1 ENVIRONMENTAL IMPACT ASSESSMENT PROCESS PROPOSED SOLIDS REMOVAL AND TREATMENT FACILITIES UPGRADE AT THE SOUTHERN WASTE WATER TREATMENT WORKS, MEREWENT, IN THE ETHEKWINI METROPOLITAN MUNICIPALITY BACKGROUND INFORMATION DOCUMENT (APRIL 2015) edtea REF NO: DM/0032/2014 / WASTE MANAGEMENT REFERENCE NO: DM/WML/0050/2014 / WUL REFERENCE NO: 11/U60G/H/1623 / CWDP REFERENCE NO: To be confirmed / DWA EXEMPTION NO: 1747B / Classified as an MHI What does this document tell YOU? This document aims to provide you, as an Interested and Affected Party (I&AP), with background information regarding the proposed Southern Waste Water Treatment Works (SWWTW) Solids Removal and Treatment Facilities Upgrade being undertaken by ethekwini Municipality. The document also provides information regarding the Environmental Impact Assessment (EIA) being undertaken. The document also advises you how you can become involved in the project by reviewing information, and making inputs thereon, including raising any possible issues. This sharing of information forms the basis of the public participation process and offers you the opportunity to become actively involved in the project from the outset. Public participation allows for local knowledge to be integrated into the EIA as generated. The project can be summarised as follows: Project name Local authority Landowner(s) Location What does the project entail? Southern Waste Water Treatment Works (SWWTW) Solids Removal and Treatment Facilities Upgrade Environmental Impact Assessment ethekwini Metropolitan Municipality KwaZulu-Natal ethekwini Metropolitan Municipality SWWTW is located at 2 Byfield Road, Merewent, on the north-eastern bank of the Umlaas Canal. Forms part of a mixed development node of both residential and industrial developments. Site locality of SWWTW
2 Current Treatment Process The SWWTW receives the majority of its raw sewage effluent through three large (1,500 mm diameter) trunk sewers, i.e. Main Southern ( Jacobs ), Wentworth Valley, and, Umlaas Trunk Sewers. Other smaller diameter pipelines coming to the Works includes those from Mondi, SAPREF and Illovo. The total average daily flow to this works is ±130 Ml/day. All treated flows leaving the site are currently discharged directly to sea through a 4.2 km long 1,500 mm diameter sea outfall. The Umlaas trunk sewer, serving Chatsworth and Umlazi, is predominantly domestic in origin. The discharged flow from this source (currently ±35 Ml/day) is immediately directed to a separate treatment facility where it undergoes preliminary, primary, secondary, and, tertiary treatment. The secondary and tertiary treatment processes are managed by Veolia Water (a private entity). The tertiary treated (or reclaimed) effluent is stored and sold to industry. The remaining waste is in the form of sludge all of this is currently discharged to sea. The Jacobs trunk sewer, serving (a) the residential areas of Yellow Wood Park and Woodlands, and (b) the industrial areas of Jacobs and Mobeni, is thus a combination of domestic and industrial effluent. The Wentworth Valley trunk sewer, serving the Bluff, Wentworth, Clairwood, Bayhead, and Island View, is also composed of both domestic and industrial effluent. The flows conveyed by these two trunk sewers (currently ±95 Ml/day) currently combine at the main inlet works and undergo preliminary treatment only (i.e. removal of screenings and grit) before being discharged to sea. In addition to the pipeline discharge of sewage effluent to this works, smaller volumes of effluent are also brought to the SWWTW by road tankers. The effluent from these road tankers undergoes preliminary treatment only, again before being discharged to sea. Current treatment process at SWWTW Scope of Work Proposed for the Upgrade of the SWWTW The aim of the proposed SWWTW upgrades is to reduce the quantity of suspended solids being disposed of to sea by affording primary treatment to the combined effluent discharges from the Jacobs and Wentworth Valley Trunk Sewers. This physical treatment process (through primary settling) will result in the organic load to sea being drastically reduced. The settled solids (referred to as primary [or raw] sludge) will then be removed and stabilised through a process of anaerobic digestion, before being dewatered.
