Stormwater Credit Open House Q&A



Similar documents
Summary and Description of 2014 Enhancements to New Jersey Model Stormwater Control Ordinance for Municipalities

Permeable Interlocking Concrete Pavements. The Stormwater Problem

Stormwater Design Guidelines Frequently Asked Questions:

Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010

City of Atlanta. Department of Watershed Management. Post-Development Stormwater Management Ordinance Summary of Revisions

AquaPaver & SF-Rima Permeable Interlocking Concrete Pavers

Post-Construction Stormwater Management Checklist* (5,000 SF or Greater)

Fiberglass Tanks for Green Building Applications. a subsidiary of ZCL Composites Inc.

Fiberglass Storage Tanks for Green Building Applications

Pervious Pavers. By: Rich Lahren. Hebron Brick & Block Supply

Storm Water Runoff. Managing. A Self-Assessment Guide for Wisconsin Businesses. Storm water runoff is coming. This guide provides businesses

A Developer s Guide: Watershed-Wise Development

Water LA. capture conserve reuse. California Adaptation Forum 2014 From Watershed to Coast: Adapting to Rising Seas & Prolonged Drought

Permeable Interlocking Concrete Pavements

APPENDIX F. RESIDENTIAL WATER QUALITY PLAN: ALLOWABLE BMP OPTIONS

How To Amend A Stormwater Ordinance

Permeable Paving System with StormAbsorb Technology

DRAINAGE SERVICE CHARGES

89 Avenue Road GP Ltd. Functional Servicing and Stormwater Management Report for 89 Avenue Road Re-Development City of Toronto

Low Impact Development Checklist

Use of Green Roofs to Meet New Development Runoff Requirements. Greg Davis Nov. 8, 2007

Kitchener s Stormwater Utility

Permeable Interlocking Concrete Pavement (PICP) A Low Impact Development Tool Training for Schools and Universities

STAFF REPORT TO COMMITTEE OF THE WHOLE

Porous Pavement Alternatives Cost Analysis

MODULE 2 RULES RELATING RULES RELA

Sustainable Urbanism with Green Roofs Natural Stormwater Management Wolfgang Ansel, Alfred Diem

Guidelines for Control of Water Runoff on Small Lots. Revised 6/09

HOUSE BILL 987. Read and Examined by Proofreaders: Sealed with the Great Seal and presented to the Governor, for his approval this

Pollution Control NEW! NEW! Stormwater Attenuation Systems Sustainable Urban Drainage Solutions for Domestic & Commercial Applications. klargester.

STORMWATER MANAGEMENT AND SERVICING REPORT IN SUPPORT OF SITE PLAN APPLICATION Cumberland Terrace

Guidelines for. Permeable Pavement

Waukesha County. Municipal Separate Storm Sewer System (MS4) Permit Annual Report to the Land Use Parks & Environment Committee

Sample DEQ Plan Submitter s Checklist for Stormwater Management Plans

GOALS, OBJECTIVES AND POLICIES

ALBUQUERQUE BERNALILLO COUNTY WATER UTILITY AUTHORITY WATER WASTE ORDINANCE

STORMWATER POLLUTION PREVENTION PLAN TEMPLATE. 1.0 SITE DESCRIPTION 1.1 Project Name and Location Date

Sustainable Drainage Systems (SUDS) A guide for developers

Planning, Health and Environment Division

1800 Washington Boulevard, Baltimore, MD TTY Users Larry Hogan, Governor Boyd

Permeable Pavers. calstone.com. Permeable Interlocking Concrete Pavements (PICP s)

When Water Comes to Town What Happens

DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES. Run-off Analysis Methods

Visit Us Online. On the road to green design. NEW PRODUCT! basalite.com. all Paver Prod. are now avail paver. in all Basalite products.

Challenging Sustainable Goals for Landscape Architects

Florida Department of Environmental Protection

APPROVAL AMENDMENT HISTORY

COMPREHENSIVE PLAN SECTION B, ELEMENT 4 WATER RESOURCES. April 20, 2010 EXHIBIT 1

URBAN DRAINAGE CRITERIA

Toronto s Wet Weather Flow Master Plan

Recommendations for future developments

Permeable Pavement Treatment Capacity

DRAINAGE MANAGEMENT PLAN. HERTFORDSHIRE RESIDUAL WASTE TREATMENT PLANT Hertfordshire County Council

Implementing Green Infrastructure in Atlanta

Storm Water Management Requirements for Construction Projects Less than One Acre

SUSTAINABLE URBAN DRAINAGE SYSTEMS

Post Construction Stormwater Management Checklist Program

Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. CIVL 1112 Detention Ponds - Part 1 1/12

Engineering Major Service Actual Budget Projected Request Executive Adopted

Berkeley s. guide. Best builders. to Conserving Water through Rainwater Harvesting & Graywater Reuse for Outdoor Use

PRELIMINARY STORMWATER MANAGEMENT AND SERVICING REPORT

Pervious Pavement SYSTEMS THINKING. THE NEW DESIGN PROBLEM and the Role of the Civil Engineer. LOW IMPACT DEVELOPMENT Introduction

