1 Botswana International University of Science & Technology (BIUST) Public Private Partnership 11 September 2009
2 BIUST Project Concept & Components Government has established a second national university, with a science and technology focus, to improve national skills levels in areas of science & technology, thereby contributing to economic growth and development Vision is a national, regional and international centre of excellence for the delivery of science and technology education to a diverse range of students from many countries. Business incubator and research park linked to new university. 2
3 BIUST Project Concept & Components BIUST development has 3 components: Founding Development; Academic Services; The PPP project for the main campus. 3
4 Founding Development The seed campus for BIUST (academic & campus physical facilities) Financed by Government under a public works contract. 256 FTE students (overall built area of ±19,700sqm). The university will open its doors March Government will operate and maintain this Founding Development until the remainder of the campus is completed through a PPP. Operation and maintenance of the physical facilities of the entire campus (including Founding Development) will then be undertaken by the PPP Operator. Greenfield site in Palapye, halfway between Gaborone and Francistown. 4
5 Academic Services Government will provide the full academic and related support services for BIUST, including: academic staff, university administration, classroom instruction, academic support services and governance, marketing and student t recruitment. t 5
6 PPP Project PPP Operator will design, construct, finance, maintain and operate the new physical facilities for the University. 6,000 FTE students plus associated staff (overall built area of ±200,000sqm). A new, purpose built campus consisting of the physical facilities for: academic library and learning centres administration i i services infrastructure housing and related facilities (such as sports, cultural, retail, religious and other services necessary for an academic campus). Full operation and maintenance of the buildings and facilities on the Site including: facilities management services; hard maintenance preventative and reactive maintenance and utilities management; and, soft services such as cleaning, landscaping, security, parking. 6
7 Excluded from the Project scope: PPP project The University s moveable assets (such as furniture, equipment, library books, vehicles) Academic programmes Academic administrative and support services Project term of 20 years as a PPP. 100% private financing expected by GoB. Private operator compensation: fixed annual Unitary Payment made by the GoB, based on availability and quality of services. The Operator required to assume substantial project risk (design, construction, financing, operation, maintenance, etc). Output specifications: architectural, space requirements and performance standards for facilities. Penalty mechanism. 7
8 BIUST PPP Project to date 1. Inception Report: Including preliminary information and observations 2. Phase 1A: PPP Options: Needs Assessment, Concept Plan and high-level PPP Options Analysis 3. Phase 1B: Master Plan and Feasibility Study: Public Sector Comparator Model, PPP Reference Model and Value for Money Analysis Master Plan (academic master plan and indicative campus development master plan) Legal due diligence Procurement Plan 4. Cabinet approval of PPP procurement of BIUST campus infrastructure 5. PPP Procurement to date Investors Conference in Gaborone RFQ issued Four pre-qualified bidders announced June 2009 Bid award
9 Contact Information Infrastructure Advisory Services Sub-Saharan Africa 14 Fricker Road Illovo 2196 Johannesburg South Africa Tel: (27-11) Fax: (27-11) Headquarters 2121 Pennsylvania Avenue, N.W. Washington, D.C USA Tel: (202) Fax: (202) Carla Faustino Coelho Investment Officer Telephone: (27) Bayo Oyewole Sr. Program Officer Telephone: (1) Emmanuel Nyirinkindi Manager Sub-Saharan Africa Telephone: (27)
Innovation in Private Higher Education: the Botswana International University of Science and Technology