3 The options proposed for the disposal of the dewatered sludge are as follows: Removal off site to agriculture and/or landfill; Thermal drying using sludge gas and then removal off-site to agriculture; If not thermal drying, sludge gas will be used for the generation of electricity in the region of 1 MW, to be used internally on the plant (partial provision of the site s needs); and Manufacture of fertilizer through a separate sludge pelletizing process using sludge gas to be established on site by a private entity (unconfirmed at this stage) and then removal off-site. This option may be investigated under a separate study to be undertaken by others and does not form part of this study nor the scope of work described hereunder. The work will be undertaken in two phases: Phase 1: immediate required upgrades, and, Phase 2: future required upgrades. Phase 1 will result in the primary treatment of ±60 Ml/day (63.5%) of the present combined flow (±95 Ml/day) from the Jacobs and Wentworth Valley trunk sewers. The solids ( sludge ) removed will be combined with that currently generated from the Umlaas trunk sewer, with the combined result being pumped to the anaerobic digesters. Biogas (±60% methane / 40% carbon dioxide) from the anaerobic digestion process will be stored in gas holders. The biogas may be used as follows: Consumption of at least 1 / 3 of the stored volume for heating of the sludge as part of the digestion process, the balance flared (burnt). Using most of the stored gas to dry the sludge through a mechanical thermal drying process. Using the waste heat from the drying process to pre-heat the sludge before drying. It is important to note that drying of the sludge will greatly reduce the road transportation requirements for removal of sludge off-site. Phase 1 work to be completed in this phase Refurbish and bring back on line two out of six existing primary settling tanks. Refurbish and bring back on line existing two anaerobic primary digesters and secondary digester and construct two new primary digesters and one secondary digester, all of same capacity as existing. Refurbish and bring back on line existing raw sludge gravity thickener and construct a new gravity thickener of the same capacity. Refurbish and bring back on line existing gas holder and construct a new gas holder of the same capacity. Refurbish and bring back on line various existing (currently unused) electrical substation buildings and small pump stations. Establishing a new mechanical sludge dewatering facility on site and two 150,000 l fully enclosed steel sludge storage silos. Establishment a new mechanical sludge thermal drying facility on site. Provide additional effluent storage capacity of 23,000,000 l at an existing low level pumping station, and installation of two new 350 kw pumps. Replace the last 70 m of the landline section of the sea outfall pipeline with two new 1,000 mm diameter pipes. Construct new road tanker effluent discharge bays in close proximity to the entrance of the Works. Install new medium voltage and low voltage electrical cables and equipment. Minor road works and a new access road Phase 2 work to be completed in this phase Refurbish and bring back on line remaining four of the existing six (6) primary settling tanks, and, construct two (2) new primary settling tanks of the same capacity as existing. Construct four (4) new anaerobic primary digesters and two new secondary digesters, all of the same capacity as existing. Construct a new raw sludge gravity thickener, of the same capacity as existing. Construct a new gas holder. Install additional mechanical sludge dewatering equipment. Construction of a third storage sump of 23 Ml.
4 Phase 1 upgrades proposed at SWWTW. Phase 2 upgrades proposed at SWWTW
5 What are the potential environmental impacts associated with the proposed project? A number of potential environmental impacts associated with the project have been identified. As part of the EIA, these potential impacts will be assessed through the following specialist studies: Specialist Study Biodiversity Scan Major Hazardous Installation Risk Assessment Heritage Impact Assessment Air Quality Assessment Process Risk Assessment Integrated Waste Water Management Plan Social Impact Assessment Water Use Licence Compliance Assessment Coastal Waters Discharge Permit Compliance Assessment Traffic Impact Assessment Organisation The Ecological Partnership Ishecon ethembeni Cultural Heritage Royal HaskoningDHV Royal HaskoningDHV Royal HaskoningDHV Royal HaskoningDHV Royal HaskoningDHV Royal HaskoningDHV Royal HaskoningDHV In the Environmental Scoping Study (ESS), desk-top specialist studies combined with a site visit, identified any potential issues which require further investigation within the current EIA phase. Of particular note, the SWWTW will be classified as a Major Hazardous Installation (MHI). Input from the public (I&APs) through the public participation process will provide valuable input in the identification of issues requiring investigation within this EIA process. The EIA will highlight areas that should be avoided in order to minimise potential impacts, and evaluate the layout alternatives recommended. This second phase of the EIA process aims to achieve the following: Provide an overall assessment of the social and biophysical environments of the affected area by the proposed construction of the project; Undertake a detailed assessment of the preferred site(s) in terms of environmental criteria including the rating of significant impacts; Identify and recommend appropriate mitigation measures for potentially significant environmental impacts; and Undertake a fully inclusive public participation process to ensure that I&AP issues and concerns are recorded and commented on. Why are environmental studies needed? In terms of the Environmental Impact Assessment (EIA) Regulations Government Notice Regulation (GNR) No. 544 to 546 of 2010 (as amended), published in terms of Section 24(5), and read with Section 44, of the National Environmental Management Act (NEMA) (Act No. 107 of 1998), ethekwini Municipality requires environmental authorisation from the KwaZulu-Natal Department of Economic Development, Tourism & Environmental Affairs (KZN edtea, previously known as DAEA) for undertaking the proposed project. Note that as this project began under the then current 2010 regulations and will be completed in terms thereof and not in terms of the new 2014 Regulations (4 December 2014). Such an approval is needed as the project includes activities listed under GNR 544, 545 and 546, as well as under Schedules A and B of GNR 921. GNR 921 of 2013 includes the waste activities in terms of the National Environmental Management Waste Act (Act No. 59 of 2008) (as amended). Activities under these listings may have a detrimental effect on the environment, and includes activities from GNR 545 and 921: Schedule B, hence a full EIA process as prescribed by GNR 543 is to be undertaken. An EIA is an effective planning and decision-making tool, which allows for the identification of potential environmental consequences of a proposed project, and its management through the planning process. EThekwini Municipality has via AECOM (as lead engineers), appointed Royal HaskoningDHV (RHDHV) as independent Environmental Assessment Practitioners (EAP) to undertake the required environmental studies. As part of these environmental studies, all I&APs will be actively involved through a public participation process. The environmental studies follow a two-phased approach: Phase 1: Environmental Scoping Study (ESS) and Plan of Study (PoS) (now completed); and Phase 2: Environmental Impact Assessment (EIA) and Environmental Management Programme (EMPr) (current phase).
