Construction Equipment Fleet Management



Similar documents
Construction Equipment Fleet Management: Case Study of Highway Construction Project

Fleet Management of Construction Equipment- A Case Study of Road

TRUCKS AND HAULING EQUIPMENT

LEET CAT MINESTAR SYSTEM INTEGRATED FLEET MONITORING & MANAGEMENT FOR MINING

Chapter 10. Hauling Equipment

Cost Estimating in Construction Part 1, Course #406. Presented by: PDH Enterprises, LLC PO Box 942 Morrisville, NC

CONSTRUCTION EQUIPMENT AND METHODS

OPTIMIZATION OF LOAD HAUL DUMP MINING SYSTEM BY OEE AND MATCH FACTOR FOR SURFACE MINING

INDEX DESCRIPTION MATERIALS APPROVAL OF SUBBASE COURSE CONSTRUCTION MEASUREMENT PAYMENT 6

PulseTerraMetrix RS Production Benefit

CW 3110 SUB-GRADE, SUB-BASE AND BASE COURSE CONSTRUCTION TABLE OF CONTENTS

EQUIPMENT SAFETY EARTHMOVING MATERIAL HANDLING NAVFAC MIDLANT

An Assessment of Nominal and Actual Hourly Production of the Construction Equipment Based on Several Earth-Fill Dam Projects in Iran

Is Truck Queuing Productive? Study of truck & shovel operations productivity using simulation platform MineDES

ICT-BASED WORK MANAGEMENT TO SUPPORT UNMANNED CONSTRUCTION FOR POST-DISASTER RESTORATION

A critical evaluation of haul truck tyre performance and management system at Rössing Uranium Mine

USE OF SOLUTION STRATEGY IN OPEN CAST MINING TRUCK DISPATCHING SYSTEM

Empirical Application of GPS Fleet Tracking Technology to a Soil Excavation Process

Hydraulic Excavators

STOCHASTIC SIMULATION MODEL FOR A LONG DISTANCE SAND TRANSPORTATION PROCESS

BENEFITS OF USING MOBILE CRUSHING AND SCREENING PLANTS IN QUARRYING CRUSHED STONE. 1. Introduction. Mario Klanfar*, Darko Vrkljan*

4-02 Gravel Base Ballast and Crushed Surfacing

GPS BASED TRUCK DISPATCH SYSTEM (TDS) IN HIGHLY MECHANIZED BAUXITE MINES A CASE STUDY.

Leica Jigsaw Jfleet Fleet Management System

WET/DAMP BASEMENTS ANSWER: BASEMENT WALLS AND FLOORS CAN BECOME WET BY A LEAK, CAPILLARY SUCTION OR CONDENSATION.

Construction Planning, Equipment, and Methods

How To Use Leica Dozernav Plus

Road Construction. Production Study. AccuGrade GPS & ATS Systems. MALAGA Demonstration & Learning Center

PART 3 DEFINITION OF ROCKFILL VERSUS EARTHFILL MATERIAL

Model based construction and Model based quality assurance process Contractor s experiences

Software Stability Model for Dump Truck Scheduling

A new short- and medium-term production scheduling tool MineSight Schedule Optimizer (MSSO)

Soils, Foundations & Moisture Control

manage your mobile, machine, and portable assets and improve your onsite productivity TRIMBLE CONSTRUCTION MANAGER

SECTION ET3. Copyright Remote Control Technologies Pty Ltd

SECTION 311 PLACEMENT AND CONSTRUCTION OF CEMENT TREATED SUBGRADESOIL CEMENT BASE COURSE

TRACKING HAULING TRUCKS FOR CUT-FILL EARTHMOVING OPERATIONS

HEAVY CONSTRUCTION & MINING

Estimating Trench Excavation

Internet of Things World Forum Chicago

Civil. 2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.

CIM Convention 2014 May SMART Benchmarking Program Update

Safety Applications for GPS Systems in the Mining Industry

Introduction PURPOSE OF THIS BOOK

There is no water, surface tension cracks, nor other environmental conditions present that reduce the stability of the excavation.

TREAD DESIGNS RADIAL AND BIAS

Construction Equipment Financing

Helen Mercury Mine EE/CA OPINION OF PROBABLE COST

In-Pit Crushing and Conveying Phil Morriss

Challenges and Opportunities for Small Businesses Engaged in Energy Development and Energy Intensive Manufacturing

Minerals Day Chile 2015 Innovative Drives for Trucks and Shovels

Project Details- Minor Minerals (Other Than Sand)

Automated Mine Scheduling: What is it and will it help me?