Innovation in Private Higher Education: the Botswana International University of Science and Technology Prof David Wilmoth, Director, Learning Cities International 1 IFC International Investment Forum
Consolidated I&T Data Centre - P3 Canada Fund
STAFF REPORT ACTION REQUIRED Consolidated I&T Data Centre - P3 Canada Fund Date: January 16, 2012 To: From: Wards: Reference Number: Government Management Committee Deputy City Manager & Chief Financial
University of Botswana An academic centre of excellence
University of Botswana An academic centre of excellence African Context 2 Regional Context 3 Gaborone Context Sir Seretse Khama International Airport UB 4 UB Aerial Photograph 5 Origins of UB 6 Vision
Life of a Project. Phase General Activities Specific Activities Notes Expected Time Frame
1.0 Inception 1.1 Project Request from Client / User 1.2 Assignment 1.3 1.4 1.5 1.6 1.7 1.8 Preliminary Project Charter Submit Project Charter to Obtain internal project number Initial Project Authorization
EEP Knowledge Exchange Forum
EEP Knowledge Exchange Forum Dar es Salaam, 3 rd December 2015 Renewable Energy and Energy Efficiency Architecture in the advent of Regional RE/EE Centres in Africa: SACREEE, EACREEE and ECREEE 1 Global
Design quality and the private finance initiative
Design quality and the private finance initiative This paper sets out CABE s perspective on the ability of the private finance initiative (PFI) to deliver well-designed public buildings, and considers
Opportunities for Small Businesses. Presented by Christina Kite, Senior VP, Corporate Group Strategy & Operations
Opportunities for Small Businesses Presented by Christina Kite, Senior VP, Corporate Group Strategy & Operations April 30,2013 Our Commitment to Puerto Rico At the Federal Reserve Bank of New York ( the
FOR USE WITH PPP PROJECTS 1 SAMPLE GUIDELINES FOR PRE-QUALIFICATION AND COMPETITIVE BIDDING PROCESS 2
FOR USE WITH PPP PROJECTS 1 SAMPLE GUIDELINES FOR PRE-QUALIFICATION AND COMPETITIVE BIDDING PROCESS 2 1. PRE-QUALIFICATION 1.1 The requirements for pre-qualifications will be reasonable and efficient and
1. Evolution of infrastructure procurement in NSW. 2. Market consultation and outcomes. 3. Response and implementation. 4. Project Deed Evolution
Reducing Bid Costs for Outcome-Based Procurements in NSW Infrastructure and Structured Finance Unit: Partnering to Create Partnerships December 2015 1. Evolution of infrastructure procurement in NSW 2.
PPP Basics and Principles of a PPP Framework
Note 1 May 2012 PPP Basics and Principles of a PPP Framework This note is the first in a series of notes on developing a comprehensive policy, legal, and institution framework for public-private partnership
Estates and Facilities Management. Director of Estates and Facilities Management. Professional Services Job Level 7. Chief Financial Officer
Post Details Last Updated: 19/05/2015 Faculty/Administrative/Service Department Estates and Facilities Management Job Title Job Family Responsible to Responsible for (Staff) Director of Estates and Facilities
PROJECT PREPARATORY TECHNICAL ASSISTANCE
A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The Government of Azerbaijan, the Ministry of Transport and Baku Metro Company requested ADB to help improving its urban transport system and
Consultancy opportunities with IFC. Stefan Roos Sr Procurement Officer, Team Lead IFC Procurement Coordination Unit Dublin, June 19, 2012
Consultancy opportunities with IFC Stefan Roos Sr Procurement Officer, Team Lead IFC Procurement Coordination Unit Dublin, June 19, 2012 Importance of Partnerships to our Work IFC s partners include a
AUDIT & PERFORMANCE REVIEW COMMITTEE ON 26 TH SEPTEMBER 2007
PAGE: 1 REPORT TO: SUBJECT: BY: AUDIT & PERFORMANCE REVIEW COMMITTEE ON 26 TH SEPTEMBER 2007 ASSET MANAGEMENT CHIEF FINANCIAL OFFICER 1. REASON FOR REPORT 1.1 To provide the Audit and Performance Review
Preliminary Draft JOB DESCRIPTIONS AND QUALIFICATIONS OF KEY PERSONNEL. XXXXX PPP Unit
Preliminary Draft JOB DESCRIPTIONS AND QUALIFICATIONS OF KEY PERSONNEL XXXXX PPP Unit Chief Executive Officer Job Description: The CEO is tasked with the establishment of a PPP Unit for the Government
Among other things, completion of the project will allow expansion at the campus to include 6 th -8 th graders and serve over 1,000 students.