6 Further identification of and consultation with I&APs Public Participation Process It is important that relevant I&APs are identified and involved in the public participation process from the outset of the project. To ensure effective public participation, the process includes the following steps during the EIA Phase: Advertise the EIA Phase Background Information Document (This document) Key Stakeholders Meetings Focus Group Meetings Public Meetings One on One Meetings Newsletters / Alternative methods of communication Advertise Draft Environmental Impact Assessment Report review and public meetings Draft Environmental Impact Assessment Report for Public Review Final Environmental Impact Assessment Report for Public Review Compile an Issues Trail following the outcomes of the Scoping Phase How can you get involved? By responding (by phone, fax or ) to our invitation for your involvement in the process. By completing the attached comment form and mailing or faxing it to Novashni Sharleen Moodley at RHDHV. By attending the meetings to be held during the course of the project. Should you register as an I&AP you will be invited to attend these meetings. The meeting dates will also be advertised in local newspapers and registered I&APs will be notified by as well. In writing contacting consultants if you have a query, comment or require further project information. By reviewing and commenting on the draft and Final EIA Reports within the allowed 40-day review periods. If you consider yourself an I&AP for this proposed project, we urge you to become involved. Please make use of the opportunities created by the public participation process to become involved in the process and provide comment. If you have issues and/or concerns which affect and/or interest you, please raise them. Or, if you would simply like more information, let us know. Your input into this process forms a key part of the environmental studies and we would like to hear from you to obtain your views on the proposed project. By completing and submitting the accompanying response form, you automatically register yourself as an I&AP for this project, and ensure that your comments, concerns and/or queries raised regarding the project will be noted. Comments and queries on the project can be directed to Mrs Novashni (Sharleen) Moodley Royal HaskoningDHV PO Box 55, Pinetown, 3600 Tel Fax [email protected]
7 ENVIRONMENTAL IMPACT ASSESSMENT PROCESS PROPOSED SOLIDS REMOVAL AND TREATMENT FACILITIES UPGRADE AT THE SOUTHERN WASTE WATER TREATMENT WORKS, MEREWENT, IN THE ETHEKWINI METROPOLITAN MUNICIPALITY BACKGROUND INFORMATION DOCUMENT (APRIL 2015) edtea REF NO: DM/0032/2014 / WASTE MANAGEMENT REFERENCE NO: DM/WML/0050/2014 / WUL REFERENCE NO: 11/U60G/H/1623 / CWDP REFERENCE NO: To be confirmed / DWA EXEMPTION NO: 1747B YOUR COMMENTS AND QUERIES ARE WELCOME Please complete this Comment Form in full and return to: Mrs Novashni (Sharleen) Moodley PO Box 55, Pinetown, 3600 Tel Royal HaskoningDHV Fax [email protected] Title (Prof/Mr/Mrs) First name Surname Capacity (e.g. Secretary / Director) Organisation Postal address Postal code Tel No. ( ) Cell No. Fax No. ( ) address What comments / concerns would you like to raise regarding this proposed project? (Please use additional pages, if required) PLEASE REGISTER THE FOLLOWING PERSON(S) ON THE PROJECT DATABASE: Title (Prof/Mr/Mrs) First name Surname Capacity (e.g. Secretary / Director) Organisation Postal address Postal code Tel No. ( ) Cell No. Fax No. ( ) address Signature IF YOU PREFER NOT TO RECEIVE ANY FURTHER INFORMATION REGARDING THIS PROPOSED PROJECT, AND, WOULD PREFER TO BE REMOVED FROM THE PROJECT DATABASE, PLEASE TICK THE BOX BELOW AND RETURN THE FORM TO THE PUBLIC PARTICIPATION CONSULTANTS (CONTACT DETAILS AS PROVIDED ABOVE). Yes, remove my name
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
PROPOSED ESTABLISHMENT OF THE TRANSALLOYS COAL-FIRED POWER PLANT NEAR EMALAHLENI, MPUMALANGA PROVINCE DEA Ref: 14/12/16/3/3/3/97
From the desk of Gabriele Wood E-mail: [email protected] 30 March 2015 Dear Stakeholder PROPOSED ESTABLISHMENT OF THE TRANSALLOYS COAL-FIRED POWER PLANT NEAR EMALAHLENI, MPUMALANGA PROVINCE DEA Ref:
The City of Boulder 75 th Street Wastewater Treatment Facility
The City of Boulder 75 th Street Wastewater Treatment Facility Wastewater Collection and Treatment The Foundation of Public Health Wastewater Collection Boulder s wastewater collection system, also known
BACKGROUND INFORMATION DOCUMENT
BACKGROUND INFORMATION DOCUMENT BASIC ENVIRONMENTAL ASSESSMENT UPGRADING OF THE TRANSNET CITY DEEP CONTAINER TERMINAL, JOHANNESBURG SEPTEMBER 2008 INTRODUCTION Transnet Freight Rail would like to upgrade
Bay Park Sewage Treatment Plant Super Storm Sandy Recovery
