Health Care Plan Review Unit
|
|
|
- Elvin Moody
- 10 years ago
- Views:
Transcription
1 Health Care Plan Review Unit State of New Jersey Department of Community Affairs Division of Codes and Standards Bureau of Construction Project Review PO Box 817 Trenton, New Jersey State of New Jersey Chris Christie, Governor Department of Community Affairs Charles A. Richman, Commissioner Updated: 1/26/2016
2 NEW JERSEY STATE DEPARTMENT OF COMMUNITY AFFAIRS HEALTH CARE PLAN REVIEW UNIT PROCEDURES FOR SUBMISSIONS TO HEALTH CARE PLAN REVIEW EFFECTIVE January 1, 2016 Contents: I. PLAN REVIEW PROCESS II. INQUIRIES III. REQUIRED PROJECT DATA IV. SCHEMATIC SUBMISSION V. PRELIMINARY SUBMISSION VI. PARTIAL APPROVAL VII. FINAL SUBMISSION VIII. FINAL APPROVAL IX. FEE CALCULATION X. APPLICABLE CONSTRUCTION CODES, REGULATIONS AND STANDARDS XI. PLAN REVIEW RECORD & ENGINEERS CHECKLIST Please be advised that the plan review conducted by the New Jersey State Department of Community Affairs shall in no way ease or relieve the responsibility of the design professional from the execution of submissions for plan review in compliance with all codes, regulations, standards and comments in conformity with best practices current to the state of the art. The following procedures shall be adhered to for the submission of prints, specifications and required documents to Health Care Plan Review (hereafter HCPR) for plan review and project approval. Copies of this document and all necessary forms and applications may be obtained at the following web address: 2
3 I. PLAN REVIEW PROCESS As of January 1, 2016 all plan submittals to the NJ Bureau of Construction Project Review will be required to be in an electronic format. Please see the NJDCA Electronic Plan Review manual for specifics. Plans, specifications and required documents, for the construction of new facilities, additions and renovations for all types of health care facilities, licensed by the New Jersey State Department of Health & Senior Services (hereafter DHSS), shall be submitted by the design professional of record to: NJ DEPARTMENT OF COMMUNITY AFFAIRS HEALTH CARE PLAN REVIEW P.O. BOX SOUTH BROAD STREET, 4TH FLOOR TRENTON, NEW JERSEY for review, comment, and release prior to the submission of an application to the local construction official for a building permit. Prints, specifications and required documents shall be reviewed for compliance with mandated codes, regulations and standards. A list of all current codes, regulations and standards may be obtained from Health Care Plan Review. Written and oral comments based on each review shall be shared with the project coordinator and will be available in report form to all others indicated on the initial application. Responses and resolutions which have been accepted shall be properly indicated on the prints of the subsequent submission and/or in the specifications. Comments not responded to or unresolved and prints not in compliance with previous comments shall be cause for incomplete review. When a given review is determined to be incomplete, that project shall be placed last in the current workload. For all submissions with a valid Certificate of Need (hereafter CN), the narrative portion of the CN application, as may be modified by the Commissioner of Health s approval letter, will establish the scope of the work to be executed and shall contain the requirements for the physical plant appropriate to the Use Group and characteristics of patients or residents and will describe the services or treatments to be rendered. For Reference Number Projects (non-cn projects) a project narrative will establish the scope of the work to be executed and shall contain a detailed description of the scope of work to be performed and a description of the services or treatments to be rendered. The quality of the review and time for the review process are directly proportional to the quality of the submittal. Generally, the more complete and detailed the submittal, the fewer comments and the shorter the review time. Professional designers and their project personnel should work within the context of N.J.A.C. 5: and these procedures in order that the review process may proceed in a timely fashion mutually beneficial to all parties. The task of the reviewer is to verify that contract documents provide minimum compliance with the Codes as set forth under N.J.A.C. 5: To that end, the reviewer will assist the design professionals to the best of his/her ability, however, the reviewer s charge is not to direct or design projects under his/her review. 3
4 The plan review process is complex, often with considerable give-and-take between the reviewer and the facility. The owner s or the facility representative s participation in the plan review process is essential if the resulting building is to truly satisfy their needs and serve its intended purpose. The owner s or the facility representative s attendance at all meetings further aids the review process by insuring the full participation of all parties in discussion related to plan changes, or compromise necessary to satisfy program requirements within licensure and life safety code limitations. II. INQUIRIES Our mailing address is: New Jersey Department of Community of Affairs Health Care Plan Review P.O. Box South Broad Street, 4 th Floor Trenton, NJ Codes, Regulations and Standards Interpretations Questions regarding plan review procedures or building code interpretations may be directed to the supervisor of the Health Care Plan Review Unit at or in writing by using the addresses noted above. Our fax number is and our address is [email protected]. Questions regarding licensing standards and interpretations of those standards should be directed to the Department of Health and Senior Services at: Certificate of Need & Health Care Facility Licensure (CNHFL) PO Box 385 Trenton, NJ III. REQUIRED PROJECT DATA A. Fee Schedule and Payment Fees shall be calculated, using the Plan Review Fee Schedule and Volume Calculation Work Sheet (if applicable), to cover the type of work being done new buildings and additions, or for alterations and renovations. When utilizing paper payment, fee payment must accompany the Project Review Application, Plan Review Fee Schedule and a Scope of Work/Narrative in order to avoid delaying the assignment of the project to the review team. Refer to page 18 for specific information for completing the Fee Schedule. When utilizing epayment, epayment must accompany scope of work/narrative and complete/correct information regarding project to be uploaded at 4
5 B. Project Identification The CN number assigned by DHSS and/or the reference number assigned by DCA shall appear on all correspondence, on each sheet of the prints, and on the title sheet or first sheet of the specifications, addenda, and any supportive information submitted subsequent to the initial submission. C. Authentication of Submitted Plans and Specifications A NJ registered architect or NJ licensed engineer must send a signed/sealed letter attesting that the electronic documents submitted were developed under his/her supervision prior to the release of the plans. An embossed seal and wet signature are only required on the printed, approved plans that will reside on the work site and are needed for permits to be issued. D. Construction Phasing Plans and specifications for projects involving additions or alterations shall include information on the construction phasing necessary to insure the safety and well being of the occupants and as required to minimize disruption of existing services during the work. IV. SCHEMATIC SUBMISSION (Optional) A. Documentation 1. A Program Narrative: This narrative shall, for CN projects, expand on the narrative in the approved CN application as it relates to construction. For Reference Number projects, a project narrative, as determined by the facility, will establish the scope of the work to be executed and shall contain a detailed description of the scope of work to be performed and a description of the services or treatments to be rendered. In either case the narrative shall fully describe the current existing conditions (i.e. building Use Group, Construction Type, Use Group of other tenants, extent of demolition, etc.), the intended use of the space, the treatments or services to be rendered after completion of the project, project construction phasing (if applicable) and all new work to be done. For projects not required to have a CN but which must still have approval from DHSS a copy of the DHSS approval letter shall accompany the narrative. 2. A Schedule of Licensed Beds: A listing of all approved licensed beds by service (Med/Surg, Pediatric, Obstetrical, etc.) shall include the bed capacities by nursing unit and by room. 3. Health Care Plan Review Record, Part I. 4. Means of Egress Sheet (Attachment #1 to Plan Review Record). (Items 3 and 4 are available at HCPR) B. Prints 1. Site Plans (if applicable) shall indicate (but need not be detailed): a. Metes and bounds b. Orientation 5