1003 K Street NW Suite 700 Washington, DC 20001 202.223.4505 phone 202.223.4504 fax www.kippdc.org May 2, 2014 REQUEST FOR PROPOSAL ( RFP ) FOR CONSTRUCTION MANAGEMENT SERVICES FOR AN EXPANSION PROJECT
Questions and Answers
Questions and Answers 1. Can pictures be inserted in the Request for Qualifications package? Do they count toward the number of pages submitted? A. Yes, you can insert photos as long as the total page
REQUEST FOR QUOTATION (RFQ) FOR RENTING WAREHOUSE FOR GLOBAL FUND UNIT- MALARIA PROGRAMME
SUDAN REQUEST FOR QUOTATION (RFQ) FOR RENTING WAREHOUSE FOR GLOBAL FUND UNIT- MALARIA PROGRAMME Date: 7 th September 2009 REFERENCE:RFQ/KRT/GF/10/09 Dear Sir / Madam: You are kindly requested to submit
SAMPLE TERMS OF REFERENCE FOR ELECTRICITY SECTOR PRIVATIZATION TRANSACTION ADVISORY SERVICES
SAMPLE TERMS OF REFERENCE FOR ELECTRICITY SECTOR PRIVATIZATION TRANSACTION ADVISORY SERVICES Table of Contents 1st. INTRODUCTION... 3 2nd. ELECTRICITY SECTOR BACKGROUND. 4 3rd. SCOPE OF WORK. 6 PHASE :
The Inkosi Albert Luthuli Hospital. Cairo, May 25 26, 2008
The South Africa PPP Program The Inkosi Albert Luthuli Hospital Transaction Cairo, May 25 26, 2008 1 USAID Support (1999-2005) to: Establish the PPP Unit (2000) Develop the policy/regulatory y framework
Request for Proposals (RFP) to Serve as Financial Advisor to the State Universities for Fiscal Year 2015
Only firms which have been prequalified by the Office of Financial Management for Fiscal Year 2014 and Fiscal Year 2015 to provide financial advisory services to the State Universities may submit a response
SUBJECT: SOFT FM SERVICES
Lanarkshire NHS Board March 25th 2015 Lanarkshire NHS Board Kirklands Fallside Road Bothwell G71 8BB Telephone: 01698 855500 www.nhslanarkshire.org.uk SUBJECT: SOFT FM SERVICES 1. PURPOSE This paper is
Case Study Royal Children s Hospital
Philippine-Australia PPP Policy Dialogue Case Study Royal Children s Hospital Tony Lubofsky Project Director Victorian Comprehensive Cancer Centre RCH Project Scope Construction
INDIVIDUAL CONSULTANCY
INDIVIDUAL CONSULTANCY ARCHITECTURAL CONSULTANT SERVICE TO DEVELOP A CONCEPT DESIGN AND UPDATE THE BUILDING SPECIFICATIONS FOR THE ONE UN HOUSE IN RWANDA TERMS OF REFERENCE 1. Background and Project Description
PREQUALIFICATION DOCUMENT FOR CONSULTANTS FOR CIVIL WORKS. (Ref No. Secy/PPC/CVL/01)
PREQUALIFICATION DOCUMENT FOR CONSULTANTS FOR CIVIL WORKS (Ref No. Secy/PPC/CVL/01) Inland Water Transport Development Company (IWTDC) No. 34-A, Street 27, Valley Road, Westridge, Rawalpindi Ph # 051-5491494-95,
Investors G u i d e 201 0 1 Investors Guide 2011
2011 Investors 2011 Guide 1. 2. 3. 01 Investors Guide 2011 1 2 5 3 4 6 Investors Guide 2011 02 03 Investors Guide 2011 1 2 3 4 5 Investors Guide 2011 04 1 2 2 2 05 Investors Guide 2011 3 3 3 4 5 5 5 Investors
Ministry Of Health Registration of Interest
Ministry Of Health Registration of Interest Intermediaries Social Bond Pilot(s) Part 1 Instructions and Supporting Information What s inside? Introduction to Social Bonds Purpose of the ROI Instructions
Opportunities in Private Healthcare in the GCC Presented by: Ralph Foster II