Stormwater management around the world Lessons from Novatech 2010 Dennis Corbett and Marion Urrutiaguer

12-O-1761 A SUBSTITUTE ORDINANCE BY CITY UTILITIES COMMITTEE

A HOMEOWNERS GUIDE ON-SITE SEWAGE MANAGEMENT SYSTEMS

Green Infrastructure in Arid and Semi-Arid Climates

GreenPlanIT LID Site Suitability Tool. Patty Frontiera, Pete Kauhanen, Marshall Kunze,

L A N D S C A P E P A T T E R N S

Stormwater Management Design Brief. Proposed Commercial Redevelopment 5830 Hazeldean Road Ottawa (Stittsville), Ontario.

Using Compost BMPs for LEED Green Building Credits

Improper storage of fuel on construction sites will increase the risk of water pollution that may occur as a result of leaks or spills.

A San Antonio Case Study on the Water Quantity and Quality Benefits of LID Development

C.3 Workshop Track 2: Sizing Calculations and Design Considerations for LID Treatment Measures

Introduction. The vision of the West Yorkshire Combined Authority (WYCA) Flood Risk Partnership

Chapter 2 Stormwater Pollution Prevention Plan (SWPPP) for Park Operations

Understanding Your An Introduction to the Chicago Area s Combined Sewer Systems

How to Build a Rain Garden at Your Home

ORDINANCE NO. (2003) AN ORDINANCE TO CREATE A STORMWATER SERVICES ADVISORY COMMISSION AND TO ESTABLISH A STORMWATER MANAGEMENT UTILITY.

Development at 2 St Albans Road, Kingston, London, KT25HQ

Operation & Maintenance Document Templates

DESIGN OF STORM WATER DETENTION POND

Dave Laurie, CTR. Sales Manager, Commercial Sales DESIGNED TO CONNECT

Good? Bad? Why? Training Module 4

Sika Sarnafil World Class Roofing and Waterproofing

Low Impact Development

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE

Gettysburg Adams Chamber of Commerce Storm Water Management

Introduction to Rainwater Harvesting. Department of Biological and Agricultural Engineering Texas A&M University

Permeable Interlocking Concrete Pavement

Transcription:

Stormwater Credit Open House Q&A Stormwater Charge Project GENERAL INFORMATION AND APPLICATION PROCESS FOR STORMWATER CREDITS Question: What is the response time for an application - 30 business days or one calendar month? How long after 30 days will a decision be given for a credit application? Answer: The expected response time is one calendar month. The City opened the Credit Application process on September 30, 2015, in advance of the start of stormwater billing, to provide applicants with a head start on the process. Question: Is an application required for each property for which an owner would like to apply or could a single application be submitted for multiple properties? Answer: The City will require one application for each property. Question: Is there a fee for the credit program application? Answer: No, there is currently no fee. Question: Who are the reviewers for a credit application? Answer: Reviewers of credit applications are the same engineering staff members who currently review stormwater management reports on development applications. Therefore, the City will have the same level of expertise and uniformity when assessing applications. Question: If I m thinking of doing work on my property, how would I assess whether I want to do the work specifically to get the credits and whether it is worth the financial investment? Answer: As every property has distinct circumstances, this is ultimately a decision between the property owner and his/her engineering consultant. However, our partners, Credit Valley Conservation (CVC) and Partners in Project Green (PPG), a group within the Toronto & Region Conservation Authority, both have resources to help you make this decision. PPG can provide customized access to consultants and engineers who could visit your property, assess your organization s needs, and determine the rough scope of a stormwater management project, accounting for facility type and size, and desired payback. Partners in Project Green can assist with the implementation of the project and the maximization of the available credits, as well. Please contact acerbu@trca.on.ca Page 1 of 6

CVC offers a suite of how-to resources and ecological landscaping programs that are designed to help both multi-residential property managers and businesses identify options for stormwater management on their property. Please see www.creditvalleyca.ca/gcg or www.bealeaderca.ca. ENGINEERS AND RELATED REQUIREMENTS AND DOCUMENTATION Question: What type of engineer will be qualified to provide certification? Answer: An engineer qualified in the field of stormwater management with a good understanding of municipal engineering as it relates to storm drainage. The responsibility is on the engineer who is certifying the documentation submitted with the application to state that he/she is qualified to perform an evaluation of stormwater best management practices on the property. The qualifications also depend on the relevant work being done for example, designing and/or evaluating the stormwater management performance of an underground tank may require different expertise than for a green roof installation. Support from different fields of expertise may also be required for the design and construction of the many types of stormwater best management practices. Question: How do I find engineering firms to do this work? Answer: Professional Engineers Ontario has a directory of practitioners on its website (www.peo.on.ca). Question: I have a new property with particular stormwater measures in place. The City already has the engineering plans, so why do I have to hire another engineer to assess my property again? Answer: While the City may have engineering plans in its files, the responsibility is on the applicant s engineering consultant to confirm that the stormwater best management practices were constructed and are operating in accordance with the engineering plans and are in a state of good repair. The engineering consultant will also be required to demonstrate how the relevant stormwater credits being applied for are achieved. The original engineering plan may be used as part of the application package. Question: My employer has a 1970s stormwater prevention system in place. Is there any exemption given to people to implement these plans since it can take time for people to make the necessary changes? Page 2 of 6