6 c. Main traffic arteries (access to sites) d. Roadways (on site) curbs, walks, parking areas, fire lanes, and loading docks. e. Barrier-free parking, accessible routes, curb cuts, drop-offs, etc. f. Building footprint (existing structures to remain and/or be demolished shall be shown). g. A map indicating the location of the facility in its geographic area. h. Site survey showing existing utilities. 2. Architectural plans, elevations and sections: a. 1/4 or 1/8 scale single line floor plans of each floor showing the relationship of the various departments and services to each other. b. Each room shall be labeled with regard to its use and shall be numerically identified for reference purposes. Actual or program occupancy for each room shall be provided. c. Simple vertical sections or space diagrams. (if applicable) d. Transverse and longitudinal sections. (if applicable) e. If the project is an addition, the new building shall be shown in relationship to the existing building to which it is attached. f. If the project is a renovation, provide a plan of the existing floor on which the renovation is proposed. g. For major addition/renovation projects (as determined by HCPR) separate fire and egress plans of each floor (scaled at not less than 1/16 of an inch) shall be provided which indicate locations of required fire resistance rated construction, occupant loads and exit units. Legends on prints shall include but not be limited to: 1) Fire walls (NJ IBC/2009, Section 706.0) 2) Rated corridors (NFPA , and NJ IBC/2009, ) Horizontal exits (NFPA , and NJ IBC/2009, 1025) 4) Smoke barriers (NFPA , and NJ IBC/2009, 407.4, 710) 5) Exits (NFPA , 18-2). Coordinate with the Department of Health, Means of Egress Sheet. (See Item III, A. 4. above) 6) Suites (NFPA , through and NJ IBC/2009, through ) 7) New and altered area. 8) Existing areas to remain. 6
7 V. PRELIMINARY SUBMISSION (80% Developed) (Optional) A. Documentation 1. Health Care Plan Review Record, Part II B. Construction Prints 1. Site Plan a. The Site Plan (if applicable) shall be fully developed to indicate the complete scope of work in accordance with mandated codes, regulations, licensure standards and review comments. 2. Architectural plans, elevations and schedules (80% developed) a. Plans of basement, floors, roofs and other appropriate areas (if applicable) showing room sizes, items of major fixed equipment, and proposed space use. All rooms and/or areas shall be labeled with regard to use and numerically identified. b. Elevations shall indicate mass of building, locations and configurations of doors, windows and other openings. Materials may be noted, but need not be shown graphically. c. Wall sections shall be limited to those most typical to indicate major construction. Materials may be noted or graphically indicated. d. Door, window and finish schedules shall be blocked out and minimally completed. (i.e. typical room finishes for each department will be acceptable on Room Finish Schedule. Each and every room, although listed, need not be completely noted). e. Details as appropriate. (fire walls, fire separations, etc.) 3. Structural Plans and Details (if applicable) a. Plans for foundations, floors, roofs and all intermediate levels with sizes, sections and the relative location of the various structural members. b. Schedule of beams, girders and columns. c. Dimensions between floor levels, column centers and offsets. d. Dimensions of special openings and pipe sleeves. e. Details of all special connections, assemblies, and expansion joints. 4. Mechanical-Electrical a. General 1) Preliminary drawings shall outline all equipment and systems required by applicable codes. 7
8 2) The drawings showing room space assignment and specifications shall be to scale. Piping and ductwork on floor plans may be single line. 3) A complete symbol list shall be submitted for each trade. All room names shall be shown on all mechanical and electrical plans. 4) Area of work on each plan shall be shown on a key plan on each drawing where the plan shows only a portion of the building. 5) Building, floor, area of work shall be given in title block. 6) Existing systems at areas of modifications, where pertinent to new systems, or portions of a new system. 7) Flow direction arrows or sizes in all mains and branch mains of heating, cooling, water, fire protection, medical gas and vacuum system. 8) Identification of all pipe and duct systems by line and symbol or note. 5. Utility Site Plans (if applicable) a. Location of new utilities and existing utilities in areas of new work: Service water, fire, sanitary sewer storm, natural and LP gas, steam, hot water, chilled water, condenser water, oxygen, nitrous oxide, fuel oil lines. b. Location of new and existing water storage, fuel oil, gasoline, LP gas, oxygen and nitrous oxide storage tanks, water wells, dry wells, pump houses, valve pits, pumping stations, manholes, outdoor incinerators, fire hydrants, siamese connections, cooling towers, sewage disposal system, sewage treatment plant. c. Location of utilities, tanks, etc. to be relocated, removed or abandoned. d. Invert and rim elevations of manholes; invert elevations of water and sanitary sewer lines at crossings; invert or centerline elevations of all utilities penetrating foundation or below grade walls. e. Electrical site plan shall include but not be limited to: (1) Point of electric service drops or service lateral. (2) Single service or dual service. (If dual service, note whether or not service originates from different utility company substations). (3) Incoming voltage and current rating. (4) Overhead service or underground service. (5) Incoming underground service with burial depth. (6) Location of outdoor pad mounted transformers, generators, and any major electrical equipment. (7) Location of site lighting, including parking lot and driveway illumination. (8) Incoming communication lines. 8
9 (9) Any signal and low voltage wiring between buildings. 6. Heating, Ventilation and Air Conditioning a. Location and arrangement of new boilers, condensate pumps, deaerators, storage tanks, water treatment, blowdown, heat, exchangers, hot water pumps, and other primary equipment required for heating systems. b. Location and arrangement of cooling towers, chillers, condensers, compressors, rooftop units, pumps, and other primary refrigeration and air conditioning equipment. c. Location and arrangement of all air handling units, control dampers, coils, filters and humidifiers. d. Air distribution system, including supply, return, exhaust, outdoor air and air relief ductwork. (1) Required fire and smoke dampers need not be shown on floor plans in this submission. However, if some are shown on a particular plan, all shall be shown on that plan. (2) Many code violations have been encountered where corridors or suspended ceiling spaces above corridors are used as supply, return, or exhaust air plenums and in the use of transfer grilles in corridor walls in buildings in Use Group I. Various codes prohibit or limit the use of such plenums and transfer grilles, and the applicable codes should be consulted at the pre-design stage. e. Air inlets and outlets for each room or area where required. Air volume rates need not be shown on floor plans at this stage, however, if some are shown on a particular floor plan, all shall be shown on that plan. f. Outline of all air plenums by zone or system. g. Location and arrangement of all energy recovery systems. h. Steam, condensate return, hot water supply and return, chilled water supply and return, condenser water supply and return, make-up water, and related piping mains and branches. Individual runouts to heating and cooling equipment, and required valves need not be shown on floor plans at this stage. However, if some are shown on a particular plan, all shall be shown on that plan. i. Location and arrangement of outdoor air intake and exhaust or relief louvers, fuel fired equipment vents, chimneys. j. Radiation, convectors, fan-coil units, wall, window, and above ceiling heating/air conditioning units. k. Location of outdoor air intakes relative to exhaust fan discharges, plumbing vents, vacuum system vents, fuel-fired vents and chimneys, and similar terminals. l. High efficiency (80% or higher) filters where required. m. HEPA (99.97%) filters where required. n. All standby pumps where required. 9
10 o. Flow direction arrows, or sizes for all piping mains, branches, and main trunk ducts. p. Location of primary automatic temperature control equipment. q. Location of connection of new to existing systems. r. Roof plan showing all air intakes, exhausts, rooftop equipment, plumbing and other vents. s. Primary equipment (boilers, pumps, fans, chillers, etc.) schedules showing the total capacities, ratings and design data. Show total supply, return and exhaust air for all HVAC systems. 7. Plumbing a. Locations of all plumbing fixtures and equipment, medical gas, compressed air, vacuum, laundry, sterilizing, dietary, laboratory equipment. Include locations of medical gas containers and all containers containing toxic or flammable materials, e.g., ethylene oxide. b. New hot, cold and return hot water, distilled and deionized water, non-potable water, and gas mains and branches; sanitary sewer, acid waste, storm sewer, and vent piping. All risers shall be shown, continued from floor to floor. Pipe enclosures shall be shown where required. c. Required valves for the above need not be shown on floor plans at this stage. However, if some are shown on a particular plan, all shall be shown on that plan. d. Medical gas mains, risers and branch piping, including medical gas zone valve boxes alarms, and medical gas outlets. e. Vacuum (suction) mains, risers, and branch piping, including zone valve boxes, and vacuum inlets. f. Waste anesthesia gas evacuation system for anesthesizing locations. g. Locations of connection of new existing systems. h. Plumbing fixture schedule. i. Runout piping to individual plumbing fixtures, medical gas outlets, vacuum inlets, sterilizing, dietary and laundry equipment need not be shown connected at this stage. j. Individual drainage piping from fixtures and equipment need not be shown connected at this stage. k. Major equipment (hot water heaters, pumps, etc.) showing total capacities, ratings and design data l. Required and available water pressures. m. Required and available water flow. n. Calculated fixture unit totals. 8. Fire Protection (All information as per IBC 2009/NJ edition) including: 10
