The Design and Construction of the Chitose Bridge
|
|
|
- Erick Jason Dean
- 10 years ago
- Views:
Transcription
1 The Design and Construction of the Chitose Bridge Mitsugu Ishida : Manager of Bridge Department, Public Works Division, Public Works Bureau of Osaka City Government Yoshinori Nagai : Chief of Bridge Department, Public Works Division, Public Works Bureau of Osaka City Government Kenji Fujitani : Staff of Bridge Department, Public Works Division, Public Works Bureau of Osaka City Government Yasunari Nakano : Staff of Eastern District Public Works Station, Administration Division, Public Works Bureau of Osaka City Government ABSTRACT The Chitose Bridge was constructed over the Taisho Inner-Port in Osaka City as shown in Fig.1 and was opened to traffic in April In the Taisho Inner-Port, there was so much traffic of vessels to influence the structural specifications of the bridge over the sea and to restrict occupation of waters in the extended period under construction. From such conditions, the Chitose Bridgewas designed as a 2-span continuous un-symmetrical braced rib arch, which is the main bridge over the sea (Photo. 1). And it was erected by large block erection method with floating cranes (FC) after marine transportation. Photo. 1 Grandview of the Chitose Bridge Fig. 1 Map around the Chitose Bridge
2 I. PLAN AND DESIGN AT THE CHITOSE BRIDGE 1. Plan for Bridge 1.1. Porpose of Enterprise It was difficult to form a road traffic network in Taisho Ward, which was surrounded by the Kizu river and the Shirinashi river and had the Taisho Inner-Port as shown in Fig.1. With a background of technological development of bridge construction in recent years, great bridges were constructed to this area such as the Senbonmatsu Bridge, a continuous box girder type with spiral access viaducts, the Sinkizugawa Bridge, a balanced Nielsen- Lohse arch type, Namihaya Bridge, a continuous curved box girder type and so on. However, on the Osaka-Yao route, called the Taisho St. and the main route in Taisho Ward, heavy traffic came out as the road network service had developed around this area. Therefore, the Chitose Bridge, over the Taisho Inner-Port, was planned to improve the Naniwa-Tsurumachi route as the bypass of the Taisho St. and so to make ease traffic congestion there. And this route was to form a loop with the Taisho St. so as to contribute the development of traffic in the water front area Span Length and Clearance to Passage of Vessels When planning construction of a bridge at this point of the Taisho Inner-Port, it was necessary to consider the vessels sailing to this area on a plan of the Osaka Port. Two types of ship were dealt with. One was 1,000GT freighter, which was the biggest type among sailing vessels of here. The other was 200GT freighter, which was standard type of sailing frequently. The height of under clearance was determined so that the aforementioned vessels could sail under this bridge at nearly highest high water (OP+1.9m) with overhead clearance of 2m. As to 1,000GT vessel (24.2m tall) it was OP+28.64m high. And as to 200GT vessel (19.2m tall) it was OP+23.64m high. ( OP is the standard mean sea level of Osaka Bay.) The width of passage for 1,000GT vessels was defined as 165m, from twice of the ship length (81.0m). And the one for 200GT vessels was defined as 230m by the field survey so that vessels could be free to sail. The main span of this bridge was determined 260m long as some of clearance was added to the passage width Selection of Bridge Type As the Chitose Bridge was to be located far above from the passage condition, the access viaducts were needed as shown in Fig.2. It was not desirable in an economical and structural view that the farther its pavement was located above, the longer access viaducts were. So in order that the girder height was to be kept small, the main span, which was
3 265m from the passage condition, should be made continuity with the next spans. However, as shown in Fig. 2, the side spans were curved. Especially, the north span was curved through although the south side span had some straight part continuously from the main span. Many of curved bridges have problems of torsion. So, as the main bridge over the sea, the main span was made a two-span continuous bridge with the north side span with less effect of torsion. Fig. 2 Plan of the Chitose Bridge Truss type was selected as the bridge type of the side span with curved part because of its high torsional rigidity. And arch type was selected as the type of main span because it could connect to the side truss by adoption of braced-rib and it was to be built of less steel than truss type. As to foundation type, steel pipe sheet pile well foundations were selected, which can also serve as the temporary coffering facilities on chuting the footing and can occupy the small area of waters under construction. And RC piers were selected as substructure. (a) Arch Bridge Type (b) Cable-Stayed Bridge Type (c) Truss Bridge Type Fig. 3 Types of Bridge in the Comparison 1.4. Structural Section Form This bridge has narrow width of only 14m to its span of 260m. Therefore, the horizontal rigidity was considered in addition to the vertical rigidity. Parallel rib form and basket handle rib form, which are shown in Fig. 4, were compared by the analysis. Generally, basket handle rib form has higher horizontal rigidity Fig. 4 Type of Arch Section Form
4 with arch effect than parallel rib form. But as shown in Table 2, basket handle form had more horizontal displacement in the case of this bridge. For, Table 2 Displacements at the middle of arch span in each form Prarel Basket Handle Prarel Basket Handle Horizontal to Dead Load Displacement to Live Load (mm) to Wind Load Virtical to Dead Load Displacement to Live Load (mm) to Wind Load this bridge was so narrow that the arch effect didn t work enough but the horizontal rigidity around its arch crown was decreased. And so the parallel rib form was selected. 2. Design 2.1. Structure Specification and Design Condition The general view of the Chitose Bridge is shown in Fig. 5, and a design conditions are shown in Table 3. Table 3 Design Conditions of the Chitose Bridge The road specification of the Chitose Bridge was No.4 type, Class 2 as it was to be situated in a metropolitan area and its traffic flow was estimated at 7,000 vehicles per a day. This bridge alignment was to be with curves of R=100m near the both sides of Taisho Inner-Port to access the existing roads as shown in Fig. 2. Road Specification No.4 type, Class 2 Design Speed 40km/h Class of Bridge First Class Bridges Bridge Type 2-Span Continuous Braced Rib Arch type Length and Span m = m + 105m Width 7.0m of Roadway, 3.0m of Walkway Alinement R = 100m- Profile Maximum of 5.5% Crossing Slope 2% of Roadway, 2% of Walkway Floor Slab Steel Deck Plate Pavement 80mm of Roadway, 30mm of Walkway Live load TT-43 Main Steels SM570,SM490Y,SM400,SS400,PWS Coating (full shop) External : Fluorocarbon Resin Coating (Blue) Internal : Tar-Epoxy Resin Coating Steel Weight 4,487t Fig.5 General View of the Main Bridge over the Sea
