Factors Affecting Progress Payments in Oil and Gas Industry Projects: Progress Measurement Method and Project Cash Flow

Size: px
Start display at page:

Download "Factors Affecting Progress Payments in Oil and Gas Industry Projects: Progress Measurement Method and Project Cash Flow"

Transcription

1 King Fahd University of Petroleum & Minerals College of Environmental Design Construction Engineering and Management Department MASTER OF ENGINEERING (CEM 600) Factors Affecting Progress Payments in Oil and Gas Industry Projects: Progress Measurement Method and Project Cash Flow For Dr. Mohammed Al-Khalil By Majed A. Nouraddin ID No Date: May 20, 2004

2 ACKNOWLEDGEMENT I would like to thank everyone who provide information and assistance in the preparation of this report. I would like to thank my supervisor, Dr. Mohammed Al-Khalil for his continuous help and guidance. I would like also to thank all CEM Professors who taught me during the Master Degree. My great thanks and appreciation to my Parents for their continuous support and encouragement to take my graduate studies, their prayers provided a great support. My everlasting thanks and great appreciation to my wife and son (Turki) who supported and sacrificed during my study. Finally, I would like to thank all my friends and colleagues who supported and encouraged me during my study.

3 TABLE OF CONTENTS SECTIONS LIST OF TABLES LIST OF FIGURES ABSTRACT PAGE NOS. v vi vii CHAPTER 1 INTRODUCTION 1.1 Significance of the Report Progress Measurement Project Cash Flow Statement of the Problem Progress Measurement Project Cash Flow Report Structure Aims and Objectives of Study Limitations of Study 7 PART I LITERATURE REVIEW CHAPTER 2 LITERATURE REVIEW ON PROGRESS MEASUREMENT 2.1 Introduction Linking Progress Payments to Contractor Performance Schedule of Values Resources Loaded CPM Network Measuring Work Progress For each Activity and Task Unit Completed Method Incremental Milestones Method Start/ Finish Method Opinion Method Cost Ratio Method Weighted or Equivalent Units Method For Overall Project Accuracy in Progress Measurement Earned Value Analysis and Lump Sum Contract Summary 19 -i-

4 TABLE OF CONTENTS SECTIONS PAGE NOS. CHAPTER 3 LITERATURE REVIEW ON PROJECT CASH FLOW 3.1 Introduction Major Causes of Business Failure in Construction Industry Insufficient Working Capital Financial Overextension Inadequate Accounting Poor Estimates Poor Management Control Inadequate Investigation of Owner s Resources Personnel Weakness Personnel Traits Involved in Outside Ventures Industry Hazards Types of Cash Flow Summary Cash Flow Detailed Cash Flow Cash Flow from Owner s Perspective Reports and Analysis of Project Cash Flow Summary 29 PART II RESEARCH METHODOLOGY, DATA ANALYSIS, CONCLUSIONS AND RECOMMENDATIONS CHAPTER 4 RESEARCH METHODOLOGY 4.1 Introduction Data Collection Project Overview Lump Sum Turnkey Contract (LSTK) Required Data Research Methodology Progress Measurement Method Project Cash Flow 35 -ii-

5 TABLE OF CONTENTS SECTIONS PAGE NOS. 4.4 Statistical Inferences about Two Populations (Matched Samples) Method Procedure Using MS Excel to conduct a Hypothesis 37 Test about (µ1 µ2): Matched Samples CHAPTER 5 DATA ANALYSIS 5.1 Introduction Progress Measurement Progress Measurement Method specified by Owner Progress Measurement Method used by Contractor Comparison of the Progress Measurement Methods 41 Results Improving Milestones () Method Provide more breakdowns for activities Change the unit of measurement Provide more events/milestones Application of the Improved Milestones () Method Civil Work Mechanical Work Piping Work Electrical Work Instrument Work Insulation and Painting Works Pre-commissioning Work Compression between the Improved Milestones () Method and the Original Milestones () Method Improved Milestones () Method Data Calculation Comparison of the Progress Measurement Methods Results 63 -iii-

6 TABLE OF CONTENTS SECTIONS PAGE NOS. 5.3 Project Cash Flow Method(s)/Technique(s) to Control Project Cash Flow Breakdown of Project Cost Progress Payment Schedule Payment Terms and Conditions Develop Project Cash Flow by Using S-Curve Method (Case Study) Data Required for Projection of Project Cash Flow Projection of Project Cash Flow The Projected Cash Flow against the Actual Cash Flow Statistical Analysis of the Result 79 CHAPTER 6 CONCLUSION 6.1 Introduction Main Findings Recommendations 84 REFERENCES 86 APPENDICES APPENDIX I : Construction Progress Assessment Increments APPENDIX II : The t Test for Paired Observation APPENDIX III : Disciplines Weight Factors for Construction Work APPENDIX IV : Modified Construction Progress Assessment Increments APPENDIX V : Progress Calculation Sheets APPENDIX VI : Project Cash Flow Statistical Data Analysis -iv-

7 LIST OF TABLES PAGE NOS. Table 2.1 : Incremental Milestones Method 12 Table 5.1 : Cumulative progress figures percentage 62 (%) for 12 Weeks Table 5.2 : Total Project Cost break-down 64 -v-

8 LIST OF FIGURES PAGE NOS. Figure 1.1 : Report Structure 6 Figure 5.1 : Project Work Breakdown Structure (WBS) 39 Figure 5.2 : Milestones () Method Vs Bill of Quantity 45 Method for Civil Work Figure 5.3 : Milestones () Method Vs Bill of Quantity 51 Method for Piping Work Figure 5.4 : Milestones () Method Vs Bill of Quantity 54 Method for Electrical Work Figure 5.5 : Milestones () Method Vs Bill of Quantity 56 Method for Instrument Work Figure 5.6 : The Cumulative Progress Payment Earned 64 for Civil Work Figure 5.7 : Difference of the Cumulative Progress Payment 65 Figure 5.8 : Progress Payment Schedule 73 Figure 5.9 : Milestones Payment Schedule 74 Figure 5.10 : Projected Payment Schedule 75 Figure 5.11 : Project Cash Flow for each Work Category 76 Figure 5.12 : Overall Project Cash Flow 77 Figure 5.13 : Projected Cash Flow vs. Actual Cash Flow 78 for Overall Project -vi-

9 ABSTRACT NAME OF THE STUDENT : MAJED A. NOURADDIN TITLE OF THE STUDY : FACTORS AFFECTING PROGRESS PAYMENTS IN OIL AND GAS INDUSTRY PROJECTS: PROGRESS MEASUREMENT METHOD AND PROJECT CASH FLOW FIELD OF THE STUDY : CONSTRUCTION ENGINEERING AND MANAGEMENT: PROGRESS PAYMENTS, PROGRESS MEASUREMENT METHOD AND PROJECT CASH FLOW DATE OF DEGREE : JANUARY 21, 2004 Payments to contractor are one of the most important factors necessary for success of any project. It is essential for project execution and completion. There are two main factors affecting progress payments in Oil and Gas industry projects i.e. Progress Measurement Method and Project Cash Flow. Progress payments are normally linked with contractor performance. Therefore, progress measurement method used to calculate work accomplished has large impact on contractor monthly progress payments. Project cash flow plays a vital role in paying the amount of progress payment determined by the progress measurement method. Unavailability of fund will delay/stop the progress payments to contractor. This research will discuss the affect of Progress Measurement Method and Project Cash Flow on Progress Payment. Also, it will improve the accuracy of milestones () method to ensure that it will provide an acceptable level of accuracy for both owner and contractor so it can be used as substitute for BOQ Method. Finally, the research will highlight the method(s)/technique(s) owner can use for better forecast and control of the project cash flow. -vii-

10 CHAPTER 1 INTRODUCTION

11 Chapter 1 Introduction Chapter 1 INTRODUCTION 1.1 SIGNIFICANCE OF THE Payments to contractor are one of the most important factors necessary for success of any project. It is essential for project execution and completion. Contracts normally provide that partial payments of the contract amount shall be made to contractor for work accomplished to date. This is known as Progress Payments (Hamilton, 2001). There are two main factors affecting progress payments in Oil and Gas industry projects i.e. progress measurement method and project cash flow. Progress payments are normally linked with contractor performance. Therefore, progress measurement method used to calculate work accomplished has large impact on determining the amount of progress payments that to be paid to contractor (Clough and Sears, 1994). Project cash flow plays a vital role in paying the amount of progress payment determined by the progress measurement method. Unavailability of fund will delay/stop the progress payments to contractor (William, 1977). Page 1 of 89

12 Chapter 1 Introduction In summary, project measurement method determines the amount of progress payment and project cash flow ensures that progress payment is paid on time Progress Measurement Owner prefers to use a progress measurement method where contractor claimed progress can be easily verified and checked at work site. Milestones () method supports such preference as progress percentage of any work can be claimed achieved only when specified milestone/event is 100% completed. However, contractor prefers to use a progress measurement method that allows him to report all works done at site. Bill of Quantities (BOQ) method supports such preference as contractor can claim progress percentage of any work done at site even though milestone/event is not 100% completed. BOQ method is very difficult to check and consumes a lot of time to verify. Also, a certain degree of subjectivity and personal judgment are involved in (Clough and Sears, 1994). This research will compare milestones () method and BOQ method and then, will improve the milestones () method to ensure an acceptable level of accuracy for both owner and contractor. Page 2 of 89

13 Chapter 1 Introduction Project Cash Flow A project cash flow is the forecasting of capital expenditure during the life of a project. Project cash flow play a vital role in the owner s financial planning, which will allow owner to schedule for the injection of funds into the project (William, 1977). Owner must wait long time from starting of project until completion before any return on investment can begin. Owner concerns in project cash flow are different than contractor. Owner must be assured that sufficient access to capital is available and remains open all times in order to keep work efforts flowing efficiently and also, to take advantage of opportunities to accelerate the work if it will reduce the overall project cost. However, contractor concerns with the overall cost of the performance of that portion of the overall project which contractor has contracted to carry out (Sol and Litchfield, 1980). The research will illustrates some of techniques owner used to control project cash flow and then, project cash flow will be forecasted by using S- Curve method. The result will be compared with the actual project cash flow. 1.2 STATEMENT OF THE PROBLEM Progress Measurement Owner wouldn t like to be in a position where contractor be overpaid for the actual work performed, as first, it cancels the effect of retention, if any, and second, contractor will get unearned profit as a result of violating the contract. Page 3 of 89

14 Chapter 1 Introduction Overpayment may occurred when contractor claim work as completed in excess of the amount of work actually done (Fisk, 1997). In the other hand, contractor wouldn t like to be in a position where he will be underpaid for the actual work performed. This will result in shortage of cash flow which may interrupt the project execution. Underpayment occurred because of the following (Fisk, 1997):- i. Slow payment due to lack of funds arrangement by owner. ii. Owner may delay payment to force contractor into expediting the work. iii. Slow processing of contract change orders. Owner wants to use milestones () method to prevent overpayment as contractor will be paid only for the amount of work 100% completed at site. However, contractor wants to get paid for all works done at site, therefore contractor prefers to use BOQ method Project Cash Flow Owner wouldn t like to be in a position where contractor is entitle for progress payment(s) and owner can not fulfill his contractual obligation. Failure of controlling the project cash flow will result in partially completed project and no money which may lead to considerable loses for both owner and contractor (William, 1977). Page 4 of 89

15 Chapter 1 Introduction Therefore, owner needs to use method(s)/technique(s) that will reinforce his ability to control and forecast the project cash flow. 1.3 STRUCTURE Chapter one is an introduction for the report, which underline the purpose of the report. It includes the significance of the report, the statement of problem, report structure, aims and objectives of study, and limitations of study. Part one will be the literature review of factors affecting progress payments to contractor in general, and progress measurement and project cash flow in particular. Part one consists of chapters two and three. Chapter two provides background and literature review on the purpose of progress measurement method and its affect on progress payment. Chapter three provides background and literature review on the purpose of project cash flow and its affect on progress payments. Part two of this report concentrates on the research methodology, techniques used for the research, data processing, analysis of the information gathered and conclusion of the research. Part two consists of chapters four, five and six. Chapter four discusses the technique used for the research and data processing. Chapter five is the application and analysis of the report methodology. It illustrates the data analysis and the study finding. Chapter six concludes the report and draw out the recommendations. Page 5 of 89

16 Chapter 1 Introduction Finally at the end, the bibliography used for the report and appendices will be added. Figure 1.1 provides an overview of the report structure. Figure 1.1: Report Structure Page 6 of 89

17 Chapter 1 Introduction 1.4 AIMS AND OBJECTIVES OF STUDY The major aims and objectives of this report can be summarized in the following points: 1. Discuss the affect of Progress Measurement Method and Project Cash Flow on Progress Payment. 2. Provide solutions that help in determining the accurate amount of progress payment and ensuring on time payment to contractor. 3. Improve the accuracy of milestones () method to ensure that it will provide an acceptable level of accuracy for both owner and contractor and it can be used as substitute for BOQ Method. 4. Develop and discuss the method(s)/technique(s) owner can use for better forecast and control of the project cash flow. 1.5 LIMITATIONS OF STUDY The scope of this study is limited to the fallowing: 1. Oil and gas industry as what is applicable for this industry may not be applicable for other industries. 2. Lump Sum Turnkey type of contract. Level of accuracy required varies from Unit Price to Lump Sum contracts. Unit Page 7 of 89

18 Chapter 1 Introduction Price type of contract required a higher level of accuracy as contract price is not fixed. 3. Medium size project that total cost is between million US dollars. A large size project need more control scheme and more breakdowns to achieve similar result and vice versa. 4. Progress measurement method that will be used to measure project progress is usually specified by owner in the contract document. Therefore, this study may be considered as from owner perspective. 5. Only progress measurement for construction work will be discussed in this report. Engineering and Procurement progress project are almost similar for both milestones () and BOQ method. 6. The research will be focused only on two factors affecting progress payments to contractor i.e. progress measurement method and project cash flow. Page 8 of 89

19 PART I LITERATURE REVIEW

20 CHAPTER 2 LITERATURE REVIEW ON PROGRESS MEASUREMENT

21 Chapter 2 Literature Review on Progress Measurement Chapter 2 LITERATURE REVIEW ON PROGRESS MEASUREMENT METHOD 2.1 INTRODUCTION Owner is concerned with getting the work completed as per specification, on or ahead of schedule and on or under budget. Whether or not these goals are achieved, the daily transactions of the contract must be supported throughout the project life with auditable documents. Contractor wants to be paid regularly and on time. The regularity and timeliness of contractor payments will be depend on the systems and controls adopted by the project. (Whitticks, 1994) There is no owner going to pay the full amount of an invoice on presentation and without verification. There must be an agreed method of calculating and checking that the work completed or the milestone achieved. It will be unreasonable for contractor to invoice every day or every time a cubic meter of concrete is poured or a length of pipe is laid. Progress payment will be made against milestones achieved, progress per month or on measured progress. (Whitticks, 1994) Page 9 of 89

22 Chapter 2 Literature Review on Progress Measurement 2.2 LINKING PROGRESS PAYMENTS TO CONTRACTOR PERFORMANCE A dispute may occur between owner and contractor about the appropriate payment amount if there is no agreement on how such amount will be determine. Therefore, progress payments shall be directly tied to the physical progress of the work accomplished on the project. (Fleming and Koppelman, 2002) (Fleming and Koppelman, 1995) Before starting of work, contractor must present a measurable performance plan against which their performance may be measured to support payment. Contractor submits to owner a request for payment every month where he will certify the money have been expended and also include supporting documentation to demonstrate the physical work has been achieved in that month. The proposed work plan can be developed by using one of the following methods (Fleming and Koppelman, 2002) (Fleming and Koppelman, 1995): Schedule of Values Schedule of values approach is the most common approach used in construction. It is a cost loaded breakout of the contract cost which prepared by contractor and verified by owner. Once agreement is reached, the proposed schedule of values is used throughout the project life to calculate physical performance. The schedule of values will be changed only to incorporate the authorized changes by owner. Schedule of values has its flaws and potential risks to owner as it can be frontloaded in favor of contractor. Frontloading is Page 10 of 89

23 Chapter 2 Literature Review on Progress Measurement overestimating the values of the early work tasks and offset the values of the later tasks, which are correspondingly understated. Frontloading happens accidentally, inadvertently or intentionally. Such potential risk can be offset by 10% retention value or by delays in making payments. However, there is no better than risk mitigation by assuring that costs are weighted properly before approving the schedule of values Resources Loaded CPM Network This approach is a more recent development in the construction industry. It requires contractor to develop a performance plan that takes a form of critical path method (CPM) schedule and contains time-phased resources. This approach provides the following benefits to owner:- i. It demonstrates during contractor selection process that contactor is aware of project scope of work and he has a plan to demonstrate this fact. ii. It demonstrates that contactor is aware and has a plan for all the required resources. iii. Such plans can be used as a project baseline to monitor contractor performance and in approving all payments to contractor. Page 11 of 89

24 Chapter 2 Literature Review on Progress Measurement 2.3 MEASURING WORK PROGRESS For each Activity and Task Project is usually divided into several phases. Each phase contain one or more deliverables. Number of activities and tasks need to be done to provide the deliverables for the definition, implementation and completion of each phase. The progress of activities and tasks can be measured using different methods. These methods are: i. Unit Completed Method ii. iii. iv. Incremental Milestones Method Start/ Finish Method Opinion Method v. Cost Ratio Method vi. Weighted or Equivalent Units Method Unit Completed Method Unit Completed Method is applicable to activities and tasks that are repeatable. The units of measurement that can be used in this method include linear, square area, cubic etc. The work to be measured may contain single or multiple tasks. Examples of using this method for single task could be pipe lying. If 40,000 linear meters of pipe to be laid and 4,000 linear meters of pipe have been laid, the percent complete is founded by dividing 4,000 linear meters by 40,000 linear meters to show 10 percent complete. Examples for multiple Page 12 of 89

25 Chapter 2 Literature Review on Progress Measurement tasks work could be placing and finishing a reinforced concrete. If 100 cubic meters of concrete to be poured and 40 cubic meters of concrete have been poured, the percent complete is founded by dividing 40 cubic meters by 100 cubic meters to show 40 percent complete. (AACE, 2003) (AACE, 2002) (Hamilton, 2001) Incremental Milestones Method Incremental Milestones Method is applicable to activities and tasks that must be handled in sequence. For example, installing a pump in an industrial plant includes the following sequential activities and tasks: Task/Activity Incremental Progress Cumulative Progress Material Receipt 5 5 Rough Setting Level and Grout Align and Couple Lubricate and Rotate Table 2.1: Incremental Milestones Method Completing any subtask is considered to be the achievement of a milestone and each incremental milestone completed represents a certain percentage of the total installation work. The percentage allocated to each milestone is normally based on the number of workhours estimated to do that Page 13 of 89

26 Chapter 2 Literature Review on Progress Measurement subtask in relation to the total work need to be done. (AACE, 2003) (AACE, 2002) (Hamilton, 2001) Start/ Finish Method Start/Finish Method is applicable to activities and tasks that are not readily definable into incremental milestones or those for which the effort/time required is very difficult to estimate. For such tasks, a percent complete is arbitrarily assigned to the start of a task and 100 percent is recorded when the task is completed. For very short duration, the start/finish percentages are usually 0 percent /100 percent. For short duration, a starting percentage of 50 percent is reasonable and for tasks with a longer duration, 20 to 30 percent would be probably used. (AACE, 2003) (AACE, 2002) (Hamilton, 2001) Opinion Method In this method, an expert person usually assigns a percent complete to the activity/task. This complete percentage is subjective and depends on personal judgment. The major problem with this approach is that some experts are optimists and some are pessimists. Therefore, there could be major differences of opinion in the progress reported for the same or similar task or activity. This is a subjective approach and should be rusticated to minor tasks and activities. Examples of task and activities applicable for this approach are dewatering, temporary facilities and landscaping. (AACE, 2003) (AACE, 2002) (Hamilton, 2001) Page 14 of 89

27 Chapter 2 Literature Review on Progress Measurement Cost Ratio Method Cost Ratio Method is applicable to tasks and activities that take a long period of time or continue as long as the project life. Examples for such tasks and activities are project management, quality assurance and quality control, contract administration and project control. The percentage complete at any time is founded by evaluating the actual cost or workhours expended to that time divided by the forecast cost or workhours at completion. For example, if the percent complete for project management need to be found at certain date given that 5,000 workhours are spent to date and 10,000 workhours are the total workhours forecast, then project management is 50 percent complete. (AACE, 2003) (AACE, 2002) (Hamilton, 2001) Weighted or Equivalent Units Method Weighted or Equivalent Units Method is applicable to activities and tasks that take a long period of time and composed of two or more overlapping subtasks. Each subtask measured with a different unit of work measurement. Structure steel erection is an example for which this method may be applied. The subtasks for structure steel erection could be run foundation bolts (each), shim (percent), shakeout (percent), columns (each), beams (each), cross braces (each), girts and sag rods (bay), plumb and align (percent), connection (each) and finally punch list (percent). Each subtask for structure steel erection has a different unit of measurement. To handle this, each subtask is weighted according to the estimated level of effort (usually workhours) that will be Page 15 of 89

28 Chapter 2 Literature Review on Progress Measurement dedicated to that subtask. As quantities are completed for each subtask, the quantities are converted into equivalent workhours. (AACE, 2003) (AACE, 2002) (Hamilton, 2001) For Overall Project Subsection discussed the different ways exist for measuring work progress on a single work item. The next step is to develop a method for determining overall percent complete for an entire project. The system for achieving this is called earned value. Also, the following terms can be used achieved value, accomplished value or physical quantity measurement. (AACE, 2002) When developing a control system for any project, the project must be divided into controllable parts. To control work, work breakdown structure (WBS) shall be developed. WBS is a deliverables oriented grouping of project elements that organize and define the total work scope of the project which it will be used in determining project progress. Each descending level represents an increasingly detailed definition of the project work. (AACE, 2003) (AACE, 2002) (Haugan, 2001) Each task in the project shall have its own cost/workhours budget. To calculate overall project progress, the following formula shall be used: Percent Complete = Earned workhours or cost for all tasks Budget workhours or cost for all tasks (AACE, 2002) Page 16 of 89

29 Chapter 2 Literature Review on Progress Measurement 2.4 ACCURACY IN PROGRESS MEASUREMENT The accuracy of progress measurement depends on two factors:- i. Accuracy of the data collected for the work accomplished ii. Accuracy of the total scope of work The accuracy of the data collected can be achieved if the physical quantities measured for progress are small enough that judgment factors used do not grossly affect any large quantities. Meeting this end takes time and effort in the initial setup phase of the progress measurement system. However, this is rewarded with easy updating of the system. (Toth, 1983) To accurately reflect the scope of work, the baseline must periodically be reviewed and forecast. At the initial stage of setup the progress measurement system, the man-hours from the budget would be the original baseline. (Toth, 1983) A study was done in 1989 by Andrew Smith to develop a new progress measurement method that can achieve the accuracy required in progress measurement with far less detail than the traditional progress measurement methods. He claimed that the aim of calculating project progress is only to enable the scheduler to analyze progress to find out the cause of slowdowns, so management can handle them on the right time. (Smith, 1989) His new method was based on the Law of Compensating errors. The law is defined as the statistical tendency of errors in measurement to cancel Page 17 of 89

30 Chapter 2 Literature Review on Progress Measurement each other out. He defined the accuracy of the total as two standard deviations which will include 95% of all results. He found that the factors affecting the accuracy of a total number are:- i. Number of items in the breakdown ii. Accuracy of measurement of each item iii. Number of items in the breakdown that are varying in any one progress period. 2.5 EARNED VALUE ANALYSIS AND LUMP SUM CONTRACT Under Lump Sum contract, contractor is given progress payment based on presentation of percentage complete together with the authorized budget for the completed work. This is earned value at its finest. However, earned value analysis cannot be completed with the aforesaid information as the actual cost spent by contractor is missing. Without the actual cost related to earned value achieved, the cost performance index (CPI) can not be determined. Contractor will not disclose to owner how much profit he is making on a project. Also, such information is not important to owner as his concern is to complete the project on or under the contract price. However, owner should be aware when contractor is incurring a loss as the bigger the loss the more likelihood the contractor may not complete the project. (Fleming and Koppelman, 2002) Page 18 of 89

31 Chapter 2 Literature Review on Progress Measurement 2.6 SUMMARY This chapter set out to highlight the purpose of progress measurement and its affect on progress payment in construction industry. The findings of this chapter can be summarized as follows:- i. Progress payments are paid on regular basis, usually in monthly basis. ii. Progress payments must be linked to contractor performance. iii. Performance plan must be developed and agreed on before starting progress payments. Two methods can be used to develop the performance plan: Schedule of Value method and Resources Loaded CPM Network method. iv. Contractor must submit auditable documents when he applies for any progress payment along with all supporting documents. v. There are five methods to measure progress for individual activity/task: Unit Completed Method, Incremental Milestones Method, Start/ Finish Method, Opinion Method, Cost Ratio Method and Weighted or Equivalent Units Method. vi. Overall project progress can be measured by combining the weighted progress of all project activities/ tasks. Page 19 of 89

32 Chapter 2 Literature Review on Progress Measurement vii. The accuracy of progress measurement depends on two factors: accuracy of the data collected for the work accomplished and accuracy of the total scope of work. viii. Earned value analysis cannot be completed under Lump Sum contract because cost performance index (CPI) cannot be determined with the available information. Contractor will not disclose to owner how much profit he is making on a project. Page 20 of 89

33 CHAPTER 3 LITERATURE REVIEW ON PROJECT CASH FLOW

34 Chapter 3 Literature Review on Project Cash Flow Chapter 3 LITERATURE REVIEW ON PROJECT CASH FLOW 3.1 INTRODUCTION One of the most important aspects of achieving any project objectives is cash flow management. A basic control system should be able to consider and compare the estimated project cost to actual (Fogel, 1997). Contractor needs an estimate of the frequency of progress payments from owner that when combined with the forecast of payments to labors, materials and subcontractors will enable estimate to be made for the cash requirements. This helps contractor to identify possible financial crisis as well as interest payments on short term borrowings. Owner will also be concerned with the availability of cash needed to fulfill his contractual obligations for progress payments. (Lowe and Lowe, 1988) Page 21 of 89

35 Chapter 3 Literature Review on Project Cash Flow 3.2 MAJOR CAUSES OF BUSINESS FAILURE IN CONSTRUCTION INDUSTRY Philip Copare in his article Cash Flow Management through Front-End Loading summarized the major causes of business failure of construction industry in US as follows (Copare, 1990): Insufficient Working Capital This may happen when contractor does not realize that he must have sufficient working capital to pay his project expenses such as labor, overhead, and project startup. When project awarded, contractor will has to finance the project for about six weeks or more before any payment is made by owner. Therefore, contractor must utilize his own financial reserve, a line of credit or other resources until advance payment/progress payments are made by owner Financial Overextension Contractor will continue adding new projects to his workload without considering his working capacity and available resources. Any delay in payment with insufficient resources will cause failure Inadequate Accounting This may happen when contractor does not realize the important of sounds financial records. He will keep all projects funds into one account, borrow from one project to finance another and not get advantage of material discounts. Also, he does not sustain accurate cost records for analyzing construction progress. Page 22 of 89

36 Chapter 3 Literature Review on Project Cash Flow Poor Estimates Contractor estimates are not accurate due to failure in identify the unit labor cost for each item of work, the unit cost of material, the cost of subcontractors, overhead cost and profit will result in low bids without sufficient funds to do the work or running the business Poor Management Control This may happen when contractor fail to provide and fulfill one or all of the basic management functions, i.e. planning, organizing, leading, staffing and controlling Inadequate Investigation of Owner s Resources This may happen when contractor fail to investigate owner financial position before project award. Owner may run out of money before project is completed, which will lead to partially completed project and no money Personnel Weakness Contractor must dedicate many hours to a project in order to reach successful completion time and cost wise. Some contractors are not willing to do that to reach these goals Personnel Traits Some contractor cannot deal effectively with owner, subcontractors and employees. They may have a problem in their personal and public relations. Page 23 of 89

37 Chapter 3 Literature Review on Project Cash Flow Therefore, many owners, subcontractors and employees will choose to do business with other contractors Involved in Outside Ventures Many contractors will speculate in real estate projects by taking an equity position in the project, thus resulting in insufficient funds to meet payment requirements Industry Hazards Construction industry is a hazardous business. Contractors increase their risk every time they undertake new project. Even after many successful projects, it only takes one bad project to bring a company from success to failure. 3.3 TYPES OF CASH FLOW Project cash flow can be furnished in both summary and detailed. Summary cash flow is representing total expenditure and it is necessary for long-term planning. Detailed cash flow is necessary for short-term planning and for the projection of summary cash flow. (William, 1977) Summary Cash Flow Summary cash flow is developed during the proposal or the conceptual phase of the project based on historical records for similar facilities. The data that required for developing summary cash flow are:- Page 24 of 89

38 Chapter 3 Literature Review on Project Cash Flow i. Cash flow experience (overall and by component) ii. Manpower curves iii. Milestone schedule dates and duration With the availability of the aforesaid data, owner and contractor are in good position to make the adjustment required for the project and then develop the project summary cash flow. As project progress, the project summary cash flow can be revised as more data and decisions are available. The revision can be made based on impact to the areas concerned, such as: i. Delivery of major equipment ii. Bulk material installation iii. Labor man-hour requirements iv. Known design criteria Detailed Cash Flow As project progress into detailed design, procurement and construction phases cash flow can be detailed and developed for the following major items:- i. Critical equipment ii. Other equipment iii. Bulk material iv. Labor direct cost v. Indirect labor cost Page 25 of 89

39 Chapter 3 Literature Review on Project Cash Flow vi. Design cost vii. Contingency viii. Escalation The total of all items must equal to the summary cash flow and hence tied back to the latest estimate and schedule. 3.4 CASH FLOW FROM OWNER S PERSPECTIVE The reasons owner need to forecast project cash flow can be summarized as follows (Lowe and Lowe, 1988):- i. To identify the interest payments on shot-term borrowing during the project life. ii. To ensure that there is enough cash to meet all contractual obligations during the project life. iii. To enable owner to plan and try to optimize his financial position. iv. To enable owner to select the best schedule of the project that will avoid overspending or significant underspending. Cash flow limitation can have both positive and negative impact on a project. On the positive side, experience has shown that any cash flow limitations imposed on a project automatically creates more management attention to the project. On the negative side, this means that project can not be Page 26 of 89

40 Chapter 3 Literature Review on Project Cash Flow completed due to funds shortage. Such issue can be avoided by classifying project activities to critical and non-critical. Activities classified as non-critical can be shifted to be completed at later stage of the project as soon as budget allow. However, if budget does not allow and these activities are not required for operation, it can be delayed after plant start-up. (William, 1977) On the other side, availability of cash will provide owner the opportunity to accelerate the work if it will reduce the overall project cost. (William, 1977) 3.5 S AND ANALYSIS OF PROJECT CASH FLOW Reporting of project cash flow is an essential part of any cost control system. It requires full commitment from the project management team. The elements of project cash flow are the responsibility of various project management team members and their accountability for performance must be imposed. (William, 1977) A tracking mechanism shall be developed and maintained to provide the project management with the required data that will improve the decision making process. (William, 1977) Page 27 of 89

41 Chapter 3 Literature Review on Project Cash Flow Often the actual expenditure deviates from the plan with no corresponding recognition in the schedule. This could be due to:- i. An unrealistic schedule ii. An unrealistic cost estimate iii. An unrealistic cash flow If the cash flow has been imposed to fit an unrealistic schedule, the expenditure, above or below the plan, will deviate regularly and should cause for a reevaluation of the project schedule. Lower than expected cash flow may indicate a potential schedule delay and on the other hand, expenditure above the plan could mean early completion of the project. (William, 1977) Page 28 of 89

42 Chapter 3 Literature Review on Project Cash Flow 3.6 SUMMARY This chapter set out to highlight the purpose of project cash flow and its affect on progress payment in construction industry. The findings of this chapter can be summarized as follows:- i. Inadequate investigation of owner s resources is one of the major causes of business failure of construction industry. ii. Project cash flow can be furnished in both summary and detailed. Summary cash flow is representing total expenditure and it is necessary for long-term planning. Detailed cash flow is necessary for short-term planning and for the projection of summary cash flow. iii. Owner needs to forecast project cash flow a. To identify the interest payments on shot-term borrowing. b. To ensure that enough cash are available in order to meet his contractual obligation. c. To plan and try to optimize his financial position. d. To select the best schedule for the project. iv. Reporting and monitoring project cash flow is an essential part of any cost control system. v. Analyzing project cash flow will improve the decision making process. Page 29 of 89

43 PART II RESEARCH METHODOLOGY, DATA ANALYSIS, CONCLUSIONS AND RECOMMENDATIONS

44 CHAPTER 4 RESEARCH METHODOLOGY

45 Chapter 4 Research Methodology Chapter 4 RESEARCH METHODOLOGY 4.1 INTRODUCTION The explanatory research presented in chapters 2 and 3, explored the importance of progress payments in success of any project. It also shows the significance of progress measurement method and project cash flow as factors affecting progress payments. Chapter 2 illustrates that progress payments shall be directly tied to the physical progress of the work accomplished on the project. Therefore, the method of measuring the physical progress of the work accomplished will affect progress payments to contractor. Owner has the right to verify the physical progress of the work accomplished reported by contractor. However, this process should not take long time; otherwise payments to contractor will be delayed. Any delay in progress payments to contractor will jeopardize the success of the project as contractor will has to fund the project from his own financial resources. Progress measurement method for any project should be selected carefully in order to reflect an accurate physical progress measure and also, it should be easily verifiable. Page 30 of 89

46 Chapter 4 Research Methodology Chapter 3 shows the importance of project cash flow and how insufficient owner financial resources can cause a business failure in construction industry. Unavailability of funds may delay or stop progress payments to contractor. Therefore, projection and control of project cash flow are essential for any project success and also, it must be included in any project control system. 4.2 DATA COLLECTION Required data for this report is collected from a medium size project that being built in Jubail Industrial City in the Eastern Province of Saudi Arabia Project Overview The scope of the project is to build a new petrochemical plant based on Lump Sum Turnkey Contract (LSTK). The contract was signed between a leading Saudi petrochemical company and an international contractor from Japan. The project duration is 30 months Lump Sum Turnkey Contract (LSTK) This is an arrangement between owner and contractor to perform both design and construction under a single design build contract. Contractor can subcontract portion of the project scope of work (usually construction). This type of contact has gained great acceptance by both owner and contractor as an optimum delivery method of executing Oil and Gas projects. (Al-Doukhi, 2000) Page 31 of 89

47 Chapter 4 Research Methodology Required Data Two case studies from the above project will be utilized in this report. First case is about progress measurement method. Owner specified in the contract that milestones () method shall be used to measure the physical progress of the project. However, after several months of reporting the construction work progress, contractor claimed that milestones () method is not reflecting the accurate progress for the project and because of that he is facing the following problems: i. Progress payment is affected by the low progress figures reported by using milestones () method. On other hand, contractor is paying his subcontractors based on BOQ method and as a result of that he has a negative cash flow. ii. Project performance will be always lower than the actual progress and site condition will not be reflected accurately. Contractor presents progress figures for both milestones () method and BOQ method for the first 13 weeks of the project construction work. This data will be used in the first part of this research. Second case is about project cash flow. Actual project cash flow will be compared with a forecasted project cash flow developed after implementing a certain methods/techniques required for better forecast and control of project cash flow. The following information is required to forecast the project cash flow: Page 32 of 89

48 Chapter 4 Research Methodology i. The project cost breakdown ii. The project duration iii. The payment terms of the contract iv. The projected expense curve for the project v. The projected progress curve for the project vi. The actual progress payments for the project 4.3 RESEARCH METHODOLOGY This report is divided into two sections. The first section is about progress measurement method and the second is about project cash flow. Following are commons research steps for both sections: i. The research problems were formulated and described in chapter 1. ii. A thorough literature review on the affect of progress measurement method and project cash flow on progress payments was conducted. The findings are summarized in chapters 2 and 3. iii. The information required for the literature review was obtained through available books, published articles, published studies and the internet. Page 33 of 89

49 Chapter 4 Research Methodology iv. Data required for the research was identified and collected from a medium size project that being built in Jubail Industrial City in the Eastern Province of Saudi Arabia Progress Measurement Method The methodology adopted for this section is summarized in the following steps: i. An overview of milestones () method and BOQ method will be presented. ii. Compare the results of milestones () method and BOQ method by using the t Test for Paired Observation method to prove that there is a significant difference between the two progress measurement methods. iii. Improve the accuracy of milestones () method to ensure that it will provide an acceptable level of accuracy for both owner and contractor. This will be done by improving the progress measurement of each work discipline, e.g. civil, mechanical, instrument etc iv. Simulate the progress calculation for the same project to calculate the progress figures for the improved milestones () method. Page 34 of 89

50 Chapter 4 Research Methodology v. Compare and analyze results of the improved milestones () method and BOQ method by using the t Test for Paired Observation method to prove that the improved milestones () method can be used as a substitute for BOQ method. vi. The report will be closed by presenting the conclusion and the recommendation that will be achieved Project Cash Flow The methodology adopted for this section is summarized in the following steps: i. Develop and discuss the method(s)/technique(s) owner can use for better forecast and control of the project cash flow. ii. Forecast the project cash flow by using the S-curve method. iii. Compare and analyze the projected project cash flow with the actual cash flow by using the t Test for Paired Observation method to prove that the discussed methods and techniques will help owner in forecasting and controlling project cash flow.. iv. The report will be closed by presenting the conclusion and the recommendation that will be achieved. Page 35 of 89

51 Chapter 4 Research Methodology 4.4 THE t TEST FOR PAIRED OBSERVATION This method is selected because there are two progress figures reported for one project for different time period. Another reason for selection of this statistics technique is the independence condition. This case is in clear violation of independence condition as the two samples consist of pairs observations made on the same project Procedure The appropriate procedure to perform this test is as follows (Mendenhall and Sincich, 1992)(Hamburg and Young, 1994): H H One-Tailed Test : O a ( µ µ ) = 1 2 DO µ µ ) 1 2 > DO or H : ( ) a µ µ < D : ( 1 2 O H H Two-Tailed Test : ( ) = O a : ( µ µ 1 1 µ µ 2 2 ) D D O O Test Statistic df = n 1 n = number d = sample D = mean d D : t = of S d n pairs difference population, Where in d pairs difference = d & n S d = 2 ( d d ) n 1 = d 2 ( d) n n 1 2 Sd = standard d = mean deviation sample of difference sample difference Rejection Region : t > t α [ or t < t ] α Rejection Region : t < t α / 2 Page 36 of 89

52 Chapter 4 Research Methodology Using MS Excel to conduct a Hypothesis Test about (µ1 µ2): Matched Samples The following steps shall be followed in order to conduct a Hypothesis Test by using MS Excel (Williams, 2001): i. Step 1 Select the Tools pull-down menu ii. Step 2 Choose the Data Analysis option iii. Step 3 Choose t-test: Paired Two Sample for Means from the list of Analysis Tools iv. Step 4 When the t-test: Paired Two Sample for Means dialog box appears: - Enter first data range in the Variable 1 Range box - Enter second data range in the Variable 2 Range box - Enter Do value in the Hypothesized Mean Difference box - Select Labels - Enter a value in the Alpha box - Select Output Range - Enter E2 (your choice) in the Output Range box - Select OK Page 37 of 89

53 CHAPTER 5 DATA ANALYSIS AND APPLICATION

54 Chapter 5 Data Analysis and Application Chapter 5 DATA ANALYSIS AND APPLICATION 5.1 INTRODUCTION In this chapter, we will examine the two factors that affect progress payments. Section 5.2 discusses progress measurement. It highlights the progress measurement method specified by owner as well as the progress measurement method used by contractor. Comparison between the result of milestones () method and BOQ method is presented in subsection In subsection 5.2.4, steps of improving milestones () method is explained. Application of the Improved Milestones () Method is presented in subsection Finally, Compression between the Improved Milestones () Method and the original Milestones () Method results is discussed in subsection Section 5.3 discusses project cash flow. Methods/techniques owner can use for better forecast and control of the project cash flow are presented in subsection Steps for projection of project cash flow by using S-Curve Method are explained in subsection In subsection 5.3.3, comparison between the projected cash flow and the actual project cash flow is illustrated. Page 38 of 89

55 Chapter 5 Data Analysis and Application 5.2 PROGRESS MEASUREMENT Progress Measurement Method specified by Owner Owner specified in the contract the progress measurement method that contractor shall used in calculating the project construction progress which is milestones () method. Construction progress is determined from the actual milestones events completed for each construction discipline. Milestones events for construction are provided in Appendix-I which identifies the primary activities and the milestones events for these activities. The project Work Breakdown Structure (WBS) is shown in figure 5.1. Figure 5.1: Project Work Breakdown Structure (WBS) Page 39 of 89

56 Chapter 5 Data Analysis and Application follows: The percentage progress for a construction discipline is calculated as Cx =?(wc.pc)/? wc Where: Cx = The construction progress for a construction discipline e.g. civil, piping etc wc = The weight value for each activity in the progress base for the respective discipline e.g. the total weight value for civil activities would be equal to the total man-hours expected to be expended in the civil discipline. pc = The percent progress for each activity in the progress base for the respective discipline. The progress for each activity/task is determined from the milestones achieved for the activity, see Appendix-I. The total construction progress is calculated as follows: PTC =?(Cx.Wc)/? Wc Where: PTC = Percent overall construction progress Cx = Percent progress for each construction discipline Wc = Weight value for each construction discipline, i.e. Wc =? wc Page 40 of 89

57 Chapter 5 Data Analysis and Application Progress Measurement Method used by Contractor Contractor used the same progress calculation methodology as specified by owner. However, contractor used unit completed method and opinion method to calculate the progress of each activity. Therefore, contractor claimed that milestones () method is not reflecting the accurate progress for the project and because of that he has a negative cash flow Comparison of the Progress Measurement Methods Results The difference of results for both methods (milestones () and BOQ) is compared by using statistics technique explained in section 4.4: Let µd = the mean of the difference progress payments values for both progress measurement methods ( µ µ ) 1 2 Hypotheses: H0: µd = 0 Ha: µd? 0 Rejection Rule: Reject H0 if t < or if t > Assuming the population of difference values is approximately normally distribution, the t distribution with n-1 degrees of freedom applies. With a =.05 (95% level of confidence) & t.025 = (11 degrees of freedom). Calculation of t value: t = (See Appendix-II for detail calculation) Page 41 of 89

58 Chapter 5 Data Analysis and Application Conclusion: Reject H0, there is a significant difference between the mean construction progress figures of the project for the two progress measurement methods Improving Milestones () Method Contractor claims that there is a significant difference between the milestones () method and the BOQ method is correct as shown in subsection Therefore, there is a necessity to improve the milestones () method in order to measure accurately the construction work progress. To improve milestones () method, detail review of all construction activities was done and the following shall be applied for all project s activities: i. Provide more breakdowns for activities. ii. Change the unit of measurement. iii. Provide more events/milestones than the ones provided in Appendix-I Provide more breakdowns for activities How much detail should be integrated in the WBS? There are many answers to this question. In general, the work package should be isolated, easily defined and managed and the work content planned and scheduled by activities. Page 42 of 89

59 Chapter 5 Data Analysis and Application For this project, contractor provides breakdowns only up to level 6 of the WBS. Many activities were assigned a huge weight values (Man-Hours) and no breakdowns for them were provided. This is badly affected the progress figures for milestones () method as work is considered completed only when the milestone/events under these activities are 100% completed. On the other hand, BOQ method reports the progress figure for all works partially/fully accomplished at site. By this, the gap between milestones () method and BOQ method increased and it will be only reduced when the work is accomplished. For such project, level 6 was not appropriate for many of activities. Therefore, level 7 breakdowns shall be developed. The following two conditions shall be adhered to while providing more breakdowns for such activities: a. Weight value for each activity shall not exceed 4,000 manhours. b. Duration of each activity shall not be more than 3 weeks. Also, the above requirements are imposed for better control and monitor of the project activities Change the unit of measurement The difficulty or simplicity of measuring work progress at site depends on the unit of measurement used to quantify such work. For example, the unit of measurement used by contactor to measure piping support work is tonnage Page 43 of 89

60 Chapter 5 Data Analysis and Application (TON). It is difficult to determine and verify how many tonnage of piping support are installed at site. However, if unit of measurement such as number or each is used to measure the piping support installation work then it is much easier to determine and verify how many piping support are installed at site. Therefore, changing the unit of measurement to numbers, each and package for applicable activities will improve the ability of measuring and verifying the work progress at site. Also, it will remove the subjectivity from determining the amount of work accomplishes at site Provide more events/milestones Owner provides events/milestones for some of activities (See Appendix- I). These events/milestones represent the work steps required to be done to complete such activities. For example, the work steps required for foundation work are as follow: 1) Excavation, 2) Rebar & Form Work, 3) Pouring Concrete, 4) Strip & Finishing, 5) Backfilling & Compaction, 6) Clear Punch List and 7) Final Acceptance. As per milestones () method, work will be considered completed for any milestone/event only when the milestone/event is 100% completed. Therefore, the more milestones/events under each activity provided the more reduction in the gap between milestones () method and BOQ method will be. For example, under foundation work, the Rebar & Form Work is considered as one work step. However, this work step can be divided into two Page 44 of 89

61 Chapter 5 Data Analysis and Application work steps: Rebar Work and Form Work. This is because of the different nature of works. Also, Owner did not provide work steps for some of works; therefore, new type of work along with its work steps will be introduced Application of the Improved Milestones () Method Civil Work The weight factor for civil work represents 35.12% of the overall construction work. Civil work has the largest weight factor among all other construction work disciplines; see Appendix-III for more detail. Figure 5.2 shows the progress figures of milestones () method vs. BOQ method for civil work. 11 Civil Milestones () Method Vs Bill of Quantity Method Progress (%) Week Milestones () Method Bill of Quantity Method Figure 5.2: Milestones () Method Vs BOQ Method for Civil Work Page 45 of 89

62 Chapter 5 Data Analysis and Application The following shall be done to improve the milestones () method for civil work: i. More breakdowns for all activities shall be done to satisfy both the targeted weight value and duration. However, it was found that some of activities can not satisfy these targets, e.g. pouring concrete for major foundations. To avoid this obstruction, 0/5 milestones can be applied for these activities. This will allow contractor to claim 50% completion when the progress of work is equal to or more than 50%. The following standard activities are to be used as a master activity for each area: o Equipment Foundations (by equipment) o Equipment Structure Foundations (by equipment) o Equipment Shelter Foundations (by shelter) o Pipe Rack Foundations (by block) o Local Foundations (by grid) o T-Support Foundations (by block) o Cable Trenches/Duct Banks (by block) o Concrete Paving (by block) o Asphalt Paving (by block) o Structural Steel Fireproofing (by grid) Page 46 of 89

63 Chapter 5 Data Analysis and Application o Structural Steel Erection (by block) o Structural Steel Handrail/Floor (by block) o T-Support Erection (by block) o Local Platform Erection (by block) o Shelter Erection (by shelter) ii. Unit of measurement specified in Appendix-I can be used for activities classified by equipment and shelter considering that all foundations will be listed. For activities classified by block and grid, unit of measurement specified in Appendix-I can be used subject to that activity is satisfying the breakdown requirements specified in item 1 above and if not, numbers of items (Nos) shall be used as a unit of measurement. For precast foundations, cable trenches, duct banks and manholes, numbers of items (Nos) shall be used as a unit of measurement. iii. Some of the milestones/events provided in Appendix-I have been modified and also, new milestones/events have been added: a. The following milestones/events are modified as follows, see Appendix-IV for more detail: Page 47 of 89

64 Chapter 5 Data Analysis and Application o Rebar and form work was one milestone under foundation work and it was representing 40% of the work. This milestone is divided to two milestones: rebar work and form work. Rebar work represents 30% of foundation work and form work represents 10%. o Rebar and form work was one milestone under concrete paving (area paving) work and it was representing 55% of the work. This milestone is divided to two milestones: rebar work and form work. Rebar work represents 45% of foundation work and form work represents 10%. o Pouring concrete and backfilling work was one milestone under underground conduit/duct banks work and it was representing 40% of the work. This milestone is divided to two milestones: pouring concrete and backfilling work. Pouring concrete work represents 30% of foundation work and backfilling work represents 10%. b. Milestones/events were developed for the following activities, see Appendix-IV for milestones/events of each activity: Page 48 of 89

65 Chapter 5 Data Analysis and Application o Soil Improvement o Asphalt Paving 1st Layer o Asphalt Paving 2nd Layer o Road Paving (Base Course) o Road Paving (Wearing Course) o Parapet Wall for Building o Ground Floor Concrete for Building o Roofing Concrete Floor for Building o Floor Concrete for Building o Soil Filling for Building o Roof Weather Proof for Building o Architectural Work for Building o Plumbing for Building o HVAC for Building Mechanical Work Mechanical work represents 10.77% of the overall construction work. Data is not available to measure the difference between progress figures of milestones () method and BOQ method for mechanical work because this work will be started in a later stage of the project. Page 49 of 89

66 Chapter 5 Data Analysis and Application The following shall be done to improve the milestones () method for mechanical work: i. More breakdowns to all activities shall be done to satisfy both the targeted weight value and duration. For example, rotating equipment installation activity is divided to two activities: equipment installation and final alignment. The following standard activities are to be used as a master activity for each project area: o Stationary Equipment Installation (by equipment) o Rotating Equipment Installation (by equipment) o Other Equipment Installation (by equipment) ii. The same unit of measurement specified in Appendix-I (each) will be used. iii. Some of the milestones/events provided in Appendix-I have been modified and also, new milestones/events have been added: a. The following milestones/events are modified as follows, see Appendix-IV for more detail: o For static equipment installation, rough setting/preliminary alignment milestone weight factor was increased by 5% to represent 70% Page 50 of 89

67 Chapter 5 Data Analysis and Application instead of 65% and clear punch list milestone was reduced by 5% to represent 5% instead of 10%. b. Milestones/events were developed for the following activities, see Appendix-IV for milestones/events of each activity: o Equipment Assemble in Site Piping Work Piping work represents 25.78% of the overall construction work. It is the second highest weight factor after civil work. Figure 5.3 shows the difference between progress figures of milestones () method vs. BOQ method for piping work. 0.8 Piping Milestones () Method Vs Bill of Quantity Method Progress (%) Week Milestones () Method Bill of Quantity Method Figure 5.3: Milestones () Method Vs BOQ Method for Piping Work Page 51 of 89

68 Chapter 5 Data Analysis and Application The following shall be done to improve the milestones () method for piping work: i. More breakdowns to all activities shall be done to satisfy both the targeted weight value and duration. To do so, piping work was classified to two main categories: aboveground and underground piping works. Aboveground piping work is classified to two main categories: rack piping and around equipment piping. For underground piping work, three categories were developed: oily sewer piping work, fire water piping work and sea water piping work. The following standard activities are to be used as a master activity for each project area: o Piping prefabrication o Piping Installation o Support Fabrication o Support Installation o Pressure Test o Flushing ii. The following unit of measurement shall be used: o For piping installation work, Linear Meter (LM) was specified in Appendix-I as unit of Page 52 of 89

69 Chapter 5 Data Analysis and Application measurement. However, Welding Dia-Inch shall be used as it easy to verify and check. Welding Dia- Inch is a result of multiplying the welding joint diameter by number of welding joints e.g. 4 Welding Dia-Inch may mean 4 inches diameter pipe multiples by 1 welding joint, 1 inch diameter pipe multiples by 4 welding joints or 2 inches diameter pipe multiples by 2 welding joints. o For pressure testing and flushing works, package (Pkg) shall be used as unit of measurement as no unit of measurement is specified in Appendix-I. o For support fabrication and installation works, number (Nos) shall be used as unit of measurement as no unit of measurement is specified in Appendix-I. iii. Some of the milestones/events provided in Appendix-I have been modified, see Appendix-IV for more detail: o For underground piping installation, weight factor shall be modified as follows: excavation & preparation from 10% to 15%, piping installation from 55% to 35%, pressure test & sign-off from 10% to 30%, backfilling 15%, flushing & re- Page 53 of 89

70 Chapter 5 Data Analysis and Application instatement from 5% to 2.5% and completed from 5% to 2.5% Electrical Work Electrical work represents 13.24% of the overall construction work. Figure 5.4 shows the difference between progress figures of milestones () method vs. BOQ method for electrical work Electrical Milestones () Method Vs Bill of Quantity Method Progress (%) Week Milestones () Method Bill of Quantity Method Figure 5.4: Milestones () Method Vs BOQ Method for Electrical Work The following shall be done to improve the milestones () method for electrical work: i. More breakdowns to all activities shall be done to satisfy both the targeted weight value and duration. The following standard Page 54 of 89

71 Chapter 5 Data Analysis and Application activities are to be used as a master activity for each project area: o Underground Conduit Piping (by block) o Grounding (by equipment and block) o Electrical Equipment Installation o Local Equipment Installation: Push Button Switch Control Switch Lighting Panel Board o Cabling (by equipment) o Lighting Conduit Piping (by block and elevation) o Lighting Fixture (by block and elevation) o Lighting Wiring (by block and elevation) o Motor Solo Run (By motor) ii. The same unit of measurement specified in Appendix-I (each) shall be used. iii. New milestones/events have been added, see Appendix-IV for milestones/events of each activity: o Cathodic Protection o Motor Solo Run Page 55 of 89