County of Nassau Department of Public Works Bay Park Sewage Treatment Plant Super Storm Sandy Recovery Edward P. Mangano County Executive Shila Shah-Gavnoudias, P.E. Commissioner of Public Works Bay Park
How To Improve The Infrastructure Of The City Of Germany
WSDP: MODULE 3 TOPIC 5: WATER SERVICES INFRASTRUCTURE 5. WATER SERVICES INFRASTRUCTURE 5.1. Future trends and goals (water services infrastructure) Internal and connector water and sanitation infrastructure
CHAPTER 9 PERMITTING. 9.2 Scotland 102 9.2.1 Exemption 102 9.2.2 Waste management licence 102 9.2.3 PPC permit 102
CHAPTER 9 PERMITTING 9.1 England and Wales 100 9.1.1 T24 exemption for on-farm AD 100 9.1.2 T25 exemption for off-farm AD 100 9.1.3 Standard rules environmental permits 100 9.1.4 Standard rules for on-farm
City of Charlottetown Wastewater Treatment Expansion & Upgrading
City of Charlottetown Wastewater Treatment Expansion & Upgrading Background As Canada s smallest provincial capital, the City of the Charlottetown has a population of approximately 34,000 residents and
Outline. Background. NFPA 820 Applicability to Wastewater Treatment Facilities. Hazardous Area Classifications. Treatment Plant Area Classifications
Outline Background NFPA 820 Applicability to Wastewater Treatment Facilities Hazardous Area Classifications Treatment Plant Area Classifications Locations of Concern Background NFPA 820 Standard for fire
Environmental Science 101 Waste. Fall 2012. Lecture Outline: Terms You Should Know: Learning Objectives: Reading Assignment: Chlorinated.
Environmental Science 101 Waste Fall 2012 1 Lecture Outline: 17. SEWAGE DISPOSAL A. Sewage Handling B. Raw Sewage C. Wastewater Treatment Steps D. Individual Septic Systems E. Taking Stock Learning Objectives:
Energy from digester gas. Optimised biogas utilisation
Energy from digester gas Optimised biogas utilisation The complete solution The complete solution Our company ENER-G designs, installs and operates biogas combined heat and power (CHP) systems for a variety
Water Management in Helsinki. Water supply. Mikael Sillfors
Water Management in Helsinki Mikael Sillfors Helsinki is located on the northern shore of the Gulf of Finland. The main water systems in the area are the Gulf of Finland and River Vantaa, which runs through
On-Site Sewerage Treatment Facility
On-Site Sewerage Treatment Facility PD Type Plumbing Permit Number On-site Sewerage Treatment Facility Owners Details Title: Mr Mrs Ms Miss Given name(s) Surname Model Title: Mr Mrs Ms Miss Given name(s)
WASTE WATER Solutions
Huber Technology is a leading supplier of stainless steel waste water treatment equipment. Our extensive experience enables us to offer high quality solutions for all your waste water treatment needs for
ISSUES TRAIL: RECORD OF COMMENTS RAISED AND/OR SUBMITTED DURING THE PUBLIC PARTICIPATION PROCESS
PROPOSED UPGRADING OF THE EXISTING SENWAMOKGOPE SEWERAGE TREATMENT PLANT AT SEKGOSESE SECONDARY SCHOOL ON PART OF THE FARM ROERFONTEIN 161-LT, SENWAMOKGOPE, LIMPOPO PROVINCE ISSUES TRAIL: RECORD OF COMMENTS
Cambridge Wastewater Treatment Facility
Cambridge Wastewater Treatment Facility Emergency Situations If you have a water or sewer emergency that relates to the City s utility system call the Public Works office at 763-689-1800 on normal working
at a disposal site for which a permit has been issued; or
Version 1/19 June 2000 INTERPRETATION OF THE DEFINITION OF DISPOSAL SITES WITH REGARD TO THE ISSUING OF PERMITS FOR WASTE INCINERATORS, WASTE MANAGEMENT FACILITIES AND OTHER ALTERNATIVE WASTE DISPOSAL
ENVIRONMENTAL IMPACT ASSESSMENT PROCESS PROPOSED PHASE 2 EXPANSION OF THE TRANSNET IRON ORE HANDLING FACILITY, SALDANHA
ENVIRONMENTAL IMPACT ASSESSMENT PROCESS PROPOSED PHASE 2 EXPANSION OF THE TRANSNET IRON ORE HANDLING FACILITY, SALDANHA BACKGROUND INFORMATION DOCUMENT 1 BACKGROUND Transnet Limited s (Transnet) existing
TALLINN WATER TREATMENT AND SEWERAGE Tuuli Myllymaa
TALLINN WATER TREATMENT AND SEWERAGE Tuuli Myllymaa Tallinn is the capital of Estonia. It has approximately 450,000 inhabitants and the town area is about 150 km 2. Tallinn Water Ltd., owned by the City
St. John s Harbour Clean-Up Phase 2. Project Description
St. John s Harbour Clean-Up Phase 2 Project Description February 2003 NEWFOUNDLAND DESIGN ASSOCIATES LIMITED 1 Introduction The City of St. John s, the adjoining City of Mount Pearl and the Town of Paradise
Legislative Council Panel on Environmental Affairs. 209DS Outlying Islands sewerage, stage 1, phase 1 - consultants fees and investigations
For discussion On 8 May 2001 Legislative Council Panel on Environmental Affairs 209DS Outlying Islands sewerage, stage 1, phase 1 - consultants fees and investigations Purpose This paper seeks Members
Water Recycling in action in South Australia: a review of agricultural and municipal reuse schemes and innovation.