Answer: A credit will become effective once it is demonstrated through the application process, to the satisfaction of the Program Coordinator, that the stormwater best management practices have been constructed and/or implemented and are in service. Question: If the owner does not have original site plan drawings, does the city have records they will share? Answer: The City may not have this information as there is a retention period for files. APPLICATION CRITERIA Question: Do pre-development conditions for quantity control (peak flow reduction) refer to an undeveloped site with native soils and what level of vegetation cover? Answer: Pre-development refers to a theoretical condition, with a runoff coefficient of 0.25. Question: Does the Peak Flow Reduction Credit of 40% apply only if the entire impervious area is controlled or will partial credit be granted if only part of the area is controlled? Answer: The Credit program is designed to award partial credit in this and all other categories, though the assessment method for partial credits varies with each category. Question: Is pollution prevention about spills and water quality only about total suspended solids (TSS)? For peak flow what if the existing site is 100% impervious now? Answer: Pollution prevention is mainly focused on material handling methods for the prevention of contaminants from entering the storm drainage system. Pollution prevention plans are customized to manage the contaminants typically handled, generated, or stored on each particular site. Water quality treatment refers more to the removal of suspended solids from stormwater runoff. If the existing property is fully impervious, a Peak Flow Reduction credit may be awarded based on the percent reduction of the 100 year post-development flow from the site compared to pre-development conditions based on a theoretical predevelopment runoff coefficient of 0.25. Page 3 of 6

BEST MANAGEMENT PRACTICES Question: Do grey-water re-use systems qualify in the schedule? If so, under which criterion? Answer: Re-use of grey-water such as used water from your bathroom sinks, showers, tubs, and washing machines are not eligible for a stormwater charge credit. However, as the City's Credit program is related to how much stormwater is being diverted from the City's storm drainage system, if the grey-water tank was being fed by stormwater runoff there could be a potential credit in the runoff volume reduction category. Question: How do permeable pavers compare to traditional asphalt paving in terms of cost? Answer: Initial expenses for permeable pavers may be more than asphalt. However, there may be cost savings due to the decreased investments in storm sewers. Question: Can permeable pavement stand up to tractor trailers? Answer: Yes, if properly designed for that load. Question: Is an off-site best management practice, like a stormwater pond, eligible for a credit? Answer: Yes, if it is a private off-site stormwater pond. Question: Is roof control eligible for quantity control credit? Answer: Yes Question: Is staff already aware if a property contains a cistern tank used for irrigation? Answer: No. Question: If the site has no vegetation but is not compacted, can billing units be adjusted? (Eg.: A property is not an active plant, but is a vacant lot with sporadic vegetation.) Answer: If the gravel area is compacted, it would be counted as hard surface. If the gravel area is designed to specifically infiltrate water, it can be accounted for in the credit program. Page 4 of 6

Question: Will there be an exemption of application fee for site plan amendments which propose stormwater best management practices on older existing commercial uses? Answer: There will not be an exemption, but the property may be eligible for a credit. ADDITIONAL QUESTIONS ABOUT THE STORMWATER CHARGE Question: Multiple buildings that are located on a single site have been assessed based on the entire site area as opposed to their proportional share. Why? Answer: The City recognizes that there are cases of multiple buildings with multiple addresses on one parcel of land. However, there will only be one stormwater charge bill for all the buildings on a property as the City does not have a mechanism to divide up a charge among the different buildings. The Region of Peel will be looking for one water bill that is the master bill for that property where the stormwater charge will go onto. This bill will then be sent to the property owner who will then have the responsibility of dividing up the charge to the tenants, if desired. If a master water bill cannot be found, a stormwater-only bill will be issued to the property owner. Question: What if property owners don t get the bill and it is sent only to tenants to pay their bill? Answer: The owner will likely have to be involved in this process as the owner is responsible for the charge. Question: Is there an anticipated end to the program or is it expected to stay forever? Answer: The stormwater charge will be in place for the foreseeable future. Question: What accountability is in place so that we know these funds are going specifically to infrastructure? Answer: The stormwater program will have its own budget book and will be presented to Council as a separate document from other City services. It will be also subject to audit to ensure funds are only used to fund the stormwater program. Question: Why is this on the Region of Peel bill? It s infrastructure so why isn t it on the tax bill? Answer: The City looked at different ways the charge could be delivered, including the tax bill and other billing providers, including the Region of Peel. Because the Page 5 of 6

Region of Peel already sends utility bills to most properties in the City, it was determined to be a good fit. There will be instances where certain properties do not receive water bills. In these cases, the property will receive a stormwater-only bill issued by the Region of Peel. Page 6 of 6