ISSUES TRAIL: RECORD OF COMMENTS RAISED AND/OR SUBMITTED DURING THE PUBLIC PARTICIPATION PROCESS



Similar documents
ENVIRONMENTAL IMPACT ASSESSMENT PROCESS

KAWERAU DISTRICT COUNCIL BUSINESS DISASTER RECOVERY PLAN 2011

How To Improve The Infrastructure Of The City Of Germany

ANNEX 2 Emergency / Pollution Incident Response Plan

sustainability report

MAGB HEALTH, SAFETY AND ENVIRONMENT GROUP POLLUTION INCIDENT RESPONSE PLAN

Key Performance Indicators for Queensland Urban Water Service Providers. Definitions Guide (version 1.2)

Water Services Act Interpretative Guide for Sanitation: Discussion Document

6 Chemicals from human settlements

1. Purpose and scope. 2. SEPA's role in hydropower and planning

Collection and disposal of wastewater

THE ECONOMIC DATA BASE AN INSTRUMENT SUPPORTING PREPARATION OF THE PROGRAMMES OF MEASURES IN ACCORDANCE TO THE WATER FRAMEWORK DIRECTIVE

A proposed groundwater management framework for municipalities in South Africa

On Site Sewage System Maintenance Inspections. March Building and Development Branch Ministry of Municipal Affairs and Housing

PPG21. Pollution Prevention Guidelines. pollution incident response planning: PPG Introduction

Shire of Coolgardie. Waste Water Services. Customer Service Charter for. Waste Water Services. Revision One Updated June Shire of Coolgardie

SERVICE PROVIDER S DATABASE FORM

Environmental guidelines for preparation of an Environment Management Plan

Type of Sewer Systems. Solomon Seyoum

Viet Nam Da Nang Waste water management

Newbiggin House Farm,

National Education Infrastructure Management System (NEIMS) September 2007

APPENDIX 7 : PHYSICAL CULTURAL RESOURCES MANAGEMENT PLAN

At the end of today s seminar you should be better. Recognize the causes of Sewer Lateral backup. Identify techniques to protect your home from

Liquid Effluent Treatment Plant (LETP) Land Clean-Up

Glen Hills Area: Septic System and Public Sewer Q & A Information Sheet Page 1

5. Environmental Analysis

Source Water Protection Practices Bulletin Managing Sanitary Sewer Overflows and Combined Sewer Overflows to Prevent Contamination of Drinking Water

septic systems What is a Septic System? How does a Septic System Work?

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS PROPOSED PHASE 2 EXPANSION OF THE TRANSNET IRON ORE HANDLING FACILITY, SALDANHA

Environmental Guidelines for Preparation of an Environmental Management Plan

Single Project Professional Indemnity Insurance Proposal Form. Note: This is a proposal form for a claims made policy

Construction Services

Water Services Act (119/2001)

Appendix N Framework Spill Prevention, Containment, and Countermeasures Plan Prepared by: Idaho Power Company 1221 W Idaho Street Boise, ID 83702

31. ECO-INFO -- SEPTIC SAFE PROTECT YOUR HEALTH AND ENVIRONMENT YOUR SEPTIC PUMP-OUT SYSTEM with SELF ASSESSMENT TROUBLE SHOOTING GUIDE

APPENDIX 9 INFRASTRUCTURE SERVICING REPORT

Septic System. Responsibility! Is Your. You should know that:

1. Name of the Project 2. Necessity and Relevance of JBIC s Assistance

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS FOR THE PROPOSED NEW COAL-FIRED POWER STATION IN THE LEPHALALE AREA, LIMPOPO PROVINCE

Homeowners and Home Buyers Guide to Wells and Private Sewage Systems

Designed and produced by geo-graphicsdesign.com DP 300 3/02

Stormwater harvesting

Role in the project (e.g. Prime Engineering Consultant or Contractor), and summary of professional Duties : Name Professional Duties Contract Awarded?

Legislative Council Panel on Environmental Affairs. 209DS Outlying Islands sewerage, stage 1, phase 1 - consultants fees and investigations

YOUR SEPTIC SYSTEM UNCOVERED

Environmental Engineering, University of Seoul, Jennong-dong, Dongdaemun-gu, Seoul, Korea.

