Rockfall in Ohio An Update of the Rockfall Database Population. Eric Kistner Stantec August 1, 2012 Geohazards Conference

Similar documents
Project Overview. Kirk Beach Ohio Department of Transportation. ODOT Geotechnical Data Management System. Office of Geotechnical Engineering

Earth Retaining Structures

Rehabilitation of the Red Bank Road Bridge over Hoover Reservoir. Presented By: Doug Stachler, P.E.

How To Manage Big Data For The Ohio Department Of Transportation

CABLE MEDIAN BARRIER

Analysis of Accident Statistics

EXPERIENCE WITH GEOGRAPHIC INFORMATION SYSTEMS (GIS) / MAPPING

INITIAL SITE INSPECTION OF MOTORCYCLE COLLISIONS WITH ROADSIDE OBJECTS IN NEW JERSEY

Parklet FAQs. Each parklet has a sign on it clearly indicating that it is a public space.

ROAD SAFETY GUIDELINES FOR TAH ROAD INFRASTRUCTURE SAFETY MANAGEMENT

ROAD/ROUTE SURVEY AND CLEARANCE

Transportation Management Plan Template

OSU Extension FACT SHEET

Development of National Geotechnical Management System Standards for Transportation Applications

The Kentucky Geological Survey Landslide Program: An Overview

1What purpose do guard

Table of Contents. 1.0 Introduction Executive Summary Conditions for the GDMS Benefits... 4

Escape the Limblessage

WHAT YOU NEED TO KNOW ABOUT LIVING NEAR INDIANA COAL MINES

Monitoring Highway Assets with Remote Technology

Integrating Maryland s s Transportation Asset Management into Maintenance and Environment

Informational Workshop Public Meeting Kanawha Falls Bridge Project

CONCEPTUAL REHABILITATION ALTERNATIVE

SR-18 Corridor Improvements in Wood County

There is no water, surface tension cracks, nor other environmental conditions present that reduce the stability of the excavation.

Translating Dreams into Reality:

P-23 - DEVELOPMENT OF DELAWARE DEPARTMENT OF TRANSPORTATION STORMWATER BEST MANAGEMENT PRACTICE INSPECTION PROGRAM

Accident Analysis of Sheridan Road between Isabella Street and South Boulevard

Pavement Management Implementation: Success Stories for Maryland Counties

The Need for Traffic Incident Management

VERTICAL SPEED CONTROL DEVICES

Distributing Access to Geohazard Information Using Web GIS for EDC Geothermal Field Sites

Truck Lane Restriction Expansion

RANDOM/GRID BLOCK CRACKING EXTREME SEVERITY. Transverse Cracking- Extreme Severity. Alligator Cracking- High. Severity

(1) Discuss the determination of the need for public visitation. Visitor center density within 100 miles.

Excavation Procedure. MIDGA Reviewed: 07/29/14 Effective: 06/20/09 Supersedes: Original Preparer: Owner: Approver: Safety Safety Safety

Superseded. The average time for a normal repair after a crash is approximately 1.5 to 2 hours for a 3- person crew.

2. RPC work at the Regional Coordination Center

BOROUGH OF OAKLAND COUNTY OF BERGEN STATE OF NEW JERSEY ORDINANCE 13-CODE-685

May 29, Ongoing Flood Damages to County Federal-aid Routes

Appendix B. Introduction to Landslide Evaluation Tools Mapping, Remote Sensing, and Monitoring of Landslides

ALBEMARLE COUNTY SERVICE AUTHORITY

SECTION EARTH MOVING

Chapter 29 VEGETATION* ARTICLE I. IN GENERAL

How To Improve Safety

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix.

SIGN DESIGN MANUAL. SECTION of the Traffic Engineering Manual. April 15, 2005 Revision

Permit No. Permit Fee: $ Permit Expires (D+90 days): Business Name: Applicants Name: Telephone Number: Address:

THE OBJECTIVES OF ROUTINE ROAD CUTS AND FILLS

AASHTO 2015 EXTREME WEATHER SESSIONS

How To Check For Scour At A Bridge

Red Wing Bridge Project. PAC #5/TAC #8 Meeting July 18, 2013

BRITISH GEOLOGICAL SURVEY

Big Data in Automotive Applications: Cloud Computing Based Velocity Profile Generation for Minimum Fuel Consumption

APPENDIX D INLET CAPACITY AND SPACING. The capacity and spacing design of storm drainage inlets are presented in detail in this Appendix.

