1 Cabinet Member for Finance and Resources and Cabinet Member for Highways and Transport Ref No. HT11(12/13) Service Vehicles Procurement Strategy November 2012 Report by Director of Business Change Key Decision Yes Part I Electoral Divisions N/A Executive Summary This report seeks approval of the Service Vehicles Procurement Strategy for the management of the County Council s vehicle fleet to replace the existing arrangements that expire on 30 June This is to ensure continuity of service delivery at the outset with the opportunity to deliver continued service improvement and contribute to the 79million savings target. The new arrangement will include transferring service vehicle fleet and pool car fleet management into the County Council, and fleet maintenance through a Framework Agreement with local suppliers to commence from the 1 st July Recommendations That the Service Vehicles Procurement Strategy encompasses: 1. The transfer of the service vehicle fleet and pool car fleet management to the County Council from 1 July That the procurement process for the provision of service vehicle maintenance through a Framework Agreement with local suppliers as detailed in the Strategy (Appendix 1) commences The Framework Agreement should be for a minimum of 2 years commencing on the 1 July 2013, to include for optional extension for periods of up to 2 years for a maximum contract period of 4 years subject to the future requirements for this service and the performance of the appointed service providers. With effect from 1 January 2013 authority is delegated to the Director of Communities Commissioning to award the contract to the bidder(s) submitting the most economically advantageous tender(s) in terms of technical and commercial ability. To make the framework available to other public body authorities within the geographical boundaries of East and West Sussex, Hampshire and Surrey who are permitted public bodies as defined within the Public Contract Regulations 2006.

2 1. Background 1.1 The current Service Vehicle Contract (SVC) with Enterprise AOL that is concerned with pool cars and commercial fleet vehicles, that commenced in 2006 is due to end on 30 June This arrangement was extended for two, twelve month periods in July 2011 and July 2012 to give WSCC time to develop a robust procurement strategy in light of changing fleet requirements across many areas of the County Council s services. 1.2 The current cost of the contractual arrangement is approximately 2 million per annum that includes substantive management costs. Costs have been reduced by purchasing end of lease vehicles. In addition to the delivery of these cost reductions it has had the effect of: enabling the County Council to reduce the fleet size with minimal penalties reducing the number of older vehicles that have higher maintenance costs. 1.3 It is considered that the current SVC is no longer fit for purpose as it will not be able to deliver a value for money service that meets the County Council s changing needs. This is due to: the substantive management costs, the need to provide a more responsive and flexible service, the outsource of services under the Support Service Outsourcing Contract, the impact of the Transport Transformation Programme, the need to deliver substantive annual savings (est. 480,000) through efficient sourcing and maintenance of the vehicle fleet 1.4 Further to the issues identified in 1.3 above and following consultation with service users the improvements required under the procurement strategy are: To contribute to the County Council s savings target of 79m by reducing operational costs in line with required savings under the Transport Transformation Programme To provide flexible sourcing of vehicles To support changing staffing numbers and increasingly flexible work patterns To contribute towards the County Council s Carbon reduction targets

3 To provide improved fleet management and vehicle usage data. To provide more flexible vehicle maintenance programmes with decreased vehicle downtime. 1.5 Detailed work has been carried out to identify critical processes, benchmark against other business models and thereby, to highlight specific improvements to be sought under the new arrangements. 1.6 Market analysis and consultation led to the evaluation of four delivery options of which the proposal to transfer the service vehicle fleet and pool car management to the County Council, and for maintenance requirements to be provided through a Framework Agreement of approved local suppliers, was found to best meet the County Council s needs (including target savings). 1.7 The Procurement Strategy developed can be found as Appendix 1 to this report. 1.8 Collaboration opportunities have been explored therefore it is recommended the framework agreement should be made available to other public bodies within the geographical boundaries of East and West Sussex, as well as Hampshire and Surrey as defined within the Public Contract Regulations Collaboration with such authorities would be in accordance with the Corporate Procurement Strategy, and it is anticipated that future benefits may be realised through these potential collaborative arrangements. 1.9 The procurement process will be undertaken using the West Sussex e-sourcing portal to increase the efficiency of the tender process for the County Council and potential bidders. The procurement process will be open, fair and transparent in compliance with WSCC standing orders on procurement and contracts and the Public Contract Regulations It will further take into account the needs of the potential service providers, and will reflect the nature of the market place To ensure best value for money the contract will be awarded to the bidders submitting the most economically advantageous tenders that balance technical and quality requirements against commercial elements to ensure the delivery of an affordable service that is best value for money It is proposed that the framework agreement should be for an initial period of two years with the option to extend for periods up to a further two years to a maximum of four years. 2. Consultation 2.1 The Cabinet Members for Highways and Transport and for Finance and Resources were briefed on 3 April 2012 and 24 September 2012.

