Innovative E-Government Best Practices in Early Warning System for Disaster Risk Management: Bangladesh Experience

Similar documents
Climate Change and Bangladesh: Issues

Disaster Risk Reduction through people centered National Multi-hazard Early Warning System in the context of Maldives

INSTALLATION OF AN AUTOMATED EARLY WARNING SYSTEM FOR ANNOTTO BAY

The IPCC Special Report on Managing the Risks of Extreme Events and Disasters to Advance Climate Change Adaptation

Domestic Policy Framework on Adaptation to Climate Change in Water Resources: Case Study for India. Working Together to Respond to Climate Change

Mobile Services for Flood Early Warning in Bangladesh: Final Report

SECTOR ASSESSMENT (SUMMARY): CLIMATE CHANGE. 1. Sector Performance, Problems, and Opportunities

Finnish Meteorological Institute s Services for Insurance Sector

CELP PROFILE Barbados CARIBBEAN EMERGENCY LEGISLATION PROJECT (CELP)

Africa Adaptation Programme

How To Manage A Flood In Mozambique

"Drinking Water Security for Poor and Women in Five Climate

How To Understand And Understand The Flood Risk Of Hoang Long River In Phuon Vietnam


Application of Google Earth for flood disaster monitoring in 3D-GIS

National Dam Safety Program Technical Seminar #22. When is Flood Inundation Mapping Not Applicable for Forecasting

Head 168 HONG KONG OBSERVATORY

How To Develop An Early Warning System

Utilizing satellite-based information for disaster risk assessment- why and how?

Flood. Glossary of Terms

Jessica Blunden, Ph.D., Scientist, ERT Inc., Climate Monitoring Branch, NOAA s National Climatic Data Center

District Disaster Risk Management Planning

CRS 610 Ventura County Flood Warning System Website

DISASTER RISK DETECTION AND MANAGEMENT COURSES SETUP SCENARIO AT MAKERERE UNIVERSITY. Makerere University

Improved Warnings for Natural Hazards: A Prototype System for Southern California

Communications Systems Used in the USA TARNS. Chris Hill, Meteorologist in Charge (ret) National Weather Service Seattle, Washington, USA

Track-Risk-Impact-Policy (TRIP) Modeling for the Agricultural Sector

Application of Space Technology for Disaster monitoring and assessment current state in Vietnam

Effects Of Rainfall And Maximum Temperature On Aman Rice Production Of Bangladesh: A Case Study For Last Decade

Tools from the US EPA s Climate Ready Water Utilities Initiative (CRWU) EPA Region 3 Conference Extreme Weather Events: Adapt, Mitigate, and Survive

Climate Change Activities in Mauritius

Real-time Ocean Forecasting Needs at NCEP National Weather Service

sample The IPCC Special Report on Managing the Risks of Extreme Events and Disasters to Advance Climate Change Adaptation

Emergency Management is responsible for coordinating the City of Houston s preparation for and response to emergency situations.

THE STRATEGIC PLAN OF THE HYDROMETEOROLOGICAL PREDICTION CENTER

Graduate School of Disaster Prevention Kangwon National University.

A. Flood Management in Nevada

Basic system of measures for flood damage mitigation in Japan. Preparedness for major floods

INFORMATION TECHNOLOGY FOR DISASTER MANAGEMENT Tulsi Vyas Aneri Desai

Standard Operating Procedures for Flood Preparation and Response

Experience on District Level Agro Met Services LS Rathore

Flood Emergency Response Planning: How to Protect Your Business from a Natural Disaster RIC005

Preparation. Preparation. Step 2 Prepare an emergency kit. Step 1 Prepare your emergency plan. Step 4 Tune into warnings

Water Resources Development and Management in India - An Overview

1. Incredible India. Shade the map on the next page, to show India s relief. The correct shading is shown on the final page! Incredible India India

Preliminary advances in Climate Risk Management in China Meteorological Administration

Weather, Climate and Water Services for the Least Developed Countries

Order No. 07/2013/L-CTN of June 28, 2013, on the promulgation of law. Law on Natural Disaster Prevention and Control

Coastal Erosion Risk Mitigation Strategies applied in a Small Island Developing State: The Barbados Model