2011 MAJOR PROJECTS UPDATE - EAST WELLFIELD EXPANDED HYDROGEOLOGICAL STUDY AND WASTEWATER TREATMENT PLANT ZERO IMPACT ANALYSIS

Environmental aspects of water fluoridation

Description of Selected Services under the UN CPC system in which the EC made Market Access Commitments in the EPA

Development proposals will require to demonstrate, according to scale, type and location, that they:-

Frequently Asked Questions About Septic System Maintenance Inspections

TERMS OF REFERENCE. BEFORE CONSTRUCTION: Sl No TOR RESPONSE 1. Legalities of the land: Is the land The Project is clear from all angles.

Flood Risk Assessment and Drainage Impact Assessment: Planning Guidance for Developers

MAP KEYS GLOSSARY FOR THE DRAINAGE AND WATER REPORT

Specialists in the Refurbishment, Replacement and Renewal of Water Mains throughout the UK

Management of Contractors and Suppliers Procedure

Township of Enniskillen. Asset Management Plan

Guidance on applying for approval of installation of a commercial onsite wastewater system

Birmingham City University / Students Union Aspects and Impacts Register. Waste. Impacts description

Water Leakage & Your Responsibilities

Frequently Asked Questions about Septic Systems

Foul Drainage, systems and responsibility. Environmental Protection

State of Rhode Island Department of Environmental Management Division of Site Remediation. Policy Memo 95-01

Annex K. Environmental Management Programme (EMPr)

Understanding Septic Tank Systems

ENVIRONMENTAL MANAGEMENT PLAN. Nilaya Hills/ Heights Promoted by M/s RBS Developers (Group Housing & Commercial Building Project)

PROPOSED ESTABLISHMENT OF THE TRANSALLOYS COAL-FIRED POWER PLANT NEAR EMALAHLENI, MPUMALANGA PROVINCE DEA Ref: 14/12/16/3/3/3/97

Proposed General Plan Update Goals, Policies, and Implementation Actions

INDONESIA - LAW ON WATER RESOURCES,

Severn Trent Water Ltd has undergone a massive investment programme in the River Tame catchment over the

ETHEKWINI MUNICIPALITY WATER AND SANITATION MASTER CLASS LEARNING NOTE

Introduction. Do You Need A Water Right? Exempt Groundwater. Plan Ahead

ECONOMIC ANALYSIS OF WATER USES GESTÃO INTEGRADA DE BACIAS HIDROGRÁFICAS INSTITUTO SUPERIOR TÉCNICO

TOWNSVILLE WATER Customer Service Standards

Leak Detection and Abatement in the Water Utility of Iasi

Ingredion ANZ Pty Ltd

Water Mains Rehabilitation Framework (NI) Northern Ireland Water

Environmental Science 101 Waste. Fall Lecture Outline: Terms You Should Know: Learning Objectives: Reading Assignment: Chlorinated.

THE PROVISIONAL CENTRAL PRODUCT CLASSIFICATION

RESIDENTIAL ON-SITE WASTEWATER TREATMENT SYSTEM (OWTS) INSTALLATION PERMIT (New or Repair) Instructions and Application Form

National Infrastructure Maintenance Strategy (NIMS) Infrastructure Maintenance Budgeting Guideline. cidb development through partnership

Homeowner s GUIDE. to living with a well and septic system. Northeast Colorado. Health. Department. Replacement System. Leach Field. Septic Tank.

Oasis Clearwater ENVIRONMENTAL SYSTEMS WASTEWATER TREATMENT ENGINEERS

Frequently asked questions July 2014

Draft Water Services Strategic Plan

NATIONAL INSTITUTE OF GOVERNMENT PURCHASING (NIGP) DESIGN AND CONSTRUCTION CODES

City of Charlottetown Wastewater Treatment Expansion & Upgrading

You and Your Septic Tank

Table of Contents. Chapter 12. South Africa Chapter Constitutional requirements for environmental protection in South Africa...