4 2.2 The Highways Commissioning Manager has been consulted about the possible effects on the depots of new contractor(s) carrying out maintenance in their own premises. His opinion was that any effects would be negligible, although there may be opportunities for revised workshop use at the depots. 2.3 Extensive market testing exercises were carried out meeting with prospective suppliers for fleet management, car hire and national and local fleet maintenance suppliers, with representatives from East Sussex County Council, (ESCC). In addition a stakeholder event of internal users was held to review future service needs. 2.4 A paper outlining the broad procurement options was taken to the Policy and Resources Select Committee on 5 July 2012 who agreed with the risks associated with procuring fleet and pool car management from the external market but asked for further analysis of fleet usage and requirements. A further report and the Procurement Strategy that was developed as a result of the work undertaken after the July Select Committee were presented to the Policy and Resources Select Committee on 11 October 2012 where the proposal was supported. Customer Focus Appraisal 3.1 A full Customer Focus Appraisal (Appendix 2) has been completed, drawing on the consultations carried out. The findings will be integrated into the design of the service where appropriate. 4. Resource Implications and Value for Money 4.1 A 5 year cost comparison table showing the existing arrangement along with the options outlined in the Procurement Strategy is shown below. It should be noted this is based on the existing fleet that is expected to be reduced over time so is effectively a maximum cost: Existing Option 1 Option 2 Option 3 Option Option 4B Contract proposed 4A Management 2.93m 0.54m 1.85m 1.59m 0.55m 2.69m Costs Lease/Depn. 4.80m 4.80m 4.80m 4.80m 4.80m 4.80m Costs Planned 2.00m 2.00m 2.00m 2.00m 2.00m 2.00m Maintenance Costs TOTAL 9.73m 7.34m 8.65m 8.39m 7.35m 9.49m Difference m m m m m 4.2 Option 1 (the proposal) provides annual savings of approximately 480,000 from the start of the arrangement providing 360,000 part year savings in 2013/14 (9 months). Options for mitigating the part year savings shortfall in 2013/14 (c 120,000) are currently being developed,

5 and will include utilising cost savings already achieved through securing more advantageous vehicle leasing rates. 4.3 The proposal includes transferring the fleet and pool car management service into the County Council. This temporarily increases the County Council s headcount by 4 (3.5 FTE) for the transfer of staff who currently provide the service through the contract, with a view that the staff would be outsourced on the termination of the Framework Agreement. The increase in FTE is not currently included within the workforce projections. The annual costs of these staff are estimated at 107, The current vehicle leases will transfer to the County Council from July 2013 to be managed internally. There will be no extra resources required over and above the transferred staff who will manage the leases. 4.5 The vehicle maintenance will be managed through the framework agreement arrangements that will be put in place as a result of the procurement process to ensure the best value for money is achieved for planned and ad hoc maintenance, and emergency works. 4.6 The transfer of staff will require Legal Services and Human Resources support from the County Council, Capita and AOL Enterprises. 5. Risk Management Implications 5.1 As vehicle maintenance will be procured through local suppliers it is essential that the potential fragmentation of work is managed robustly by the County Council. Market testing included meeting local suppliers which will inform the development of the service delivery model that will need to include and not be limited to agreed flexible collection and delivery arrangements. Maintenance taking place on site with mobile units could be also used. 5.2 Call off arrangements will be put into place to ensure any emergency maintenance and repair work can be provided. 5.3 Transfer of staff will be undertaken in line with the Transfer of Undertakings (Protection of Employees) Regulations 2006, and the County Council policy on TUPE transfers. 5.4 The existing contractor is aware of the pending end of the contract and meetings have been set up to discuss a smooth transition. 5.5 Successful vehicle maintenance suppliers will be required to have appropriate levels of insurance in accordance with West Sussex County Council Standing Orders on Procurement and Contracts. There is a further requirement to ensure compliance with the health and safety standards of the County Council. 5.6 The procurement process will be run in accordance with best practice procurement principles to mitigate any risk of challenge or noncompliance with the relevant regulations. It is anticipated that the

6 procurement process will be run by Capita Business Services Limited ( Capita ) on behalf of the County Council under the Support Services Outsource. 5.7 A risk log will be developed to mitigate risks associated with the project and the procurement process. The risk log will be dynamic to reflect the progress of the project and will be managed by an appointed officer from the project team. 6. Crime and Disorder Act Implications There are no identifiable Crime and Disorder Act implications. 7. Human Rights Act Implications There are no identifiable Human Rights Act implications. Sue Hawker Director of Business Change Contact: Andy Ekinsmyth, Service Manager, Transport & Countryside, (Ext 77811) Kim Medhurst, Principal Manager Procurement, Capita (Ext 82168) Appendix 1 Procurement Strategy September 2012 Appendix 2 Customer Focus Appraisal Background papers: None

Cabinet Member Finance and Resources. Procurement of Electricity and Gas Supplies

Cabinet Member Finance and Resources. Procurement of Electricity and Gas Supplies Cabinet Member Finance and Resources Procurement of Electricity and Gas Supplies Report by Executive Director Customers and Change Ref No. FR07(11/12) Key Decision Yes Part I Electoral Division N/A Executive

More information

(2) That the contract runs from 1 April 2015 for an initial period of seven years. The value of the contract will be in the order of 10m per annum.

