MASTER DATA ACQUISITION USING eotd Dr Salomon de Jager PiLog

Similar documents
Implement RAMIS MDAT application software through which Master Data can be cleaned up and verified, and then managed on a continuous basis.

Cat Electronic Technician 2015A v1.0 Product Status Report 4/20/2016 2:49 PM

PiLog Master Data Quality Manager

MASTER DATA THE BACKBONE OF A SUCCESSFUL COMPUTERISED MAINTENANCE MANAGEMENT SYSTEM. KEYWORDS: Master Data, Maintenance, ERP, CMMS, SAP.

Chronos CMMS. System Overview

Getting the Best Value from your Asset Management Information System

Supplier Engineering Change Control Training

Lonmin Plc The SAP PM Journey Process Division. Power without control is meaningless. SAP PM without structure and execution suffers a similar fate.

Accpac ERP for transport. - The Integrated Journey

What's New - Application in Microsoft Dynamics AX 2012 for Supply Chain Management, and Manufacturing Course 80163A: 1 Day; Instructor-Led

Cat Electronic Technician 2015C v1.0 Product Status Report 2/20/2016 4:34 PM

Enterprise Asset Management made for Microsoft Dynamics AX

Presentation: Cloud reigns over (SPIR) spread-sheets

Automatic Fire Fighting Monitors

REMAN ENGINES APPLICATION GUIDE

Industry Market Research for the MRO Supplies Strategic Sourcing Solution. Background:

CMMS/EAM. Maintenance Solutions

September 9 11, 2013 Anaheim, California Spatial Analytics: 3D Models in SBOP Dashboards

ITIL: What is it? How does ITIL link to COBIT and ISO 17799?

Diagnostic Fault Codes For Cummins Engines

I.M.A. Ltd. World-Class Material Master Data Management Solutions. Empowering Data-Driven Savings

HYDRA-GRENE - A Powerful Partner for the Industry

Applying Open Standards for PLM System Interoperability

IT Organisation in Change

Lecture 17: Requirements Specifications

Bright Idea: GE s Storage Performance Best Practices Brian W. Walker

EveryTM. Coverage. North American Truck Coverages For ISL9, ISC8.3 And ISB6.7 Engines.

Software Asset Management (SAM) and ITIL Service Management - together driving efficiency

ERP Systems. Generic ERP system. Categories of ERP systems. December 4, 2014

TSGS#13(01)0562. Technical Specification Group Services and System Aspects Meeting #13, Beijing, China, September 2001

ORACLE FUSION ERP CLOUD SERVICES START-UP PACKS

JSP 886 THE DEFENCE LOGISTIC SUPPORT CHAIN MANUAL VOLUME 2 INVENTORY MANAGEMENT PART 9 THE MANAGEMENT OF ASSETS

Proactive Asset Management with IIoT and Analytics

ion Manufacturing Solution

Atkins China Asset Management. Alan Wilson. Strategy Development

Cendec Systems Inc.

The Leading Reward of Maintenance Management

Start Date. Start Time. Finish Date. Finish Time. Comments

Axis Cloud Collaboration Platform Business Partner Collaboration

DOCUMENTS AND PARAMETERS PROCESS AND CONTROL

A pre-configured ERP solution for Sugar industry

Work Breakdown Structure.

Recommended Practice for Software Acquisition

GAMP 5 and the Supplier Leveraging supplier advantage out of compliance

Energy Recovery System for Excavators Meng (Rachel) Wang, Chad Larish Eaton Corporation

Certain statements in this presentation constitute forward looking statements within the meaning of the Private Securities Litigation Reform Act of

EveryTM. Coverage. North American Truck Coverages For 2013 ISL9 And ISB6.7 Engines.

Water Treatment Operator. Water Treatment Operator I

inoerp Accounts Payable Process Flows inoerp

Automotive Service and Technology

Oracle Enterprise Asset Management

Altiris Asset Management Suite 7.0

The product. SIMAC a machine simulator. Plan. Presentation of the simulation. Simulation, why? What : SIMAC product. Page 1 SIMAC

CUMBRIA COUNTY COUNCIL. Strategic & Commercial Procurement

WIRELESS MAGNETIC CONTACT

Learning From a Failed ERP Implementation

EAGLE ASSET TRACKING DATABASE

MAN - MERCEDES - BENZ

OPERATIONAL PROJECT MANAGEMENT (USING MS PROJECT)

Cat Electronic Technician 2015A v1.0 Product Status Report 6/3/2015 4:41 PM

World Bridge Replacement Parts for EMD 567 and 645 Diesel Engines

Integrating Oracle E-Business Suite with Oracle Utilities Work Order Management System

Backup Fuel Oil System Decommissioning & Restoration Plan

Business Process Flowchart. Fleet Management. Packet Description. MAGIC Roles. MAGIC Flows. Help or Questions

IBM Maximo for Transportation. Don Beahm IBM Transportation and Government Product Manager

M&V of Hot Water Boiler Plant. Boban Ratkovich, P. Eng, CEM, BESA, LEED AP President CES Engineering Ltd

T146 Electro Mechanical Engineering Technician MTCU Code Program Learning Outcomes

Managed Service Plans

RHODE ISLAND DEPARTMENT OF ENVIRONMENTAL MANAGEMENT FY WORK PLAN - OFFICE OF MANAGEMENT SERVICES

Status of the Diamond Storage Ring RF Systems. Morten Jensen on behalf of Diamond Storage Ring RF Group

Effectively managing your fleet with the Annata Dynamics FLEET solution

Making the Right CMMS Selection for Users: Durham Water Management s Experience

Infrastructure. management for ONGC. Infrastructure. Management. Network & Security. Management. 24x7 Application Support. Vendor.

