TUFF-N-DRI BASEMENT WATERPROOFING SYSTEM DETAILED APPLICATION INSTRUCTIONS



Similar documents
Product Description. Storage. TUFF-N-DRI Basement Waterproofing System Detailed Membrane and Board (Full System) Application Instructions

Basement Moisture Problems

Minor Cracks in Horizontal Surfaces

BLACK JACK ALL WEATHER ROOF COATING

NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003)

Foundation Experts, LLC Specializes in Foundation Repair and Waterproofing

T R A N S F E R A B L E F U L LY

Waterproofing and interior insulation for basements takes new twist in technology.

Waterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries

Foundation Water Problems. An Overview and Discussion of some Causes and Cures for Water Infiltration into Basements and Foundation Structures

FOUNDATION INSULATING SYSTEM, INCLUDING WATERPROOFING AND DAMP PROOFING

BITUMINOUS ROOF COATINGS, CEMENTS, PRIMERS AND ADHESIVES

Carpet Seam Sealer 8200

R E S I D E N T I A L H O U S I N G

Improving the flood resistance of your home. Advice sheet 6: Flood-resilient floors

Section SEWER PIPE INSTALLATION AND TESTING

Wastewater Capital Projects Management Standard Construction Specification

What Causes Foundation Leaking?

State of Connecticut Department of Public Health RADON PROGRAM

CITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN Fax: Re-Roofing: Asphalt Shingles

BP WIND ENERGY POLICIES AND PROCEDURES

A. This Section includes rubberized asphalt sheet membrane waterproofing systems.

How to repair your existing low slope flat roof.

NRDCA 400 GUIDELINE FOR FIELD APPLICATION of LIGHTWEIGHT INSULATING CONCRETE REROOFING/RECOVER SYSTEMS

RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000

K2 STONE NATURAL VENEER

LAYING BLOCK AND BRICK

Colorado State University. Durrell Center Roof Repair

Sun Windows General Information Sun New Construction Window Installation Instructions

Proposed Minimum Subterranean Termite Treatment Standards

WESTERN COOL ROOF SYSTEMS Sustainable - Energy Efficient FLUID APPLIED REINFORCED ROOF SYSTEM

Building Owners Guide to a Duro-Last System!

Technical Data Sheet Art. No Kiesol. applications. Shelf-life. rate depending on application. Characteristic data of the product

PERFORMANCE GUIDELINES

Best Basement Water Management Practices

CHAPTER 6 ASPHALT ROLL ROOFING

Renovating Your Basement

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)

Guide Specification STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM

Comment Form on Proposed Gut Rehabilitation Alternatives

BUILT-UP ROOF COATING SMOOTH and GRANULE SURFACE SPECIFICATION

WATERPROOFING FOR CONCRETE STRUCTURES

SECTION REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

What you need to know about concrete block basement construction.

Why is my air conditioner dripping on my customers?

A. Contractor shall furnish, to the Engineer, all materials certifications available from the manufacturer for all required materials.

HIGH PERFORMANCE PRE-APPLIED SYSTEM FOR BLIND SIDE & BELOW GRADE WATERPROOFING APPLICATIONS

STEPS TO CONSTRUCTING A MOISTURE-RESISTANT FOUNDATION SOURCES OF MOISTURE IN NEW CONSTRUCTION. Natural ground slope

WATERPROOFING OF WET ROOMS

CHAPTER 7: Building Systems ROOFING SYSTEMS

SMOOTHMOVE INSTRUCTIONS FURNITURE VAN EPOXY FLOOR FINISH KIT VOC-FREE - NO SOLVENT GENERAL INFORMATION KEY 87269AB

Standard Method for Sampling and Analysis of. of Chlorine Containing Bleaches. Soap Products

STERI-SOFT HIGH FOOT TRAFFIC, ULTRAVIOLET RESISTANT, URETHANE RESILIENT FLOORING SYSTEM, 1/8 GREEN BUILDING FEATURES TYPICAL APPLICATIONS

BEST MANAGEMENT STANDARDS FOR FOUNDATION REPAIR MARCH 2003 REVISED JUNE 13, 2012

METAL ROOF RESTORATION SAMPLE DESIGN GUIDELINES

THERMOTEK SELF ADHESIVE MEMBRANE +G2 OVER WOOD SYSTEM DESCRIPTION SELF ADHESIVE OVER WOOD (8YR) BS-SA/CS

AIR RELEASE, CLEANOUT, AND SEWER MANHOLES

BELOW GROUND TANKING

SANITARY SEWER SPECIFICATIONS

FLAT ROOF REPAIR CUT COST WITHOUT CUTTING CORNERS

INSTALLATION GUIDE. americanwick.com WICK (9425)