11 a. Location of fire extinguishing systems, including water supply, meters, standpipe mains, risers and branch mains, and sprinkler system mains, risers and feed mains. Branch piping to sprinkler heads, and drain, relief, and overflow piping need not be shown at this stage. b. Location of fire pumps, water storage tanks, fire department (siamese) connections, and related piping. c. Location of fire hose cabinets, hose lengths, control valves, and fire department valves for standpipe system. d. Location of all required sprinkler heads, control valves, and flow switches. Heads may be shown on reflected ceiling plans. e. Location of alarm valves, check valves in sprinkler and standpipe systems. f. Location of Gaseous Suppressant systems, dry chemical and containers. g. Fire extinguishers (may be on fire protection or architectural plans). h. Fire pump schedule noting GMP, head H.P., voltage. i. Required and available water pressures. j. Required and available water flow and source location. 9. Electrical a. Location of main distribution panel(s) with metering sections, switchgear, ground fault equipment protection if required, number of service disconnects, etc. b. Location of main switchboard, power and lighting panels, normal and emergency panels, and motor control centers. c. Power riser diagram showing all over current devices, feeder and conduit sizes and connection with the emergency electrical systems. Feeder and conduit sizes may be shown up to ground floor level for normal and emergency systems. d. Emergency electrical system with separation into life safety, critical and equipment branches identified in a single line riser diagram. e. Lighting and power plans shall show home runs to branch panels. Wire sizes and number of wires need not be shown at this stage. f. Locations of all fire alarms pull stations, fire and smoke detectors, and medical gas alarm stations. Duct detectors may also be shown on HVAC plans. g. General and emergency lighting fixtures, and illuminated exit signs. h. Special grounding systems for surgical suites, critical care units, and other areas where required (may be described in the outline specifications at this stage). i. Isolation transformers, isolation monitors for anesthetizing locations (may be described in the outline specifications at this stage). j. Location of Nurses call system devices and Communication System devices. 11
12 k. Emergency generator and related equipment (automatic transfer switches, etc.). l. Ratings of all primary equipment (transformers, switchgear, transfer switches, generators, etc.). 10. Miscellaneous a. Locations and types of all energy recovery systems, incinerators, trash compactors, and miscellaneous systems or equipment. 11. Outline Specifications a. All sections to be included in the final specifications shall be outlined at this time to generally describe their participation in the scope of the work. Such descriptions shall be adequate for review purposes but need not be as detailed as those for construction purposes. b. Mechanical-Electrical (1) General HVAC, Plumbing, Fire Protection, Electrical and related specifications shall be provided. They shall include a general description of all required materials, systems and equipment including types. (2) HVAC General description of all primary equipment, piping and ductwork systems shall be included. Describe control systems and sequence of operation including fire emergency venting systems and smoke control systems where provided, fan shutdown upon fire alarm system actuation, or smoke condition. (3) Plumbing A general description shall be included for fixtures, domestic water heaters, fire extinguishing systems water, sewer, medical gas, vacuum and compressed air systems, laundry, food service and sterilizing equipment. (4) Fire Protection A general description of sprinkler, standpipe, and other fire extinguishing systems including types of systems and major components shall be included. The design criteria to be used by the contractor to develop the shop drawings shall be included. Hazard classification of all rooms & spaces, water density & maximum area coverage by sprinkler & materials to be used shall be included. (Area density or room design method). (5) Electrical a) General description of electrical service including voltage, and type of service, whether overhead or underground. b) General description of electrical equipment. c) General description of transformers, motors, elevators, switchboards, cabinets, fixtures, and required grounding systems, nurses call systems, fire alarm and 12
13 VI. PARTIAL APPROVAL detection systems, emergency electrical systems, and communication and paging system. d) Describe wiring systems. Include wire types, conduits, raceways, and cables. In compliance with the Uniform Construction Code, State of New Jersey (hereafter N.J.A.C.) N.J.A.C. 5: Construction Permit-Procedure (g) Approval of Part: projects which satisfy the following requirements may be approved in part for early construction starts: A. Request for approval of part shall be made prior to or concurrent with preliminary submission. B. Preliminary Submission for Approval of Part shall include all plans and documentation necessary to fully explain that scope of work limited to: 1. Demolition as required. 2. Site work (100%) less planting schedules and related, finished landscaping details. 3. Structural prints and calculations, 100% complete. 4. Floor and roof plans, exterior elevations, door and window schedules and wall sections as required to construction and enclose the new construction secure from the elements. C. HCPR, upon approval of the Preliminary Submission may authorize such construction starts by stamping a set of construction documents. This set will become a part of the application for a construction permit. VII. FINAL SUBMISSION (Fully developed Contract Documents) A. Documentation 1. Copies of requested/required letters of approval in addition to those listed under the Preliminary Submission, such as: a letter from physicist regarding shielding methods, letter from laboratory reviewer, etc. shall be submitted and accepted prior to the issuing of final approval. 2. Engineers Checklist (Attachment #2 as required by Health Care Plan Review Record). B. Construction Prints 1. The Site Plan (if applicable) shall be fully developed to indicate the complete scope of work in accordance with mandated codes, regulations, licensure standards and review comments. 2. Construction prints as required under the Preliminary Submission and any additional ones as needed to indicate the complete scope of work shall be fully developed in accordance with mandated codes, regulations, licensure standards, and review comments. 3. Mechanical-Electrical 13
14 a. General 1) The final stage drawings shall include all information as required under ITEM IV, B., 4. through IV, B., 10. of the Preliminary Submission, and any additional information as necessary to show compliance with all applicable codes, regulations, licensure standards, and review comments. This shall include but not be limited to the following: i. Complete site plan. (if applicable) ii. HVAC: iii. Plumbing a) All ductwork. b) All air inlets, outlets, include types and sizes. c) All air volume rates at all inlets and outlets. d) All volume dampers, both manual and mechanical/electrical. e) All fire and smoke dampers. f) All smoke partitions and two-hour fire rated partitions. g) All ductwork and piping sizes. h) All service valves. i) All pressure and temperature relief valves, low water cut off devices and other safety controls. j) All thermostats, humidistats, and control devices. k) ATC control diagrams. l) Flow diagrams. m) All relief, drain, vent piping and related valves. n) All overflow piping. o) Special or typical details (e.g. fire dampers in walls and floors, roof-top unit installation, etc.). p) Heat or smoke detectors for fan shutdown. q) Complete schedules, diagrams and details to determine that design, capacities, controls and performance of the various systems are in conformance with the applicable codes and regulations. a) All shutoff or control valves. 14
15 b) All safety devices. c) All relief, drain, vent and overflow piping. d) All drain valves. e) All air intakes and exhausts for vacuum system. f) Roof plan showing vents, roof drains. g) Backflow prevention devices, vacuum breakers, check valves. h) Medical gas outlets, vacuum inlets. i) Riser diagrams for water, sanitary sewer, medical gas and vacuum systems. j) All piping and services for special equipment, e.g. food services, laundry, sterilizing equipment, incinerators. iv. Fire Protection v. Electrical a) All valves, including control, test and drain valves and check valves. b) All pump test headers, automatic ball drips, flow measuring devices, tamper switches, and control devices. c) All piping to sprinkler heads, except cross-mains and branches may not be shown. d) All test and drain piping. e) Riser diagrams for sprinkler and standpipe systems. f) Sufficient schedules, diagrams and details to determine systems are in accordance with the applicable codes and regulations. g) Hydraulically designed shop drawings along with calculation in accordance with NFPA , 8-1 & 2 a) All electrical equipment and devices, light and power panels, transfer switches. b) Mounting heights for all switches, receptacles, thermostats, and fire alarm devices. c) Home-runs with wiring sizes and number of wires. d) Diagrams for grounding and special grounding systems to include wire sizes and groundings fittings. e) Capacities, ratings, details for isolation systems. f) Ratings for all over current protective devices. 15