72 Chapter 5 Data Analysis and Application Instrument Work Instrument work represents 8.68% of the overall construction work. Figure 5.5 shows the difference between progress figures of milestones () method vs. BOQ method for instrument work Instrument Milestones () Method Vs Bill of Quantity Method Progress (%) Week Milestones () Method Bill of Quantity Method Figure 5.5: Milestones () Method Vs BOQ Method for Instrument Work The following shall be done to improve the milestones () method for instrument work: i. More breakdowns to all activities shall be done to satisfy both the targeted weight value and duration. The following standard activities are to be used as a master activity for each project area: o Cable Duct (by block) Page 56 of 89

73 Chapter 5 Data Analysis and Application o Junction Box Installation (by block) o Local Instrument Installation (by block): Transmitter Controller Thermo Element Local Switch Output Gauge & Indicator Local Panel Local Mounted Instrument Local Panel Mounted Instrument o Conduit Piping (by block) Aboveground Conduit Piping Underground Conduit Piping o Main Cabling (by equipment and junction box) o Local Cabling (by equipment and junction box) o Air Piping/Sub-Headers (by block and elevation) o Impulse Tubing (by block and elevation) o Loop/Interlock Test (by equipment and junction box) Page 57 of 89

74 Chapter 5 Data Analysis and Application ii. The following unit of measurement instead of the one specified in Appendix-I shall be used: o Cable Duct (Each) o Conduit Piping (Each) o Main Cabling (Each) o Local Cabling (Each) o Air Piping/Sub-Headers (Each) o Impulse Tubing (Each) o Loop/Interlock Test (Each) iii. New milestones/events have been added, see Appendix-IV for milestones/events of each activity: o Air Piping/Tubing o Impulse Tubing o Analyzer House Installation Insulation and Painting Works Insulation and Painting works represent 5.57% of the overall construction work. Data is not available to measure the difference between progress figures of milestones () method and BOQ method for painting and insulation works because these works will be started in a later stage of the project. Page 58 of 89

75 Chapter 5 Data Analysis and Application The following shall be done to improve the milestones () method for insulation and painting works: i. More breakdowns to all activities shall be done to satisfy both the targeted weight value and duration. The following standard activities are to be used as a master activity for each project area: o For insulation Work : Insulation for Equipment (by equipment) Insulation for Piping (by equipment and block): i. Rack Area Piping ii. Around Equipment Piping Fireproofing for Equipment (by equipment) o For Painting Work : Touch-up Painting: i. Structure Steel (by elevation and block) ii. Equipment (by equipment) iii. Piping Support (by block): 1. Pipe Rack Page 59 of 89

76 Chapter 5 Data Analysis and Application 2. Around Equipment ii. The same unit of measurement specified in Appendix-I (each) shall be used. iii. New milestones/events have been added, see Appendix-IV for milestones/events of each activity: o Fire Proofing for Equipment Pre-commissioning Work Pre-commissioning work represent 0.42% of the overall construction work. Data is not available to measure the difference between progress figures of milestones () method and BOQ method for pre-commissioning work because this work will be started in a later stage of the project. The following shall be done to improve the milestones () method for pre-commissioning work: i. More breakdowns to all activities shall be done to satisfy both the targeted weight value and duration. The following standard activities are to be used as a master activity for each project area: o Ready for Pre-commissioning (by unit or facility): a. Approximate date of Ready for Precommissioning Page 60 of 89

77 Chapter 5 Data Analysis and Application b. Final Notice of Ready for Precommissioning o Ready for Commissioning (by unit or facility): a. Notice of Ready for Commissioning b. Interim Mechanical Completion c. Final Mechanical Completion ii. The unit of measurement Package (Pkg) shall be used Compression between the Improved Milestones () Method and the Original Milestones () Method In section 5.2.3, we have proved that there is a significant difference between Milestones () Method and the BOQ Method. In sections and 5.2.5, we have improved the Milestones () Method to be an acceptable substitute for the BOQ Method. In this section, we will apply the improvement discussed in subsection for civil work and then we will compare and analyze the result. Page 61 of 89

78 Chapter 5 Data Analysis and Application Improved Milestones () Method Data Calculation In order to verify that the improved milestones () method can be used as substitute for the BOQ Method, we have calculated the progress figures for the improved milestones () method for 12 weeks by simulating the progress calculation for the same project. Followings are the main steps: i. Implement the improvements indicated in section above ii. Construct a progress calculation sheet to simulate the progress figures for 12 weeks (see Appendix V) Table 5.1 shows 12 weeks progress figures for BOQ Method and Improved Milestones () Method. Week BOQ Improved Table 5.1: Cumulative progress figures percentage (%) for 12 Weeks Page 62 of 89

79 Chapter 5 Data Analysis and Application Comparison of the Progress Measurement Methods Results The difference of results for both methods (milestones () and BOQ) is compared by using the same statistics technique used in section Let µd = the mean of the difference values of progress payments for both methods ( µ µ ) 1 2 Hypotheses: H0: µd = 0 Ha: µd? 0 Rejection Rule: Reject H0 if t < or if t > Assuming the population of difference values is approximately normally distribution, the t distribution with n-1 degrees of freedom applies. With a =.05 (95% level of confidence) & t.025 = (10 degrees of freedom). Calculation of t value: t = (See Appendix-II for detail calculation) Conclusion: Accept H0, the improved milestones () method can be used as a substitute for the BOQ method with 95% level of confidence Analysis of the Result The test conducted in section measures the difference in the weekly progress payments earned by contractor. However, cumulative progress payment earned will provide more accurate measure. This is because contactor Page 63 of 89

80 Chapter 5 Data Analysis and Application compares the total payment received against the total work completed at site until that time. Figure 5.6 shows the cumulative progress payment earned by contractor for civil work for BOQ Method, Original Milestones () Method and Improved Milestones () Method. This figure clearly shows the improvement made in the Milestones () Method. Cumulative Progress Payments for Civil Work 7,500,000 7,000,000 6,500,000 6,000,000 5,500,000 US $ 5,000,000 4,500,000 4,000,000 3,500,000 3,000,000 2,500,000 2,000, Week BOQ Improved Original Figure 5.6: The Cumulative Progress Payment Earned for Civil Work Figure 5.7 shows the difference between BOQ Method and Original Milestones () Method and the difference between BOQ Method and Improved Milestones () Method. In the first week, contractor is paid US $ 585,000 less than the actual work contractor claimed completed at site. However, if Improved Milestones () Method was used in calculating the project progress, contractor will be paid US $ 82,500 less than the actual work Page 64 of 89

81 Chapter 5 Data Analysis and Application contractor claimed completed at site. In the twelfth week, the difference between BOQ Method and Improved Milestones () Method is USD 337,500 compared to USD 1,222,500 for the difference between BOQ Method and Original Milestones () Method. This clearly shows the magnitude of improvement made on the Original Milestones () Method. Also, it proofs that the gap between BOQ method and Milestones () Method is reduced by applying the improvement discussed in sections and Difference of Cumulative Progress Payment 1,300,000 1,200,000 1,100,000 1,000, , ,000 US $ 700, , , , , , , Week BOQ - Improved BOQ - Original Figure 5.7: Difference of the Cumulative Progress Payment The difference between BOQ Method and Improved Milestones () Method can be recovered by the time saving resulted from reporting and verifying the work completed in site. Page 65 of 89

82 Chapter 5 Data Analysis and Application 5.3 PROJECT CASH FLOW In section 5.2, we discussed progress measurement method, which determine the amount of progress payment earned by contractor. In this section, we will discuss how owner can ensure that such payment will be paid on time to contractor Method(s)/Technique(s) to Control Project Cash Flow flow, i.e.: There are three methods/techniques owner use to control project cash i. Breakdown of Project Cost ii. Progress Payment Schedule iii. Payment Terms and Conditions Breakdown of Project Cost Project cost breakdown plays a vital role in controlling project cash flow. Owner must ensure that project cost is distributed fairly between all project Work Breakdown Structure (WBS) elements. Misallocation of project cost means that contractor will get paid higher in some phases and lesser in other. Contractor can use this to frontload the project cost to maximize the amount of money received in early phases of the project. Owner can verify the distribution of project cost among the project phases by comparing contactor cost breakdown with owner cost estimate, owner similar projects and/or other bidders cost. Page 66 of 89

83 Chapter 5 Data Analysis and Application Also, for better control of project cash flow, owner shall consider two types of payments for each project phase, i.e.: Progress Payments and Milestones Payment. Progress Payments will be linked with contractor performance and its amount will be determined by the progress measurement method. Milestones Payment will be paid when contractor achieved the specified event Progress Payment Schedule Progress payment schedule is the maximum monthly cumulative progress percentage contractor can get paid for in each project phase. It is developed for each project phase from the Project S-curve that contractors submit during bidding stage and from similar previous projects actual S-curves. Phase deliverables play a major role in determining the progress payment schedule for each phase. Detail engineering phase deliverable is the final project design that will be provided as drawings and documents. Project documents and drawings are developed under supervision of owner engineers from the study and calculation stage until issuance of final documents and drawings for construction. Therefore, progress payment schedule for detail engineering phase will be more or less same as contractors proposed engineering progress curve. On the other hand, procurement phase deliverable is the arrival of material and equipment at work site whish is not under direct supervision of owner engineers. Plant material and equipment will take very long time to be Page 67 of 89

84 Chapter 5 Data Analysis and Application delivered to work site especially for engineered equipment. Also, 65% of procurement phase is allocated for fabrication work where the percent progress will be uniform for each month up to final inspection. Therefore, progress payment schedule for procurement phase will be always less than contractors proposed procurement progress curve and the difference could be about three to four months in the peak. For Construction phase, phase deliverable is the plant and its facilities, whish will be done under supervision of owner engineers and inspectors. However, owner will not know if installed equipment or constructed facilities are function properly until pre-commission and commission stage where such equipment and facilities will be tested. Therefore, progress payment schedule for construction phase will be always less than contractors proposed construction progress curve and the difference could be about one to two months in the peak. Progress payment schedule is a very useful tool as it will prevent contactor benefiting from frontloading. Because if contractor frontload project phases activities, progress payment schedule will allow owner to pay only the cumulative progress percentage specified for each phase. This will always keep owner on top of his project. A question my arise that progress payment schedule may prevent contractor from accelerating the work to finish ahead of schedule as contractor knows that he will be paid only for the cumulative progress percentage Page 68 of 89

85 Chapter 5 Data Analysis and Application specified in the progress payment schedule not what he earned. The answer to this question is that owner and contractor have agreed on the project cost and schedule in contract. Therefore, each party has to fulfill his contractual obligation. However, if owner wishes the project to be completed before the date specified in contract, owner shall offer contractor an incentive, e.g. owner will pay contractor an additional one million dollar if contractor complete the project one month ahead of schedule and so on Payment Terms and Conditions Owner has to specify clearly payment terms and condition in contract document. Payment terms and conditions may include the following: i. Advance Payment It is a normal practice in Lump Sum contract that owner pays an advance payment to contractor in beginning of project and recovers it from each invoice. Owner shall specify the amount of advance payment in contract. Also, procedure for how to recover such payment shall be included. ii. Retention It is common for owner to pay only ninety or ninety-five percent of each invoice and retain the balance against the possibility of defective work and until handover of final project documentation. Owner shall specify clearly the amount of retention to be Page 69 of 89

86 Chapter 5 Data Analysis and Application deducted from contractor invoice and when such amount will be paid back to contractor. iii. Invoicing verification and clearance period There must be an agreed period between submission of invoice and payment (about thirty days usually) for verification and clearance. Owner shall include in contract document an invoicing procedure that shows clearly the steps, time and format required for invoicing. Also, it is important that both parties agreed on a cutoff date for contractor to prepare and submit invoice for owner approval. This will help both contractor and owner teams to work together to expedite verification and sustain the cash flow Develop Project Cash Flow by Using S-Curve Method (Case Study) In this section, a case study will be presented by implementing methods/ techniques discuses in section Data Required for Projection of Project Cash Flow flow: The following are the information required to develop the project cash i. Project Cost The project cost is bracken-down to five main categories: Project Management, Engineering, Procurement, Construction and Critical Milestones. Page 70 of 89

87 Chapter 5 Data Analysis and Application Cost of each category is divided to two main elements: progress percentage and milestone achievement as shown in Table5.2. Project Management Percentage of Contribution in Total Project Cost (%) Percentage of Contribution per Category Percentage Progress (%) Milestone Achievement (%) Engineering Procurement Construction Critical Milestones Table 5.2: Total Project Cost break-down Progress percentage is defined as the physical progress of the work accomplish by contractor. Milestones are the events owner has specified in the contract and assign a percentage of contact price that will be payable when contractor achieve them. ii. Project Duration The project duration is thirty (30) months as specified in the contract. Page 71 of 89

88 Chapter 5 Data Analysis and Application iii. Payment Terms and Conditions of the Contract a. Advance Payment As per contract, owner shall pay to contractor an advance payment of ten percent (10%) of contract price, which shall be paid to contractor within thirty (30) days upon receipt of a refund bond. The refund bond shall be issued to owner within two (2) weeks after contract award date. b. Progress Payment At the beginning of each month, contractor shall furnish owner with an invoice indicating the value of work performed during the preceding month. This invoice shall be accompanied by an interim certificate from owner for that portion of contract price, which equals the percentage of completion actually achieved during the preceding month. The net payable amount of the invoice shall be equal to: 1) Total value of work carried out to the satisfaction of owner to the progress cut-off date covered by the invoice. 2) Less five percent (5%) retention payable upon submission of final project records three (3) months after Mechanical Completion Date. 3) Less ten percent (10%) advance payment recovery until such time as the advance payment amount has been totally refunded. Page 72 of 89

89 Chapter 5 Data Analysis and Application Within thirty (30) days from the receipt of such invoices and related certificates, owner shall pay to contractor the net payable amount of the invoice. iv. Progress Payment Schedule for Work During Front-End Engineering and Design (FEED) phase, owner developed a progress payment schedule for each work category from bids proposal submitted by contractors and from his experience. Progress payment for each respective category is subject to the maximum cumulative percentage indicated in the progress payment schedule. See Figure 5.8 PROGRESS PAYMENT SCHEDULE Cumulative Percentage Calender Month Project Management Engineering Procurement Construction Figure 5.8: Progress Payment Schedule Page 73 of 89

90 Chapter 5 Data Analysis and Application v. Milestones Payment Schedule for Work Contractor developed the milestones payment schedule based on the project detail schedule that he papered. The date of milestone completion is not fixed and it can be rescheduled by contractor. However, the dates of critical milestones are fixed by contract and can not be changed. See Figure 5.9 MILESTONES PAYMENT SCHEDULE Cumulative Percentage Calendar Month Project Management Engineering Procurement Construction Critical Milestones Figure 5.9: Milestones Payment Schedule Projection of Project Cash Flow Project cash flow is developed by adding the progress payment schedule and the milestones payment schedule after taking into consideration the payment terms of the contract. The following are steps used to develop the project cash flow:- Page 74 of 89

91 Chapter 5 Data Analysis and Application i. Projected Payment Schedule Payment will be made after thirty (30) days from the receipt of contractor invoice. Usually contractor requires between two to three weeks to obtain owner approval for the achieved work during the preceding month and also to submit invoice for that work. Therefore, payment for work achieved in any month will be due within 45 days from the end of that month. Projected payment schedule is developed for each work category monthly ways (See Figure 5.10). PROJECTED PAYMENT SCHEDULE Cumulative Percentage Payment due in the 11th month of the project calendar for Engineering Work is equal to % Cumulative figure is equal to 41.97% Calendar Month Project Management Engineering Procurement Construction Critical Milestones Figure 5.10: Projected Payment Schedule However, contractor will take about four (4) months to develop the project progress calculation system. Therefore, payment will be started from the 6 th project calendar month. Page 75 of 89

92 Chapter 5 Data Analysis and Application ii. Advance Payment Advanced Payment (10% of Contract Price) will be due within 44 days after contract award date as contractor requires about 14 days for arranging the refund bond and 30 days for owner to pay the advance payment. Therefore, the advance payment will be paid in the 2 nd project calendar month. iii. Advance Payment Recovery and Retention Five percent (5%) retention will be deducted from contractor monthly progress invoice and it will be paid to contractor in the 34 th project calendar month. Ten percent (10%) advance payment recovery will be deducted from contractor monthly progress invoice. Projected cash flow for each work category has been developed (See Figure 5.11) as well as Overall Project Cash Flow (See Figure 5.12). Cumulative Percentage PROJECT CASH FLOW FOR EACH WORK CATEGORY Calendar Month Project Management 1.8% Detail Engineering 7.6% Procurement 60.2% Construction 25.4% Critical Milestones 5.00% Figure 5.11: Project Cash Flow for each Work Category Page 76 of 89

93 Chapter 5 Data Analysis and Application PROJECT CASH FLOW Cumulative Percentage % Advance Payment Calendar Month 5% Retention Progress Payment started on the 6th Month after Contract Award Overall Project Cash Flow Figure 5.12: Overall Project Cash Flow Page 77 of 89

94 Chapter 5 Data Analysis and Application The Projected Cash Flow against the Actual Cash Flow Figure 5.13 shows the project cash flow developed by using S-Curve method against the actual cash flow of the project. 110 OVERALL PROJECT CASH FLOW PROJECTED VS. ACTUAL Cumulative Percentage Month ACTUAL PROJECTED Figure 5.13: Projected Cash Flow vs. Actual Cash Flow for Overall Project Actual progress payments are always less than or equal to the projected cash flow. This is a clear indication that the methods/techniques used provide a high quality forecast for the project cash flow. Following are the main reasons for difference between the projected and actual cash flow:- i. Advance payment (10% of contract price) has been delayed from the first month to the forth month due to delay of submitting the refund bound by contractor. Page 78 of 89

95 Chapter 5 Data Analysis and Application ii. The difference between the actual progress payments and the projected cash flow from the eleventh month to month number thirty-three are due to delay in project activities as project is falling behind the original schedule. iii. Retention payment (5% of contract price) not yet paid by owner due delay of the plant mechanical completion and in submission of final project records. iv. Remaining progress payments are not paid due to defective work and negative change orders Statistical Analysis of the Result The difference of results for both projected cash flow and actual cash flow for the project is compared by using the same statistics technique discussed in section 4.4. Let µd = the mean of the difference values of projected and actual cash flow ( µ µ ) 1 2 Hypotheses: H0: µd = 0 Ha: µd? 0 Rejection Rule: Reject H0 if t < or if t > 2.03 Assuming the population of difference values is approximately normally distribution, the t distribution with n-1 degrees of freedom applies. With a =.05 (95% level of confidence) & t.025 = 2.03 (34 degrees of freedom). Page 79 of 89

96 Chapter 5 Data Analysis and Application Calculation of t value: t = (See Appendix-VI for detail calculation) Conclusion: Accept H0, the methods and techniques owner used to control project cash flow will provide an estimate for project cash flow with 95% level of confidence. Page 80 of 89

97 CHAPTER 6 CONCLUSION

98 Chapter 6 Conclusion Chapter 6 CONCLUSION 6.1 INTRODUCTION This is the final chapter of the report and it presents the principal outcomes of the research. Section 6.2 summarized the main findings in relation to the aims and objectives as stated in Chapter 1. Section 6.3 presents the recommendations in the light of current research. 6.2 MAIN FINDINGS The following are the main findings of this research in relation to the aims and objective as specified in Chapter 1: i. Progress payments are essential for any project success. ii. Progress measurement method and project cash flow are factors affection progress payment from owner to contractor. iii. There is a significant difference between construction work progress figures calculated by using milestones () method and BOQ method. Page 81 of 89

99 Chapter 6 Conclusion iv. In order to improve milestones () method the following improvement was applied to all contraction disciplines: a. Provide more breakdown to all activities until satisfying the following two requirements: 1. Weight value for each activity shall not exceed 4,000 man-hours. 2. Duration of each activity shall not be more than 3 weeks. The above requirements are imposed for better control and monitor of project activities. b. Change the unit of measurement to numbers, each and package for applicable activities to be easily verifiable. c. Modify events/milestones specified in Appendix-I and provide new events/milestones for activities not covered in Appendix-I. v. The improved milestones () method can be used as a substitute for the BOQ method with 95% level of confidence. vi. The difference between BOQ Method and Improved Milestones () Method can be recovered by the time saving resulted from reporting and verifying the work completed in site. Page 82 of 89

100 Chapter 6 Conclusion vii. There are three methods/techniques owner may use to control project cash flow, i.e.: a. Breakdown of Project Cost b. Progress Payment Schedule c. Payment Terms and Conditions viii. The following information are required for developing the project cash flow: a. Project Cost b. Project Duration c. Payment Terms and Conditions of the Contract d. Progress Payment Schedule for Work e. Milestones Payment Schedule for Work ix. Actual progress payments are always less than or equal to the projected cash flow for the project. This is a clear indication that the methods/techniques used provide a high quality forecast for the project cash flow. x. The methods and techniques owner used to control project cash flow will provide an estimate for project cash flow with 95% level of confidence. Page 83 of 89

101 Chapter 6 Conclusion 6.3 RECOMMENDATIONS In the light of the application and result of this report, the following recommendations are provided: i. Progress payments shall be paid to contractor regularly and on time. ii. Progress payments terms and condition shall be specified clearly in contract. iii. The Improved Milestones () method shall be used to measure progress in Lump Sum Turnkey projects. However, clear description and detail shall be provided in the contract. iv. Contractor shall submit the progress backup calculation to owner in weekly basis. Also, owner project management team shall review and verify the progress figures on weekly basis in order to minimize the approval time required to approve the monthly progress figure. v. Owner shall review weight values for all activities very carefully in order to ensure that contractor did not frontload the project activities. vi. Project cash flow shall be prepared in the early phase of the project in order to help owner and contractor to have a clear picture of how project cash will be managed. Page 84 of 89

102 Chapter 6 Conclusion vii. Project cash flow shall be reviewed and updated frequently to reflect any changes occur in project schedule in order to ensure the highest level of accuracy. viii. Project cash flow need to be reported in project monthly report to check its performance in periodical period. ix. Breakdown of project cost, progress payment schedule and payment terms and condition are techniques shall be used by owner to control project cash flow. Such techniques enable owner to be on top of his project x. Maximum cumulative percentages shall be estimated carefully to avoid any over or underpayment to contractor. Page 85 of 89

103 References REFERENCES 1. AACE International. Certification Study Guide. Morgantown: AACE International, AACE International. Skills & Knowledge of Cost Engineering. Morgantown: AACE International, Al-Douki, Khalil. Performance Measurement System Criteria vs. Earned Value Management System Criteria for Lump Sum Turnkey Petrochemical Project in Eastern Province, K.S.A. Master of Engineering Report, King Fahd University of Petroleum & Mineral, Saudi Arabia, Clough, Richard and Glenn Sears. Construction Contracting. Indianapolis: John Wiley & Sons, Inc., Copare, Philip. Cash Flow Management through Front-End Loading. The Proceeding of the 1990 AACE Transactions, AACE International, Morgantown, A Fisk, Edward. Construction Project Administration. New Jersey: Prentice-Hill, Inc., Page 86 of 89

104 References 7. Fleming, Quentin and Joel Koppelman. Using Earned Value Management. Cost Engineering 44.9 (2002): Fleming, Quentin and Joel Koppelman. Linking Contractor Payments to Contractor Performance. Cost Engineering (1995): Fleming, Quentin and Joel Koppelman. The Essence of Evolution of Earned Value. Cost Engineering (1994): Fogal, Irving. Cost Control and Cash Flow Management: A Simple Approach. Cost Engineering (1997): Hamburg, Morris and Peg Young. Statistical Analysis for Decision Making. Florida: Harcourt Brace & Company, Hamilton, Albert. Managing Projects for Success. London: Thomas Telford Ltd, Haugan, Gregory. Effective Work Breakdown Structures. Vienna: Management Concepts, Inc., Lewis, James. Project Planning, Scheduling & Control. New York: McGraw-Hill, Page 87 of 89

105 References 15. Lowe, John and Helen Lowe. Cash Flow and the Construction Client. The Proceeding of the 1988 AACE Transactions, AACE International, Morgantown, A Mendenhall, William and Terry Sincich. Statistics for Engineering and the Sciences. New York: Macmillan, Inc, Navarrete, Pablo and William Cole. Planning, Estimating and Control of Chemical Construction Projects. New York: Marcel Dekker, Inc, Sancho, William. Project Cash Flow. The Proceeding of the 1977 AACE Transactions, AACE International, Morgantown, B Smith, Andrew. Accuracy in Progress Measurement. The Proceeding of the 1989 AACE Transactions, AACE International, Morgantown, A Tavakoli, Amir. Construction Project Cash Flow Analysis. Cost Engineering 30.3 (1988): Toth, Shiela. Field Progress Measurement System-Direct Hire Job. Cost Engineering 25.2 (1983): Page 88 of 89

106 References 22. Ward, Sol and Thorndike Litchfield. Cost Control in Design and Construction. New York: McGraw-Hill, Whitticks, Edward. Contracts Management. Houston: Gulf Publishing, Williams, Anderson. Contemporary Business Statistics. Florence: Thomson Learning, Page 89 of 89

107 APPENDICES

108 APPENDIX-I

109 CONSTRUCTION PROGRESS ASSESSMENT INCREMENTS APPENDIX-I Page 1 of 1 Type of Work Units Work Step Receive & Check-out Fabrication Pipe Installation Supports Installation Clear Punch List Pressure Test & Signoff Flushing & Reinstatement Final Acceptance A/G Pipe Fabrication & Erection LM 3% 35% 40% 5% 7% 3% 5% 2% Excavation & Preparation Erect Pressure Test Pipe/Conduit & Sign-off Backfilling/Concrete Flushing & Re- Instatement Final Acceptance 10% 55% 10% 15% 5% 5% U/G Pipe Installation LM U/G Conduit/Duct banks LM 10% 45% -- 40% -- 5% U/G 34.5 KV Cable Trench LM 35% % -- 15% Excavation Rebar & Form Work Pouring Concrete Strip & Finishing Backfilling & Compaction Clear Punch List Final Acceptance 10% 40% 15% 10% 15% 5% 5% Foundation CM Area Paving CM 10% 55% 15% 10% -- 5% 5% Receive & Check-out Erect Plumb, Bolt and Torque Clear Punch List Final Acceptance Structural Steel Erection KG 10% 50% 25% -- 10% 5% Ladders & Platforms LM,SM 10% 50% 25% -- 10% 5% Pipe Supports KG 10% 50% 25% -- 10% 5% Miscellaneous Steel EA,LM,SM 10% 50% 25% -- 10% 5% Receive Rough Setting /Preliminary Alignment Level & Grout Finial Alignment Run In Clear Punch List Final Acceptance Static Equipment EA 5% 65% 15% % 5% Vessel Internals EA 5% 80% % 5% Rotating Equipment EA 5% 40% 10% 25% 10% 5% 5% Install Unit Conduit Wire & Cable Terminate & Test Clear Punch List Final Acceptance 90% % 5% Cable Tray LM Grounding LM 40% -- 30% 20% 5% 5% Electrical Equipment EA 70% % 5% 5% Home Run Cable LM % 20% 5% 5% Instrument Wire LM % 40% 5% 5% Power Cable LM -- 20% 40% 30% 5% 5% 34.5 KV Cable LM % 15% 5% 5% Lighting EA, LM 10% 40% 20% 20% 5% 5% Receive Calibrate Install & Support Loop Check Clear Punch List Final Acceptance Tagged Instruments EA 5% 10% 50% 25% 5% 5% Insulation Metal Trim Clear Punch List Final Acceptance Equipment Insulation EA, SM 40% 40% 10% 5% 5% Pipe Insulation LM, SM 40% 40% 10% 5% 5% Blast & Prime Finish Coat Clear Punch List Final Acceptance Painting LM, SM 20% 70% 5% 5%

110 APPENDIX-II

111 OVERALL PROJECT (%) CUMULATIVE THE t TEST FOR PAIRED OBSERVATION BOQ VS ORIGINAL MILESTONE METHODS PROGRESS PAYMENTS WEEKLY FOR OVERALL PROJECT Difference BOQ BOQ BOQ ,097, ,497, t-test: Paired Two Sample for Means ,495, ,715, , , , Variables BOQ ,780, ,962, , , , Mean ,095, ,525, , , , Variance ,657, ,705, , , , Observations ,137, ,065, , , , Pearson Correlation ,602, ,650, , , , Hypothesized Mean Difference ,022, ,965, , , , df ,607, ,467, , , , t Stat ,155, ,790, , , , P(T<=t) one-tail ,725, ,232, , , , t Critical one-tail ,257, ,622, , , , P(T<=t) two-tail ,895, ,020, , , , t Critical two-tail STATISTICAL ANALYSIS BOQ VS IMPROVED MILESTONE METHODS FOR CIVIL WORK OVERALL PROGRESS PAYMENTS STATISTICAL ANALYSIS PROJECT (%) CUMULATIVE WEEKLY BOQ BOQ BOQ Difference t-test: Paired Two Sample for Means ,767, ,685, Variables BOQ ,142, ,992, , , , Mean ,420, ,232, , , , Variance ,690, ,562, , , , Observations ,237, ,057, , , , Pearson Correlation ,680, ,425, , , , Hypothesized Mean Difference ,077, ,867, , , , df ,422, ,205, , , , t Stat ,022, ,745, , , , P(T<=t) one-tail ,382, ,022, , , , t Critical one-tail ,757, ,495, , , , P(T<=t) two-tail ,177, ,840, , , , t Critical two-tail Page 1 of 1 APPENDIX-II

112 APPENDIX-III

113 APPENDIX-III Page 1 of 1 DISCIPLINES WEIGHT FACTORS FOR CONSTRUCTION WORK S/N DISCIPLINE WEIGHT (%) 1 CIVIL MECHANICAL PIPING ELECTRICAL INSTRUMENT PAINTING & INSULATION PRE-COMMISSIONING TEMPORARY FACILITIES TOTAL TEMPORARY FACILITIES 0.42% PRE-COMMISSIONING 0.42% PAINTING & INSULATION 5.57% INSTRUMENT 8.68% ELECTRICAL 13.24% PIPING 25.78% CIVIL 35.12% MECHANICAL 10.77% CIVIL MECHANICAL PIPING ELECTRICAL INSTRUMENT PAINTING & INSULATION PRE-COMMISSIONING TEMPORARY FACILITIES

114 APPENDIX-IV

115 APPENDIX-IV Page 1 of 6 MODIFIED CONSTRUCTION PROGRESS ASSESSMENT INCREMENTS CIVIL WORK Excavation Rebar Form Work Pouring Concrete Strip & Finishing Backfilling & Compaction Clear Punch List Completed Foundations 10.0% 30.0% 10.0% 15.0% 10.0% 15.0% 5.0% 5.0% Excavation Rebar Form Work Pouring Concrete Strip & Finishing Clear Punch List Completed Concrete Paving (Area Paving) 10.00% 45.00% 10.00% 15.00% 10.00% 5.00% 5.00% Excavation Conduit Pouring Concrete Backfilling & Compaction Completed U/G Conduit/Duct Banks 10.0% 45.0% 30.0% 10.0% 5.0% Excavation Pre-cast Concrete Installation of Concrete Completed Cable Trench 35.0% 25.0% 25.0% 15.0% New Activities: Installation of Well Point Setting out of stone column Pre-CPT Pilot Test Finishing Column Installation Reactor Column Installation Silo Column Installation Post CPT 2.0% 2.0% 2.0% 2.0% 25.0% 25.0% 25.0% 2.0% Soil Improvement Plate Load Test Rough Grading Clear Punch List Completed 2.0% 3.0% 5.0% 5.0% Excavation Base Coarse Primer Coat Asphalt Layer Clear Punch List Completed Asphalt Paving 1st Layer 10.00% 55.00% 10.00% 15.00% 5.00% 5.00% Asphalt Paving 2nd Layer 90.00% 5.00% 5.00% Road Paving (Base Course) Road Paving (Wearing Course) Excavation Base Coarse Primer Coat 20.00% 1st Asphalt Layer 2nd Asphalt Layer Clear Punch List Completed 70.00% 5.00% 5.00% 10.00% 40.00% 40.00% 5.00% 5.00%

116 APPENDIX-IV Page 2 of 6 For Building: Rebar Form Work Pouring Concrete Parapet 40.0% 15.0% 15.0% Strip & Finishing 20.0% Clear Punch List Completed 5.0% 5.0% Moisture Barrier Excavation Form Work Pouring Concrete Strip & Finishing Joint Treatment Clear Punch List Completed Ground Floor Concrete 10.0% 30.0% 10.0% 15.0% 10.0% 15.0% 5.0% 5.0% Scaffolding Rebar Form Work Roofing Concrete Floor 10.0% 40.0% Pouring Concrete Strip & Finishing Clear Punch List 15.0% 15.0% 10.0% 5.0% Completed 5.0% Receive & Shake-out Installation of support beam Installation of deck slab Pouring Concrete Completed Floor Concrete 10.0% 50.0% 25.0% 10.0% 5.0% Backfilling & Compaction Soil Filling 100.0% Cleaning and Finishing Weather Proof Coat Clear Punch List Completed Roof Weather Proof 20.0% 70.0% 5.0% 5.0% Receive & Shake-out Installation of Material Architectural Finishing Architectural Work 5.0% 60.0% 25.0% Clear Punch List Completed 5.0% 5.0% Receive & Shake-out Installation of Plumbing Plumbing 5.0% 60.0% Operation Check 25.0% Clear Punch List Completed 5.0% 5.0% Receiving Rough Setting HVAC/ M&E 5.0% 40.0% Leveling Grout 10.0% Finial Align Run In Clear Punch List Completed 25.0% 10.0% 5.0% 5.0%

117 APPENDIX-IV Page 3 of 6 MODIFIED CONSTRUCTION PROGRESS ASSESSMENT INCREMENTS MECHANICAL WORK Receive Rough Set./Prelim. Alignment Level & Grout Finial Alignment Run In Clear Punch List Completed Rotating Equipment Equipment Install Final Alignment 5.00% 50.00% 45.00% 80.00% 10.00% 5.00% 5.00% Receive Rough Set./Prelim. Alignment Level & Grout Clear Punch List Completed Static Equipment Equipment Install 5.00% 70.00% 15.00% 5.00% 5.00% New Activities: Receive Assembling Clear Punch List Completed Field Assemble Equipment 5.00% 80.00% 10.00% 5.00%

118 APPENDIX-IV Page 4 of 6 MODIFIED CONTRACTOR CONSTRUCTION PROGRESS ASSESSMENT INCREMENTS PIPING WORK A/G Pipe Feb & Erect Piping Install Receive & Check-out Fabrication Pipe Installation 5.00% 40.00% 45.00% 10.00% Supports Clear Punch Installation List Test/Flushing 80.00% Pressure Test & Signoff 10.00% Flushing & Reinstatement Completed 5.00% 5.00% Excavation & Preparation Piping Installation Pressure Test & Signoff Backfilling Flushing & Reinstatement Completed U/G Pipe Piping Install 30.00% 70.00% Test/Flushing 60.00% 30.00% 5.00% 5.00% Receive & Check-out Fabrication Piping Prefabrication 10.00% 90.00% Pipe Installation Support Receive & Check-out Support Fabrication Supports Installation Clear Punch List Pressure Flushing & Test & Signoff Reinstatement Completed Rack Piping Install % A/G Pipe Feb & Erect Piping Install Around Equipment Small Bore Piping Support Fabrication % % 10.00% 90.00% Support Install % Pressure Test 90.00% 10.00% Flushing 95.00% 5.00%

119 MODIFIED CONSTRUCTION PROGRESS ASSESSMENT INCREMENTS ELECTRICAL/INSTRUMENT WORKS APPENDIX-IV Page 5 of 6 Excavation & Preparation Conduit Installation Backfilling Completed Unit Installation Wire & Cabling Termination & Test Clear Punch List Completed U/G Conduit & Grounding 5.00% 25.00% 18.00% 2.00% 20.00% 15.00% 8.00% 5.00% 2.00% Conduit, Cabling, Grounding & Test Conduit Installation Wire & Cabling Termination & Test Clear Punch List 10.00% 20.00% 13.00% 5.00% Completed Unit Installation 2.00% 20.00% Wire & Cabling 15.00% Termination & Test Clear Punch List 8.00% 5.00% Completed 2.00% Receive Calibrate Install & Support Loop Check Clear Punch List Completed Tagged Instruments Local Instrument Install 5.00% Loop Test/Interlock Test 20.00% 75.00% 90.00% 5.00% 5.00% New Activities: Cathodic Protection Provide Termination Clear Punch Anode & Completed Test List Protection 70.00% 20.00% 5.00% 5.00% Motor Solo Run Air Piping/Tubing Impuls Tubing Preparation of Motor Solo Inspection of Alignment Run Clear Punch List Completed 5.00% 35.00% 50.00% 5.00% 5.00% Recive Install & Support 5.00% 95.00% Recive Install & Support 5.00% 95.00% Analyzer House Installation Rough Level & Clear Receive Set./Prelim. Completed Grout Punch List Alignment 5.00% 65.00% 15.00% 10.00% 5.00%

120 APPENDIX-IV Page 6 of 6 MODIFIED CONSTRUCTION PROGRESS ASSESSMENT INCREMENTS PAINT/INSULATION WORKS Scaffolding Insulation Metal Trim Clear Punch List Completed Insulation for Piping 15.00% 25.00% 40.00% 10.00% 5.00% 5.00% Scaffolding Insulation Metal Trim Clear Punch List Completed Insulation for Equipment 15.00% 25.00% 40.00% 10.00% 5.00% 5.00% New Activities: Scaffolding Mortar Clear Punch List Completed Fire Proofing for Equipment 15.00% 75.00% 5.00% 5.00%

121 APPENDIX-V

122 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for Project each Level6 CMPL % Weight Value Level7 activity UTILITIES SYSTEM & RAW MATERIAL FEED SYSTEM (Area-1) CIVIL WORK 3, , C PIPE RACK FOUNDATION -N01 (OTHER OSBL) % % 0.07% 21.93% 0.05% OSBL From : Grid 26 to Column K-1 100% 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid 26 to Column K-2 100% 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid 26 to Column K-3 100% 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid 26 to Column K-4 100% 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid 26 to Column K-5 100% 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid 26 to Column K-6 100% 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid 26 to Column K-7 100% 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid 26 to Column K-7A 100% 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid 26 to Column K-8 100% 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid 26 to Column K-9 100% 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid 26 to Column K % 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid 26 to Column K % 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% Progress Value 4,815,410 % To Total Mhrs BOQ % CMPL Improved % REPOR Page 1 of 26

123 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for Project each Level6 CMPL % Weight Value Level7 activity Progress Value 4,815,410 From : Grid 26 to Column K % 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid 26 to Column K % 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid 26 to Column K % 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid 26 to Column K % 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid 26 to Column K % 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid 26 to Column K % 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid 26 to Column K % 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid 26 to Column K % 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid 26 to Column K % 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid 26 to Column K % 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid 26 to Column K % 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid 26 to Column K % 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid 26 to Column K % 21.0% % Excavation M3 10% BOQ % CMPL Improved % REPOR Page 2 of 26

124 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for Project each Level6 CMPL % Weight Value Level7 activity Progress Value 4,815,410 Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid 26 to Column K % 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid 26 to Column K % 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid 26 to Column K % 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid 26 to Column K % 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid 26 to Column K % 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid 26 to Column K % 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid 26 to Column K % 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid 24 to Column K-7 100% 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid 24 to Column K-7A 100% 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid 24 to Column K-8 100% 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid 24 to Column K-9 100% 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid 24 to Column K % 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% BOQ % CMPL Improved % REPOR Page 3 of 26

125 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for Project each Level6 CMPL % Weight Value Level7 activity Progress Value 4,815,410 Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid 24 to Column K % 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid 24 to Column K % 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid 24 to Column K % 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid 24 to Column K % 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid 24 to Column K % 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid 24 to Column K % 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid 24 to Column K % 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid 24 to Column K % 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid 24 to Column K % 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid 24 to Column K % 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid 24 to Column K % 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid 24 to Column K % 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% BOQ % CMPL Improved % REPOR Page 4 of 26

126 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for Project each Level6 CMPL % Weight Value Level7 activity Progress Value 4,815,410 From : Grid 24 to Column K % 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid 24 to Column K % 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid 24 to Column K % 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid 24 to Column K % 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid 24 to Column K % 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid 24 to Column K % 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid 24 to Column K % 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid 24 to Column K % 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid 24 to Column K % 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid 25 to Column K-1 100% 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid 25 to Column K-2 100% 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid 25 to Column K-3 100% 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid 25 to Column K-4 100% 21.0% % Excavation M3 10% BOQ % CMPL Improved % REPOR Page 5 of 26

127 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for Project each Level6 CMPL % Weight Value Level7 activity Progress Value 4,815,410 Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid 25 to Column K-5 100% 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid 25 to Column K-6 100% 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid S27 to Column-1 100% 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid S27 to Column-2 100% 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid S27 to Column-3 100% 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid S27 to Column-4 100% 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid S27 to Column-5 100% 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid S27 to Column-6 100% 65.0% % Excavation M3 10% Rebar Work 3.00 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 5.00 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 15% From : Grid S27 to Column-7 100% 65.0% % Excavation M3 10% Rebar Work 3.00 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 5.00 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 15% From : Grid S27 to Column-8 100% 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid S27 to Column-9 100% 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid S27 to Column % 40.0% % Excavation M3 10% Rebar Work 3.00 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 5.00 M3 15% BOQ % CMPL Improved % REPOR Page 6 of 26

128 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for Project each Level6 CMPL % Weight Value Level7 activity Progress Value 4,815,410 Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid S27 to Column % 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid S27 to Column % 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid S27 to Column % 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid S27 to Column % 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid S27 to Column % 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid S27 to Column % 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid S27 to Column % 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid S27 to Column % 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid S27 to Column % 65.0% % Excavation M3 10% Rebar Work 3.00 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 5.00 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 15% From : Grid S27 to Column % 65.0% % Excavation M3 10% Rebar Work 3.00 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 5.00 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 15% From : Grid S27 to Column % 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid S27 to Column % 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% BOQ % CMPL Improved % REPOR Page 7 of 26

129 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for Project each Level6 CMPL % Weight Value Level7 activity Progress Value 4,815,410 From : Grid S27 to Column % 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid S28 to Column-1 100% 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid S28 to Column-2 100% 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid S28 to Column-3 100% 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid S28 to Column-4 100% 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid S28 to Column-5 100% 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid S28 to Column-6 100% 65.0% % Excavation M3 10% Rebar Work 3.00 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 5.00 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 15% From : Grid S28 to Column-7 100% 65.0% % Excavation M3 10% Rebar Work 3.00 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 5.00 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 15% From : Grid S28 to Column-8 100% 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid S28 to Column-9 100% 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid S28 to Column % 40.0% % Excavation M3 10% Rebar Work 3.00 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid S28 to Column % 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid S28 to Column % 21.0% % Excavation M3 10% BOQ % CMPL Improved % REPOR Page 8 of 26

130 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for Project each Level6 CMPL % Weight Value Level7 activity Progress Value 4,815,410 Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid S28 to Column % 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid S28 to Column % 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid S28 to Column % 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid S28 to Column % 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid S28 to Column % 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid S28 to Column % 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid S28 to Column % 65.0% % Excavation M3 10% Rebar Work 3.00 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 5.00 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 15% From : Grid S28 to Column % 65.0% % Excavation M3 10% Rebar Work 3.00 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 5.00 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 15% From : Grid S28 to Column % 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid S28 to Column % 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid S28 to Column % 21.0% % Excavation M3 10% Rebar Work 3.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : Grid K31 to Column % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 3.00 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 5.00 M3 100% 15% 15.0% 15.0% BOQ % CMPL Improved % REPOR Page 9 of 26

131 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for Project each Level6 CMPL % Weight Value Level7 activity Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : Grid K32 to Column % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 3.00 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 5.00 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : Grid K31 to Column % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 3.00 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 5.00 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : Grid K32 to Column % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 3.00 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 5.00 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% C DUCT BANK, MH (MAIN CABLE) -N01 (OTHER OSBL) % % 0.01% Block-A 100% 3.6% Excavation M3 36% 10% 3.6% Conduit Pipe M 45% Concrete M3 30% Backfilling M3 10% Hand over to laying cable works 1.00 NOS 5% Block-B 100% 3.6% Excavation M3 36% 10% 3.6% Conduit Pipe M 45% Concrete M3 30% Backfilling M3 10% Hand over to laying cable works 1.00 NOS 5% Block-C 100% 3.6% Excavation M3 36% 10% 3.6% Conduit Pipe M 45% Concrete M3 30% Backfilling M3 10% Hand over to laying cable works 1.00 NOS 5% Block-D 100% 3.6% Excavation M3 36% 10% 3.6% Conduit Pipe M 45% Concrete M3 30% Backfilling M3 10% Hand over to laying cable works NOS 5% C EXCAVATION FOR U/G SW PIPING -N01 (OTHER OSBL) 29 7, % , % 0.15% 83.33% 0.13% Segment-1 2, % 100.0% 2, , % Well Point Installation M 100% 20% 20.0% 20.0% Excavation 4, M3 100% 50% 50.0% 50.0% Protection for Existing Facility 1.00 Lot 100% 20% 20.0% 20.0% Sand bedding for SW Piping M3 100% 5% 5.0% 5.0% Hand over to Piping Works 1.00 NOS 100% 5% 5.0% 5.0% Segment-2 2, % 84.1% 2, , % Well Point Installation M 84% 20% 16.8% 10.0% Excavation 5, M3 84% 50% 42.0% 25.0% Protection for Existing Facility 1.00 Lot 85% 20% 17.0% 10.0% Sand bedding for SW Piping M3 85% 5% 4.3% 2.5% Hand over to Piping Works 1.00 NOS 80% 5% 4.0% 2.5% Segment-3 2, % 100.0% 2, , % Well Point Installation M 100% 20% 20.0% 20.0% Excavation 9, M3 100% 50% 50.0% 50.0% Protection for Existing Facility 1.00 Lot 100% 20% 20.0% 20.0% Sand bedding for SW Piping M3 100% 5% 5.0% 5.0% Hand over to Piping Works 1.00 NOS 100% 5% 5.0% 5.0% C CONCRETE FOR U/G SW PIPING AT ROAD CROSS -N01 (O % % 0.05% % 0.05% Block-A 100% 100.0% % Lean Concrete 1.00 M2 100% 10% 10.0% 10.0% Rebar Work 1.00 TON 100% 40% 40.0% 40.0% Form Work 1.00 M2 100% 15% 15.0% 15.0% Pouring Concrete 1.00 M3 100% 10% 10.0% 10.0% Strip & Finishing 1.00 M2 100% 15% 15.0% 15.0% Completed 1.00 NOS 100% 5% 5.0% 5.0% Block-B 100% 100.0% % Lean Concrete 1.00 M2 100% 10% 10.0% 10.0% Rebar Work 1.00 TON 100% 40% 40.0% 40.0% Form Work 1.00 M2 100% 15% 15.0% 15.0% Pouring Concrete 1.00 M3 100% 10% 10.0% 10.0% Strip & Finishing 1.00 M2 100% 15% 15.0% 15.0% Completed 1.00 NOS 100% 5% 5.0% 5.0% C BACKFILLING FOR U/G SW PIPING -N01 (OTHER OSBL) % 78.0% % 0.07% 74.58% 0.07% Block A 100% 100.0% % Water filling In Pipe M3 100% 20% 20.0% 20.0% Backfillng M3 100% 75% 75.0% 75.0% Completed 1 LOT 100% 5% 5.0% 5.0% Block B 100% 100.0% % Water filling In Pipe M3 100% 20% 20.0% 20.0% Backfillng M3 100% 75% 75.0% 75.0% Completed 1 LOT 100% 5% 5.0% 5.0% Block C 100% 100.0% % Water filling In Pipe M3 100% 20% 20.0% 20.0% Backfillng M3 100% 75% 75.0% 75.0% Completed 1.00 LOT 100% 5% 5.0% 5.0% Block D 100% 100.0% % Water filling In Pipe M3 100% 20% 20.0% 20.0% Backfillng M3 100% 75% 75.0% 75.0% Completed 1.00 LOT 100% 5% 5.0% 5.0% Block E 100% 68.0% % Water filling In Pipe M3 80% 20% 16.0% 10.0% Progress Value 4,815,410 BOQ % CMPL Improved % REPOR Page 10 of 26

132 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for Project each Level6 CMPL % Weight Value Level7 activity Backfillng M3 68% 75% 51.0% 37.5% Completed 1.00 LOT 20% 5% 1.0% Block F 100% Water filling In Pipe M3 20% Backfillng M3 75% Completed 1.00 LOT 5% C EXCAVATION FOR U/G SW PIPING -N , % 100.0% , % 0.02% % 0.02% Well Point Installation M 100% 20% 20.0% 20.0% Excavation 4, M3 100% 50% 50.0% 50.0% Protection for Exsisting Facility 1.00 Lot 100% 20% 20.0% 20.0% Sand bedding for SW Piping M3 100% 5% 5.0% 5.0% Hand over to Piping Works 1.00 NOS 100% 5% 5.0% 5.0% C BACKFILL FOR U/G SW PIPING -N , % 100.0% , % 0.05% % 0.05% Water filling In Pipe M3 100% 20% 20.0% 20.0% Backillng 2, M3 100% 75% 75.0% 75.0% Completed 1.00 LOT 100% 5% 5.0% 5.0% C PIT NO.1 & NO. 2 FOR U/G SW PIPING -N , % , % 0.11% 86.67% 0.11% Pit-1 - Segment 1 100% 100.0% % Excavation 6.67 M3 100% 10% 10.0% 10.0% Rebar Work 0.67 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 6.00 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction 3.33 M3 100% 15% 15.0% 15.0% Pit-1 - Segment 2 100% 100.0% % Excavation 6.67 M3 100% 10% 10.0% 10.0% Rebar Work 0.67 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 6.00 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction 3.33 M3 100% 15% 15.0% 15.0% Pit-1 - Segment 3 100% 73.0% % Excavation 6.67 M3 100% 10% 10.0% 10.0% Rebar Work 0.67 TON 100% 30% 30.0% 30.0% Form Work M2 55% 10% 5.5% 5.0% Pouring Concrete 6.00 M3 34% 15% 5.1% Strip & Finishing M2 34% 10% 3.4% Backfiling& Compaction 3.33 M3 100% 15% 15.0% 15.0% Clear Punchlist 1.00 NOS 40% 5% 2.0% Hand over to Mech,Piping Work to Others 1.00 NOS 40% 5% 2.0% Pit-2- Segment 1 100% 100.0% % Excavation 6.67 M3 100% 10% 10.0% 10.0% Rebar Work 0.67 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 6.00 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction 3.33 M3 100% 15% 15.0% 15.0% Pit-2- Segment 2 100% 100.0% % Excavation 6.67 M3 100% 10% 10.0% 10.0% Rebar Work 0.67 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 6.00 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction 3.33 M3 100% 15% 15.0% 15.0% Pit-2- Segment 3 100% 75.4% % Excavation 6.67 M3 100% 10% 10.0% 10.0% Rebar Work 0.67 TON 100% 30% 30.0% 30.0% Form Work M2 64% 10% 6.4% 5.0% Pouring Concrete 6.00 M3 40% 15% 6.0% Strip & Finishing M2 40% 10% 4.0% Backfiling& Compaction 3.33 M3 100% 15% 15.0% 15.0% Clear Punchlist 1.00 NOS 40% 5% 2.0% Hand over to Mech,Piping Work to Others 1.00 NOS 40% 5% 2.0% C PIT NO.3 FOR U/G SW PIPING -N , % , % 0.11% 90.83% 0.11% Pit-3 - Segment 1 100% 100.0% 1, , % Excavation 6.67 M3 100% 10% 10.0% 10.0% Rebar Work 0.67 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 6.00 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction 3.33 M3 100% 15% 15.0% 15.0% Pit-3 - Segment 2 100% 100.0% 1, , % Excavation 6.67 M3 100% 10% 10.0% 10.0% Rebar Work 0.67 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 6.00 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction 3.33 M3 100% 15% 15.0% 15.0% Pit-3 - Segment 3 100% 79.6% 1, , % Excavation 6.67 M3 100% 10% 10.0% 10.0% Rebar Work 0.67 TON 100% 30% 30.0% 30.0% Form Work M2 67% 10% 6.7% 5.0% Pouring Concrete 6.00 M3 58% 15% 8.7% 7.5% Strip & Finishing M2 52% 10% 5.2% 5.0% Backfiling& Compaction 3.33 M3 100% 15% 15.0% 15.0% Clear Punchlist 1.00 NOS 40% 5% 2.0% Hand over to Mech,Piping Work to Others 1.00 NOS 40% 5% 2.0% C EQPT FOUNDATION -N , % , , % 0.10% 79.08% 0.10% PC0649 Construct Fdn. NE-1101A Seawater/Cooling Water 100% 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 6.18 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 5.76 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% PC0651 Construct Fdn. NE-1101B Seawater/Cooling Water 100% 100.0% % Excavation M3 100% 10% 10.0% 10.0% Progress Value 4,815,410 BOQ % CMPL Improved % REPOR Page 11 of 26