Project Details- Minor Minerals (Other Than Sand)

Position: HEAVY EQUIPMENT OPERATOR Classification: 3 Highway Personnel Member B & C

Overview of DFA OPQ CAP Meeting

Caterpillar Haul Road Design and Management. Pete Holman 2006 Big Iron University St. Charles, IL

Predicting From the Edge in an

Compliance Guideline for MSHA s Part 46 Training Regulations

Specialist remote area rental solutions.

Traffic Management Issue 1.0 Revision: v2 October 2014

Aggregate Handling And Storage Piles General

Exploring the Human Factors Challenges of Automated Mining Equipment

CAT DETECT MINESTAR SYSTEM

The Manitoba Water Services Board SECTION Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11

Managing Your Fleet Is Easy With FleetForce

FEMA's SCHEDULE OF EQUIPMENT RATES

CIVIL AND MINING CONTRACTORS

«Construction Equipment in an Agile World» Plenary Session, 16th October 2014, Crowne Plaza -Antwerp

Wencore. This is where you start. Wenco Fleet Management - The Core Products WHAT IS A FLEET MANAGEMENT SYSTEM?

MACHINE VISION ORIENTATION SENSOR THERMAL IMAGING 3D VISION DEEP LEARNING THERMAL IMAGING.

GUIDANCE FOR CARRYING OUT RISK ASSESSMENT SURFACE MINING OPERATIONS

Attachment G-1: Pit Latrine Diagram. Fig E.1a: Pit Latrine. Fig E.1b: Plan View of Twin Pits

Virtualization Technology using Virtual Machines for Cloud Computing

Model based quality assurance process in a infra construction. Case Riippa-Eskola RU2 double rail project

COST ANALYSIS OF FOUR ALTERNATIVES FOR HAULING COAL FROM THE PROPOSED OTHELLO MINE

Technology Trends in MRO Inventory Management

Discovering New Territories: Sustainable Systems for Efficient Mining Operation Mr. Norbert Becker

PROPOSAL FOR CONTRACTORS ALL RISKS

IMPROVING OUR CUSTOMER S EXPERIENCE

Focus on learning key. 1 NIHL impacts. Exercise. Discuss. Introduction

MANURE COLLECTION AND TRANSFER SYSTEMS IN LIVESTOCK OPERATIONS WITH DIGESTERS. A. C. Lenkaitis GEA Farm Technologies Inc. (Houle USA), Naperville, IL

GHG Accounting in a Construction Project: The Case of Montréal's Turcot Project. Sylvie Tanguay Research Officer, Ministère des Transports du Québec

Road Transportation of Freight Turnover Measures and Practices at the U.S. Census Bureau

THE ALTERATION OF THE HUNGARIAN TOLL PAYMENT SYSTEM IN 2013, ACTIVITY SUPPORT WITH THE APPLICATION OF A FLEET MANAGEMENT SYSTEM

Using Bow-Tie analyses to enhance incident investigation activities

MINING AND EARTHMOVING

Stefan Sjöström, SEABB, PAPI UGM Automation ABB Underground mining Mobile Integration. ABB Group May 18, 2015 Slide 1 3BSE

management system, and unattended driver terminals, your facility can process more trucks per day and reduce traffic congestion.

John Deere Customer Business Data Type Inventory

Performance Measurement of Mining Equipments by Utilizing OEE

Truck: A :22 PM ton. Maximize payload, maximize profit. LOADRITE X2650 Excavator Scales. transforming the way the world works

Estimated emissions and CO2 savings deriving from adoption of in-place recycling techniques for road pavements

Ardessie Hydro Electric Project

Top Five Fleet Tracking Benefits for the Landscaping Industry

Moving Small Mountains Vesuvius Dam Rehab

Cat Detect. for Surface Mining Applications

TRIMBLE ATS TOTAL STATION ADVANCED TRACKING SYSTEMS FOR HIGH-PRECISION CONSTRUCTION APPLICATIONS

Revenue Chapter ALABAMA DEPARTMENT OF REVENUE ADMINISTRATIVE CODE CHAPTER ALABAMA UNIFORM SEVERANCE TAX TABLE OF CONTENTS

Simulation of an Open Pit Mine to Study Autonomous Haulage Trucks

Transcription:

International OPEN ACCESS Journal Of Modern Engineering Research (IJMER) Construction Equipment Fleet Management Sujay Dandwate *(Civil Engineering Department, D.Y.Patil College of Engineering, Akurdi, Pune-44, India ABSTRACT: Fleet management can be defined by three basic components: Equipment assignment and optimization, Production monitoring, and Position and material monitoring. Equipment assignment and optimization is the primary reason many construction companies choose to implement fleet management systems in the first place. By enabling the scheduling and assignment of all types of equipment from multiple manufacturers as well as shift change management from a central office location. The second critical element, production monitoring, is the ability to review information on machine cycle time, payload, loading performance and other key operational parameters. Fleet management provides visibility in real time to this kind of data which can be tracked by individual machine or operator, groups of machines, specific sites or an entire fleet enabling miners to make timely changes to improve loading performance and increase payload predictability. Position and material monitoring is the third key component. At its most basic level, fleet management is about monitoring equipment location for an entire fleet but beyond that, it also helps to ensure that machines are in the right location and that the amount and type of material they are moving is accurate. The study revealed to analyze performance factors such as dump movement and haul road congestion to boost overall site productivity. Keywords Fleet management, Equipment assignment, Production monitoring, Material monitoring, Productivity. I. Introduction Flipping through a mining journal or attending any mining industry conference there is a likely possibility to come across some discussion of fleet management. It s a hot topic these days. But beyond the obvious definition managing a fleet of equipment what exactly does it entail? And what benefits should it deliver for a construction operation? The simplest way to define fleet management is to look more closely at its three basic components: Equipment assignment and optimization, Production monitoring, and position and Material monitoring. 1.1. Equipment assignment and optimization: Equipment assignment and optimization is the primary reason many construction companies choose to implement fleet management systems in the first place. By enabling the scheduling and assignment of all types of equipment from multiple manufacturers as well as shift change management from a central office location, fleet management helps minimize unproductive machine wait time and optimize equipment usage on site. 1.2. Production monitoring: The second critical element, production monitoring, is the ability to review information on machine cycle time, payload, loading performance and other key operational parameters. Fleet management provides visibility in real time to this kind of data which can be tracked by individual machine or operator, groups of machines, specific sites or an entire fleet enabling fleet managers to make timely changes to improve loading performance and increase payload predictability. 1.3. Position and material monitoring: Position and material monitoring is the third key component. At its most basic level, fleet management is about monitoring equipment location for an entire fleet but beyond that, it also helps to ensure that machines are in the right location and that the amount and type of material they re moving is accurate. This type of data can be used to alert operators to misroutes before mistakes or safety hazards occur, as well as to analyse performance factors such as dump movement and haul road congestion to boost overall site productivity. IJMER ISSN: 2249 6645 www.ijmer.com Vol. 5 Iss.2 Feb. 2015 29

II. Fleet Problem And Action Plan: The construction of dams, levees, highways, airports, commercial buildings and industrial plants utilize some type of earth-moving operations. Earth-moving is must on every construction site. Moreover all the mining operations include excavation and haulage. Earth-moving operations include excavating, hauling, placing, and compacting. Consider a virtual problem of moving of Aggregate stockpiled at a certain location A to certain location B which is 2 Km away. The total stockpile volume is 10,000 Solution: 2.1 Equipment Selection: First step the fleet manager has to take is the decision regarding equipment selection. In general the type s equipment s that can be chosen for earth-moving operations include dozers, scrapers, loaders, excavators, dragline, clamshell, haulers, graders and compacters. For each type of equipment selected, there are unique qualities that must be considered (e.g. horsepower, size, productivity, etc.) Many contractors depend on their years of experience for selecting the right pieces of equipment for a job. The preparation for selecting a fleet of equipment and estimates for earth-moving operations depend heavily on skilled judgment and taking into account all likely variables (e.g., job specifications, soil conditions, etc.). Much of the information needed is available to assist the selector; it usually exists in the form of historical data, manufacturers' performance specifications, and guidelines on methods of calculating production output, labour resources, and equipment requirements. The various factors governing equipment selection in earthmoving operations can be summarized as follows: 2.1.1 Budget & schedule. 2.1.2. Range of total size of work. (i.e. total of amount material to be moved) 2.1.3. Material condition. (i.e. if soil weather wet or dry) 2.1.4. Distance of soil movement. 2.1.5. Hauling road condition (i.e. off highway road or a public road) 2.1.6. Digging Depth. 2.1.7. Working space available. In this problem the equipment s selected are: JCB 426, Bucket capacity: 1.14 ASHOK LEYLAND 1631, capacity: 6.84 2.2 Equipment Optimization IJMER ISSN: 2249 6645 www.ijmer.com Vol. 5 Iss.2 Feb. 2015 30