16 g) Site plan shall be fully developed with details of outdoor lighting including specific lighting fixture identification, service conduit and feeder sizing, duct detail, grounding detail, transformer details including mounting pad detail, and all other supporting service entrance details. h) All space smoke and heat detectors and their connections with fire alarm system. i) All duct heat detectors and smoke detectors required for fan shutdown. These detectors shall be shown connected with the fire alarm system in accordance with the N.F.P.A. and NJIBC. j) All electrical wiring details and connections to special equipment such as laundry equipment, food service equipment, HVAC equipment, sterilizing equipment. k) Magnetic door holders, audible and visual fire alarms devices. l) Lighting fixture schedule. m) Schedules of all panels showing number, sizes of wires, over current devices, and branch & panel loading. n) Nurse call system, with call lights, patient call stations, staff stations, and emergency call stations. o) Riser diagrams for fire alarm and detection system, nurses call, telephone and paging system. p) Fire Alarm construction documents in accordance with of NJIBC 2009 q) Ratings for all primary equipment, and other equipment not listed above. r) Location and installation detail of a fire pump system as may be required. C. Specifications 1. General All sections shall be fully developed as required to supplement the construction prints and to describe types, sizes, finishes, workmanship and characteristics of all materials and equipment including manufacturers or suppliers recommendations for installation. 2. Mechanical and Electrical a. Shall include detailed description of all materials, equipment, systems, system components, controls, control sequences, and characteristics or features. The contract documents shall be complete and shall call attention to all requirements of the codes. Specific attention is called for to the following. 1) Fire characteristics and ratings for insulation. 16
17 2) Testing and balancing of air and water systems. Written reports shall be submitted to Owner and Engineer. 3) All systems including the electrical system shall be tested and operated to demonstrate to the owner or his representative that the installation and performance of these systems conform to the requirements of the plans and specifications, and applicable codes. 4) Duct linings to comply with the codes. 5) Filters for HVAC systems. 6) Detailed description of electrical equipment and systems including but not limited to emergency electrical system, nurse call system, communication system, grounding system, any other special electrical system, transformers, generators, fire pumps, motors and motor control center, over current device, elevators, x-ray system, high voltage splicing, wiring methods and devices, etc. 17
18 IX. FEE CALCULATION FEE CALCULATION INSTRUCTIONS The following page includes the Volume Calculation Worksheet. The volume worksheet must accompany the Fee Schedule for all new construction or additions. In case of both new construction plus renovations, a volume calculation worksheet for only the new construction must be submitted. The volume is used to complete Section 2C of the Fee Schedule. Cost of reconstruction, alteration, renovation, and repair, if any, is used to complete Section 2D of the Fee Schedule. General Instructions The following information is required on the Project Review Application or uploaded at to complete Section 2C of the Plan Review Fee Schedule: Use Group (See building subcode, Article 3: Use or Occupancy) B...Business I-1... Institutional, residential I-2... Institutional, incapacitated I-4... Medical Daycare NOTE: In healthcare buildings of the above noted Use Groups, some areas may be classified as other uses (A, E, F, H, R, S & U). In these cases, the primary Use Group of the building shall be used for fee calculation purposes Plan Review Fee Schedule Upon determining the use group and volume for new structures and/or total cost of renovation for existing ones, proceed to the Fee Schedule and enter all required information. Only those items pertaining to the particular project type need to be completed. Healthcare projects are separated on the Fee Schedule because their fees are different. If unsure as to whether a Healthcare review is required for all or a portion of the project, please contact the Bureau before completing the Schedule and remitting the fee. Please note that blank Fee Schedules may be duplicated and used for submissions of future projects. Each section of the Fee Schedule contains instructions on how to complete it. If there is any question about fees, please request assistance at (609) The Plan Review Fee Schedule is not to be used to determine permit fees. Each municipality has a permit fee schedule established by local ordinance that will be used for this purpose. The municipality is required to credit the applicant an amount equal to 20 percent of their permit fee, since the plan review was performed by the Department rather than the local agency. If the project submitted for review is a Stateowned facility, contact the State Buildings Unit for a State Buildings Permit Fee Schedule at
19 VOLUME CALCULATION WORKSHEET In accordance with N.J.A.C. 5: , volume computation, the volume of the structure shall be calculated as follows: Structures with basements: (N.J.A.C. 5: (b) 1) Height extending from basement or cellar floor to: Top of the roof beams of a flat roof Mean height of a pitched roof Floor area Total volume = floor area multiplied by height ft. ft. sq. ft. cu. ft. Structures without basements: (N.J.A.C. 5: (b)2 ) Height extending from one-fifth the distance from the first floor level to bottom of the footings not exceeding 2-1/2 feet below the first floor level to: Top of the roof beams of a flat roof Mean height of a pitched roof Floor area Total volume = floor area multiplied by height ft. ft. sq. ft. cu. ft. Open sheds: (N.J.A.C. 5: (c) ) The volume shall be measured within the perimeter of the roof for a height from the grade line to the mean roof level. 19
20 X. APPLICABLE CONSTRUCTION CODES, REGULATIONS and STANDARDS SOURCES For the NJAC/UCC: New Jersey Department of Community Affairs Division of Codes and Standards Publications Unit P.O. Box 802 Trenton, New Jersey For the NJIBC 2015, IMC 2015, IFGC 2015, IECC 2015 & NEC 2014: International Code Council, Inc. Publications 4051 West Flossmoor Road Country Club Hills, IL For the NFPA Life Safety Code 101: National Fire Protection Association 11 Tracy Drive Avon, MA For the NSPC 2015: National Association of Plumbing-Heating-Cooling Contractors P.O. Box 6808 Falls Church, VA For the Manual of Standards: New Jersey Department of Health & Senior Services Licensing & Certification P.O. Box Trenton, New Jersey For the FGI Guidelines : The American Society for Healthcare Engineering 155 North Wacker Drive Chicago, IL
21 Construction Codes, Regulations and Standards for FREE-STANDING AMBULATORY CARE FACILITIES - MRIs Uniform Construction Code State of New Jersey, Title 5, Chapter 23, Subchapters 1 through 12. Barrier Free Requirements per ICC/ANSI A (NJAC 5:23-7.2) International Building Code, NJ Edition/2015 (NJAC 5: ) Use Group B. International Mechanical Code/2015. (NJAC 5: ) International Fuel Gas Code/2015 (NJAC 5: ) The National Standard Plumbing Code 2015 (NJAC 5: ). The National Electrical Code (NJAC 5: ). Life Safety Code NFPA Air Conditioning and Ventilating Systems. (NFPA 90A-2012) Guidelines for Design & Construction of Hospital and Outpatient Facilities/2014 (NJAC 5:23-3.2) Part 3 OUTPATIENT FACILITIES, 3.1 Common Elements for Outpatient Facilities; 3.2 Primary Care Facilities; 3.3 Freestanding Outpatient Diagnostic and Treatment Facilities. New Jersey Department of Health & Senior Services - Latest Edition of the Manual of Standards for Licensure of Ambulatory Care Facilities 21
22 Construction Codes, Regulations and Standards for ADULT & PEDIATRIC DAY HEALTH CARE FACILITIES Uniform Construction Code State of New Jersey, Title 5, Chapter 23, Subchapters 1 through 12. Barrier Free Requirements per ICC/ANSI A (NJAC 5:23-7.2) International Building Code, NJ Edition/2015 (NJAC 5: ) Use Group I-4. International Mechanical Code/2015. (NJAC 5: ) International Fuel Gas Code/2015 (NJAC 5: ) The National Standard Plumbing Code 2015 (NJAC 5: ). The National Electrical Code (NJAC 5: ). Life Safety Code NFPA Air Conditioning and Ventilating Systems. (NFPA 90A-2012) Part 5 NON RESIDENTIAL SUPPORT FACILITIES; 5.2 Adult Day Health Care Facilities New Jersey Department of Health & Senior Services Latest Edition of the Manual of Standards for Licensure of Adult and Pediatric Day Health Care Facilities with Chapters 23 & 24 22