Foundation. Foundation

Metropolitan Builders Association Masonry & Concrete Standard

Product Systems AQUAFIN-IC CEMENTITIOUS CRYSTALLINE PENETRATING WATERPROOFING. Waterproofing Specification

Mineral waterproof coating PCI Dichtschlämme

APPENDIX C MOISTURE GUIDELINES & MOISTURE TESTING

High Performance PSA in Sheet Membrane in Water Protection

NEOGARD. Preventive Maintenance Manual

WINDOW INSTALLATION GUIDE FOR NEW CONSTRUCTION - WOOD FRAMING

Get The Picture. page 2. Congratulations on taking your first step toward becoming a basement waterproofing expert!

INSTALLATION RECOMMENDATIONS. Outdoor Rubber Tiles

Best Practices for Crawl Space Insulation

Water Management & Damage Prevention:

Cavity Drain R20 is manufactured from1.0mm thick black high density polyethylene with studs approximately 20mm high.

Re-Cover Board-3. Insulation for Above the Deck ROOF WALL SPECIALTY

2.18 INTERIOR & EXTERIOR FINISHES VAPOR & AIR BARRIERS

Commercial Roof Management

DRAINAGE MATS For Vertical: Flow 15-P For Horizontal: Flow 18-H

CONTROL METHODS. There are five ways to control the release of asbestos fibers:

SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS

Shower Walls and Tub Surrounds

SECTION STORM DRAINAGE SYSTEM

ITEM THERMOPLASTIC MEMBRANE ROOFING

Adhesive Recommendation for Altro Flooring. Porous (absorbent) subfloors (most wood subfloors and some concrete)

orizontal BarrierS PATENTED SYSTEM

Roofing Systems. There are many different systems, each with it's own special requirements and benefits. Browse through all the options below.

THERMOTEK MODIFIED BITUMEN TORCH MEMBRANE OVER POLYSOCYANURATE SYSTEM DESCRIPTION TORCH SYSTEM OVER POLYISO (15,17,19 YR) TH/BS-TH/CS

STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM

Compressed Gas Cylinder Storage and Handling Guide

Crescent Valley High School Roof Investigation

ENERGY STAR Qualified New Homes Thermal Enclosure Checklist. Water Management Checklist. Eli Caudill

GYPSUM AREA SEPARATION FIREWALLS GA

The minimum reinforcement for the stem wall is the placement of:

INSTALLATION OF A BAY WINDOW

Division 9. SignaFlor Pad and Pour Flooring System

Sewer Jetter GuideSM. How to Unclog Drains with Your Pressure Washer. Use this Guide To:

RESIDENTIAL FOUNDATION GUIDELINE Johnson County, KS

BASEMENT FLOODING. Prevention Guide for. Homeowners

Air-Conditioning, Heating, and Refrigeration Institute. Sheet Metal and Air-Conditioning Contractors National Association

Transcription:

TUFF-N-DRI BASEMENT WATERPROOFING SYSTEM DETAILED APPLICATION INSTRUCTIONS PRODUCT DESCRIPTION TUFF-N-DRI Waterproofing Membrane is a fluid-applied, single component, polymer-modified asphalt emulsion. This material is specifically designed for spray application on below grade exterior foundation walls or above grade when covered by other material. TUFF-N-DRI can be applied to many different substrates, but is primarily applied to block, parged block or poured concrete foundations. WARM-N-DRI Insulation/Drainage Board is a uniformly textured material made from inorganic glass fibers bonded by a thermosetting resin. The product is designed to be applied to the exterior of foundation walls to protect the waterproofing membrane from damage by backfill, to provide a drainage pathway for ground water, and to provide insulation for the reduction of heat loss. Proper installation of both products is critical to ensuring the quality of their performance. TUFF-N-DRI's application instructions are outlined in the following text and should be strictly adhered to during all phases of application. STORAGE TUFF-N-DRI, like all asphalt emulsions, must be kept from freezing. It is best to store TUFF-N-DRI off the floor at an ambient temperature above 50 Degrees Fahrenheit (F). Opened drums should be tightly sealed before storage to avoid a skin developing on top of the liquid. When shipping emulsion-based products during the winter months, there is always a risk of the material freezing while in transport. The risk is much higher on shipments of less than 40 drums because these shipments go as "less than truckload" and therefore do not go directly from our warehouse to yours. If you suspect that a shipment has been exposed to temperatures below freezing, you can easily inspect the material yourself. Insert a pole or stick through the bung opening and check for chunks or debris. If none is detected the material should be fine to spray. If you are still uncertain contact your TUFF-N-DRI Technical Representative or Territory Manager. SAFETY Use the following safety instructions when handling TUFF-N-DRI. Also review the Material Safety Data Sheet (MSDS), as well as the safety precautions provided by the spray equipment manufacturer. 1. Avoid direct contact with the material. Prolonged or repeated contact can cause skin irritation. If prolonged contact is anticipated, impervious gloves should be worn. 2. In a confined space at temperatures less than 212 F, sufficient vapors can accumulate and flash if a source of ignition is present. The product will not support sustained combustion, and will not burn under normal circumstances. 3. Mist from spray application in a confined area can cause a headache, nausea, and irritation of the nose, throat, and lungs. To prevent this, a NIOSH approved respirator for ammonia must be worn. If you begin to smell ammonia through the mask, replace the cartridges.