133 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE PC0653 PC0655 PC0657 PC0659 PC0661 PC0663 PC0665 PC0667 PC0669 PC0671 PC0673 PC0675 DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for Project each Level6 CMPL % Weight Value Level7 activity Progress Value 4,815,410 Rebar Work 6.18 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 5.76 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% Construct Fdn. NE-1101C Seawater/Cooling Water 100% 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 6.18 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 5.76 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% Construct Fdn. NE-1101D Seawater/Cooling Water 100% 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 6.18 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 5.76 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% Construct Fdn. NE-1101E Seawater/Cooling Water 100% 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 6.18 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 5.76 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% Construct Fdn. NE-1101F Seawater/Cooling Water 100% 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 6.18 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 5.76 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% Construct Fdn. NE-1101G Seawater/Cooling Water 100% 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 6.18 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 5.76 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% Construct Fdn. NE-1101H Seawater/Cooling Water 100% 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 6.18 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 5.76 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% Construct Fdn. NE-1101I Seawater/Cooling Water 100% 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 6.18 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 5.76 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% Construct Fdn. NE-1101S Seawater/Cooling Water 100% 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 6.18 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 5.76 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% Construct Fdn. NP-1101A Cooling Water Pump 100% 22.0% % Excavation M3 70% 10% 7.0% 5.0% Rebar Work 8.52 TON 50% 30% 15.0% 15.0% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% Construct Fdn. NP-1101B Cooling Water Pump 100% 22.0% % Excavation M3 70% 10% 7.0% 5.0% Rebar Work 8.52 TON 50% 30% 15.0% 15.0% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% Construct Fdn. NP-1101C Cooling Water Pump 100% 23.0% % Excavation M3 80% 10% 8.0% 5.0% Rebar Work 4.32 TON 50% 30% 15.0% 15.0% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% Construct Fdn. NP-1101S Cooling Water Pump 100% 23.0% % Excavation M3 80% 10% 8.0% 5.0% Rebar Work 4.32 TON 50% 30% 15.0% 15.0% Form Work M2 10% Pouring Concrete M3 15% BOQ % CMPL Improved % REPOR Page 12 of 26

134 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE PC0677 PC01AD08 PC01AD09 PC02AD01 PC02AD02 PC02AD03 PC02AD04 PC02AD05 PC02AD06 PC02AD07 PC02AD08 PC0679 DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for Project each Level6 CMPL % Weight Value Level7 activity Progress Value 4,815,410 Strip & Finishing M2 10% Backfiling& Compaction M3 15% Construct Fdn. NC-1101 Cooling Water Column 100% 70.3% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.87 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 85% 15% 12.8% 7.5% Strip & Finishing M2 75% 10% 7.5% 5.0% Backfiling& Compaction M3 15% Construct Fdn. NF-1101A Seawater Strainer 100% 98.8% % Excavation 4.59 M3 100% 10% 10.0% 10.0% Rebar Work 0.19 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 1.65 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction 3.38 M3 100% 15% 15.0% 15.0% Hand over to Mech,Piping Work to Others 1.00 NOS 75% 5% 3.8% 2.5% Construct Fdn. NF-1101B Seawater Strainer 100% 98.8% % Excavation 4.59 M3 100% 10% 10.0% 10.0% Rebar Work 0.19 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 1.65 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction 3.38 M3 100% 15% 15.0% 15.0% Hand over to Mech,Piping Work to Others 1.00 NOS 75% 5% 3.8% 2.5% Construct Fdn. NF-1101C Seawater Strainer 100% 98.8% % Excavation 4.59 M3 100% 10% 10.0% 10.0% Rebar Work 0.19 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 1.65 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction 3.38 M3 100% 15% 15.0% 15.0% Hand over to Mech,Piping Work to Others 1.00 NOS 75% 5% 3.8% 2.5% Construct Fdn. NF-1101D Seawater Strainer 100% 98.8% % Excavation 4.59 M3 100% 10% 10.0% 10.0% Rebar Work 0.19 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 1.65 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction 3.38 M3 100% 15% 15.0% 15.0% Hand over to Mech,Piping Work to Others 1.00 NOS 75% 5% 3.8% 2.5% Construct Fdn. NF-1101E Seawater Strainer 100% 98.8% % Excavation 4.59 M3 100% 10% 10.0% 10.0% Rebar Work 0.19 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 1.65 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction 3.38 M3 100% 15% 15.0% 15.0% Hand over to Mech,Piping Work to Others 1.00 NOS 75% 5% 3.8% 2.5% Construct Fdn. NF-1101F Seawater Strainer 100% 78.8% % Excavation 4.59 M3 100% 10% 10.0% 10.0% Rebar Work 0.19 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 1.65 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction 3.38 M3 15% Clear Punchlist 1.00 NOS 75% 5% 3.8% 2.5% Construct Fdn. NF-1101G Seawater Strainer 100% 78.8% % Excavation 4.59 M3 100% 10% 10.0% 10.0% Rebar Work 0.19 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 1.65 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction 3.38 M3 15% Clear Punchlist 1.00 NOS 75% 5% 3.8% 2.5% Construct Fdn. NF-1101H Seawater Strainer 100% 78.8% % Excavation 4.59 M3 100% 10% 10.0% 10.0% Rebar Work 0.19 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 1.65 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction 3.38 M3 15% Clear Punchlist 1.00 NOS 75% 5% 3.8% 2.5% Construct Fdn. NF-1101I Seawater Strainer 100% 78.8% % Excavation 4.59 M3 100% 10% 10.0% 10.0% Rebar Work 0.19 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 1.65 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction 3.38 M3 15% Clear Punchlist 1.00 NOS 75% 5% 3.8% 2.5% Construct Fdn. NF-1101S Seawater Strainer 100% 78.8% % Excavation 4.59 M3 100% 10% 10.0% 10.0% Rebar Work 0.19 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 1.65 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction 3.38 M3 15% Clear Punchlist 1.00 NOS 75% 5% 3.8% 2.5% Construct Fdn. NV-1101 Cooling Water Chemical 100% 78.8% % Excavation 0.97 M3 100% 10% 10.0% 10.0% Rebar Work 0.03 TON 100% 30% 30.0% 30.0% Form Work 2.56 M2 100% 10% 10.0% 10.0% Pouring Concrete 0.45 M3 100% 15% 15.0% 15.0% Strip & Finishing 2.56 M2 100% 10% 10.0% 10.0% Backfiling& Compaction 0.67 M3 15% Clear Punchlist 1.00 NOS 75% 5% 3.8% 2.5% BOQ % CMPL Improved % REPOR Page 13 of 26

135 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for Project each Level6 CMPL % Weight Value Level7 activity C PIPE RACK FOUNDATION -N % % 0.09% 64.86% 0.08% From : A % 98.5% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.54 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 7.36 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% Hand over to Mech,Piping Work to Others 1.00 NOS 70% 5% 3.5% 2.5% From : A % 98.5% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.54 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 7.36 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% Hand over to Mech,Piping Work to Others 1.00 NOS 70% 5% 3.5% 2.5% From : A % 98.5% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.54 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 7.36 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% Hand over to Mech,Piping Work to Others 1.00 NOS 70% 5% 3.5% 2.5% From : A % 98.5% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.54 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 7.36 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% Hand over to Mech,Piping Work to Others 1.00 NOS 70% 5% 3.5% 2.5% From : A % 98.5% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.54 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 7.36 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% Hand over to Mech,Piping Work to Others 1.00 NOS 70% 5% 3.5% 2.5% From : A % 98.5% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.54 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 7.36 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% Hand over to Mech,Piping Work to Others 1.00 NOS 70% 5% 3.5% 2.5% From : A % 98.5% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.54 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 7.36 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% Hand over to Mech,Piping Work to Others 1.00 NOS 70% 5% 3.5% 2.5% From : A % 84.5% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.54 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 7.36 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 95% 10% 9.5% 5.0% Backfiling& Compaction M3 50% 15% 7.5% 7.5% Clear Punchlist 1.00 NOS 50% 5% 2.5% 2.5% From : A % 84.5% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.54 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 7.36 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 95% 10% 9.5% 5.0% Backfiling& Compaction M3 50% 15% 7.5% 7.5% Clear Punchlist 1.00 NOS 50% 5% 2.5% 2.5% From : A % 32.0% % Excavation M3 95% 10% 9.5% 5.0% Rebar Work 0.54 TON 75% 30% 22.5% 15.0% Form Work M2 10% Pouring Concrete 7.36 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : A % 32.0% % Excavation M3 95% 10% 9.5% 5.0% Rebar Work 0.54 TON 75% 30% 22.5% 15.0% Form Work M2 10% Pouring Concrete 7.36 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : A % 32.0% % Excavation M3 95% 10% 9.5% 5.0% Rebar Work 0.54 TON 75% 30% 22.5% 15.0% Form Work M2 10% Pouring Concrete 7.36 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : A % 32.0% % Progress Value 4,815,410 BOQ % CMPL Improved % REPOR Page 14 of 26

136 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for Project each Level6 CMPL % Weight Value Level7 activity Excavation M3 95% 10% 9.5% 5.0% Rebar Work 0.54 TON 75% 30% 22.5% 15.0% Form Work M2 10% Pouring Concrete 7.36 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : A % 32.0% % Excavation M3 95% 10% 9.5% 5.0% Rebar Work 0.54 TON 75% 30% 22.5% 15.0% Form Work M2 10% Pouring Concrete 7.36 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : A % 32.0% % Excavation M3 95% 10% 9.5% 5.0% Rebar Work 0.54 TON 75% 30% 22.5% 15.0% Form Work M2 10% Pouring Concrete 7.36 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : A % 68.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.54 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 7.36 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 30% 10% 3.0% Backfiling& Compaction M3 15% From : A % 71.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.54 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 7.36 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 60% 10% 6.0% 5.0% Backfiling& Compaction M3 15% From : A % 71.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.54 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 7.36 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 60% 10% 6.0% 5.0% Backfiling& Compaction M3 15% C CABLE TRENCH -N % % 0.01% 35.00% 0.01% Block-A 100% 35.0% % Excavation M3 100% 35% 35.0% 35.0% Installation of Precast Concrete/Concrete Pouring 8.92 M3 25% Backfilling & Compaction M 25% Hand over to Mech,Piping Work to Others 1.00 NOS 15% Block-B 100% 35.0% % Excavation M3 100% 35% 35.0% 35.0% Installation of Precast Concrete/Concrete Pouring 8.92 M3 25% Backfilling & Compaction M 25% Hand over to Mech,Piping Work to Others 1.00 NOS 15% Block-C 100% 35.0% % Excavation M3 100% 35% 35.0% 35.0% Installation of Precast Concrete/Concrete Pouring 8.92 M3 25% Backfilling & Compaction M 25% Hand over to Mech,Piping Work to Others 1.00 NOS 15% C EQPT FOUNDATION -N , % , % 0.12% % 0.12% PC0609 Construct Fdn. NP-2002A Butene Charge Pump 100% 100.0% % Excavation 6.20 M3 100% 10% 10.0% 10.0% Rebar Work 0.14 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 4.53 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction 2.89 M3 100% 15% 15.0% 15.0% PC0611 Construct Fdn. NP-2002S Butene Charge Pump 100% 100.0% % Excavation 6.20 M3 100% 10% 10.0% 10.0% Rebar Work 0.14 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 4.53 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction 2.89 M3 100% 15% 15.0% 15.0% PC0613 Construct Fdn. NV-2002 Butene Day Drum 100% 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.82 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% PC0715 Construct Fdn. NP-1301 Flare Knockout Liquid Pump 100% 100.0% % Excavation 1.34 M3 100% 10% 10.0% 10.0% Rebar Work 0.04 TON 100% 30% 30.0% 30.0% Form Work 3.79 M2 100% 10% 10.0% 10.0% Pouring Concrete 0.76 M3 100% 15% 15.0% 15.0% Strip & Finishing 3.79 M2 100% 10% 10.0% 10.0% Backfiling& Compaction 0.87 M3 100% 15% 15.0% 15.0% PC02AD11 Construct Fdn. NP-1302 Liquid Waste Pump 100% 100.0% % Excavation 1.34 M3 100% 10% 10.0% 10.0% Rebar Work 0.04 TON 100% 30% 30.0% 30.0% Form Work 3.79 M2 100% 10% 10.0% 10.0% Pouring Concrete 0.76 M3 100% 15% 15.0% 15.0% Progress Value 4,815,410 BOQ % CMPL Improved % REPOR Page 15 of 26

137 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE PC0717 PC0719 PC0711 PC0713 PC0721 PC01AD6 PC0723 PC0725 PC0693 PC0697 PC0699 PC0705 DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for Project each Level6 CMPL % Weight Value Level7 activity Progress Value 4,815,410 Strip & Finishing 3.79 M2 100% 10% 10.0% 10.0% Backfiling& Compaction 0.87 M3 100% 15% 15.0% 15.0% Construct Fdn. NP-2003A Isopentane Charge Pump 100% 100.0% % Excavation 2.54 M3 100% 10% 10.0% 10.0% Rebar Work 0.29 TON 100% 30% 30.0% 30.0% Form Work 6.41 M2 100% 10% 10.0% 10.0% Pouring Concrete 2.04 M3 100% 15% 15.0% 15.0% Strip & Finishing 6.41 M2 100% 10% 10.0% 10.0% Backfiling& Compaction 1.31 M3 100% 15% 15.0% 15.0% Construct Fdn. NP-2003S Isopentane Charge Pump 100% 100.0% % Excavation 2.54 M3 100% 10% 10.0% 10.0% Rebar Work 0.29 TON 100% 30% 30.0% 30.0% Form Work 6.41 M2 100% 10% 10.0% 10.0% Pouring Concrete 2.04 M3 100% 15% 15.0% 15.0% Strip & Finishing 6.41 M2 100% 10% 10.0% 10.0% Backfiling& Compaction 1.31 M3 100% 15% 15.0% 15.0% Construct Fdn. NP-2010A Isopentane Feed Pump 100% 100.0% % Excavation 3.51 M3 100% 10% 10.0% 10.0% Rebar Work 0.50 TON 100% 30% 30.0% 30.0% Form Work 7.86 M2 100% 10% 10.0% 10.0% Pouring Concrete 3.29 M3 100% 15% 15.0% 15.0% Strip & Finishing 7.86 M2 100% 10% 10.0% 10.0% Backfiling& Compaction 1.56 M3 100% 15% 15.0% 15.0% Construct Fdn. NP-2010S Isopentane Feed Pump 100% 100.0% % Excavation 3.51 M3 100% 10% 10.0% 10.0% Rebar Work 0.50 TON 100% 30% 30.0% 30.0% Form Work 7.86 M2 100% 10% 10.0% 10.0% Pouring Concrete 3.29 M3 100% 15% 15.0% 15.0% Strip & Finishing 7.86 M2 100% 10% 10.0% 10.0% Backfiling& Compaction 1.56 M3 100% 15% 15.0% 15.0% Construct Fdn. NV-1302 Liquid Waste Drum 100% 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.76 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 6.74 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% Construct Fdn. NV-1301 Flare Knockout Drum 100% 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 1.73 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% Construct Fdn. NV-2003 Isopentane Surge Drum 100% 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.99 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 7.38 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% Construct Fdn. NV-2010 Isopentane Storage Drum 100% 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 1.39 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% Construct Fdn. NE-2003 Hexene Cooler 100% 100.0% % Excavation 7.67 M3 100% 10% 10.0% 10.0% Rebar Work 0.15 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 1.26 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction 6.50 M3 100% 15% 15.0% 15.0% Construct Fdn. NP-2001A Hexene Charge Pump 100% 100.0% % Excavation 6.22 M3 100% 10% 10.0% 10.0% Rebar Work 0.14 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 4.53 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction 2.89 M3 100% 15% 15.0% 15.0% Construct Fdn. NP-2001S Hexene Charge Pump 100% 100.0% % Excavation 6.22 M3 100% 10% 10.0% 10.0% Rebar Work 0.14 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 4.53 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction 2.89 M3 100% 15% 15.0% 15.0% Construct Fdn. NV-2001 Hexene Surge Drum 100% 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 2.44 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% BOQ % CMPL Improved % REPOR Page 16 of 26

138 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for Project each Level6 CMPL % Weight Value Level7 activity C PIPE RACK FOUNDATION -N , % , % 0.12% 95.38% 0.12% From : A % 70.0% % Excavation M3 10% Rebar Work 0.37 TON 100% 30% 30.0% 30.0% Form Work 9.41 M2 100% 10% 10.0% 10.0% Pouring Concrete 4.67 M3 100% 15% 15.0% 15.0% Strip & Finishing 9.41 M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 15% From : A % 70.0% % Excavation M3 10% Rebar Work 0.37 TON 100% 30% 30.0% 30.0% Form Work 9.41 M2 100% 10% 10.0% 10.0% Pouring Concrete 4.67 M3 100% 15% 15.0% 15.0% Strip & Finishing 9.41 M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 15% From : A % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.37 TON 100% 30% 30.0% 30.0% Form Work 9.41 M2 100% 10% 10.0% 10.0% Pouring Concrete 4.67 M3 100% 15% 15.0% 15.0% Strip & Finishing 9.41 M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : A % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.37 TON 100% 30% 30.0% 30.0% Form Work 9.41 M2 100% 10% 10.0% 10.0% Pouring Concrete 4.67 M3 100% 15% 15.0% 15.0% Strip & Finishing 9.41 M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : A % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.37 TON 100% 30% 30.0% 30.0% Form Work 9.41 M2 100% 10% 10.0% 10.0% Pouring Concrete 4.67 M3 100% 15% 15.0% 15.0% Strip & Finishing 9.41 M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : A % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.37 TON 100% 30% 30.0% 30.0% Form Work 9.41 M2 100% 10% 10.0% 10.0% Pouring Concrete 4.67 M3 100% 15% 15.0% 15.0% Strip & Finishing 9.41 M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : A % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.37 TON 100% 30% 30.0% 30.0% Form Work 9.41 M2 100% 10% 10.0% 10.0% Pouring Concrete 4.67 M3 100% 15% 15.0% 15.0% Strip & Finishing 9.41 M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : A % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.37 TON 100% 30% 30.0% 30.0% Form Work 9.41 M2 100% 10% 10.0% 10.0% Pouring Concrete 4.67 M3 100% 15% 15.0% 15.0% Strip & Finishing 9.41 M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : A % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.37 TON 100% 30% 30.0% 30.0% Form Work 9.41 M2 100% 10% 10.0% 10.0% Pouring Concrete 4.67 M3 100% 15% 15.0% 15.0% Strip & Finishing 9.41 M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : A % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.37 TON 100% 30% 30.0% 30.0% Form Work 9.41 M2 100% 10% 10.0% 10.0% Pouring Concrete 4.67 M3 100% 15% 15.0% 15.0% Strip & Finishing 9.41 M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : A % 80.5% % Excavation M3 10% Rebar Work 0.37 TON 100% 30% 30.0% 30.0% Form Work 9.41 M2 100% 10% 10.0% 10.0% Pouring Concrete 4.67 M3 100% 15% 15.0% 15.0% Strip & Finishing 9.41 M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 70% 15% 10.5% 7.5% From : A % 90.0% % Excavation M3 10% Rebar Work 0.37 TON 100% 30% 30.0% 30.0% Form Work 9.41 M2 100% 10% 10.0% 10.0% Pouring Concrete 4.67 M3 100% 15% 15.0% 15.0% Strip & Finishing 9.41 M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : A % 100.0% % Progress Value 4,815,410 BOQ % CMPL Improved % REPOR Page 17 of 26

139 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for Project each Level6 CMPL % Weight Value Level7 activity Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.37 TON 100% 30% 30.0% 30.0% Form Work 9.41 M2 100% 10% 10.0% 10.0% Pouring Concrete 4.67 M3 100% 15% 15.0% 15.0% Strip & Finishing 9.41 M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : A % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.37 TON 100% 30% 30.0% 30.0% Form Work 9.41 M2 100% 10% 10.0% 10.0% Pouring Concrete 4.67 M3 100% 15% 15.0% 15.0% Strip & Finishing 9.41 M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : A % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.37 TON 100% 30% 30.0% 30.0% Form Work 9.41 M2 100% 10% 10.0% 10.0% Pouring Concrete 4.67 M3 100% 15% 15.0% 15.0% Strip & Finishing 9.41 M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : A % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.37 TON 100% 30% 30.0% 30.0% Form Work 9.41 M2 100% 10% 10.0% 10.0% Pouring Concrete 4.67 M3 100% 15% 15.0% 15.0% Strip & Finishing 9.41 M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : A % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.37 TON 100% 30% 30.0% 30.0% Form Work 9.41 M2 100% 10% 10.0% 10.0% Pouring Concrete 4.67 M3 100% 15% 15.0% 15.0% Strip & Finishing 9.41 M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : A % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.37 TON 100% 30% 30.0% 30.0% Form Work 9.41 M2 100% 10% 10.0% 10.0% Pouring Concrete 4.67 M3 100% 15% 15.0% 15.0% Strip & Finishing 9.41 M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : A % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.37 TON 100% 30% 30.0% 30.0% Form Work 9.41 M2 100% 10% 10.0% 10.0% Pouring Concrete 4.67 M3 100% 15% 15.0% 15.0% Strip & Finishing 9.41 M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : A % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.37 TON 100% 30% 30.0% 30.0% Form Work 9.41 M2 100% 10% 10.0% 10.0% Pouring Concrete 4.67 M3 100% 15% 15.0% 15.0% Strip & Finishing 9.41 M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% C EQPT STR FOUNDATION -N , % , % 0.17% % 0.17% From : A % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.33 TON 100% 30% 30.0% 30.0% Form Work 6.63 M2 100% 10% 10.0% 10.0% Pouring Concrete 3.54 M3 100% 15% 15.0% 15.0% Strip & Finishing 6.63 M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : A % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.33 TON 100% 30% 30.0% 30.0% Form Work 6.63 M2 100% 10% 10.0% 10.0% Pouring Concrete 3.54 M3 100% 15% 15.0% 15.0% Strip & Finishing 6.63 M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : A % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.33 TON 100% 30% 30.0% 30.0% Form Work 6.63 M2 100% 10% 10.0% 10.0% Pouring Concrete 3.54 M3 100% 15% 15.0% 15.0% Strip & Finishing 6.63 M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : A % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.33 TON 100% 30% 30.0% 30.0% Form Work 6.63 M2 100% 10% 10.0% 10.0% Pouring Concrete 3.54 M3 100% 15% 15.0% 15.0% Strip & Finishing 6.63 M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : A % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.33 TON 100% 30% 30.0% 30.0% Progress Value 4,815,410 BOQ % CMPL Improved % REPOR Page 18 of 26

140 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for Project each Level6 CMPL % Weight Value Level7 activity Form Work 6.63 M2 100% 10% 10.0% 10.0% Pouring Concrete 3.54 M3 100% 15% 15.0% 15.0% Strip & Finishing 6.63 M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : A % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.33 TON 100% 30% 30.0% 30.0% Form Work 6.63 M2 100% 10% 10.0% 10.0% Pouring Concrete 3.54 M3 100% 15% 15.0% 15.0% Strip & Finishing 6.63 M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : A % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.33 TON 100% 30% 30.0% 30.0% Form Work 6.63 M2 100% 10% 10.0% 10.0% Pouring Concrete 3.54 M3 100% 15% 15.0% 15.0% Strip & Finishing 6.63 M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : A % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.33 TON 100% 30% 30.0% 30.0% Form Work 6.63 M2 100% 10% 10.0% 10.0% Pouring Concrete 3.54 M3 100% 15% 15.0% 15.0% Strip & Finishing 6.63 M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : A % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.33 TON 100% 30% 30.0% 30.0% Form Work 6.63 M2 100% 10% 10.0% 10.0% Pouring Concrete 3.54 M3 100% 15% 15.0% 15.0% Strip & Finishing 6.63 M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : A % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.33 TON 100% 30% 30.0% 30.0% Form Work 6.63 M2 100% 10% 10.0% 10.0% Pouring Concrete 3.54 M3 100% 15% 15.0% 15.0% Strip & Finishing 6.63 M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : A % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.33 TON 100% 30% 30.0% 30.0% Form Work 6.63 M2 100% 10% 10.0% 10.0% Pouring Concrete 3.54 M3 100% 15% 15.0% 15.0% Strip & Finishing 6.63 M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : A % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.33 TON 100% 30% 30.0% 30.0% Form Work 6.63 M2 100% 10% 10.0% 10.0% Pouring Concrete 3.54 M3 100% 15% 15.0% 15.0% Strip & Finishing 6.63 M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : A % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.33 TON 100% 30% 30.0% 30.0% Form Work 6.63 M2 100% 10% 10.0% 10.0% Pouring Concrete 3.54 M3 100% 15% 15.0% 15.0% Strip & Finishing 6.63 M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : A % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.33 TON 100% 30% 30.0% 30.0% Form Work 6.63 M2 100% 10% 10.0% 10.0% Pouring Concrete 3.54 M3 100% 15% 15.0% 15.0% Strip & Finishing 6.63 M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% C CABLE TRENCH/DUCT BANK -N , % , % 0.12% 80.00% 0.11% Block-A 100% 91.3% 1, , % Excavation M3 100% 35% 35.0% 35.0% Installation of Precast Concrete/Concrete Pouring 3.48 M3 100% 25% 25.0% 25.0% Backfilling & Compaction M 95% 25% 23.8% 12.5% Hand over to Mech,Piping Work to Others 1.00 NOS 50% 15% 7.5% 7.5% Block-B 100% 91.3% 1, , % Excavation M3 100% 35% 35.0% 35.0% Installation of Precast Concrete/Concrete Pouring 3.48 M3 100% 25% 25.0% 25.0% Backfilling & Compaction M 95% 25% 23.8% 12.5% Hand over to Mech,Piping Work to Others 1.00 NOS 50% 15% 7.5% 7.5% Block-C 100% 91.3% 1, , % Excavation M3 100% 35% 35.0% 35.0% Installation of Precast Concrete/Concrete Pouring 3.48 M3 100% 25% 25.0% 25.0% Backfilling & Compaction M 95% 25% 23.8% 12.5% Hand over to Mech,Piping Work to Others 1.00 NOS 50% 15% 7.5% 7.5% Block-D 100% 91.3% 1, , % Excavation M3 100% 35% 35.0% 35.0% Installation of Precast Concrete/Concrete Pouring 3.48 M3 100% 25% 25.0% 25.0% Backfilling & Compaction M 95% 25% 23.8% 12.5% Hand over to Mech,Piping Work to Others 1.00 NOS 50% 15% 7.5% 7.5% C CONCRETE PAVING -N % % 0.01% 10.00% 0.01% Block-A 100% 23.5% % Excavation M3 100% 10% 10.0% 10.0% Progress Value 4,815,410 BOQ % CMPL Improved % REPOR Page 19 of 26

141 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for Project each Level6 CMPL % Weight Value Level7 activity Progress Value 4,815,410 Rebar Work 1.00 TON 30% 45% 13.5% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Clear Punch List 1.00 NOS 5% Completed 1.00 NOS 5% Block-B 100% 23.5% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 1.00 TON 30% 45% 13.5% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Clear Punch List 1.00 NOS 5% Completed 1.00 NOS 5% Block-C 100% 23.5% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 1.00 TON 30% 45% 13.5% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Clear Punch List 1.00 NOS 5% Completed 1.00 NOS 5% C N21S1 STR ERECTION -N % % 0.00% 1.50% 0.00% From : Grid 104, % 6.0% % Receive and Shake-out 4.00 TON 60% 10% 6.0% 5.0% Erection 4.00 TON 50% Plumb, Bolt and Torque 4.00 TON 25% Clear Punch list 1.00 NOS 10% From : Grid 107, % 6.0% % Receive and Shake-out 4.00 TON 60% 10% 6.0% 5.0% Erection 4.00 TON 50% Plumb, Bolt and Torque 4.00 TON 25% Clear Punch list 1.00 NOS 10% From : Grid 110, % Receive and Shake-out 4.00 TON 10% Erection 4.00 TON 50% Plumb, Bolt and Torque 4.00 TON 25% Clear Punch list 1.00 NOS 10% From : Grid 113, % Receive and Shake-out 4.00 TON 10% Erection 4.00 TON 50% Plumb, Bolt and Torque 4.00 TON 25% Clear Punch list 1.00 NOS 10% From : Grid 107, % 6.0% % Receive and Shake-out 4.00 TON 60% 10% 6.0% 5.0% Erection 4.00 TON 50% Plumb, Bolt and Torque 4.00 TON 25% Clear Punch list 1.00 NOS 10% From : Grid 110, % Receive and Shake-out 4.00 TON 10% Erection 4.00 TON 50% Plumb, Bolt and Torque 4.00 TON 25% Clear Punch list 1.00 NOS 10% From : Grid 113, % Receive and Shake-out 4.00 TON 10% Erection 4.00 TON 50% Plumb, Bolt and Torque 4.00 TON 25% Clear Punch list 1.00 NOS 10% From : Grid 117, % Receive and Shake-out 4.00 TON 10% Erection 4.00 TON 50% Plumb, Bolt and Torque 4.00 TON 25% Clear Punch list 1.00 NOS 10% From : Grid 120, % Receive and Shake-out 4.00 TON 10% Erection 4.00 TON 50% Plumb, Bolt and Torque 4.00 TON 25% Clear Punch list 1.00 NOS 10% From : Grid 123, % Receive and Shake-out 4.00 TON 10% Erection 4.00 TON 50% Plumb, Bolt and Torque 4.00 TON 25% Clear Punch list 1.00 NOS 10% C N21R1 PIPE RACK ERECTION -N % % 0.01% 10.00% 0.01% From: Grid A1-A2 100% 10.0% % Receive and Shake-out TON 100% 10% 10.0% 10.0% Erection TON 50% Plumb, Bolt and Torque TON 25% Clear Punch list 1.00 NOS 10% From: Grid A1-A2 100% 10.0% % Receive and Shake-out TON 100% 10% 10.0% 10.0% Erection TON 50% Plumb, Bolt and Torque TON 25% Clear Punch list 1.00 NOS 10% From: Grid A1-A2 100% 10.0% % Receive and Shake-out TON 100% 10% 10.0% 10.0% Erection TON 50% Plumb, Bolt and Torque TON 25% Clear Punch list 1.00 NOS 10% From: Grid A1-A2 100% 10.0% % Receive and Shake-out TON 100% 10% 10.0% 10.0% Erection TON 50% Plumb, Bolt and Torque TON 25% Clear Punch list 1.00 NOS 10% From: Grid A1-A2 100% 10.0% % Receive and Shake-out TON 100% 10% 10.0% 10.0% Erection TON 50% BOQ % CMPL Improved % REPOR Page 20 of 26

142 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for Project each Level6 CMPL % Weight Value Level7 activity Plumb, Bolt and Torque TON 25% Clear Punch list 1.00 NOS 10% From: (Finishing Bldg) Grid A1-A2-Road Crossing 100% 10.0% % Receive and Shake-out TON 100% 10% 10.0% 10.0% Erection TON 50% Plumb, Bolt and Torque TON 25% Clear Punch list 1.00 NOS 10% C EQPT STR FOUNDATION -N , % , % 0.13% % 0.13% From : 131-A21 100% 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.19 TON 100% 30% 30.0% 30.0% Form Work 8.49 M2 100% 10% 10.0% 10.0% Pouring Concrete 3.31 M3 100% 15% 15.0% 15.0% Strip & Finishing 8.49 M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : 131-A22 100% 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.19 TON 100% 30% 30.0% 30.0% Form Work 8.49 M2 100% 10% 10.0% 10.0% Pouring Concrete 3.31 M3 100% 15% 15.0% 15.0% Strip & Finishing 8.49 M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : 131-A23 100% 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.19 TON 100% 30% 30.0% 30.0% Form Work 8.49 M2 100% 10% 10.0% 10.0% Pouring Concrete 3.31 M3 100% 15% 15.0% 15.0% Strip & Finishing 8.49 M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : 131-A24 100% 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.19 TON 100% 30% 30.0% 30.0% Form Work 8.49 M2 100% 10% 10.0% 10.0% Pouring Concrete 3.31 M3 100% 15% 15.0% 15.0% Strip & Finishing 8.49 M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : 131-A25 100% 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.19 TON 100% 30% 30.0% 30.0% Form Work 8.49 M2 100% 10% 10.0% 10.0% Pouring Concrete 3.31 M3 100% 15% 15.0% 15.0% Strip & Finishing 8.49 M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : 131-A26 100% 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.19 TON 100% 30% 30.0% 30.0% Form Work 8.49 M2 100% 10% 10.0% 10.0% Pouring Concrete 3.31 M3 100% 15% 15.0% 15.0% Strip & Finishing 8.49 M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : 131-A27 100% 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.19 TON 100% 30% 30.0% 30.0% Form Work 8.49 M2 100% 10% 10.0% 10.0% Pouring Concrete 3.31 M3 100% 15% 15.0% 15.0% Strip & Finishing 8.49 M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : 131-A28 100% 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.19 TON 100% 30% 30.0% 30.0% Form Work 8.49 M2 100% 10% 10.0% 10.0% Pouring Concrete 3.31 M3 100% 15% 15.0% 15.0% Strip & Finishing 8.49 M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : 131-A29 100% 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.19 TON 100% 30% 30.0% 30.0% Form Work 8.49 M2 100% 10% 10.0% 10.0% Pouring Concrete 3.31 M3 100% 15% 15.0% 15.0% Strip & Finishing 8.49 M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : 131-A30 100% 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.19 TON 100% 30% 30.0% 30.0% Form Work 8.49 M2 100% 10% 10.0% 10.0% Pouring Concrete 3.31 M3 100% 15% 15.0% 15.0% Strip & Finishing 8.49 M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : 132-A21 100% 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.19 TON 100% 30% 30.0% 30.0% Form Work 8.49 M2 100% 10% 10.0% 10.0% Pouring Concrete 3.31 M3 100% 15% 15.0% 15.0% Strip & Finishing 8.49 M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : 132-A22 100% 100.0% % Excavation M3 100% 10% 10.0% 10.0% Progress Value 4,815,410 BOQ % CMPL Improved % REPOR Page 21 of 26

143 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for Project each Level6 CMPL % Weight Value Level7 activity Progress Value 4,815,410 Rebar Work 0.19 TON 100% 30% 30.0% 30.0% Form Work 8.49 M2 100% 10% 10.0% 10.0% Pouring Concrete 3.31 M3 100% 15% 15.0% 15.0% Strip & Finishing 8.49 M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : 132-A23 100% 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.19 TON 100% 30% 30.0% 30.0% Form Work 8.49 M2 100% 10% 10.0% 10.0% Pouring Concrete 3.31 M3 100% 15% 15.0% 15.0% Strip & Finishing 8.49 M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : 132-A24 100% 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.19 TON 100% 30% 30.0% 30.0% Form Work 8.49 M2 100% 10% 10.0% 10.0% Pouring Concrete 3.31 M3 100% 15% 15.0% 15.0% Strip & Finishing 8.49 M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : 132-A25 100% 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.19 TON 100% 30% 30.0% 30.0% Form Work 8.49 M2 100% 10% 10.0% 10.0% Pouring Concrete 3.31 M3 100% 15% 15.0% 15.0% Strip & Finishing 8.49 M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : 132-A26 100% 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.19 TON 100% 30% 30.0% 30.0% Form Work 8.49 M2 100% 10% 10.0% 10.0% Pouring Concrete 3.31 M3 100% 15% 15.0% 15.0% Strip & Finishing 8.49 M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : 132-A27 100% 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.19 TON 100% 30% 30.0% 30.0% Form Work 8.49 M2 100% 10% 10.0% 10.0% Pouring Concrete 3.31 M3 100% 15% 15.0% 15.0% Strip & Finishing 8.49 M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : 132-A28 100% 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.19 TON 100% 30% 30.0% 30.0% Form Work 8.49 M2 100% 10% 10.0% 10.0% Pouring Concrete 3.31 M3 100% 15% 15.0% 15.0% Strip & Finishing 8.49 M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : 132-A29 100% 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.19 TON 100% 30% 30.0% 30.0% Form Work 8.49 M2 100% 10% 10.0% 10.0% Pouring Concrete 3.31 M3 100% 15% 15.0% 15.0% Strip & Finishing 8.49 M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : 132-A30 100% 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.19 TON 100% 30% 30.0% 30.0% Form Work 8.49 M2 100% 10% 10.0% 10.0% Pouring Concrete 3.31 M3 100% 15% 15.0% 15.0% Strip & Finishing 8.49 M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : 133-A21 100% 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.19 TON 100% 30% 30.0% 30.0% Form Work 8.49 M2 100% 10% 10.0% 10.0% Pouring Concrete 3.31 M3 100% 15% 15.0% 15.0% Strip & Finishing 8.49 M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : 133-A22 100% 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.19 TON 100% 30% 30.0% 30.0% Form Work 8.49 M2 100% 10% 10.0% 10.0% Pouring Concrete 3.31 M3 100% 15% 15.0% 15.0% Strip & Finishing 8.49 M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : 133-A23 100% 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.19 TON 100% 30% 30.0% 30.0% Form Work 8.49 M2 100% 10% 10.0% 10.0% Pouring Concrete 3.31 M3 100% 15% 15.0% 15.0% Strip & Finishing 8.49 M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : 133-A24 100% 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.19 TON 100% 30% 30.0% 30.0% Form Work 8.49 M2 100% 10% 10.0% 10.0% Pouring Concrete 3.31 M3 100% 15% 15.0% 15.0% BOQ % CMPL Improved % REPOR Page 22 of 26

144 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for Project each Level6 CMPL % Weight Value Level7 activity Progress Value 4,815,410 Strip & Finishing 8.49 M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : 133-A25 100% 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.19 TON 100% 30% 30.0% 30.0% Form Work 8.49 M2 100% 10% 10.0% 10.0% Pouring Concrete 3.31 M3 100% 15% 15.0% 15.0% Strip & Finishing 8.49 M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : 133-A26 100% 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.19 TON 100% 30% 30.0% 30.0% Form Work 8.49 M2 100% 10% 10.0% 10.0% Pouring Concrete 3.31 M3 100% 15% 15.0% 15.0% Strip & Finishing 8.49 M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : 133-A27 100% 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.19 TON 100% 30% 30.0% 30.0% Form Work 8.49 M2 100% 10% 10.0% 10.0% Pouring Concrete 3.31 M3 100% 15% 15.0% 15.0% Strip & Finishing 8.49 M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : 133-A28 100% 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.19 TON 100% 30% 30.0% 30.0% Form Work 8.49 M2 100% 10% 10.0% 10.0% Pouring Concrete 3.31 M3 100% 15% 15.0% 15.0% Strip & Finishing 8.49 M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : 133-A29 100% 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.19 TON 100% 30% 30.0% 30.0% Form Work 8.49 M2 100% 10% 10.0% 10.0% Pouring Concrete 3.31 M3 100% 15% 15.0% 15.0% Strip & Finishing 8.49 M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : 133-A30 100% 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.19 TON 100% 30% 30.0% 30.0% Form Work 8.49 M2 100% 10% 10.0% 10.0% Pouring Concrete 3.31 M3 100% 15% 15.0% 15.0% Strip & Finishing 8.49 M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : 134-A21 100% 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.19 TON 100% 30% 30.0% 30.0% Form Work 8.49 M2 100% 10% 10.0% 10.0% Pouring Concrete 3.31 M3 100% 15% 15.0% 15.0% Strip & Finishing 8.49 M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : 134-A22 100% 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.19 TON 100% 30% 30.0% 30.0% Form Work 8.49 M2 100% 10% 10.0% 10.0% Pouring Concrete 3.31 M3 100% 15% 15.0% 15.0% Strip & Finishing 8.49 M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : 134-A23 100% 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.19 TON 100% 30% 30.0% 30.0% Form Work 8.49 M2 100% 10% 10.0% 10.0% Pouring Concrete 3.31 M3 100% 15% 15.0% 15.0% Strip & Finishing 8.49 M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : 134-A24 100% 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.19 TON 100% 30% 30.0% 30.0% Form Work 8.49 M2 100% 10% 10.0% 10.0% Pouring Concrete 3.31 M3 100% 15% 15.0% 15.0% Strip & Finishing 8.49 M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : 134-A25 100% 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.19 TON 100% 30% 30.0% 30.0% Form Work 8.49 M2 100% 10% 10.0% 10.0% Pouring Concrete 3.31 M3 100% 15% 15.0% 15.0% Strip & Finishing 8.49 M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : 134-A26 100% 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.19 TON 100% 30% 30.0% 30.0% Form Work 8.49 M2 100% 10% 10.0% 10.0% Pouring Concrete 3.31 M3 100% 15% 15.0% 15.0% Strip & Finishing 8.49 M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% BOQ % CMPL Improved % REPOR Page 23 of 26

145 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for Project each Level6 CMPL % Weight Value Level7 activity From : 134-A27 100% 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.19 TON 100% 30% 30.0% 30.0% Form Work 8.49 M2 100% 10% 10.0% 10.0% Pouring Concrete 3.31 M3 100% 15% 15.0% 15.0% Strip & Finishing 8.49 M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : 134-A28 100% 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.19 TON 100% 30% 30.0% 30.0% Form Work 8.49 M2 100% 10% 10.0% 10.0% Pouring Concrete 3.31 M3 100% 15% 15.0% 15.0% Strip & Finishing 8.49 M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : 134-A29 100% 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.19 TON 100% 30% 30.0% 30.0% Form Work 8.49 M2 100% 10% 10.0% 10.0% Pouring Concrete 3.31 M3 100% 15% 15.0% 15.0% Strip & Finishing 8.49 M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : 134-A30 100% 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.19 TON 100% 30% 30.0% 30.0% Form Work 8.49 M2 100% 10% 10.0% 10.0% Pouring Concrete 3.31 M3 100% 15% 15.0% 15.0% Strip & Finishing 8.49 M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% C CABLE TRENCH/DUCT BANK -N , % , % 0.04% 68.75% 0.04% Block-A 100% 93.5% % Excavation M3 100% 10% 10.0% 10.0% Conduit Pipe 1.00 M 100% 45% 45.0% 45.0% Installation of Precast Concrete/Concrete Pouring M3 100% 30% 30.0% 30.0% Backfilling & Compaction M3 85% 10% 8.5% 5.0% Hand over to laying cable works 1.00 NOS 5% Block-B 100% 84.0% % Excavation M3 100% 10% 10.0% 10.0% Conduit Pipe 1.00 M 100% 45% 45.0% 45.0% Installation of Precast Concrete/Concrete Pouring M3 80% 30% 24.0% 15.0% Backfilling & Compaction M3 50% 10% 5.0% 5.0% Hand over to laying cable works 1.00 NOS 5% Block-C 100% 55.0% % Excavation M3 100% 10% 10.0% 10.0% Conduit Pipe 1.00 M 100% 45% 45.0% 45.0% Installation of Precast Concrete/Concrete Pouring M3 30% Backfilling & Compaction M3 10% Hand over to laying cable works 1.00 NOS 5% Block-D 100% 55.0% % Excavation M3 100% 10% 10.0% 10.0% Conduit Pipe 1.00 M 100% 45% 45.0% 45.0% Installation of Precast Concrete/Concrete Pouring M3 30% Backfilling & Compaction M3 10% Hand over to laying cable works 1.00 NOS 5% C CONCRETE PAVING -N % % 0.02% 40.83% 0.01% Block-A 100% 44.5% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 1.00 TON 50% 45% 22.5% 22.5% Form Work M2 40% 10% 4.0% Pouring Concrete M3 40% 15% 6.0% Strip & Finishing M2 20% 10% 2.0% Clear Punch List 1.00 NOS 5% Completed 1.00 NOS 5% Block-B 100% 59.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 1.00 TON 65% 45% 29.3% 22.5% Form Work M2 65% 10% 6.5% 5.0% Pouring Concrete M3 65% 15% 9.8% 7.5% Strip & Finishing M2 35% 10% 3.5% Clear Punch List 1.00 NOS 5% Completed 1.00 NOS 5% Block-C 100% 53.8% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 1.00 TON 60% 45% 27.0% 22.5% Form Work M2 55% 10% 5.5% 5.0% Pouring Concrete M3 55% 15% 8.3% 7.5% Strip & Finishing M2 30% 10% 3.0% Clear Punch List 1.00 NOS 5% Completed 1.00 NOS 5% Progress Value 4,815,410 C N22S1 STR ERECTION -N % % 0.00% From : A21-A25 Grid 106, % Receive and Shake-out 5.00 TON 10% Erection 5.00 TON 50% Plumb, Bolt and Torque 5.00 TON 25% Clear Punch list 1.00 NOS 10% From : A25-A30 Grid 106, % 6.0% Receive and Shake-out 5.00 TON 60% 10% 6.0% Erection 5.00 TON 50% Plumb, Bolt and Torque 5.00 TON 25% Clear Punch list 1.00 NOS 10% From : A2-A25 Grid 106, % Receive and Shake-out 5.00 TON 10% Erection 5.00 TON 50% Plumb, Bolt and Torque 5.00 TON 25% Clear Punch list 1.00 NOS 10% From : A25-A30 Grid 106, % 6.0% Receive and Shake-out 5.00 TON 60% 10% 6.0% Erection 5.00 TON 50% Plumb, Bolt and Torque 5.00 TON 25% Clear Punch list 1.00 NOS 10% BOQ % CMPL Improved % REPOR Page 24 of 26

146 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for Project each Level6 CMPL % Weight Value Level7 activity From : A2-A25 Grid 109, % Receive and Shake-out 5.00 TON 10% Erection 5.00 TON 50% Plumb, Bolt and Torque 5.00 TON 25% Clear Punch list 1.00 NOS 10% From : A25-A30 Grid 109, % Receive and Shake-out 5.00 TON 10% Erection 5.00 TON 50% Plumb, Bolt and Torque 5.00 TON 25% Clear Punch list 1.00 NOS 10% From : A2-A25 Grid 109, % Receive and Shake-out 5.00 TON 10% Erection 5.00 TON 50% Plumb, Bolt and Torque 5.00 TON 25% Clear Punch list 1.00 NOS 10% From : A25-A30 Grid 109, % Receive and Shake-out 5.00 TON 10% Erection 5.00 TON 50% Plumb, Bolt and Torque 5.00 TON 25% Clear Punch list 1.00 NOS 10% From : A2-A25 Grid 112, % Receive and Shake-out 5.00 TON 10% Erection 5.00 TON 50% Plumb, Bolt and Torque 5.00 TON 25% Clear Punch list 1.00 NOS 10% From : A25-A30 Grid 112, % Receive and Shake-out 5.00 TON 10% Erection 5.00 TON 50% Plumb, Bolt and Torque 5.00 TON 25% Clear Punch list 1.00 NOS 10% From : A2-A25 Grid 112, % Receive and Shake-out 5.00 TON 10% Erection 5.00 TON 50% Plumb, Bolt and Torque 5.00 TON 25% Clear Punch list 1.00 NOS 10% From : A25-A30 Grid 112, % Receive and Shake-out 5.00 TON 10% Erection 5.00 TON 50% Plumb, Bolt and Torque 5.00 TON 25% Clear Punch list 1.00 NOS 10% From : A2-A25 Grid 116, % Receive and Shake-out 5.00 TON 10% Erection 5.00 TON 50% Plumb, Bolt and Torque 5.00 TON 25% Clear Punch list 1.00 NOS 10% From : A25-A30 Grid 116, % Receive and Shake-out 5.00 TON 10% Erection 5.00 TON 50% Plumb, Bolt and Torque 5.00 TON 25% Clear Punch list 1.00 NOS 10% From : A2-A25 Grid 116, % Receive and Shake-out 5.00 TON 10% Erection 5.00 TON 50% Plumb, Bolt and Torque 5.00 TON 25% Clear Punch list 1.00 NOS 10% From : A25-A30 Grid 116, % Receive and Shake-out 5.00 TON 10% Erection 5.00 TON 50% Plumb, Bolt and Torque 5.00 TON 25% Clear Punch list 1.00 NOS 10% C EQPT FOUNDATION -N , % , % 0.05% 52.50% 0.05% PC0603 Construct Fdn. NP-2005 Sump Pump 100% 1, Excavation M3 10% Rebar Work 0.50 TON 30% Form Work M2 10% Pouring Concrete 8.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% PC0601 Construct Fdn. NV-2005 Mineral Oil Blow Drum 100% 70.0% 1, % Excavation 5.62 M3 10% Rebar Work 0.08 TON 100% 30% 30.0% 30.0% Form Work 6.05 M2 100% 10% 10.0% 10.0% Pouring Concrete 1.58 M3 100% 15% 15.0% 15.0% Strip & Finishing 6.05 M2 100% 10% 10.0% 10.0% Backfiling& Compaction 4.06 M3 15% Progress Value 4,815,410 BOQ % CMPL Improved % REPOR PC0607 PC01AD42 Construct Fdn. NV-2006 Unloading Seal Drum 100% 70.0% 1, % Excavation 6.50 M3 10% Rebar Work 0.18 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 5.04 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction 2.23 M3 15% Construct Fdn. NV-2007 Alkyl Disposal Tank 100% 70.0% 1, % Excavation 6.69 M3 10% Rebar Work 0.21 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 1.69 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction 5.26 M3 15% Page 25 of 26

147 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for Project each Level6 CMPL % Weight Value Level7 activity C ISOCONTAINER STRUCTURE / FIRE WALL -N % % 0.01% Block -A 100% 9.0% Excavation M3 10% Rebar Work 1.00 TON 30% 30% 9.0% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% Block -B 100% 9.0% Excavation M3 10% Rebar Work 1.00 TON 30% 30% 9.0% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% Block -C 100% 9.0% Excavation M3 10% Rebar Work 1.00 TON 30% 30% 9.0% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% Block -D 100% 9.0% Excavation M3 10% Rebar Work 1.00 TON 30% 30% 9.0% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% Block -E 100% 9.0% Excavation M3 10% Rebar Work 1.00 TON 30% 30% 9.0% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% Block -F 100% 9.0% Excavation M3 10% Rebar Work 1.00 TON 30% 30% 9.0% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% AREA TOTAL 1.66% 1.56% Progress Value 4,815,410 BOQ % CMPL Improved % REPOR Page 26 of 26