5 X 2.2. Section Designing Design section forces were calculated by solid frame analysis to evaluate the influence of the torsion in the curve in the side span and so on. In addition to the entire system to the dead and live loads and the temporary system by each construction step, the states of erection blocks which was to fluctuate on the marine transportation and to be lifted by FC were analyzed for designing of the temporary facilities and construction management FEM Analysis of Middle Fulcrum Part The P6 middle fulcrum part was a complicated structure which had a jointed corner part between the arch rib lower cord member and the stiffening girder and also gathered a vertical member and deck plate. Therefore, its local stress condition was checked by FEM analysis. The stress contour is shown in Fig.6. According to the result of the analysis, most of the stress between the arch rib lower chord member and the stiffening girder transmitted through their web and there was no more local stress concentration particularly than the previous assumption. The validity of this structure could be confirmed. And it was found that he stress by the axial Z Y Output Set: Case-301 Contour: Plate Top VonMises Stress force of the diagonal member was distributed over the area within 20-degrees range from the girder. Fig. 6 FEM Analysis of Middle Fulcrum Part (Stress Contour) Seismic Design Outline of Dynamic Response Analysis The time history non-linear dynamic response analysis was done to verify earthquake-proof against the great earthquakes which hardly occur during the use period. As the entry earthquake wave, it used the standard corrugation for the time history dynamic response analysis prescribed in SPECIFICATION FOR HIGHWAYBRIDGE and the corrugation, as shown in Fig. 7, in the neighborhood of the position of this bridge out of the assumed corrugation for design of civil engineering structure in the Osaka City area.
6 Fig. 7 Assumed Corrugation for Design of Civil Engineering Structure in the Osaka City Area (4s-35e) Analysis Result As a result of the eigenvalue computation, the 1st mode was the horizontal opposite phase vibration that the arch ribs and the girders displaced to the opposite in the horizontal direction at the natural period of 1.97 seconds, which is pretty long. The 2nd mode was the opposite symmetrical vertical vibration that the main span displaced to the vertical direction. The mode figure is shown in Fig. 8. To the earthquake to the direction of the bridge axis, the superstructure response was eased because of extension of the natural period by the plastic-ization of a substructure however the girder end much moved. To the earthquake to the crossing direction to the bridge axis, the large axial couple reactions of 5,855tf occurred on the fixed bearings. They were 2.2 times of the reactions of the fixed bearings by the earthquake to the direction of bridge axis. Generally, fixed bearings restrict a rotation in the horizontal plane which accompanies a deflection to the crossing direction to the bridge axis, and because bridges like arch type are with long span (a) 1st Mode : Natural Period of 1.97 s (b) 2nd Mode : Natural Period of 1.44 s Horizontal Opposite Phase Vibration of Arch Rib and Girders Opposite Symmetrical Vertical Vibration Fig. 8 Results of Eigenvalue Anakysis
7 and have only two bearings in a support line, large axial couple reactions often occur. In the case of this bridge, by improved type of rubber bearing, the axial reactions were reduced Improvement of Fixed Bearing to Large Force The clearance between the upper shoe and the side block that was about 3mm in usual was widened 20mm in the both side as shown in the Fig. 9, so that the horizontal rotation was to be ease so that the couple reactions could reduce to 2,651tf as much as reactions on the earthquake to the direction of the bridge axis. To add to the side blocks, flex bars were installed which worked to the firm loads but deformed plastically to great earthquake forces. Fig. 9 Improved Fixed Rubber Bearing 2.5. Analysis of Ultimate State Purpose and Outline As this bridge is an un-symmetrical braced-rib-arch bridge of a special bridge form, elasto-plastic finite displacement analysis of structural buckling was made to grasp the behavior to its ultimate state and to confirm the safety of its ultimate strength to the design loads Cases of Loading The cases of loading were as the followings. And α, the loading parameter, was increased gradually. Case-1 α ( D +Ps +L ) Case-2 α ( D +Ps +W) where D : dead load, Ps : The pre-tension of the hanger cables, L: live load, W : wind load, α : loading parameter (magnification to the design load) Analysis Result The deformation mode at the ultimate state at each case, and the loading parameter α - displacement relation are shown in Fig ) Case-1 At α=1.9, an upper cord member near the arch rib crown part yielded. At α=2.2, as more of upper cord members yielded, the arch rib began structural
8 buckling, and the non-linear behavior of the entire structure was seen noticeably. At α = α u =2.67, the lower chord members near the middle fulcrum buckled and the entire structure resulted in the ultimate state. Supposing that the load parameter was required more than α req =1.7 of the safety factor of steels, the structure was safe enough where α u > α req. 1) Case-2 At α=1.7, the upper cord member on the truss part near the middle fulcrum on the side of the windward yielded over the full section by tension and the non-linear behavior of the entire structure was seen noticeably. At α = α u = 2.23, the lower chord member near the arch crown on the side of the windward yielded over full section and the entire structure resulted in instability and the ultimate state. Supposing that the load parameter was required more than α req =1.7/1.25 = 1.36 of the safety factor of steels under wind loading, the structure was safe enough where α u > α req. (a) Deformation at the Ultimate State (Case-1) (b) - Vertical Displacement Relation (Case-1) (c) Deformation at the Ultimate State (Case-2) (d) - Horizontal Displacement Relation (Case-2) II. The Large Block Erection of Main Bridge over the Sea Fig.10 Results of Buckling Proof Analysis 1. Outline of Construction As the Taisho Inner-Port, which was the erection point of the Chitose Bridge, had much traffic of vessels, it was difficult to occupy this area in the extended period when its superstructure was erected. Therefore it was erected by large block erection method with FC having assembled the arch block and the truss block in the different yard. The arch block was set on a 16,000t-DB (a deck barge: 16,000t DW) with a 3,700t-FC
9 (FC: lifting Load of 3,700t) and 2,200t-FC (FC: lifting Lad of 2,200t) at the wharf of the assembly yard on October 30th in The arch block on the DB and the FCs were transported to Taisho Inner-Port on a different day of November 1st to 3rd, for it was not desirable for the large fleets to navigate in Taisho Inner-Port at once in the view to the safe passage of the other vessels. Then the arch block was set on November 4th. Two weeks after, the truss block was transported on a 7,000t-DB and set on November 17th with the same 2,200t-FC that had been used at the arch block erection. It was joined to the arch block by moment joint method. Fig. 11 Erection Blocks Fig. 12 Transportation Route Map 2. Block Assembly in the Yard It was necessary that each assembly yard was so large as to assemble a grand block and had a wharf. Members were assembled into a block with track crane or crawler crane in the stressless condition by bents. The appearances of blocks in the assembly yard are shown in Photo. 2 and Photo. 3. And the assembly process of arch block is shown in Fig. 13. Fig. 13 Assembly Process in Yard