What to do if sewage floods your property

Dewatering - Time and Cost Relief by way of Trenchless Construction

Transcription:

PROPOSED UPGRADING OF THE EXISTING SENWAMOKGOPE SEWERAGE TREATMENT PLANT AT SEKGOSESE SECONDARY SCHOOL ON PART OF THE FARM ROERFONTEIN 161-LT, SENWAMOKGOPE, LIMPOPO PROVINCE ISSUES TRAIL: RECORD OF COMMENTS RAISED AND/OR SUBMITTED DURING THE PUBLIC PARTICIPATION PROCESS Contents 1. Ecological Issues / Natural Environment... 1 2. General Issues... 2 3. Health Issues... 3 4. Heritage Issues... 3 5. Socio-Economic Issues... 4 6. Technical Issues... 6 7. Water-related Issues... 6 ABBREVIATIONS: CLO Community Liaison Officer GLM Greater Letaba Municipality DEA Department of Environmental Affairs I&AP Interested and/or Affected Party DWA Department of Water Affairs MDM Mopani District Municipality ECO Environmental Control Officer MRC Mamaila Royal Council EIA Environmental Impact Assessment NEMWA National Environmental Management: Waste Act EIR Environmental Impact Report NWA National Water Act EMP Environmental Management Plan PM Public Meeting ESR Environmental Scoping Report SAHRA South African Heritage Resources Agency COMMENT RAISED BY RESPONSE 1. Ecological Issues / Natural Environment Enquired into whether Polygon Environmental Planning would be responsible for environmental management through to the operational phase. Mr Joseph Lekitima, Polygon has so far only been appointed for the EIA, which runs up to the point where DEA will issue a decision on the proposed project. If the project is authorised by LDEDET, the applicant (MDM) will have to appoint an ECO (which may or may not be Polygon) to monitor environmental compliance during the construction phase. During the operational phase, environmental management and monitoring may be handled by an official from MDM, or an environmental officer may be contracted to perform those duties. The most important environmental monitoring during the operational phase will be the periodic sampling and testing of groundwater and water from the nearby river to monitor water quality. 1

2. General Issues Fertilizer. Enquired into the process for reporting a burst pipe. Enquired as to whether the MRC had been consulted with regards to the proposed project. If work is done on sewer pipelines situated under paved areas, the paving should be re-done following construction work. Enquired as to whether the upgrading was proposed by the traditional authority or the municipality. We would like to acknowledge the receipt of your letter addressed to the Office of the Regional Land Claims Commissioner: Limpopo, faxed 18 August 2010. The matter is receiving our attention; we will revert back to you in due course. Manure. The proposed project is a good thing and that it should proceed as quickly as possible. SJ Kgekolo, Mamaila Traditional Authority. Comments completed on comment form accompanying draft ESR at Mr Jeffrey Kungwa, Mr Jeffrey Kungwa, Mr Joseph Lekitima, Mr Raymond Mahoma, TA Maphoto, Regional Land Claims Commissioner: Limpopo. Faxed comments, 06.09.2010 Ms Maphoko Melida Mapyesa, Modudi wa Mamaila. Comments completed on comment form Ms Sopie Mashau, community member. Comment at PM, 31.07.2010 Do you mean that the sludge from the treatment system should be used as fertilizer? The possibility exists that the sludge may eventually be used for fertilization of fields. A plant operator is at the sewerage treatment plant at Sekgosese Secondary School daily, and pipe bursts could be reported to him. Alternatively, the GLM Sekgosese sub-office could be contacted; they will then pass the message to the appropriate officer within GLM. It is very important that community members do report any such incidents (leakage, pipe bursts, etc), as the GLM does not have enough staff to monitor all their pipelines daily, and rely on the vigilance of community members to bring these incidents to their attention. Ms Machaba and Ms Agenbag met with representatives of the MRC several times at the start of the EIA. An agreement has been reached with the MRC for the use of the site for the proposed upgrading of the sewerage system. The project is being proposed by MDM on land belonging to the Mamaila Royal Council (MRC). Authorisation on the EIA will have to be issued by DEA. Do you mean that the sludge from the treatment system should be used as fertilizer? The possibility exists that the sludge may eventually be used for fertilization of fields. Appointment of the Council officer to act as a liaison officer. Mr FM Mogale, MRC. We will forward your comment to Mošomo Consulting Civil Engineers to take 2