23 Construction Codes, Regulations and Standards for ASSISTED LIVING RESIDENCES AND COMPREHENSIVE PERSONAL CARE HOMES Uniform Construction Code State of New Jersey, Title 5, Chapter 23, Subchapters 1 through 12. Barrier Free Requirements per ICC/ANSI A (NJAC 5:23-7.2) 100% Adaptable for ALF & 4% Accessible for CPC. International Building Code, NJ Edition/2015 Use Group I-2. (NJAC 5: ) International Mechanical Code/2015. (NJAC 5: ) International Fuel Gas Code/2015 (NJAC 5: ) The National Standard Plumbing Code 2015 (NJAC 5: ). The National Electrical Code (NJAC 5: ). New Jersey Department of Health & Senior Services: Latest Edition of the Manual of Standards for Licensure of Assisted Living Residences and Comprehensive Personal Care Homes 23
24 Construction Codes, Regulations and Standards for FREE-STANDING AMBULATORY CARE FACILITIES Uniform Construction Code State of New Jersey, Title 5, Chapter 23, Subchapters 1 through 12. Barrier Free Requirements per ICC/ANSI A (NJAC 5:23-7.2) International Building Code, NJ Edition/2015 (NJAC 5: ) Use Group B. International Mechanical Code/2015. (NJAC 5: ) International Fuel Gas Code/2015 (NJAC 5: ) The National Standard Plumbing Code 2015 (NJAC 5: ). The National Electrical Code (NJAC 5: ). Life Safety Code NFPA Air Conditioning and Ventilating Systems. (NFPA 90A-2012) Guidelines for Design & Construction of Hospital and Outpatient Facilities/2014 (NJAC 5:23-3.2) Part 3 OUTPATIENT FACILITIES, 3.1 Common Elements for Outpatient Facilities; 3.2 Primary Care Outpatient Centers New Jersey Department of Health & Senior Services Latest Edition of the Manual of Standards for Licensure of Ambulatory Care Facilities 24
25 Construction Codes, Regulations and Standards for FREE-STANDING AMBULATORY CARE FACILTIES- BIRTHING CENTERS Uniform Construction Code State of New Jersey, Title 5, Chapter 23, Subchapters 1 through 12. Barrier Free Requirements per ICC/ANSI A (NJAC 5:23-7.2) International Building Code, NJ Edition/2015 (NJAC 5: ) Use Group B. International Mechanical Code/2015. (NJAC 5: ) International Fuel Gas Code/2015 (NJAC 5: ) The National Standard Plumbing Code 2015 (NJAC 5: ). The National Electrical Code (NJAC 5: ). Life Safety Code NFPA Air Conditioning and Ventilating Systems. (NFPA 90A-2012) Guidelines for Design & Construction of Hospital and Outpatient Facilities/2014 (NJAC 5:23-3.2) Part 3 OUTPATIENT FACILITIES, 3.1 Common Elements for Outpatient Facilities; 3.4 Freestanding Birthing Centers New Jersey Department of Health & Senior Services Latest Edition of the Manual of Standards for Licensure of Ambulatory Care Facilities 25
26 Construction Codes, Regulations and Standards for NURSING HOMES (LONG TERM CARE FACILITIES) Uniform Construction Code State of New Jersey, Title 5, Chapter 23, Subchapters 1 through 12. Barrier Free Requirements per ICC/ANSI A (NJAC 5:23-7.2) International Building Code, NJ Edition/2015 (NJAC 5: ) Use Group I-2. International Mechanical Code/2015. (NJAC 5: ) International Fuel Gas Code/2015 (NJAC 5: ) The National Standard Plumbing Code 2015 (NJAC 5: ). The National Electrical Code (NJAC 5: ). Life Safety Code NFPA Air Conditioning and Ventilating Systems. (NFPA 90A-2012) Guidelines for Design & Construction of Residential Health, Care and Support Facilities/2014 (NJAC 5:23-3.2) Part 3 RESIDENTIAL HEALTH FACILITIES; 3.1 Common Elements for all Residential Health Care Facilities; 3.2 Nursing Facilities New Jersey Department of Health & Senior Services Latest Edition of the Licensing Manual of Standards for Long Term Care Facilities 26
27 Construction Codes, Regulations and Standards for HOSPITALS (ACUTE CARE FACILITIES) Uniform Construction Code State of New Jersey, Title 5, Chapter 23, Subchapters 1 through 12. Barrier Free Requirements per ICC/ANSI A (NJAC 5:23-7.2) International Building Code, NJ Edition/2015 (NJAC 5: ) Use Group I-2. International Mechanical Code/2015. (NJAC 5: ) International Fuel Gas Code/2015 (NJAC 5: ) The National Standard Plumbing Code 2015 (NJAC 5: ). The National Electrical Code (NJAC 5: ). Life Safety Code NFPA Air Conditioning and Ventilating Systems. (NFPA 90A-2012) Guidelines for Design & Construction of Hospital and Outpatient Facilities/2014 (NJAC 5:23-3.2) Part 2 HOSPITALS; 2.1 Common Elements for Hospitals; 2.2 General Hospitals New Jersey Department of Health & Senior Services Latest Edition of the Manual of Licensing Standards for Hospital 27
28 Construction Codes, Regulations and Standards for OUTPATIENT SURGICAL FACILITIES Uniform Construction Code State of New Jersey, Title 5, Chapter 23, Subchapters 1 through 12. Barrier Free Requirements per ICC/ANSI A (NJAC 5:23-7.2) International Building Code, NJ Edition/2015 Use Group I-2 for those facilities within a Hospital and Use Group B for free standing facilities. (NJAC 5: ) International Mechanical Code/2015. (NJAC 5: ) International Fuel Gas Code/2015 (NJAC 5: ) The National Standard Plumbing Code 2015 (NJAC 5: ). The National Electrical Code (NJAC 5: ). Life Safety Code NFPA Air Conditioning and Ventilating Systems. (NFPA 90A-2012) Guidelines for Design & Construction of Hospital and Outpatient Facilities/2014 (NJAC 5:23-3.2) Part 3 OUTPATIENT FACILITIES, 3.1 Common Elements for Outpatient Facilities; 3.7 Outpatient Surgical Facilities Or (for in hospital) Part 2 HOSPITALS, Section (In Hospital) New Jersey Department of Health & Senior Services Latest Edition of the Licensing Standards for Hosptials OR (Free-Standing) Latest Edition of the Manual of Standards for Licensure of Ambulatory Care Facilities. 28
29 Construction Codes, Regulations and Standards for PSYCHIATRIC HOSPITAL FACILITIES Uniform Construction Code State of New Jersey, Title 5, Chapter 23, Subchapters 1 through 12. Barrier Free Requirements per ICC/ANSI A (NJAC 5:23-7.2) International Building Code, NJ Edition/2015 (NJAC 5: ) Use Group I-2. International Mechanical Code/2015. (NJAC 5: ) International Fuel Gas Code/2015 (NJAC 5: ) The National Standard Plumbing Code 2015 (NJAC 5: ). The National Electrical Code (NJAC 5: ). Life Safety Code NFPA Air Conditioning and Ventilating Systems. (NFPA 90A-2012) Guidelines for Design & Construction of Hospital and Outpatient Facilities/2014 (NJAC 5:23-3.2) Part 2 HOSPITALS; 2.1 Common Elements for Hospitals; 2.5 Psychiatric Hospitals New Jersey Department of Health & Senior Services Latest Edition of the Manual of Licensing Standards for Hospitals 29
30 Construction Codes, Regulations and Standards for REHABILITATION HOSPITAL FACILITIES Uniform Construction Code State of New Jersey, Title 5, Chapter 23, Subchapters 1 through 12. Barrier Free Requirements per ICC/ANSI A (NJAC 5:23-7.2) International Building Code, NJ Edition/2015 (NJAC 5: ) Use Group I-2. International Mechanical Code/2015. (NJAC 5: ) International Fuel Gas Code/2015 (NJAC 5: ) The National Standard Plumbing Code 2015 (NJAC 5: ). The National Electrical Code (NJAC 5: ). Life Safety Code NFPA Air Conditioning and Ventilating Systems. (NFPA 90A-2012) Guidelines for Design & Construction of Hospital and Outpatient Facilities/2014 (NJAC 5:23-3.2) Part 2 HOSPITALS; 2.1 Common Elements for Hospitals; 2.6 Rehabilitation Hospitals New Jersey Department of Health & Senior Services Latest Edition of the Manual of Licensing Standards for Rehabilitation Hospitals - Excluding Subchapters 23 and 24 30
31 Construction Codes, Regulations and Standards for OUTPATIENT RENAL DIALYSIS FACILITIES Uniform Construction Code State of New Jersey, Title 5, Chapter 23, Subchapters 1 through 12. Barrier Free Requirements per ICC/ANSI A (NJAC 5:23-7.2) International Building Code, NJ Edition/2015 (NJAC 5: ) Use Group B. International Mechanical Code/2015. (NJAC 5: ) International Fuel Gas Code/2015 (NJAC 5: ) The National Standard Plumbing Code 2015 (NJAC 5: ). The National Electrical Code (NJAC 5: ). Life Safety Code NFPA Air Conditioning and Ventilating Systems. (NFPA 90A-2012) Guidelines for Design & Construction of Hospital and Outpatient Facilities/2014 (NJAC 5:23-3.2) Part 3 OUTPATIENT FACILITIES, 3.1 Common Elements for Outpatient Facilities; 3.10 Renal Dialysis Centers (In Hospital) New Jersey Department of Health & Senior Services Latest Edition of the Licensing Standards for Hosptials OR (Free-Standing) Latest Edition of the Manual of Standards for Licensure of Ambulatory Care Facilities. 31
Element D Services Plumbing
Medical Vacuum and Gas PART 1 - GENERAL 1.01 OVERVIEW A. This section addresses medical vacuum, waste anesthetic gas disposal, compressed air, oxygen, nitrous oxide, nitrogen and carbon dioxide systems.
Building Permit Application
Building Permit Application Administrative Use Only PARENT PERMIT NUMBER (Required if part of another project) PERMITTEE: PERMITTEE ADDRESS: E-MAIL ADDRESS: ARCHITECT/ENGINEER: PHONE: PHONE: ARCHITECT/ENGINEER
#506 New Multi-Family Buildings & Additions Plan Intake Submittal Checklist
#506 New Multi-Family Buildings & Additions Plan Intake Submittal Checklist Case #: Date: Project Name: Site Address: Application Submittal Building permit applications and plans can be submitted to the
Subpart 1. Installation. All plumbing systems must be. installed and tested according to this chapter and chapter 4715,
4658.4500 PLUMBING SYSTEMS; NEW CONSTRUCTION. Subpart 1. Installation. All plumbing systems must be installed and tested according to this chapter and chapter 4715, the Minnesota Plumbing Code. Subp. 2.
Element D Services Plumbing
PART 1 - GENERAL 1.01 OVERVIEW A. This section addresses domestic cold, hot and hot water return distribution systems within and to five feet beyond building perimeter. PART 2 - DESIGN CRITERIA 2.01 GENERAL
All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal.