10 2.1. Yard Bents and their Foundations The bent which was used for the assembly of the arch block designed considering not only reactions in usual erection with truck crane but added reactions by girders bending on lifting the block and horizontal forces by sway of lifted block and so on. And, according to the soil bearing power test in the yard, concrete spread foundations of bent were made. Photo.2 Assembly of Arch Block in the YardPhoto.3 Assembly of Truss Block in the Yard 2.2. Precision Management of the joint Because the arch block and the truss block were to be joined by moment joint method, especially high precision about the connections between the blocks was required. Therefore it was the inspection of the precision about the connections that first one panel of the truss block was assembled with the arch block and then it was transferred from the arch yard to the truss yard. 3. Marine Transportation of Blocks Each block was transported from the yard via outer harbor to Taisho Inner-Port as shown in Fig Transportation height The large blocks on the deck barges had to pass under the Minato Bridge and the Namihaya Bridge as shown in Fig. 12. The arch rise of the Chitose Bridge was keeped low Fig. 14 Arch Block on the Deck Barge
11 to be 40m by the clearance under the Namihaya Bridge at transportation in design as shown in Fig. 14. So the height of the arch block was to be managed strictly also at actual transportation. Based on the estimated sea level in Osaka Port of the time that the arch block was to be pass under the Namihaya Bridge, the height on transportation was adjusted the draft of barge by pouring 7,213t of seawater inside Temporary Facilities for Transportation As shown in Fig. 14, the center of gravity at transportation of the arch block was high position and the front and the rear of the arch block was much projected from the supports. Therefore, and the stability analysis was implemented considering fluctuation by waves and winds at transportation. The condition of the wave to have used for stability analysis was set as shown in Table 4 by NKKK (Nippon Kaiji Kentei Kyoukai) based on the conditions in transportation. And, temporary structures in transportation were designed as the following based on this analysis. Temporary struts were installed in the assembly yard to keep the shape of arch rib and to transmit the weight of the arch rib to the temporary support. At the temporary supports, temporary cradles are installed on the deck to transmit the reaction of temporary struts and the weight of the stiffening girders considering the deflection of projecting parts for its weight. And the deck barge was reinforced insides at the temporary supports. Because the deflection shape of the stiffening girders changed on lifting of block with the FC or by the fluctuation at transportation, bearing shoes which could follow the deflection was set on the temporary supports. Table 4 Condition about Marine Transportation Significant Wave 1.50m Highest Wave 2.90m Wave Period seconds Route from the Sakai Port to the Port of Osaka Season November Deck Barge 120m*34.0m*7.8m Freight 3,900 t of Bridge Block Photo.4 Marine Transportation Photo.5 Passage under the Namihaya Bridge
12 4. Large Block Erection Each block was lifted by FC twice, to set on the DB at the assembly yard, and to set at the erection site. As the arch block was lifted tandem by 3,700t-FC and 2,200t-FC, which coordinated the winching speed each other. When lifting the truss block, its curved part inclined to unbalance the loads at each hook. So, it was lifted carefully by 2,200t-FC which could control the winching load the each hook. And it was jointed to the arch block with lifted with FC. Photo. 6 Erection of Arch Block Photo.7 Erection of Truss Block and Moment Joint 4.1. Lifting of Arch Block The wires were winched under the control that the load of each hook was increased or decreased 10% of the full by the step having been calculated by previous frame analysis. The outline of load control is shown in Table 5. And on lifting the block, FC was controlled at any time on the check of the position of the block by transits 4.2. Moment Joint By moment joint method, the truss block was joined to the arch block so that the dead load, previous to setting the truss block, could be borne by the Fig. 15 Lifting of the Arch Block Table 5 Summary of Winching Load Management 10 % 50 % 100 % Measured Analysis Measured Analysis Measured Analysis Y1-L Y1-R Y2-L Y2-R Subtotal S1-L S1-R S2-L S2-R Subtotal TOTAL (tf)
13 entire system of the continuous structure. In the case of the Chitose Bridge, the truss block was joined to the arch Fig. 16 Moment Joint block with lifted with the 2,200-t lift FC with some of overhead clearance of P5 pier and it was subsequently jacked down so that a section moment was forced to be introduced. The working error of the clearance was to influence the introduced moment because the blocks had high structural rigidity. Therefore the introduction of moment had been simulated by the frame analysis, and defined the allowable range. The measurements of the clearance at bolts tightening of the joint met the allowable range as shown in Table 6. And strain gages were put on the inside of the upper cords near the bolt joints and the sectional forces was checked while the truss block was jacked down as shown in Table 7. Table 6 Clearance δ?at P5 (mm) Measured Analysis Allowable Range GL GR Table Increment of Sectional Forces of Upper Cord Member Measured Analysis At FC Load Axial Force 122 (tf) 157 (tf) Released Bending Moment 28 (tf m) 21 (tf m) At P5 Jacked Axial Force 119 (tf) 127 (tf) Down Bending Moment 2 (tf m) 2 (tf m) CONCLUSION The Chitose Bridge was designed as 2-span continuous braced rib arch bridge, which was rarely seen, by various knowledge and analyses about bridge planning and designing. And under the condition of the inner port that had much traffic, the large block erection could be implemented with bridge construction technologies and managements. The opening of this bridge is expected to lead the facilitation of the road traffic, the activation of the water front area the improvement of the user-friendliness by the operation of city buses and so on. The Chitose Bridge, which has an elegant shape in vivid blue, is expected to feel familiar for a long time together with the nearby bridges, the Minato Bridge and the Namihaya Bridge as a symbolic landmark. Finally we authors express our sincere appreciation to all the partners for their assistances and advices to go ahead of this enterprise. REFERENCES 1) Takei, Yokota, Yubisui, Aketa, Kanazawa, Miyagawa: BRIDGE AND FOUDATION
14 ENGINEERING, Planning and Design of Chitose Bridge, March ) Kawashima, Doi, Mochida, Shibahara, Miyake, Kuwabara: BRIDGE AND FOUDATION ENGINEERING, Erection of Chitose Bridge, September 2003
Design of Steel Structures Prof. S.R.Satish Kumar and Prof. A.R.Santha Kumar. Fig. 7.21 some of the trusses that are used in steel bridges
7.7 Truss bridges Fig. 7.21 some of the trusses that are used in steel bridges Truss Girders, lattice girders or open web girders are efficient and economical structural systems, since the members experience
US 51 Ohio River Bridge Engineering and Environmental Study
US 51 Ohio River Bridge Engineering and Environmental Study ITEM NOS. 1-100.00 & 1-1140.00 Prepared by: Michael Baker Jr., Inc. 9750 Ormsby Station Rd Louisville, KY 40223 August 16, 2013 Table of Contents
Engineers at Liftech designed the structure of the first container crane and have designed and reviewed thousands of container cranes since.