Water Recycling in action in South Australia: a review of agricultural and municipal reuse schemes and innovation. S. Rinck-Pfeiffer * Veolia Water/United Water, Parkside, GPO Box 1875, Adelaide, South
PRODUCT SELECTOR Pollution Control, Pumping and Rainwater Harvesting Systems
PRODUCT SELECTOR Pollution Control, Pumping and Rainwater Harvesting Systems PACKAGE SEWAGE TREATMENT SYSTEM Clearwater treatment plants are ideal for single houses and employ the well proven aerobic biological
Table of Contents. Chapter 12. South Africa Chapter 12. 12.1 Constitutional requirements for environmental protection in South Africa...
Table of Contents 12.1 Constitutional requirements for environmental protection in South Africa...316 Chapter 12 12.2 Institutional and administrative structure for environmental impact assessment in South
INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION. Infrastructure Flood Protection Remediation Policies
INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION Infrastructure Flood Protection Remediation Policies DRAFT POOLBEG PLANNING SCHEME 196 FIGURE 9.1: UTILITIES WAYLEAVES Electricity Cables 8m Wayleave for
SECTION 1 UTILITY OVERVIEW, INTRODUCTION, and PROJECT BACKGROUND
SECTION 1 UTILITY OVERVIEW, INTRODUCTION, and PROJECT BACKGROUND Wastewater Utility Overview In the late 1950 s, the Village of Old Forge began to realize the impacts of dumping sewage in the Moose River.
Introduction to Waste Treatment Technologies. Contents. Household waste
Contents Introduction to waste treatment technologies 3 Section 1: The treatment of recyclable waste 4 Bulking facilities 5 Materials Reclamation Facility (MRF) 6 Reuse and recycling centres 8 Composting
CHAPTER 1 - EXECUTIVE SUMMARY
Chapter Page CHAPTER 1 - EXECUTIVE SUMMARY 1.1 Background 1-1 1.2 Purpose/ Objectives 1-1 1.3 Flow, Condition and Operation Assessment 1-3 1.4 Class A Biosolids 1-4 1.5 Summary of Recommendations 1-4 CHAPTER
Products, systems and services for water and wastewater treatment plants Enhanced plant performance, efficiency and reliability
Products, systems and services for water and wastewater treatment plants Enhanced plant performance, efficiency and reliability Treating water efficiently A global challenge Water and wastewater treatment
Charging for Pre-application Advice. WSCC Guidance Note
Charging for Pre-application Advice WSCC Guidance Note Content 1. Introduction 1.1 Our Objectives 1.2 Development Team Approach 1.3 Areas of Advice 1.4 What We Expect of You 1.5 Benefits of Pre-application
MAP KEYS GLOSSARY FOR THE DRAINAGE AND WATER REPORT
Record MAP KEYS GLOSSARY FOR THE DRAINAGE AND WATER REPORT Abandoned Gravity Private Combined Gravity Private Foul Gravity Private Surface Water Gravity Public Combined Gravity Public Foul Gravity Public
St. Petersburg, FL: Vehicle Use of Recycled Natural Gas Derived from Wastewater Biosolids
U.S Department of Energy - Biomass 2014 St. Petersburg, FL: Vehicle Use of Recycled Natural Gas Derived from Wastewater Biosolids William Eleazer, PE Project Design Manager John Willis, PE, BCEE Project
Wastewater(Solids(Management(( 2(Atlantic(Canada(Perspective( Dwayne(Doucette,(MASc.(P.Eng.((( June(19,(2013(
Wastewater(Solids(Management(( 2(Atlantic(Canada(Perspective( Dwayne(Doucette,(MASc.(P.Eng.((( June(19,(2013( Wastewater(Treatment(in( Atlantic(Canada( Dramatic improvement in this Region over the Past
WASTEWATER TREATMENT OBJECTIVES
WASTEWATER TREATMENT OBJECTIVES The student will do the following: 1. Define wastewater and list components of wastewater. 2. Describe the function of a wastewater treatment plant. 3. Create a wastewater
Description of the Water Conserv II Facility
Description of the Water Conserv II Facility Introduction The Water Conserv II (WCII) Water Reclamation Facility provides service to a majority of the southwest section of Orlando. The WCII facility has
Collection and disposal of wastewater
10 Collection and disposal of wastewater 10.1 Characteristics and hazards of wastewater from health-care establishments Wastewater from health-care establishments is of a similar quality to urban wastewater,
Orange County Sanitation District
Orange County Sanitation District The Orange County Sanitation District operates large wastewater treatment plants in Fountain Valley and Huntington Beach, CA. These plants treat about 230 million gallons
Environmental Impact Assessment Ordinance (Cap. 499) Environmental Impact Assessment Report Sludge Treatment Facilities
40/F, Revenue Tower, 5 Gloucester Road, Wan Chai, Hong Kong 香 港 灣 仔 告 士 打 道 5 號 稅 務 大 樓 40 樓 ACE-EIA Paper 2/2009 For advice Environmental Impact Assessment Ordinance (Cap. 499) Environmental Impact Assessment
Terms of Reference. Aqaba Water and Wastewater Utility Asset Valuation
Technical Support for Procurement and Project Management and Private Sector Participation to the Ministry of Water and Irrigation, Water Authority of Jordan and the Jordan Valley Authority Support for
A copy of Worksheet 1 at the appropriate level for each pupil. Ask pupils to answer the question 'What is sewerage?'