Opportunities in Private Healthcare in the GCC Presented by: Ralph Foster II AHMC PROFILE AHMC is a private US company headquartered in Washington D.C. focused on the development and management of world-class
Development and Administration of Self- Supporting Degree Programs at Public Institutions
UNIVERSITY BUSINESS EXECUTIVE ROUNDTABLE Development and Administration of Self- Supporting Degree Programs at Public Institutions Custom Research Brief TABLE OF CONTENTS RESEARCH ASSOCIATE Joe LeMaster
ETHICS ADVISORY OPINION 2008-02. Ethical Cross-Selling of Other Financial and Insurance Products and Services April 21, 2008
1400 16 th Street, NW Suite 420 Washington, DC 20036 Tel. 202.939.1760 Fax. 202.265.4435 www.nrmlaonline.org ETHICS ADVISORY OPINION 2008-02 Ethical Cross-Selling of Other Financial and Insurance Products
GREENFIELD MIDDLE SCHOOL ROOF PROJECT
CITY OF GREENFIELD GREENFIELD, MASSACHUSETTS RFQ TITLE: GREENFIELD MIDDLE SCHOOL ROOF PROJECT RFQ #: 12-03 Date of Issuance: June 22, 2011 9:00 a.m. Deadline for Receipt Of Bids: July 8, 2011 2:00 p.m.
May 7, 2014. Board of Trustees University of the District of Columbia 4200 Connecticut Avenue N.W. Washington, D.C. 20008.
James E. Lyons, Sr. Interim President May 7, 2014 Board of Trustees University of the District of Columbia 4200 Connecticut Avenue N.W. Washington, D.C. 20008 Dear Trustee: For your consideration, I am
August 2011. Energy Saving Trust contact: Paul Hegarty Local Delivery Manager [email protected] 0794456807
Community Support to Deploying Renewable Energy Projects in the Liverpool City Region Joining up community support outputs and energy infrastructure project mapping August 2011 Energy Saving Trust contact:
You & Your Architect A GUIDE FOR A SUCCESSFUL PARTNERSHIP.
A GUIDE FOR A SUCCESSFUL PARTNERSHIP. YOU AND YOUR ARCHITECT Architecture isn t only for museums, corporations, and the very wealthy. Whether you are remodeling a kitchen, creating your dream home, or
Highlands and Islands Broadband Pathfinder Project - Background
ITEM: 22(a) PAGE: 1 REPORT TO: The Moray Council on 5 July, 2006 SUBJECT: BY: Highlands and Islands Broadband Pathfinder Project - Background Chief Executive 1. Reason for Report 1.1 The Pathfinder Broadband
8.OFFER DUE DATE: 2:00pm September 18, 2008 12. PAYMENT DISCOUNT TERMS
TASK ORDER UNDER GENERAL SERVICES ADMINISTRATION (GSA) FEDERAL SUPPLY SCHEDULE CONTRACT 1.REQUISITION NUMBER PAGE 1 OF 19 2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 7. FOR SOLICITATION INFORMATION CONTACT:
APIMS INTEGRATED INFRASTRUCTURE MANAGEMENT SERVICES
APIMS INTEGRATED INFRASTRUCTURE MANAGEMENT SERVICES One of the fastest growing economy Critical Infrastructure Development 50% 50% Public Sector Private Sector The seed of APIMS was planted For the growth
CITY OF KALAMA REQUEST FOR QUALIFICATIONS ARCHITECTURAL SERVICES. Proposal Due Date: April 13, 2016
CITY OF KALAMA REQUEST FOR QUALIFICATIONS ARCHITECTURAL SERVICES Proposal Due Date: April 13, 2016 The City of Kalama (CITY) invites proposals for the services of a registered architect and their team
(2) That the contract runs from 1 April 2015 for an initial period of seven years. The value of the contract will be in the order of 10m per annum.