Page 2 4. To protect eyes from contact with high pressure spray, wear chemical safety glasses with side shields. If contact with eyes occurs, flush with large amounts of cool water while holding eyelids open. Get medical attention if irritation persists. Follow the safety precautions listed below, as well as those found on the MSDS sheet, when handling WARM-N-DRI. There are three primary areas where the fibers can be introduced into your system: 1. Inhalation: If inhaled, remove person to fresh air. Drink water to clear throat and blow nose to evacuate fibers. 2. Skin Contact: Frequent rinsing of skin surface with cool water to remove accumulated fibers will minimize irritation. If irritation persists, consult a physician. Treat as a mechanical irritant. 3. Eye Contact: Flush eye with flowing water for at least 15 minutes. APPLICATION INSTRUCTIONS PREPARATION 1. Surfaces to be coated must be clean, smooth, firm, free of dust, mud, loose mortar, wires, fins, metal projections or any other substances which might prevent placement and bonding of a continuous film. Take particular care to ensure that the footing and cove are clean. 2. On poured concrete walls, remove wall ties on outside and inside of wall. 3. On poured concrete walls, tie holes and other small voids can be patched with an asphalt-based mastic. 4. For block walls, mortar joints must be struck (made flush) and filled in order to ensure a void free surface. Also make sure that all brick ledges are properly capped or filled. 5. On all block walls, it is recommended that all patching and repair be done with mortar or grout. (A quicksetting and non-shrinking material is preferred.) 6. When waterproofing block walls, be sure to find out whether any or all the cores of the block foundation are to be filled with concrete. If any cores are to be filled, they must be filled with concrete and allowed to dry BEFORE the wall is waterproofed with the TUFF-N-DRI Waterproofing System. 7. For poured concrete or block walls, repair and/or parge any cracks, honeycombs or large voids in the wall or footing with grout. (Non-shrinking grout is preferred, i.e., Thoroseal Waterproofing or 50/50 mix Waterplug and cement.) 8. TUFF-N-DRI may be applied to damp or green concrete. However, the product must not be applied over standing water, or a water film, or ice or snow. 9. Before waterproofing a monolithic slab/footing foundation (where the floor slab and footing are all a single slab), call your TUFF-N-DRI Technical Representative at 1-800-876-5624. 10. Consult TUFF-N-DRI's "Builder's Guide to Ensuring a Dry Basement" for the best ways to waterproof lintels (long masonry blocks that provide support over the ditch for attachments to the foundation walls). If the lintel is already attached to the foundation, check around, beneath and between (if 2 lintel blocks are used) to make sure all gaps in the mortar work are filled. Finally, apply TUFF-N-DRI Waterproofing to both sides of the lintel and walls on top of the lintel to grade and extend this waterproofing one block beyond the end of the lintel. Do not put any WARM-N-DRI board on this area of waterproofing.