New challenges of water resources management: Title the future role of CHy

Flood risk assessment through a detailed 1D/2D coupled model

Catchment and Lake Research

Probabilistic Risk Assessment Studies in Yemen

Elbe flood in 2002 and 2006 in terms of emergency management

WELCOMES ALL THE ATTENDEES WATER UTILISATION, MEASUREMENT AND METHODOLOGIES

Armenian State Hydrometeorological and Monitoring Service

Nowcasting: analysis and up to 6 hours forecast

Climate Change Adaptation at European Railway Infrastructure Companies

A.4 SEVERE WEATHER PLAN

Burnt River Black River and Gull River Flood Contingency Plan

CHAPTER 8 Natural Disasters

Geospatial Software Solutions for the Environment and Natural Resources

Emergency Management Service. early warning FLOOD AND FIRE ALERTS. Space

JASPERS Networking Platform

Climate Change Impacts in the Asia/Pacific Region

Real Time Flood Alert System (RTFAS) for Puerto Rico

Symposium on Climate Risk Management

Developing Capacities for Risk Management and Resilience

National Disaster Management Institute

Storms Short Study Guide

How can we defend ourselves from the hazard of Nature in the modern society?

Submission by the United States of America to the UN Framework Convention on Climate Change Communication of U.S. Adaptation Priorities May 29, 2015

AMESD/MESA & GMES and Africa

Flash Flood Guidance Systems

Survey and Mapping Activities in Vietnam *

Precipitation Monitoring Network:

Natural Disasters & Assessing Hazards and Risk. Natural Hazards and Natural Disasters

Managing Extreme Weather at Transport for London. ARCC Assembly - 12 June 2014 Helen Woolston, Transport for London Sustainability Coordinator

Natural Disaster Impact on Business and Communities in Taiwan. Dr. Chung-Sheng Lee. NCDR Chinese Taipei

Dirk Nyland - Chief Engineer BC Ministry of Transportation and Infrastructure NRCan - CCIAD Presentation 9 September 2014

Resolution XII.13. Wetlands and disaster risk reduction

2015 Global Risk Assessment. Sahar Safaie Program Officer, UNISDR Risk Knowledge Section

Flash Flood Science. Chapter 2. What Is in This Chapter? Flash Flood Processes

CONFEDERATION OF ASIA-PACIFIC CHAMBERS OF COMMERCE AND INDUSTRY (CACCI)

Monsoon Variability and Extreme Weather Events

Guideline for Stress Testing the Climate Resilience of Urban Areas

RISD Hurricane Preparedness

APPENDIX A : 1998 Survey of Proprietary Risk Assessment Systems

Building Caribbean GeoNode Platform in Support of Climate Risk Management Jacob Opadeyi, PhD

Risk and vulnerability assessment of the build environment in a dynamic changing society

Transcription:

Innovative E-Government Best Practices in Early Warning System for Disaster Risk Management: Bangladesh Experience Dilder Ahmed (Joint Secretary) Project Director ECRRP-D-1 Department of Disaster Management.

COUNTRY PROFILE Ranks globally among the most climate vulnerable nations Fifth rank in the world risk index 2012 DROUGHT - Affects about 8.3 million of land. FLASH FLOOD - Unpredictable, uncertain. FLOOD - Inundates more areas, increases river erosion, breaches embankments, damages infrastructures. SALINITY INTRUSION - Spreading intrusion from 1.5 to 2.5 Mha (2007). Projected displacement: 6-8 m by 2050 CYCLONE - Remain to be the deadliest and most destructive hazard. It has recurring events, lingering aftermath, complex recovery. AND CLIMATE CHANGE HAZARDS, EARTHQUAKES, FIRE BREAKOUT, INFRASTRUCTURE COLLAPSE ETC. BANGLADESH SHIFTED THE PARADIGM FROM RESPONSE/RELIEF-ORIENTED TO COMPREHENSIVE APPROACH AND RISK REDUCTION CULTURE SINCE MID 1980 S

WHAT IS E-GOVERNANCE It is the use of a range of modern information and communication technologies such as internet, local area networks, mobiles etc by Governments to improve effectiveness, efficiency, service delivery to the citizen. 1

WHAT IS E-GOVERNANCE E-governance is defined as the application of electronic means in The interaction between government and citizens and government and businesses, as well as in internal government operations to simplify and improve democratic, government and business aspects of Governance. The term interaction stands for the delivery of government products and services, exchange of information, communication, transactions and system integration. 2