148 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for each Level6 activity Project CMPL % Weight Value Level7 Progress Value BOQ CATALYST MANUFACTURING(Area-2) CIVIL WORK 1,185 53, , % To Total Mhrs C EQPT FOUNDATION -N , % 79.6% 3, , % 0.05% 77.9% 0.05% PC01AD1 Construct Fdn. NV-1402 Conds Fls Drum 100% 92.0% % Excavation 5.49 M3 100% 10% 10.0% 10.0% Rebar Work 0.21 TON 100% 30% 30.0% 30.0% Form Work 9.49 M2 100% 10% 10.0% 10.0% Pouring Concrete 4.23 M3 100% 15% 15.0% 15.0% Strip & Finishing 9.49 M2 100% 10% 10.0% 10.0% Backfiling& Compaction 0.92 M3 80% 15% 12.0% 7.5% PC01AD2 Construct Fdn. NV-1401 Connection Tank 100% 92.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.21 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 6.04 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction 4.58 M3 80% 15% 12.0% 7.5% PC01AD3 Construct Fdn. NV-3030 Inhibitor Addition Pot 100% 77.5% % Excavation 3.26 M3 100% 10% 10.0% 10.0% Rebar Work 0.07 TON 100% 30% 30.0% 30.0% Form Work 5.25 M2 100% 10% 10.0% 10.0% Pouring Concrete 1.08 M3 100% 15% 15.0% 15.0% Strip & Finishing 5.25 M2 100% 10% 10.0% 10.0% Backfiling& Compaction 2.31 M3 15% Clear Punchlist 1.00 NOS 50% 5% 2.5% 2.5% PC01AD4 Construct Fdn. NV-3030 Mineral Oil Drum 100% 77.5% % Excavation 5.62 M3 100% 10% 10.0% 10.0% Rebar Work 0.08 TON 100% 30% 30.0% 30.0% Form Work 6.05 M2 100% 10% 10.0% 10.0% Pouring Concrete 1.58 M3 100% 15% 15.0% 15.0% Strip & Finishing 6.05 M2 100% 10% 10.0% 10.0% Backfiling& Compaction 4.06 M3 15% Clear Punchlist 1.00 NOS 50% 5% 2.5% 2.5% PC0641 Construct Fdn. NF-3005A Catalyst Screener 100% 77.5% % Excavation 2.10 M3 100% 10% 10.0% 10.0% Rebar Work 0.09 TON 100% 30% 30.0% 30.0% Form Work 5.99 M2 100% 10% 10.0% 10.0% Pouring Concrete 1.72 M3 100% 15% 15.0% 15.0% Strip & Finishing 5.99 M2 100% 10% 10.0% 10.0% Backfiling& Compaction 0.92 M3 15% Clear Punchlist 1.00 NOS 50% 5% 2.5% 2.5% PC0643 Construct Fdn. NF-3005B Catalyst Screener 100% 80.0% % Excavation 2.10 M3 100% 10% 10.0% 10.0% Rebar Work 0.09 TON 100% 30% 30.0% 30.0% Form Work 5.99 M2 100% 10% 10.0% 10.0% Pouring Concrete 1.72 M3 100% 15% 15.0% 15.0% Strip & Finishing 5.99 M2 100% 10% 10.0% 10.0% Backfiling& Compaction 0.92 M3 15% PC0645 Construct Fdn. NF-3055A Catalyst Screener 100% 80.0% % Excavation 2.10 M3 100% 10% 10.0% 10.0% Rebar Work 0.09 TON 100% 30% 30.0% 30.0% Form Work 5.99 M2 100% 10% 10.0% 10.0% Pouring Concrete 1.72 M3 100% 15% 15.0% 15.0% Strip & Finishing 5.99 M2 100% 10% 10.0% 10.0% Backfiling& Compaction 0.92 M3 15% PC0647 Construct Fdn. NF-3055B Catalyst Screener 100% 80.0% % Excavation 2.10 M3 100% 10% 10.0% 10.0% Rebar Work 0.09 TON 100% 30% 30.0% 30.0% Form Work 5.99 M2 100% 10% 10.0% 10.0% Pouring Concrete 1.72 M3 100% 15% 15.0% 15.0% Strip & Finishing 5.99 M2 100% 10% 10.0% 10.0% Backfiling& Compaction 0.92 M3 15% PC0615 Construct Fdn. NP-3001A TEAL Charge Pump 100% 80.0% % Excavation 1.90 M3 100% 10% 10.0% 10.0% Rebar Work 0.07 TON 100% 30% 30.0% 30.0% Form Work 6.55 M2 100% 10% 10.0% 10.0% Pouring Concrete 1.39 M3 100% 15% 15.0% 15.0% Strip & Finishing 6.55 M2 100% 10% 10.0% 10.0% Backfiling& Compaction 1.18 M3 15% PC0617 Construct Fdn. NP-3001S TEAL Charge Pump 100% 77.5% % Excavation 1.90 M3 100% 10% 10.0% 10.0% Rebar Work 0.07 TON 100% 30% 30.0% 30.0% Form Work 6.55 M2 100% 10% 10.0% 10.0% Pouring Concrete 1.39 M3 100% 15% 15.0% 15.0% Strip & Finishing 6.55 M2 100% 10% 10.0% 10.0% Backfiling& Compaction 1.18 M3 15% Clear Punchlist 1.00 NOS 50% 5% 2.5% 2.5% PC0625 Construct Fdn. NP-3002 Mineral Oil Pump 100% 24.5% % Excavation 1.90 M3 95% 10% 9.5% 5.0% Rebar Work 0.07 TON 50% 30% 15.0% 15.0% Form Work 6.55 M2 10% Pouring Concrete 1.39 M3 15% Strip & Finishing 6.55 M2 10% Backfiling& Compaction 1.18 M3 15% PC0635 Construct Fdn. NP-3003A Tempered Water Pump 100% 94.8% % Excavation 6.13 M3 100% 10% 10.0% 10.0% Rebar Work 0.15 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 4.41 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction 2.89 M3 85% 15% 12.8% 7.5% Hand over to Mech,Piping Work to Others 1.00 NOS 40% 5% 2.0% 4,815,410 CMPL Improved Page 1 of 14

149 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for each Level6 activity Project CMPL % Weight Value Level7 Progress Value 4,815,410 BOQ PC0637 Construct Fdn. NP-3003S Tempered Water Pump 100% 94.8% % Excavation 6.13 M3 100% 10% 10.0% 10.0% Rebar Work 0.15 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 4.41 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction 2.89 M3 85% 15% 12.8% 7.5% Hand over to Mech,Piping Work to Others 1.00 NOS 40% 5% 2.0% PC0619 Construct Fdn. NP-3051 TEAL Charge Pump 100% 77.5% % Excavation 6.63 M3 100% 10% 10.0% 10.0% Rebar Work 0.07 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 4.94 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction 3.01 M3 15% Clear Punchlist 1.00 NOS 50% 5% 2.5% 2.5% PC0639 Construct Fdn. NP-3053 Tempered Water Pump 100% 94.0% % Excavation 6.63 M3 100% 10% 10.0% 10.0% Rebar Work 0.31 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 4.94 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction 3.01 M3 80% 15% 12.0% 7.5% Hand over to Mech,Piping Work to Others 1.00 NOS 40% 5% 2.0% PC0627 Construct Fdn. NW-3003 Shipping Container Scale 100% 100.0% % Excavation 4.00 M3 100% 10% 10.0% 10.0% Rebar Work 0.20 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 2.00 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction 2.00 M3 100% 15% 15.0% 15.0% PC0629 Construct Fdn. NW-3053 Shipping Container Scale 100% 100.0% % Excavation 4.00 M3 100% 10% 10.0% 10.0% Rebar Work 0.20 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 2.00 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction 2.00 M3 100% 15% 15.0% 15.0% PC01AD7 Construct Fdn. NP-1401A Condensate Transfer Pump 100% 80.0% % Excavation 6.25 M3 100% 10% 10.0% 10.0% Rebar Work 0.15 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 4.52 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction 2.93 M3 15% PC01AD8 Construct Fdn. NP-1401S Condensate Transfer Pump 100% 80.0% % Excavation 6.25 M3 100% 10% 10.0% 10.0% Rebar Work 0.15 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 4.52 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction 2.93 M3 15% PC01AD9 Construct Fdn. NP-1402A - Desuperheater Water 100% 77.5% % Excavation 1.32 M3 100% 10% 10.0% 10.0% Rebar Work 0.05 TON 100% 30% 30.0% 30.0% Form Work 3.73 M2 100% 10% 10.0% 10.0% Pouring Concrete 0.75 M3 100% 15% 15.0% 15.0% Strip & Finishing 3.73 M2 100% 10% 10.0% 10.0% Backfiling& Compaction 0.86 M3 15% Clear Punchlist 1.00 NOS 50% 5% 2.5% 2.5% PC01AD10 Construct Fdn. NP-1402S - Desuperheater Water 100% 77.5% % Excavation 1.32 M3 100% 10% 10.0% 10.0% Rebar Work 0.05 TON 100% 30% 30.0% 30.0% Form Work 3.73 M2 100% 10% 10.0% 10.0% Pouring Concrete 0.75 M3 100% 15% 15.0% 15.0% Strip & Finishing 3.73 M2 100% 10% 10.0% 10.0% Backfiling& Compaction 0.86 M3 15% Clear Punchlist 1.00 NOS 50% 5% 2.5% 2.5% PC01AD40 Construct Fdn. NE Condensate Cooler 100% 92.0% % Excavation 6.94 M3 100% 10% 10.0% 10.0% Rebar Work 0.13 TON 100% 30% 30.0% 30.0% Form Work 9.64 M2 100% 10% 10.0% 10.0% Pouring Concrete 1.40 M3 100% 15% 15.0% 15.0% Strip & Finishing 9.64 M2 100% 10% 10.0% 10.0% Backfiling& Compaction 5.60 M3 80% 15% 12.0% 7.5% PC01AD41 Construct Fdn. NV Alkyl Disposal Drum 100% 25.0% % Excavation 7.39 M3 100% 10% 10.0% 10.0% Rebar Work 2.00 TON 50% 30% 15.0% 15.0% Form Work M2 10% Pouring Concrete 2.11 M3 15% Strip & Finishing M2 10% Backfiling& Compaction 5.66 M3 15% C T-SUPPORT FOUNDATION -N % 79.0% % 0.04% 77.5% 0.04% Excavation M3 100% 10% 10.0% 10.0% Rebar Work 3.11 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 10% 15% 1.5% Clear Punchlist 1.00 NOS 50% 5% 2.5% 2.5% C N31S1 EQPT STR FOUNDATION -N , % 100.0% 3, , % 0.06% 100.0% 0.06% FDN for Silica struc.-from B % 100.0% % Excavation M3 100% 10% 10.0% 10.0% CMPL Improved Page 2 of 14

150 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for each Level6 activity Project CMPL % Weight Value Level7 Progress Value BOQ Rebar Work 3.21 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% FDN for Silica struc.-from B % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 3.21 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% FDN for Silica struc.-from B % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 3.21 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% FDN for Silica struc.-from B % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 3.21 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% FDN for Silica struc.-from B % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 3.21 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% FDN for Silica struc.-from B % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 3.21 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% C CABLE TRENCH/DUCT BANK -N % 17.8% 1, % 0.01% 9.4% 0.00% Block-A 100% 9.5% % Excavation M3 95% 10% 9.5% 5.0% Conduit Pipe 3.48 M 45% Concrete M3 30% Backfilling 0.40 M3 10% Hand over to laying cable works 1.00 NOS 5% Block-B 100% 9.5% % Excavation M3 95% 10% 9.5% 5.0% Conduit Pipe 3.48 M 45% Concrete M3 30% Backfilling 0.40 M3 10% Hand over to laying cable works 1.00 NOS 5% Block-C 100% 9.5% % Excavation M3 95% 10% 9.5% 5.0% Conduit Pipe 3.48 M 45% Concrete M3 30% Backfilling 0.40 M3 10% Hand over to laying cable works 1.00 NOS 5% Block-D 100% 42.8% % Excavation M3 10% Conduit Pipe 3.48 M 95% 45% 42.8% 22.5% Concrete M3 30% Backfilling 0.40 M3 10% Hand over to laying cable works 1.00 NOS 5% C N32H1 EQPT & SHELTER FOUNDATION -N , % 2, , % 0.05% 96.9% 0.05% PC0727 PC0731 PC0729 PC0296 4,815,410 Construct Fdn. NK-2001A Nitrogen Compressor % 99.5% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 1.44 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% Hand over to Mech,Piping Work to Others 1.00 NOS 90% 5% 4.5% 2.5% Construct Fdn. NK-2001B Nitrogen Compressor % 99.5% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 1.44 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% Hand over to Mech,Piping Work to Others 1.00 NOS 90% 5% 4.5% 2.5% Construct Fdn. NK-2001S Nitrogen Compressor % 99.5% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 1.44 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% Hand over to Mech,Piping Work to Others 1.00 NOS 90% 5% 4.5% 2.5% Construct fdn. NF-2001A / 2001S % 79.5% % Excavation 1.26 M3 95% 10% 9.5% 5.0% Rebar Work 0.04 TON 100% 30% 30.0% 30.0% Form Work 3.30 M2 100% 10% 10.0% 10.0% Pouring Concrete 0.38 M3 100% 15% 15.0% 15.0% Strip & Finishing 3.30 M2 100% 10% 10.0% 10.0% CMPL Improved Page 3 of 14

151 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for each Level6 activity Project CMPL % Weight Value Level7 Progress Value BOQ Backfiling& Compaction 1.00 M3 15% Construct Shelter FDN-N % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 3.88 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% C N31PS1 T-SUPPORT FOUNDATION -N % 80.0% % 0.03% 80.0% 0.03% Excavation 1.27 M3 100% 10% 10.0% 10.0% Rebar Work 0.03 TON 100% 30% 30.0% 30.0% Form Work 3.29 M2 100% 10% 10.0% 10.0% Pouring Concrete 0.37 M3 100% 15% 15.0% 15.0% Strip & Finishing 3.29 M2 100% 10% 10.0% 10.0% Backfiling& Compaction 1.00 M3 15% C N31S2 EQPT STR FOUNDATION -N , % 99.5% 3, , , % 0.08% 97.6% 0.07% FDN for Catalyst: From : 212-B0 100% 99.5% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.67 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 6.69 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% Hand over to Mech,Piping Work to Others 1.00 NOS 90% 5% 4.5% 2.5% FDN for Catalyst: From : 212-B1 100% 99.5% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.67 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 6.69 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% Hand over to Mech,Piping Work to Others 1.00 NOS 90% 5% 4.5% 2.5% FDN for Catalyst: From : 212-B2 100% 99.5% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.67 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 6.69 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% Hand over to Mech,Piping Work to Others 1.00 NOS 90% 5% 4.5% 2.5% FDN for Catalyst: From : 212-B3 100% 99.5% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.67 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 6.69 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% Hand over to Mech,Piping Work to Others 1.00 NOS 90% 5% 4.5% 2.5% FDN for Catalyst: From : 212-B4 100% 99.5% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.67 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 6.69 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% Hand over to Mech,Piping Work to Others 1.00 NOS 90% 5% 4.5% 2.5% FDN for Catalyst: From : 212-B5 100% 99.5% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.67 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 6.69 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% Hand over to Mech,Piping Work to Others 1.00 NOS 90% 5% 4.5% 2.5% FDN for Catalyst: From : 212-B6 100% 99.5% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.67 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 6.69 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% Hand over to Mech,Piping Work to Others 1.00 NOS 90% 5% 4.5% 2.5% FDN for Catalyst: From : 212-B7 100% 99.5% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.67 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 6.69 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% Hand over to Mech,Piping Work to Others 1.00 NOS 90% 5% 4.5% 2.5% FDN for Catalyst: From : 212-B8 100% 99.5% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.67 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 6.69 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% Hand over to Mech,Piping Work to Others 1.00 NOS 90% 5% 4.5% 2.5% FDN for Catalyst: From : 204-B0 100% 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.67 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 6.69 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% 4,815,410 CMPL Improved Page 4 of 14

152 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for each Level6 activity Project CMPL % Weight Value Level7 Progress Value 4,815,410 BOQ FDN for Catalyst: From : 204-B1 100% 99.5% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.67 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 6.69 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% Hand over to Mech,Piping Work to Others 1.00 NOS 90% 5% 4.5% 2.5% FDN for Catalyst: From : 204-B2 100% 99.5% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.67 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 6.69 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% Hand over to Mech,Piping Work to Others 1.00 NOS 90% 5% 4.5% 2.5% FDN for Catalyst: From : 204-B3 100% 99.5% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.67 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 6.69 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% Hand over to Mech,Piping Work to Others 1.00 NOS 90% 5% 4.5% 2.5% FDN for Catalyst: From : 204-B4 100% 99.5% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.67 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 6.69 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% Hand over to Mech,Piping Work to Others 1.00 NOS 90% 5% 4.5% 2.5% FDN for Catalyst: From : 204-B5 100% 99.5% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.67 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 6.69 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% Hand over to Mech,Piping Work to Others 1.00 NOS 90% 5% 4.5% 2.5% FDN for Catalyst: From : 204-B6 100% 99.5% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.67 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 6.69 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% Hand over to Mech,Piping Work to Others 1.00 NOS 90% 5% 4.5% 2.5% FDN for Catalyst: From : 204-B7 100% 99.5% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.67 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 6.69 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% Hand over to Mech,Piping Work to Others 1.00 NOS 90% 5% 4.5% 2.5% FDN for Catalyst: From : 204-B8 100% 99.5% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.67 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 6.69 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% Hand over to Mech,Piping Work to Others 1.00 NOS 90% 5% 4.5% 2.5% FDN for Catalyst: From : 203-B5 100% 99.5% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.67 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 6.69 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% Hand over to Mech,Piping Work to Others 1.00 NOS 90% 5% 4.5% 2.5% FDN for Catalyst: From : 203-B6 100% 99.5% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.67 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 6.69 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% Hand over to Mech,Piping Work to Others 1.00 NOS 90% 5% 4.5% 2.5% FDN for Catalyst: From : 203-B7 100% 99.5% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.67 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 6.69 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% Hand over to Mech,Piping Work to Others 1.00 NOS 90% 5% 4.5% 2.5% FDN for Catalyst: From : 203-B8 100% 99.5% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.67 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 6.69 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% Hand over to Mech,Piping Work to Others 1.00 NOS 90% 5% 4.5% 2.5% FDN for Catalyst: From : 202-B1 100% 99.5% % Excavation M3 100% 10% 10.0% 10.0% CMPL Improved Page 5 of 14

153 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for each Level6 activity Project CMPL % Weight Value Level7 Progress Value BOQ Rebar Work 0.67 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 6.69 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% Hand over to Mech,Piping Work to Others 1.00 NOS 90% 5% 4.5% 2.5% FDN for Catalyst: From : 202-B2 100% 99.5% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.67 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 6.69 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% Hand over to Mech,Piping Work to Others 1.00 NOS 90% 5% 4.5% 2.5% FDN for Catalyst: From : 202-B3 100% 99.5% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.67 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 6.69 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% Hand over to Mech,Piping Work to Others 1.00 NOS 90% 5% 4.5% 2.5% FDN for Catalyst: From : 202-B4 100% 99.5% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.67 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 6.69 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% Hand over to Mech,Piping Work to Others 1.00 NOS 90% 5% 4.5% 2.5% FDN for Catalyst: From : 202-B5 100% 99.5% 97.5% Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.67 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 6.69 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% Hand over to Mech,Piping Work to Others 1.00 NOS 90% 5% 4.5% 2.5% FDN for Catalyst: From : 201-B3A 100% 99.5% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.67 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 6.69 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% Hand over to Mech,Piping Work to Others 1.00 NOS 90% 5% 4.5% 2.5% FDN for Catalyst: From : 201-B4 100% 99.5% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.67 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 6.69 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% Hand over to Mech,Piping Work to Others 1.00 NOS 90% 5% 4.5% 2.5% FDN for Catalyst: From : 201-B5 100% 99.5% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.67 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 6.69 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% Hand over to Mech,Piping Work to Others 1.00 NOS 90% 5% 4.5% 2.5% FDN for Catalyst: From : 201-B6 100% 99.5% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.67 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 6.69 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% Hand over to Mech,Piping Work to Others 1.00 NOS 90% 5% 4.5% 2.5% FDN for Catalyst: From : 201-B7 100% 99.5% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.67 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 6.69 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% Hand over to Mech,Piping Work to Others 1.00 NOS 90% 5% 4.5% 2.5% FDN for Catalyst: From : 201-B8 100% 99.5% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.67 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 6.69 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% Hand over to Mech,Piping Work to Others 1.00 NOS 90% 5% 4.5% 2.5% C CABLE TRENCH/DUCT BANK -N % % 0.00% 5.0% 0.00% Block-A 100% 9.5% % Excavation M3 95% 10% 9.5% 5.0% Conduit Pipe 1.00 M 45% Concrete M3 30% Backfilling M3 10% Hand over to laying cable works 1.00 NOS 5% Block-B 100% 9.5% % Excavation M3 95% 10% 9.5% 5.0% Conduit Pipe 1.00 M 45% Concrete M3 30% Backfilling M3 10% Hand over to laying cable works 1.00 NOS 5% Block-C 100% 9.5% % 4,815,410 CMPL Improved Page 6 of 14

154 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for each Level6 activity Project CMPL % Weight Value Level7 Progress Value 4,815,410 BOQ Excavation M3 95% 10% 9.5% 5.0% Conduit Pipe 1.00 M 45% Concrete M3 30% Backfilling M3 10% Hand over to laying cable works 1.00 NOS 5% Block-D 100% 9.5% % Excavation M3 95% 10% 9.5% 5.0% Conduit Pipe 1.00 M 45% Concrete M3 30% Backfilling M3 10% Hand over to laying cable works 1.00 NOS 5% C FOUNDATION (SILICA STG BLD) -N % 80.6% % 0.05% 76.4% 0.05% From: B61 Grid % 74.5% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 1.00 TON 100% 30% 30.0% 30.0% Form Work 6.85 M2 100% 10% 10.0% 10.0% Pouring Concrete 1.68 M3 100% 15% 15.0% 15.0% Strip & Finishing 6.85 M2 95% 10% 9.5% 5.0% Backfiling& Compaction M3 15% From: B61 Grid % 74.5% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 1.00 TON 100% 30% 30.0% 30.0% Form Work 6.85 M2 100% 10% 10.0% 10.0% Pouring Concrete 1.68 M3 100% 15% 15.0% 15.0% Strip & Finishing 6.85 M2 95% 10% 9.5% 5.0% Backfiling& Compaction M3 15% From: B61 Grid % 68.5% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 1.00 TON 100% 30% 30.0% 30.0% Form Work M2 90% 10% 9.0% 5.0% Pouring Concrete 2.25 M3 90% 15% 13.5% 7.5% Strip & Finishing M2 60% 10% 6.0% 5.0% Backfiling& Compaction M3 15% From: B61 Grid % 68.5% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 1.00 TON 100% 30% 30.0% 30.0% Form Work M2 90% 10% 9.0% 5.0% Pouring Concrete 2.25 M3 90% 15% 13.5% 7.5% Strip & Finishing M2 60% 10% 6.0% 5.0% Backfiling& Compaction M3 15% From: B61 Grid % 74.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 1.00 TON 100% 30% 30.0% 30.0% Form Work 6.85 M2 100% 10% 10.0% 10.0% Pouring Concrete 1.68 M3 100% 15% 15.0% 15.0% Strip & Finishing 6.85 M2 90% 10% 9.0% 5.0% Backfiling& Compaction M3 15% From: B61 Grid % 74.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 1.00 TON 100% 30% 30.0% 30.0% Form Work 6.85 M2 100% 10% 10.0% 10.0% Pouring Concrete 1.68 M3 100% 15% 15.0% 15.0% Strip & Finishing 6.85 M2 90% 10% 9.0% 5.0% Backfiling& Compaction M3 15% From: B62 Grid % 77.0% % Excavation 7.97 M3 100% 10% 10.0% 10.0% Rebar Work 1.00 TON 100% 30% 30.0% 30.0% Form Work 5.01 M2 100% 10% 10.0% 10.0% Pouring Concrete 1.64 M3 100% 15% 15.0% 15.0% Strip & Finishing 5.01 M2 95% 10% 9.5% 5.0% Backfiling& Compaction 6.07 M3 15% Clear Punchlist 1.00 NOS 50% 5% 2.5% 2.5% From: B62 Grid % 100.0% % Excavation 7.97 M3 100% 10% 10.0% 10.0% Rebar Work 1.00 TON 100% 30% 30.0% 30.0% Form Work 5.01 M2 100% 10% 10.0% 10.0% Pouring Concrete 1.64 M3 100% 15% 15.0% 15.0% Strip & Finishing 5.01 M2 100% 10% 10.0% 10.0% Backfiling& Compaction 6.07 M3 100% 15% 15.0% 15.0% From: B62 Grid % 100.0% % Excavation 7.97 M3 100% 10% 10.0% 10.0% Rebar Work 1.00 TON 100% 30% 30.0% 30.0% Form Work 5.01 M2 100% 10% 10.0% 10.0% Pouring Concrete 1.64 M3 100% 15% 15.0% 15.0% Strip & Finishing 5.01 M2 100% 10% 10.0% 10.0% Backfiling& Compaction 6.07 M3 100% 15% 15.0% 15.0% From: B62 Grid % 100.0% % Excavation 7.97 M3 100% 10% 10.0% 10.0% Rebar Work 1.00 TON 100% 30% 30.0% 30.0% Form Work 5.01 M2 100% 10% 10.0% 10.0% Pouring Concrete 1.64 M3 100% 15% 15.0% 15.0% Strip & Finishing 5.01 M2 100% 10% 10.0% 10.0% Backfiling& Compaction 6.07 M3 100% 15% 15.0% 15.0% From: B62 Grid % 100.0% % Excavation 7.97 M3 100% 10% 10.0% 10.0% Rebar Work 1.00 TON 100% 30% 30.0% 30.0% Form Work 5.01 M2 100% 10% 10.0% 10.0% Pouring Concrete 1.64 M3 100% 15% 15.0% 15.0% Strip & Finishing 5.01 M2 100% 10% 10.0% 10.0% Backfiling& Compaction 6.07 M3 100% 15% 15.0% 15.0% CMPL Improved Page 7 of 14

155 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for each Level6 activity Project CMPL % Weight Value Level7 Progress Value BOQ From: B62 Grid % 77.0% % Excavation 7.97 M3 100% 10% 10.0% 10.0% Rebar Work 1.00 TON 100% 30% 30.0% 30.0% Form Work 5.01 M2 100% 10% 10.0% 10.0% Pouring Concrete 1.64 M3 100% 15% 15.0% 15.0% Strip & Finishing 5.01 M2 95% 10% 9.5% 5.0% Backfiling& Compaction 6.07 M3 15% Clear Punchlist 1.00 NOS 50% 5% 2.5% 2.5% From: B63 Grid % 77.0% % Excavation 7.97 M3 100% 10% 10.0% 10.0% Rebar Work 1.00 TON 100% 30% 30.0% 30.0% Form Work 5.01 M2 100% 10% 10.0% 10.0% Pouring Concrete 1.64 M3 100% 15% 15.0% 15.0% Strip & Finishing 5.01 M2 95% 10% 9.5% 5.0% Backfiling& Compaction 6.07 M3 15% Clear Punchlist 1.00 NOS 50% 5% 2.5% 2.5% From: B63 Grid % 77.0% % Excavation 8.62 M3 100% 10% 10.0% 10.0% Rebar Work 1.00 TON 100% 30% 30.0% 30.0% Form Work 5.69 M2 100% 10% 10.0% 10.0% Pouring Concrete 1.89 M3 100% 15% 15.0% 15.0% Strip & Finishing 5.69 M2 95% 10% 9.5% 5.0% Backfiling& Compaction 6.47 M3 15% Clear Punchlist 1.00 NOS 50% 5% 2.5% 2.5% From: B63 Grid % 77.0% % Excavation 8.62 M3 100% 10% 10.0% 10.0% Rebar Work 1.00 TON 100% 30% 30.0% 30.0% Form Work 5.69 M2 100% 10% 10.0% 10.0% Pouring Concrete 1.89 M3 100% 15% 15.0% 15.0% Strip & Finishing 5.69 M2 95% 10% 9.5% 5.0% Backfiling& Compaction 6.47 M3 15% Clear Punchlist 1.00 NOS 50% 5% 2.5% 2.5% From: B63 Grid % 77.0% % Excavation 8.62 M3 100% 10% 10.0% 10.0% Rebar Work 1.00 TON 100% 30% 30.0% 30.0% Form Work 5.69 M2 100% 10% 10.0% 10.0% Pouring Concrete 1.89 M3 100% 15% 15.0% 15.0% Strip & Finishing 5.69 M2 95% 10% 9.5% 5.0% Backfiling& Compaction 6.47 M3 15% Clear Punchlist 1.00 NOS 50% 5% 2.5% 2.5% From: B63 Grid % 77.0% % Excavation 8.62 M3 100% 10% 10.0% 10.0% Rebar Work 1.00 TON 100% 30% 30.0% 30.0% Form Work 5.69 M2 100% 10% 10.0% 10.0% Pouring Concrete 1.89 M3 100% 15% 15.0% 15.0% Strip & Finishing 5.69 M2 95% 10% 9.5% 5.0% Backfiling& Compaction 6.47 M3 15% Clear Punchlist 1.00 NOS 50% 5% 2.5% 2.5% From: B63 Grid % 77.0% % Excavation 7.97 M3 100% 10% 10.0% 10.0% Rebar Work 1.00 TON 100% 30% 30.0% 30.0% Form Work 5.01 M2 100% 10% 10.0% 10.0% Pouring Concrete 1.64 M3 100% 15% 15.0% 15.0% Strip & Finishing 5.01 M2 95% 10% 9.5% 5.0% Backfiling& Compaction 6.07 M3 15% Clear Punchlist 1.00 NOS 50% 5% 2.5% 2.5% REACTION SYSTEM(Area-3) CIVIL WORK 1, , , C EQPT FOUNDATION -N , % 100.0% 6, , % 0.14% 100.0% 0.14% Excavation M3 100% 10% 10.0% 10.0% Rebar Work TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% C C/G COMP FOUNDATION (NK-4001)-N , % 100.0% 10, , % 0.22% 100.0% 0.22% Excavation M3 100% 10% 10.0% 10.0% Rebar Work TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% C PIPE RACK FOUNDATION -N , % 7, , % 0.15% 100.0% 0.15% From : A % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.45 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 6.12 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : A % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.45 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 6.12 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : A % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.45 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 6.12 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% 4,815,410 CMPL Improved Page 8 of 14

156 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for each Level6 activity Project CMPL % Weight Value Level7 Progress Value 4,815,410 BOQ From : A % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.45 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 6.12 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : A % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.45 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 6.12 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : A % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.45 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 6.12 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : A % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.45 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 6.12 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : A % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.45 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 6.12 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : A % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.45 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 6.12 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : A % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.45 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 6.12 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% C REACTOR STR FOUNDATION -N , % 100.0% 7, , % 0.15% 100.0% 0.15% Excavation M3 100% 10% 10.0% 10.0% Rebar Work TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% C C/G COOLER STR FOUNDATION -N , % 4, , % 0.06% 55.0% 0.05% PC0739 Construct C G Cooler struc. fdn.-(n40s2) 100% 24.0% 2, % Excavation M3 100% 10% 10.0% 10.0% Rebar Work TON 35% 30% 10.5% Form Work M2 10% 10% 1.0% Pouring Concrete M3 10% 15% 1.5% Strip & Finishing M2 10% 10% 1.0% Backfiling& Compaction M3 15% PC0739A Construct C G Comp. struc. fdn.- (N40H1) 100% 100.0% 2, , % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 6.95 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% C CABLE TRENCH IN N40S1 -N , % 3, , % 0.05% 56.9% 0.04% Block-A 100% 80.5% % Excavation 5.99 M3 100% 35% 35.0% 35.0% Installation of Precast Concrete/Pouring of Concrete 0.92 M3 95% 25% 23.8% 12.5% Backfill & Compaction 5.37 M 75% 25% 18.8% 12.5% Hand over to Mech,Piping Work to Others 1.00 NOS 20% 15% 3.0% Block-B 100% 79.3% % Excavation M3 100% 35% 35.0% 35.0% Installation of Precast Concrete/Pouring of Concrete M3 90% 25% 22.5% 12.5% Backfill & Compaction M 75% 25% 18.8% 12.5% Hand over to Mech,Piping Work to Others 1.00 NOS 20% 15% 3.0% Block-C 100% 75.5% % Excavation M3 100% 35% 35.0% 35.0% Installation of Precast Concrete/Pouring of Concrete M3 80% 25% 20.0% 12.5% Backfill & Compaction M 70% 25% 17.5% 12.5% Hand over to Mech,Piping Work to Others 1.00 NOS 20% 15% 3.0% Block-D 100% 50.0% % Excavation M3 100% 35% 35.0% 35.0% Installation of Precast Concrete/Pouring of Concrete 2.10 M3 60% 25% 15.0% 12.5% Backfill & Compaction M 25% CMPL Improved Page 9 of 14

157 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for each Level6 activity Project CMPL % Weight Value Level7 Progress Value 4,815,410 BOQ Hand over to Mech,Piping Work to Others 1.00 NOS 15% C CABLE TRENCH AT C/G COOLER -N , % 35.0% 1, % 0.01% 35.0% 0.01% Block-A 100% 35.0% % Excavation M3 100% 35% 35.0% 35.0% Installation of Precast Concrete/Pouring of Concrete 0.14 M3 25% Backfill & Compaction M 25% Hand over to Mech,Piping Work to Others 1.00 NOS 15% Block-B 100% 35.0% % Excavation 8.99 M3 100% 35% 35.0% 35.0% Installation of Precast Concrete/Pouring of Concrete 0.45 M3 25% Backfill & Compaction 8.53 M 25% Hand over to Mech,Piping Work to Others 1.00 NOS 15% Block-C 100% 35.0% % Excavation M3 100% 35% 35.0% 35.0% Installation of Precast Concrete/Pouring of Concrete 3.60 M3 25% Backfill & Compaction M 25% Hand over to Mech,Piping Work to Others 1.00 NOS 15% Block-D 100% 35.0% % Excavation M3 100% 35% 35.0% 35.0% Installation of Precast Concrete/Pouring of Concrete 1.20 M3 25% Backfill & Compaction M 25% Hand over to Mech,Piping Work to Others 1.00 NOS 15% C PIPE TRENCH -N % 28.0% % 0.01% 17.5% 0.01% Block-A 100% 28.0% % Excavation M3 80% 35% 28.0% 17.5% Installation of Precast Concrete/Pouring of Concrete M3 25% Backfill & Compaction M 25% Hand over to Mech,Piping Work to Others NOS 15% Block-B 100% 28.0% % Excavation M3 80% 35% 28.0% 17.5% Installation of Precast Concrete/Pouring of Concrete M3 25% Backfill & Compaction M 25% Hand over to Mech,Piping Work to Others NOS 15% Block-C 100% 28.0% % Excavation M3 80% 35% 28.0% 17.5% Installation of Precast Concrete/Pouring of Concrete M3 25% Backfill & Compaction M 25% Hand over to Mech,Piping Work to Others NOS 15% C LOCAL FOUNDATION -N % 47.9% % 0.03% 44.0% 0.03% PC01AD11 Construct NEL-4001 Elev. Fnd % 64.3% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 2.50 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 5.00 M3 75% 15% 11.3% 7.5% Strip & Finishing M2 30% 10% 3.0% Backfiling& Compaction M3 15% PC01AD12 Construct Analyzer Bldg. 1 Fnd % Excavation M3 10% Rebar Work 1.00 TON 30% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% PC01AD13 Construct Catalyst Hose Sta. Fnd % Excavation M3 10% Rebar Work 4.00 TON 30% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% PC01AD14 Construct Lube Oil Console Fnd.(N40/N50) % 98.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 1.01 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 95% 15% 14.3% 7.5% Hand over to Mech,Piping Work to Others 1.00 NOS 75% 5% 3.8% 2.5% PC01AD30 Construct N40 Local Fdn % 77.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.29 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 6.24 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 95% 10% 9.5% 5.0% Backfiling& Compaction 7.29 M3 15% Clear Punchlist 1.00 NOS 50% 5% 2.5% 2.5% C CONCRETE PAVING IN N40S1 -N % 34.0% % 0.03% 21.7% 0.02% Block-A (From C31-C34 to ) 100% 55.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 1.00 TON 60% 45% 27.0% 22.5% Form Work M2 60% 10% 6.0% 5.0% Pouring Concrete M3 60% 15% 9.0% 7.5% Strip & Finishing M2 30% 10% 3.0% Clear Punch List 1.00 NOS 5% Completed 1.00 NOS 5% Block-B (From: C31-C34 to A) 100% 23.5% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 1.00 TON 30% 45% 13.5% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Clear Punch List 1.00 NOS 5% Completed 1.00 NOS 5% Block-C (From: C31-C34 to 332A-334) 100% 23.5% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 1.00 TON 30% 45% 13.5% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Clear Punch List 1.00 NOS 5% Completed 1.00 NOS 5% C CONCRETE PAVING AT C/G COOLER -N % 23.5% % 0.01% 10.0% 0.00% Block-A 100% 23.5% % CMPL Improved Page 10 of 14

158 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for each Level6 activity Project CMPL % Weight Value Level7 Progress Value BOQ Excavation M3 100% 10% 10.0% 10.0% Rebar Work 1.50 TON 30% 45% 13.5% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Clear Punch List NOS 5% Completed NOS 5% Block-B 100% 23.5% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 1.50 TON 30% 45% 13.5% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Clear Punch List NOS 5% Completed NOS 5% Block-C 100% 23.5% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 1.50 TON 30% 45% 13.5% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Clear Punch List NOS 5% Completed NOS 5% C ASPHALT PAVING (1ST LAYER) -N % 9.5% % 0.00% 5.0% 0.00% Block-A 100% 9.5% % Excavation M3 95% 10% 9.5% 5.0% Base coarse M3 55% Primer Coat M2 10% 1 st Asphalt M3 15% Clear Punch List NOS 5% Completed NOS 5% Block-B 100% 9.5% % Excavation M3 95% 10% 9.5% 5.0% Base coarse M3 55% Primer Coat M2 10% 1 st Asphalt M3 15% Clear Punch List NOS 5% Completed NOS 5% Block-C 100% 9.5% % Excavation M3 95% 10% 9.5% 5.0% Base coarse M3 55% Primer Coat M2 10% 1 st Asphalt M3 15% Clear Punch List NOS 5% Completed NOS 5% C N40S1 STR ERECTION -N % 5.3% % 0.01% 5.0% 0.01% Install level & align El % 8.0% % Receive and Shake-out TON 80% 10% 8.0% 5.0% Erection TON 50% Plumb, Bolt and Torque TON 25% Clear Punch list 1.00 NOS 10% Install level & align El % 5.0% % Receive and Shake-out TON 50% 10% 5.0% 5.0% Erection TON 50% Plumb, Bolt and Torque TON 25% Clear Punch list 1.00 NOS 10% Install, level & align stl. El % 5.0% % Receive and Shake-out TON 50% 10% 5.0% 5.0% Erection TON 50% Plumb, Bolt and Torque TON 25% Clear Punch list 1.00 NOS 10% Install, level & align stl. El % 5.0% % Receive and Shake-out TON 50% 10% 5.0% 5.0% Erection TON 50% Plumb, Bolt and Torque TON 25% Clear Punch list 1.00 NOS 10% Install, level & align stl. El % 5.0% % Receive and Shake-out TON 50% 10% 5.0% 5.0% Erection TON 50% Plumb, Bolt and Torque TON 25% Clear Punch list 1.00 NOS 10% Install, level & align stl. El % 5.0% % Receive and Shake-out TON 50% 10% 5.0% 5.0% Erection TON 50% Plumb, Bolt and Torque TON 25% Clear Punch list 1.00 NOS 10% Install, level & align stl. El % 5.0% % Receive and Shake-out TON 50% 10% 5.0% 5.0% Erection TON 50% Plumb, Bolt and Torque TON 25% Clear Punch list 1.00 NOS 10% Install, level & align stl. El % 5.0% % Receive and Shake-out TON 50% 10% 5.0% 5.0% Erection TON 50% Plumb, Bolt and Torque TON 25% Clear Punch list 1.00 NOS 10% Install, level & align stl. El % 5.0% % Receive and Shake-out TON 50% 10% 5.0% 5.0% Erection TON 50% Plumb, Bolt and Torque TON 25% Clear Punch list 1.00 NOS 10% Install, level & align stl. El % 5.0% % Receive and Shake-out TON 50% 10% 5.0% 5.0% Erection TON 50% Plumb, Bolt and Torque TON 25% Clear Punch list 1.00 NOS 10% Install, level & align stl. El % 5.0% % Receive and Shake-out TON 50% 10% 5.0% 5.0% Erection TON 50% Plumb, Bolt and Torque TON 25% Clear Punch list 1.00 NOS 10% 4,815,410 CMPL Improved Page 11 of 14

159 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for each Level6 activity Project CMPL % Weight Value Level7 Progress Value 4,815,410 BOQ Install, level & align stl. El % 5.0% % Receive and Shake-out TON 50% 10% 5.0% 5.0% Erection TON 50% Plumb, Bolt and Torque TON 25% Clear Punch list 1.00 NOS 10% C N21R1 PIPE RACK ERECTION -N % % 0.00% 5.0% 0.00% From: Grid A1-A2 100% 6.0% % Receive and Shake-out TON 60% 10% 6.0% 5.0% Erection TON 50% Plumb, Bolt and Torque TON 25% Clear Punch list 1.00 NOS 10% From: Grid A1-A2 100% 6.0% % Receive and Shake-out TON 60% 10% 6.0% 5.0% Erection TON 50% Plumb, Bolt and Torque TON 25% Clear Punch list 1.00 NOS 10% C EQPT FOUNDATION -N , % 6, , % 0.14% 100.0% 0.14% PC1002 Construct R2 Eqpt Fdns 100% Excavation M3 100% 10% 10.0% 10.0% Rebar Work TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% C C/G COMP FOUNDATION (NK-5001) - N , % 100.0% 10, , % 0.22% 100.0% 0.22% Excavation M3 100% 10% 10.0% 10.0% Rebar Work TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% C REACTOR STR FOUNDATION -N , % 100.0% 6, , % 0.14% 100.0% 0.14% Excavation M3 100% 10% 10.0% 10.0% Rebar Work TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% C C/G COOLER STR FOUNDATION -N , % 59.5% 4, , % 0.05% 55.0% 0.05% PC1057 Construct C G Cooler struc. fdn.-(n50s2) 32 1, % 19.0% 2, % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 9.39 TON 30% 30% 9.0% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% PC1057B Construct C G Comp. struc. fdn.- (N50H1) 89 3, % 100.0% 2, , % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 7.61 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% C CABLE TRENCH IN N50S1 -N % 58.8% 1, % 0.02% 50.6% 0.02% Block-A 100% 43.8% % Excavation M3 100% 35% 35.0% 35.0% Installation of Precast Concrete/Pouring of Concrete M3 35% 25% 8.8% Backfill & Compaction M 25% Hand over to Mech,Piping Work to Others 1.00 NOS 15% Block-B 100% 68.8% % Excavation M3 100% 35% 35.0% 35.0% Installation of Precast Concrete/Pouring of Concrete M3 85% 25% 21.3% 12.5% Backfill & Compaction M 50% 25% 12.5% 12.5% Hand over to Mech,Piping Work to Others 1.00 NOS 15% Block-C 100% 75.0% % Excavation M3 100% 35% 35.0% 35.0% Installation of Precast Concrete/Pouring of Concrete M3 90% 25% 22.5% 12.5% Backfill & Compaction M 70% 25% 17.5% 12.5% Hand over to Mech,Piping Work to Others 1.00 NOS 15% Block-D 100% 47.5% % Excavation M3 100% 35% 35.0% 35.0% Installation of Precast Concrete/Pouring of Concrete M3 50% 25% 12.5% 12.5% Backfill & Compaction M 25% Hand over to Mech,Piping Work to Others 1.00 NOS 15% C CABLE TRENCH AT C/G COOLER -N % 37.5% 1, % 0.01% 35.0% 0.01% Block-A 100% 37.5% % Excavation M3 100% 35% 35.0% 35.0% Installation of Precast Concrete/Pouring of Concrete 8.00 M3 10% 25% 2.5% Backfill & Compaction M 25% Hand over to Mech,Piping Work to Others 1.00 NOS 15% Block-B 100% 37.5% % Excavation M3 100% 35% 35.0% 35.0% Installation of Precast Concrete/Pouring of Concrete 5.20 M3 10% 25% 2.5% Backfill & Compaction M 25% Hand over to Mech,Piping Work to Others 1.00 NOS 15% Block-C 100% 37.5% % Excavation M3 100% 35% 35.0% 35.0% Installation of Precast Concrete/Pouring of Concrete 5.20 M3 10% 25% 2.5% Backfill & Compaction M 25% Hand over to Mech,Piping Work to Others 1.00 NOS 15% Block-D 100% 37.5% % Excavation M3 100% 35% 35.0% 35.0% Installation of Precast Concrete/Pouring of Concrete 5.20 M3 10% 25% 2.5% Backfill & Compaction M 25% Hand over to Mech,Piping Work to Others 1.00 NOS 15% C PIPE TRENCH -N % 28.0% % 0.01% 17.5% 0.01% Block-A 100% 28.0% % CMPL Improved Page 12 of 14

160 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for each Level6 activity Project CMPL % Weight Value Level7 Progress Value 4,815,410 BOQ Excavation M3 80% 35% 28.0% 17.5% Installation of Precast Concrete/Pouring of Concrete M3 25% Backfill & Compaction M 25% Hand over to Mech,Piping Work to Others NOS 15% Block-B 100% 28.0% % Excavation M3 80% 35% 28.0% 17.5% Installation of Precast Concrete/Pouring of Concrete M3 25% Backfill & Compaction M 25% Hand over to Mech,Piping Work to Others NOS 15% Block-C 100% 28.0% % Excavation M3 80% 35% 28.0% 17.5% Installation of Precast Concrete/Pouring of Concrete M3 25% Backfill & Compaction M 25% Hand over to Mech,Piping Work to Others NOS 15% C LOCAL FOUNDATION -N % 36.3% % 0.02% 34.4% 0.02% PC01AD15 Construct NEL-5001 R2 Elevator % 63.3% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 2.50 TON 100% 30% 30.0% 30.0% Form Work M2 80% 10% 8.0% 5.0% Pouring Concrete 5.00 M3 75% 15% 11.3% 7.5% Strip & Finishing M2 40% 10% 4.0% Backfiling& Compaction M3 15% PC01AD16 Construct Catalyst Hose St. Fdn % Excavation M3 10% Rebar Work 1.00 TON 30% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% PC01AD17 Construct Analyzer Bldg. 2 Fdn % Excavation M3 10% Rebar Work 1.00 TON 30% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% PC01AD32 Construct N50 Local Fdn % 77.5% % Excavation 8.46 M3 100% 10% 10.0% 10.0% Rebar Work 0.17 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 3.75 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction 4.38 M3 15% Clear Punchlist 1.00 NOS 50% 5% 2.5% 2.5% C CONCRETE PAVING IN N50S1 -N % 35.5% % 0.03% 21.7% 0.02% Block-A 100% 60% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 1.00 TON 65% 45% 29.3% 22.5% Form Work M2 65% 10% 6.5% 5.0% Pouring Concrete M3 65% 15% 9.8% 7.5% Strip & Finishing M2 40% 10% 4.0% Clear Punch List 1.00 NOS 5% Completed 1.00 NOS 5% Block-B 100% 24% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 1.00 TON 30% 45% 13.5% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Clear Punch List 1.00 NOS 5% Completed 1.00 NOS 5% Block-C 100% 24% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 1.00 TON 30% 45% 13.5% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Clear Punch List 1.00 NOS 5% Completed 1.00 NOS 5% C CONCRETE PAVING AT C/G COOLER -N % 24.4% % 0.01% 5.0% 0.00% Block-A 100% 24% % Excavation M3 95% 10% 9.5% 5.0% Rebar Work 1.50 TON 33% 45% 14.9% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Clear Punch List NOS 5% Completed NOS 5% Block-B 100% 24% % Excavation M3 95% 10% 9.5% 5.0% Rebar Work 1.50 TON 33% 45% 14.9% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Clear Punch List NOS 5% Completed NOS 5% Block-C 100% 24% % Excavation M3 95% 10% 9.5% 5.0% Rebar Work 1.50 TON 33% 45% 14.9% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Clear Punch List NOS 5% Completed NOS 5% C ASPHALT PAVING (1ST LAYER) -N % 9.5% % 0.00% 5.0% 0.00% Block-A 100% 9.5% % Excavation M3 95% 10% 9.5% 5.0% Base coarse M3 55% Primer Coat M2 10% 1 st Asphalt M3 15% Clear Punch List NOS 5% Completed NOS 5% Block-B 100% 9.5% % Excavation M3 95% 10% 9.5% 5.0% CMPL Improved Page 13 of 14

161 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for each Level6 activity Project CMPL % Weight Value Level7 Progress Value 4,815,410 BOQ Base coarse M3 55% Primer Coat M2 10% 1 st Asphalt M3 15% Clear Punch List NOS 5% Completed NOS 5% Block-C 100% 9.5% % Excavation M3 95% 10% 9.5% 5.0% Base coarse M3 55% Primer Coat M2 10% 1 st Asphalt M3 15% Clear Punch List NOS 5% Completed NOS 5% C N50S1 STR ERECTION -N % 0.5% % 0.00% 0.42% 0.00% Install level & align El % 6% % Receive and Shake-out TON 60% 10% 6.0% 5.0% Erection TON 50% Plumb, Bolt and Torque TON 25% Clear Punch list 1.00 NOS 10% Install level & align El % Receive and Shake-out TON 10% Erection TON 50% Plumb, Bolt and Torque TON 25% Clear Punch list 1.00 NOS 10% Install, level & align stl. El % Receive and Shake-out TON 10% Erection TON 50% Plumb, Bolt and Torque TON 25% Clear Punch list 1.00 NOS 10% Install, level & align stl. El % Receive and Shake-out TON 10% Erection TON 50% Plumb, Bolt and Torque TON 25% Clear Punch list 1.00 NOS 10% Install, level & align stl. El % Receive and Shake-out TON 10% Erection TON 50% Plumb, Bolt and Torque TON 25% Clear Punch list 1.00 NOS 10% Install, level & align stl. El % Receive and Shake-out TON 10% Erection TON 50% Plumb, Bolt and Torque TON 25% Clear Punch list 1.00 NOS 10% Install, level & align stl. El % Receive and Shake-out TON 10% Erection TON 50% Plumb, Bolt and Torque TON 25% Clear Punch list 1.00 NOS 10% Install, level & align stl. El % Receive and Shake-out TON 10% Erection TON 50% Plumb, Bolt and Torque TON 25% Clear Punch list 1.00 NOS 10% Install, level & align stl. El % Receive and Shake-out TON 10% Erection TON 50% Plumb, Bolt and Torque TON 25% Clear Punch list 1.00 NOS 10% Install, level & align stl. El % Receive and Shake-out TON 10% Erection TON 50% Plumb, Bolt and Torque TON 25% Clear Punch list 1.00 NOS 10% Install, level & align stl. El % Receive and Shake-out TON 10% Erection TON 50% Plumb, Bolt and Torque TON 25% Clear Punch list 1.00 NOS 10% Install, level & align stl. El % Receive and Shake-out TON 10% Erection TON 50% Plumb, Bolt and Torque TON 25% Clear Punch list 1.00 NOS 10% AREA TOTALS 1.88% 1.80% CMPL Improved Page 14 of 14

162 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for each Level6 CMPL % activity Project Weight Value Level7 Progress Value VENT RECOVERY SYSTEM(Area-4) % To Total Mhrs CIVIL WORK , C EQPT FOUNDATION -N % 5, , % 0.04% 25.0% 0.03% Construct FDN of NV-4061 Low Pressure Cooler 100% 32.0% 1, % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% 10% 1.0% Pouring Concrete M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% Construct FDN of NV-4065 Refrigerant Condenser 100% 32.0% 1, % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% 10% 1.0% Pouring Concrete M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% Construct FDN of NV-5061 Low Pressure Cooler 100% 32.0% 1, % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% 10% 1.0% Pouring Concrete M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% Construct FDN of NV-5065 Refrigerant Condenser 100% 32.0% 1, % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% 10% 1.0% Pouring Concrete M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% C V/R COMP FOUNDATION -N % 5, , % 0.04% 25.0% 0.03% Construct FDN of NK-4061 Vent Recovery Compressor 100% 37.1% 2, % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 4.80 TON 75% 30% 22.5% 15.0% Form Work M2 46% 10% 4.6% Pouring Concrete M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% Construct FDN of NK-5061 Vent Recovery Compressor 100% 37.1% 2, % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 4.80 TON 75% 30% 22.5% 15.0% Form Work M2 46% 10% 4.6% Pouring Concrete M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% C PIPE RACK FOUNDATION -N % 5, , % 0.11% 90.0% 0.10% From: 442-D11 100% 95.5% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 1.84 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 1.90 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 80% 15% 12.0% 7.5% Hand over to Mech,Piping Work to Others 1.00 NOS 70% 5% 3.5% 2.5% From: 442-D12 100% 95.5% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 1.84 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 1.90 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 80% 15% 12.0% 7.5% Hand over to Mech,Piping Work to Others 1.00 NOS 70% 5% 3.5% 2.5% From: 442-D13 100% 95.5% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 1.84 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 1.90 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 80% 15% 12.0% 7.5% Hand over to Mech,Piping Work to Others 1.00 NOS 70% 5% 3.5% 2.5% From: 442-D14 100% 95.5% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 1.84 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 1.90 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 80% 15% 12.0% 7.5% Hand over to Mech,Piping Work to Others 1.00 NOS 70% 5% 3.5% 2.5% From: 442-D15 100% 95.5% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 1.84 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 1.90 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 80% 15% 12.0% 7.5% Hand over to Mech,Piping Work to Others 1.00 NOS 70% 5% 3.5% 2.5% From: 442-D16 100% 95.5% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 1.84 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 1.90 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 80% 15% 12.0% 7.5% Hand over to Mech,Piping Work to Others 1.00 NOS 70% 5% 3.5% 2.5% From: 442-D17 100% 95.5% % Excavation M3 100% 10% 10.0% 10.0% BOQ CMPL Improved Page 1 of 31