Engineers at Liftech designed the structure of the first container crane and have designed and reviewed thousands of container cranes since. Liftech is the structural review engineer of record for most
Challenging Skew: Higgins Road Steel I-Girder Bridge over I-90 OTEC 2015 - October 27, 2015 Session 26
2014 HDR Architecture, 2014 2014 HDR, HDR, Inc., all all rights reserved. Challenging Skew: Higgins Road Steel I-Girder Bridge over I-90 OTEC 2015 - October 27, 2015 Session 26 Brandon Chavel, PhD, P.E.,
Optimum proportions for the design of suspension bridge
Journal of Civil Engineering (IEB), 34 (1) (26) 1-14 Optimum proportions for the design of suspension bridge Tanvir Manzur and Alamgir Habib Department of Civil Engineering Bangladesh University of Engineering
Design of Bridges. Introduction. 3 rd to 4 th July 2012. Lecture for SPIN Training at the University of Dar es Salaam
Design of Bridges Introduction 3 rd to 4 th July 2012 1 FUNCTION OF A BRIDGE To connect two communities which are separated by streams, river, valley, or gorge, etc. 2 EVOLUTION OF BRIDGES 1. Log Bridge
Analysis of the Response Under Live Loads of Two New Cable Stayed Bridges Built in Mexico
Analysis of the Response Under Live Loads of Two New Cable Stayed Bridges Built in Mexico Roberto Gómez, Raul Sánchez-García, J.A. Escobar and Luis M. Arenas-García Abstract In this paper we study the
How To Write An Analysis System For Bridge Test
Study of Analysis System for Bridge Test Chen Ke, Lu Jian-Ming, Research Institute of Highway, 100088, Beijing, China ([email protected], [email protected]) Summary Analysis System for Bridge Test (Chinese
EFFECTS ON NUMBER OF CABLES FOR MODAL ANALYSIS OF CABLE-STAYED BRIDGES
EFFECTS ON NUMBER OF CABLES FOR MODAL ANALYSIS OF CABLE-STAYED BRIDGES Yang-Cheng Wang Associate Professor & Chairman Department of Civil Engineering Chinese Military Academy Feng-Shan 83000,Taiwan Republic
Safe & Sound Bridge Terminology
Safe & Sound Bridge Terminology Abutment A retaining wall supporting the ends of a bridge, and, in general, retaining or supporting the approach embankment. Approach The part of the bridge that carries
KOSCIUSZKO BRIDGE PROJECT BRIDGE PRIMER
KOSCIUSZKO BRIDGE PROJECT BRIDGE PRIMER The New York State Department of Transportation (NYSDOT) is preparing an Environmental Impact Statement (EIS) to evaluate alternatives for the rehabilitation or
INTRODUCTION TO BEAMS
CHAPTER Structural Steel Design LRFD Method INTRODUCTION TO BEAMS Third Edition A. J. Clark School of Engineering Department of Civil and Environmental Engineering Part II Structural Steel Design and Analysis
LOAD TESTING OF SOME NEW BRIDGES IN LATVIA
LOAD TESTING OF SOME NEW BRIDGES IN LATVIA Edmunds Akimovs, Civ.Eng., Bridge Engineer, Consulting Company Inzenierbuve, Address: Azenes st. 20, Riga, LV1048, Latvia. E-mail: [email protected] Ainars
Weight Measurement Technology
Kistler-Morse (KM) introduced bolt-on weight measuring systems three decades ago. These devices featured Walter Kistler s invention, the Microcell. Over the years, many improvements were made to the Microcell
Brandangersundet Bridge A slender and light network arch
Brandangersundet Bridge A slender and light network arch Rolf Magne Larssen Dr. ing./ Ph.D. Dr. ing A. Aas-Jakobsen AS Oslo, Norway [email protected] Rolf Magne Larssen, born 1958, received his Ph.D. in structural
Truss. are both simple and A Matsuo Example continuous trusses. The
Girder Bridge A girder bridge is perhaps the most common and most basic bridge. A log across a creek is an example of a girder bridge in its simplest form. In modern steel girder bridges, the two most
COLUMN-FREE OFFICE SPACE RISES IN CHICAGO S LOOP
COLUMN-FREE OFFICE SPACE RISES IN CHICAGO S LOOP 30 x45 bay provides maximum tenant flexibility and increases leasing marketability By David E. Eckmann AIA, S.E. P.E. SURGING DEMANDS FOR RENTABLE OFFICE
National Council of Examiners for Engineering and Surveying. Principles and Practice of Engineering Structural Examination
Structural Effective Beginning with the April 2011 The structural engineering exam is a breadth and exam examination offered in two components on successive days. The 8-hour Vertical Forces (Gravity/Other)
4B-2. 2. The stiffness of the floor and roof diaphragms. 3. The relative flexural and shear stiffness of the shear walls and of connections.