A front loader with a 1.14 bucket has the following cycle elements: Move to stockpile 0.05 min Fill bucket 0.10 min Move to truck and man oeuvre to load0.15 min Dump loaded bucket 0.10 min Construction Equipment Fleet Management Total cycle time (loader) Loader productivity = 0.4 min = = 171 The tipper has to move 2 Km to and 2 Km fro i.e. 4 Km. considering the average speed 40 Kmph the travel time is: = = 0.1 hr = 6.5 min = = 2.4 min Thus Total Cycle time (tipper) = 6.5 + 2.4 = 8.9 min Number of Tippers required satisfying the operation: N = = = 3.71 tippers Now the selection of optimum numbers is a crucial task. Rounding off the number of tippers will depend on two factors p, productivity and Profit Differential. 2.2.1 Rounding Based On Productivity: The decision of rounding off the optimum number of haul units up or down can have a marked effect on the system's productivity. Rounding the number up, maximizes the loading facility productivity. Rounding the number down, maximizes haul unit productivity. Therefore, it is logical to check both and select the higher of the two. Rounding down will maximize haul unit productivity. In other words, the haul units will not have to wait to be loaded, but the loader will be idle during a portion of each cycle. Therefore productivity of 3 hauls units: = = 138 < 171 (loader production) Rounding up will maximize loader productivity, with the haul units having to wait for a portion of each cycle. This assumes that there will always be a truck waiting to be loaded as the loader finishes loading the previous truck. Here the cycle time changes as the each tipper has to wait for each cycle. Waiting time = (no. Of tipper loading time) (original cycle time) = (4 2.4) (8.9) = 0.7 min New cycle time = 8.9 + 0.7 = 9.6 min Therefore productivity of 4 hauls units: = = 171 = 171 (loader production) Thus in this case it is better to round up as a greater productivity is realized. 2.2.2. Rounding based upon Profit Differential: Another philosophy on rounding off the optimum number of haul units involves analyzing both cases to determine which would yield the greatest amount of profit. The aim is to find the best trade-off between the added cost of an extra vehicle and the benefit of having or not having that vehicle. The means of measuring the productivity of earth work is done by cost per ton and the lower that number, the greater is their profitability. As the largest contributor to those costs, loading and haulage are key areas of focus for sites looking to improve their operations. Even small changes can add up to big benefits. IJMER ISSN: 2249 6645 www.ijmer.com Vol. 5 Iss.2 Feb. 2015 31

Considering the hourly cost of operating loader with operator is 150 and 50 for the tipper with a driver. The total cost (TC) to complete the project can be described by the following TC = Here M= Total Project quantity ( ) C = Cycle Time (min) Hn= Hourly cost of tipper ( ) Hl= Hourly cost of loader ( ) N= No. Of tippers Sh= Tipper size ( ) If N is rounded down to 3 units, the total cost is TC= = 1231.2 If N is rounded up to 4 units, the total cost is TC= = 1641.6 The total revenue = 5000 /- Profit with 3 tippers = 3768.8 Profit with 4 tippers= 3358.4 Thus in this case it is better to round down as a greater profit is realized. 3.1 Swell factor: III. Theoretical Content Material Swell factor Clay, dry 0.74 Clay, wet 0.74 Earth, dry 0.80 Earth, wet 0.80 Earth & gravel 0.83 Gravel, dry 0.89 Gravel, wet 0.88 Limestone 0.63 Rock, well blasted 0.63 Sand, dry 0.87 Sand, wet 0.87 Shale 0.71 3.2. Fill factor: Material Fill Factor (%) Moist Loam/sandy clay 100-110 Sand and Gravel 95-110 Rock-poorly blasted 40-50 Rock-well blasted 60-75 Hard, tough clay 80-90 IJMER ISSN: 2249 6645 www.ijmer.com Vol. 5 Iss.2 Feb. 2015 32

IV. Conclusion Project engineers and estimators may accept less than optimum selections of equipment under the pressure of instantaneous decision making and lack of time to perform the tedious repetitive calculations necessary to determine the most economical selection.this paper gives a idea for the selection of equipment, finally it s the decision of contractor or engineer to go with productivity or cost. The automated procedure permits the user to perform what-if scenarios to compare the production and cost of different equipment spreads. The procedure could easily be extended to allow the user to enter limitations on the time allowed for the excavation and request the system to provide the total number of equipment required to complete the work within the time allotted. Thus with using fleet management overall site productivity increases by increasing efficiency of the group of machine. REFERENCES [1]. Douglas D. Gransberg, OPTIMIZING HAUL UNIT SIZE AND NUMBER BASED ON LOADING FACILITY CHARACTERISTICS [2]. Serji N. Amirkhanian & Nancy J. Baker, ASCE EXPERT SYSTEM FOR EQUIPMENT SELECTION FOR EARTH-MOVING OPERATIONS [3]. Dashmir Istrefi & Betim Çiço, International Journal of Computer Science and Information Technology & Security (IJCSITS), ISSN: 2249-9555 Vol. 3, No.3, June 2013 FLEET MANAGEMENT SOLUTION [4]. Construction planning, equipment, methods Peurifoy/Schnexyder, sixth Edition (Chapter no.8 & 10) IJMER ISSN: 2249 6645 www.ijmer.com Vol. 5 Iss.2 Feb. 2015 33