced MEP design team that understands the critical differences in system requirements between an MOB and an outpatient surgical facility. Whether it is defining the appropriate HVAC system to meet airflow, temperature and humidity requirements in the operating rooms, or designing an appropriate emergency power system, Barton Healthcare s teams will help you identify the MEP systems and building requirements necessary to deliver a successful project.

WellSpan Health York, PA New Surgery & Rehabilitation Hospital 148,000 sq. ft. $41.4 million April 2012 Barton Healthcare provided mechanical, electrical and plumbing design services for a freestanding, 148,000 square-foot surgical and rehabilitation hospital with 73 private rooms on WellSpan Health s Apple Hill Campus. The hospital also includes a Traumatic Brain Injury (TBI) suite and four operating rooms, as well as an integrated therapy gym, transitional living unit and on-site diagnostic imaging. The facility also includes a full-service kitchen and cafeteria, as well as administration and pre- and post-op areas and support functions. The building s electrical system included paralleled medium voltage generators, a new campus primary metered electrical service and medium voltage site distribution to the hospital, as well as preparations to connect two existing secondary metered buildings to the site power distribution loop. The hospital s electrical distribution consisted of distribution switchboards, panel boards, transformers, multiple automatic transfer switches, and uninterruptible power supplies for the critical branches of the essential electrical system. The building s mechanical systems included several features and design strategies to improve the building s operational reliability. The building s Reliability Centered Maintenance program and infrastructure systems design created for the new hospital was recognized by UpTime Magazine as the program of the year in the category of Best Design for Reliability.

Hanover Healthcare Plus Hanover, PA Hanover SurgiCenter Fit-Out 10,000 sq. ft. $2.7 million January 2010 Barton Healthcare provided mechanical, electrical and plumbing design services for the fit-out of approximately 10,000 square feet of shell space to create an ambulatory surgical center for Hanover Healthcare Plus. The surgery center included three class C operating rooms as well as sterile supply, prep and recovery spaces and associated office and support space. Barton designed packaged rooftop units with hot water reheat zone control. The project also included a dedicated emergency generator to serve the surgical center. A vacuum pump and bottled oxygen, nitrogen and nitrous oxide gas systems were also added to serve the center.

Photo courtesy of GS Architects LLC. Capital Medical Center Harrisburg, PA Medical Office Building & Ambulatory Surgery Center 32,000 sq. ft. $4.7 million November 2012 Barton Healthcare provided mechanical, electrical and plumbing design services for a new 24,000 square-foot medical office building (MOB) and 8,000 square-foot ambulatory surgery center (ASC). The design for the Medical Office Building was for utility connections for the building, emergency generator, main water and sewer services and HVAC systems consisting of packaged DX equipment. The ASC was designed as a full fit-out with standalone mechanical systems which included two class C operating rooms.

Memorial Hospital York PA Outpatient Endoscopy Center 9,100 sq. ft. $1.1 million July 2008 Barton Healthcare provided mechanical, electrical and plumbing design services for renovations to convert approximately 9,100 square feet of existing medical office space on the third floor of the Surgery Center Building into an outpatient endoscopy suite. The project included 4 endoscopy procedure rooms as well as a central decontamination room, 9 prep/recovery bays and support areas. Barton Healthcare designed packaged rooftop units with high efficiency filtration to serve the suite and extended the existing emergency power system. A duplex vacuum pump, humidity control equipment, medical gas and vacuum distribution system and nurse call system were also added to serve the center. All MEP services were designed and prepped for future expansion of the suite.

Mechanical Electrical Plumbing Fire Protection Master Planning Commissioning Integrated Energy Solutions Barton Healthcare a division of Barton Associates, Inc. provides quality engineering solutions to healthcare clients throughout the Mid-Atlantic Region. Healthcare projects are often highly sensitive and complex in nature and require a customized engineering approach. Barton Healthcare has an extensive portfolio of state-of-the art facilities including surgical, emergency, outpatient surgical, treatment/diagnostic, nursing services, patient support services, medical offices, general support services and assisted living. Barton Healthcare considers ways to minimize energy consumption, conserve resources and enhance indoor environmental quality for every project we complete. Energy Conservation is a priority in every design and our staff of professionals are trained, licensed and/or certified to design MEP systems and evaluate the performance of these systems. We utilize building information modeling for greater team collaboration. We apply focus, dedication, practicality, precision and longevity to each project we deliver and live by these principles to help us achieve our mission We Make Buildings Work. www.ba-inc.com York Susquehanna Commerce Center North Building 221 West Philadelphia Street York PA 17401 State College 329 Innovation Boulevard Suite 112 State College PA 16803 Pittsburgh 5816 Forbes Avenue Suite 100 Pittsburgh PA 15217 10/2013