2.02 DESIGN DEVELOPMENT PHASE GENERAL The Architect shall prepare the Design Development Documents from the approved Schematic Design. The Design Development Documents shall consist of drawings and other
PLAN REVIEW SERVICES CONSTRUCTION DOCUMENTS NECESSARY FOR A THOROUGH PLAN REVIEW
CONSTRUCTION DOCUMENTS NECESSARY FOR A THOROUGH PLAN REVIEW PRELIMINARY BUILDING REVIEW two sets of the following: Architectural/engineering design development drawings indicating size of the building,
Mechanical, Plumbing, and Fire Protection Conditions
Mechanical, Plumbing, and Fire Protection Conditions Mechanical Conditions The mechanical systems within the building consist of a combination of the original 1926 systems and renovations that occurred
Fire Pump Plan Review March 2010
Fire Pump Plan Review March 2010 Date of Review: / / Permit Number: Business/Building Name: Address of Project: Designer Name: Designer s Phone: Contractor: Contractor s Phone: Occupancy Classification:
SECTION.3400 - MECHANICAL: ELECTRICAL: PLUMBING
SECTION.3400 - MECHANICAL: ELECTRICAL: PLUMBING 10A NCAC 13D.3401 HEATING AND AIR CONDITIONING Heating and cooling systems shall meet the American Society of Heating, Refrigerating, and Air Conditioning
Electrical Contractors. and the. New Jersey. Rehabilitation Code
Electrical Contractors and the New Jersey Rehabilitation Code Alan Chech Electrical Seminars 609-890-7072 www.alanchech.com Information is based on the presently adopted electrical subcode NEC 2005. Current
MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION
MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION Fire Pump Plan Review 2009 International Fire Code and NFPA 20 Date of Review / / BLD201 - Project Address: Project Name: Contractor s Business
PLAN SUBMITTAL INFORMATION
PLAN SUBMITTAL INFORMATION APPLICATION FOR A BUILDING PERMIT Prior to drafting construction drawings, please check with the North Miami Beach Community Development Department concerning the following:
BUILDING SAFETY UNIT
POLICY Page 1 of 5 SUBMITTAL REQUIREMENTS FOR ONE AND TWO FAMILY DWELLINGS, ADDITIONS AND RENOVATIONS All submittals shall be site specific and designed to the provisions of the 2012 International Residential
City of Oviedo Commercial Shell Building Permit Application Guidelines
City of Oviedo Commercial Shell Building Permit Application Guidelines All permit application packages must be complete prior to acceptance. A complete application package shall include the following:
ELECTRICAL CONTRACTORS THE UNIVERSITY OF TENNESSEE KNOXVILLE, TENNESSEE SECTION 16050 PAGE 1
KNOXVILLE, TENNESSEE SECTION 16050 PAGE 1 PART 1 - GENERAL 1.01 RELATED DOCUMENTS: SECTION 16050 A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division-1
Electrical. This section applies to the design and installation of building power distribution systems.
Basis of Design This section applies to the design and installation of building power distribution systems. Design Criteria This section contains the architectural, structural and mechanical provisions
DESIGN CHECKLIST PROJECT NAME DISCIPLINE DATE TYPE REVIEW REVIEWER DRAWINGS REVIEWED
DESIGN CHECKLIST PROJECT NAME DISCIPLINE DATETYPE REVIEW_ REVIEWER DRAWINGS REVIEWED EVERY ITEM WILL BE REVIEWED AND NOTED FOR COMPLIANCE (C), OR NON- APPLICABILITY (NA). A. GENERAL SECTION 7 PLUMBING
Upper Southampton Township Department of Licenses and Inspections 939 Street Rd. Southampton, Pa. 18966 Phone: 215-322-9700 Fax: 215-322-5842
Upper Southampton Township Department of Licenses and Inspections 939 Street Rd. Southampton, Pa. 18966 Phone: 215-322-9700 Fax: 215-322-5842 APPLICATION for ZONING and BUILDING PERMIT APPLICATION INSTRUCTIONS:
SECTION THREE CONSTRUCTION CODES
SECTION THREE CONSTRUCTION CODES CHAPTER 36: Construction Codes in Michigan Purpose and Applicability of Regulations Manufacturing facilities and other businesses must be designed according to code in
Design and Construction Design Phase Deliverables
Design and Construction Design Phase Deliverables Notes: 1. The Architect or Engineer of record shall submit this document along with the deliverables for the project at the end of each design phase for
ALBERTA FIRE CODE SAFETY EQUIPMENT MAINTENANCE REQUIREMENTS
ALBERTA FIRE CODE SAFETY EQUIPMENT MAINTENANCE REQUIREMENTS In this document are the fire safety equipment maintenance requirements that are found in Division B of the Alberta Fire Code (AFC 2006) for
Plan Review Instructions
Plan Review Instructions Effective January 1, 2016 State of New Jersey Department of Community Affairs Division of Codes and Standards Bureau of Construction Project Review PO Box 817 101 South Broad Street,
Winnipeg Fire Department Fire Prevention Branch
Winnipeg Fire Department Fire Prevention Branch Manitoba Fire Code Life-Safety Equipment Maintenance Requirements The Fire Prevention Branch of the Winnipeg Fire Department has prepared this document of
CyberFortress Data Center at Innovation Park Infrastructure and Topology Guide. Innovation Park Charlotte. NC 28262. DRAFT V0.
Innovation Park Charlotte. NC 28262 DRAFT V0.1 Page 2 CyberFortress Data Center at Innovation Park BECO South purchased Innovation Park in March 2010 and immediately launched a dramatic top-to-bottom $30M
FLORIDA ATLANTIC UNIVERSITY FIRE ALARM SYSTEM INSTALLATION MANUAL
FLORIDA ATLANTIC UNIVERSITY FIRE ALARM SYSTEM INSTALLATION MANUAL January, 2003 Environmental Health and Safety Florida Atlantic University 777 Glades Rd. Boca Raton, FL 33431 Phone: 561-297-3129 Fax:
NYC Department of Education Building Condition Assessment Survey 2014-2015 BROADWAY EDUCATION CAMPUS - MANHATTAN, 26 BROADWAY, MANHATTAN, NY, 10004
School: InspectionId Asset Data Inspection Type Building Assessment Survey 204-205 BROADWAY EDUCATION CAMPUS - MANHATTAN, 26 BROADWAY, MANHATTAN, NY, 0004 Time In Last Edited 255 MECHANICAL 205-05-8 09:00AM
MULTI-FAMILY, COMMERCIAL, INDUSTRIAL, AS GOVERNED BY THE BC BUILDING CODE PART 3
TOWN OF SIDNEY Multi-Family, Commercial, Industrial and Institutional Building Permit Guide The information provided is intended as a guide only and does not replace current bylaws and regulations. Complete
PLAN REVIEW GUIDE FOR FIRE ALARM
PLAN REVIEW GUIDE FOR FIRE ALARM PROJECT NAME: PERMIT # PROJECT ADDRESS: CONTACT PERSON: PHONE Fire alarm system installation information shall be provided on the appropriate architectural and electrical
COMMERCIAL PLAN SUBMISSION FOR NEW CONSTRUCTION AND/OR RENOVATIONS
COMMERCIAL PLAN SUBMISSION FOR NEW CONSTRUCTION AND/OR RENOVATIONS Permit applicants shall submit three (3) COMPLETE SETS of plans and specifications with each application for a permit. Plans and specifications
Bold items are particular to the City of Euless
EULESS FIRE DEPARTMENT FIRE MARSHAL S OFFICE INFORMATION LINE: Revised 2/12 Fire Chief Wes Rhodes Fire Marshal Paul Smith EFD-FMO 3-2 2009 International Fire & Building Code as Amended NFPA Standards Adopted
SECTION 16721 FIRE ALARM AND DETECTION SYSTEM
1. GENERAL 1.1. Related Documents: 1.2. Scope: 1.1.1. The general provisions of the Contract, including General and Supplementary Conditions and General Requirements apply to the work specified in this
Design Consultant (Electrical Services) Design Deliverables and Responsibilities Allocation (Stage E+)
Design Consultant (Electrical Services) Design Deliverables and Responsibilities Allocation (Stage E+) 1. In addition to the information scheduled below, the pre-tender designer is responsible for: (i)
Does Wall Township require an inspection by the building department on resale of a home?
Selling your home Does Wall Township require an inspection by the building department on resale of a home? No. We do not require a Certificate of Continued Occupancy on the resale of home. A Smoke Detector,
Botetourt County, Virginia. Frequently Asked Questions
Botetourt County, Virginia Development Services Construction Compliance Frequently Asked Questions Permits... 2 When is a permit required?... 2 When is a permit NOT required?... 2 Who may apply for a permit?...
General Fire Code Requirements Within Commercial Tenant Spaces
FIRE DEPARTMENT in cooperation with Scope: General Fire Code Requirements Within Commercial Tenant Spaces This handout is designed to assist owners, architects, contractors and others in understanding
PLAN SUBMITTAL REQUIREMENTS FOR SPRAY BOOTHS AND SPRAYING ROOMS EXTINGUISHING SYSTEMS
January 1997 PLAN SUBMITTAL REQUIREMENTS FOR SPRAY BOOTHS AND SPRAYING ROOMS EXTINGUISHING SYSTEMS 1.0 PERMIT 1.1 After receipt of a Building Permit from the City of San Jose Building Department, submit
SECTION 00 0110 TABLE OF CONTENTS. H. 00 2115.01 - Proposed Material, Product or Equipment Substitution Request
SECTION 00 0110 PROCUREMENT AND CONTRACTING REQUIREMENTS 1.1 DIVISION 00 -- PROCUREMENT AND CONTRACTING REQUIREMENTS A. 00 0101 - Project Title Page B. 00 0105 - Certifications Page C. 00 0110 - Table
Commercial Building Permit Application & Submittal Guidelines
Building Inspection Department 1625 13 th Street, Suite 106 Lubbock, Texas 79457 (806) 775-2087 (806) 775-2088 http://buildinsp.ci.lubbock.tx.us/ Commercial Building Permit Application & Submittal Guidelines
Safety, Health and Accessibility Design Guidelines For Architects, Engineers and Design Firms
Safety, Health and Accessibility Design Guidelines For Architects, Engineers and Design Firms U.S. Department of the Interior Bureau of Indian Affairs Division of Safety and Risk Management Introduction
CITY OF FAIRFAX CODE ADMINISTRATION 703-385-7830 / FAX 703-385-9265 www.fairfaxva.gov
CITY OF FAIRFAX CODE ADMINISTRATION 703-385-7830 / FAX 703-385-9265 www.fairfaxva.gov Finishing a basement to make additional living space in a house is a popular construction project for many homeowners.