Waste Water Treatment 1. Fascinating Facts Aim: To introduce pupils to key facts about waste water Materials: A copy of Worksheet 1 at the appropriate level for each pupil String Method: Ask pupils to
TOWN OF LAKESHORE CLASS ENVIRONMENTAL ASSESSMENT ENVIRONMENTAL STUDY REPORT FOR LAKESHORE EASTERN COMMUNITIES SEWAGE WORKS
TOWN OF LAKESHORE CLASS ENVIRONMENTAL ASSESSMENT ENVIRONMENTAL STUDY REPORT FOR LAKESHORE EASTERN COMMUNITIES SEWAGE WORKS Prepared for The Town of Lakeshore 419 Notre Dame Street, Belle River Ontario
UVDB empowered by Achilles
UVDB empowered by Achilles DISAB Centurion: High Performance Wet/Dry Materials Handling Unit DISAB Centurion: High performance vacuum tanker that will vacuum dry or wet material The DISAB can vacuum material
Aquatera 2015/16 Business Plan Highlights
Who We Are Aquatera 2015/16 Business Plan Highlights Aquatera is a full-service utility corporation the provider of choice for governments, businesses, and communities. Our business is to provide high-quality
Microsoft - Cheyenne Board of Public Utilities Biogas CHP Demonstration Project
Microsoft - Cheyenne Board of Public Utilities Biogas CHP Demonstration Project Presented By: Sean James - Microsoft Ryan Smith - BOPU Todd Lovell - Jacobs E.B. Jensen - Jacobs Sean James o Microsoft -
Application for a Waste Management Licence
Application for a Waste Management Licence Waste management (For office use only) stamp Received by Initials Please read the guidance notes and the form carefully before you complete it. How to apply To
Energy and Carbon Management
Energy and Carbon Management Andrew Gardner General Manager Energy and Carbon Management Severn Trent Water [email protected] 30th March 2010 Agenda Why we are investing in Low Carbon Future
Drainage. Information for those with problem drains
Drainage Information for those with problem drains Contents 1 Purpose 2 Introduction 2 Explanations: what is a drain and what is a sewer 3 Explanation of the responsibilities for public and private sewers
LANDFILL GAS TO ENERGY- COMBINED ENGINE AND ORC-PROCESS
LANDFILL GAS TO ENERGY- COMBINED ENGINE AND ORC-PROCESS Dr Petri Kouvo Helsinki Region Environmental Services Authority THIRD INTERNATIONAL SYMPOSIUM ON ENERGY FROM BIOMASS AND WASTE Venice, Italy 8-11
APPENDIX 9 INFRASTRUCTURE SERVICING REPORT
APPENDIX 9 INFRASTRUCTURE SERVICING REPORT Lot 50 Cockram Street, Mundijong Infrastructure Servicing Report Peet Ltd August 2012 LOT 50 COCKRAM STREET, MUNDIJONG-INFRASTRUCTURE SERVICING REPORT Project
A NOVEL ION-EXCHANGE/ELECTROCHEMICAL TECHNOLOGY FOR THE TREATMENT OF AMMONIA IN WASTEWATER
A NOVEL ION-EXCHANGE/ELECTROCHEMICAL TECHNOLOGY FOR THE TREATMENT OF AMMONIA IN WASTEWATER ABSTRACT Leonard P. Seed, M.Sc., P.Eng., Enpar Technologies Inc. * Daren D. Yetman, A.Sc.T., Enpar Technologies
Loviisa 3 unique possibility for large scale CHP generation and CO 2 reductions. Nici Bergroth, Fortum Oyj FORS-seminar 26.11.