SAP Master Data Governance for Enterprise Asset Management. Dean Fitt Solution Manager, Asset Management Solutions, SAP SE Stavanger, 21 October 2015

Chapter 2. The Development of Enterprise Resource Planning Systems

FD-101. Electronic Commodity Ordering System (ECOS) & Web Based Supply Chain Management (WBSCM) Todd Griffith FDD Systems Branch May 2008

How To Install A Mazzei Injector

Aerni consulting services

High-Performance Maintenance Management Software With All-Terrain Capabilities

IUID ASSET TRACKING FOR DEFENSE CONTRACTORS

Fixed Scope Offering for Oracle Fusion HCM. Slide 1

Penn State University (PSU)

KIFINTI. Kifinti White Paper. IT Asset Management Four Steps To Implementing an Effective IT Asset Management Strategy. Paul Kelsey 4/1/2012

Section 11 - System Diagrams

Configuration Management ISO 10007

Hydrostatic closed loop Bosch Rexroth. Fuel tank 180 l 180 l

SIMPLE WELL ORCHESTRATED ERP SOFTWARE SOLUTION

CM927 WIRELESS PROGRAMMABLE THERMOSTAT FEATURES PRODUCT SPECIFICATION SHEET

Transcription:

MASTER DATA ACQUISITION USING eotd Dr Salomon de Jager PiLog ECCMA 10 th Anniversary Conference 27 th to 29 th October 2009 Cataloging at Source - the last piece of the puzzle

Master Data Management Quadrants Public Domain Client Domain ERP 1 MM eproc OPS Area Staging Area Standards Standardized External Data Non Standardized External Data Master Data Management Data Flow Master Data Acquisition ERP 2 Other Content Refinery OPS Area Staging Area

C@S MDA Integrated Model Project Procurement Spares/Materials Management Operational System Vendor Master Item Catalogue Inventory Asset Register Location Structures Bills of Materials Asset Management PiLog Master Data Acquisition

Level of Effort Master Data Overview From the Cradle to the Grave Master Data Acquisition / Project Phase Design Procurement Documentation Construction Configuration Data Extraction Upload to ERP Preparation 18 months Max Level of Effort Master Data Management / Operational ERP Phase Planning Inventory Feedback Requisition Procurement Receiving Issuing Maintenance Phase -Out Best Business Practice Existing Practice Plant Commissioning Time 4-5 years Handover 20 years

Master Data Acquisition for ERP Operation Baseline Establishment and Equipment Life Cycle Management Principles

Managing the Acquisition of Master Data Equipment Baseline Creation and Management Sourced from: Eng Design Specs, OEM Prescriptions, Design Drawings Equipment Configuration Definition Maintenance Significant Item Identification Maintenance Task Definition Maint & Ops Resource Requirements Document Management Material Item Master Creation Driven By Operational Requirements Data requirement statements Equipment and Operations Management Operations planning and execution Reporting & Analysis Breakdown Maintenance Long Term Maintenance Planning WIP Execution Short Term Plans (WIP) Phase Out Planning Procurement Management Inventory Management HR Management

Managing the Acquisition of Master Data Equipment Baseline Creation and Management Sourced from: Eng Design Specs, OEM Prescriptions, Design Drawings Equipment Configuration Definition Maintenance Significant Item Identification Maintenance Task Definition Maint & Ops Resource Requirements Document Management Material Item Master Creation Driven By Operational Requirements Data Requirement Statements Equipment and Operations Management Operations planning and execution Reporting & Analysis Breakdown Maintenanc e Long Term Maintenance Planning WIP Execution Short Term Plans (WIP) Phase Out Planning Procurement Management Inventory Management HR Management