Cabinet Member for Corporate Relations Redesign of Facilities Management Services April 2014 Report by Director Service Operations and Principal Manager Facilities Management Ref No: CR02(14/15) Key Decision:
business IT BSG Track Record Business Analysis www.bsgdelivers.com // @bsguk Version 1.1
business IT BSG Track Record Business Analysis www.bsgdelivers.com // @bsguk Version 1.1 1 Briefly BSG BSG (UK) is a niche business analysis consultancy. We bring deep technical and domain expertise to
1. The transfer of the service vehicle fleet and pool car fleet management to the County Council from 1 July 2013.
Cabinet Member for Finance and Resources and Cabinet Member for Highways and Transport Ref No. HT11(12/13) Service Vehicles Procurement Strategy November 2012 Report by Director of Business Change Key
Bath and North East Somerset Council - Resources Directorate Plan 2016/17 to 2019/20
Bath and North East Somerset Council - Resources Directorate Plan 2016/17 to 2019/20 Introduction This plan sets out the future direction of the Resources Directorate over the next 3 years. Legal & Democratic
GOVERNMENT SCHOOLS OPERATIONAL BUDGETS POLICY (June 2010)
GOVERNMENT SCHOOLS OPERATIONAL BUDGETS POLICY (June 2010) POLICY STATEMENT The Ministry of Education will allocate to each government school and private school on Rarotonga and Outer Islands, an equitable
Vermont Energy Investment Corporation (VEIC), a nonprofit organization, requests proposals for Website Content Strategy for Efficiency Vermont.
Notice Type: Request for Proposal Short Title: Website Content Strategy for Efficiency Vermont Posted date: 7/18/ 2014 E-mail response date: 7/28/2014 Decision: 7/30/2014 Introduction Vermont Energy Investment
JOINT PRESS RELEASE. ERA and GET FiT announce the first 20 MW of Solar Photovoltaic (PV) projects to be developed in Uganda
ERA and GET FiT announce the first 20 MW of Solar Photovoltaic (PV) projects to be developed in Uganda Kampala, December 10, 2014 18:00 The Electricity Regulatory Authority (ERA) in cooperation with GET
STRATEGIC PLAN. Responsible Regulation in a Dynamic Environment
STRATEGIC PLAN Responsible Regulation in a Dynamic Environment Vision Framework MFDA Members and their Approved Persons provide the most accessible advice-driven distribution model to retail investors
Westside Trail Open House January 14, 2014 Frequently Asked Questions
Westside Trail Open House January 14, 2014 Frequently Asked Questions 1. How is the project funded? It is funded by the Atlanta BeltLine Tax Allocation District, philanthropic donations, exiting federal
COUNTY OF UNION, NEW JERSEY
CITY OF ELIZABETH COUNTY OF UNION, NEW JERSEY REQUEST FOR QUALIFICATIONS FINANCIAL ADVISORARY SERVICES Contract Term 2017 State Fiscal Year (Ending June 30, 2017) SUBMISSION DEADLINE 11:00 A.M. MAY 12,
Department of Small and Local Business Development DSLBD (EN)
DSLBD (EN) MISSION The mission of the (DSLBD) is to foster the economic growth, development and retention of District based businesses. SUMMARY OF SERVICES The provides assistance and services to Districtbased