163 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for each Level6 CMPL % activity Project Weight Value Level7 Progress Value BOQ Rebar Work 1.84 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 1.90 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 80% 15% 12.0% 7.5% Hand over to Mech,Piping Work to Others 1.00 NOS 70% 5% 3.5% 2.5% From: 442-D18 100% 93.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 1.84 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 1.90 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 70% 15% 10.5% 7.5% Hand over to Mech,Piping Work to Others 1.00 NOS 50% 5% 2.5% 2.5% From: 442-D19 100% 93.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 1.84 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 1.90 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 70% 15% 10.5% 7.5% Hand over to Mech,Piping Work to Others 1.00 NOS 50% 5% 2.5% 2.5% From: 442-D20 100% 93.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 1.84 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 1.90 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 70% 15% 10.5% 7.5% Hand over to Mech,Piping Work to Others 1.00 NOS 50% 5% 2.5% 2.5% From: 443-D11 100% 95.5% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 1.84 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 1.90 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 80% 15% 12.0% 7.5% Hand over to Mech,Piping Work to Others 1.00 NOS 70% 5% 3.5% 2.5% From: 443-D12 100% 95.5% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 1.84 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 1.90 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 80% 15% 12.0% 7.5% Hand over to Mech,Piping Work to Others 1.00 NOS 70% 5% 3.5% 2.5% From: 443-D13 100% 95.5% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 1.84 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 1.90 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 80% 15% 12.0% 7.5% Hand over to Mech,Piping Work to Others 1.00 NOS 70% 5% 3.5% 2.5% From: 443-D14 100% 95.5% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 1.84 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 1.90 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 80% 15% 12.0% 7.5% Hand over to Mech,Piping Work to Others 1.00 NOS 70% 5% 3.5% 2.5% From: 443-D15 100% 95.5% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 1.84 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 1.90 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 80% 15% 12.0% 7.5% Hand over to Mech,Piping Work to Others 1.00 NOS 70% 5% 3.5% 2.5% From: 443-D16 100% 95.5% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 1.84 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 1.90 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 80% 15% 12.0% 7.5% Hand over to Mech,Piping Work to Others 1.00 NOS 70% 5% 3.5% 2.5% From: 443-D17 100% 95.5% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 1.84 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 1.90 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 80% 15% 12.0% 7.5% Hand over to Mech,Piping Work to Others 1.00 NOS 70% 5% 3.5% 2.5% From: 443-D18 100% 93.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 1.84 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 1.90 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 70% 15% 10.5% 7.5% Hand over to Mech,Piping Work to Others 1.00 NOS 50% 5% 2.5% 2.5% From: 443-D19 100% 93.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 1.84 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 1.90 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 70% 15% 10.5% 7.5% Hand over to Mech,Piping Work to Others 1.00 NOS 50% 5% 2.5% 2.5% CMPL Improved Page 2 of 31

164 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for each Level6 CMPL % activity Project Weight Value Level7 Progress Value BOQ From: 443-D20 100% 93.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 1.84 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 1.90 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 70% 15% 10.5% 7.5% Hand over to Mech,Piping Work to Others 1.00 NOS 50% 5% 2.5% 2.5% From: 401-D11 100% 95.5% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 1.84 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 1.90 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 80% 15% 12.0% 7.5% Hand over to Mech,Piping Work to Others 1.00 NOS 70% 5% 3.5% 2.5% From: 401-D12 100% 95.5% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 1.84 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 1.90 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 80% 15% 12.0% 7.5% Hand over to Mech,Piping Work to Others 1.00 NOS 70% 5% 3.5% 2.5% From: 402-D11 100% 95.5% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 1.84 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 1.90 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 80% 15% 12.0% 7.5% Hand over to Mech,Piping Work to Others 1.00 NOS 70% 5% 3.5% 2.5% From: 402-D12 100% 95.5% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 1.84 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 1.90 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 80% 15% 12.0% 7.5% Hand over to Mech,Piping Work to Others 1.00 NOS 70% 5% 3.5% 2.5% C EQPT STR FOUNDATION -N % 5, , % 0.11% 94.8% 0.11% From : 422-D31 100% 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 4.00 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : 422-D32 100% 84.5% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 4.00 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 30% 15% 4.5% From : 422-D33 100% 84.5% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 4.00 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 30% 15% 4.5% From : 422-D34 100% 84.5% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 4.00 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 30% 15% 4.5% From : 422-D41 100% 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 4.00 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : 422-D42 100% 84.5% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 4.00 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 30% 15% 4.5% From : 422-D43 100% 84.5% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 4.00 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 30% 15% 4.5% From : 422-D44 100% 84.5% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 4.00 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% CMPL Improved Page 3 of 31

165 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for each Level6 CMPL % activity Project Weight Value Level7 Progress Value BOQ Backfiling& Compaction M3 30% 15% 4.5% From : 423-D31 100% 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 4.00 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : 423-D32 100% 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 4.00 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : 423-D33 100% 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 4.00 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : 423-D34 100% 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 4.00 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : 423-D41 100% 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 4.00 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : 423-D42 100% 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 4.00 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : 423-D43 100% 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 4.00 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : 423-D44 100% 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 4.00 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : 424-D32 100% 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 4.00 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : 424-D33 100% 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 4.00 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : 424-D34 100% 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 4.00 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : 424-D41 100% 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 4.00 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : 424-D42 100% 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 4.00 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% CMPL Improved Page 4 of 31

166 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for each Level6 CMPL % activity Project Weight Value Level7 Progress Value BOQ Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : 424-D43 100% 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 4.00 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : 424-D44 100% 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 4.00 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% C V/R COMP SHED FOUNDATION -N % % 0.10% 84.9% 0.10% From: 431-D51 100% 94.4% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing % 10% 10.0% 10.0% Backfiling& Compaction M3 76% 15% 11.4% 7.5% Hand over to Mech,Piping Work to Others 1.00 NOS 60% 5% 3.0% 2.5% From: 431-D52 100% 94.4% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 76% 15% 11.4% 7.5% Hand over to Mech,Piping Work to Others 1.00 NOS 60% 5% 3.0% 2.5% From: 431-D53 100% 94.4% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 76% 15% 11.4% 7.5% Hand over to Mech,Piping Work to Others 1.00 NOS 60% 5% 3.0% 2.5% From: 431-D54 100% 94.4% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 76% 15% 11.4% 7.5% Hand over to Mech,Piping Work to Others 1.00 NOS 60% 5% 3.0% 2.5% From: 431-D55 100% 87.5% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 50% 15% 7.5% 7.5% From: 431-D56 100% 76.3% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 73% 10% 7.3% 5.0% Backfiling& Compaction M3 10% 15% 1.5% Clear Punchlist 1.00 NOS 50% 5% 2.5% 2.5% From: 432-D51 100% 93.8% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 75% 15% 11.3% 7.5% Hand over to Mech,Piping Work to Others 1.00 NOS 50% 5% 2.5% 2.5% From: 432-D52 100% 93.8% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 75% 15% 11.3% 7.5% Hand over to Mech,Piping Work to Others 1.00 NOS 50% 5% 2.5% 2.5% From: 432-D53 100% 93.8% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 75% 15% 11.3% 7.5% Hand over to Mech,Piping Work to Others 1.00 NOS 50% 5% 2.5% 2.5% From: 432-D54 100% 93.8% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 75% 15% 11.3% 7.5% Hand over to Mech,Piping Work to Others 1.00 NOS 50% 5% 2.5% 2.5% From: 432-D55 100% 74.8% % CMPL Improved Page 5 of 31

167 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for each Level6 CMPL % activity Project Weight Value Level7 Progress Value Excavation M3 100% 10% 10.0% 10.0% Rebar Work TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 73% 10% 7.3% 5.0% Backfiling& Compaction M3 15% Clear Punchlist 1.00 NOS 50% 5% 2.5% 2.5% From: 432-D56 100% 74.8% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 73% 10% 7.3% 5.0% Backfiling& Compaction M3 15% Clear Punchlist 1.00 NOS 50% 5% 2.5% 2.5% C CABLE TRENCH (INSIDE) -N % 2, % 0.02% 35.0% 0.02% Block-A 100% 35.0% % Excavation M3 100% 35% 35.0% 35.0% Precast Concrete M3 25% Installation of Concrete M3 25% Hand over to Mech,Piping Work to Others 1.00 NOS 15% Block-B 100% 35.0% % Excavation M3 100% 35% 35.0% 35.0% Precast Concrete M3 25% Installation of Concrete M3 25% Hand over to Mech,Piping Work to Others 1.00 NOS 15% Block-C 100% 35.0% % Excavation M3 100% 35% 35.0% 35.0% Precast Concrete M3 25% Installation of Concrete M3 25% Hand over to Mech,Piping Work to Others 1.00 NOS 15% Block-D 100% 35.0% % Excavation M3 100% 35% 35.0% 35.0% Precast Concrete M3 25% Installation of Concrete M3 25% Hand over to Mech,Piping Work to Others 1.00 NOS 15% C CABLE TRENCH (OUTSIDE) -N % 3, , % 0.03% 35.0% 0.03% Block-A 100% 43.3% % Excavation M3 100% 35% 35.0% 35.0% Installation of Precast Concrete/Concrete Pouring M3 33% 25% 8.3% Backfilling & Compaction M3 25% Hand over to Mech,Piping Work to Others 1.00 NOS 15% Block-B 100% 43.8% % Excavation M3 100% 35% 35.0% 35.0% Installation of Precast Concrete/Concrete Pouring M3 35% 25% 8.8% Backfilling & Compaction M3 25% Hand over to Mech,Piping Work to Others 1.00 NOS 15% Block-C 100% 43.8% % Excavation M3 100% 35% 35.0% 35.0% Installation of Precast Concrete/Concrete Pouring M3 35% 25% 8.8% Backfilling & Compaction M3 25% Hand over to Mech,Piping Work to Others 1.00 NOS 15% Block-D 100% 43.3% % Excavation M3 100% 35% 35.0% 35.0% Installation of Precast Concrete/Concrete Pouring M3 33% 25% 8.3% Backfilling & Compaction M3 25% Hand over to Mech,Piping Work to Others 1.00 NOS 15% C LOCAL FOUNDATION -N % % 0.01% 5.0% 0.00% Block-A 100% 9.5% % Excavation 5.00 M3 95% 10% 9.5% 5.0% Rebar Work 2.00 TON 30% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Backfiling& Compaction 4.00 M3 15% Block-B 100% 9.5% % Excavation 5.00 M3 95% 10% 9.5% 5.0% Rebar Work 2.00 TON 30% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Backfiling& Compaction 4.00 M3 15% Block-C 100% 9.5% % Excavation 5.00 M3 95% 10% 9.5% 5.0% Rebar Work 2.00 TON 30% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Backfiling& Compaction 4.00 M3 15% Block-D 100% 9.5% % Excavation 5.00 M3 95% 10% 9.5% 5.0% Rebar Work 2.00 TON 30% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Backfiling& Compaction 4.00 M3 15% C N46R1 PIPE RACK ERECTION -N % % 0.00% 5.0% 0.00% From : D11-D13 Grid % 5.0% % Receive and Shake-out TON 50% 10% 5.0% 5.0% Erection TON 50% Plumb, Bolt and Torque TON 25% Clear Punch list 1.00 NOS 10% From : D13-D15 Grid % 5.0% % Receive and Shake-out TON 50% 10% 5.0% 5.0% Erection TON 50% Plumb, Bolt and Torque TON 25% Clear Punch list 1.00 NOS 10% From : D15-D18 Grid % 5.0% % Receive and Shake-out TON 50% 10% 5.0% 5.0% Erection TON 50% Plumb, Bolt and Torque TON 25% Clear Punch list 1.00 NOS 10% BOQ CMPL Improved Page 6 of 31

168 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for each Level6 CMPL % activity Project Weight Value Level7 Progress Value From : D18-D20 Grid % 5.0% % Receive and Shake-out TON 50% 10% 5.0% 5.0% Erection TON 50% Plumb, Bolt and Torque TON 25% Clear Punch list 1.00 NOS 10% FINISHING & COMPOUNDING(Area-5) CIVIL WORK 3, , C BUILDING FOUNDATION -N % 16, , % 0.33% 100.0% 0.33% From : E % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.68 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : E % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.68 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : E % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.68 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : E % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.68 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : E % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.68 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : E % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.68 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : E % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.68 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : E % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.68 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : E % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.68 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : E % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.68 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : E % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.68 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : E % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.68 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% BOQ CMPL Improved Page 7 of 31

169 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for each Level6 CMPL % activity Project Weight Value Level7 Progress Value BOQ From : E % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.68 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : E % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.68 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : E % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.68 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : E % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.68 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : E % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.68 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : E % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.68 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : E % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.68 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : E % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.68 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : E % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.68 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : E % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.68 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : E % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.68 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : E % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.68 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : E % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.68 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% CMPL Improved Page 8 of 31

170 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for each Level6 CMPL % activity Project Weight Value Level7 Progress Value BOQ Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : E % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.68 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : E % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.68 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : E % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.68 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : E % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.68 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : E % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.68 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% C CABLE TRENCH(INSIDE) -N % 2, % 0.02% 35.0% 0.02% From : E6-E7 to % 35.0% % Excavation M3 100% 35% 35.0% 35.0% Precast Concrete M3 25% Installation of Concrete M 25% Hand over to Mech,Piping Work to Others NOS 15% From : E7 TO E8 100% 35.0% % Excavation M3 100% 35% 35.0% 35.0% Precast Concrete M3 25% Installation of Concrete M 25% Hand over to Mech,Piping Work to Others NOS 15% From : E8-E9 TO % 35.0% % Excavation M3 100% 35% 35.0% 35.0% Precast Concrete M3 25% Installation of Concrete M 25% Hand over to Mech,Piping Work to Others NOS 15% From : E9 TO E11 100% 35.0% % Excavation M3 100% 35% 35.0% 35.0% Precast Concrete M3 25% Installation of Concrete M 25% Hand over to Mech,Piping Work to Others NOS 15% C CABLE TRENCH(OUTSIDE) -N % 5, , % 0.05% 35.0% 0.04% Block-A (From : E1-E2) 100% 43.0% 1, % Excavation M3 100% 35% 35.0% 35.0% Installation of Precast Concrete/Concrete Pouring M3 32% 25% 8.0% Backfilling & Compaction M3 25% Hand over to Mech,Piping Work to Others 1.00 NOS 15% Block-B (From: E2-E3) 100% 42.0% 1, % Excavation M3 100% 35% 35.0% 35.0% Installation of Precast Concrete/Concrete Pouring M3 28% 25% 7.0% Backfilling & Compaction M3 25% Hand over to Mech,Piping Work to Others 1.00 NOS 15% Block-C (From: E3-E4) 100% 42.0% 1, % Excavation M3 100% 35% 35.0% 35.0% Installation of Precast Concrete/Concrete Pouring M3 28% 25% 7.0% Backfilling & Compaction M3 25% Hand over to Mech,Piping Work to Others 1.00 NOS 15% Block-D (From: E4-E5) 100% 42.0% 1, % Excavation M3 100% 35% 35.0% 35.0% Installation of Precast Concrete/Concrete Pouring M3 28% 25% 7.0% Backfilling & Compaction M3 25% Hand over to Mech,Piping Work to Others 1.00 NOS 15% C PIPE TRENCH (INSIDE) -N % 2, % 0.02% 35.0% 0.02% Block-A 100% 35.0% % Excavation M3 100% 35% 35.0% 35.0% Precast Concrete M3 25% Installation of Concrete M 25% Hand over to Mech,Piping Work to Others NOS 15% Block-B 100% 35.0% % Excavation M3 100% 35% 35.0% 35.0% Precast Concrete M3 25% Installation of Concrete M 25% Hand over to Mech,Piping Work to Others NOS 15% Block-C 100% 35.0% % Excavation M3 100% 35% 35.0% 35.0% Precast Concrete M3 25% Installation of Concrete M 25% Hand over to Mech,Piping Work to Others NOS 15% Block-D 100% 35.0% % Excavation M3 100% 35% 35.0% 35.0% Precast Concrete M3 25% Installation of Concrete M 25% Hand over to Mech,Piping Work to Others NOS 15% C N60S1 FINISH BLDG RC WORKS -N % 20, , % 0.27% 60.9% 0.25% Elev. 109,960 From : E6-501(Column) 100% 100.0% % CMPL Improved Page 9 of 31

171 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for each Level6 CMPL % activity Project Weight Value Level7 Progress Value BOQ Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : E6-502(Column) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : E6-503 (Column) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : E6-504 (Column) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : E6-505 (Column) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : E7-501 (Column) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : E7-502 (Column) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : E7-503 (Column) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : E7-504 (Column) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : E7-505 (Column) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing 1.00 M2 100% 20% 20.0% 20.0% From : E8-501 (Column) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : E8-502 (Column) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : E8-503 (Column) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : E8-504 (Column) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : E8-505 (Column) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : E9-501 (Column) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : E9-502 (Column) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete M3 100% 15% 15.0% 15.0% CMPL Improved Page 10 of 31

172 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for each Level6 CMPL % activity Project Weight Value Level7 Progress Value BOQ Strip & Finishing M2 100% 20% 20.0% 20.0% From : E9-503 (Column) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : E9-504 (Column) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : E9-505 (Column) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : E (Column) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : E (Column) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : E (Column) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : E (Column) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : E (Column) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : E (Column) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : E (Column) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : E (Column) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : E (Column) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : E (Column) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From:E6-Grid (Beam) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 9.00 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From:E6-Grid (Beam) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 9.00 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From:E6-Grid (Beam) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 6.30 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% CMPL Improved Page 11 of 31

173 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for each Level6 CMPL % activity Project Weight Value Level7 Progress Value BOQ From:E6-Grid (Beam) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 7.20 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From:E7-Grid (Beam) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 9.00 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From:E7-Grid (Beam) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 9.00 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From:E7-Grid (Beam) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 6.30 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From:E7-Grid (Beam) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 7.20 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From:E8-Grid (Beam) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 9.00 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From:E8-Grid (Beam) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 9.00 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From:E8-Grid (Beam) 100% 75.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 6.30 M3 50% 15% 7.5% 7.5% Strip & Finishing M2 50% 20% 10.0% 10.0% Clear Punchlist 1.00 NOS 50% 5% 2.5% 2.5% From:E8-Grid (Beam) 100% 30.0% % Rebar Work TON 75% 40% 30.0% 20.0% Form Work M2 15% Pouring Concrete 7.20 M3 15% Strip & Finishing M2 20% From:E9-Grid (Beam) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 9.00 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From:E9-Grid (Beam) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 9.00 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From:E9-Grid (Beam) 100% 75.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 6.30 M3 50% 15% 7.5% 7.5% Strip & Finishing M2 50% 20% 10.0% 10.0% Clear Punchlist 1.00 NOS 50% 5% 2.5% 2.5% From:E9-Grid (Beam) 100% 30.0% % Rebar Work TON 75% 40% 30.0% 20.0% Form Work M2 15% Pouring Concrete 7.20 M3 15% Strip & Finishing M2 20% From:E10-Grid (Beam) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 9.00 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From:E10-Grid (Beam) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 9.00 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From:E10-Grid (Beam) 100% 75.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 6.30 M3 50% 15% 7.5% 7.5% Strip & Finishing M2 50% 20% 10.0% 10.0% Clear Punchlist 1.00 NOS 50% 5% 2.5% 2.5% From:E10-Grid (Beam) 100% 47.5% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 50% 15% 7.5% 7.5% CMPL Improved Page 12 of 31

174 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for each Level6 CMPL % activity Project Weight Value Level7 Progress Value BOQ Pouring Concrete 7.20 M3 15% Strip & Finishing M2 20% From:E11-Grid (Beam) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 9.00 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From:E11-Grid (Beam) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 9.00 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From:E11-Grid (Beam) 100% 75.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 6.30 M3 50% 15% 7.5% 7.5% Strip & Finishing M2 50% 20% 10.0% 10.0% Clear Punchlist 1.00 NOS 50% 5% 2.5% 2.5% From:E11-Grid (Beam) 100% 50.1% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 67% 15% 10.1% 7.5% Pouring Concrete 7.20 M3 15% Strip & Finishing M2 20% From: 501-Grid E6-E7 (Beam) 100% 100.0% % Rebar Work 6.20 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 6.75 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From: 501-Grid E7-E8 (Beam) 100% 100.0% % Rebar Work 8.00 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 8.10 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From: 501-Grid E8-E9 (Beam) 100% 100.0% % Rebar Work 8.00 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 8.10 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From: 501-Grid E9-E10 (Beam) 100% 100.0% % Rebar Work 8.00 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 8.10 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From: 501-Grid E10-E11 (Beam) 100% 100.0% % Rebar Work 3.10 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 3.60 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From: 502-Grid E6-E7 (Beam) 100% 100.0% % Rebar Work 6.20 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 6.75 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From: 502-Grid E7-E8 (Beam) 100% 100.0% % Rebar Work 8.00 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 8.10 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From: 502-Grid E8-E9 (Beam) 100% 100.0% % Rebar Work 8.00 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 8.10 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From: 502-Grid E9-E10 (Beam) 100% 100.0% % Rebar Work 8.00 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 8.10 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From: 502-Grid E10-E11 (Beam) 100% 100.0% % Rebar Work 3.10 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 3.60 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From: 503-Grid E6-E7 (Beam) 100% 100.0% % Rebar Work 6.20 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 6.75 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From: 503-Grid E7-E8 (Beam) 100% 100.0% % Rebar Work 8.00 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 8.10 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% CMPL Improved Page 13 of 31

175 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for each Level6 CMPL % activity Project Weight Value Level7 Progress Value BOQ From: 503-Grid E8-E9 (Beam) 100% 100.0% % Rebar Work 8.00 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 8.10 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From: 503-Grid E9-E10 (Beam) 100% 100.0% % Rebar Work 8.00 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 8.10 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From: 503-Grid E10-E11 (Beam) 100% 100.0% % Rebar Work 3.10 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 3.60 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From: 504-Grid E6-E7 (Beam) 100% 100.0% % Rebar Work 4.80 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 5.40 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From: 504-Grid E7-E8 (Beam) 100% 77.5% % Rebar Work 8.00 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 8.10 M3 50% 15% 7.5% 7.5% Strip & Finishing M2 50% 20% 10.0% 10.0% Clear Punchlist 1.00 NOS 50% 5% 2.5% 2.5% Hand over to Mech,Piping Work to Others 1.00 NOS 50% 5% 2.5% 2.5% From: 504-Grid E8-E9 (Beam) 100% 37.5% % Rebar Work 8.00 TON 75% 40% 30.0% 20.0% Form Work M2 50% 15% 7.5% 7.5% Pouring Concrete 8.10 M3 15% Strip & Finishing M2 20% From: 504-Grid E9-E10 (Beam) 100% 30.0% % Rebar Work 8.00 TON 75% 40% 30.0% 20.0% Form Work M2 15% Pouring Concrete 8.10 M3 15% Strip & Finishing M2 20% From: 504-Grid E10-E11 (Beam) 100% 30.0% % Rebar Work 3.10 TON 75% 40% 30.0% 20.0% Form Work M2 15% Pouring Concrete 3.60 M3 15% Strip & Finishing M2 20% From: 505-Grid E6-E7 (Beam) 100% 100.0% % Rebar Work 6.20 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 6.75 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From: 505-Grid E7-E8 (Beam) 100% 77.5% % Rebar Work 8.00 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 8.10 M3 50% 15% 7.5% 7.5% Strip & Finishing M2 50% 20% 10.0% 10.0% Clear Punchlist 1.00 NOS 50% 5% 2.5% 2.5% Hand over to Mech,Piping Work to Others 1.00 NOS 50% 5% 2.5% 2.5% From: 505-Grid E8-E9 (Beam) 100% 30.0% % Rebar Work 8.00 TON 75% 40% 30.0% 20.0% Form Work M2 15% Pouring Concrete 8.10 M3 15% Strip & Finishing M2 20% From: 505-Grid E9-E10 (Beam) 100% 30.0% % Rebar Work 8.00 TON 75% 40% 30.0% 20.0% Form Work M2 15% Pouring Concrete 8.10 M3 15% Strip & Finishing M2 20% From: 505-Grid E10-E11 (Beam) 100% 30.0% % Rebar Work 3.10 TON 75% 40% 30.0% 20.0% Form Work M2 15% Pouring Concrete 3.60 M3 15% Strip & Finishing M2 20% From : Elev up to 116,490 From : E6-501(Column) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work 7.65 M2 100% 15% 15.0% 15.0% Pouring Concrete 6.68 M3 100% 15% 15.0% 15.0% Strip & Finishing 7.65 M2 100% 20% 20.0% 20.0% From : E6-502(Column) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work 7.65 M2 100% 15% 15.0% 15.0% Pouring Concrete 6.68 M3 100% 15% 15.0% 15.0% Strip & Finishing 7.65 M2 100% 20% 20.0% 20.0% From : E6-503 (Column) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work 7.65 M2 100% 15% 15.0% 15.0% Pouring Concrete 6.68 M3 100% 15% 15.0% 15.0% Strip & Finishing 7.65 M2 100% 20% 20.0% 20.0% From : E6-504 (Column) 100% 47.5% CMPL Improved Page 14 of 31

176 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for each Level6 CMPL % activity Project Weight Value Level7 Progress Value BOQ Rebar Work TON 100% 40% 40.0% 40.0% Form Work 7.65 M2 50% 15% 7.5% 7.5% Pouring Concrete 6.68 M3 15% Strip & Finishing 7.65 M2 20% From : E6-505 (Column) 100% 47.5% Rebar Work TON 100% 40% 40.0% 40.0% Form Work 7.65 M2 50% 15% 7.5% 7.5% Pouring Concrete 6.68 M3 15% Strip & Finishing 7.65 M2 20% From : E7-501 (Column) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work 7.65 M2 100% 15% 15.0% 15.0% Pouring Concrete 6.68 M3 100% 15% 15.0% 15.0% Strip & Finishing 7.65 M2 100% 20% 20.0% 20.0% From : E7-502 (Column) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work 7.65 M2 100% 15% 15.0% 15.0% Pouring Concrete 6.68 M3 100% 15% 15.0% 15.0% Strip & Finishing 7.65 M2 100% 20% 20.0% 20.0% From : E7-503 (Column) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work 7.65 M2 100% 15% 15.0% 15.0% Pouring Concrete 6.68 M3 100% 15% 15.0% 15.0% Strip & Finishing 7.65 M2 100% 20% 20.0% 20.0% From : E7-504 (Column) 100% 47.5% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work 7.65 M2 50% 15% 7.5% 7.5% Pouring Concrete 6.68 M3 15% Strip & Finishing 7.65 M2 20% From : E7-505 (Column) 100% 47.5% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work 7.65 M2 50% 15% 7.5% 7.5% Pouring Concrete 6.68 M3 15% Strip & Finishing 7.65 M2 20% From : E8-501 (Column) 100% 55.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work 7.65 M2 100% 15% 15.0% 15.0% Pouring Concrete 6.68 M3 15% Strip & Finishing 7.65 M2 20% From : E8-502 (Column) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work 7.65 M2 100% 15% 15.0% 15.0% Pouring Concrete 6.68 M3 100% 15% 15.0% 15.0% Strip & Finishing 7.65 M2 100% 20% 20.0% 20.0% From : E8-503 (Column) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work 7.65 M2 100% 15% 15.0% 15.0% Pouring Concrete 6.68 M3 100% 15% 15.0% 15.0% Strip & Finishing 7.65 M2 100% 20% 20.0% 20.0% From : E8-504 (Column) 100% 40.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work 7.65 M2 15% Pouring Concrete 6.68 M3 15% Strip & Finishing 7.65 M2 20% From : E8-505 (Column) 100% 40.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work 7.65 M2 15% Pouring Concrete 6.68 M3 15% Strip & Finishing 7.65 M2 20% From : E9-501 (Column) 100% 40.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work 7.65 M2 15% Pouring Concrete 6.68 M3 15% Strip & Finishing 7.65 M2 20% From : E9-502 (Column) 100% 40.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work 7.65 M2 15% Pouring Concrete 6.68 M3 15% Strip & Finishing 7.65 M2 20% From : E9-503 (Column) 100% 40.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work 7.65 M2 15% Pouring Concrete 6.68 M3 15% Strip & Finishing 7.65 M2 20% From : E9-504 (Column) 100% 40.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work 7.65 M2 15% Pouring Concrete 6.68 M3 15% Strip & Finishing 7.65 M2 20% From : E9-505 (Column) 100% 40.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work 7.65 M2 15% Pouring Concrete 6.68 M3 15% CMPL Improved Page 15 of 31

177 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for each Level6 CMPL % activity Project Weight Value Level7 Progress Value BOQ Strip & Finishing 7.65 M2 20% From : E (Column) 100% 40.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work 7.65 M2 15% Pouring Concrete 6.68 M3 15% Strip & Finishing 7.65 M2 20% From : E (Column) 100% 40.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work 7.65 M2 15% Pouring Concrete 6.68 M3 15% Strip & Finishing 7.65 M2 20% From : E (Column) 100% 40.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work 7.65 M2 15% Pouring Concrete 6.68 M3 15% Strip & Finishing 7.65 M2 20% From : E (Column) 100% 40.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work 7.65 M2 15% Pouring Concrete 6.68 M3 15% Strip & Finishing 7.65 M2 20% From : E (Column) 100% 40.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work 7.65 M2 15% Pouring Concrete 6.68 M3 15% Strip & Finishing 7.65 M2 20% From : E (Column) 100% 40.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work 7.65 M2 15% Pouring Concrete 6.68 M3 15% Strip & Finishing 7.65 M2 20% From : E (Column) 100% 40.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work 7.65 M2 15% Pouring Concrete 6.68 M3 15% Strip & Finishing 7.65 M2 20% From : E (Column) 100% 40.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work 7.65 M2 15% Pouring Concrete 6.68 M3 15% Strip & Finishing 7.65 M2 20% From : E (Column) 100% 40.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work 7.65 M2 15% Pouring Concrete 6.68 M3 15% Strip & Finishing 7.65 M2 20% From : E (Column) 100% 40.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work 7.65 M2 15% Pouring Concrete 6.68 M3 15% Strip & Finishing 7.65 M2 20% From:E6-Grid (Beam) 100% 31.2% % Rebar Work 9.00 TON 78% 40% 31.2% 20.0% Form Work M2 15% Pouring Concrete 7.20 M3 15% Strip & Finishing M2 20% From:E6-Grid (Beam) 100% 31.2% % Rebar Work 9.00 TON 78% 40% 31.2% 20.0% Form Work M2 15% Pouring Concrete 7.20 M3 15% Strip & Finishing M2 20% From:E6-Grid (Beam) 100% 31.2% % Rebar Work 9.00 TON 78% 40% 31.2% 20.0% Form Work 8.00 M2 15% Pouring Concrete 5.00 M3 15% Strip & Finishing 8.00 M2 20% From:E6-Grid (Beam) 100% 31.2% % Rebar Work 9.00 TON 78% 40% 31.2% 20.0% Form Work 9.00 M2 15% Pouring Concrete 5.80 M3 15% Strip & Finishing 9.00 M2 20% From:E7-Grid (Beam) 100% 31.2% % Rebar Work 9.00 TON 78% 40% 31.2% 20.0% Form Work M2 15% Pouring Concrete 7.20 M3 15% Strip & Finishing M2 20% From:E7-Grid (Beam) 100% 31.2% % Rebar Work 9.00 TON 78% 40% 31.2% 20.0% Form Work M2 15% Pouring Concrete 7.20 M3 15% Strip & Finishing M2 20% CMPL Improved Page 16 of 31

178 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for each Level6 CMPL % activity Project Weight Value Level7 Progress Value BOQ From:E7-Grid (Beam) 100% 31.2% % Rebar Work 9.00 TON 78% 40% 31.2% 20.0% Form Work 8.00 M2 15% Pouring Concrete 5.00 M3 15% Strip & Finishing 8.00 M2 20% From:E7-Grid (Beam) 100% 31.2% % Rebar Work 9.00 TON 78% 40% 31.2% 20.0% Form Work 9.00 M2 15% Pouring Concrete 5.80 M3 15% Strip & Finishing 9.00 M2 20% From:E8-Grid (Beam) 100% 31.2% % Rebar Work 9.00 TON 78% 40% 31.2% 20.0% Form Work M2 15% Pouring Concrete 7.20 M3 15% Strip & Finishing M2 20% From:E8-Grid (Beam) 100% 31.2% % Rebar Work 9.00 TON 78% 40% 31.2% 20.0% Form Work M2 15% Pouring Concrete 7.20 M3 15% Strip & Finishing M2 20% From:E8-Grid (Beam) 100% 31.2% % Rebar Work 9.00 TON 78% 40% 31.2% 20.0% Form Work 8.00 M2 15% Pouring Concrete 5.00 M3 15% Strip & Finishing 8.00 M2 20% From:E8-Grid (Beam) 100% 31.2% % Rebar Work 9.00 TON 78% 40% 31.2% 20.0% Form Work 9.00 M2 15% Pouring Concrete 5.80 M3 15% Strip & Finishing 9.00 M2 20% From:E9-Grid (Beam) 100% 31.2% % Rebar Work 9.00 TON 78% 40% 31.2% 20.0% Form Work M2 15% Pouring Concrete 7.20 M3 15% Strip & Finishing M2 20% From:E9-Grid (Beam) 100% 31.2% % Rebar Work 9.00 TON 78% 40% 31.2% 20.0% Form Work M2 15% Pouring Concrete 7.20 M3 15% Strip & Finishing M2 20% From:E9-Grid (Beam) 100% 31.2% % Rebar Work 9.00 TON 78% 40% 31.2% 20.0% Form Work 8.00 M2 15% Pouring Concrete 5.00 M3 15% Strip & Finishing 8.00 M2 20% From:E9-Grid (Beam) 100% 31.2% % Rebar Work 9.00 TON 78% 40% 31.2% 20.0% Form Work 9.00 M2 15% Pouring Concrete 5.80 M3 15% Strip & Finishing 9.00 M2 20% From:E10-Grid (Beam) 100% 31.2% % Rebar Work 9.00 TON 78% 40% 31.2% 20.0% Form Work M2 15% Pouring Concrete 7.20 M3 15% Strip & Finishing M2 20% From:E10-Grid (Beam) 100% 31.2% % Rebar Work 9.00 TON 78% 40% 31.2% 20.0% Form Work M2 15% Pouring Concrete 7.20 M3 15% Strip & Finishing M2 20% From:E10-Grid (Beam) 100% 31.2% % Rebar Work 9.00 TON 78% 40% 31.2% 20.0% Form Work 8.00 M2 15% Pouring Concrete 5.00 M3 15% Strip & Finishing 8.00 M2 20% From:E10-Grid (Beam) 100% 31.2% % Rebar Work 9.00 TON 78% 40% 31.2% 20.0% Form Work 9.00 M2 15% Pouring Concrete 5.80 M3 15% Strip & Finishing 9.00 M2 20% From:E11-Grid (Beam) 100% 31.2% % Rebar Work 9.00 TON 78% 40% 31.2% 20.0% Form Work M2 15% Pouring Concrete 7.20 M3 15% Strip & Finishing M2 20% From:E11-Grid (Beam) 100% 31.2% % Rebar Work 9.00 TON 78% 40% 31.2% 20.0% Form Work M2 15% Pouring Concrete 7.20 M3 15% Strip & Finishing M2 20% From:E11-Grid (Beam) 100% 31.2% % Rebar Work 9.00 TON 78% 40% 31.2% 20.0% Form Work 8.00 M2 15% CMPL Improved Page 17 of 31

179 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for each Level6 CMPL % activity Project Weight Value Level7 Progress Value BOQ Pouring Concrete 5.00 M3 15% Strip & Finishing 8.00 M2 20% From:E11-Grid (Beam) 100% 31.2% % Rebar Work 9.00 TON 78% 40% 31.2% 20.0% Form Work 9.00 M2 15% Pouring Concrete 5.80 M3 15% Strip & Finishing 9.00 M2 20% From: 501-Grid E6-E7 (Beam) 100% 31.2% % Rebar Work 9.00 TON 78% 40% 31.2% 20.0% Form Work M2 15% Pouring Concrete 6.48 M3 15% Strip & Finishing M2 20% From: 501-Grid E7-E8 (Beam) 100% 31.2% % Rebar Work 9.00 TON 78% 40% 31.2% 20.0% Form Work M2 15% Pouring Concrete 6.48 M3 15% Strip & Finishing M2 20% From: 501-Grid E8-E9 (Beam) 100% 31.2% % Rebar Work 9.00 TON 78% 40% 31.2% 20.0% Form Work M2 15% Pouring Concrete 6.48 M3 15% Strip & Finishing M2 20% From: 501-Grid E9-E10 (Beam) 100% 31.2% % Rebar Work 9.00 TON 78% 40% 31.2% 20.0% Form Work M2 15% Pouring Concrete 6.48 M3 15% Strip & Finishing M2 20% From: 501-Grid E10-E11 (Beam) 100% 31.2% % Rebar Work 9.00 TON 78% 40% 31.2% 20.0% Form Work 8.00 M2 15% Pouring Concrete 2.88 M3 15% Strip & Finishing 8.00 M2 20% From: 502-Grid E6-E7 (Beam) 100% 31.2% % Rebar Work 9.00 TON 78% 40% 31.2% 20.0% Form Work M2 15% Pouring Concrete 6.48 M3 15% Strip & Finishing M2 20% From: 502-Grid E7-E8 (Beam) 100% 31.2% % Rebar Work 9.00 TON 78% 40% 31.2% 20.0% Form Work M2 15% Pouring Concrete 6.48 M3 15% Strip & Finishing M2 20% From: 502-Grid E8-E9 (Beam) 100% 31.2% % Rebar Work 9.00 TON 78% 40% 31.2% 20.0% Form Work M2 15% Pouring Concrete 6.48 M3 15% Strip & Finishing M2 20% From: 502-Grid E9-E10 (Beam) 100% 31.2% % Rebar Work 9.00 TON 78% 40% 31.2% 20.0% Form Work M2 15% Pouring Concrete 6.48 M3 15% Strip & Finishing M2 20% From: 502-Grid E10-E11 (Beam) 100% 31.2% % Rebar Work 9.00 TON 78% 40% 31.2% 20.0% Form Work 8.00 M2 15% Pouring Concrete 2.88 M3 15% Strip & Finishing 8.00 M2 20% From: 503-Grid E6-E7 (Beam) 100% 31.2% % Rebar Work 9.00 TON 78% 40% 31.2% 20.0% Form Work M2 15% Pouring Concrete 6.48 M3 15% Strip & Finishing M2 20% From: 503-Grid E7-E8 (Beam) 100% 31.2% % Rebar Work 9.00 TON 78% 40% 31.2% 20.0% Form Work M2 15% Pouring Concrete 6.48 M3 15% Strip & Finishing M2 20% From: 503-Grid E8-E9 (Beam) 100% 31.2% % Rebar Work 9.00 TON 78% 40% 31.2% 20.0% Form Work M2 15% Pouring Concrete 6.48 M3 15% Strip & Finishing M2 20% From: 503-Grid E9-E10 (Beam) 100% 31.2% % Rebar Work 9.00 TON 78% 40% 31.2% 20.0% Form Work M2 15% Pouring Concrete 6.48 M3 15% Strip & Finishing M2 20% From: 503-Grid E10-E11 (Beam) 100% 31.2% % Rebar Work 9.00 TON 78% 40% 31.2% 20.0% Form Work 8.00 M2 15% Pouring Concrete 2.88 M3 15% Strip & Finishing 8.00 M2 20% CMPL Improved Page 18 of 31

180 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for each Level6 CMPL % activity Project Weight Value Level7 Progress Value BOQ From: 504-Grid E6-E7 (Beam) 100% 31.2% % Rebar Work 9.00 TON 78% 40% 31.2% 20.0% Form Work M2 15% Pouring Concrete 6.48 M3 15% Strip & Finishing M2 20% From: 504-Grid E7-E8 (Beam) 100% 31.2% % Rebar Work 9.00 TON 78% 40% 31.2% 20.0% Form Work M2 15% Pouring Concrete 6.48 M3 15% Strip & Finishing M2 20% From: 504-Grid E8-E9 (Beam) 100% 31.2% % Rebar Work 9.00 TON 78% 40% 31.2% 20.0% Form Work M2 15% Pouring Concrete 6.48 M3 15% Strip & Finishing M2 20% From: 504-Grid E9-E10 (Beam) 100% 31.2% % Rebar Work 9.00 TON 78% 40% 31.2% 20.0% Form Work M2 15% Pouring Concrete 6.48 M3 15% Strip & Finishing M2 20% From: 504-Grid E10-E11 (Beam) 100% 31.2% % Rebar Work 9.00 TON 78% 40% 31.2% 20.0% Form Work M2 15% Pouring Concrete 6.48 M3 15% Strip & Finishing M2 20% From: 505-Grid E6-E7 (Beam) 100% 31.2% % Rebar Work 9.00 TON 78% 40% 31.2% 20.0% Form Work M2 15% Pouring Concrete 6.48 M3 15% Strip & Finishing M2 20% From: 505-Grid E7-E8 (Beam) 100% 31.2% % Rebar Work 9.00 TON 78% 40% 31.2% 20.0% Form Work M2 15% Pouring Concrete 6.48 M3 15% Strip & Finishing M2 20% From: 505-Grid E8-E9 (Beam) 100% 31.2% % Rebar Work 9.00 TON 78% 40% 31.2% 20.0% Form Work M2 15% Pouring Concrete 6.48 M3 15% Strip & Finishing M2 20% From: 505-Grid E9-E10 (Beam) 100% 31.2% % Rebar Work 9.00 TON 78% 40% 31.2% 20.0% Form Work M2 15% Pouring Concrete 6.48 M3 15% Strip & Finishing M2 20% From: 505-Grid E10-E11 (Beam) 100% 31.2% % Rebar Work 9.00 TON 78% 40% 31.2% 20.0% Form Work M2 15% Pouring Concrete 6.48 M3 15% Strip & Finishing M2 20% C N60S1 FINISH BLDG ST ERECTION -N % % 0.01% 2.3% 0.01% From: EL. 109,810 : E6-E11 TO % 7.3% % Receive and Shake-out TON 73% 10% 7.3% 5.0% Erection TON 50% Plumb, Bolt and Torque TON 25% Clear Punch list 1.00 NOS 10% From: EL. 116,490 : E6-E11 TO % 6.9% % Receive and Shake-out TON 69% 10% 6.9% 5.0% Erection TON 50% Plumb, Bolt and Torque TON 25% Clear Punch list 1.00 NOS 10% From : Ground to Elev. 109,810 : to F6-F11 100% 6.0% % Receive and Shake-out TON 60% 10% 6.0% 5.0% Erection TON 50% Plumb, Bolt and Torque TON 25% Clear Punch list 1.00 NOS 10% From : EL. 123,090 : TO E6-E11 100% 6.5% % Receive and Shake-out TON 65% 10% 6.5% 5.0% Erection TON 50% Plumb, Bolt and Torque TON 25% Clear Punch list 1.00 NOS 10% From : EL. 129,590 : TO E6-E11 100% 5.1% % Receive and Shake-out TON 51% 10% 5.1% 5.0% Erection TON 50% Plumb, Bolt and Torque TON 25% Clear Punch list 1.00 NOS 10% From : EL. 134,590 : TO E6-E11 100% 4.2% Receive and Shake-out TON 42% 10% 4.2% Erection TON 50% Plumb, Bolt and Torque TON 25% Clear Punch list 1.00 NOS 10% From : EL. 138,440 : TO E6-E11 100% 5.2% % Receive and Shake-out TON 52% 10% 5.2% 5.0% Erection TON 50% Plumb, Bolt and Torque TON 25% Clear Punch list 1.00 NOS 10% From : EL. 144,250 : TO E6-E11 100% 3.1% CMPL Improved Page 19 of 31

181 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for each Level6 CMPL % activity Project Weight Value Level7 Receive and Shake-out TON 31% 10% 3.1% Erection TON 50% Plumb, Bolt and Torque TON 25% Clear Punch list 1.00 NOS 10% From : EL. 151,200 : TO E6-E11 100% 3.0% Receive and Shake-out TON 30% 10% 3.0% Erection TON 50% Plumb, Bolt and Torque TON 25% Clear Punch list 1.00 NOS 10% From : EL. 162,050 : TO E6-E11 100% 3.0% Receive and Shake-out TON 30% 10% 3.0% Erection TON 50% Plumb, Bolt and Torque TON 25% Clear Punch list 1.00 NOS 10% From : EL. 170,650 : TO E6-E11 100% 3.0% Receive and Shake-out TON 30% 10% 3.0% Erection TON 50% Plumb, Bolt and Torque TON 25% Clear Punch list 1.00 NOS 10% From : EL. 179,400 : TO E6-E11 100% 3.0% Receive and Shake-out TON 30% 10% 3.0% Erection TON 50% Plumb, Bolt and Torque TON 25% Clear Punch list 1.00 NOS 10% From : EL. 185,150 : TO E6-E11 100% 3.0% Receive and Shake-out TON 30% 10% 3.0% Erection TON 50% Plumb, Bolt and Torque TON 25% Clear Punch list 1.00 NOS 10% Progress Value C N60S1 FINISH BLDG FLOOR CONCRETE 2F EL N % 9% % 0.00% 5.0% 0.00% Receive and Shake-out TON 89% 10% 8.9% 5.0% Installation of support beam TON 50% Installation of deck slab M2 25% Pouring Concrete M3 10% Completed 1.00 NOS 5% C N60S1 FINISH BLDG FLOOR CONCRETE 3F EL N % 5% % 0.00% 5.0% 0.00% Receive and Shake-out TON 50% 10% 5.0% 5.0% Installation of support beam TON 50% Installation of deck slab M2 25% Pouring Concrete M3 10% Completed 1.00 NOS 5% C BUILDING FOUNDATION -N % 12, , % 0.25% 100.0% 0.25% From : E % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.68 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : E % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.68 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : E % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.68 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : E % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.68 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : E % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.68 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : E % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.68 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : E % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.68 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : E % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.68 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% BOQ CMPL Improved Page 20 of 31

182 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for each Level6 CMPL % activity Project Weight Value Level7 Progress Value BOQ Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : E % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.68 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : E % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.68 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : E % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.68 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : E % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.68 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : E % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.68 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : E % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.68 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : E % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.68 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : E % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.68 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : E % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.68 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : E % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.68 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : E % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.68 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : E % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.68 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : E % 100.0% % Excavation M3 100% 10% 10.0% 10.0% CMPL Improved Page 21 of 31

183 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for each Level6 CMPL % activity Project Weight Value Level7 Progress Value BOQ Rebar Work 5.68 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : E % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.68 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : E % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.68 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : E % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.68 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : E % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.68 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% C CABLE TRENCH (INSIDE) -N % 2, % 0.02% 35.0% 0.02% Block-A 100% 35% % Excavation M3 100% 35% 35.0% 35.0% Precast Concrete M3 25% Installation of Concrete M 25% Hand over to Mech,Piping Work to Others NOS 15% Block-B 100% 35% % Excavation M3 100% 35% 35.0% 35.0% Precast Concrete M3 25% Installation of Concrete M 25% Hand over to Mech,Piping Work to Others NOS 15% Block-C 100% 35% % Excavation M3 100% 35% 35.0% 35.0% Precast Concrete M3 25% Installation of Concrete M 25% Hand over to Mech,Piping Work to Others NOS 15% Block-D 100% 35% % Excavation M3 100% 35% 35.0% 35.0% Precast Concrete M3 25% Installation of Concrete M 25% Hand over to Mech,Piping Work to Others NOS 15% C CABLE TRENCH (OUTSIDE) -N % 5, , % 0.05% 35.0% 0.04% Block-A 100% 43.0% 1, % Excavation M3 100% 35% 35.0% 35.0% Installation of Precast Concrete/Concrete Pouring M3 32% 25% 8.0% Backfilling & Compaction M3 25% Hand over to Mech,Piping Work to Others 1.00 NOS 15% Block-B 100% 43.0% 1, % Excavation M3 100% 35% 35.0% 35.0% Installation of Precast Concrete/Concrete Pouring M3 32% 25% 8.0% Backfilling & Compaction M3 25% Hand over to Mech,Piping Work to Others 1.00 NOS 15% Block-C 100% 43.0% 1, % Excavation M3 100% 35% 35.0% 35.0% Installation of Precast Concrete/Concrete Pouring M3 32% 25% 8.0% Backfilling & Compaction M3 25% Hand over to Mech,Piping Work to Others 1.00 NOS 15% Block-D 100% 41.0% 1, % Excavation M3 100% 35% 35.0% 35.0% Installation of Precast Concrete/Concrete Pouring M3 24% 25% 6.0% Backfilling & Compaction M3 25% Hand over to Mech,Piping Work to Others 1.00 NOS 15% C PIPE TRENCH (INSIDE) -N % % 0.02% 35.0% 0.02% Block-A 100% 35.0% % Excavation M3 100% 35% 35.0% 35.0% Precast Concrete M3 25% Installation of Concrete M 25% Hand over to Mech,Piping Work to Others NOS 15% Block-B 100% 35.0% % Excavation M3 100% 35% 35.0% 35.0% Precast Concrete M3 25% Installation of Concrete M 25% Hand over to Mech,Piping Work to Others NOS 15% Block-C 100% 35.0% % Excavation M3 100% 35% 35.0% 35.0% Precast Concrete M3 25% Installation of Concrete M 25% Hand over to Mech,Piping Work to Others NOS 15% Block-D 100% 35.0% % Excavation M3 100% 35% 35.0% 35.0% Precast Concrete M3 25% Installation of Concrete M 25% Hand over to Mech,Piping Work to Others NOS 15% C N60S1 FINISH BLDG RC WORKS -N % 20, , % 0.32% 75.1% 0.31% Elev. 109,660 From : E1-501(Column) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% CMPL Improved Page 22 of 31

184 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for each Level6 CMPL % activity Project Weight Value Level7 Progress Value BOQ From : E1-502(Column) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : E1-503 (Column) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : E1-504 (Column) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : E1-505 (Column) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : E2-501 (Column) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : E2-502 (Column) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : E2-503 (Column) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : E2-504 (Column) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : E2-505 (Column) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : E3-501 (Column) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : E3-502 (Column) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : E3-503 (Column) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : E3-504 (Column) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : E3-505 (Column) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : E4-501 (Column) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : E4-502 (Column) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : E4-503 (Column) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% CMPL Improved Page 23 of 31

185 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for each Level6 CMPL % activity Project Weight Value Level7 Progress Value BOQ Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : E4-504 (Column) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : E4-505 (Column) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : E5-501 (Column) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : E5-502 (Column) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : E5-503 (Column) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : E5-504 (Column) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : E5-505 (Column) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From: E1- Grid Elev. 109, % 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 9.00 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From: E1- Grid Elev. 109, % 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 9.00 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From: E1- Grid Elev. 109, % 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 6.30 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From: E1- Grid Elev. 109, % 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 7.20 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From: E2- Grid Elev. 109, % 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 9.00 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From: E2- Grid Elev. 109, % 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 9.00 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From: E2- Grid Elev. 109, % 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 6.30 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From: E2- Grid Elev. 109, % 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 7.20 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From: E3- Grid Elev. 109, % 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 9.00 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% CMPL Improved Page 24 of 31

186 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for each Level6 CMPL % activity Project Weight Value Level7 Progress Value BOQ From: E3- Grid Elev. 109, % 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 9.00 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From: E3- Grid Elev. 109, % 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 6.30 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From: E3- Grid Elev. 109, % 50.1% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 67% 15% 10.1% 7.5% Pouring Concrete 7.20 M3 15% Strip & Finishing M2 20% From: E4- Grid Elev. 109, % 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 9.00 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From: E4- Grid Elev. 109, % 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 9.00 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From: E4- Grid Elev. 109, % 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 6.30 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From: E4- Grid Elev. 109, % 39.5% % Rebar Work TON 80% 40% 32.0% 20.0% Form Work M2 50% 15% 7.5% 7.5% Pouring Concrete 7.20 M3 15% Strip & Finishing M2 20% From: E5- Grid Elev. 109, % 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 9.00 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From: E5- Grid Elev. 109, % 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 9.00 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From: E5- Grid Elev. 109, % 69.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 6.30 M3 40% 15% 6.0% Strip & Finishing M2 40% 20% 8.0% From: E5- Grid Elev. 109, % 32.0% % Rebar Work TON 80% 40% 32.0% 20.0% Form Work M2 15% Pouring Concrete 7.20 M3 15% Strip & Finishing M2 20% From: 501-Grid E1-E2 (Beam) Elev. 109, % 100.0% % Rebar Work 6.00 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 6.30 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From: 501-Grid E2-E3 (Beam) Elev. 109, % 100.0% % Rebar Work 8.00 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 8.10 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From: 501-Grid E3-E4 (Beam) Elev. 109, % 100.0% % Rebar Work 8.00 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 8.10 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From: 501-Grid E4-E5 (Beam) Elev. 109, % 100.0% % Rebar Work 8.00 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 8.10 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From: 502-Grid E1-E2 (Beam) Elev. 109, % 100.0% % Rebar Work 6.00 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 6.30 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From: 502-Grid E2-E3 (Beam) Elev. 109, % 100.0% % Rebar Work 8.00 TON 100% 40% 40.0% 40.0% CMPL Improved Page 25 of 31