Plumbing Installations A homeowner guide to the City of Winnipeg plumbing requirements for a single-family dwelling
PLANNING, PROPERTY AND DEVELOPMENT DEPARTMENT Plumbing Installations A homeowner guide to the City of Winnipeg plumbing requirements for a single-family dwelling October 2014 contents General Information
SECTION 23 05 12 GENERAL PROVISIONS FOR HVAC WORK
SECTION 23 05 12 GENERAL PROVISIONS FOR HVAC WORK 1 GENERAL 1.1 GENERAL REQUIREMENTS A. This Section is coordinated with and complementary to the General Conditions and Supplementary General Conditions
Plumbing Installations. A homeowner guide to the City of Winnipeg plumbing requirements for a single-family dwelling
Plumbing Installations A homeowner guide to the City of Winnipeg plumbing requirements for a single-family dwelling February 2001 contents General Information 3 Inspection 4 New Drain and Vent Installations
A Residential Owner s Guide to PERMITS. Elgin CITY OF PLANNING & NEIGHBORHOOD SERVICES
A Residential Owner s Guide to PERMITS CITY OF Elgin PLANNING & NEIGHBORHOOD SERVICES CITY OF Elgin A Residential Owner s Guide Welcome! This booklet has been prepared to provide residential property owners
GROWTH MANAGEMENT DEPARTMENT 201 SE 3 rd ST, (Second Floor), Ocala, FL 34471 (352) 629-8421; FAX: (352) 629-8264
BUILDING CODE GUIDELINES FOR ELECTRICAL INSPECTIONS Building Code compliance is the obligation of design professionals and/or contractors. Plan Review and Inspection Guidelines are intended to be used
FIRE-FIGHTING DESIGN BRIEF REPORT
P a g e 1 SECTION 04 (Doc.No.A/DBR 001) FIRE-FIGHTING DESIGN BRIEF REPORT P a g e 2 1.0 SCOPE 2.0 STANDARDS AND CODES 3.0 TYPES OF SYSTEM PROPOSED 4.0 FIRE HYDRANT SYSTEM 5.0 AUTOMATIC SPRINKLER SYSTEM
city of edmonds development information
#B17 city of edmonds development information Commercial Kitchen Hood & Hood Fire Suppression System Permit Submittal Requirements PERMIT REQUIRED: CODES: FEES: A Commercial Kitchen Hood Mechanical Permit
HOMEOWNER S PERMIT GUIDE
HOMEOWNER S PERMIT GUIDE WHEN IS A PERMIT REQUIRED? Department of Development and Permits 306 Cedar Road, City Hall 2 nd Floor P.O. Box 15225 Chesapeake, VA 23328 Phone: (757) 382-6018 Fax: (757) 382-8448
Fire Alarm System Plans Submittal Guidelines For New and Existing Systems
Fire Alarm System Plans Submittal Guidelines For New and Existing Systems SCOPE The Temecula Fire Prevention Bureau (TFPB) has established the following requirements for the submittal of all fire alarms,
When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are:
When is a Permit Required? The most common types of projects that require permits are: -New Houses or buildings -Room Additions or Expansions -Structural repairs, remodeling and alterations -Accessory
Fire Alarm System Plans Review Checklist Property location Date of Review
Fire Alarm System Plans Review Checklist Property location Date of Review 1. Is application completed in entirety? 2. Are the plans review fee submitted with the application? 3. Does floor plan include
Lot Number. City. Architect Name SUBCONTRACTORS - COMPLETE AND ATTACH LIST ON PAGE 4
New Construction Permit Application Village of Shorewood Building Division One Towne Center Blvd Shorewood, IL 60404 (815)553-2310 Fax (815)744-6766 SUBMISSION CHECKLIST - Complete this application and
Current as of 11/10/08 1 of 1
BEST PRACTICES STANDARDS FOR SCHOOLS UNDER CONSTRUCTION OR BEING PLANNED FOR CONSTRUCTION I. Site Layout A. School buildings shall be provided with a securable perimeter. A securable perimeter means that
CITY OF BERKELEY BUILDING PERMIT DETAILED CHECKLIST
CITY OF BERKELEY DETAILED CHECKLIST This checklist will assist you in preparing plans for submittal with a building permit application. Alterations, additions and remodeling projects may not require all
2014 Limited Plan Submittal Checklist
City of Aurora Public Works Department WET AND DRY CHEMICAL HOOD SUPPRESSION SYSTEM 2014 Limited Plan Submittal Checklist Building Division 15151 E. Alameda Parkway, Ste 2400 Aurora, CO 80012 303-739-7420
Arapahoe County Residential Water Heater Installation and Inspection Guide
Arapahoe County Residential Water Heater Installation and Inspection Guide The attached handout is designed to be a general permit submittal and inspection guide covering most installation instances, however
OPEN ITEMS LIST - CONSTRUCTION Project Name: East Central Middle School - Jackson County CLA#: 11003
OPEN ITEMS LIST - CONSTRUCTION Project Name: East Central Middle School - Jackson County CLA#: 11003 No. Discipline Sent to Name Item Date Noted Date Resolved How item was resolved Electrical Contractor
Building Code Clarifications - 7. Fire Resistance
Building Code Clarifications - 7. Fire Resistance 7.1 (15-12-030) Use of combustibles in Type III construction roof assemblies Code Section (15-12-030) Use of Combustibles was revised on May 17, 2000,
COMMISSIONING OF HVAC SYSTEMS
FORM CL-01 SYSTEMS / EQUIPMENT INCLUDED : SYSTEM STARTUP CHECKLIST I - PRE - STARTUP INSPECTION EQUIPMENT MOUNTING & SETTING CONTROL, INTERLOCK & POWER WIRING ALIGNMENT OF MOTORS & DRIVES PIPING, CONNECTIONS
SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST RESIDENTIAL FIRE SPRINKLERS NFPA 13R
July 1, 2010 SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST RESIDENTIAL FIRE SPRINKLERS NFPA 13R Address: Permit #: Inspector: Date: Status: Inspector: Date: Status: A-Approved;
Construction Permit Application Instructions Instructions for completing Construction Permit Applications and Technical Sections are as follows:
Construction Permit Application Instructions Instructions for completing Construction Permit Applications and Technical Sections are as follows: UCC-F100, Construction Permit Application pg. 1. Applicant
The City of Basehor, Kansas
The City of Basehor, Kansas Residential and Miscellaneous Permits This list provides general information regarding permit requirements for various residential construction and maintenance activities. The
WHITE PLAINS PLUMBING CODE PART 1. GENERAL REQUIREMENTS
WHITE PLAINS PLUMBING CODE PART 1. GENERAL REQUIREMENTS a. New Plumbing and Gas Piping Systems. This code in conjunction with the Plumbing and Fuel Gas Codes of the State of New York shall apply to plumbing
COMMERCIAL COOKING HOODS, VENTILATION & FIRE SUPPRESSION SYSTEM GUIDELINES AND PROCEDURES
COMMERCIAL COOKING HOODS, VENTILATION & FIRE SUPPRESSION SYSTEM GUIDELINES AND PROCEDURES These guidelines are to be used for ALL commercial cooking hoods, ventilation systems and related fire suppression
Original Document 10/16/07 Revised 01/30/09 2 nd Revision 01-23-12 3 rd Revision- 12/18/14
North Collier Fire Control & Rescue District Greater Naples Fire Rescue District Immokalee Fire Control & Rescue District 2800 North Horseshoe Drive Naples, Florida 34104 SYSTEM REHABILITATION PLAN CHECKLIST
LAKE COUNTY ANIMAL SERVICES EXPANSION SECTION 15459
SECTION 15459 PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division-1 Specification sections, apply to work
FIRE ALARM SYSTEM. A. Shop drawings shall be submitted as follows: 1. Manufacturer's published literature. for aspproval.
Polk School District Specifications for the New Fire Alarm in the Existing Building Eastside Elementary School FIRE ALARM SYSTEM 1.01 SUBMITTALS A. Shop drawings shall be submitted as follows: 1. Manufacturer's
HVAC Checklist - Long Form
HVAC Checklist - Long Form Page 1 of 14 Appendix B discusses HVAC system components in relation to indoor air quality. utside Air Intake Location pen during occupied hours? Unobstructed? Standing water,
WHEN IS A PERMIT REQUIRED?