Shear Walls Buildings that use shear walls as the lateral force-resisting system can be designed to provide a safe, serviceable, and economical solution for wind and earthquake resistance. Shear walls
REPAIR AND RETROFIT OF BRIDGES DAMAGED BY THE 2010 CHILE MAULE EARTHQUAKE
Proceedings of the International Symposium on Engineering Lessons Learned from the 2011 Great East Japan Earthquake, March 1-4, 2012, Tokyo, Japan REPAIR AND RETROFIT OF BRIDGES DAMAGED BY THE 2010 CHILE
After reading this lesson you will be able to: 12.3 IMPORTANCE OF ROOF 12.4 TYPES OF ROOF IN A HOUSE
86 :: Certificate in Construction Supervision (CIVIL) 12 ROOF 12.1 INTRODUCTION The structure provided to cover the house surface (floor) is known as roof. For different situation and requirement, it is
Draft Table of Contents. Building Code Requirements for Structural Concrete and Commentary ACI 318-14
Draft Table of Contents Building Code Requirements for Structural Concrete and Commentary ACI 318-14 BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE (ACI 318 14) Chapter 1 General 1.1 Scope of ACI 318
(1) Minami Nagamachi and Naka Nagamachi viaducts between Shiraishi Zao and Sendai Stations on the Tohoku Shinkansen line
Report by the First Joint Survey Team of the JSCE Concrete and Structural Engineering Committees on the damage caused by the Great East Japan Earthquake April 5, 2011 (First Report) 1. Survey team members
Overhang Bracket Loading. Deck Issues: Design Perspective
Deck Issues: Design Perspective Overhang Bracket Loading Deck overhangs and screed rails are generally supported on cantilever brackets during the deck pour These brackets produce an overturning couple
APPENDIX H DESIGN CRITERIA FOR NCHRP 12-79 PROJECT NEW BRIDGE DESIGNS
APPENDIX H DESIGN CRITERIA FOR NCHRP 12-79 PROJECT NEW BRIDGE DESIGNS This appendix summarizes the criteria applied for the design of new hypothetical bridges considered in NCHRP 12-79 s Task 7 parametric
REPAIR AND STRENGTHENING OF HISTORICAL CONCRETE BRIDGE OVER VENTA RIVER IN LATVIA
1 REPAIR AND STRENGTHENING OF HISTORICAL CONCRETE BRIDGE OVER VENTA RIVER IN LATVIA Verners Straupe, M.sc.eng., Rudolfs Gruberts, dipl. eng. JS Celuprojekts, Murjanu St. 7a, Riga, LV 1024, Latvia e-mail:
REHABILITATION OF THE FIGUEIRA DA FOZ BRIDGE
REHABILITATION OF THE FIGUEIRA DA FOZ BRIDGE A.Rito Proponte, Lda, Lisbon, Portugal J. Appleton A2P Consult, Lda, Lisbon, Portugal ABSTRACT: The Figueira da Foz Bridge includes a 405 m long cable stayed
INSTALLATION. General. Important Note. Design. Transport
General The roof trusses you are about to install have been manufactured to precise engineering standards. To ensure that the trusses perform as designed, it is essential that they be handled, erected
Joist. Reinforcement. Draft 12/7/02
Joist Reinforcement Draft 12/7/02 1 JOIST REINFORCING The purpose of this CSD Design Aid is to provide procedures and suggested details for the reinforcement of open web steel joists. There are three basic
Materials. Estimating Steel. Players. Materials. Shop Drawings. Detailing Process. Standard shapes. Fabricated members, Built-up sections
Materials Standard shapes W sections, C channels, Structural T, Angles, Pipes, Tubes, Rods and Plates Fabricated members, Built-up sections Adding plates to beam flanges, Stiffeners to beam webs Built
METHOD OF STATEMENT FOR STATIC LOADING TEST
Compression Test, METHOD OF STATEMENT FOR STATIC LOADING TEST Tension Test and Lateral Test According to the American Standards ASTM D1143 07, ASTM D3689 07, ASTM D3966 07 and Euro Codes EC7 Table of Contents
Seismic Isolation Retrofitting of Japanese Wooden Buildings
Seismic Isolation Retrofitting of Japanese Wooden Buildings Summary Junko Suga Building Design Department Takenaka Corporation, Osaka Main Office Osaka, Japan Hiroyuki Ueda Building Design Department Takenaka
Field Damage Inspection and Static Load Test Analysis of Jiamusi Highway Prestressed Concrete Bridge in China
Advanced Materials Research Vols. 163-167 (2011) pp 1147-1156 Online available since 2010/Dec/06 at www.scientific.net (2011) Trans Tech Publications, Switzerland doi:10.4028/www.scientific.net/amr.163-167.1147
DESIGN OF SLABS. 3) Based on support or boundary condition: Simply supported, Cantilever slab,
DESIGN OF SLABS Dr. G. P. Chandradhara Professor of Civil Engineering S. J. College of Engineering Mysore 1. GENERAL A slab is a flat two dimensional planar structural element having thickness small compared
New Troja Bridge in Prague Concept and Structural Analysis of Steel Parts
Available online at www.sciencedirect.com Procedia Engineering 00 (2012) 000 000 www.elsevier.com/locate/procedia Steel Structures and Bridges 2012 New Troja Bridge in Prague Concept and Structural Analysis
Detailing of Reinforcment in Concrete Structures
Chapter 8 Detailing of Reinforcment in Concrete Structures 8.1 Scope Provisions of Sec. 8.1 and 8.2 of Chapter 8 shall apply for detailing of reinforcement in reinforced concrete members, in general. For
INTRODUCTION TO LIMIT STATES
4 INTRODUCTION TO LIMIT STATES 1.0 INTRODUCTION A Civil Engineering Designer has to ensure that the structures and facilities he designs are (i) fit for their purpose (ii) safe and (iii) economical and
2015 ODOT Bridge Design Conference May 12, 2014. DeJong Rd Bridge High- Seismic Zone Case Study: Bridge Rehab vs. Replacement.