187 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for each Level6 CMPL % activity Project Weight Value Level7 Progress Value BOQ Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 8.10 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From: 502-Grid E3-E4 (Beam) Elev. 109, % 100.0% % Rebar Work 8.00 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 8.10 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From: 502-Grid E4-E5 (Beam) Elev. 109, % 100.0% % Rebar Work 8.00 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 8.10 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From: 503-Grid E1-E2 (Beam) Elev. 109, % 100.0% % Rebar Work 6.00 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 6.30 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From: 503-Grid E2-E3 (Beam) Elev. 109, % 100.0% % Rebar Work 8.00 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 8.10 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From: 503-Grid E3-E4 (Beam) Elev. 109, % 100.0% % Rebar Work 8.00 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 8.10 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From: 503-Grid E4-E5 (Beam) Elev. 109, % 100.0% % Rebar Work 8.00 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 8.10 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From: 504-Grid E1-E2 (Beam) Elev. 109, % 100.0% % Rebar Work 5.00 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 5.04 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From: 504-Grid E2-E3 (Beam) Elev. 109, % 75.0% % Rebar Work 6.00 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 6.48 M3 50% 15% 7.5% 7.5% Strip & Finishing M2 50% 20% 10.0% 10.0% Clear Punchlist 1.00 NOS 50% 5% 2.5% 2.5% From: 504-Grid E3-E4 (Beam) Elev. 109, % 32.0% % Rebar Work 6.00 TON 80% 40% 32.0% 20.0% Form Work M2 15% Pouring Concrete 6.48 M3 15% Strip & Finishing M2 20% From: 504-Grid E4-E5 (Beam) Elev. 109, % 32.0% % Rebar Work 6.00 TON 80% 40% 32.0% 20.0% Form Work M2 15% Pouring Concrete 6.48 M3 15% Strip & Finishing M2 20% From: 505-Grid E1-E2 (Beam) Elev. 109, % 100.0% % Rebar Work 6.00 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 6.30 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From: 505-Grid E2-E3 (Beam) Elev. 109, % 75.0% % Rebar Work 8.00 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 8.10 M3 50% 15% 7.5% 7.5% Strip & Finishing M2 50% 20% 10.0% 10.0% Clear Punchlist 1.00 NOS 50% 5% 2.5% 2.5% From: 505-Grid E3-E4 (Beam) Elev. 109, % 32.0% % Rebar Work 8.00 TON 80% 40% 32.0% 20.0% Form Work M2 15% Pouring Concrete 8.10 M3 15% Strip & Finishing M2 20% From: 505-Grid E4-E5 (Beam) Elev. 109, % 32.0% % Rebar Work 8.00 TON 80% 40% 32.0% 20.0% Form Work M2 15% Pouring Concrete 8.10 M3 15% Strip & Finishing M2 20% From : E1-501 Elev. 116, % 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work 7.65 M2 100% 15% 15.0% 15.0% Pouring Concrete 6.68 M3 100% 15% 15.0% 15.0% Strip & Finishing 7.65 M2 100% 20% 20.0% 20.0% From : E1-502 (Column) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work 7.65 M2 100% 15% 15.0% 15.0% Pouring Concrete 6.68 M3 100% 15% 15.0% 15.0% Strip & Finishing 7.65 M2 100% 20% 20.0% 20.0% CMPL Improved Page 26 of 31

188 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for each Level6 CMPL % activity Project Weight Value Level7 Progress Value BOQ From : E1-503 (Column) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work 7.65 M2 100% 15% 15.0% 15.0% Pouring Concrete 6.68 M3 100% 15% 15.0% 15.0% Strip & Finishing 7.65 M2 100% 20% 20.0% 20.0% From : E1-504 (Column) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work 7.65 M2 100% 15% 15.0% 15.0% Pouring Concrete 6.68 M3 100% 15% 15.0% 15.0% Strip & Finishing 7.65 M2 100% 20% 20.0% 20.0% From : E1-505 (Column) 100% 47.5% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work 7.65 M2 50% 15% 7.5% 7.5% Pouring Concrete 6.68 M3 15% Strip & Finishing 7.65 M2 20% From : E2-501 (Column) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work 7.65 M2 100% 15% 15.0% 15.0% Pouring Concrete 6.68 M3 100% 15% 15.0% 15.0% Strip & Finishing 7.65 M2 100% 20% 20.0% 20.0% From : E2-502 (Column) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work 7.65 M2 100% 15% 15.0% 15.0% Pouring Concrete 6.68 M3 100% 15% 15.0% 15.0% Strip & Finishing 7.65 M2 100% 20% 20.0% 20.0% From : E2-503 (Column) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work 7.65 M2 100% 15% 15.0% 15.0% Pouring Concrete 6.68 M3 100% 15% 15.0% 15.0% Strip & Finishing 7.65 M2 100% 20% 20.0% 20.0% From : E2-504 (Column) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work 7.65 M2 100% 15% 15.0% 15.0% Pouring Concrete 6.68 M3 100% 15% 15.0% 15.0% Strip & Finishing 7.65 M2 100% 20% 20.0% 20.0% From : E2-505 (Column) 100% 40.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work 7.65 M2 15% Pouring Concrete 6.68 M3 15% Strip & Finishing 7.65 M2 20% From : E3-501 (Column) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work 7.65 M2 100% 15% 15.0% 15.0% Pouring Concrete 6.68 M3 100% 15% 15.0% 15.0% Strip & Finishing 7.65 M2 100% 20% 20.0% 20.0% From : E3-502 (Column) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work 7.65 M2 100% 15% 15.0% 15.0% Pouring Concrete 6.68 M3 100% 15% 15.0% 15.0% Strip & Finishing 7.65 M2 100% 20% 20.0% 20.0% From : E3-503 (Column) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work 7.65 M2 100% 15% 15.0% 15.0% Pouring Concrete 6.68 M3 100% 15% 15.0% 15.0% Strip & Finishing 7.65 M2 100% 20% 20.0% 20.0% From : E3-504 (Column) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work 7.65 M2 100% 15% 15.0% 15.0% Pouring Concrete 6.68 M3 100% 15% 15.0% 15.0% Strip & Finishing 7.65 M2 100% 20% 20.0% 20.0% From : E3-505 (Column) 100% 40.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work 7.65 M2 15% Pouring Concrete 6.68 M3 15% Strip & Finishing 7.65 M2 20% From : E4-501 (Column) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work 7.65 M2 100% 15% 15.0% 15.0% Pouring Concrete 6.68 M3 100% 15% 15.0% 15.0% Strip & Finishing 7.65 M2 100% 20% 20.0% 20.0% From : E4-502 (Column) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work 7.65 M2 100% 15% 15.0% 15.0% Pouring Concrete 6.68 M3 100% 15% 15.0% 15.0% Strip & Finishing 7.65 M2 100% 20% 20.0% 20.0% From : E4-503 (Column) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work 7.65 M2 100% 15% 15.0% 15.0% Pouring Concrete 6.68 M3 100% 15% 15.0% 15.0% Strip & Finishing 7.65 M2 100% 20% 20.0% 20.0% From : E4-504 (Column) 100% 40.0% % CMPL Improved Page 27 of 31

189 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for each Level6 CMPL % activity Project Weight Value Level7 Progress Value BOQ Rebar Work TON 100% 40% 40.0% 40.0% Form Work 7.65 M2 15% Pouring Concrete 6.68 M3 15% Strip & Finishing 7.65 M2 20% From : E4-505 (Column) 100% 40.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work 7.65 M2 15% Pouring Concrete 6.68 M3 15% Strip & Finishing 7.65 M2 20% From : E5-501 (Column) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work 7.65 M2 100% 15% 15.0% 15.0% Pouring Concrete 6.68 M3 100% 15% 15.0% 15.0% Strip & Finishing 7.65 M2 100% 20% 20.0% 20.0% From : E5-502 (Column) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work 7.65 M2 100% 15% 15.0% 15.0% Pouring Concrete 6.68 M3 100% 15% 15.0% 15.0% Strip & Finishing 7.65 M2 100% 20% 20.0% 20.0% From : E5-503 (Column) 100% 100.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work 7.65 M2 100% 15% 15.0% 15.0% Pouring Concrete 6.68 M3 100% 15% 15.0% 15.0% Strip & Finishing 7.65 M2 100% 20% 20.0% 20.0% From : E5-504 (Column) 100% 40.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work 7.65 M2 15% Pouring Concrete 6.68 M3 15% Strip & Finishing 7.65 M2 20% From : E5-505 (Column) 100% 40.0% % Rebar Work TON 100% 40% 40.0% 40.0% Form Work 7.65 M2 15% Pouring Concrete 6.68 M3 15% Strip & Finishing 7.65 M2 20% From: E1- Grid Elev. 116, % 55.0% % Rebar Work 9.00 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 7.20 M3 15% Strip & Finishing M2 20% From: E1- Grid (Beam) 100% 55.0% % Rebar Work 9.00 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 7.20 M3 15% Strip & Finishing M2 20% From: E1- Grid (Beam) 100% 38.7% % Rebar Work 9.00 TON 78% 40% 31.2% 20.0% Form Work M2 50% 15% 7.5% 7.5% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 20% From: E1- Grid (Beam) 100% 31.2% % Rebar Work 9.00 TON 78% 40% 31.2% 20.0% Form Work M2 15% Pouring Concrete 5.80 M3 15% Strip & Finishing M2 20% From: E2- Grid (Beam) 100% 38.7% % Rebar Work 9.00 TON 78% 40% 31.2% 20.0% Form Work M2 50% 15% 7.5% 7.5% Pouring Concrete 7.20 M3 15% Strip & Finishing M2 20% From: E2- Grid (Beam) 100% 38.7% % Rebar Work 9.00 TON 78% 40% 31.2% 20.0% Form Work M2 50% 15% 7.5% 7.5% Pouring Concrete 7.20 M3 15% Strip & Finishing M2 20% From: E2- Grid (Beam) 100% 38.7% % Rebar Work 9.00 TON 78% 40% 31.2% 20.0% Form Work M2 50% 15% 7.5% 7.5% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 20% From: E2- Grid (Beam) 100% 31.2% % Rebar Work 9.00 TON 78% 40% 31.2% 20.0% Form Work M2 15% Pouring Concrete 5.80 M3 15% Strip & Finishing M2 20% From: E3- Grid (Beam) 100% 80.0% % Rebar Work 9.00 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 7.20 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 50% 20% 10.0% 10.0% From: E3- Grid (Beam) 100% 80.0% % Rebar Work 9.00 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 7.20 M3 100% 15% 15.0% 15.0% CMPL Improved Page 28 of 31

190 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for each Level6 CMPL % activity Project Weight Value Level7 Progress Value BOQ Strip & Finishing M2 50% 20% 10.0% 10.0% From: E3- Grid (Beam) 100% 55.0% % Rebar Work 9.00 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 20% From: E3- Grid (Beam) 100% 31.2% % Rebar Work 9.00 TON 78% 40% 31.2% 20.0% Form Work M2 15% Pouring Concrete 5.80 M3 15% Strip & Finishing M2 20% From: E4- Grid (Beam) 100% 82.5% % Rebar Work 9.00 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 7.20 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 50% 20% 10.0% 10.0% Clear Punchlist 1.00 NOS 50% 5% 2.5% 2.5% From: E4- Grid (Beam) 100% 82.5% % Rebar Work 9.00 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 7.20 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 50% 20% 10.0% 10.0% Clear Punchlist 1.00 NOS 50% 5% 2.5% 2.5% From: E4- Grid (Beam) 100% 55.0% % Rebar Work 9.00 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 20% From: E4- Grid (Beam) 100% 31.2% % Rebar Work 9.00 TON 78% 40% 31.2% 20.0% Form Work M2 15% Pouring Concrete 5.80 M3 15% Strip & Finishing M2 20% From: E5- Grid (Beam) 100% 82.5% % Rebar Work 9.00 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 7.20 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 50% 20% 10.0% 10.0% Clear Punchlist 1.00 NOS 50% 5% 2.5% 2.5% From: E5- Grid (Beam) 100% 82.5% % Rebar Work 9.00 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 7.20 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 50% 20% 10.0% 10.0% Clear Punchlist 1.00 NOS 50% 5% 2.5% 2.5% From: E5- Grid (Beam) 100% 55.0% % Rebar Work 9.00 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 5.00 M3 15% Strip & Finishing M2 20% From: E5- Grid (Beam) 100% 31.2% % Rebar Work 9.00 TON 78% 40% 31.2% 20.0% Form Work M2 15% Pouring Concrete 5.80 M3 15% Strip & Finishing M2 20% From: 501-Grid E1-E2 (Beam) 100% 38.7% % Rebar Work 9.00 TON 78% 40% 31.2% 20.0% Form Work M2 50% 15% 7.5% 7.5% Pouring Concrete 5.04 M3 15% Strip & Finishing M2 20% From: 501-Grid E2-E3 (Beam) 100% 38.7% % Rebar Work 9.00 TON 78% 40% 31.2% 20.0% Form Work M2 50% 15% 7.5% 7.5% Pouring Concrete 6.48 M3 15% Strip & Finishing M2 20% From: 501-Grid E3-E4 (Beam) 100% 82.5% % Rebar Work 9.00 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 6.48 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 50% 20% 10.0% 10.0% Clear Punchlist 1.00 NOS 50% 5% 2.5% 2.5% From: 501-Grid E4-E5 (Beam) 100% 82.5% % Rebar Work 9.00 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 5.40 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 50% 20% 10.0% 10.0% Clear Punchlist 1.00 NOS 50% 5% 2.5% 2.5% From: 502-Grid E1-E2 (Beam) 100% 38.7% % Rebar Work 9.00 TON 78% 40% 31.2% 20.0% Form Work M2 50% 15% 7.5% 7.5% Pouring Concrete 5.04 M3 15% Strip & Finishing M2 20% From: 502-Grid E2-E3 (Beam) 100% 38.7% % Rebar Work 9.00 TON 78% 40% 31.2% 20.0% Form Work M2 50% 15% 7.5% 7.5% Pouring Concrete 6.48 M3 15% Strip & Finishing M2 20% CMPL Improved Page 29 of 31

191 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for each Level6 CMPL % activity Project Weight Value Level7 Progress Value BOQ From: 502-Grid E3-E4 (Beam) 100% 80.0% % Rebar Work 9.00 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 6.48 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 50% 20% 10.0% 10.0% From: 502-Grid E4-E5 (Beam) 100% 80.0% % Rebar Work 9.00 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 5.40 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 50% 20% 10.0% 10.0% From: 503-Grid E1-E2 (Beam) 100% 38.7% % Rebar Work 9.00 TON 78% 40% 31.2% 20.0% Form Work M2 50% 15% 7.5% 7.5% Pouring Concrete 5.04 M3 15% Strip & Finishing M2 20% From: 503-Grid E2-E3 (Beam) 100% 38.7% % Rebar Work 9.00 TON 78% 40% 31.2% 20.0% Form Work M2 50% 15% 7.5% 7.5% Pouring Concrete 6.48 M3 15% Strip & Finishing M2 20% From: 503-Grid E3-E4 (Beam) 100% 80.0% % Rebar Work 9.00 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 6.48 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 50% 20% 10.0% 10.0% From: 503-Grid E4-E5 (Beam) 100% 80.0% % Rebar Work 9.00 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 5.40 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 50% 20% 10.0% 10.0% From: 504-Grid E1-E2 (Beam) 100% 38.7% % Rebar Work 9.00 TON 78% 40% 31.2% 20.0% Form Work M2 50% 15% 7.5% 7.5% Pouring Concrete 5.04 M3 15% Strip & Finishing M2 20% From: 504-Grid E2-E3 (Beam) 100% 37.5% % Rebar Work 9.00 TON 75% 40% 30.0% 20.0% Form Work M2 50% 15% 7.5% 7.5% Pouring Concrete 3.36 M3 15% Strip & Finishing M2 20% From: 504-Grid E3-E4 (Beam) 100% 31.2% % Rebar Work 9.00 TON 78% 40% 31.2% 20.0% Form Work M2 15% Pouring Concrete 4.32 M3 15% Strip & Finishing M2 20% From: 504-Grid E4-E5 (Beam) 100% 31.2% % Rebar Work 9.00 TON 78% 40% 31.2% 20.0% Form Work M2 15% Pouring Concrete 4.32 M3 15% Strip & Finishing M2 20% From: 505-Grid E1-E2 (Beam) 100% 31.2% % Rebar Work 9.00 TON 78% 40% 31.2% 20.0% Form Work M2 15% Pouring Concrete 5.04 M3 15% Strip & Finishing M2 20% From: 505-Grid E2-E3 (Beam) 100% 31.2% % Rebar Work 9.00 TON 78% 40% 31.2% 20.0% Form Work M2 15% Pouring Concrete 6.48 M3 15% Strip & Finishing M2 20% From: 505-Grid E3-E4 (Beam) 100% 31.2% % Rebar Work 9.00 TON 78% 40% 31.2% 20.0% Form Work M2 15% Pouring Concrete 6.48 M3 15% Strip & Finishing M2 20% From: 505-Grid E4-E5 (Beam) 100% 31.2% % Rebar Work 9.00 TON 78% 40% 31.2% 20.0% Form Work M2 15% Pouring Concrete 5.40 M3 15% Strip & Finishing M2 20% C N60S1 FINISH BLDG ST ERECTION -N % % 0.01% 2.3% 0.01% From: EL. 109,810 : E1-E5 TO % 7.3% % Receive and Shake-out TON 73% 10% 7.3% 5.0% Erection TON 50% Plumb, Bolt and Torque TON 25% Clear Punch list 1.00 NOS 10% From: EL. 116,490 : E1-E5 TO % 6.9% % Receive and Shake-out TON 69% 10% 6.9% 5.0% Erection TON 50% Plumb, Bolt and Torque TON 25% Clear Punch list 1.00 NOS 10% From : Ground to Elev. 109,810 : to E1-E5 100% 6.0% % Receive and Shake-out TON 60% 10% 6.0% 5.0% Erection TON 50% Plumb, Bolt and Torque TON 25% CMPL Improved Page 30 of 31

192 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for each Level6 CMPL % activity Project Weight Value Level7 Progress Value BOQ Clear Punch list 1.00 NOS 10% From : EL. 123,090 : TO E1-E5 100% 6.5% % Receive and Shake-out TON 65% 10% 6.5% 5.0% Erection TON 50% Plumb, Bolt and Torque TON 25% Clear Punch list 1.00 NOS 10% From : EL. 129,590 : TO E1-E5 100% 5.1% % Receive and Shake-out TON 51% 10% 5.1% 5.0% Erection TON 50% Plumb, Bolt and Torque TON 25% Clear Punch list 1.00 NOS 10% From : EL. 134,590 : TO E1-E5 100% 4.2% Receive and Shake-out TON 42% 10% 4.2% Erection TON 50% Plumb, Bolt and Torque TON 25% Clear Punch list 1.00 NOS 10% From : EL. 138,440 : TO E1-E5 100% 5.2% % Receive and Shake-out TON 52% 10% 5.2% 5.0% Erection TON 50% Plumb, Bolt and Torque TON 25% Clear Punch list 1.00 NOS 10% From : EL. 144,250 : TO E1-E5 100% 3.1% Receive and Shake-out TON 31% 10% 3.1% Erection TON 50% Plumb, Bolt and Torque TON 25% Clear Punch list 1.00 NOS 10% From : EL. 151,200 : TO E1-E5 100% 3.0% Receive and Shake-out TON 30% 10% 3.0% Erection TON 50% Plumb, Bolt and Torque TON 25% Clear Punch list 1.00 NOS 10% From : EL. 162,050 : TO E1-E5 100% 3.0% Receive and Shake-out TON 30% 10% 3.0% Erection TON 50% Plumb, Bolt and Torque TON 25% Clear Punch list 1.00 NOS 10% From : EL. 170,650 : TO E1-E5 100% 3.0% Receive and Shake-out TON 30% 10% 3.0% Erection TON 50% Plumb, Bolt and Torque TON 25% Clear Punch list 1.00 NOS 10% From : EL. 179,400 : TO E1-E5 100% 3.0% Receive and Shake-out TON 30% 10% 3.0% Erection TON 50% Plumb, Bolt and Torque TON 25% Clear Punch list 1.00 NOS 10% From : EL. 185,150 : TO E1-E5 100% 3.0% Receive and Shake-out TON 30% 10% 3.0% Erection TON 50% Plumb, Bolt and Torque TON 25% Clear Punch list 1.00 NOS 10% C N60S1 FINISH BLDG FLOOR CONCRETE 2F EL N % 8.9% % 0.00% 5.0% 0.00% Receive and Shake-out TON 89% 10% 8.9% 5.0% Installation of support beam TON 50% Installation of deck slab M2 25% Pouring Concrete M3 10% Completed 1.00 NOS 5% C N60S1 FINISH BLDG FLOOR CONCRETE 3F EL N % 5.8% % 0.00% 5.0% 0.00% Receive and Shake-out TON 58% 10% 5.8% 5.0% Installation of support beam TON 50% Installation of deck slab M2 25% Pouring Concrete M3 10% Completed 1.00 NOS 5% C N60S1 FINISH BLDG FLOOR CONCRETE 4F EL N % 3.3% % 0.00% Receive and Shake-out TON 33% 10% 3.3% Installation of suppot beam TON 50% Installation of deck slab M2 25% Pouring Concrete M3 10% Completed 1.00 NOS 5% AREA TOTALS 1.84% 1.73% CMPL Improved Page 31 of 31

193 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for each Level6 activity Project Progress CMPL % Weight Value for Level7 Progress Value BOQ 4,815,410 SUBSTATION & CONTROL SYSTEM & BUILDING(Area-6) CIVIL WORK 1, , C DUCT BANK TO N32 AREA -N % % 0.01% 5.0% 0.01% Block-A 100% 6.0% % Excavation M3 60% 10% 6.0% 5.0% Conduit Pipe M 45% Concrete M3 30% Backfilling M3 10% Hand over to laying cable works 1.00 NOS 5% Block-B 100% 6.0% % Excavation M3 60% 10% 6.0% 5.0% Conduit Pipe M 45% Concrete M3 30% Backfilling M3 10% Hand over to laying cable works 1.00 NOS 5% Block-C 100% 6.0% % Excavation M3 60% 10% 6.0% 5.0% Conduit Pipe M 45% Concrete M3 30% Backfilling M3 10% Hand over to laying cable works 1.00 NOS 5% Block-D 100% 6.0% % Excavation M3 60% 10% 6.0% 5.0% Conduit Pipe M 45% Concrete M3 30% Backfilling M3 10% Hand over to laying cable works 1.00 NOS 5% C EARTH CABLE TRENCH -N % % 0.01% 17.5% 0.01% Block-A 100% 21.0% % Excavation M3 60% 35% 21.0% 17.5% Installation of Precast Concrete/ Concrete Pouring M3 25% Backfilling & Compaction M 25% Hand over to Mech,Piping Work to Others NOS 15% Block-B 100% 21.0% % Excavation M3 60% 35% 21.0% 17.5% Installation of Precast Concrete/ Concrete Pouring M3 25% Backfilling & Compaction M 25% Hand over to Mech,Piping Work to Others NOS 15% Block-C 100% 21.0% % Excavation M3 60% 35% 21.0% 17.5% Installation of Precast Concrete/ Concrete Pouring M3 25% Backfilling & Compaction M 25% Hand over to Mech,Piping Work to Others NOS 15% C FOUNDATION FOR BLDG (SS-18) -N % 100.0% 9, , % 0.20% 100.0% 0.20% Excavation M3 100% 10% 10.0% 10.0% Rebar Work TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% C FOUNDATION FOR TRANS, SHED, BLAST WALL (SS-18) -N % 100.0% 7, , % 0.15% 100.0% 0.15% Excavation M3 100% 10% 10.0% 10.0% Rebar Work TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% C RC WORK (SS-18) -N05 (Column) % 14, , % 0.31% 100.0% 0.31% From : Grid R21-R22 100% 100.0% % Rebar Work 0.55 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 7.82 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : Grid R22-R23 100% 100.0% % Rebar Work 0.55 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 7.82 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : Grid R23-R24 100% 100.0% % Rebar Work 0.55 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 7.82 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : Grid R24-R25 100% 100.0% % Rebar Work 0.55 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 7.82 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : Grid R25-R26 100% 100.0% % Rebar Work 0.55 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 7.82 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : Grid R21-R22 100% 100.0% % Rebar Work 0.55 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 7.82 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : Grid R22-R23 100% 100.0% % Rebar Work 0.55 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 7.82 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : Grid R23-R24 100% 100.0% % Rebar Work 0.55 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 7.82 M3 100% 15% 15.0% 15.0% CMPL Improved Page 1 of 34

194 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for each Level6 activity Project Progress CMPL % Weight Value for Level7 Progress Value BOQ 4,815,410 Strip & Finishing M2 100% 20% 20.0% 20.0% From : Grid R24-R25 100% 100.0% % Rebar Work 0.55 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 7.82 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : Grid R25-R26 100% 100.0% % Rebar Work 0.55 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 7.82 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : Grid R21-R22 100% 100.0% % Rebar Work 0.55 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 7.82 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : Grid R22-R23 100% 100.0% % Rebar Work 0.55 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 7.82 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : Grid R23-R24 100% 100.0% % Rebar Work 0.55 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 7.82 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : Grid R24-R25 100% 100.0% % Rebar Work 0.55 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 7.82 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : Grid R25-R26 100% 100.0% % Rebar Work 0.55 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 7.82 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : Grid R21-R22 100% 100.0% % Rebar Work 0.55 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 7.82 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : Grid R22-R23 100% 100.0% % Rebar Work 0.55 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 7.82 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : Grid R23-R24 100% 100.0% % Rebar Work 0.55 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 7.82 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : Grid R24-R25 100% 100.0% % Rebar Work 0.55 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 7.82 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : Grid R25-R26 100% 100.0% % Rebar Work 0.55 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 7.82 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : Grid R21-R22 100% 100.0% % Rebar Work 0.55 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 7.82 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : Grid R22-R23 100% 100.0% % Rebar Work 0.55 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 7.82 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : Grid R23-R24 100% 100.0% % Rebar Work 0.55 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 7.82 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : Grid R24-R25 100% 100.0% % Rebar Work 0.55 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 7.82 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% CMPL Improved Page 2 of 34

195 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for each Level6 activity Project Progress CMPL % Weight Value for Level7 Progress Value BOQ 4,815,410 From : Grid R25-R26 100% 100.0% % Rebar Work 0.55 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 7.82 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : Grid R21-R22 100% 100.0% % Rebar Work 0.55 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 7.82 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : Grid R22-R23 100% 100.0% % Rebar Work 0.55 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 7.82 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : Grid R23-R24 100% 100.0% % Rebar Work 0.55 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 7.82 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : Grid R24-R25 100% 100.0% % Rebar Work 0.55 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 7.82 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : Grid R25-R26 100% 100.0% % Rebar Work 0.55 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 7.82 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : Grid R21-R22 100% 100.0% % Rebar Work 0.55 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 7.82 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : Grid R22-R23 100% 100.0% % Rebar Work 0.55 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 7.82 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : Grid R23-R24 100% 100.0% % Rebar Work 0.55 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 7.82 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : Grid R24-R25 100% 100.0% % Rebar Work 0.55 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 7.82 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : Grid R25-R26 100% 100.0% % Rebar Work 0.55 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 7.82 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : Grid R21-R22 100% 100.0% % Rebar Work 0.55 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 7.82 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : Grid R22-R23 100% 100.0% % Rebar Work 0.55 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 7.82 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : Grid R23-R24 100% 100.0% % Rebar Work 0.55 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 7.82 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : Grid R24-R25 100% 100.0% % Rebar Work 0.55 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 7.82 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : Grid R25-R26 100% 100.0% % Rebar Work 0.55 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 7.82 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : Grid R21-R22 100% 100.0% % Rebar Work 0.55 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% CMPL Improved Page 3 of 34

196 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for each Level6 activity Project Progress CMPL % Weight Value for Level7 Progress Value BOQ 4,815,410 Pouring Concrete 7.82 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : Grid R22-R23 100% 100.0% % Rebar Work 0.55 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 7.82 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : Grid R23-R24 100% 100.0% % Rebar Work 0.55 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 7.82 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : Grid R24-R25 100% 100.0% % Rebar Work 0.55 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 7.82 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : Grid R25-R26 100% 100.0% % Rebar Work 0.55 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 7.82 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : Grid R21-R22 100% 100.0% % Rebar Work 0.55 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 7.82 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : Grid R22-R23 100% 100.0% % Rebar Work 0.55 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 7.82 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : Grid R23-R24 100% 100.0% % Rebar Work 0.55 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 7.82 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : Grid R24-R25 100% 100.0% % Rebar Work 0.55 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 7.82 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : Grid R25-R26 100% 100.0% % Rebar Work 0.55 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 7.82 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : Grid R21-R22 100% 100.0% % Rebar Work 0.55 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 7.82 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : Grid R22-R23 100% 100.0% % Rebar Work 0.55 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 7.82 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : Grid R23-R24 100% 100.0% % Rebar Work 0.55 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 7.82 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : Grid R24-R25 100% 100.0% % Rebar Work 0.55 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 7.82 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : Grid R25-R26 100% 100.0% % Rebar Work 0.55 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete 7.82 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% C FLOOR CONCRETE (SS-18) -N % 4, , % 0.10% 100.0% 0.10% From : Grid R21-R26 100% 100.0% , % Moisture Barrier M2 100% 10% 10.0% 10.0% Rebar Work TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Joint Treatment 1.00 M3 100% 15% 15.0% 15.0% From : Grid R21-R26 100% 100.0% , % Moisture Barrier M2 100% 10% 10.0% 10.0% Rebar Work TON 100% 30% 30.0% 30.0% CMPL Improved Page 4 of 34

197 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for each Level6 activity Project Progress CMPL % Weight Value for Level7 Progress Value BOQ 4,815,410 Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Joint Treatment 1.00 M3 100% 15% 15.0% 15.0% From : Grid R21-R26 100% 100.0% , % Moisture Barrier M2 100% 10% 10.0% 10.0% Rebar Work TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Joint Treatment 1.00 M3 100% 15% 15.0% 15.0% C ROOF CONCRETE (SS-18) -N05 (ROOF BEAM) % % 0.05% 25.0% 0.04% From : Grid R21-R26 100% 33.2% % Moisture Barrier M2 100% 10% 10.0% 10.0% Rebar Work (Structural/Metal Deck) TON 61% 30% 18.3% 15.0% Form Work M2 34% 10% 3.4% Pouring Concrete M3 10% 15% 1.5% Strip & Finishing M2 10% Joint Treatment 1.00 M 15% From : Grid R21-R26 100% 33.2% % Moisture Barrier M2 100% 10% 10.0% 10.0% Rebar Work (Structural/Metal Deck) TON 61% 30% 18.3% 15.0% Form Work M2 34% 10% 3.4% Pouring Concrete M3 10% 15% 1.5% Strip & Finishing M2 10% Joint Treatment 1.00 M 15% From : Grid R21-R26 100% 33.2% % Moisture Barrier M2 100% 10% 10.0% 10.0% Rebar Work (Structural/Metal Deck) TON 61% 30% 18.3% 15.0% Form Work M2 34% 10% 3.4% Pouring Concrete M3 10% 15% 1.5% Strip & Finishing M2 10% Joint Treatment 1.00 M 15% C PARAPET (SS-18) -N % % 0.03% 20.0% 0.02% North 100% 28.0% % Rebar Work 2.00 TON 70% 40% 28.0% 20.0% Form Work M2 15% Pouring Concrete M3 15% Strip & Finishing M2 20% East 100% 28.0% % Rebar Work 2.00 TON 70% 40% 28.0% 20.0% Form Work M2 15% Pouring Concrete M3 15% Strip & Finishing M2 20% West 100% 28.0% % Rebar Work 2.00 TON 70% 40% 28.0% 20.0% Form Work M2 15% Pouring Concrete M3 15% Strip & Finishing M2 20% South 100% 28.0% % Rebar Work 2.00 TON 70% 40% 28.0% 20.0% Form Work M2 15% Pouring Concrete M3 15% Strip & Finishing M2 20% C FOUNDATION FOR BLDG -N05 (PCB) % 100.0% 9, , % 0.20% 100.0% 0.20% Excavation M3 100% 10% 10.0% 10.0% Rebar Work TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% C RC WALL/ROOF WORK -N05 (PCB) % 27, , % 0.48% 78.7% 0.44% From : % 100.0% , % Rebar Work 6.50 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : % 100.0% , % Rebar Work 6.50 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : % 55.0% , % Rebar Work 6.50 TON 55% 40% 22.0% 20.0% Form Work M2 55% 15% 8.3% 7.5% Pouring Concrete M3 55% 15% 8.3% 7.5% Strip & Finishing M2 55% 20% 11.0% 10.0% Clear Punchlist 1.00 NOS 55% 5% 2.8% Hand over to Mech,Piping Work to Others 1.00 NOS 55% 5% 2.8% From : % 100.0% , % Rebar Work 6.50 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : % 70.0% , % Rebar Work 6.50 TON 70% 40% 28.0% 20.0% Form Work M2 70% 15% 10.5% 7.5% Pouring Concrete M3 70% 15% 10.5% 7.5% Strip & Finishing M2 70% 20% 14.0% 10.0% CMPL Improved Page 5 of 34

198 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for each Level6 activity Project Progress CMPL % Weight Value for Level7 Progress Value BOQ 4,815,410 Clear Punchlist 1.00 NOS 70% 5% 3.5% 2.5% Hand over to Mech,Piping Work to Others 1.00 NOS 70% 5% 3.5% 2.5% From : % 100.0% , % Rebar Work 6.50 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : % 100.0% , % Rebar Work 6.50 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : % 55.0% , % Rebar Work 6.50 TON 55% 40% 22.0% 20.0% Form Work M2 55% 15% 8.3% 7.5% Pouring Concrete M3 55% 15% 8.3% 7.5% Strip & Finishing M2 55% 20% 11.0% 10.0% Clear Punchlist 1.00 NOS 55% 5% 2.8% 2.5% Hand over to Mech,Piping Work to Others 1.00 NOS 55% 5% 2.8% 2.5% From : % 100.0% , % Rebar Work 6.50 TON 100% 40% 40.0% 40.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 20% 20.0% 20.0% From : % 70.0% , % Rebar Work 6.50 TON 70% 40% 28.0% 20.0% Form Work M2 70% 15% 10.5% 7.5% Pouring Concrete M3 70% 15% 10.5% 7.5% Strip & Finishing M2 70% 20% 14.0% 10.0% Clear Punchlist 1.00 NOS 70% 5% 3.5% 2.5% Hand over to Mech,Piping Work to Others 1.00 NOS 70% 5% 3.5% 2.5% C PARAPET -N05 (PCB) % % 0.05% 20.0% 0.03% North 100% 32.0% % Rebar Work 1.30 TON 80% 40% 32.0% 20.0% Form Work M2 15% Pouring Concrete M3 15% Strip & Finishing M2 20% East 100% 32.0% % Rebar Work 1.30 TON 80% 40% 32.0% 20.0% Form Work M2 15% Pouring Concrete M3 15% Strip & Finishing M2 20% West 100% 32.0% % Rebar Work 1.30 TON 80% 40% 32.0% 20.0% Form Work M2 15% Pouring Concrete M3 15% Strip & Finishing M2 20% South 100% 32.0% % Rebar Work 1.30 TON 80% 40% 32.0% 20.0% Form Work M2 15% Pouring Concrete M3 15% Strip & Finishing M2 20% C FLOOR CONCRETE -N05 (PCB) % % 0.05% 15.0% 0.04% From : % 21% % Moisture Barrier M2 10% Rebar Work TON 70% 30% 21% 15.0% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Joint Treatment M 15% From : % 21% % Moisture Barrier M2 10% Rebar Work TON 70% 30% 21% 15.0% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Joint Treatment M 15% From : % 21% % Moisture Barrier M2 10% Rebar Work TON 70% 30% 21% 15.0% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Joint Treatment M 15% From : % 21% % Moisture Barrier M2 10% Rebar Work TON 70% 30% 21% 15.0% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Joint Treatment M 15% C FOUNDATION FOR BLDG -N05( L M B) % % 0.14% 63.4% 0.13% From : F % 78.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 2.00 TON 100% 30% 30.0% 30.0% Form Work 6.00 M2 100% 10% 10.0% 10.0% Pouring Concrete 6.00 M3 100% 15% 15.0% 15.0% Strip & Finishing 6.00 M2 90% 10% 9.0% 5.0% Backfiling& Compaction M3 10% 15% 1.5% Clear Punchlist 1.00 NOS 50% 5% 2.5% 2.5% From : F % 36.0% % Excavation M3 100% 10% 10.0% 10.0% CMPL Improved Page 6 of 34

199 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for each Level6 activity Project Progress CMPL % Weight Value for Level7 Progress Value BOQ 4,815,410 Rebar Work 2.00 TON 70% 30% 21.0% 15.0% Form Work 6.00 M2 50% 10% 5.0% 5.0% Pouring Concrete 6.00 M3 15% Strip & Finishing 6.00 M2 10% Backfiling& Compaction M3 15% From : F % 36.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 2.00 TON 70% 30% 21.0% 15.0% Form Work 6.00 M2 50% 10% 5.0% 5.0% Pouring Concrete 6.00 M3 15% Strip & Finishing 6.00 M2 10% Backfiling& Compaction M3 15% From : F % 36.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 2.00 TON 70% 30% 21.0% 15.0% Form Work 6.00 M2 50% 10% 5.0% 5.0% Pouring Concrete 6.00 M3 15% Strip & Finishing 6.00 M2 10% Backfiling& Compaction M3 15% From : F % 36.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 2.00 TON 70% 30% 21.0% 15.0% Form Work 6.00 M2 50% 10% 5.0% 5.0% Pouring Concrete 6.00 M3 15% Strip & Finishing 6.00 M2 10% Backfiling& Compaction M3 15% From : F % 36.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 2.00 TON 70% 30% 21.0% 15.0% Form Work 6.00 M2 50% 10% 5.0% 5.0% Pouring Concrete 6.00 M3 15% Strip & Finishing 6.00 M2 10% Backfiling& Compaction M3 15% From : F % 78.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 2.00 TON 100% 30% 30.0% 30.0% Form Work 6.00 M2 100% 10% 10.0% 10.0% Pouring Concrete 6.00 M3 100% 15% 15.0% 15.0% Strip & Finishing 6.00 M2 90% 10% 9.0% 5.0% Backfiling& Compaction M3 10% 15% 1.5% Clear Punchlist 1.00 NOS 50% 5% 2.5% 2.5% From : F % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 2.00 TON 100% 30% 30.0% 30.0% Form Work 6.00 M2 100% 10% 10.0% 10.0% Pouring Concrete 6.00 M3 100% 15% 15.0% 15.0% Strip & Finishing 6.00 M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : F % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 2.00 TON 100% 30% 30.0% 30.0% Form Work 6.00 M2 100% 10% 10.0% 10.0% Pouring Concrete 6.00 M3 100% 15% 15.0% 15.0% Strip & Finishing 6.00 M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : F % 37.5% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 2.00 TON 75% 30% 22.5% 15.0% Form Work 6.00 M2 50% 10% 5.0% 5.0% Pouring Concrete 6.00 M3 15% Strip & Finishing 6.00 M2 10% Backfiling& Compaction M3 15% From : F % 37.5% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 2.00 TON 75% 30% 22.5% 15.0% Form Work 6.00 M2 50% 10% 5.0% 5.0% Pouring Concrete 6.00 M3 15% Strip & Finishing 6.00 M2 10% Backfiling& Compaction M3 15% From : F % 37.5% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 2.00 TON 75% 30% 22.5% 15.0% Form Work 6.00 M2 50% 10% 5.0% 5.0% Pouring Concrete 6.00 M3 15% Strip & Finishing 6.00 M2 10% Backfiling& Compaction M3 15% From : F % 78.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 2.00 TON 100% 30% 30.0% 30.0% Form Work 6.00 M2 100% 10% 10.0% 10.0% Pouring Concrete 6.00 M3 100% 15% 15.0% 15.0% Strip & Finishing 6.00 M2 90% 10% 9.0% 5.0% Backfiling& Compaction M3 10% 15% 1.5% Clear Punchlist 1.00 NOS 50% 5% 2.5% 2.5% From : F % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 2.00 TON 100% 30% 30.0% 30.0% Form Work 6.00 M2 100% 10% 10.0% 10.0% Pouring Concrete 6.00 M3 100% 15% 15.0% 15.0% Strip & Finishing 6.00 M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% CMPL Improved Page 7 of 34

200 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for each Level6 activity Project Progress CMPL % Weight Value for Level7 Progress Value BOQ 4,815,410 From : F % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 2.00 TON 100% 30% 30.0% 30.0% Form Work 6.00 M2 100% 10% 10.0% 10.0% Pouring Concrete 6.00 M3 100% 15% 15.0% 15.0% Strip & Finishing 6.00 M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : F % 43.5% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 2.00 TON 70% 30% 21.0% 15.0% Form Work 6.00 M2 50% 10% 5.0% 5.0% Pouring Concrete 6.00 M3 50% 15% 7.5% 7.5% Strip & Finishing 6.00 M2 10% Backfiling& Compaction M3 15% From : F % 68.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 2.00 TON 100% 30% 30.0% 30.0% Form Work 6.00 M2 85% 10% 8.5% 5.0% Pouring Concrete 6.00 M3 85% 15% 12.8% 7.5% Strip & Finishing 6.00 M2 67% 10% 6.7% 5.0% Backfiling& Compaction M3 15% From : F % 68.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 2.00 TON 100% 30% 30.0% 30.0% Form Work 6.00 M2 85% 10% 8.5% 5.0% Pouring Concrete 6.00 M3 85% 15% 12.8% 7.5% Strip & Finishing 6.00 M2 67% 10% 6.7% 5.0% Backfiling& Compaction M3 15% From : F % 76.5% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 2.00 TON 100% 30% 30.0% 30.0% Form Work 6.00 M2 100% 10% 10.0% 10.0% Pouring Concrete 6.00 M3 100% 15% 15.0% 15.0% Strip & Finishing 6.00 M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 10% 15% 1.5% From : F % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 2.00 TON 100% 30% 30.0% 30.0% Form Work 6.00 M2 100% 10% 10.0% 10.0% Pouring Concrete 6.00 M3 100% 15% 15.0% 15.0% Strip & Finishing 6.00 M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : F % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 2.00 TON 100% 30% 30.0% 30.0% Form Work 6.00 M2 100% 10% 10.0% 10.0% Pouring Concrete 6.00 M3 100% 15% 15.0% 15.0% Strip & Finishing 6.00 M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : F % 68.5% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 2.00 TON 100% 30% 30.0% 30.0% Form Work 6.00 M2 87% 10% 8.7% 5.0% Pouring Concrete 6.00 M3 87% 15% 13.1% 7.5% Strip & Finishing 6.00 M2 67% 10% 6.7% 5.0% Backfiling& Compaction M3 15% From : F % 68.5% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 2.00 TON 100% 30% 30.0% 30.0% Form Work 6.00 M2 87% 10% 8.7% 5.0% Pouring Concrete 6.00 M3 87% 15% 13.1% 7.5% Strip & Finishing 6.00 M2 67% 10% 6.7% 5.0% Backfiling& Compaction M3 15% From : F % 68.5% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 2.00 TON 100% 30% 30.0% 30.0% Form Work 6.00 M2 87% 10% 8.7% 5.0% Pouring Concrete 6.00 M3 87% 15% 13.1% 7.5% Strip & Finishing 6.00 M2 67% 10% 6.7% 5.0% Backfiling& Compaction M3 15% From : F % 79.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 2.00 TON 100% 30% 30.0% 30.0% Form Work 6.00 M2 100% 10% 10.0% 10.0% Pouring Concrete 6.00 M3 100% 15% 15.0% 15.0% Strip & Finishing 6.00 M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 10% 15% 1.5% Clear Punchlist 1.00 NOS 50% 5% 2.5% 2.5% From : F % 79.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 2.00 TON 100% 30% 30.0% 30.0% Form Work 6.00 M2 100% 10% 10.0% 10.0% Pouring Concrete 6.00 M3 100% 15% 15.0% 15.0% Strip & Finishing 6.00 M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 10% 15% 1.5% Clear Punchlist 1.00 NOS 50% 5% 2.5% 2.5% From : F % 79.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 2.00 TON 100% 30% 30.0% 30.0% Form Work 6.00 M2 100% 10% 10.0% 10.0% Pouring Concrete 6.00 M3 100% 15% 15.0% 15.0% Strip & Finishing 6.00 M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 10% 15% 1.5% CMPL Improved Page 8 of 34

201 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for each Level6 activity Project Progress CMPL % Weight Value for Level7 Progress Value BOQ 4,815,410 Clear Punchlist 1.00 NOS 50% 5% 2.5% 2.5% From : F % 78.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 2.00 TON 100% 30% 30.0% 30.0% Form Work 6.00 M2 100% 10% 10.0% 10.0% Pouring Concrete 6.00 M3 100% 15% 15.0% 15.0% Strip & Finishing 6.00 M2 90% 10% 9.0% 5.0% Backfiling& Compaction M3 10% 15% 1.5% Clear Punchlist 1.00 NOS 50% 5% 2.5% 2.5% From : F % 75.5% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 2.00 TON 100% 30% 30.0% 30.0% Form Work 6.00 M2 100% 10% 10.0% 10.0% Pouring Concrete 6.00 M3 100% 15% 15.0% 15.0% Strip & Finishing 6.00 M2 90% 10% 9.0% 5.0% Backfiling& Compaction M3 10% 15% 1.5% From : F % 74.8% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 2.00 TON 100% 30% 30.0% 30.0% Form Work 6.00 M2 100% 10% 10.0% 10.0% Pouring Concrete 6.00 M3 100% 15% 15.0% 15.0% Strip & Finishing 6.00 M2 83% 10% 8.3% 5.0% Backfiling& Compaction M3 10% 15% 1.5% PRODUCT TRANSFER SYSTEM & SILOS(Area-7) CIVIL WORK 1, , C EQPT FOUNDATION(SILO NORTH) -N % % 0.04% 25.0% 0.04% Construct FDN of NTK-1607 Sludge Tank 100% 25.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 3.00 TON 50% 30% 15.0% 15.0% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% Clear Punchlist NOS 5% Hand over to Mech,Piping Work to Others NOS 5% Construct FDN of NTK-1608 Recovered Oil Tank 100% 25.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 3.00 TON 50% 30% 15.0% 15.0% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% Clear Punchlist NOS 5% Hand over to Mech,Piping Work to Others NOS 5% Construct FDN of NP-1608A Recovered Oil Pump 100% 25.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 3.00 TON 50% 30% 15.0% 15.0% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% Clear Punchlist NOS 5% Hand over to Mech,Piping Work to Others NOS 5% Construct FDN of NP-1608S Recovered Oil Pump 100% 25.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 3.00 TON 50% 30% 15.0% 15.0% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% Clear Punchlist NOS 5% Hand over to Mech,Piping Work to Others NOS 5% Construct FDN of NP-1607 CPI Sludge Pump 100% 25.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 3.00 TON 50% 30% 15.0% 15.0% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% Clear Punchlist NOS 5% Hand over to Mech,Piping Work to Others NOS 5% Construct FDN of NM-1607A No. 1 Corrugate Plate Interceptor 100% 25.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 3.00 TON 50% 30% 15.0% 15.0% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% Clear Punchlist NOS 5% Hand over to Mech,Piping Work to Others NOS 5% Construct FDN of NM-1607S No. 1 Corrugate Plate Interceptor 100% 25.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 3.00 TON 50% 30% 15.0% 15.0% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% Clear Punchlist NOS 5% Hand over to Mech,Piping Work to Others NOS 5% Construct FDN of NTK-8001 Wash Water Tank 100% 25.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 3.00 TON 50% 30% 15.0% 15.0% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% Clear Punchlist NOS 5% Hand over to Mech,Piping Work to Others NOS 5% Construct FDN of NP-8001A Wash Water Pump 100% 25.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 3.00 TON 50% 30% 15.0% 15.0% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% Clear Punchlist NOS 5% Hand over to Mech,Piping Work to Others NOS 5% Construct FDN of NP-8001S Wash Water Pump 100% 25.0% % Excavation M3 100% 10% 10.0% 10.0% CMPL Improved Page 9 of 34

202 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for each Level6 activity Project Progress CMPL % Weight Value for Level7 Progress Value BOQ 4,815,410 Rebar Work 3.00 TON 50% 30% 15.0% 15.0% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% Clear Punchlist NOS 5% Hand over to Mech,Piping Work to Others NOS 5% Construct FDN of NV-1303 Incenerator Alkyl Feed Drum 100% 25.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 3.00 TON 50% 30% 15.0% 15.0% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% Clear Punchlist NOS 5% Hand over to Mech,Piping Work to Others NOS 5% Construct FDN of NP-1303 Incenerator Feed Pump 100% 25.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 3.00 TON 50% 30% 15.0% 15.0% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% Clear Punchlist NOS 5% Hand over to Mech,Piping Work to Others NOS 5% Construct FDN of NP-1601A Oily Water Sump Pump 100% 25.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 3.00 TON 50% 30% 15.0% 15.0% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% Clear Punchlist NOS 5% Hand over to Mech,Piping Work to Others NOS 5% Construct FDN of NP-1601S Oily Water Sump Pump 100% 25.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 3.00 TON 50% 30% 15.0% 15.0% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% Clear Punchlist NOS 5% Hand over to Mech,Piping Work to Others NOS 5% Construct FDN of NP-1602A PE Water Sump Screening Pump 100% 25.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 3.00 TON 50% 30% 15.0% 15.0% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% Clear Punchlist NOS 5% Hand over to Mech,Piping Work to Others NOS 5% Construct FDN of NP-1602B PE Water Sump Screening Pump 100% 25.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 3.00 TON 50% 30% 15.0% 15.0% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% Clear Punchlist NOS 5% Hand over to Mech,Piping Work to Others NOS 5% Construct FDN of NP-1603 Incinerator Feed Pump 100% 25.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 3.00 TON 50% 30% 15.0% 15.0% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% Clear Punchlist NOS 5% Hand over to Mech,Piping Work to Others NOS 5% Construct FDN of NP-1606A Settling Pond Water Pump 100% 25.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 3.00 TON 50% 30% 15.0% 15.0% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% Clear Punchlist NOS 5% Hand over to Mech,Piping Work to Others NOS 5% Construct FDN of NP-1606S Settling Pond Water Pump 100% 25.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 3.00 TON 50% 30% 15.0% 15.0% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% Clear Punchlist NOS 5% Hand over to Mech,Piping Work to Others NOS 5% C EQPT FOUNDATION(SILO SOUTH) -N % % 0.06% 38.0% 0.06% Construct FDN of NK-8001A Pallet Compressor Package 100% 15.0% % Excavation M3 10% Rebar Work 4.00 TON 50% 30% 15.0% 15.0% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% Clear Punchlist NOS 5% Hand over to Mech,Piping Work to Others NOS 5% Construct FDN of NK-8001B Pallet Compressor Package 100% 15.0% % Excavation M3 10% Rebar Work 4.00 TON 50% 30% 15.0% 15.0% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% Clear Punchlist NOS 5% Hand over to Mech,Piping Work to Others NOS 5% Construct FDN of NK-8001S Pallet Compressor Package 100% 15.0% % Excavation M3 10% Rebar Work 4.00 TON 50% 30% 15.0% 15.0% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% Clear Punchlist NOS 5% CMPL Improved Page 10 of 34

203 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for each Level6 activity Project Progress CMPL % Weight Value for Level7 Progress Value BOQ 4,815,410 Hand over to Mech,Piping Work to Others NOS 5% Construct FDN of NK-9001A Granular Compressor Package 100% 15.0% % Excavation M3 10% Rebar Work 4.00 TON 50% 30% 15.0% 15.0% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% Clear Punchlist NOS 5% Hand over to Mech,Piping Work to Others NOS 5% Construct FDN of NK-9001B Granular Compressor Package 100% 15.0% % Excavation M3 10% Rebar Work 4.00 TON 50% 30% 15.0% 15.0% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% Clear Punchlist NOS 5% Hand over to Mech,Piping Work to Others NOS 5% Construct FDN of NK-9001S Granular Compressor Package 100% 15.0% % Excavation M3 10% Rebar Work 4.00 TON 50% 30% 15.0% 15.0% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% Clear Punchlist NOS 5% Hand over to Mech,Piping Work to Others NOS 5% Construct FDN of NE-9001 Return Gas Cooler 100% 15.0% % Excavation M3 10% Rebar Work 4.00 TON 50% 30% 15.0% 15.0% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% Clear Punchlist NOS 5% Hand over to Mech,Piping Work to Others NOS 5% Construct FDN of NE-9006 Return Gas Cooler 100% 15.0% % Excavation M3 10% Rebar Work 4.00 TON 50% 30% 15.0% 15.0% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% Clear Punchlist NOS 5% Hand over to Mech,Piping Work to Others NOS 5% Construct FDN of NMU-9001 N2 Make Up Unit 100% 100.0% % Excavation 1.00 M3 100% 10% 10.0% 10.0% Rebar Work 1.00 TON 100% 30% 30.0% 30.0% Form Work 1.00 M2 100% 10% 10.0% 10.0% Pouring Concrete 1.00 M3 100% 15% 15.0% 15.0% Strip & Finishing 1.00 M2 100% 10% 10.0% 10.0% Backfiling& Compaction 1.00 M3 100% 15% 15.0% 15.0% Construct FDN of NMU-9006 N2 Make Up Unit 100% 100.0% % Excavation 1.00 M3 100% 10% 10.0% 10.0% Rebar Work 1.00 TON 100% 30% 30.0% 30.0% Form Work 1.00 M2 100% 10% 10.0% 10.0% Pouring Concrete 1.00 M3 100% 15% 15.0% 15.0% Strip & Finishing 1.00 M2 100% 10% 10.0% 10.0% Backfiling& Compaction 1.00 M3 100% 15% 15.0% 15.0% Construct FDN of NV-1201 Air Reciever 100% 15.0% % Excavation M3 10% Rebar Work 4.00 TON 50% 30% 15.0% 15.0% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% Construct FDN of NV-8001 Transfer Air Reciever 100% 15.0% % Excavation 8.00 M3 10% Rebar Work 4.00 TON 50% 30% 15.0% 15.0% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% Clear Punchlist NOS 5% Hand over to Mech,Piping Work to Others NOS 5% Construct FDN of NV-9001 Transfer Air Reciever 100% 15.0% % Excavation 8.00 M3 10% Rebar Work 4.00 TON 50% 30% 15.0% 15.0% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% Clear Punchlist NOS 5% Hand over to Mech,Piping Work to Others NOS 5% Construct FDN of NK-1201A Air Compressor 100% 15.0% % Excavation M3 10% Rebar Work 4.00 TON 50% 30% 15.0% 15.0% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% Clear Punchlist NOS 5% Hand over to Mech,Piping Work to Others NOS 5% Construct FDN of NK-1201B Air Compressor 100% 15.0% % Excavation M3 10% Rebar Work 4.00 TON 50% 30% 15.0% 15.0% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% Clear Punchlist NOS 5% Hand over to Mech,Piping Work to Others NOS 5% Construct FDN of NF-1201A Inlet Filter 100% 15.0% % Excavation M3 10% Rebar Work 4.00 TON 50% 30% 15.0% 15.0% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% CMPL Improved Page 11 of 34