Loviisa 3 unique possibility for large scale CHP generation and CO 2 reductions Nici Bergroth, Fortum Oyj FORS-seminar 26.11.2009, Otaniemi Loviisa 3 CHP Basis for the Loviisa 3 CHP alternative Replacement
Energy and Water Efficiency Management Practice Guide
Carbonproof Energy and Water Efficiency Management Practice Guide The material provided in this guide has been produced in conjunction with our partner Energetics Pty Ltd. 2011 Energetics Pty Ltd and AgriFood
Development of Organic Waste Treatment Facilities, Phase 2
ENVIRONMENTAL PROTECTION DEPARTMENT Development of Organic Waste Treatment Facilities, Phase 2 Project Profile April 2011 CONTENTS 1 PURPOSE OF PROJECT PROFILE... 3 2 BASIC INFORMATION... 3 2.1 Project
Environmental Law Enforcement in Zimbabwe. Farai Michael Nyahwa
Environmental Law Enforcement in Zimbabwe By Farai Michael Nyahwa Presentation Breakdown Institutional Arrangement for Environmental Law Enforcement in Zimbabwe Major Environmental Issues of Concern In
Urban Environmental Management in Singapore. Jothieswaran P Chief Engineer Pollution Control Department National Environment Agency
Urban Environmental Management in Singapore Jothieswaran P Chief Engineer Pollution Control Department National Environment Agency Introduction City state comprising a main island and some islets Land
GUIDELINES FOR LEACHATE CONTROL
GUIDELINES FOR LEACHATE CONTROL The term leachate refers to liquids that migrate from the waste carrying dissolved or suspended contaminants. Leachate results from precipitation entering the landfill and
Operational Audit and. Asset Management System Review. Shire of Coolgardie
Shire of Coolgardie Operational Audit and Asset Management System Shire of Review Dowerin 2011 (Water Services Operating Licence) Water Services Operating Licence (Sewerage and Non-Potable Water) DRAFT
12:10 Lysotherm : 5 jaar ervaring met innovatieve slibhydrolyse. Bert Geraats (Eliquo)
LYSOTHERM A novel approach to thermal sludge hydrolysis 01.07.2015 ELIQUO WATER GROUP FACTS AND FIGURES STAFF HISTORY FIGURES >200 employees Engineers Technicians Sales, commercial staff 1986 ELIQUO WATER
INTEGRATED WATER FOR CASEY CLYDE
INTEGRATED WATER FOR CASEY CLYDE James Westcott 1, Andrew Chapman 1, Jamie Ewert 2, Brigid Adams 3 1. South East Water, Melbourne, Vic, Australia 2. Melbourne Water, Melbourne, Vic, Australia 3. Department
CHAPTER 4 NEED AND ALTERNATIVES
CHAPTER 4 NEED AND ALTERNATIVES 4.1 Introduction 4.1.1 This chapter of the ES outlines the need for the Upgrade to Deephams Sewage Works. It provides a description of the main alternatives to the Upgrade
Training Program on Urban Climate Change Resilience 20-22 April, 2015 Database Management System for coastal cities
Training Program on Urban Climate Change Resilience 20-22 April, 2015 Database Management System for coastal cities Rozita Singh, Research Associate, Sustainable Habitat Division, TERI Why Data? Infrastructure
How To Get A Stormwater Discharge Permit In A City Of Scottsdale
Environmental Regulations Guide Section 4 Pollution Prevention 4. 0 Pollution Prevention The Pollution Prevention Act (PPA) focuses on source reduction, i.e. on reducing the amount of pollution through
CNG Fueling Developments and Renewable Conversion to RNG Technology and Update on a RNG Fleet
CNG Fueling Developments and Renewable Conversion to RNG Technology and Update on a RNG Fleet NY State Chapter of SWANA, Albany. NY. June 13, 2013 Bernard Sheff, PE, Vice President Anaergia Inc. Agenda
Draft Water Services Strategic Plan
Draft Water Services Strategic Plan A Plan for the Future of Water Services Customer Water Wastewater Environment Growth Investment Safeguarding your water for your future Irish Water at a glance... Irish
COD/BOD 5 Reduction with ROTAMAT Fine and Micro Screens
COD/BOD 5 Reduction with ROTAMAT Fine and Micro Screens Removal of particulate material from wastewater Eco-efficient use of capital Water pollution control through maximum COD/BOD 5 reduction Service
PPG21. Pollution Prevention Guidelines. pollution incident response planning: PPG 21. 1. Introduction
PPG21 February 2004 Environmental Alliance working together Pollution Prevention Guidelines pollution incident response planning: PPG 21 These guidance notes have been drawn up to assist those developing
SERVICE PROVIDER S DATABASE FORM
SERVICE PROVIDER S DATABASE FORM PANEL OF CONSULTANTS EXPRESSION OF INTEREST Company Name : Consulting Field: These forms must be completed and returned to the following address: Umjindi Municipality Hospital
ENVIRONMENTAL IMPACT STUDY OF CORE AREA WASTEWATER TREATMENT PROGRAM FACILITIES TERRESTRIAL ENVIRONMENT VOLUME I OF II. October 2013 10215
ENVIRONMENTAL IMPACT STUDY OF CORE AREA WASTEWATER TREATMENT PROGRAM FACILITIES TERRESTRIAL ENVIRONMENT VOLUME I OF II October 2013 10215 Prepared for: Prepared by: Capital Regional District 625 Fisgard
Wastewater Treatment System Rehabilitation Project