2015 ODOT Bridge Design Conference May 12, 2014 DeJong Rd Bridge High- Seismic Zone Case Study: Bridge Rehab vs. Replacement Mary Ann Triska 2015 HDR, all rights reserved. Presentation Outline Project
The Rehabilitation Alternative Huey P. Long Bridge Case Study. Bruce E. Peterson, P.E. Project Manager Modjeski and Masters, Inc.
The Rehabilitation Alternative Huey P. Long Bridge Case Study Bruce E. Peterson, P.E. Project Manager Modjeski and Masters, Inc. March 22, 2010 Replacement vs. Rehabilitation Project Background Introduction
SEISMIC DESIGN. Various building codes consider the following categories for the analysis and design for earthquake loading:
SEISMIC DESIGN Various building codes consider the following categories for the analysis and design for earthquake loading: 1. Seismic Performance Category (SPC), varies from A to E, depending on how the
REHABILITATION PACKAGE 1-a
1-a WINONA BRIDGE (BRIDGE 5900) REHABILITATION PACKAGE 1-a Rehab option 1-a is a rehabilitation package whereby all spans of the existing structure would be rehabilitated to the degree feasible and strengthened
Engineering for Stability in Bridge Construction: A New Manual and Training Course by FHWA/NHI
Engineering for Stability in Bridge Construction: A New Manual and Training Course by FHWA/NHI AASHTO SCOBS T-14 Meeting Saratoga Springs, NY April 20, 2015 Brian Kozy, PhD, P.E. Federal Highway Administration
SEISMIC RETROFITTING OF STRUCTURES
SEISMIC RETROFITTING OF STRUCTURES RANJITH DISSANAYAKE DEPT. OF CIVIL ENGINEERING, FACULTY OF ENGINEERING, UNIVERSITY OF PERADENIYA, SRI LANKA ABSTRACT Many existing reinforced concrete structures in present
TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE
TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE TECHNICAL SPECIFICATION PART 8000 - PRECAST CONCRETE TABLE OF CONTENTS Item Number Page 8100 PRECAST CONCRETE CONSTRUCTION - GENERAL 8-3 8101 General
NUMERICAL ANALYSIS OF A HORIZONTALLY CURVED BRIDGE MODEL
10NCEE Tenth U.S. National Conference on Earthquake Engineering Frontiers of Earthquake Engineering July 21-25, 2014 Anchorage, Alaska NUMERICAL ANALYSIS OF A HORIZONTALLY CURVED BRIDGE MODEL K. Kinoshita
Analysis and Repair of an Earthquake-Damaged High-rise Building in Santiago, Chile
Analysis and Repair of an Earthquake-Damaged High-rise Building in Santiago, Chile J. Sherstobitoff Ausenco Sandwell, Vancouver, Canada P. Cajiao AMEC, Vancouver, Canada P. Adebar University of British
Quality Control and Quality Assurance Guide
Quality Control and Quality Assurance Guide Bridge Division, Design Section October 2013 Table of Contents Chapter 1 About this Guide... 3 Chapter 2 Goals and Objectives... 5 Chapter 3 Participants...
Technical Analysis and High-End Structural Design
Capability Statement (Infrastructure & Buildings) Services ABES provides design and sub-consulting services in Australia and internationally. We are able to provide our services in a wide range of applications
SEISMIC DESIGN OF HIGHWAY BRIDGES
Journal of Japan Association for Earthquake Engineering, Vol.4, No.3 (Special Issue), 2004 SEISMIC DESIGN OF HIGHWAY BRIDGES Kazuhiko KAWASHIMA 1 and Shigeki UNJOH 2 1 Member of JAEE, Professor, Department
DISTRIBUTION OF LOADSON PILE GROUPS
C H A P T E R 7 DISTRIBUTION OF LOADSON PILE GROUPS Section I. DESIGN LOADS 7-1. Basic design. The load carried by an individual pile or group of piles in a foundation depends upon the structure concerned
Statics of Structural Supports
Statics of Structural Supports TYPES OF FORCES External Forces actions of other bodies on the structure under consideration. Internal Forces forces and couples exerted on a member or portion of the structure
High Strain Dynamic Load Testing of Drilled Shafts
Supplemental Technical Specification for High Strain Dynamic Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (9/15) September 3, 2015 1.0 GENERAL This work shall consist of performing high-strain
SEISMIC UPGRADE OF OAK STREET BRIDGE WITH GFRP
13 th World Conference on Earthquake Engineering Vancouver, B.C., Canada August 1-6, 2004 Paper No. 3279 SEISMIC UPGRADE OF OAK STREET BRIDGE WITH GFRP Yuming DING 1, Bruce HAMERSLEY 2 SUMMARY Vancouver
Chaudière Crossing Bridge Rehabilitation
Chaudière Crossing Bridge Rehabilitation Douglas K. Lowry P. Eng., Armtec Infrastructure Incorporated David Delicate, P.Eng. Public Works and Government Services Canada (Retired) Prepared for presentation
3.1 Historical Considerations
3. Recommended Scope of Bridge improvements 3.1 Historical Considerations In the fall of 2000, an outside consultant, Fraser Design, suggested that the existing 4 th St. Bridge is potentially eligible
FORM DESIGN. easy to work with, and generally available.