204 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for each Level6 activity Project Progress CMPL % Weight Value for Level7 Progress Value BOQ 4,815,410 Backfiling& Compaction M3 15% Clear Punchlist NOS 5% Hand over to Mech,Piping Work to Others NOS 5% Construct FDN of NF-1201B Inlet Filter 100% 15.0% % Excavation M3 10% Rebar Work 4.00 TON 50% 30% 15.0% 15.0% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% Clear Punchlist NOS 5% Hand over to Mech,Piping Work to Others NOS 5% Construct FDN of NR-1201A Air Dryer 100% 15.0% % Excavation M3 10% Rebar Work 4.00 TON 50% 30% 15.0% 15.0% Form Work M2 10% Pouring Concrete 6.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% Construct FDN of NR-1201B Air Dryer 100% 15.0% % Excavation M3 10% Rebar Work 4.00 TON 50% 30% 15.0% 15.0% Form Work M2 10% Pouring Concrete 6.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% Construct FDN of NR-1202A Air Dryer 100% 15.0% % Excavation M3 10% Rebar Work 4.00 TON 50% 30% 15.0% 15.0% Form Work M2 10% Pouring Concrete 6.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% Construct FDN of NR-1202B Air Dryer 100% 15.0% % Excavation M3 10% Rebar Work 4.00 TON 50% 30% 15.0% 15.0% Form Work M2 10% Pouring Concrete 6.00 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% Construct FDN of NF-8002A Discharge Filter 100% 15.0% % Excavation M3 10% Rebar Work 4.00 TON 50% 30% 15.0% 15.0% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% Clear Punchlist NOS 5% Hand over to Mech,Piping Work to Others NOS 5% Construct FDN of NF-8002B Discharge Filter 100% 15.0% % Excavation M3 10% Rebar Work 4.00 TON 50% 30% 15.0% 15.0% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% Clear Punchlist NOS 5% Hand over to Mech,Piping Work to Others NOS 5% Construct FDN of NF-8002S Discharge Filter 100% 15.0% % Excavation M3 10% Rebar Work 4.00 TON 50% 30% 15.0% 15.0% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% Clear Punchlist NOS 5% Hand over to Mech,Piping Work to Others NOS 5% Construct FDN of NF-9002A Discharge Filter 100% 15.0% % Excavation M3 10% Rebar Work 4.00 TON 50% 30% 15.0% 15.0% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% Clear Punchlist NOS 5% Hand over to Mech,Piping Work to Others NOS 5% Construct FDN of NF-9002B Discharge Filter 100% 15.0% % Excavation M3 10% Rebar Work 4.00 TON 50% 30% 15.0% 15.0% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% Clear Punchlist NOS 5% Hand over to Mech,Piping Work to Others NOS 5% Construct FDN of NF-9002S Discharge Filter 100% 15.0% % Excavation M3 10% Rebar Work 4.00 TON 50% 30% 15.0% 15.0% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% Clear Punchlist NOS 5% Hand over to Mech,Piping Work to Others NOS 5% Construct FDN of NF-9001 Return Gas Filter 100% 15.0% % Excavation M3 10% Rebar Work 4.00 TON 50% 30% 15.0% 15.0% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% Clear Punchlist NOS 5% Hand over to Mech,Piping Work to Others NOS 5% Construct FDN of NF-9006 Return Gas Filter 100% 15.0% % Excavation M3 10% Rebar Work 4.00 TON 50% 30% 15.0% 15.0% Form Work M2 10% CMPL Improved Page 12 of 34

205 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for each Level6 activity Project Progress CMPL % Weight Value for Level7 Progress Value BOQ 4,815,410 Pouring Concrete M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% Clear Punchlist NOS 5% Hand over to Mech,Piping Work to Others NOS 5% Construct FDN of NMU-1201A Inlet Silencer 100% 15.0% % Excavation M3 10% Rebar Work 4.00 TON 50% 30% 15.0% 15.0% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% Clear Punchlist NOS 5% Hand over to Mech,Piping Work to Others NOS 5% Construct FDN of NMU-1201B Inlet Silencer 100% 15.0% % Excavation M3 10% Rebar Work 4.00 TON 50% 30% 15.0% 15.0% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% Clear Punchlist NOS 5% Hand over to Mech,Piping Work to Others NOS 5% Construct FDN of NMU-1202A Blow-off Silencer 100% 15.0% % Excavation M3 10% Rebar Work 4.00 TON 50% 30% 15.0% 15.0% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% Clear Punchlist NOS 5% Hand over to Mech,Piping Work to Others NOS 5% Construct FDN of NMU-1202B Blow-off Silencer 100% 15.0% % Excavation M3 10% Rebar Work 4.00 TON 50% 30% 15.0% 15.0% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% Clear Punchlist NOS 5% Hand over to Mech,Piping Work to Others NOS 5% Construct FDN of NF-8001A Suction Filter 100% 100.0% % Excavation 1.00 M3 100% 10% 10.0% 10.0% Rebar Work 1.00 TON 100% 30% 30.0% 30.0% Form Work 1.00 M2 100% 10% 10.0% 10.0% Pouring Concrete 1.00 M3 100% 15% 15.0% 15.0% Strip & Finishing 1.00 M2 100% 10% 10.0% 10.0% Backfiling& Compaction 1.00 M3 100% 15% 15.0% 15.0% Construct FDN of NF-8001B Suction Filter 100% 100.0% % Excavation 1.00 M3 100% 10% 10.0% 10.0% Rebar Work 1.00 TON 100% 30% 30.0% 30.0% Form Work 1.00 M2 100% 10% 10.0% 10.0% Pouring Concrete 1.00 M3 100% 15% 15.0% 15.0% Strip & Finishing 1.00 M2 100% 10% 10.0% 10.0% Backfiling& Compaction 1.00 M3 100% 15% 15.0% 15.0% Construct FDN of NF-8001S Suction Filter 100% 100.0% % Excavation 1.00 M3 100% 10% 10.0% 10.0% Rebar Work 1.00 TON 100% 30% 30.0% 30.0% Form Work 1.00 M2 100% 10% 10.0% 10.0% Pouring Concrete 1.00 M3 100% 15% 15.0% 15.0% Strip & Finishing 1.00 M2 100% 10% 10.0% 10.0% Backfiling& Compaction 1.00 M3 100% 15% 15.0% 15.0% Construct FDN of NE-1201A Ist Stage Intercooler 100% 100.0% % Excavation 1.00 M3 100% 10% 10.0% 10.0% Rebar Work 1.00 TON 100% 30% 30.0% 30.0% Form Work 1.00 M2 100% 10% 10.0% 10.0% Pouring Concrete 1.00 M3 100% 15% 15.0% 15.0% Strip & Finishing 1.00 M2 100% 10% 10.0% 10.0% Backfiling& Compaction 1.00 M3 100% 15% 15.0% 15.0% Construct FDN of NE-1201B Ist Stage Intercooler 100% 100.0% % Excavation 1.00 M3 100% 10% 10.0% 10.0% Rebar Work 1.00 TON 100% 30% 30.0% 30.0% Form Work 1.00 M2 100% 10% 10.0% 10.0% Pouring Concrete 1.00 M3 100% 15% 15.0% 15.0% Strip & Finishing 1.00 M2 100% 10% 10.0% 10.0% Backfiling& Compaction 1.00 M3 100% 15% 15.0% 15.0% Construct FDN of NE-1202A 2nd Stage Intercooler 100% 100.0% % Excavation 1.00 M3 100% 10% 10.0% 10.0% Rebar Work 1.00 TON 100% 30% 30.0% 30.0% Form Work 1.00 M2 100% 10% 10.0% 10.0% Pouring Concrete 1.00 M3 100% 15% 15.0% 15.0% Strip & Finishing 1.00 M2 100% 10% 10.0% 10.0% Backfiling& Compaction 1.00 M3 100% 15% 15.0% 15.0% Construct FDN of NE-1202B 2nd Stage Intercooler 100% 100.0% % Excavation 1.00 M3 100% 10% 10.0% 10.0% Rebar Work 1.00 TON 100% 30% 30.0% 30.0% Form Work 1.00 M2 100% 10% 10.0% 10.0% Pouring Concrete 1.00 M3 100% 15% 15.0% 15.0% Strip & Finishing 1.00 M2 100% 10% 10.0% 10.0% Backfiling& Compaction 1.00 M3 100% 15% 15.0% 15.0% Construct FDN of NE-1203A Aftercooler 100% 100.0% % Excavation 1.00 M3 100% 10% 10.0% 10.0% Rebar Work 1.00 TON 100% 30% 30.0% 30.0% Form Work 1.00 M2 100% 10% 10.0% 10.0% Pouring Concrete 1.00 M3 100% 15% 15.0% 15.0% Strip & Finishing 1.00 M2 100% 10% 10.0% 10.0% Backfiling& Compaction 1.00 M3 100% 15% 15.0% 15.0% Construct FDN of NE-1203B Aftercooler 100% 100.0% % Excavation 1.00 M3 100% 10% 10.0% 10.0% CMPL Improved Page 13 of 34

206 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for each Level6 activity Project Progress CMPL % Weight Value for Level7 Progress Value BOQ 4,815,410 Rebar Work 1.00 TON 100% 30% 30.0% 30.0% Form Work 1.00 M2 100% 10% 10.0% 10.0% Pouring Concrete 1.00 M3 100% 15% 15.0% 15.0% Strip & Finishing 1.00 M2 100% 10% 10.0% 10.0% Backfiling& Compaction 1.00 M3 100% 15% 15.0% 15.0% Construct FDN of NE-1204A Lube Oil cooler 100% 100.0% % Excavation 1.00 M3 100% 10% 10.0% 10.0% Rebar Work 1.00 TON 100% 30% 30.0% 30.0% Form Work 1.00 M2 100% 10% 10.0% 10.0% Pouring Concrete 1.00 M3 100% 15% 15.0% 15.0% Strip & Finishing 1.00 M2 100% 10% 10.0% 10.0% Backfiling& Compaction 1.00 M3 100% 15% 15.0% 15.0% Construct FDN of NE-1204B Lube Oil cooler 100% 100.0% % Excavation 1.00 M3 100% 10% 10.0% 10.0% Rebar Work 1.00 TON 100% 30% 30.0% 30.0% Form Work 1.00 M2 100% 10% 10.0% 10.0% Pouring Concrete 1.00 M3 100% 15% 15.0% 15.0% Strip & Finishing 1.00 M2 100% 10% 10.0% 10.0% Backfiling& Compaction 1.00 M3 100% 15% 15.0% 15.0% Construct FDN of NV-1202A Ist Stage Intercooler Separator 100% 15.0% % Excavation M3 10% Rebar Work 4.00 TON 50% 30% 15.0% 15.0% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% Clear Punchlist NOS 5% Hand over to Mech,Piping Work to Others NOS 5% Construct FDN of NV-1202B Ist Stage Intercooler Separator 100% 15.0% % Excavation M3 10% Rebar Work 4.00 TON 50% 30% 15.0% 15.0% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% Clear Punchlist NOS 5% Hand over to Mech,Piping Work to Others NOS 5% Construct FDN of NV-1203A 2nd Stage Intercooler Separator 100% 15.0% % Excavation M3 10% Rebar Work 4.00 TON 50% 30% 15.0% 15.0% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% Clear Punchlist NOS 5% Hand over to Mech,Piping Work to Others NOS 5% Construct FDN of NV-1203B 2nd Stage Intercooler Separator 100% 15.0% % Excavation M3 10% Rebar Work 4.00 TON 50% 30% 15.0% 15.0% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% Clear Punchlist NOS 5% Hand over to Mech,Piping Work to Others NOS 5% C N80R4 PIPE RACK FOUNDATION -N % % 0.01% 15.0% 0.01% From : G20-F51 100% 30.0% % Excavation M3 10% Rebar Work 4.00 TON 100% 30% 30.0% 30.0% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% Clear Punchlist NOS 5% Hand over to Mech,Piping Work to Others NOS 5% From : G20-F52 100% 30.0% % Excavation M3 10% Rebar Work 4.00 TON 100% 30% 30.0% 30.0% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% Clear Punchlist NOS 5% Hand over to Mech,Piping Work to Others NOS 5% From : G % Excavation M3 10% Rebar Work 4.00 TON 30% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% Clear Punchlist NOS 5% Hand over to Mech,Piping Work to Others NOS 5% From : G % Excavation M3 10% Rebar Work 4.00 TON 30% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% Clear Punchlist NOS 5% Hand over to Mech,Piping Work to Others NOS 5% C N80S1 SILO STR FOUNDATION -N % 9, , % 0.14% 64.4% 0.13% From : G % 47.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.00 TON 100% 30% 30.0% 30.0% Form Work M2 70% 10% 7.0% 5.0% Pouring Concrete 8.40 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : G % 47.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.00 TON 100% 30% 30.0% 30.0% Form Work M2 70% 10% 7.0% 5.0% Pouring Concrete 8.40 M3 15% Strip & Finishing M2 10% CMPL Improved Page 14 of 34

207 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for each Level6 activity Project Progress CMPL % Weight Value for Level7 Progress Value BOQ 4,815,410 Backfiling& Compaction M3 15% From : G % 47.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.00 TON 100% 30% 30.0% 30.0% Form Work M2 70% 10% 7.0% 5.0% Pouring Concrete 8.40 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : G % 81.5% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.00 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 8.40 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 10% 15% 1.5% From : G % 31.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.00 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 8.40 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : G % 47.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.00 TON 100% 30% 30.0% 30.0% Form Work M2 70% 10% 7.0% 5.0% Pouring Concrete 8.40 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : G % 50.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.00 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 8.40 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : G % 47.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.00 TON 100% 30% 30.0% 30.0% Form Work M2 70% 10% 7.0% 5.0% Pouring Concrete 8.40 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : G % 84.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.00 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 8.40 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 10% 15% 1.5% Hand over to Mech,Piping Work to Others 1.00 NOS 50% 5% 2.5% 2.5% From : G % 40.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.00 TON 100% 30% 30.0% 30.0% Form Work M2 10% Pouring Concrete 8.40 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : G % 90.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.00 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 8.40 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 33% 15% 5.0% From : G % 90.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.00 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 8.40 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 33% 15% 5.0% From : G % 90.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.00 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 8.40 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 33% 15% 5.0% From : G % 90.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.00 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 8.40 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 33% 15% 5.0% CMPL Improved Page 15 of 34

208 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for each Level6 activity Project Progress CMPL % Weight Value for Level7 Progress Value BOQ 4,815,410 From : G % 47.5% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.00 TON 100% 30% 30.0% 30.0% Form Work M2 75% 10% 7.5% 5.0% Pouring Concrete 8.40 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : G % 90.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.00 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 8.40 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 33% 15% 5.0% From : G % 90.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.00 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 8.40 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 33% 15% 5.0% From : G % 90.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.00 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 8.40 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 33% 15% 5.0% From : G % 86.5% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.00 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 8.40 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 10% 15% 1.5% From : G % 47.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.00 TON 100% 30% 30.0% 30.0% Form Work M2 70% 10% 7.0% 5.0% Pouring Concrete 8.40 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : G % 90.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.00 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 8.40 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 33% 15% 5.0% From : G % 88.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.00 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 8.40 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 20% 15% 3.0% From : G % 88.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.00 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 8.40 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 20% 15% 3.0% From : G % 86.5% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.00 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 8.40 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 10% 15% 1.5% From : G % 47.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.00 TON 100% 30% 30.0% 30.0% Form Work M2 70% 10% 7.0% 5.0% Pouring Concrete 8.40 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : G % 90.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.00 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 8.40 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 33% 15% 5.0% CMPL Improved Page 16 of 34

209 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for each Level6 activity Project Progress CMPL % Weight Value for Level7 Progress Value BOQ 4,815,410 From : G % 90.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.00 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 8.40 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 33% 15% 5.0% From : G % 90.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.00 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 8.40 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 33% 15% 5.0% From : G % 90.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.00 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 8.40 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 33% 15% 5.0% From : G % 83.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.00 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 8.40 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 20% 15% 3.0% From : G % 90.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.00 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 8.40 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 33% 15% 5.0% From : G % 90.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.00 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 8.40 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 33% 15% 5.0% From : G % 90.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.00 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 8.40 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 33% 15% 5.0% From : G % 90.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.00 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 8.40 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 33% 15% 5.0% From : G % 87.5% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.00 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 8.40 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 33% 15% 5.0% Hand over to Mech,Piping Work to Others 1.00 NOS 50% 5% 2.5% 2.5% From : G % 44.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.00 TON 100% 30% 30.0% 30.0% Form Work M2 40% 10% 4.0% Pouring Concrete 8.40 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : G % 25.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.00 TON 50% 30% 15.0% 15.0% Form Work M2 10% Pouring Concrete 8.40 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : G % 25.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.00 TON 50% 30% 15.0% 15.0% Form Work M2 10% Pouring Concrete 8.40 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% CMPL Improved Page 17 of 34

210 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for each Level6 activity Project Progress CMPL % Weight Value for Level7 Progress Value BOQ 4,815,410 From : G % 25.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.00 TON 50% 30% 15.0% 15.0% Form Work M2 10% Pouring Concrete 8.40 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : G % 25.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.00 TON 50% 30% 15.0% 15.0% Form Work M2 10% Pouring Concrete 8.40 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : G % 25.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.00 TON 50% 30% 15.0% 15.0% Form Work M2 10% Pouring Concrete 8.40 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : G % 47.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.00 TON 100% 30% 30.0% 30.0% Form Work M2 70% 10% 7.0% 5.0% Pouring Concrete 8.40 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : G % 47.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.00 TON 100% 30% 30.0% 30.0% Form Work M2 70% 10% 7.0% 5.0% Pouring Concrete 8.40 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : G % 47.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.00 TON 100% 30% 30.0% 30.0% Form Work M2 70% 10% 7.0% 5.0% Pouring Concrete 8.40 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : G % 47.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.00 TON 100% 30% 30.0% 30.0% Form Work M2 70% 10% 7.0% 5.0% Pouring Concrete 8.40 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : G % 47.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.00 TON 100% 30% 30.0% 30.0% Form Work M2 70% 10% 7.0% 5.0% Pouring Concrete 8.40 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : G % 47.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.00 TON 100% 30% 30.0% 30.0% Form Work M2 70% 10% 7.0% 5.0% Pouring Concrete 8.40 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : G % 83.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.00 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 8.40 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 20% 15% 3.0% From : G % 83.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.00 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 8.40 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 20% 15% 3.0% From : G % 83.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.00 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 8.40 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 20% 15% 3.0% From : G % 83.0% % CMPL Improved Page 18 of 34

211 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for each Level6 activity Project CMPL % Weight Value Progress for Level7 Progress Value BOQ 4,815,410 CMPL Improved Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.00 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 8.40 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 20% 15% 3.0% From : G % 83.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.00 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 8.40 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 20% 15% 3.0% From : G % 83.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 5.00 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 8.40 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 20% 15% 3.0% C N80S2 EQPT STR FOUNDATION -N % % 0.04% 25.0% 0.03% From : G % 31.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 1.38 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 9.38 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : G % 31.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 1.38 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 9.38 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : G % 31.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 1.38 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 9.38 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : G % 31.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 1.38 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 9.38 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : G % 31.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 1.38 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 9.38 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : G % 31.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 1.38 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 9.38 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : G % 31.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 1.38 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 9.38 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From : G % 31.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 1.38 TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete 9.38 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% C WW CONCRETE PIT -N % 9, , % 0.06% 29.5% 0.06% Segmnet-1 100% 75% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 15% Segmnet-2 100% 65% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Page 19 of 34

212 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for each Level6 activity Project Progress CMPL % Weight Value for Level7 Progress Value BOQ 4,815,410 Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 10% Backfiling& Compaction M3 15% Segmnet-3 100% 48% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work TON 100% 30% 30.0% 30.0% Form Work M2 30% 10% 3.0% Pouring Concrete M3 30% 15% 4.5% Strip & Finishing M2 10% Backfiling& Compaction M3 15% Segmnet-4 100% 40% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work TON 100% 30% 30.0% 30.0% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% Segmnet-5 100% 31% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work TON 70% 30% 21.0% 15.0% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% Segmnet-6 100% 10% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work TON 30% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% Segmnet-7 100% 10% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work TON 30% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% Segmnet-8 100% 10% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work TON 30% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% Segmnet-9 100% 10% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work TON 30% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% Segmnet % 10% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work TON 30% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% C N80S1 STR RC WORKS -N % % 0.07% 24.1% 0.06% From : G1-702 (Column) 100% 20.0% % Rebar Work 3.50 TON 50% 40% 20.0% 20.0% Form Work M2 15% Pouring Concrete M3 15% Strip & Finishing M2 20% From : G2-702 (Column) 100% 20.0% % Rebar Work 3.50 TON 50% 40% 20.0% 20.0% Form Work M2 15% Pouring Concrete M3 15% Strip & Finishing M2 20% From : G3-702 (Column) 100% 20.0% % Rebar Work 3.50 TON 50% 40% 20.0% 20.0% Form Work M2 15% Pouring Concrete M3 15% Strip & Finishing M2 20% From : G4-702 (Column) 100% 20.0% % Rebar Work 3.50 TON 50% 40% 20.0% 20.0% Form Work M2 15% Pouring Concrete M3 15% Strip & Finishing M2 20% From : G5-702 (Column) 100% 20.0% % Rebar Work 3.50 TON 50% 40% 20.0% 20.0% Form Work M2 15% Pouring Concrete M3 15% Strip & Finishing M2 20% From : G1-704 (Column) 100% 20.0% % Rebar Work 3.50 TON 50% 40% 20.0% 20.0% CMPL Improved Page 20 of 34

213 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for each Level6 activity Project Progress CMPL % Weight Value for Level7 Progress Value BOQ 4,815,410 Form Work M2 15% Pouring Concrete M3 15% Strip & Finishing M2 20% From : G2-704 (Column) 100% 20.0% % Rebar Work 3.50 TON 50% 40% 20.0% 20.0% Form Work M2 15% Pouring Concrete M3 15% Strip & Finishing M2 20% From : G3-704 (Column) 100% 20.0% % Rebar Work 3.50 TON 50% 40% 20.0% 20.0% Form Work M2 15% Pouring Concrete M3 15% Strip & Finishing M2 20% From : G4-704 (Column) 100% 20.0% % Rebar Work 3.50 TON 50% 40% 20.0% 20.0% Form Work M2 15% Pouring Concrete M3 15% Strip & Finishing M2 20% From : G5-704 (Column) 100% 20.0% % Rebar Work 3.50 TON 50% 40% 20.0% 20.0% Form Work M2 15% Pouring Concrete M3 15% Strip & Finishing M2 20% From : G1-706 (Column) 100% 32.0% % Rebar Work 3.50 TON 80% 40% 32.0% 20.0% Form Work M2 15% Pouring Concrete M3 15% Strip & Finishing M2 20% From : G2-706 (Column) 100% 32.0% % Rebar Work 3.50 TON 80% 40% 32.0% 20.0% Form Work M2 15% Pouring Concrete M3 15% Strip & Finishing M2 20% From : G3-706 (Column) 100% 32.0% % Rebar Work 3.50 TON 80% 40% 32.0% 20.0% Form Work M2 15% Pouring Concrete M3 15% Strip & Finishing M2 20% From : G4-706 (Column) 100% 32.0% % Rebar Work 3.50 TON 80% 40% 32.0% 20.0% Form Work M2 15% Pouring Concrete M3 15% Strip & Finishing M2 20% From : G5-706 (Column) 100% 24.0% % Rebar Work 3.50 TON 60% 40% 24.0% 20.0% Form Work M2 15% Pouring Concrete M3 15% Strip & Finishing M2 20% From : G1-707 (Column) 100% 39.5% % Rebar Work 3.50 TON 80% 40% 32.0% 20.0% Form Work M2 50% 15% 7.5% 7.5% Pouring Concrete M3 15% Strip & Finishing M2 20% From : G2-707 (Column) 100% 39.5% % Rebar Work 3.50 TON 80% 40% 32.0% 20.0% Form Work M2 50% 15% 7.5% 7.5% Pouring Concrete M3 15% Strip & Finishing M2 20% From : G3-707 (Column) 100% 39.5% % Rebar Work 3.50 TON 80% 40% 32.0% 20.0% Form Work M2 50% 15% 7.5% 7.5% Pouring Concrete M3 15% Strip & Finishing M2 20% From : G4-707 (Column) 100% 39.5% % Rebar Work 3.50 TON 80% 40% 32.0% 20.0% Form Work M2 50% 15% 7.5% 7.5% Pouring Concrete M3 15% Strip & Finishing M2 20% From : G5-707 (Column) 100% 32.0% % Rebar Work 3.50 TON 80% 40% 32.0% 20.0% Form Work M2 15% Pouring Concrete M3 15% Strip & Finishing M2 20% From : G1-709 (Column) 100% 58.4% % Rebar Work 3.50 TON 71% 40% 28.4% 20.0% Form Work M2 50% 15% 7.5% 7.5% Pouring Concrete M3 50% 15% 7.5% 7.5% Strip & Finishing M2 50% 20% 10.0% 10.0% Clear Punchlist 1.00 NOS 50% 5% 2.5% 2.5% Hand over to Mech,Piping Work to Others 1.00 NOS 50% 5% 2.5% 2.5% From : G2-709 (Column) 100% 58.4% % Rebar Work 3.50 TON 71% 40% 28.4% 20.0% Form Work M2 50% 15% 7.5% 7.5% Pouring Concrete M3 50% 15% 7.5% 7.5% Strip & Finishing M2 50% 20% 10.0% 10.0% CMPL Improved Page 21 of 34

214 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for each Level6 activity Project Progress CMPL % Weight Value for Level7 Progress Value BOQ 4,815,410 Clear Punchlist 1.00 NOS 50% 5% 2.5% 2.5% Hand over to Mech,Piping Work to Others 1.00 NOS 50% 5% 2.5% 2.5% From : G3-709 (Column) 100% 58.4% % Rebar Work 3.50 TON 71% 40% 28.4% 20.0% Form Work M2 50% 15% 7.5% 7.5% Pouring Concrete M3 50% 15% 7.5% 7.5% Strip & Finishing M2 50% 20% 10.0% 10.0% Clear Punchlist 1.00 NOS 50% 5% 2.5% 2.5% Hand over to Mech,Piping Work to Others 1.00 NOS 50% 5% 2.5% 2.5% From : G4-709 (Column) 100% 58.4% % Rebar Work 3.50 TON 71% 40% 28.4% 20.0% Form Work M2 50% 15% 7.5% 7.5% Pouring Concrete M3 50% 15% 7.5% 7.5% Strip & Finishing M2 50% 20% 10.0% 10.0% Clear Punchlist 1.00 NOS 50% 5% 2.5% 2.5% Hand over to Mech,Piping Work to Others 1.00 NOS 50% 5% 2.5% 2.5% From : G5-709 (Column) 100% 20.0% % Rebar Work 3.50 TON 50% 40% 20.0% 20.0% Form Work M2 15% Pouring Concrete M3 15% Strip & Finishing M2 20% From : G1-711 (Column) 100% 58.4% % Rebar Work 3.50 TON 71% 40% 28.4% 20.0% Form Work M2 50% 15% 7.5% 7.5% Pouring Concrete M3 50% 15% 7.5% 7.5% Strip & Finishing M2 50% 20% 10.0% 10.0% Clear Punchlist 1.00 NOS 50% 5% 2.5% 2.5% Hand over to Mech,Piping Work to Others 1.00 NOS 50% 5% 2.5% 2.5% From : G2-711 (Column) 100% 58.4% % Rebar Work 3.50 TON 71% 40% 28.4% 20.0% Form Work M2 50% 15% 7.5% 7.5% Pouring Concrete M3 50% 15% 7.5% 7.5% Strip & Finishing M2 50% 20% 10.0% 10.0% Clear Punchlist 1.00 NOS 50% 5% 2.5% 2.5% Hand over to Mech,Piping Work to Others 1.00 NOS 50% 5% 2.5% 2.5% From : G3-711 (Column) 100% 58.4% % Rebar Work 3.50 TON 71% 40% 28.4% 20.0% Form Work M2 50% 15% 7.5% 7.5% Pouring Concrete M3 50% 15% 7.5% 7.5% Strip & Finishing M2 50% 20% 10.0% 10.0% Clear Punchlist 1.00 NOS 50% 5% 2.5% 2.5% Hand over to Mech,Piping Work to Others 1.00 NOS 50% 5% 2.5% 2.5% From : G4-711 (Column) 100% 58.4% % Rebar Work 3.50 TON 71% 40% 28.4% 20.0% Form Work M2 50% 15% 7.5% 7.5% Pouring Concrete M3 50% 15% 7.5% 7.5% Strip & Finishing M2 50% 20% 10.0% 10.0% Clear Punchlist 1.00 NOS 50% 5% 2.5% 2.5% Hand over to Mech,Piping Work to Others 1.00 NOS 50% 5% 2.5% 2.5% From : G5-711 (Column) 100% 28.4% % Rebar Work 3.50 TON 71% 40% 28.4% 20.0% Form Work M2 15% Pouring Concrete M3 15% Strip & Finishing M2 20% From : G1-712 (Column) 100% 55.9% % Rebar Work 3.50 TON 71% 40% 28.4% 20.0% Form Work M2 50% 15% 7.5% 7.5% Pouring Concrete M3 50% 15% 7.5% 7.5% Strip & Finishing M2 50% 20% 10.0% 10.0% Clear Punchlist 1.00 NOS 50% 5% 2.5% 2.5% From : G2-712 (Column) 100% 55.9% % Rebar Work 3.50 TON 71% 40% 28.4% 20.0% Form Work M2 50% 15% 7.5% 7.5% Pouring Concrete M3 50% 15% 7.5% 7.5% Strip & Finishing M2 50% 20% 10.0% 10.0% Clear Punchlist 1.00 NOS 50% 5% 2.5% 2.5% From : G3-712 (Column) 100% 55.9% % Rebar Work 3.50 TON 71% 40% 28.4% 20.0% Form Work M2 50% 15% 7.5% 7.5% Pouring Concrete M3 50% 15% 7.5% 7.5% Strip & Finishing M2 50% 20% 10.0% 10.0% Clear Punchlist 1.00 NOS 50% 5% 2.5% 2.5% From : G4-712 (Column) 100% 58.4% % Rebar Work 3.50 TON 71% 40% 28.4% 20.0% Form Work M2 50% 15% 7.5% 7.5% Pouring Concrete M3 50% 15% 7.5% 7.5% Strip & Finishing M2 50% 20% 10.0% 10.0% Clear Punchlist 1.00 NOS 50% 5% 2.5% 2.5% Hand over to Mech,Piping Work to Others 1.00 NOS 50% 5% 2.5% 2.5% From : G5-712 (Column) 100% 20.0% % Rebar Work 3.50 TON 50% 40% 20.0% 20.0% Form Work M2 15% Pouring Concrete M3 15% Strip & Finishing M2 20% From : G1 - G3 / (Slab) 100% 6.0% Rebar Work 5.00 TON 15% 40% 6.0% Form Work M2 15% Pouring Concrete M3 15% Strip & Finishing M2 20% From : G3 - G5 / (Slab) 100% 6.0% Rebar Work 5.00 TON 15% 40% 6.0% Form Work M2 15% Pouring Concrete M3 15% Strip & Finishing M2 20% From : G1 - G3 / (Slab) 100% 6.0% Rebar Work 5.00 TON 15% 40% 6.0% Form Work M2 15% Pouring Concrete M3 15% Strip & Finishing M2 20% From : G3 - G5 / (Slab) 100% 6.0% CMPL Improved Page 22 of 34

215 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for each Level6 activity Project Progress CMPL % Weight Value for Level7 Progress Value BOQ 4,815,410 Rebar Work 5.00 TON 15% 40% 6.0% Form Work M2 15% Pouring Concrete M3 15% Strip & Finishing M2 20% From : G6-701 (Column) 100% 20.0% % Rebar Work 6.00 TON 50% 40% 20.0% 20.0% Form Work M2 15% Pouring Concrete M3 15% Strip & Finishing M2 20% From : G7-701 (Column) 100% 20.0% % Rebar Work 6.00 TON 50% 40% 20.0% 20.0% Form Work M2 15% Pouring Concrete M3 15% Strip & Finishing M2 20% From : G8-701 (Column) 100% 20.0% % Rebar Work 6.00 TON 50% 40% 20.0% 20.0% Form Work M2 15% Pouring Concrete M3 15% Strip & Finishing M2 20% From : G6-703 (Column) 100% 20.0% % Rebar Work 6.00 TON 50% 40% 20.0% 20.0% Form Work M2 15% Pouring Concrete M3 15% Strip & Finishing M2 20% From : G7-703 (Column) 100% 20.0% % Rebar Work 6.00 TON 50% 40% 20.0% 20.0% Form Work M2 15% Pouring Concrete M3 15% Strip & Finishing M2 20% From : G8-703 (Column) 100% Rebar Work 6.00 TON 40% Form Work M2 15% Pouring Concrete M3 15% Strip & Finishing M2 20% From : G6-705 (Column) 100% 28.0% % Rebar Work 6.00 TON 70% 40% 28.0% 20.0% Form Work M2 15% Pouring Concrete M3 15% Strip & Finishing M2 20% From : G7-705 (Column) 100% 28.0% % Rebar Work 6.00 TON 70% 40% 28.0% 20.0% Form Work M2 15% Pouring Concrete M3 15% Strip & Finishing M2 20% From : G8-705 (Column) 100% 28.0% % Rebar Work 6.00 TON 70% 40% 28.0% 20.0% Form Work M2 15% Pouring Concrete M3 15% Strip & Finishing M2 20% From : G6-708 (Column) 100% 28.0% % Rebar Work 3.50 TON 70% 40% 28.0% 20.0% Form Work M2 15% Pouring Concrete M3 15% Strip & Finishing M2 20% From : G7-708 (Column) 100% 28.0% % Rebar Work 3.50 TON 70% 40% 28.0% 20.0% Form Work M2 15% Pouring Concrete M3 15% Strip & Finishing M2 20% From : G8-708 (Column) 100% 28.0% % Rebar Work 3.50 TON 70% 40% 28.0% 20.0% Form Work M2 15% Pouring Concrete M3 15% Strip & Finishing M2 20% From : G6-710 (Column) 100% 28.0% % Rebar Work 6.00 TON 70% 40% 28.0% 20.0% Form Work M2 15% Pouring Concrete M3 15% Strip & Finishing M2 20% From : G7-710 (Column) 100% 28.0% % Rebar Work 6.00 TON 70% 40% 28.0% 20.0% Form Work M2 15% Pouring Concrete M3 15% Strip & Finishing M2 20% From : G8-710 (Column) 100% 28.0% % Rebar Work 6.00 TON 70% 40% 28.0% 20.0% Form Work M2 15% Pouring Concrete M3 15% Strip & Finishing M2 20% From : G6-712 (Column) 100% 28.0% % Rebar Work 6.00 TON 70% 40% 28.0% 20.0% Form Work M2 15% Pouring Concrete M3 15% CMPL Improved Page 23 of 34

216 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for each Level6 activity Project Progress CMPL % Weight Value for Level7 Progress Value BOQ 4,815,410 Strip & Finishing M2 20% From : G7-712 (Column) 100% 28.0% % Rebar Work 6.00 TON 70% 40% 28.0% 20.0% Form Work M2 15% Pouring Concrete M3 15% Strip & Finishing M2 20% From : G8-712 (Column) 100% 28.0% % Rebar Work 6.00 TON 70% 40% 28.0% 20.0% Form Work M2 15% Pouring Concrete M3 15% Strip & Finishing M2 20% From : G6 - G8 / (Slab) 100% 6.0% Rebar Work 5.00 TON 15% 40% 6.0% Form Work M2 15% Pouring Concrete M3 15% Strip & Finishing M2 20% From : G6 - G8 / (Slab) 100% 6.0% Rebar Work 5.00 TON 15% 40% 6.0% Form Work M2 15% Pouring Concrete M3 15% Strip & Finishing M2 20% C FOUNDATION FOR BLDG (SS-19) -N % 5, , % 0.11% 100.0% 0.11% From : G % 100% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.71 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : G % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.71 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : G % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.71 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : G % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.71 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : G % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.71 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : G % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.71 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : G % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.71 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : G % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.71 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : G % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.71 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : G % 100.0% % Excavation M3 100% 10% 10.0% 10.0% CMPL Improved Page 24 of 34

217 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for each Level6 activity Project Progress CMPL % Weight Value for Level7 Progress Value BOQ 4,815,410 Rebar Work 0.71 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : G % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.71 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : G % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.71 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : G % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.71 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : G % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.71 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : G % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.71 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : G % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.71 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : G % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.71 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : G % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.71 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : G % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.71 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : G % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.71 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : G % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.71 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : G % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.71 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% CMPL Improved Page 25 of 34

218 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for each Level6 activity Project Progress CMPL % Weight Value for Level7 Progress Value BOQ 4,815,410 From : G % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.71 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : G % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.71 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : G % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.71 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : G % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.71 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : G % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.71 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% From : G % 100.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 0.71 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction M3 100% 15% 15.0% 15.0% C FOUNDATION FOR TRANS, SHED, BLAST WALL (SS-19) -N % 4, , % 0.10% 100.0% 0.10% From : G71-G72 100% 100.0% % Excavation 8.33 M3 100% 10% 10.0% 10.0% Rebar Work 0.34 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 6.67 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction 4.00 M3 100% 15% 15.0% 15.0% From : G72-G73 100% 100.0% % Excavation 8.33 M3 100% 10% 10.0% 10.0% Rebar Work 0.34 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 6.67 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction 4.00 M3 100% 15% 15.0% 15.0% From : G73-G74 100% 100.0% % Excavation 8.33 M3 100% 10% 10.0% 10.0% Rebar Work 0.34 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 6.67 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction 4.00 M3 100% 15% 15.0% 15.0% From : G74-G75 100% 100.0% % Excavation 8.33 M3 100% 10% 10.0% 10.0% Rebar Work 0.34 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 6.67 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction 4.00 M3 100% 15% 15.0% 15.0% From : G75-G76 100% 100.0% % Excavation 8.33 M3 100% 10% 10.0% 10.0% Rebar Work 0.34 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 6.67 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction 4.00 M3 100% 15% 15.0% 15.0% From : G76-G77 100% 100.0% % Excavation 8.33 M3 100% 10% 10.0% 10.0% Rebar Work 0.34 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete 6.67 M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Backfiling& Compaction 4.00 M3 100% 15% 15.0% 15.0% C RC WORK (SS-19) -N % 9, , % 0.18% 90.1% 0.17% From : Grid G71-G72 100% 100.0% % Rebar Work 1.00 M3 100% 40% 40.0% 40.0% Form Work 8.33 TON 100% 15% 15.0% 15.0% Pouring Concrete 4.33 M2 100% 15% 15.0% 15.0% Strip & Finishing M3 100% 20% 20.0% 20.0% CMPL Improved Page 26 of 34

219 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for each Level6 activity Project Progress CMPL % Weight Value for Level7 Progress Value BOQ 4,815,410 Clear Punchlist 1.00 M2 100% 5% 5.0% 5.0% Hand over to Mech,Piping Work to Others 1.00 M3 100% 5% 5.0% 5.0% From : Grid G72-G73 100% 100.0% % Rebar Work 1.00 M3 100% 40% 40.0% 40.0% Form Work 8.33 TON 100% 15% 15.0% 15.0% Pouring Concrete 4.33 M2 100% 15% 15.0% 15.0% Strip & Finishing M3 100% 20% 20.0% 20.0% Clear Punchlist 1.00 M2 100% 5% 5.0% 5.0% Hand over to Mech,Piping Work to Others 1.00 M3 100% 5% 5.0% 5.0% From : Grid G71-G72 100% 100.0% % Rebar Work 1.00 M3 100% 40% 40.0% 40.0% Form Work 8.33 TON 100% 15% 15.0% 15.0% Pouring Concrete 4.33 M2 100% 15% 15.0% 15.0% Strip & Finishing M3 100% 20% 20.0% 20.0% Clear Punchlist 1.00 M2 100% 5% 5.0% 5.0% Hand over to Mech,Piping Work to Others 1.00 M3 100% 5% 5.0% 5.0% From : Grid G72-G73 100% 100.0% % Rebar Work 1.00 M3 100% 40% 40.0% 40.0% Form Work 8.33 TON 100% 15% 15.0% 15.0% Pouring Concrete 4.33 M2 100% 15% 15.0% 15.0% Strip & Finishing M3 100% 20% 20.0% 20.0% Clear Punchlist 1.00 M2 100% 5% 5.0% 5.0% Hand over to Mech,Piping Work to Others 1.00 M3 100% 5% 5.0% 5.0% From : Grid G71-G72 100% 98.0% % Rebar Work 1.00 M3 100% 40% 40.0% 40.0% Form Work 8.33 TON 100% 15% 15.0% 15.0% Pouring Concrete 4.33 M2 100% 15% 15.0% 15.0% Strip & Finishing M3 100% 20% 20.0% 20.0% Clear Punchlist 1.00 M2 80% 5% 4.0% 2.5% Hand over to Mech,Piping Work to Others 1.00 M3 80% 5% 4.0% 2.5% From : Grid G72-G73 100% 65.4% % Rebar Work 1.00 M3 100% 40% 40.0% 40.0% Form Work 8.33 TON 64% 15% 9.6% 7.5% Pouring Concrete 4.33 M2 52% 15% 7.8% 7.5% Strip & Finishing M3 40% 20% 8.0% Clear Punchlist 1.00 M2 5% Hand over to Mech,Piping Work to Others 1.00 M3 5% From : Grid G73-G74 100% 100.0% % Rebar Work 1.00 M3 100% 40% 40.0% 40.0% Form Work 8.33 TON 100% 15% 15.0% 15.0% Pouring Concrete 4.33 M2 100% 15% 15.0% 15.0% Strip & Finishing M3 100% 20% 20.0% 20.0% Clear Punchlist 1.00 M2 100% 5% 5.0% 5.0% Hand over to Mech,Piping Work to Others 1.00 M3 100% 5% 5.0% 5.0% From : Grid G74-G75 100% 100.0% % Rebar Work 1.00 M3 100% 40% 40.0% 40.0% Form Work 8.33 TON 100% 15% 15.0% 15.0% Pouring Concrete 4.33 M2 100% 15% 15.0% 15.0% Strip & Finishing M3 100% 20% 20.0% 20.0% Clear Punchlist 1.00 M2 100% 5% 5.0% 5.0% Hand over to Mech,Piping Work to Others 1.00 M3 100% 5% 5.0% 5.0% From : Grid G73-G74 100% 100.0% % Rebar Work 1.00 M3 100% 40% 40.0% 40.0% Form Work 8.33 TON 100% 15% 15.0% 15.0% Pouring Concrete 4.33 M2 100% 15% 15.0% 15.0% Strip & Finishing M3 100% 20% 20.0% 20.0% Clear Punchlist 1.00 M2 100% 5% 5.0% 5.0% Hand over to Mech,Piping Work to Others 1.00 M3 100% 5% 5.0% 5.0% From : Grid G74-G75 100% 98.0% % Rebar Work 1.00 M3 100% 40% 40.0% 40.0% Form Work 8.33 TON 100% 15% 15.0% 15.0% Pouring Concrete 4.33 M2 100% 15% 15.0% 15.0% Strip & Finishing M3 100% 20% 20.0% 20.0% Clear Punchlist 1.00 M2 100% 5% 5.0% 5.0% Hand over to Mech,Piping Work to Others 1.00 M3 60% 5% 3.0% 2.5% From : Grid G73-G74 100% 89.7% % Rebar Work 1.00 M3 100% 40% 40.0% 40.0% Form Work 8.33 TON 92% 15% 13.8% 7.5% Pouring Concrete 4.33 M2 98% 15% 14.7% 7.5% Strip & Finishing M3 98% 20% 19.6% 10.0% Clear Punchlist 1.00 M2 32% 5% 1.6% Hand over to Mech,Piping Work to Others 1.00 M3 5% From : Grid G74-G75 100% 40.0% % Rebar Work 1.00 M3 100% 40% 40.0% 40.0% Form Work 8.33 TON 15% Pouring Concrete 4.33 M2 15% Strip & Finishing M3 20% Clear Punchlist 1.00 M2 5% Hand over to Mech,Piping Work to Others 1.00 M3 5% From : Grid G75-G76 100% 100.0% % Rebar Work 1.00 M3 100% 40% 40.0% 40.0% Form Work 8.33 TON 100% 15% 15.0% 15.0% Pouring Concrete 4.33 M2 100% 15% 15.0% 15.0% Strip & Finishing M3 100% 20% 20.0% 20.0% Clear Punchlist 1.00 M2 100% 5% 5.0% 5.0% Hand over to Mech,Piping Work to Others 1.00 M3 100% 5% 5.0% 5.0% From : Grid G76-G77 100% 100.0% % Rebar Work 1.00 M3 100% 40% 40.0% 40.0% Form Work 8.33 TON 100% 15% 15.0% 15.0% Pouring Concrete 4.33 M2 100% 15% 15.0% 15.0% Strip & Finishing M3 100% 20% 20.0% 20.0% Clear Punchlist 1.00 M2 100% 5% 5.0% 5.0% Hand over to Mech,Piping Work to Others 1.00 M3 100% 5% 5.0% 5.0% From : Grid G75-G76 100% 100.0% % Rebar Work 1.00 M3 100% 40% 40.0% 40.0% Form Work 8.33 TON 100% 15% 15.0% 15.0% Pouring Concrete 4.33 M2 100% 15% 15.0% 15.0% Strip & Finishing M3 100% 20% 20.0% 20.0% Clear Punchlist 1.00 M2 100% 5% 5.0% 5.0% Hand over to Mech,Piping Work to Others 1.00 M3 100% 5% 5.0% 5.0% From : Grid G76-G77 100% 100.0% % Rebar Work 1.00 M3 100% 40% 40.0% 40.0% Form Work 8.33 TON 100% 15% 15.0% 15.0% Pouring Concrete 4.33 M2 100% 15% 15.0% 15.0% Strip & Finishing M3 100% 20% 20.0% 20.0% Clear Punchlist 1.00 M2 100% 5% 5.0% 5.0% Hand over to Mech,Piping Work to Others 1.00 M3 100% 5% 5.0% 5.0% From : Grid G75-G76 100% 99.0% % Rebar Work 1.00 M3 100% 40% 40.0% 40.0% Form Work 8.33 TON 100% 15% 15.0% 15.0% Pouring Concrete 4.33 M2 100% 15% 15.0% 15.0% Strip & Finishing M3 100% 20% 20.0% 20.0% Clear Punchlist 1.00 M2 100% 5% 5.0% 5.0% Hand over to Mech,Piping Work to Others 1.00 M3 80% 5% 4.0% 2.5% From : Grid G76-G77 100% 81.5% % CMPL Improved Page 27 of 34

220 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for each Level6 activity Project Progress CMPL % Weight Value for Level7 Progress Value BOQ 4,815,410 Rebar Work 1.00 M3 100% 40% 40.0% 40.0% Form Work 8.33 TON 100% 15% 15.0% 15.0% Pouring Concrete 4.33 M2 70% 15% 10.5% 7.5% Strip & Finishing M3 70% 20% 14.0% 10.0% Clear Punchlist 1.00 M2 40% 5% 2.0% Hand over to Mech,Piping Work to Others 1.00 M3 5% C FLOOR CONCRETE (SS-19) -N % 2, , % 0.05% 100.0% 0.05% From : Grid G71-G72 100% 100.0% % Moisture Barrier M2 100% 10% 10.0% 10.0% Rebar Work 5.00 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Joint Treatment 1.00 M3 100% 15% 15.0% 15.0% From : Grid G72-G73 100% 100.0% % Moisture Barrier M2 100% 10% 10.0% 10.0% Rebar Work 6.00 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Joint Treatment 1.00 M3 100% 15% 15.0% 15.0% From : Grid G71-G72 100% 100.0% % Moisture Barrier M2 100% 10% 10.0% 10.0% Rebar Work 6.00 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Joint Treatment 1.00 M3 100% 15% 15.0% 15.0% From : Grid G72-G73 100% 100.0% % Moisture Barrier M2 100% 10% 10.0% 10.0% Rebar Work 5.00 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Joint Treatment 1.00 M3 100% 15% 15.0% 15.0% From : Grid G71-G72 100% 100.0% % Moisture Barrier M2 100% 10% 10.0% 10.0% Rebar Work 6.00 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Joint Treatment 1.00 M3 100% 15% 15.0% 15.0% From : Grid G72-G73 100% 100.0% % Moisture Barrier M2 100% 10% 10.0% 10.0% Rebar Work 6.00 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Joint Treatment 1.00 M3 100% 15% 15.0% 15.0% From : Grid G73-G74 100% 100.0% % Moisture Barrier M2 100% 10% 10.0% 10.0% Rebar Work 5.00 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Joint Treatment 1.00 M3 100% 15% 15.0% 15.0% From : Grid G74-G75 100% 100.0% % Moisture Barrier M2 100% 10% 10.0% 10.0% Rebar Work 6.00 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Joint Treatment 1.00 M3 100% 15% 15.0% 15.0% From : Grid G73-G74 100% 100.0% % Moisture Barrier M2 100% 10% 10.0% 10.0% Rebar Work 6.00 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Joint Treatment 1.00 M3 100% 15% 15.0% 15.0% From : Grid G74-G75 100% 100.0% % Moisture Barrier M2 100% 10% 10.0% 10.0% Rebar Work 5.00 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Joint Treatment 1.00 M3 100% 15% 15.0% 15.0% From : Grid G73-G74 100% 100.0% % Moisture Barrier M2 100% 10% 10.0% 10.0% Rebar Work 6.00 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Joint Treatment 1.00 M3 100% 15% 15.0% 15.0% From : Grid G74-G75 100% 100.0% % Moisture Barrier M2 100% 10% 10.0% 10.0% Rebar Work 6.00 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Joint Treatment 1.00 M3 100% 15% 15.0% 15.0% CMPL Improved Page 28 of 34

221 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for each Level6 activity Project Progress CMPL % Weight Value for Level7 Progress Value BOQ 4,815,410 From : Grid G75-G76 100% 100.0% % Moisture Barrier M2 100% 10% 10.0% 10.0% Rebar Work 5.00 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Joint Treatment 1.00 M3 100% 15% 15.0% 15.0% From : Grid G76-G77 100% 100.0% % Moisture Barrier M2 100% 10% 10.0% 10.0% Rebar Work 6.00 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Joint Treatment 1.00 M3 100% 15% 15.0% 15.0% From : Grid G75-G76 100% 100.0% % Moisture Barrier M2 100% 10% 10.0% 10.0% Rebar Work 6.00 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Joint Treatment 1.00 M3 100% 15% 15.0% 15.0% From : Grid G76-G77 100% 100.0% % Moisture Barrier M2 100% 10% 10.0% 10.0% Rebar Work 5.00 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Joint Treatment 1.00 M3 100% 15% 15.0% 15.0% From : Grid G75-G76 100% 100.0% % Moisture Barrier M2 100% 10% 10.0% 10.0% Rebar Work 6.00 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Joint Treatment 1.00 M3 100% 15% 15.0% 15.0% From : Grid G76-G77 100% 100.0% % Moisture Barrier M2 100% 10% 10.0% 10.0% Rebar Work 6.00 TON 100% 30% 30.0% 30.0% Form Work M2 100% 10% 10.0% 10.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% Joint Treatment 1.00 M3 100% 15% 15.0% 15.0% PACKAGING SYSTEM & WAREHOUSE (Area-8) CIVIL WORK 1, , C EQPT FOUNDATION -N % 15.0% % 0.01% 15.0% 0.01% Excavation M3 10% Rebar Work TON 50% 30% 15.0% 15.0% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% C PIPE RACK FOUNDATION -N % 1.3% % 0.00% Excavation M3 13% 10% 1.3% Rebar Work TON 30% Form Work M2 10% Pouring Concrete M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% Clear Punchlist NOS 5% Hand over to Mech,Piping Work to Others NOS 5% C EQPT STR FOUNDATION -N % % 0.04% 28.6% 0.04% From: 811- H31 100% 45.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 6.50 TON 100% 30% 30.0% 30.0% Form Work M2 50% 10% 5.0% 5.0% Pouring Concrete 7.22 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From: 811- H32 100% 45.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 6.50 TON 100% 30% 30.0% 30.0% Form Work M2 50% 10% 5.0% 5.0% Pouring Concrete 7.22 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From: 811- H33 100% 45.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 6.50 TON 100% 30% 30.0% 30.0% Form Work M2 50% 10% 5.0% 5.0% Pouring Concrete 7.22 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From: 811- H34 100% 45.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 6.50 TON 100% 30% 30.0% 30.0% Form Work M2 50% 10% 5.0% 5.0% Pouring Concrete 7.22 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From: 811- H35 100% 40.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 6.50 TON 100% 30% 30.0% 30.0% Form Work M2 10% CMPL Improved Page 29 of 34