WHEN IS A PERMIT REQUIRED? Any owner, builder, contractor, or other authorized agent who intends to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure,
ESTIMATING PLUMBING, HEATING, VENTILATING, AND AIR CONDITIONING (HVAC), AND ELECTRICAL WORK
C H A P T E R 7 ESTIMATING PLUMBING, HEATING, VENTILATING, AND AIR CONDITIONING (HVAC), AND ELECTRICAL WORK OBJECTIVES After reading this chapter and completing the review questions, you should be able
77 ILLINOIS ADMINISTRATIVE CODE, PART 890 (NEW) ILLINOIS PLUMBING CODE (02/04) SUBPART I: WATER SUPPLY AND DISTRIBUTION
SUBPART I: WATER SUPPLY AND DISTRIBUTION Section 890.1110 Quality of Water Supply All premises intended for human habitation or occupancy shall be provided with a potable water supply. The potable water
SARATOGA FIRE DISTRICT EARLY WARNING FIRE ALARM SYSTEM STANDARDS AND REQUIRMENTS CONTENTS
SARATOGA FIRE DISTRICT EARLY WARNING FIRE ALARM SYSTEM STANDARDS AND REQUIRMENTS CONTENTS I. APPLICATION AND DEFINITIONS 1.01 Authorization for Standards 1.02 Application of Standards 1.03 Definitions
REGULATIONS for INSTALLATION, MAINTENANCE, and TESTING APPLICATION PACKET
REGULATIONS for INSTALLATION, MAINTENANCE, and TESTING FIRE SUPPRESSION SYSTEMS APPLICATION PACKET CITY OF NAPERVILLE 400 S. EAGLE STREET NAPERVILLE, Il 60540 PHONE: 630.420.6070 FAX: 630.420.6657 Fire
Schedule B to By-law 33-2009
Amended by By-law 8-2016 Note: This consolidation is prepared for convenience only. For accurate reference the original by-laws should be reviewed. Floor Area Calculation Floor area shall: Schedule B to
CONSTRUCTION FIRE SAFETY PLANNING GUIDELINES
CONSTRUCTION FIRE SAFETY PLANNING GUIDELINES Review the following information pertaining to Construction Fire Safety Planning: B.C. Building Code Sections 8.1 up to and including Subsection 8.2.3 B.C.
TAMARAC FIRE RESCUE INSTRUCTIONS FOR FIRE ALARM PRE-SUBMITTAL CHECKLIST
TAMARAC FIRE RESCUE INSTRUCTIONS FOR FIRE ALARM PRE-SUBMITTAL CHECKLIST In order to provide a comprehensive plan review in a timely manner, and to insure the design and installation of fire alarm systems
Health Chapter 420-5-22 ALABAMA STATE BOARD OF HEALTH ALABAMA DEPARTMENT OF PUBLIC HEALTH ADMINISTRATIVE CODE
Health Chapter 420-5-22 ALABAMA STATE BOARD OF HEALTH ALABAMA DEPARTMENT OF PUBLIC HEALTH ADMINISTRATIVE CODE CHAPTER 420-5-22 SUBMISSION OF PLANS AND SPECIFICATIONS FOR HEALTH CARE FACILITIES TABLE OF
MECHANICAL PLAN REVIEW REQUIREMENTS
6. Accessibility provisions. 7. Description and details of proposed special occupancies such as a covered mall, high-rise, mezzanine, atrium, public garage, etc. 8. Adequate details to evaluate fire resistive
SPACE TYPE: LABORATORY (WET) FOR CHEMISTRY AND BIOLOGY
SPACE TYPE: LABORATORY (WET) FOR CHEMISTRY AND BIOLOGY Construction Criteria The unit costs for (Wet) space types are based on the construction quality and design features in the following table. This
2.4 Hardcopy submittals shall be provided at adequate size so that all notes are readable.
DESIGN EQUIEMENTS POJECT DELIVEABLES CHECKLISTS GENEAL INFOMATION 1.1 The following is a checklist to be used as a guide for the required deliverables for the Schematic Design phase. 1.2 Schematic Design
Development Services Guidelines
Dear Customer/Developer: Balcones Heights 3300 Hillcrest San Antonio, Texas 78201 210-735-9148 ext 246 Fax: 210-735-9409 Development Services Guidelines Welcome to the City of Balcones Heights, we look
Scope of Work Class I Contractor s Licenses. Putnam County Ordinance 2004-13. Section 17. Types of Authorized Contractor Licenses.
Scope of Work Class I Contractor s Licenses Putnam County Ordinance 2004-13 Section 17. Types of Authorized Contractor Licenses. A. Class I Contractors: The Class I Contractors are listed in this subsection
FIRE ALARM SYSTEMS PERMIT APPLICATION, PLAN SUBMITTAL, DESIGN, INSTALLATION AND INSPECTION REQUIREMENTS Effective Date: January, 2011
Office of the Fire Marshal 1.0 PERMITS FIRE ALARM SYSTEMS PERMIT APPLICATION, PLAN SUBMITTAL, DESIGN, INSTALLATION AND INSPECTION REQUIREMENTS Effective Date: January, 2011 1.1 To acquire an installation
Arizona Health Care Association DISASTER PLANNING AND EMERGENCY MANAGEMENT GUIDE POST INCIDENT DAMAGE ASSESSMENT CHECKLIST
It is essential to perform a Basic Damage Assessment (BDA) following an adverse event to help ensure the safety of building occupants as well as prevent additional losses from occurring. This checklist
SPECIFICATIONS FOR THE INSTALLATION OF FIRE ALARM SYSTEMS, SPRINKLER SYSTEMS, AND MASTER BOXES IN THE POQUONNOCK BRIDGE FIRE DISTRICT
SPECIFICATIONS FOR THE INSTALLATION OF FIRE ALARM SYSTEMS, SPRINKLER SYSTEMS, AND MASTER BOXES IN THE POQUONNOCK BRIDGE FIRE DISTRICT The purpose of these specifications is to insure that there are minimum
MISCELLANEOUS ELECTRICAL JOBS REQUIRING PERMITS
MISCELLANEOUS ELECTRICAL JOBS REQUIRING PERMITS 01. SAFETY INSPECTION of service equipment at FPL Power Source 02. Construction GFI power outlets (Temp Pole for Construction) 03. 90 day temporary power
Automatic Fire Sprinkler Submittal Requirements
Automatic Fire Sprinkler Submittal Requirements All commercial and industrial buildings with a total floor area of 5000 sq. ft. shall have an approved automatic sprinkler system installed. The Windsor-Severance
INSTALLATION GUIDELINES for SOLAR PHOTOVOLTAIC SYSTEMS 1
City of Cotati Building Division 201 W. Sierra Ave. Cotati, CA 94931 707 665-3637 Fax 792-4604 INSTALLATION GUIDELINES for SOLAR PHOTOVOLTAIC SYSTEMS 1 Any PV system on a new structures should be included
SAM HOUSTON STATE UNIVERSITY
PART 1: GENERAL 1.01 General Requirements A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the
HERNANDO COUNTY FIRE ALARM GUIDELINES
HERNANDO COUNTY FIRE ALARM GUIDELINES To be used for all commercial building fire alarm system plan review. The procedures set forth in this document are the minimum requirements necessary to ensure a
2. What building projects are exempted? (permit not required)
BUILDING AND SAFETY DEPARTMENT 1. What building projects require a permit? Following is a list of projects that require building permits based on Appendix chapter 1 of the California Building Code and
Miami University Design Standards
Miami University Design Standards INDEX General Division 01 Supplemental Conditions Division 02 Existing Conditions Division 03 Concrete Division 04 Masonry Division 05 Metals Division 06 Wood, Plastics,
527 CMR: BOARD OF FIRE PREVENTION REGULATIONS
527 CMR 31.00: CARBON MONOXIDE ALARMS Section 31.01: Purpose and Scope 31.02: Definitions 31.03: General Installation Provisions 31.04: Specific Installation Provisions 31.05: Carbon Monoxide Protection:
LOUISVILLE FIRE PROTECTION DISTRICT 895 West Via Appia, Louisville, Colorado 80027 303-666-8809
LOUISVILLE FIRE PROTECTION DISTRICT 895 West Via Appia, Louisville, Colorado 80027 303-666-8809 Contractor s Checklist and Installation Guide TABLE OF CONTENTS Fire Protection Narrative........... 3 Fire
What to Expect From the Examination. How to Study the Plumbing Codes
Texas State Board of Plumbing Examiners Plumbing Inspector Examination Review Course The following Examination Review Course is designed to assist an applicant in preparing for the Plumbing Inspector examination.
Aurora Mall. Aurora (Denver), Colorado
is the largest superregional mall in the city of Aurora, and it s only getting bigger and better. The mall is currently undergoing a significant interior and exterior renovation, scheduled for completion