Forms play a major role in concrete construction. They give the plastic concrete its shape and hold it until it hardens. Forms protect the concrete, assist in curing it, and support any reinforcing rods
Chapter 3 - Structural Design
Chapter 3 - Structural Design 3.0 General 3.0.1 Design Overview Greenhouse buildings are a complete structure including the structural support and enclosure elements. The primary structural system includes:
Numerical Analysis of the Moving Formwork Bracket Stress during Construction of a Curved Continuous Box Girder Bridge with Variable Width
Modern Applied Science; Vol. 9, No. 6; 2015 ISSN 1913-1844 E-ISSN 1913-1852 Published by Canadian Center of Science and Education Numerical Analysis of the Moving Formwork Bracket Stress during Construction
June 2007 CHAPTER 7 - CULVERTS 7.0 CHAPTER 7 - CULVERTS 7.1 GENERAL
7.0 7.1 GENERAL For the purpose of this manual, culverts are defined as structures that are completely surrounded by soil and located below the surface of the roadway parallel to the general direction
SEISMIC RETROFITTING TECHNIQUE USING CARBON FIBERS FOR REINFORCED CONCRETE BUILDINGS
Fracture Mechanics of Concrete Structures Proceedings FRAMCOS-3 AEDIFICA TIO Publishers, D-79104 Freiburg, Germany SEISMIC RETROFITTING TECHNIQUE USING CARBON FIBERS FOR REINFORCED CONCRETE BUILDINGS H.
DEVELOPMENT AND APPLICATIONS OF TUNED/HYBRID MASS DAMPERS USING MULTI-STAGE RUBBER BEARINGS FOR VIBRATION CONTROL OF STRUCTURES
13 th World Conference on Earthquake Engineering Vancouver, B.C., Canada August 1-6, 2004 Paper No. 2243 DEVELOPMENT AND APPLICATIONS OF TUNED/HYBRID MASS DAMPERS USING MULTI-STAGE RUBBER BEARINGS FOR
Precision Miniature Load Cell. Models 8431, 8432 with Overload Protection
w Technical Product Information Precision Miniature Load Cell with Overload Protection 1. Introduction The load cells in the model 8431 and 8432 series are primarily designed for the measurement of force
bi directional loading). Prototype ten story
NEESR SG: Behavior, Analysis and Design of Complex Wall Systems The laboratory testing presented here was conducted as part of a larger effort that employed laboratory testing and numerical simulation
1,045 m length of the Deh Cho Bridge
Innovative Design Features: Lightweight truss: The principles of lightweight design led to a saving of 25% in the use of structural steel. State of the art deck system: Designed as a four-way slab, it
Stress and deformation of offshore piles under structural and wave loading
Stress and deformation of offshore piles under structural and wave loading J. A. Eicher, H. Guan, and D. S. Jeng # School of Engineering, Griffith University, Gold Coast Campus, PMB 50 Gold Coast Mail
FOUNDATION DESIGN. Instructional Materials Complementing FEMA 451, Design Examples
FOUNDATION DESIGN Proportioning elements for: Transfer of seismic forces Strength and stiffness Shallow and deep foundations Elastic and plastic analysis Foundation Design 14-1 Load Path and Transfer to
Forensic engineering of a bored pile wall
NGM 2016 Reykjavik Proceedings of the 17 th Nordic Geotechnical Meeting Challenges in Nordic Geotechnic 25 th 28 th of May Forensic engineering of a bored pile wall Willem Robert de Bruin Geovita AS, Norway,
Design rules for bridges in Eurocode 3
Design rules for bridges in Eurocode 3 Gerhard Sedlacek Christian üller Survey of the Eurocodes EN 1991 EN 1990 Eurocode: Basis of Design EN 1992 to EN 1996 Eurocode 1: Actions on Structures Eurocode 2:
STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM
Chapter 9 STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM 9.1 BACKGROUND Steel is widely used in the construction of multi-storey buildings. However, steel construction is seldom used and is traditionally
6720616592.00-1.SD. Flat roof. Rack Mounting. Installation instructions 6 720 647 036 (2010/11) AU
6720616592.00-1.SD Flat roof Rack Mounting AU Installation instructions 2 Contents AU Contents 1 Key to symbols and safety instructions....... 3 1.1 Explanation of symbols................ 3 1.2 Safety
ARCH 331 Structural Glossary S2014abn. Structural Glossary
Structural Glossary Allowable strength: Nominal strength divided by the safety factor. Allowable stress: Allowable strength divided by the appropriate section property, such as section modulus or cross
What is Seismic Retrofitting?
What is Seismic Retrofitting? SEISMIC RETROFITTING A Seismic Retrofit provides existing structures with more resistance to seismic activity due to earthquakes. In buildings, this process typically includes
HORIZONTAL INSTALLATION
THERMO/SOLAR Žiar s.r.o. MANUAL FOR INSTALLATION PV SUPPORTING FRAMES HORIZONTAL INSTALLATION Technical alternation reserved A1410 1 12/2014 CONTENT ORD.NO. PAGE Mounting information 3 Mounting, flat roof
DESIGN OF BLAST RESISTANT BUILDINGS IN AN LNG PROCESSING PLANT
DESIGN OF BLAST RESISTANT BUILDINGS IN AN LNG PROCESSING PLANT Troy Oliver 1, Mark Rea 2 ABSTRACT: This paper provides an overview of the work undertaken in the design of multiple buildings for one of
ETABS. Integrated Building Design Software. Concrete Shear Wall Design Manual. Computers and Structures, Inc. Berkeley, California, USA
ETABS Integrated Building Design Software Concrete Shear Wall Design Manual Computers and Structures, Inc. Berkeley, California, USA Version 8 January 2002 Copyright The computer program ETABS and all
SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS
July 14, 2015 1.0 GENERAL BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS This work shall consist of furnishing all materials, equipment, labor, and incidentals necessary for conducting bi-directional
Bracing Webs in Trusses that have Dissimilar Configurations
Bracing Webs in Trusses that have Dissimilar Configurations Released April 25, 2006 Issue: Truss Design Drawings (TDD) that are prepared in accordance with ANSI/TPI 1, National Design Standard for Metal
Engineered Material Handling. Overhead Bridge Cranes and Gantry Cranes
TM Engineered Material Handling Overhead Bridge Overhead and Gantry Bridge Cranes and Gantry Cranes Custom Engineered Crane Systems Gantry Cranes EMH builds a complete range of gantry cranes including
The Collapse of Building 7 by Arthur Scheuerman December 8, 06
The Collapse of Building 7 by Arthur Scheuerman December 8, 06 WTC s Building 7 was a 47-story office building completed in 1987 by Silverstein Properties on land owned by the Port Authority. It was built
Optimising plate girder design
Optimising plate girder design NSCC29 R. Abspoel 1 1 Division of structural engineering, Delft University of Technology, Delft, The Netherlands ABSTRACT: In the design of steel plate girders a high degree
Bridging Your Innovations to Realities
Graphic User Interface Graphic User Interface Modeling Features Bridge Applications Segmental Bridges Cable Bridges Analysis Features Result Evaluation Design Features 02 07 13 17 28 34 43 48 2 User Interface
Performance-based Evaluation of the Seismic Response of Bridges with Foundations Designed to Uplift
Performance-based Evaluation of the Seismic Response of Bridges with Foundations Designed to Uplift Marios Panagiotou Assistant Professor, University of California, Berkeley Acknowledgments Pacific Earthquake
Steel joists and joist girders are
THE STEEL CONFERENCE Hints on Using Joists Efficiently By Tim Holtermann, S.E., P.E.; Drew Potts, P.E.; Bob Sellers, P.E.; and Walt Worthley, P.E. Proper coordination between structural engineers and joist
INCREASE OF DURABILITY AND LIFETIME OF EXISTING BRIDGES. PIARC TC 4.4 EXPERIENCE.