Page 3 11. The concrete foundation must be of such strength and design to ensure structural integrity. Foundation walls must be properly cured according to local building code regulations. If these are not available, consult the National Concrete Masonry Association for specifications or the Concrete Foundation Association. TUFF-N-DRI APPLICATION 1. TUFF-N-DRI can be applied to surfaces down to 20 F. Material temperature at application must be between 110 F and 160 F. Do not exceed 175 F. 2. To ensure proper temperature at the spray gun, insulate the lines and the pump housing of the spray apparatus. When spraying below 50 F ambient temperature, it is highly recommended to have your equipment and material enclosed in a heated compartment. 3. Spray TUFF-N-DRI in a pressure range between 2300 and 2800 pounds per square inch (psi). For best results, use a.035" spray tip. Do not use any tip larger than.039". 4. The membrane should be applied to a minimum thickness of 60 mils wet. The product will cure to a dry film thickness of 40 mils. Use a wet film mil gauge to ensure proper application thickness. For poured concrete walls, a maximum coverage rate of 25 square feet per gallon (sf/gal) will yield the desired wet mil thickness at application. The maximum coverage rate on block walls should be 20 sf/gal. Coverage rates may be lower depending on the porosity of the block or poured concrete walls. 5. Careful attention must be taken during the application process to ensure a consistent, homogeneous membrane. Extra coating should be applied to voids or honeycombed areas, changes in plane including joints between footing and wall, joints between blocks, tie holes, form joints, cold seams and other rough areas. For best results, apply TUFF-N-DRI using a two-coat technique. Spray the first tack coat horizontally along the entire length of the wall. Spray the second coverage coat vertically to the required wet mil thickness. This technique will help to optimize the coverage rate and ensure a uniform mil thickness. 6. Inspect the sprayed wall thoroughly for pin holes, blisters, or other voids in the membrane. If any are detected, lightly re-spray until a monolithic coating is achieved. 7. After application, applicator must verify that: a. Adequate foundation drainage system is installed (See "Drainage Requirements") b. All Penetrations (water, sewer, etc.) have been sealed. c. Backfill does not exceed the level of the waterproofing system. d. Grade slopes away from the foundation. 8. Applicator may pass the responsibilities in number 7 on to the builder or general contractor. If the applicator does pass these responsibilities on, be sure the builder or general contractor is aware of these responsibilities. 9. To waterproof penetrations, the voids around the penetration must first be filled with non-shrinking grout then the penetration area and approximately one foot of pipe must be sealed with an elastomeric membrane.

Page 4 WARM-N-DRI INSTALLATION 1. Applying the board at the correct time is essential to ensure good adhesion to the TUFF-N-DRI. The board must be set as the membrane begins to cure. This will vary, depending on ambient temperature and humidity levels. A signal that the membrane is beginning to cure is when it changes from brown to black in color. At 70 F ambient temperature, this should take 2 to 7 minutes. As the temperature drops, the curing process will take longer. On walls exposed to full sunlight, the curing process will be much faster than on shaded walls. 2. To install the board, place the bottom of the board on the footer at the cove and press firmly. Slowly work your way up to the top of the board carefully pressing the board onto the membrane. Take special care not to slide the board. The board may appear to be loose, but as the membrane cures, it will draw the board in resulting in excellent adhesion between the board and the membrane. If the board falls off, check the integrity of the membrane and re-spray to 60 mils wet if needed. It may be necessary to spray a mist of TUFF-N-DRI on the wall to increase adhesion. 3. Place the board around the foundation in the same direction as the membrane was applied. All boards should be checked before leaving the job site. When the WARM-N-DRI Board is applied, the foundation can be backfilled in 16 to 24 hours. 4. When installing 4' x 4' boards, install the bottom board first then immediately place the top board. Proceed in this fashion of placing bottom board then top board. This prevents the TUFF-N-DRI membrane from running down and onto the top edge of the bottom board. 5. It may be difficult to achieve the desired adhesion characteristics when applying the thicker boards (i.e., 1 3/16" and 2 3/8"). Adhesives or mechanical fasteners can be considered. Apply the adhesive using a caulking gun to the edges of the back of the board. Consult your TUFF-N-DRI Technical Representative for availability and detailed application instruction on these products. 6. Mechanical fasteners may be used as needed. They are highly recommended when large areas of WARM-N- DRI are left exposed. 7. Another technique to enhance board adhesion is to wet the back side of the WARM-N-DRI board with a calcium chloride solution before installing the board to the TUFF-N-DRI membrane. The solution is simply prepared by mixing up a ratio of approximately 2-3 pounds of granular calcium chloride per 1 gallon of water. (For example: In a 5 gallon bucket, put in 10-15 pounds of calcium chloride and add 5 gallons of water. Stir or mix solution until granular solid is dissolved. Note: Be aware that dissolving the calcium chloride can heat the water significantly, up to 150 F.) Wet the board with the solution using a watering can or weed sprayer or similar device. It is not necessary to drench the board; simply dampen it. Install the wet side of the board to the TUFF-N-DRI membrane. Contact your TUFF-N-DRI Technical Representative, if necessary, for more instruction on this procedure. DRAINAGE REQUIREMENTS In order to qualify for the 30-Year Limited Warranty, a proper drainage system must be installed. TUFF-N-DRI requires a positive drainage system consistent with local, good construction practices. An exterior drainage system consisting of a 3" minimum, perforated drainage pipe, and gravel over the pipe, on to the footer and at least 10" up the face of the vertical wall is recommended. The drain tile must channel the water to either an operating sump pump or to daylight. If an interior drainage system is used, special measures to ensure proper drainage must be taken. Weep holes in the footing must be created to allow water from the WARM-N-DRI on the exterior foundation wall to flow to the interior drain tile. There should be weep holes every 8 feet and gravel installed as detailed previously. PVC pipe through the footer is acceptable in place of weep holes. The grade should always slope away from the structure.