E-Governance in Bangladesh Honorable Prime Minister herself has put great emphasis on identifying challenges in the implementation of nation-wide E-Governance and on initiating pilot projects in various sectors of the government. E Government in disaster management: (Government of Bangladesh is taking the advantage of E- Governance through the following issues): Interactive Voice Response (IVR) through mobile phone for early warning. Short Message Services (SMS) through mobile phone for early warning and preparedness. Cell Broadcasting Services (CBS) through mobile phone for early warning and preparedness. Web based on line damage and need assessment after any disaster Development of hazard and risk map through satellite and GIS Micro zonation map of the country Cyclone and flood shelter on line data base Volunteers on line data base 14

BUILDING A DIGITAL BANGLADESH Vision 2021 makes use of the Digital Bangladesh strategy to highlight the tremendous capacity of information and communication technology. The national ICT Policy 2009 has expressed its vision in terms of expansion of information and communication technology. Establishing a transparent, committed and accountable government, to ensuring the development of skilled manpower. Through the successful implementation of ICT policy vision and principles, it will be possible to build a Digital Bangladesh as promised by the government.

EARLY WARNING INSTITUTIONAL MECHANISM Hazards Cyclone, Storm, Drought, Cold and Hot wave Riverine Flood, Flash Flood Agro Forecasting Epidemic Advisory Dedicated institution according to the Government of Bangladesh Bangladesh Meteorological Department (BMD) Flood Forecasting and Warning Center (FFWC) Bangladesh Meteorological Department (BMD) Director General of Health Services

Development of warning by Bangladesh Meteorological Department for Flood, Cyclone Rainfall, Temperature, Thunderstorm and drought is based upon Electronic System

Indian Meghalaya Hill, world s wettest region Annual Rainfall: 12,000 mm = 12 meters!!

Diagnostic charts Analyzing Processes/Tools Surface Synoptic Chart- every 3 hours or more frequent Upper air pilot chart- every 6 hours Upper air constant pressure chart- every 12 hours Pressure change chart- every 3 hours and more frequent

Model Products: Analyzing Processes/Tools Global Forecasting System (GFS) Model analysis from NOAA Limited Area Model (LAM) Products NWP output from different centres (ECMWF, JMA, IMD, NCMRWF, RIMES) Track product by running STP & STEEPER Models of BMD WRF Model, NHM Model Empirical and Numerical /Dynamical Storm Surge Models (IIT-D Model) MRI (JMA) Storm Surge and Wave Model

Radar Network of BMD

Agro Meteorological Probabilistic Forecast

Development of warning by Flood Forecasting and Warning Center (FFWC)

WATER is great opportunity for Bangladesh

and also threat to living condition and development

RIVERS OF BANGLADESH Brahmaputra/Jamuna Q max. =98,000m 3 /sec Q min. =4,000 m 3 /sec WL max. =20.37m WL min. =12.95m snow melt & rain fed river starts rising in March/April & usually attains a peak in June. Another peak in July/August Ganges Q maxm. =78,000 m 3 /sec Q minm. = 700 m 3 /sec WL max. =15.19m WL min. =7.44m snow melt & rain fed river starts rising in June/July and attains the annual flood peak in late August or early September India Meghna (Lower Meghna Q maxm. =180,000 m 3 /sec Q minm. = 4,000 m 3 /sec WL max. =7.33m WL min. =1.97m primarily a rain fed river 20

Types of Flooding Monsoon floods from the major rivers Overbank spills from major rivers and their distributaries cause the most extensive damages Flash floods in the eastern and northern areas Sharp rise followed by a rapid recession Floods due to storm surge in the coastal area Generated by cyclones cause floods in coastal zones Local floods due to high intensity rainfalls High rainfall of long duration

Flood (or water) Management Approaches Structural Flood Control, Drainage and Irrigation projects Coastal embankment Dredging/de-siltation to increase conveyance Riverbank Protection Accelerated Land Reclamation Salinity protection Surface water retention (including rain water) Non-structural Flood and drought forecasting and Warning Erosion Prediction (planned) Hydrological data collection and survey Capacity development