Wastewater Treatment System Rehabilitation Project An overview The City of Shelton, WA / January 2010 Before After SHELTON WASTEWATER TREATMENT IMPROVMENTS PROJECT Enabled by extensive grant-funding, loans
Landfill Gas In Ireland - The Facts
Landfill Gas In Ireland - The Facts Almost two million tonnes of municipal solid waste (MSW) were generated in Ireland in 1998, over 90% of which was consigned to landfill. At landfill, bacteria cause
Facility management briefing checklist
Facility management briefing checklist The checklist has been prepared as a complementary document to BS 8536:2010 Facility management briefing. Code of practice. BS 8536 is a standard for facility designers,
DIVISION D ELECTRICITY, GAS, WATER AND WASTE SERVICES
The Electricity, Gas, Water and Waste Services Division comprises units engaged in the provision of electricity; gas through mains systems; water; drainage; and sewage services. This division also includes
CABINET 26 JULY 2011 PROCUREMENT OF LONG TERM WASTE TREATMENT FACILITIES REPORT OF THE DIRECTOR OF ENVIRONMENT AND TRANSPORT
K CABINET 26 JULY 2011 PROCUREMENT OF LONG TERM WASTE TREATMENT FACILITIES REPORT OF THE DIRECTOR OF ENVIRONMENT AND TRANSPORT Purpose of Report PART A 1. The purpose of this report is to seek Member approval
Property Condition Disclosure Statement
NYS Department of State Division of Licensing Services P.O. Box 22001 Albany, NY 12201-2001 (518) 474-4429 www.dos.state.ny.us Name of Seller or Sellers: Property Address: General Instructions: The Property
STANDARD OPERATING INSTRUCTION. Safe Handling and Removal of Asbestos Cement Pipes Procedure
STANDARD OPERATING INSTRUCTION Safe Handling and Removal of Asbestos Cement Pipes Procedure 1 July 2012 Title System Reference Number Approved By Safe Handling and Removal of Asbestos Cement Pipes People
Viet Nam Da Nang Waste water management
Case Study Country: City: Key Sectors: Viet Nam Da Nang Waste water management Local Partner Organization Geography and Population Da Nang People s Committee Department of Natural Resources and Environment
Equipment and Instrument Tagging Requirements
Sanitary Sewer Overflow (SSO) Control and Wastewater Facilities Program Equipment and Instrument Tagging Requirements City of Baton Rouge/Parish of East Baton Rouge Department of Public Works Submitted
ITEM FOR PUBLIC WORKS SUBCOMMITTEE OF FINANCE COMMITTEE
For discussion on 8 April 2014 PWSC(2014-15)1 ITEM FOR PUBLIC WORKS SUBCOMMITTEE OF FINANCE COMMITTEE HEAD 705 CIVIL ENGINEERING Environmental Protection Refuse Disposal 172DR Organic waste treatment facilities
Construction Services
Construction Services Construction Turning innovative ideas into delivered solutions At Golder Associates we strive to be the most respected global company providing consulting, design, and construction
Waste Water Solutions
Waste Water Solutions Mono is a leading name in the design, manufacture and supply of progressing cavity pumps, parts, grinders, screens and packaged solutions, worldwide. We have 7 international sites
ON-SITE WASTEWATER TREATMENT SYSTEMS ACT
ON-SITE WASTEWATER TREATMENT SYSTEMS ACT Revised and reproduced by the Colorado Department of Public Health and Environment June, 2012 (PLEASE NOTE: This is an unofficial copy of this statute. The official
C o m p a n y P r o f i l e Company:
C o m p a n y P r o f i l e Company: Surname: Address: Name: ZIP code: Town: Country: Tel.: E-mail: Website: Turnover: Your position in the company: Owner C.E.O./Chief Executive Officer Head of Department/Supervisor
Student Seminar Building climate resilient cities: Exploring theories, practices and prospects 16-17 Feb 2015
Student Seminar Building climate resilient cities: Exploring theories, practices and prospects 16-17 Feb 2015 Database Management System for coastal cities Rozita Singh, Research Associate, Sustainable
Prepared and Submitted by
Technical Feasibility Study Report of Proposed Sulfuric Acid and Phosphoric Acid Unloading Facilities, Acid Storage Tanks at the existing Wharf and Acid Transfer Pipeline Falling within the CRZ area &
POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN
FUCHS LUBRICANTS (AUSTRALASIA) PTY LTD 2 HOLLAND STREET WICKHAM NSW POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN ENVIRONMENTAL PROTECTION LICENCE No.10181 Pubic Version DOC REF:ENV228 ISSUE:1 DATE:21.11.13
Ann Arbor Wastewater Treatment Plant Facilities Renovations Project September 2015
Ann Arbor Wastewater Treatment Plant Facilities Renovations Project September 2015 The Facilities Master Plan was completed in 2004 and identified the need for improvements to the City of Ann Arbor s Wastewater
Changes to the Electricity (Safety) Regulations effective from 1 July 2013. www.energysafety.govt.nz www.ewrb.govt.nz www.standards.co.
Changes to the Electricity (Safety) Regulations effective from 1 July 2013 www.energysafety.govt.nz www.ewrb.govt.nz www.standards.co.nz Changes to the electrical certification regime under the Electricity