Director, Digital Strategy & Technology Integration
Carnegie Library of Pittsburgh Director, Digital Strategy & Technology Integration... www.carnegielibrary.org s Director, Digital Strategy & Technology Integration Carnegie Library of Pittsburgh (CLP)
Sub-Saharan Africa Transport Policy Program (SSATP) Output- and Performance-based Road Contracts (OPRC)
Sub-Saharan Africa Transport Policy Program (SSATP) Work in Progress and New Developments in RMF Output- and Performance-based Road Contracts (OPRC) (Based on presentations by Schliessler/Gericke WB) Olav
PROJECT FINANCE & PPPs
PROJECT FINANCE & PPPs EIB Presentation, BOAD, 40 th Anniversary 1 14 November 2013 Definition of PPPs 1) An agreement between a government and one or more private partners whereby the private partner(s)
Services provided by the Horwath Network
Advisory Services Services provided by the Horwath Network Assurance and Corporate Services Audit Client Accounting Secretarial Tax Compliance Property Administration Corporate Finance Software Solutions
AfDB New Procurement Policy: Training Program for the Bank s Procurement Staff
11 AfDB New Procurement Policy: Training Program for the Bank s Procurement Staff Competitive Negotiations and Competitive Dialogue (overview based on OPM) Dialogue 2 Involve simultaneous negotiation (dialogue)
R&D Strategy and Product & Service Development Consulting Marketplace 2009-2012. KENNEDY Consulting Research & Advisory
New from Kennedy Consulting Research & Advisory R&D Strategy and Product & Service Development Consulting Marketplace 2009-2012 Key Trends, Profiles and Forecasts Part of the Management Consulting Research
Developing a Public-Private Partnership Framework: Policies and PPP Units
Note 4 May 2012 Developing a Public-Private Partnership Framework: Policies and PPP Units This note is the fourth in a series of notes on developing a comprehensive policy, legal, and institution framework
THE PRIVATE INFRASTRUCTURE DEVELOPMENT GROUP TECHNICAL ASSISTANCE FACILITY STATEMENT OF POLICIES AND PROCEDURES. Amended July 2008
THE PRIVATE INFRASTRUCTURE DEVELOPMENT GROUP TECHNICAL ASSISTANCE FACILITY STATEMENT OF POLICIES AND PROCEDURES Amended July 2008 1. Introduction 1.1 By an exchange of letters dated December 2001 and January
Alberta Schools Alternative Procurement (ASAP) Projects. Public School Construction Program September 19, 2011 Baltimore, USA
Alberta Schools Alternative Procurement (ASAP) Projects Public School Construction Program September 19, 2011 Baltimore, USA Presentation Outline P3 s in Alberta - An Overview Alberta Schools (ASAP) Projects
Administration Procedure
Administration Procedure Complete Procedure Title: Procedures related to Tracking, Loss, Damage and Disposition of University Assets Approved by: Assistant Vice President Administration and CFO Date of
PUBLIC PRIVATE PARTNERSHIP HANDBOOK
PUBLIC PRIVATE PARTNERSHIP HANDBOOK VERSION 2 March 2012 1 CONTENTS Section 1: Introduction to Public Private Partnerships... 3 1.1 What is Public Private Partnership?... 4 1.2 Typical PPP Delivery Models...