Flood Forecasting & Warning Activities Data Collection Preparation Output Dissemination Data collection and feed to computer MANUAL Field Observation Water Level Rainfall Water Level from 85 stations 85x5=425 Rainfall 56 stations, daily basis FFWC Office Other Sources BMD Satellite image Web-site Indian data Analysis & Quality check Feed to computer Error check Model Run Result consistency check Flood Bulletin Preparation Rainfall Surface Map Flood Inundation Map Dissemination Through Hard copy E-mail Fax Phone Web-site SMS IVR-mobile Distributed to Policy makers Disaster managers (GO & NGO) Media Others 06:00 to 09:00 hrs 08:30 to 10:30 hrs 10:30 to 11:00 hrs 11:00 to 12:00 hrs 11:30 to --------

Warning dissemination

Forecaster How to Issue Warnings Charts Satellite Data RADAR Warnings NWP Products Other Information

Warning dissemination mechanisms

Warning Products for Cyclone

Dissemination Hard Copy Limited, policy makers and top officials e-mail over 600 address in the folder, in different groups, Ministries, BWDB, Disaster management agencies, NGO, Research Organ, Development partners, Media Fax Limited, policy makers and top officials Phone Continuous response Web-site www.ffwc.gov.bd SMS Very limited IVR Latest, started this month (July-2011), call 10941 Bangla Voice Message (1 minute), charge applicable

Curtsey: Md. Bazlur Rashid, BMD

Flood Forecasting & Warning Step by Step 2012 2009 Strengthening of FFWC with CDMP- II support Expansion of area coverage 54 points on 29 rivers 38 points on 21 rivers 3-days 5-days 1998 & 2007 two big FLOODS 1996 1992 Super Model Model based Flood Forecast 1987-88 two big FLOODS 30 points 16 points 1-day 2-days 1972 FFWC established Monitoring & few hours forecast 0 1 2 3 4 5 Lead time in days

EARLY WARNING DISSEMINATION AND USE OF ELECTRONICALLY AND DIGITAL SYSTEM

Community based signaling CDMP I

Mobile Technology Used in DRR Cell Broadcasting System DMIC Activity Cyclone Test-1 land fall Chittagong-Teknaf coast. DMCs in these area are instructed to send SoS within 24 hours and D form within 72 hours DIAL 10941 FROM MOBILE except citycel & Warid Searching Disaster Information 1 2 3 WEATHER SEA PORT FLOOD WARNING HF/VHF BMD FFWC 64 DISTRICTS AND 310 UPAZILLA 13 GOVERNMENT AGENCIES PRESS BUTTON Volunteers NGO INGO Community

Products/Services A Cell Broadcasting (CB) Piloting of early warning dissemination in flood prone Sirajganj and cyclone prone Cox s Bazar through Cell Broadcasting (CB) has been Successful. B IVR (Interactive Voice Response) Initiative have been taken to weather, flood forecasting and early warning for river port through IVR. The Service is available through all mobile subscribers. IVR Hot Line - 10941 C SMS SMS service to disseminate disaster early warning during and after disaster instruction will be circulated to officials of relevant disaster management.

Tools Used for mapping GIS Setup Software ArcGIS/ ENVI Databases Different layers including administrative boundaries, River, Sea, School, shelter etc. Administrative District Map Upazila/Union/ Natural (River) Hazard Map Flood, Cyclone, Salinity, Response Map

Community are in action after receive the early warning

Recommendation for the future by BMD 1. Procurement for Hi performance Computer (PC Cluster) with necessary software for Weather Research Forecast (WRF) model and factory training under processing. 2. Advance training on Weather Research and Forecasting (WRF) for senior Meteorological Personnel 3. Develop Methodology and converting forecast products to understandable bi-lingual text. 4. Meteorological & Skill development training 5. Final Workshop 6. Publication 7. Final Report writing

Way forward Automation of Data Collection & Processing Increasing Lead Time (may be seasonal scale) Expansion of Flood Forecasting in the coastal zone of Bangladesh Dissemination improvement at community level Improvement of Flood Map Generation(updated DEM) Capacity development of FFWC (persons, skill and equipment) Cooperation, knowledge & skill sharing at REGIONAL level

Conclusion Our Flood forecasting computation based on the rivers with the boundary If this could be extended further, FF Lead time will increase, We may try for basin wise FF, which will certainly beneficial for the people, the agencies dealing with flood

THANKS ALL