222 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for each Level6 activity Project Progress CMPL % Weight Value for Level7 Progress Value BOQ 4,815,410 Pouring Concrete 7.22 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From: 811- H36 100% 40.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 6.50 TON 100% 30% 30.0% 30.0% Form Work M2 10% Pouring Concrete 7.22 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From: 811- H37 100% 40.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 6.50 TON 100% 30% 30.0% 30.0% Form Work M2 10% Pouring Concrete 7.22 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From: 811- H38A 100% 40.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 6.50 TON 100% 30% 30.0% 30.0% Form Work M2 10% Pouring Concrete 7.22 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From: 811- H38B 100% 40.0% % Excavation M3 100% 10% 10.0% 10.0% Rebar Work 6.50 TON 100% 30% 30.0% 30.0% Form Work M2 10% Pouring Concrete 7.22 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From: 812- H31 100% 19.0% % Excavation M3 10% 10% 1.0% Rebar Work 6.50 TON 60% 30% 18.0% 15.0% Form Work M2 10% Pouring Concrete 7.22 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From: 812- H32 100% 19.0% % Excavation M3 10% 10% 1.0% Rebar Work 6.50 TON 60% 30% 18.0% 15.0% Form Work M2 10% Pouring Concrete 7.22 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From: 812- H33 100% 19.0% % Excavation M3 10% 10% 1.0% Rebar Work 6.50 TON 60% 30% 18.0% 15.0% Form Work M2 10% Pouring Concrete 7.22 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From: 812- H34 100% 19.0% % Excavation M3 10% 10% 1.0% Rebar Work 6.50 TON 60% 30% 18.0% 15.0% Form Work M2 10% Pouring Concrete 7.22 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From: 812- H35 100% 19.0% % Excavation M3 10% 10% 1.0% Rebar Work 6.50 TON 60% 30% 18.0% 15.0% Form Work M2 10% Pouring Concrete 7.22 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From: 812- H36 100% 19.0% % Excavation M3 10% 10% 1.0% Rebar Work 6.50 TON 60% 30% 18.0% 15.0% Form Work M2 10% Pouring Concrete 7.22 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From: 812- H37 100% 19.0% % Excavation M3 10% 10% 1.0% Rebar Work 6.50 TON 60% 30% 18.0% 15.0% Form Work M2 10% Pouring Concrete 7.22 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From: 812- H38A 100% 19.0% % Excavation M3 10% 10% 1.0% Rebar Work 6.50 TON 60% 30% 18.0% 15.0% Form Work M2 10% Pouring Concrete 7.22 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% From: 812- H38B 100% 19.0% % Excavation M3 10% 10% 1.0% CMPL Improved Page 30 of 34

223 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for each Level6 activity Project Progress CMPL % Weight Value for Level7 Progress Value BOQ 4,815,410 Rebar Work 6.50 TON 60% 30% 18.0% 15.0% Form Work M2 10% Pouring Concrete 7.22 M3 15% Strip & Finishing M2 10% Backfiling& Compaction M3 15% C FOUNDATION / RETAINING WALL -N % 9, , % 0.14% 64.7% 0.13% From : Grid H1-H3 100% 44.6% Excavation M3 100% 15% 15.0% 15.0% Rebar Work TON 73% 35% 25.6% 17.5% Form Work M2 27% 15% 4.1% Pouring Concrete M3 15% Strip & Finishing M2 10% From : Grid H3-H5 100% 44.6% % Excavation M3 100% 15% 15.0% 15.0% Rebar Work TON 73% 35% 25.6% 17.5% Form Work M2 27% 15% 4.1% Pouring Concrete M3 15% Strip & Finishing M2 10% From : Grid H5-H7 100% 25.0% % Excavation M3 50% 15% 7.5% 7.5% Rebar Work TON 50% 35% 17.5% 17.5% Form Work M2 15% Pouring Concrete M3 15% Strip & Finishing M2 10% From : Grid H7-H10 100% 25.0% % Excavation M3 50% 15% 7.5% 7.5% Rebar Work TON 50% 35% 17.5% 17.5% Form Work M2 15% Pouring Concrete M3 15% Strip & Finishing M2 10% From : Grid H10-H12 100% 25.0% % Excavation M3 50% 15% 7.5% 7.5% Rebar Work TON 50% 35% 17.5% 17.5% Form Work M2 15% Pouring Concrete M3 15% Strip & Finishing M2 10% From : Grid H12-H14 100% 27.4% % Excavation M3 66% 15% 9.9% 7.5% Rebar Work TON 50% 35% 17.5% 17.5% Form Work M2 15% Pouring Concrete M3 15% Strip & Finishing M2 10% From : Grid H14-H16 100% 32.5% % Excavation M3 100% 15% 15.0% 15.0% Rebar Work TON 50% 35% 17.5% 17.5% Form Work M2 15% Pouring Concrete M3 15% Strip & Finishing M2 10% From : Grid H16-H18 100% 32.9% % Excavation M3 100% 15% 15.0% 15.0% Rebar Work TON 51% 35% 17.9% 17.5% Form Work M2 15% Pouring Concrete M3 15% Strip & Finishing M2 10% From : Grid H18-H20 100% 100.0% % Excavation M3 100% 15% 15.0% 15.0% Rebar Work TON 100% 35% 35.0% 35.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% From : Grid H20-H22 100% 100.0% % Excavation M3 100% 15% 15.0% 15.0% Rebar Work TON 100% 35% 35.0% 35.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% From : Grid H22-H24 100% 100.0% % Excavation M3 100% 15% 15.0% 15.0% Rebar Work TON 100% 35% 35.0% 35.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% From : Grid H24-H26 100% 100.0% % Excavation M3 100% 15% 15.0% 15.0% Rebar Work TON 100% 35% 35.0% 35.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% From : Grid H1-H3 100% 49.1% % Excavation M3 100% 15% 15.0% 15.0% Rebar Work TON 73% 35% 25.6% 17.5% Form Work M2 41% 15% 6.2% Pouring Concrete M3 16% 15% 2.4% Strip & Finishing M2 10% From : Grid H3-H5 100% 64.0% % Excavation M3 100% 15% 15.0% 15.0% Rebar Work TON 83% 35% 29.1% 17.5% CMPL Improved Page 31 of 34

224 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for each Level6 activity Project Progress CMPL % Weight Value for Level7 Progress Value BOQ 4,815,410 Form Work M2 71% 15% 10.7% 7.5% Pouring Concrete M3 51% 15% 7.7% 7.5% Strip & Finishing M2 16% 10% 1.6% From : Grid H5-H7 100% 70.1% % Excavation M3 100% 15% 15.0% 15.0% Rebar Work TON 100% 35% 35.0% 35.0% Form Work M2 72% 15% 10.8% 7.5% Pouring Concrete M3 51% 15% 7.7% 7.5% Strip & Finishing M2 16% 10% 1.6% From : Grid H7-H10 100% 83.1% % Excavation M3 100% 15% 15.0% 15.0% Rebar Work TON 100% 35% 35.0% 35.0% Form Work M2 88% 15% 13.2% 7.5% Pouring Concrete M3 85% 15% 12.8% 7.5% Strip & Finishing M2 71% 10% 7.1% 5.0% From : Grid H10-H12 100% 88.3% % Excavation M3 100% 15% 15.0% 15.0% Rebar Work TON 100% 35% 35.0% 35.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete M3 88% 15% 13.2% 7.5% Strip & Finishing M2 76% 10% 7.6% 5.0% Clear Punchlist 1.00 NOS 50% 5% 2.5% 2.5% From : Grid H12-H14 100% 88.3% % Excavation M3 100% 15% 15.0% 15.0% Rebar Work TON 100% 35% 35.0% 35.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete M3 88% 15% 13.2% 7.5% Strip & Finishing M2 76% 10% 7.6% 5.0% Clear Punchlist 1.00 NOS 50% 5% 2.5% 2.5% From : Grid H14-H16 100% 89.1% % Excavation M3 100% 15% 15.0% 15.0% Rebar Work TON 100% 35% 35.0% 35.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete M3 88% 15% 13.2% 7.5% Strip & Finishing M2 84% 10% 8.4% 5.0% Clear Punchlist 1.00 NOS 50% 5% 2.5% 2.5% From : Grid H16-H18 100% 100.0% % Excavation M3 100% 15% 15.0% 15.0% Rebar Work TON 100% 35% 35.0% 35.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% From : Grid H18-H20 100% 100.0% % Excavation M3 100% 15% 15.0% 15.0% Rebar Work TON 100% 35% 35.0% 35.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% From : Grid H20-H22 100% 100.0% % Excavation M3 100% 15% 15.0% 15.0% Rebar Work TON 100% 35% 35.0% 35.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% From : Grid H22-H24 100% 100.0% % Excavation M3 100% 15% 15.0% 15.0% Rebar Work TON 100% 35% 35.0% 35.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% From : Grid H24-H26 100% 100.0% % Excavation M3 100% 15% 15.0% 15.0% Rebar Work TON 100% 35% 35.0% 35.0% Form Work M2 100% 15% 15.0% 15.0% Pouring Concrete M3 100% 15% 15.0% 15.0% Strip & Finishing M2 100% 10% 10.0% 10.0% C SOIL FILLING -N % 7, , % 0.14% 93.8% 0.14% Block-A 100% 100.0% % Backfilling and Compaction M3 100% 100% 100.0% 100.0% Block-B 100% 100.0% % Backfilling and Compaction M3 100% 100% 100.0% 100.0% Block-C 100% 100.0% % Backfilling and Compaction M3 100% 100% 100.0% 100.0% Block-D 100% 100.0% % Backfilling and Compaction M3 100% 100% 100.0% 100.0% Block-E 100% 100.0% % Backfilling and Compaction M3 100% 100% 100.0% 100.0% Block-F 100% 100.0% % Backfilling and Compaction M3 100% 100% 100.0% 100.0% Block-G 100% 100.0% % Backfilling and Compaction M3 100% 100% 100.0% 100.0% Block-H 100% 60.0% % Backfilling and Compaction M3 60% 100% 60.0% 50.0% OTHER FACILITIES(Area-9) CIVIL WORK C SOIL IMPROVEMENT -N00(KELLER) % 100.0% 5, , % 0.11% 100.0% 0.11% Installation of well point NOS 100% 2% 2.0% 2.0% setting out of stone column NOS 100% 2% 2.0% 2.0% Pre-CPT NOS 100% 2% 2.0% 2.0% Pilot Test 1.00 NOS 100% 2% 2.0% 2.0% Finishing Column Installation M 100% 25% 25.0% 25.0% Reactor Column Installation M 100% 25% 25.0% 25.0% Silo Column Installation M 100% 25% 25.0% 25.0% Post CPT NOS 100% 2% 2.0% 2.0% Plate Load Test 3.00 NOS 100% 2% 2.0% 2.0% Rough Grading M3 100% 3% 3.0% 3.0% CMPL Improved Page 32 of 34

225 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for each Level6 activity Project Progress CMPL % Weight Value for Level7 Progress Value BOQ 4,815,410 Clear Punch list 1.00 NOS 100% 5% 5.0% 5.0% Completed 1.00 NOS 100% 5% 5.0% 5.0% C EARTH WORK FOR U/G PIPING -N % 30, , % 0.57% 88.3% 0.57% Block-A % , % Excavation M3 100% 90% 90.0% 90.0% Sand bedding for Piping M3 100% 5% 5.0% 5.0% Hand over to Piping Works 1.00 NOS 100% 5% 5.0% 5.0% Block-B % , % Excavation M3 100% 90% 90.0% 90.0% Sand bedding for Piping M3 100% 5% 5.0% 5.0% Hand over to Piping Works 1.00 NOS 100% 5% 5.0% 5.0% Block-C % , % Excavation M3 100% 90% 90.0% 90.0% Sand bedding for Piping M3 100% 5% 5.0% 5.0% Hand over to Piping Works 1.00 NOS 100% 5% 5.0% 5.0% Block-D % , % Excavation M3 100% 90% 90.0% 90.0% Sand bedding for Piping M3 100% 5% 5.0% 5.0% Hand over to Piping Works 1.00 NOS 100% 5% 5.0% 5.0% Block-E % , % Excavation M3 100% 90% 90.0% 90.0% Sand bedding for Piping M3 100% 5% 5.0% 5.0% Hand over to Piping Works 1.00 NOS 100% 5% 5.0% 5.0% Block-F % , % Excavation M3 100% 90% 90.0% 90.0% Sand bedding for Piping M3 100% 5% 5.0% 5.0% Hand over to Piping Works 1.00 NOS 100% 5% 5.0% 5.0% Block-G % , % Excavation M3 100% 90% 90.0% 90.0% Sand bedding for Piping M3 100% 5% 5.0% 5.0% Hand over to Piping Works 1.00 NOS 100% 5% 5.0% 5.0% Block-H % , % Excavation M3 100% 90% 90.0% 90.0% Sand bedding for Piping M3 100% 5% 5.0% 5.0% Hand over to Piping Works 1.00 NOS 100% 5% 5.0% 5.0% Block-I % , % Excavation M3 100% 90% 90.0% 90.0% Sand bedding for Piping M3 100% 5% 5.0% 5.0% Hand over to Piping Works 1.00 NOS 100% 5% 5.0% 5.0% Block-J % , % Excavation M3 100% 90% 90.0% 90.0% Sand bedding for Piping M3 100% 5% 5.0% 5.0% Hand over to Piping Works 1.00 NOS 100% 5% 5.0% 5.0% Block-K % , % Excavation M3 100% 90% 90.0% 90.0% Sand bedding for Piping M3 100% 5% 5.0% 5.0% Hand over to Piping Works 1.00 NOS 100% 5% 5.0% 5.0% Block-L % , % Excavation M3 100% 90% 90.0% 90.0% Sand bedding for Piping M3 100% 5% 5.0% 5.0% Hand over to Piping Works 1.00 NOS 100% 5% 5.0% 5.0% Block-M 95.00% , % Excavation M3 100% 90% 90.0% 90.0% Sand bedding for Piping M3 100% 5% 5.0% 5.0% Hand over to Piping Works 1.00 NOS 5% Block-N 95.00% , % Excavation M3 100% 90% 90.0% 90.0% Sand bedding for Piping M3 100% 5% 5.0% 5.0% Hand over to Piping Works 1.00 NOS 5% Block-O 95.00% , % Excavation M3 100% 90% 90.0% 90.0% Sand bedding for Piping M3 100% 5% 5.0% 5.0% Hand over to Piping Works 1.00 NOS 5% Block-P 95.00% , % Excavation M3 100% 90% 90.0% 90.0% Sand bedding for Piping M3 100% 5% 5.0% 5.0% Hand over to Piping Works 1.00 NOS 5% Block-Q 95.00% , % Excavation M3 100% 90% 90.0% 90.0% Sand bedding for Piping M3 100% 5% 5.0% 5.0% Hand over to Piping Works 1.00 NOS 5% Block-R 90.00% , % Excavation M3 100% 90% 90.0% 90.0% Sand bedding for Piping M3 5% Hand over to Piping Works 1.00 NOS 5% Block-S 18.00% Excavation M3 20% 90% 18.0% Sand bedding for Piping M3 5% Hand over to Piping Works 1.00 NOS 5% Block-T Excavation M3 90% Sand bedding for Piping M3 5% Hand over to Piping Works 1.00 NOS 5% C PRECAST(FOUNDATION, CABLE TRENCH, MH) -N % 24, , % 0.47% 90.5% 0.47% FOUNDATION 100% 90.1% , % Form Works NOS 93% 35% 32.6% 32.6% Rebars NOS 93% 25% 23.3% 23.3% Precast of Concrete NOS 92% 25% 23.0% 23.0% Hand over to Mech,Piping Work to Others NOS 75% 15% 11.3% 11.3% CABLE TRENCH - N00 100% 88.1% , % Form Works NOS 91% 35% 31.9% 31.9% Rebars NOS 92% 25% 23.0% 23.0% Precast of Concrete NOS 91% 25% 22.8% 22.8% Hand over to Mech,Piping Work to Others NOS 70% 15% 10.5% 10.5% MANHOLE 100% 93.3% , % Excavation NOS 98% 35% 34.3% 34.3% Precast Concrete NOS 96% 25% 24.0% 24.0% Installation of Concrete NOS 92% 25% 23.0% 23.0% Hand over to Mech,Piping Work to Others NOS 80% 15% 12.0% 12.0% C STORM DITCH (AROUND PRODUCT W/H) -N % % 0.08% 20.0% 0.08% Construct Storm Ditch ( Lay-out 1 / 8) 100% 60.0% % Excavation M3 100% 35% 35.0% 35.0% Installation of Precast Concrete/ Concrete Pouring M3 100% 25% 25.0% 25.0% Backfilling & Compaction M 25% Hand over to Mech,Piping Work to Others NOS 15% Construct Storm Ditch ( Lay-out 2 / 8) 100% 50.0% % Excavation M3 100% 35% 35.0% 35.0% Installation of Precast Concrete/ Concrete Pouring M3 60% 25% 15.0% 12.5% Backfilling & Compaction M 25% Hand over to Mech,Piping Work to Others NOS 15% Construct Storm Ditch ( Lay-out 3 / 8) 100% 35.0% % Excavation M3 100% 35% 35.0% 35.0% Installation of Precast Concrete/ Concrete Pouring M3 25% Backfilling & Compaction M 25% Hand over to Mech,Piping Work to Others NOS 15% CMPL Improved Page 33 of 34

226 CIVIL CATEGORY CONSTRUCTION ACTIVITIES APPENDIX-V WEEK NO. 12 ACT WBS TITLE DURATION (DAY) RESOURCE AMOUNT (MH) Total BOQ Unit Weight for each Level6 activity Project Progress CMPL % Weight Value for Level7 Progress Value BOQ 4,815,410 Construct Storm Ditch ( Lay-out 4 / 8) 100% 21.0% % Excavation M3 60% 35% 21.0% 17.5% Installation of Precast Concrete/ Concrete Pouring M3 25% Backfilling & Compaction M 25% Hand over to Mech,Piping Work to Others NOS 15% Construct Storm Ditch ( Lay-out 5 / 8) 100% Excavation M3 35% Installation of Precast Concrete/ Concrete Pouring M3 25% Backfilling & Compaction M 25% Hand over to Mech,Piping Work to Others NOS 15% Construct Storm Ditch ( Lay-out 6 / 8) 100% Excavation M3 35% Installation of Precast Concrete/ Concrete Pouring M3 25% Backfilling & Compaction M 25% Hand over to Mech,Piping Work to Others NOS 15% Construct Storm Ditch ( Lay-out 7 / 8) 100% Excavation M3 35% Installation of Precast Concrete/ Concrete Pouring M3 25% Backfilling & Compaction M 25% Hand over to Mech,Piping Work to Others NOS 15% Construct Storm Ditch ( Lay-out 8 / 8) 100% Excavation M3 35% Installation of Precast Concrete/ Concrete Pouring M3 25% Backfilling & Compaction M 25% Hand over to Mech,Piping Work to Others NOS 15% AREA TOTALS 4.19% 4.03% CMPL Improved Page 34 of 34

227 APPENDIX-VI

228 APPENDIX-VI Page 1 of 1 PROJECT CASH FLOW STATISTICAL DATA ANALYSIS Month Cumulative (%) Cumulative Payment (USD) Monthly t-test: Paired Two Sample for Means Actual Plan Actual Plan Actual Plan ,800, ,800,000 Actual Plan ,800, Mean 7,865, ,514, ,002, ,731 Variance E E ,352, ,142 Observations ,800,000 31,353,251 29,800,000 1,000,378 Pearson Correlation ,573,000 34,646,430 1,773,000 3,293,179 Hypothesized Mean Difference ,362,000 40,669,422 2,789,000 6,022,992 df ,583,000 46,308,778 5,221,000 5,639,357 t Stat ,692,000 53,608,819 5,109,000 7,300,040 P(T<=t) one-tail ,705,000 66,902,498 8,013,000 13,293,679 t Critical one-tail ,198,000 77,189,771 11,493,000 10,287,273 P(T<=t) two-tail ,198,000 85,617, ,427,556 t Critical two-tail ,763,000 93,869,478 9,565,000 8,252, ,352, ,661,793 6,589,000 10,792, ,733, ,248,887 21,381,000 11,587, ,009, ,096,189 6,276,000 7,847, ,341, ,006,034 7,332,000 11,909, ,366, ,884,053 8,025,000 11,878, ,618, ,848,445 8,252,000 9,964, ,899, ,362,998 2,281,000 16,514, ,633, ,079,445 31,734,000 18,716, ,429, ,546,144 12,796,000 18,466, ,732, ,903,627 25,303,000 15,357, ,004, ,032,269 10,272,000 11,128, ,023, ,939,815 8,019,000 10,907, ,121, ,464,875 8,098,000 7,525, ,406, ,966,235 1,285,000 7,501, ,141, ,864,019 11,735,000 5,897, ,574, ,047,545 5,433,000 4,183, ,027, ,909,724 17,453,000 3,862, ,567, ,384,445 3,540,000 3,474, ,292, ,100,000 5,725,000 1,715, ,292, ,100, ,292, ,000, ,900, ,292, ,000,

Cash flow is the life line of a business. Many start-up

Cash flow is the life line of a business. Many start-up PM.02 ABC of Cash Flow Projections Mark T. Chen, PE CCE Cash flow is the life line of a business. Many start-up companies fail because of insufficient cash flow. From the perspectives of both owner and

More information

PROJECT COST MANAGEMENT

PROJECT COST MANAGEMENT 7 PROJECT COST MANAGEMENT Project Cost Management includes the processes required to ensure that the project is completed within the approved budget. Figure 7 1 provides an overview of the following major

More information

1.040 Project Management

1.040 Project Management MIT OpenCourseWare http://ocw.mit.edu 1.040 Project Management Spring 2009 For information about citing these materials or our Terms of Use, visit: http://ocw.mit.edu/terms. Fred Moavenzadeh Spring 2009

More information

SPECIFICATIONS - DETAILED PROVISIONS Section 01310 - Project Control Schedule C O N T E N T S

SPECIFICATIONS - DETAILED PROVISIONS Section 01310 - Project Control Schedule C O N T E N T S SPECIFICATIONS - DETAILED PROVISIONS Section 01310 - Project Control Schedule C O N T E N T S PART 1 - SCHEDULE REQUIREMENTS PROGRESS SCHEDULE... 1 PART 2 - SUBMITTAL PROCEDURES... 2 PART 3 - DEFINITIONS...

More information

Project Management Using Earned Value

Project Management Using Earned Value Project Management Using Earned Value Third Edition Gary C. Humphreys Earned Value Management Consulting Training 2002, 2011, 2014 Gary C. Humphreys Humphreys & Associates, Inc. All rights reserved. No

More information

SECTION 01310 COST LOADED CRITICAL PATH SCHEDULE

SECTION 01310 COST LOADED CRITICAL PATH SCHEDULE SECTION 01310 COST LOADED CRITICAL PATH SCHEDULE 1.0 General 1.1 Description The Work specified in this Section consists of developing and maintaining an accurate cost loaded critical path schedule in

More information

Spec. Standard: 11/27/06 01310-1 Revision: 11/27/06

Spec. Standard: 11/27/06 01310-1 Revision: 11/27/06 SECTION 01310 CONSTRUCTION SCHEDULES PART 1 - GENERAL 1.01 SCOPE: A. Construction Progress Schedule: The CONTRACTOR shall submit a detailed work progress schedule showing all work in a graphic format suitable

More information

JAGAN RAO ADELAIDE, TUESDAY, 3 DECEMBER 2013

JAGAN RAO ADELAIDE, TUESDAY, 3 DECEMBER 2013 JAGAN RAO ADELAIDE, TUESDAY, 3 DECEMBER 2013 Relate to this? Outline 1. Safety & Housekeeping 2. Aim 3. Introduction SKM and Jagan Rao 4. Project Controls Overview 5. Cost Estimating 6. Planning & Scheduling

More information

Project success depends on

Project success depends on Project success depends on many factors both within and outside the control of the project team. One of the aspects that is within the control of the project team is the planning. Almost everything we

More information

THE PROJECT MANAGEMENT KNOWLEDGE AREAS

THE PROJECT MANAGEMENT KNOWLEDGE AREAS THE PROJECT MANAGEMENT KNOWLEDGE AREAS 4. Project Integration Management 5. Project Scope Management 6. Project Time Management 7. Project Cost Management 8. Project Quality Management 9. Project Human

More information

Activity Schedules in the NEC3 Engineering and Construction Contract

Activity Schedules in the NEC3 Engineering and Construction Contract Activity Schedules in the NEC3 Engineering and Construction Contract Prepared by Dr Ron Watermeyer Briefing Note NEC3#2 March 2013 Overview This briefing note outlines the NEC3 provisions for a Activity

More information

CHAPTER 9 PROJECT FINANCE AND CONTRACT PRICING

CHAPTER 9 PROJECT FINANCE AND CONTRACT PRICING CHAPTER 9 PROJECT FINANCE AND CONTRACT PRICING In the previous chapters, techniques for project planning, scheduling, resources management, and timecost trade off have been introduced. This chapter will

More information

Subcontractor Involvement Project Tracking Progress Curves. CSTM 462 Fall 2012

Subcontractor Involvement Project Tracking Progress Curves. CSTM 462 Fall 2012 Subcontractor Involvement Project Tracking Progress Curves CSTM 462 Fall 2012 Subcontractor Involvement into the Critical Path Many building contractors get very little input into the schedule from their

More information

CHAPTER 6 PROJECT CASH FLOW

CHAPTER 6 PROJECT CASH FLOW CHAPTER 6 PROJECT CASH FLOW In the previous chapters, techniques for project planning, scheduling, resources management, and timecost trade off have been introduced. This chapter will deal with project

More information

LONG INTERNATIONAL. Long International, Inc. 10029 Whistling Elk Drive Littleton, CO 80127-6109 (303) 972-2443 Fax: (303) 972-6980

LONG INTERNATIONAL. Long International, Inc. 10029 Whistling Elk Drive Littleton, CO 80127-6109 (303) 972-2443 Fax: (303) 972-6980 LONG INTERNATIONAL Long International, Inc. 10029 Whistling Elk Drive Littleton, CO 80127-6109 (303) 972-2443 Fax: (303) 972-6980 www.long-intl.com Ronald J. Rider, M.B.A. Table of Contents 1. INTRODUCTION...

More information

PROJECT MANAGEMENT PLAN TEMPLATE < PROJECT NAME >

PROJECT MANAGEMENT PLAN TEMPLATE < PROJECT NAME > PROJECT MANAGEMENT PLAN TEMPLATE < PROJECT NAME > Date of Issue: < date > Document Revision #: < version # > Project Manager: < name > Project Management Plan < Insert Project Name > Revision History Name

More information

CONTRACT ADMINISTRATION AND MANAGEMENT GUIDE

CONTRACT ADMINISTRATION AND MANAGEMENT GUIDE CONTRACT ADMINISTRATION AND MANAGEMENT GUIDE STATE OF IDAHO DEPARTMENT OF ADMINISTRATION DIVISION OF PURCHASING REVISED 01 01 14 Table of Contents I. Purpose... 1 II. Overview of Contract Management and

More information

LONG INTERNATIONAL. Long International, Inc. 10029 Whistling Elk Drive Littleton, CO 80127-6109 (303) 972-2443 Fax: (303) 972-6980

LONG INTERNATIONAL. Long International, Inc. 10029 Whistling Elk Drive Littleton, CO 80127-6109 (303) 972-2443 Fax: (303) 972-6980 LONG INTERNATIONAL Long International, Inc. 10029 Whistling Elk Drive Littleton, CO 80127-6109 (303) 972-2443 Fax: (303) 972-6980 www.long-intl.com Richard J. Long, P.E. Table of Contents 1. INTRODUCTION...

More information

Capital Projects and Construction: Building in Risk Management and Project Controls

Capital Projects and Construction: Building in Risk Management and Project Controls Capital Projects and Construction: Building in Risk Management and Project Controls Making Every Dollar Count The global economic crisis sparked by the subprime mortgage debacle, the collapse of the securitized

More information

PN 107-01/16/2009 - CRITICAL PATH METHOD PROGRESS SCHEDULE

PN 107-01/16/2009 - CRITICAL PATH METHOD PROGRESS SCHEDULE PN 107-01/16/2009 - CRITICAL PATH METHOD PROGRESS SCHEDULE A. General. The progress schedule required for this project is the critical path method schedule (CPM schedule). The Contractor shall designate

More information

Project Cost Management

Project Cost Management PDHonline Course P104 (8 PDH) Project Cost Management Instructor: William J. Scott, P.E. 2012 PDH Online PDH Center 5272 Meadow Estates Drive Fairfax, VA 22030-6658 Phone & Fax: 703-988-0088 www.pdhonline.org

More information

SE351a: Software Project & Process Management

SE351a: Software Project & Process Management SE351a: Software Project & Process Management W8: Software Project Planning 22 Nov., 2005 SE351a, ECE UWO, (c) Hamada Ghenniwa SE351 Roadmap Introduction to Software Project Management Project Management

More information

Introduction to the ITS Project Management Methodology

Introduction to the ITS Project Management Methodology Introduction to the ITS Project Management Methodology In September 1999 the Joint Legislative Committee on Performance Evaluation and Expenditure Review (PEER) produced a report entitled Major Computer

More information

How to successfully manage your mega-project

How to successfully manage your mega-project BUILDING, CONSTRUCTION & REAL ESTATE How to successfully manage your mega-project Part II Stakeholder communication and project controls integration kpmg.com 2 Building, Construction & Real Estate How

More information

Memorandum. Jeff Jasper, P.E. Director, Division of Design. Technical Support TEBM, Division of Construction. From: Jeremiah Littleton, P.E.

Memorandum. Jeff Jasper, P.E. Director, Division of Design. Technical Support TEBM, Division of Construction. From: Jeremiah Littleton, P.E. Memorandum To: Thru: Jeff Jasper, P.E. Director, Division of Design Rachel Mills, P.E. Technical Support TEBM, Division of Construction From: Jeremiah Littleton, P.E. Division of Construction Date: June

More information

// Benchmarking Project Schedules

// Benchmarking Project Schedules // Benchmarking Project Schedules Dr. Dan Patterson, PMP CEO & President, Acumen March 2011 www.projectacumen.com Table of Contents Introduction... 4 Benchmarking Overview... 4 Uses of Schedule Benchmarking...

More information

SIMULATION TOOL FOR MANPOWER FORECAST LOADING AND RESOURCE LEVELING. Mikhail Hanna Janaka Y. Ruwanpura

SIMULATION TOOL FOR MANPOWER FORECAST LOADING AND RESOURCE LEVELING. Mikhail Hanna Janaka Y. Ruwanpura Proceedings of the 2007 Winter Simulation Conference S. G. Henderson, B. Biller, M.-H. Hsieh, J. Shortle, J. D. Tew, and R. R. Barton, eds. SIMULATION TOOL FOR MANPOWER FORECAST LOADING AND RESOURCE LEVELING

More information

Controlling Our Critical Path: A CDOT Guide to Better Project Management Practices

Controlling Our Critical Path: A CDOT Guide to Better Project Management Practices : A CDOT Guide to Better Project Management Practices Project Management practices have been a part of the CDOT culture for many years. However, with a transitioning workforce and increasing demands, it

More information

LONG INTERNATIONAL. Long International, Inc. 10029 Whistling Elk Drive Littleton, CO 80127-6109 (303) 972-2443 Fax: (303) 972-6980

LONG INTERNATIONAL. Long International, Inc. 10029 Whistling Elk Drive Littleton, CO 80127-6109 (303) 972-2443 Fax: (303) 972-6980 LONG INTERNATIONAL Long International, Inc. 10029 Whistling Elk Drive Littleton, CO 80127-6109 (303) 972-2443 Fax: (303) 972-6980 www.long-intl.com James M. Bolin Table of Contents ABSTRACT... 1 1. CHANGE

More information

WORK PROGRAM GUIDELINES

WORK PROGRAM GUIDELINES Project Managed Change Program WORK PROGRAM GUIDELINES JABATAN KERJA RAYA MALAYSIA Cawangan Pengurusan Projek Kompleks (PROKOM) Ibu Pejabat JKR Malaysia 2 Document Ownership Section No Section Amendment

More information

CHAPTER 4 TYPES OF COST ESTIMATES

CHAPTER 4 TYPES OF COST ESTIMATES CHAPTER 4 TYPES OF COST ESTIMATES 1. INTRODUCTION All projects, both construction and environmental restoration, require cost estimates to plan and budget the project efficiently. Numerous estimates are

More information

Module 5 Cost Management PMP Exam Questions

Module 5 Cost Management PMP Exam Questions Module 5 Cost Management PMP Exam Questions PMP, PMBOK and the Registered Education Provider logo are registered marks of the Project Management Institute, Inc Question 1 A company, which provides professional

More information

Earned Value Management Guidelines

Earned Value Management Guidelines Effective Date: April 21, 2009 Status: Revision 1 Supersedes: NA Document Owner: Director, Environmental and Engineering Program Introduction This paper provides guidance and recommendations for the application

More information

Contract Administration

Contract Administration Chapter 5 Contract Administration Section 3 Change Orders 5-301 General 5-302 Change Order Policy 5-303 Purpose of Change Orders 5-304 Initiation of Change Orders 5-305 Preliminary Considerations 5-306

More information

Role of Project Manager from the Client s Side on the Performance of a Construction Project

Role of Project Manager from the Client s Side on the Performance of a Construction Project International Journal of Engineering and Advanced Technology (IJEAT) Role of Project Manager from the Client s Side on the Performance of a Construction Project Shruti Wadalkar, S.S. Pimplikar Abstract

More information

WORKING CAPITAL MANAGEMENT

WORKING CAPITAL MANAGEMENT CHAPTER 9 WORKING CAPITAL MANAGEMENT Working capital is the long term fund required to run the day to day operations of the business. The company starts with cash. It buys raw materials, employs staff

More information

Construction Management Standards of Practice

Construction Management Standards of Practice Construction Management Standards of Practice 2010 Edition Advancing Professional Construction/ Program Management Worldwide. 7926 Jones Branch Drive, Suite 800 McLean, VA 22102-3303 USA 703.356.2622 703.356.6388

More information

School Construction Projects

School Construction Projects The process of educating young people seems to be continually developing. New insights regarding how students most effectively receive retain and gain understanding of information and principles affect

More information

Unit 5: Cost Management (PMBOK Guide, Chapter 7)

Unit 5: Cost Management (PMBOK Guide, Chapter 7) (PMBOK Guide, Chapter 7) The questions on this topic have historically been more difficult than average for some exam takers because of unfamiliarity with some of the math. You will be responsible for

More information

Project Management Guide

Project Management Guide Project Management Guide What is in this guide? All development workers, and community organisations may at times work with development projects. This may bring you into contact with consultants, project

More information

Qualitative analysis: Analyzing the construction schedule. 2014 Baker Tilly Virchow Krause, LLP

Qualitative analysis: Analyzing the construction schedule. 2014 Baker Tilly Virchow Krause, LLP Qualitative analysis: Analyzing the construction schedule 2014 Baker Tilly Virchow Krause, LLP About Baker Tilly > Established in 1931 > One of the top 20 largest accounting and advisory firms in the United

More information

Chapter 7. (PMBOK Guide)

Chapter 7. (PMBOK Guide) Chapter 7 Project Cost Management (PMBOK Guide) Mohammad A. Rajabi Dept. of Geomatics Eng., University it of Th Tehran Tel: +98 21 8833 4341, Cell: +98 912 132 5823 Email: [email protected] ir Homepage:

More information

pm4dev, 2008 management for development series Project Budget Management PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS

pm4dev, 2008 management for development series Project Budget Management PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS pm4dev, 2008 management for development series Project Budget Management PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS A methodology to manage development

More information

Project Control. 1. Schedule Updating

Project Control. 1. Schedule Updating Project Control During the execution of a project, procedures for project control and record keeping become indispensable tools to managers and other participants in the construction process. These tools

More information

[Project Name] NZTA Contract No. [Contract Number] Schedule of Prices

[Project Name] NZTA Contract No. [Contract Number] Schedule of Prices [Project Name] NZTA Contract No. [Contract Number] Schedule of Prices Schedule of Prices SP1

More information

Accounting System. Page 1 of 9

Accounting System. Page 1 of 9 Page 1 of 9 Accounting System In support of program management and Earned Value Management, the accounting system must be able to relate costs incurred to work accomplished. Not all accounting systems

More information

MATERIALS: The Contractor shall provide the latest version of Primavera SureTrak software.

MATERIALS: The Contractor shall provide the latest version of Primavera SureTrak software. DESCRIPTION: '108-01, Start and Progress of Work, is hereby amended to require that the Contractor furnish and participate in a computerized CPM (critical path method) network scheduling system. The purpose

More information

Project Management Guidebook

Project Management Guidebook METHOD 12 3 empowering managers to succeed Project Management Guidebook ISBN 0-473-10445-8 A bout this e-book This e-book was created by Method123 (see www.method123.com) to help provide you with a simple

More information

Construction Economics & Finance. Module 6. Lecture-1

Construction Economics & Finance. Module 6. Lecture-1 Construction Economics & Finance Module 6 Lecture-1 Financial management: Financial management involves planning, allocation and control of financial resources of a company. Financial management is essential

More information

Project Time Management an essential element to project success

Project Time Management an essential element to project success Project Time Management an essential element to project success Abstract This paper discusses the reasons behind the necessity to apply sound Project Time Management principles and processes to projects

More information

Project Management Plan for

Project Management Plan for Project Management Plan for [Project ID] Prepared by: Date: [Name], Project Manager Approved by: Date: [Name], Project Sponsor Approved by: Date: [Name], Executive Manager Table of Contents Project Summary...

More information

Productivity: Measurement, Improvement and its Role in Mitigating the Risks of Dispute in Construction Projects

Productivity: Measurement, Improvement and its Role in Mitigating the Risks of Dispute in Construction Projects Productivity: Measurement, Improvement and its Role in Mitigating the Risks of Dispute in Construction Projects Dr. Rashad Zakieh (PMP) 27 April, 2010 Copyright Saudi Aramco, 2010. All rights reserved.

More information

Integration of Income Management and Cost Management: A Complementary for Financial Analysis of Projects. Abstract. Introduction

Integration of Income Management and Cost Management: A Complementary for Financial Analysis of Projects. Abstract. Introduction Integration of Income Management and Cost Management: A Complementary for Financial Analysis of Projects Puian Masudifar, Deputy CEO, VIRA Consulting Engineers Fereydoun Fardad, Aryana Project Management

More information

Project Management Institute. Construction. Extension to. A Guide to the Project Management Body of Knowledge. PMBOK Guide 2000 Edition.

Project Management Institute. Construction. Extension to. A Guide to the Project Management Body of Knowledge. PMBOK Guide 2000 Edition. Project Management Institute Construction Extension to A Guide to the Project Management Body of Knowledge PMBOK Guide 2000 Edition Provisional Construction Extension to A Guide to the Project Management

More information

PROJECT PROCUREMENT MANAGEMENT

PROJECT PROCUREMENT MANAGEMENT 12 PROJECT PROCUREMENT MANAGEMENT Project Procurement Management includes the processes required to acquire goods and services from outside the performing organization. For simplicity, goods and services,

More information

CRITICAL PATH METHOD (CPM) SCHEDULES

CRITICAL PATH METHOD (CPM) SCHEDULES 96 CRITICAL PATH METHOD (CPM) SCHEDULES How-to for Reading, Understanding, and Using CPM Schedules (without Direct Primavera Access.) 1 Objectives Learn to read, understand, and use CPM schedules (without

More information

Schedule of Prices. Project Name Contract No. Contract Number

Schedule of Prices. Project Name Contract No. Contract Number Schedule of Prices Project Name Contract No. Contract Number C3-LS-BP-Issue 2 SP Page 1 Printed 1 March 2011 >: 1. When preparing the schedule

More information

Project Cost Management

Project Cost Management Project Skills Team FME www.free-management-ebooks.com ISBN 978-1-62620-982-9 Copyright Notice www.free-management-ebooks.com 2014. All Rights Reserved ISBN 978-1-62620-982-9 The material contained within

More information

FINANCIAL STATEMENTS AND RATIO ANALYSIS

FINANCIAL STATEMENTS AND RATIO ANALYSIS In following we will be demonstrating the use of ratios to help examine the health of a firm. Ratios allow managers evaluate to a firm's financial statements in order to point out the strengths and weaknesses

More information

CHAPTER 2 QUANTITY TAKE-OFF

CHAPTER 2 QUANTITY TAKE-OFF CHAPTER 2 QUANTITY TAKEOFF The quantity takeoff is an important part of the cost estimate. It must be as accurate as possible and should be based on all available engineering and design data. Use of appropriate

More information

Project Management for Scientists

Project Management for Scientists Project Management for Scientists Cost & Schedule Estimates Christoph U. Keller, [email protected] Sterrekundig Instituut Utrecht Utrecht University www.astro.uu.nl/~keller Outline Resource Assignments

More information

EXHIBIT 2-2-C PROGRESS SCHEDULES

EXHIBIT 2-2-C PROGRESS SCHEDULES EXHIBIT 2-2-C PROGRESS SCHEDULES PART 1 GENERAL 1.01 SUMMARY A. The work specified in this section consists of furnishing transportation, labor, materials, equipment and incidentals necessary for preparation,

More information

Project Creation and Gantt Chart Design Using Microsoft Project. R. Baker. The University of Tampa

Project Creation and Gantt Chart Design Using Microsoft Project. R. Baker. The University of Tampa Project Creation and Gantt Chart Design Using Microsoft Project R. Baker The University of Tampa What is Microsoft Project? Microsoft Project is a software package designed help managers manage a variety

More information

DATA ITEM DESCRIPTION Title: Integrated Program Management Report (IPMR) Number: DI-MGMT-81861 Approval Date: 20120620

DATA ITEM DESCRIPTION Title: Integrated Program Management Report (IPMR) Number: DI-MGMT-81861 Approval Date: 20120620 DATA ITEM DESCRIPTION Title: Integrated Program Management Report (IPMR) Number: DI-MGMT-81861 Approval Date: 20120620 AMSC Number: D7549 Limitation: DTIC Applicable: No GIDEP Applicable: No Preparing

More information

Project Management Guidelines

Project Management Guidelines Project Management Guidelines 1. INTRODUCTION. This Appendix (Project Management Guidelines) sets forth the detailed Project Management Guidelines. 2. PROJECT MANAGEMENT PLAN POLICY AND GUIDELINES OVERVIEW.

More information

EARNED VALUE MANAGEMENT SYSTEM AS A PROJECT MANAGEMENT TOOL FOR MAJOR MULTI-DISCIPLINARY PROJECTS

EARNED VALUE MANAGEMENT SYSTEM AS A PROJECT MANAGEMENT TOOL FOR MAJOR MULTI-DISCIPLINARY PROJECTS 14 EARNED VALUE MANAGEMENT SYSTEM AS A PROJECT MANAGEMENT TOOL FOR MAJOR MULTI-DISCIPLINARY PROJECTS Dr. P.B.G. Dissanayake 1 1 Department of Civil Engineering, Faculty of Engineering, University of Peradeniya

More information

Project Cost Management

Project Cost Management Project Cost Management Study Notes PMI, PMP, CAPM, PMBOK, PM Network and the PMI Registered Education Provider logo are registered marks of the Project Management Institute, Inc. Points To Note Please

More information

PMO Metrics Recommendations

PMO Metrics Recommendations Introduction The purpose of this document is to recommend metrics to be used by the Project Management Office (PMO) to measure and analyze their project and PMO success. The metrics are divided into Project

More information

LONG INTERNATIONAL. Long International, Inc. 10029 Whistling Elk Drive Littleton, CO 80127-6109 (303) 972-2443 Fax: (303) 972-6980

LONG INTERNATIONAL. Long International, Inc. 10029 Whistling Elk Drive Littleton, CO 80127-6109 (303) 972-2443 Fax: (303) 972-6980 LONG INTERNATIONAL Long International, Inc. 10029 Whistling Elk Drive Littleton, CO 80127-6109 (303) 972-2443 Fax: (303) 972-6980 www.long-intl.com Richard J. Long, P.E. and Rod C. Carter, CCP, PSP Table

More information

February 3, 2016 12(1) CHAPTER 12

February 3, 2016 12(1) CHAPTER 12 February 3, 2016 12(1) CHAPTER 12 Table of Contents Paragraph Page 12-000 Auditing Contract Termination, Delay/Disruption, and Other Price Adjustment Proposals or Claims 12-001 Contract Terminations and

More information

REQUEST FOR PROPOSALS (RFP) - Construction Management Services. Germantown School District Office

REQUEST FOR PROPOSALS (RFP) - Construction Management Services. Germantown School District Office REQUEST FOR PROPOSALS (RFP) - Construction Management Services From: Germantown School District Project: Germantown School District Addition & Renovations to Rockfield Elementary School N132 W18473 Rockfield

More information

LONG INTERNATIONAL. Andrew Avalon, P.E., PSP and Curtis W. Foster

LONG INTERNATIONAL. Andrew Avalon, P.E., PSP and Curtis W. Foster Andrew Avalon, P.E., PSP and Curtis W. Foster LONG INTERNATIONAL Long International, Inc. 5265 Skytrail Drive Littleton, Colorado 80123-1566 USA Telephone: (303) 972-2443 Fax: (303) 200-7180 www.long-intl.com

More information

DRAFT RESEARCH SUPPORT BUILDING AND INFRASTRUCTURE MODERNIZATION RISK MANAGEMENT PLAN. April 2009 SLAC I 050 07010 002

DRAFT RESEARCH SUPPORT BUILDING AND INFRASTRUCTURE MODERNIZATION RISK MANAGEMENT PLAN. April 2009 SLAC I 050 07010 002 DRAFT RESEARCH SUPPORT BUILDING AND INFRASTRUCTURE MODERNIZATION RISK MANAGEMENT PLAN April 2009 SLAC I 050 07010 002 Risk Management Plan Contents 1.0 INTRODUCTION... 1 1.1 Scope... 1 2.0 MANAGEMENT

More information

Appendix B: Work Breakdown Structure (WBS)

Appendix B: Work Breakdown Structure (WBS) : Work Breakdown Structure (WBS) B.1. Introduction The WBS and WBS dictionary are effective management processes for planning, organizing, and administering NASA programs and projects. In accordance with

More information

700 Analysis and Reporting

700 Analysis and Reporting Jefferson Science Associates, LLC 700 Analysis and Reporting Project Control System Manual Revision 7-50 - 700 Analysis and Reporting This chapter of the JSA Project Control System Manual explains how

More information

300 Scheduling and Budgeting

300 Scheduling and Budgeting Jefferson Science Associates, LLC 300 Scheduling and Budgeting Project Control System Manual Revision 7-16 - 300 Scheduling and Budgeting This chapter of the JSA Project Control System Manual describes

More information

Project Management Seminars. Financial Management of Projects

Project Management Seminars. Financial Management of Projects Project Management Seminars Financial Management of Projects.inproject managementandsystems engineering, is a deliverable-oriented decomposition of a project into smaller components. (source: Wikipedia)

More information

How to successfully manage your mega-project

How to successfully manage your mega-project How to successfully manage your mega-project Part I Early planning and organizing for success kpmg.com 2 Building, Construction & Real Estate How to successfully manage your mega-project A three-part series

More information

7. PROJECT MANAGEMENT

7. PROJECT MANAGEMENT 7. PROJECT MANAGEMENT Syllabus Definition and scope of project, Technical design, Financing, Contracting, Implementation and performance monitoring. Implementation plan for top management, Planning Budget,

More information

Document Comparison. AIA Documents A134 2009 and A131CMc 2003

Document Comparison. AIA Documents A134 2009 and A131CMc 2003 Document Comparison AIA Documents A134 2009 and A131CMc 2003 AIA Document A134 2009 is in the right-hand column. Corresponding sections of AIA Document A131 CMc 2003 are in the left-hand column. Sections

More information

Experience and Qualifications of PROCESS PLANTS CORPORATION

Experience and Qualifications of PROCESS PLANTS CORPORATION Experience and Qualifications of PROCESS PLANTS CORPORATION Table of Contents Section 1. Project Services pg 3-20 Engineering Services Project management Design engineering Design management Construction

More information

Procurement Strategy and Contract Selection

Procurement Strategy and Contract Selection GUIDELINE Capital Works Management Framework Procurement Strategy and Contract Selection The suite of Capital Works Management Framework documents is available online www.hpw.qld.gov.au: The Capital Works

More information

REPORT 2016/035 INTERNAL AUDIT DIVISION

REPORT 2016/035 INTERNAL AUDIT DIVISION INTERNAL AUDIT DIVISION REPORT 2016/035 Audit of the use of consultants and individual contractors in the United Nations Stabilization Mission in Haiti Overall results relating to the effective hiring

More information

U.S. Department of Energy Office of Inspector General Office of Audit Services. Audit Report. Selected Energy Efficiency and Renewable Energy Projects

U.S. Department of Energy Office of Inspector General Office of Audit Services. Audit Report. Selected Energy Efficiency and Renewable Energy Projects U.S. Department of Energy Office of Inspector General Office of Audit Services Audit Report Selected Energy Efficiency and Renewable Energy Projects DOE/IG-0689 May 2005 SELECTED ENERGY EFFICIENCY AND

More information

INSE 6230 Total Quality Project Management

INSE 6230 Total Quality Project Management Lecture 5 Project Cost Management Project cost management introduction Estimating costs and budgeting Earned Value Management (EVM) 2 IT projects have a poor track record for meeting budget goals Cost

More information

DEVELOPMENT OF BEST MANAGEMENT PRACTICES TO EXECUTE A SUCCESSFUL CAPITAL IMPROVEMENT PROGRAM

DEVELOPMENT OF BEST MANAGEMENT PRACTICES TO EXECUTE A SUCCESSFUL CAPITAL IMPROVEMENT PROGRAM DEVELOPMENT OF BEST MANAGEMENT PRACTICES TO EXECUTE A SUCCESSFUL CAPITAL IMPROVEMENT PROGRAM 2015 Business Plan Chapter 3, Water Facilities Focus Area, Goal Number 4 June 2011 CAPITAL IMPROVEMENT PROGRAM

More information

Project Procurement Management

Project Procurement Management Project Procurement Management Study Notes PMI, PMP, CAPM, PMBOK, PM Network and the PMI Registered Education Provider logo are registered marks of the Project Management Institute, Inc. Points to Note

More information

Earned Value Management and Professional Services Automation

Earned Value Management and Professional Services Automation Earned Value Management and Professional Services Automation Prepared by: Frances B. Craig Unanet Technologies www.unanet.com 1 of 5 Earned Value Management and Professional Services Automation Earned

More information

PMP SAMPLE QUESTIONS BASED ON PMBOK 5TH EDITION

PMP SAMPLE QUESTIONS BASED ON PMBOK 5TH EDITION PMP SAMPLE QUESTIONS http://www.tutorialspoint.com/pmp-exams/pmp_sample_questions.htm Copyright tutorialspoint.com BASED ON PMBOK 5TH EDITION Here are 200 more objective type sample questions and their

More information

Appendix D Glossary Of Terms

Appendix D Glossary Of Terms Appendix D Glossary Of Terms The notational style used in this glossary is to begin the definition of each defined term with a new paragraph beginning with the term in UPPERCASE. Any word or phrase used

More information

Project Implementation Plan (PIP) User Guide

Project Implementation Plan (PIP) User Guide eea financial mechanism Project Implementation Plan (PIP) User Guide 23 November 2007 norwegian financial mechanism Page 2 of 20 1 Introduction The Project Implementation Plan (PIP) is a representation

More information

Project Management Guidelines

Project Management Guidelines Project Management Guidelines Overview Section 86-1506 (5) directs the NITC to adopt guidelines regarding project planning and management. The goal of project management is to achieve the objectives of

More information

PROJECT RISK MANAGEMENT

PROJECT RISK MANAGEMENT 11 PROJECT RISK MANAGEMENT Project Risk Management includes the processes concerned with identifying, analyzing, and responding to project risk. It includes maximizing the results of positive events and

More information