NEPAD PLANNING AND COORDINATING AGENCY
NEPAD PLANNING AND COORDINATING AGENCY PROCUREMENT NOTICE ADVERTISEMENT Country: NEPAD Agency based in Midrand, South Africa Description of the assignment: Development of a continental information management
ENGAGING A LANDSCAPE CONSULTANT GUIDANCE FOR CLIENTS ON FEES SEPTEMBER 2002
ENGAGING A LANDSCAPE CONSULTANT GUIDANCE FOR CLIENTS ON FEES SEPTEMBER 2002 The Landscape Institute 33 Great Portland Street London W1W 8QG Tel: +44 (0)20 7299 4500 Fax: +44 (0)20 7299 4501 Email: [email protected]
The benefits of private equity investment
The benefits of private equity investment David Wilton, Chief Investment Officer, International Finance Corporation (IFC), looks at how private equity can be beneficial; the different investment strategies
The Competitive Dialogue:
The Competitive Dialogue: A powerful tool to procure Value for Money PPP Projects Respa Conference on PPPs 23&24 June 2014, Danilovgrad, Montenegro Today s presentation Introduction and background What
Availability Payment Mechanisms For Transit Projects ADVISORY
Availability Payment Mechanisms For Transit Projects ADVISORY Agenda Availability Payments Overview Structure Financial Implications Case Study Additional Considerations KPMG Infrastructure 2 What is an
PUBLIC PRIVATE PARTNERSHIP (PPP) IN HARYANA
PUBLIC PRIVATE PARTNERSHIP (PPP) IN HARYANA 1. INTRODUCTION 1.1 Government of Haryana (GoH) recognizes that a partnership approach under Public Private Partnership (PPP) should be one of the tools to deliver
H107 Video Conference Room
Capacity: 20 persons White Board (1) Document Camera (1) Door (1) Network connections possible Layout: Seminar style with chairs and tables (moveable) Podium (1) Media Cart (1) Windows (4) Meets all ADA
10/30/2015. Procurement Under the New Requirements. Why This Session Is Needed. Lesson Overview & Module Objectives. Changes to conflict of interest
Requirements Procurement under the New Requirements 1 1 Why This Session Is Needed New provisions in Uniform Guidance Changes to conflict of interest requirements in Uniform Guidance Distinctions between
Request for Qualifications (Design-Build Contract) State of Ohio Standard Forms and Documents
Request for Qualifications (Design-Build Contract) State of Ohio Standard Forms and Documents Administration of Project: Local Higher Education Project Name Campus Elevator Upgrades Response Deadline 9/03/13
No.Q/HCD/474/7/2011 Government of India Ministry of External Affairs Housing Complex-Dwarka. Tender Notice
No.Q/HCD/474/7/2011 Government of India Ministry of External Affairs Housing Complex-Dwarka Tender Notice New Delhi, 16 th December 2015 Subject: Invitation for competitive tender for providing garden
Records Information Management System Development and Implementation
ENQUIRIES: SUPPLY CHAIN MANAGEMENT UNIT TEL NO. : + 27 (0)11 830 2200 FAX NO. : + 27 (0)11 830 2201 EMAIL : [email protected] WEBSITE : www.mgslg.co.za 40 Hull Street, Cnr. 8th Street and Hull Streets
ASEAN Bilateral Program 2012
ASEAN Bilateral Program 2012 Presentation on PPP Financial Structures 30 October 2012 Contents Introduction Our PPP Experience Key Elements of a PPP Project Risk Allocation The Payment Mechanism Financing
ANNUAL QUALIFIED MORTGAGE INFORMATION
JULY 15, 2010 SPECIAL EDITION H A W K I N S A D V I S O R Y HAWKINS DELAFIELD & WOOD LLP ANNUAL QUALIFIED MORTGAGE INFORMATION Please allow this to serve as a reminder, if necessary, that the Qualified
PROJECT PROCUREMENT MANAGEMENT
12 PROJECT PROCUREMENT MANAGEMENT Project Procurement Management includes the processes required to acquire goods and services from outside the performing organization. For simplicity, goods and services,
PPP Seminar : Health Royal Liverpool Hospital Case study
PPP Seminar : Health Royal Liverpool Hospital Case study Gavin Quantock Deloitte Corporate Finance 23 July 2014 Case study Royal Liverpool hospital PPP and Health Background Deloitte involvement Structure
Governments implement PPP programmes in the healthcare sector for one or more of a number of reasons:
UNECE Healthcare PPP Project Team Project Brief Introduction This is a very active time globally for the healthcare sector as demand for services continues to grow exponentially, driven by rising life
4.03. Brampton Civic Hospital Public-private Partnership Project. Chapter 4 Section. Background. Follow-up on VFM Section 3.03, 2008 Annual Report
Chapter 4 Section 4.03 Brampton Civic Hospital Public-private Partnership Project Follow-up on VFM Section 3.03, 2008 Annual Report Background In 2001, the then Minister of Finance announced that public