Fertilizer. Enquired as to how Mamaila would benefit from the proposed project. Senwamokgope has a problem in terms of the availability of water. The new flushing toilets (to be connected to the proposed expanded reticulation network) would lead to a further increase in local water use. Comments completed on comment form accompanying draft ESR at Mr Albert Mohale, local resident. Comments completed on comment form Comment at FGM, 15.03.2010 Mr Makoro Nteu, community member. Comment at PM, 31.07.2010 into account if and when construction commences. Do you mean that the sludge from the treatment system should be used as fertilizer? The possibility exists that the sludge may eventually be used for fertilization of fields. A large number of households in Senwamokgope will benefit from service delivery through the provision of waterborne sewerage infrastructure (to which flushing toilets can connect). Construction phase job creation will also benefit the community. Clr Sebelemetja, the local ward councillor, confirmed that there is a shortage of water, but indicated that MDM had appointed Mošomo for this sewerage project and would still in future need to address the water supply issue. However, water provision did not form part of this project. The project should be kick-started, as the community is hungry for jobs. She also emphasised the importance of community members attending meetings such as this one, so that they can be informed of what is being planned in their area. 3. Health Issues Enquired as to the risk of illness if people used water from the river which might be contaminated by E. coli. Clr HM Sebelemetja, ward councillor. Comment at PM, 31.07.2010 Mr Peter Letswalo, Mr NE Netswinga of the Department of Water Affairs (DWA) explained that the municipality had already applied to DWA for an allocation of water from Nandoni Dam, but that this Water Use Licence Application (WULA) still had to be finalised by DWA, following which bulk water infrastructure would have to be established to deliver the water to this area from Nandoni. Sewage can cause contaminate of water sources with the E. coli bacterium, which can lead to illness such as diarrhoea in people who drink such water. Currently, the partially functional sewerage system, the leaking outfall sewer and the large number of pit toilets in Senwamokgope pose a risk of water pollution (both surface water and groundwater) by E. coli and other organisms. One of the main aims of the proposed upgrading of the sewerage system is to reduce water pollution and the associated health risks. Contamination is anticipated to be greatly reduced following the proposed upgrade. 4. Heritage Issues What would happen if graves or fossils were uncovered during Mr Peter Letswalo, The Phase 1 HIA which was undertaken by Shasa Heritage Consultants 3

excavation for the sewer pipelines or components of the sewerage system? Guided by the HIA report, LIHRA concurs with the findings laid by the heritage specialist that there are no visible heritage resources identified. However, experience taught that some heritage resources are often found during excavations and digging that takes place during construction. It is for this reason that we advise that should you during construction unearth objects of cultural significance, LIHRA should be informed. This memo serves to inform that from a heritage management point of view LIHRA has no objection. We trust that you will find the above matters in order. 5. Socio-Economic Issues Lack of job opportunities. Creating job. Mr Noel Nemauluma, LIHRA. Faxed comments, 15.09.2010 MM Lesoka. Comment Ms Sewela Cathrine Madongwane, Modudi wa Mamaila. Comment investigated the likelihood of graves or other objects of heritage value occurring on the site. Because many such items occur below ground and graves are sometimes unmarked, the archaeologists looked for clues such as disturbances on the surface. They did not find any heritage resources during the Phase 1 HIA, but the possibility still exists that such objects may be discovered during construction. Should any such discovery be made, construction activities will need to stop immediately, until an archaeologist and a representative of SAHRA has been able to investigate and make recommendations as to the preservation or removal of the objects. In the case of graves, a process would have to be followed to determine whether there are still living relatives of the deceased in the area. If relatives can be traced, these relatives will have to be consulted to determine whether the grave can be relocated to a different site which will not be impacted by the project. If the relatives do not agree to this, it may be necessary to preserve the grave in its current position (in-situ) and the layout of the proposed sewerage system may then need to be changed so as not to affect the grave. Comments noted. 4

Creation of decent jobs. Creating job opportunities. Development. She had been under the impression that there would be recruitment at this meeting. Enquired into the name of the contractor, and asked whether the contractor would bring their own labourers or use local labour. He also asked if the project would be advertised. Labour during the construction phase must be sourced from the local community. Ms Maggy Ramare, Ramotlotlo wa Sekgosese Heritage. Comment P.J. Mamaila, MRC. Comment completed on comment sheet accompanying draft ESR at MRC, September 2010 SC Mamaila, Mamaila Kolobetona Traditional Council. Comment completed on comment sheet Ms Jane Mamorobela, Comment at FGM, 15.03.2010 The proposed sewage system is anticipated to facilitate development in Senwamokgope; this would be an indirect impact of the treatment system. Neither Ms Agenbag nor Ms Machaba have the authority to appoint / employ people to be involved in the proposed project. This meeting was only being held as part of the EIA process to inform the community of the project which was being proposed in their area, as well as to offer community members the opportunity to raise any issues that should be taken into account as part of the EIA or to ask questions regarding the project. Recruitment would only be done at a much later stage of the process, after the project has been authorised by DEA (if it is authorised). If and when the proposed project is authorised by DEA, Mošomo would advertise tenders for contractors, and the successful contractor will then have to recruit labourers. It could not be said for certain at this stage how the contractor would recruit labourers and how many local labourers they will use; however, normally contractors are required to spend a specific percentage of the contract value on local labour, and usually recruit the unskilled and semiskilled labourers locally. Skilled staff such as machine operators are usually employed by the contractor and are imported to the area for the project. Normally, a Community Liaison Officer (CLO) is appointed once the contractor has been appointed; the CLO then recruits the required number of labourers from the area where the project is to be implemented. As large a component of the labour force as possible will be sourced locally, and where feasible, labour-intensive methods will be used. 5