INCREASE OF DURABILITY AND LIFETIME OF EXISTING BRIDGES. PIARC TC 4.4 EXPERIENCE. M.Sc. Gediminas Viršilas Head of Bridge Division, Lithuanian Road Administration Working group 2 of PIARC Technical Committee
Property Inspection. 83A Ascot Avenue North New Brighton Christchurch STRUCTURAL REPORT
Property Inspection 83A Ascot Avenue North New Brighton Christchurch STRUCTURAL REPORT March 2013 This document has been prepared for the benefit of Clint Marston. No liability is accepted by this company
CHAPTER 9 LONG TERM MONITORING AT THE ROUTE 351 BRIDGE
CHAPTER 9 LONG TERM MONITORING AT THE ROUTE 351 BRIDGE 9.1 INTRODUCTION An important reason that composite piles have not gained wide acceptance in the civil engineering practice is the lack of a long
Reinforced Concrete Design
FALL 2013 C C Reinforced Concrete Design CIVL 4135 ii 1 Chapter 1. Introduction 1.1. Reading Assignment Chapter 1 Sections 1.1 through 1.8 of text. 1.2. Introduction In the design and analysis of reinforced
Virginia Approach Spans
Virginia Concrete Conference 2009 Woodrow Virginia Approach Spans David Tackoor, HNTB Formerly of URS Corp for Potomac Crossing Consultants Woodrow 1 Second Severn Crossing 2 Medway Crossing (Channel Tunnel
3. Observed Damage in Railway Viaducts
Structural Damage of Tohoku Shinkansen Viaducts by the Off the Pacific Tohoku Earthquake First Report on March 16, 2011 Dr. Yoshikazu Takahashi, Associate Professor Disaster Prevention Research Institute,
Quality and the Bridge Engineer
Quality and the Bridge Engineer Shane R. Beabes, P.E. Rio-Antirio Bridge in Greece Joint ASHE / SEI General Meeting September 16, 2014 Introduction Agenda Quality Management System Client Requirements
Section A Roof Truss
Section A Roof Truss Truss Types Wisconsin Truss, Inc. can build a variety of truss types, pictured below are some common examples. Common Bobtail Scissor Mono Studio Dual Slope Cathedral Tray Vault Parallel
1997 Uniform Administrative Code Amendment for Earthen Material and Straw Bale Structures Tucson/Pima County, Arizona
for Earthen Material and Straw Bale Structures SECTION 70 - GENERAL "APPENDIX CHAPTER 7 - EARTHEN MATERIAL STRUCTURES 70. Purpose. The purpose of this chapter is to establish minimum standards of safety
Page & Turnbull imagining change in historic environments through design, research, and technology
DCI+SDE STRUCTURAL EVALUATIONS OFFICE BUILDING, TOOL SHED & WATER TANK, AND BLACKSMITH & MACHINE SHOP BUILDINGS SAN FRANCISCO, CALIFORNIA [14290] PRIMARY PROJECT CONTACT: H. Ruth Todd, FAIA, AICP, LEED
2.0 External and Internal Forces act on structures
2.0 External and Internal Forces act on structures 2.1 Measuring Forces A force is a push or pull that tends to cause an object to change its movement or shape. Magnitude, Direction, and Location The actual
STEEL BUILDINGS IN EUROPE. Single-Storey Steel Buildings Part 5: Detailed Design of Trusses
STEEL BUILDIGS I EUROPE Single-Storey Steel Buildings Part 5: Detailed Design of Trusses Single-Storey Steel Buildings Part 5: Detailed Design of Trusses 5 - ii Part 5: Detailed Design of Trusses FOREWORD
6 RETROFITTING POST & PIER HOUSES
Retrofitting Post & Pier Houses 71 6 RETROFITTING POST & PIER HOUSES by James E. Russell, P.E. 72 Retrofitting Post & Pier Houses Retrofitting Post & Pier Houses 73 RETROFITTING POST AND PIER HOUSES This
A COMPUTER ANALYSIS OF THE VINCENT THOMAS SUSPENSION BRIDGE
A COMPUTER ANALYSIS OF THE VINCENT THOMAS SUSPENSION BRIDGE 81 Raymond W. Wolfe Hany J. Farran A COMPUTER ANALYSIS OF THE VINCENT THOMAS SUSPENSION BRIDGE Civil Engineering Civil Engineering Given the
GMC 2013: Piping Misalignment and Vibration Related Fatigue Failures
GMC 2013: Piping Misalignment and Vibration Related Fatigue Failures www.betamachinery.com Authors/Presenters: Gary Maxwell, General Manager, BETA Machinery Analysis Brian Howes, Chief Engineer, BETA Machinery
Introduction to Beam. Area Moments of Inertia, Deflection, and Volumes of Beams
Introduction to Beam Theory Area Moments of Inertia, Deflection, and Volumes of Beams Horizontal structural member used to support horizontal loads such as floors, roofs, and decks. Types of beam loads