Master Data Equipment Configuration Management

Structure Types Generic Structure Specific Structure Top SYC L1 SYC L1 SYC L1 SYC L2 SYC L2 SYC L2 SYC L2 SYC L3 SYC L3 SYC L3 SYC L4 SYC L4 SYC End Eqp No 1 End Eqp No 2 End Eqp No 3 End Eqp No 4 Top SYC Top Ser SYC No X Top Ser SYC No X Top Ser SYCNo X L1 SYC Ser No X L1 SYC L1 SYC L1 Ser SYC No: null L1 Ser SYC No: null L1 Ser SYC No: null L1 Ser SYC No: null L1 Ser SYC No: null L1 Ser SYC No: null L1 Ser SYC No: null L1 Ser SYC No: null L1 Ser SYC No: null Ser No: L2 SYC null Ser No: null L2 SYC L2 SYC Ser No: L2 null SYC L2 Ser SYC No: null L2 Ser SYC No: null L2 Ser SYC No: null L2 Ser SYC No: null L2 Ser SYC No: null L2 Ser SYC No: null L2 Ser SYC No: null L2 Ser SYC No: null L2 Ser SYC No: null L2 Ser SYC No: null L2 Ser SYC No: null L2 Ser SYC No: null Ser No: null Ser No: null Ser No: null Ser No: null L3 SYC L3 SYC L3 SYC L3 Ser SYC No: null L3 Ser SYC No: null L3 Ser SYC No: null L3 Ser SYC No: null L3 Ser SYC No: null L3 Ser SYC No: null L3 Ser SYC No: null L3 Ser SYC No: null L3 Ser SYC No: null Ser No: L4 SYC null Ser No: L4 SYC null Ser No: null L4 Ser SYC No: null L4 Ser SYC No: null L4 Ser SYC No: null L4 Ser SYC No: null Ser No: null L4 SYC Ser No: null Ser No: null L4 SYC Ser No: null

Generic Structure

Specific Structure Available End Equipment

Specific Structure Selected End Equipment

Specific Structure Population Equipment Register Eqp No Eqp Type Part No Description CR 06-191 CRANE PTNO 0123 GW AK912 Crane EQP SNO 001 CHASSIS 0000660716 CHASSIS ASSEMBLY EQP SNO 002 POWER PACK 000125004317 POWER PACK EQP SNO 003 ENGINE 000125006431 BASIC ENGINE EQP SNO 004 EQP SNO 005 EQP SNO 006 EQP SNO 007 EQP SNO 008 EQP SNO 009 EQP SNO 010 SOLENOI D VALVE 000137004104 FUEL PUMP 000912004002 INJ PUMP 000931008049 SOLENOID VALVE, HOUSING AND AIR PIPE FUEL PUMP,MECHANICAL INJECTION PUMP WITH ROLLER TAPPETS INJECTO R 000931008075 FUEL INJECTOR INTERFA CE 5511530050 POWER PACK 007603010110 POWER PACK 007603010110 ENGINE, TRANSMISSION INTERFACE EQP SNO 011 TURRET 8800703010 TURRET POWER PACK, FUEL SUPPLY SYSTEM POWERPACK COOLING SYSTEM Specific Structure Prod X LL Comp LL Comp LL Comp LL Comp LL Comp LL Comp LL Comp LL Comp LL Comp CR 06-191 LL Comp LL Comp LL Comp LL Comp

Structure and CI Associated Info Physical Hardware Breakdown Structure CATALOGING PROCESS Generic Equipment Configuration Structure Valid and Preferred Part No s Alternative Part Numbers Configuration Status Codes (Mods) Material Item Master INSTALLED Serialized Equipment Specific Equipment Config Structures Actual Utilization (Meter Feedback) ASSOCIATED DOCUMENTS Ageing Parameters (Meters) Standard Maintenance Tasks

Master data Asset Management

Asset Management Equipment Types Vendors Part Numbers Mat Item Numbers Departments Personnel Asset Register Asset Status Codes Asset Waranties Asset Meters Asset Tracking Application Asset Utilisation Condition Asset Meter Update/Feedback EXT Location Change Asset Status Change INT Location Change

Asset Management Equipment Register

MDA Maintenance Management

Maintenance Task Definition Standard Maintenance Task Priorities Status Codes Task Types Task Instructions Associated Documents Verbs Std Task Associated Info Standard Tasks OEM Instructions Trades Special Conditions Proposed Tasks Inherent Details: Standard Task Code Verb & Description Task Schedule Type Resources Fix & Statutory Indicators Task Type Estimated Duration Support Material Frequency Equipment Schedule Type (FS, SS, ) Date From Ind Experience / Expertise RCM Facilities

Maintenance Task Resource Requirements Standard Maintenance Task Priorities Status Codes Task Types Verbs Standard Tasks OEM Instructions Special Conditions Proposed Tasks Experience / Expertise RCM Std Task Associated Info Task Instructions Task Resources Facilities Associated Documents Trades Material Support Equipment

Standard Task Associated Information - Materials

Standard Task Associated Information - Instructions

MDA Materials/Inventory Management

Material Item Master

Material Item Master System/Eqp Association

MDA Document Management

Document Management Principles Document Registration Document Number Document Revision Number Document Description Document Type Document Indexing Topic Document Date Document phrases and words Document Publishing Document Breakdown Structures Document Imaging/File Management Document Associations Document Modification

Document Interface

Conclusion

Master Data Overview 5 Golden Rules Never underestimate the power of quality data with integrity. Data is a company Asset, treat it as such, control it, maintain it, repair it and govern it. Let the data work for you, do not become a slave of the data. Do it right the first time. Do not bring the level of your systems and data down to the User, bring the level of the User up to the systems and the operational data.