5 ALTERNATIVE SOLUTIONS AND EVALUATION

Arkansas PHONE: (501) Mon. - Fri. 6:00 A.M. - 4:30 P.M. CENTRAL TIME. Legal Limits Legal Limits. Arkansas

Roof Maintenance Scope of Work

City of Wichita, Kansas Americans with Disabilities Act Transition Plan Main Library Address

CHAPTER 2 PAVEMENT MANAGEMENT SYSTEM

District 6. Business Plan

Tutorial on QRA Rockfall hazard risk assessment. Andorra la Vella, E. Pyrenees

Traffic Signal Asset Management. Edward Fok USDOT/FHWA Resource Center

CITY OF ALLIANCE REQUEST FOR QUOTES (RFQ) LAWN MOWING SERVICES

Table of Contents RULES GOVERNING OVERLEGAL PERMITS FOR RELOCATION OF BUILDINGS OR HOUSES

Risk-Based Asset Management Plan. Risk-Based Asset. Management Plan

Mille Bornes Rules. About the Theme

Emergency Streambank Restoration/Stabilization. Kentucky Division of Water Water Quality Certification May 2010 Educational Assistance

Ohio Department of Transportation Prebid Questions

ECONOMIC ANALYSIS FLOOD DAMAGE REDUCTION. Lower Carmel River Floodplain Restoration and Enhancement Project

Safe & Sound Bridge Terminology

SPCC Plan - Calculation Guidance

Wildfires pose an on-going. Integrating LiDAR with Wildfire Risk Analysis for Electric Utilities. By Jason Amadori & David Buckley

4.7 HAZARDS AND HAZARDOUS MATERIALS

HOMEOWNER S GUIDE. to LANDSLIDES. and MITIGATION RECOGNITION, PREVENTION, CONTROL, Compiled by Dr. Scott F. Burns Tessa M. Harden Carin J.

Prattsville Berm Removal Project. 1.0 Project Location

Termites: How to Reduce Your Home's Risk of Infestation

STORM DRAINS CHAPTER 7

Boston Traffic Management Center Activity Report for FY 2013 Real-time Traffic Signal Adjustments

Moving Small Mountains Vesuvius Dam Rehab

NORTH CAROLINA NUG UPDATES FOR SUCCESSFUL TIM TEAMS. Traffic Incident Management Workshop June 19th, 2012

Chapter Forty-seven. RURAL TWO-LANE/MULTILANE STATE HIGHWAYS (New Construction/Reconstruction) BUREAU OF DESIGN AND ENVIRONMENT MANUAL

Asset Management for MAP-21. Gary Lasham, P.E. Jonathan Pollack

Report to INFRASTRUCTURE SERVICES Committee for noting

Slip, Trip & Fall Program Table of Contents

Jackson Gulch Outlet Canal Rehabilitation Project

FLOOD PROTECTION BENEFITS

City of Springboro 320 West Central Avenue, Springboro, Ohio. Planning Commission Regular Meeting. Wednesday, June 25, 2014

A Bicycle Accident Study Using GIS Mapping and Analysis

Chehalis River Basin Flood Damage Reduction Capital Budget Approved by Legislature in June 2013

Town of Amherst Flood Plan Annex

TITLE 13. LAW AND PUBLIC SAFETY, CHAPTER 18 SUBCHAPTER 1. PERMITS FOR OVERDIMENSIONAL OR OVERWEIGHT VEHICLES

SURFACE TRANSPORTATION PROGRAM (STP) PROCEDURES FOR THE OKLAHOMA CITY URBANIZED AREA FUNDS

11 p.m. to. Tuesday, June. will remain open. 14. closed

URBAN DRAINAGE CRITERIA

Status of Pavement Management Systems (PMS) in Southeast Michigan. May 2003

Developing and Implementing Mobility Management in Oregon. W.D. Baldwin OBDP/HDR TCM 2008 Orlando, Florida


Planning Level Cost Estimation Tool. User s Manual

SR 89/Fanny Bridge Community Revitalization Project. Draft Environmental Impact Report/ Environmental Impact Statement/ Environmental Assessment

Transcription:

Rockfall in Ohio An Update of the Rockfall Database Population Eric Kistner Stantec August 1, 2012 Geohazards Conference

Presentation Outline Rockfall in Ohio An Update of the Rockfall Database Population I. Introduction II. Site Identification III. Site Tiers IV. Field Data Collection V. Database Population VI. Results VII. Remediation Cost Estimating