Page 5 EQUIPMENT RECOMMENDATIONS Emulsion-based products require some special handling in order to optimize their application. Below are listed some equipment recommendations and a "trouble shooting" section should any spray problems arise. EQUIPMENT SET-UP 1. A pump capable of spraying 3000 psi is required. The GRACO #733 or GRACO Hydromax 350 pumps work well with this material. (Contact TUFF-N-DRI for assistance with equipment purchases.) 2. The diameter and length of all the interlinking lines is critical to ensuring a good flow of material to and from the pump. The larger the diameter and shorter the length of all interlinking lines decreases the flow resistance and optimizes product transfer. The siphon line from the drum to the heat exchanger should not be longer than 4 feet if possible, and a 2" diameter is recommended. The line from the heat exchanger to the pump should have a minimum inside diameter of 1 1/4" and be no longer than 3 feet. All connections should be as tight as possible so as to not introduce air into the lines. 3. Make sure the lower piston ball check is on the high setting. Consult your equipment manual for adjustment procedures. 4. A single-pass heat exchanger connected to an engine's coolant system is the best way to heat the TUFF-N-DRI to the preferred application temperature of 110 to 130 F. Many different sizes of heat exchangers have been used with good success. One in particular that produces good heat transfer is the API Basco Model 500. Consult your TUFF-N-DRI Territory Manager for availability. 5. The spray hose must be a "high pressure" type, capable of taking 4000 psi. A maximum of 1/2" diameter line is accepted for the first 100 feet of hose. It can then be reduced to 3/8" for the next 100 feet. No more than 200 feet of hose is recommended. 6. Many different airless spray guns can be used to spray TUFF-N-DRI. The most widely used brand is Graco. The Graco Silver Plus gun is the most popular for polymer-modified asphalt emulsion type spraying. You may also use the Graco Heavy-Duty Texture Gun or the Graco Flex Plus Gun. The Graco Contractor II line of guns can also be used to spray TUFF-N-DRI if the handle filters are removed. TROUBLE SHOOTING If you lose pressure while spraying: 1. Check all line connections for air leaks. 2. Reduce the amount of engine coolant going through the heat exchanger, but watch to be sure the TUFF-N-DRI material temperature does not drop below 110 F. 3. Flush system with Toluene, diesel fuel, or mineral spirits. 4. Spray product to test pressure.

Page 6 5. If pressure can not be maintained, take apart the lower foot valve and inspect the piston ball check. If the piston ball check moves freely and is seating correctly, take out the piston rod and inspect the packings. Replace the packings if they are damaged or worn excessively. 6. Reassemble the equipment and spray product to see if a constant pressure can be maintained. 7. If pressure still can't be maintained, open up the heat exchanger and check for blockage. If blocked, clean thoroughly and reassemble. 8. If these procedures do not work, consult your GRACO Service Representative or TUFF-N-DRI Technical Representative. OPERATIONAL MAINTENANCE Consult your GRACO Service Manual for maintenance scheduling or replacing of vital parts (i.e. piston packings, ball check, etc.). 1. Many different solvents can be used to flush the system but mineral spirits are recommended because they act as a lubricant for the leather packings in the pump. 2. DO NOT use water to flush TUFF-N-DRI out of the lines. This will shock the emulsion and cause it to "break" in the lines. 3. Mineral spirits, toluene and most other solvents are flammable and/or hazardous. Be sure to check with the suppliers of these solvents for the correct safety and handling procedures and follow the suppliers recommendations when using clean up solvents. TRANSPORTATION TUFF-N-DRI is classified as a non-hazardous emulsion and does not require placarding. If you have any further questions please call us at (800) DRY-BSMT Tremco Barrier Solutions 6402 East Main Street Reynoldsburg, OH 43068 Rev. 06/05 Copyright 2005, Tremco Barrier Solutions. TUFF-N-DRI is a registered trademark of Tremco Barrier Solutions. WARM-N-DRI is a registered trademark of Owens Corning TBS-0045