Enquired into the possible involvement of local high school students in the process, so that they can be exposed to the engineering field. Enquired as to whether jobs would be created for local community members during the assessment phase, and indicated that, once royalties have been settled on, an agreement would also need to be entered into regarding employment of community members in the assessments. Income. 6. Technical Issues Asked whether the plant would be refurbished after its lifetime elapses. Asked whether toilets will be connected to the sewer pipelines. Enquired into the size of the proposed outfall sewer. Enquired as to when construction would begin. What will be done with the treated effluent leaving the sewerage plant? 7. Water-related Issues DWA would like the following issues to be addressed in terms of the National Water Act (NWA, Act 36 of 1998) before approval can be granted. WUL should be applied for as it is stipulated by NWA section 21(e), (f), (g) and (37)(1)(a). Attached is a copy of IWWP that you should attach to as you will be submitting your application. Comment at FGM, 31.05.2010 Comment at FGM, 07.06.2010 ME Ramoseki. Comment Mr Joseph Lekitima, Ms Margaret Ralebepe, Ms Happy Mabasa, DWA. Faxed comments, 23.11.2010 Issues such as the possible involvement of students can be worked out at a later stage. If students are going to be involved, selection will have to be done through the ward councillor. Employment will only be created later, during construction. Ms Machaba will discuss the issue of job opportunities during the assessment phase with her colleagues and revert back to the MRC. The proposed sewage system as such will not generate income, but is anticipated to facilitate development in Senwamokgope, which may in turn generate income. This would be an indirect impact of the treatment system. This proposed upgrading in fact already constitutes a type of refurbishment of the existing plant. The new plant was being designed for a projected life span of 20 years, and it was likely that the plant would be refurbished again after that time period elapses. This will be done. The outfall pipe is to be 200mm in diameter. Construction can only start if and when DEA authorises the proposed project. The EIA may still extend into 2011; it is not known for certain when the process would be completed. It would only be possible to give an indication of the start date at a later stage in the EIA. The treated (purified) effluent will be released back into the nearby river. At a later stage it was anticipated that the treated effluent would be used for irrigation of sports fields in a sport stadium. Thank you for your comments on the draft ESR. Please note that an application for registration of the sewage treatment plant in terms of the General Authorisation was submitted to DWA on 22 November 2010, and also included the engineering details of the proposed upgrading of the sewage plant. 6

The application should contain engineering details of the works in order for the license to be considered. Page 19, 5.2.8 indicates that during the construction phase portable chemical toilets are recommended to be provided therefore, the contents of those portable toilets should be disposed of in a suitable municipal treatment works There is a need for two monitoring boreholes, one upstream and the other downstream in order to monitor the extent of ground water pollution. Page 20, second paragraph, indicated that it is recommended that a proper management and monitoring programme be implemented over long term to ensure that ground water resources are not impacted on. Therefore the results should be sent to this office on monthly basis for compliance with the water use license conditions. No construction should take place within 1:100 year flood line. I can confirm that the EMP will stipulate that chemical toilets will have to be provided during construction, the contents of which will have to be disposed of at a licensed treatment works. Two boreholes, one upslope and one downslope of the sewage treatment plant, will be drilled for groundwater analysis as part of the second phase of the geo-hydrological study which will be done in the impact assessment phase of the EIA. These will also be used for long-term monitoring to determine if any groundwater contamination is caused by the treatment plant. Regular groundwater quality monitoring will be done during the lifetime of the treatment plant and the results submitted to DWA. I can confirm that the site is not impacted by any 1:100 year flood line. Therefore no construction will take place within a flood line. Please do not hesitate to contact this department should you have any queries. 7