I. Introduction ODOT Geohazards Management System (GHMS) Landslides Underground Voids Rockfall Manual for Rockfall Inventory (ODOT OGE, January 2009) From the manual: rockfalls constitute a major hazard along Ohio roadways, posting a risk to life, property and public safety. Risk assessment process to prioritize rockfall prone sites

I. Introduction Why was Rockfall process developed? Rockfall prevalent in Ohio, especially unglaciated areas Problems with past rockfall Highway closures Property damage High repair costs A need to be proactive Public Safety Budgetary Mechanism Informational Resource

II. Site Identification Site Criteria Natural or manmade slope with exposed bedrock, i.e. rock slope At least 10 feet tall (normally) Not longer than 1 mile Not crossing county lines

III. Site Tiers Determined by: Potential of rockfall occurrence Potential of rockfall reaching travelled lanes Tiers: Tier 1 low to moderate, low to moderate Tier 2 moderate to high, moderate Tiers 3/4 high to very high, high to very high

III. Site Tiers Preliminary Rating Potential of Rockfall Occurance Potential of Rockfall Impacting the Traffic Lane Very High (10) High (8) Moderate (4) Low (1) Very High (10) High (8) 12 Moderate (4) Low (1)

III. Site Tiers Tiered Approach to Data Collection Preliminary Rating Score (PRS) Required Data Sections Risk Assessment Criteria PRS = 2 to 5 (Tier 1 Sites) Preliminary Rating Only Preliminary Rating Only PRS = 8 to 11 (Tier 2 Sites) Part A Only Site Location, General, and Interview Information; GPS Files PRS = 12 to 16 (Tier 3 Sites) PRS = 18 to 20 (Tier 4 Sites) Part A, Part B, Part C Traffic, Maintenance, Accident, Geological, Slope, Hydrological, Rock Sampling Information

IV. Data Collection Field Equipment

IV. Data Collection (Performed by PSI Columbus, Ohio) Criteria Required for All Sites Beginning/Ending Mileage Point Orientation/Position of Rock Slope Lat/Long/Elevation

IV. Data Collection Tier 1 Sites Slope Configuration Single-Angle Multi-Angle Single-Angle Benched Multi-Angle Benched Slope Condition vegetation cover, talus buildup, weathering, etc. Photographic Documentation

IV. Data Collection Tier 2 Sites Geometrics and Traffic Survey Data Additional Slope Information Slope height Overall face angle Undercutting features Jointing patterns Catchment dimensions Corrective actions and effectiveness

IV. Data Collection Tier 3/4 Sites Add l Slope Geological Conditions such as: Bench elevations and widths Slope angles and elevations Potential rockfall volume estimations Talus accumulation information Hydrological conditions (springs, seeps,etc.) Slake Durability Index (SDI) testing Road slope and detour distance/time

V. Database Population Site Listing

V. Database Population Preliminary Rating

V. Database Population Site Location

V. Database Population Basic Slope Information

V. Database Population Geologic Information

V. Database Population Joint Information

V. Database Population Slope Information

VI. Results Statewide Map RED Rockfall Sites > 400 ORANGE Rockfall Sites > 200 YELLOW Rockfall Sites > 100 GREEN Rockfall Sites > 50 LIGHT GREEN Rockfall Sites > 0

VI. Results Statewide Summary # of Rockfall Sites 5,540 100% Tier 1 3,997 72% Tier 2 1,040 19% Tier 3 484 9% Tier 4 19 0.3%

V. Database Population Risk Analysis Score

Score Summary Tier 2 Sites 419 Tier 3 Sites Tier 4 Sites 260 216 171 3

VII. Remediation Cost Estimating RCDA Remediation Cost Database and Application Web-enabled cost estimating application developed by OSU Plan scenarios Flatten the rock slope Widen the catchment area Placement of a New Jersey or modified D50 concrete barrier Trim blasting of a rock overhang Manually scaling the slope

VII. Remediation Cost Estimating Statewide Average Remediation Costs Remediation Scenario Cost ($) / Foot Site Length New Jersey Barrier 87 Modified D50 Concrete Barrier 101 Scaling 164 Trim Blasting 240 Flatten Slope 1,885 Flatten Slope with Added Catchment 2,392

VII. Remediation Cost Estimating Scaling COS-36

VII. Remediation Cost Estimating Trim Blasting After Before GUE-22 North Slope

VII. Remediation Cost Estimating Trim Blasting/Draping After Before GUE-22 South Slope

Closing Ohio (esp. southeast Ohio) contains rockfall-prone bedrock formations. ODOT has established a risk-based inventory for rockfall-prone sites. ODOT is utilizing the inventory to systematically remediate the highest risk sites. Questions?