(2) That the contract runs from 1 April 2015 for an initial period of seven years. The value of the contract will be in the order of 10m per annum. Cabinet Member for Corporate Relations Redesign of Facilities Management Services April 2014 Report by Director Service Operations and Principal Manager Facilities Management Ref No: CR02(14/15) Key Decision:

More information

Agenda Item No. 4. Policy and Resources Select Committee. 11 October 2012. Contract Procurement and Contract Management

Agenda Item No. 4. Policy and Resources Select Committee. 11 October 2012. Contract Procurement and Contract Management Agenda Item No. 4 Policy and Resources Select Committee 11 October 2012 Contract Procurement and Contract Management Head of Procurement & Contract Services Executive Summary The Policy and Resources Select

More information

Cabinet Member for Corporate Relations

Cabinet Member for Corporate Relations Cabinet Member for Corporate Relations Proposal for new customer experience October 2015 Report by the Executive Director Residents Services and the Director of Customer Services Ref No: CR05(15/16) Key

More information

CABINET. 18 December 2013

CABINET. 18 December 2013 CABINET 18 December 2013 Title: Procurement of Various Supplies and Service Contracts Report of the Cabinet Member for Finance Open Report Wards Affected: None Report Author: Martin Storrs, Head of Procurement

More information

Page 97. Executive Head of Asset Planning, Management and Capital Delivery

Page 97. Executive Head of Asset Planning, Management and Capital Delivery Page 97 Agenda Item 7 Report to: Strategy and Resources Committee Date: 16 December 2013 Report of: Executive Head of Asset Planning, Management and Capital Delivery Ward Location: Not applicable Author

More information

Gary Cooke, Cabinet Member for Corporate and Democratic Services

Gary Cooke, Cabinet Member for Corporate and Democratic Services From: To: Decision No: Subject: Classification: Gary Cooke, Cabinet Member for Corporate and Democratic Services The Property Sub Committee N/A Total Facilities Management 2 nd Biannual Review Unrestricted

More information

CABINET. 24 March 2015

CABINET. 24 March 2015 CABINET 24 March 2015 Title: Procurement of Electricity and Gas Supplies Report of the Cabinet Member for Finance Open Report with Exempt Appendix 4 Wards Affected: All Report Author: Andrew Sivess Group

More information

MS DENISE LE GAL, CABINET MEMBER FOR CHANGE AND EFFICIENCY

MS DENISE LE GAL, CABINET MEMBER FOR CHANGE AND EFFICIENCY Item Item REVISED SURREY COUNTY COUNCIL CABINET DATE: 23 APRIL 2013 REPORT OF: LEAD OFFICER: SUBJECT: MS DENISE LE GAL, CABINET MEMBER FOR CHANGE AND EFFICIENCY LAURA LANGSTAFF, ACTING HEAD OF PROCUREMENT

More information

The report explores three possible options open to the County Council which are:-

The report explores three possible options open to the County Council which are:- Cabinet Member for Corporate Relations Contract for the Provision of Liquid Fuels September 2015 Report by Executive Director Corporate Resources and Services Ref No. CR03(15/16) Key Decision: Yes Part

More information

Cabinet Member for Public Protection PP03 (11/12) Key Decision: Approval to Commence Procurement of Drug and

Cabinet Member for Public Protection PP03 (11/12) Key Decision: Approval to Commence Procurement of Drug and Cabinet Member for Public Protection PP03 (11/12) Key Decision: Approval to Commence Procurement of Drug and Yes Alcohol Treatment Services. Part I July 2011 Report by the Interim Director Joint Commissioning

More information

London Borough of Bromley LEASE CAR ACCIDENT DAMAGE REPAIRS

London Borough of Bromley LEASE CAR ACCIDENT DAMAGE REPAIRS Report No. ES15016 London Borough of Bromley PART ONE - PUBLIC Decision Maker: Environment Portfolio Holder Date: 17 th March 2015 For Pre-Decision Scrutiny by Environment PDS Committee on Decision Type:

More information

Fleet Management & Vehicle Maintenance Team Plan 2015/16

Fleet Management & Vehicle Maintenance Team Plan 2015/16 Fleet Management & Vehicle Maintenance Team Plan 2015/16 Team Manager: Service Plan: Visible Services Date signed off: 31/07/2015 Signed off by: Miles Punter 1 Contents Team Overview... 3 Our Contribution

More information

Project Appraisal and Scrutiny Committee Recommendation

Project Appraisal and Scrutiny Committee Recommendation Cambridge City Council To: Report by: Scrutiny committee: Wards affected: Executive Councillor for Environmental and Waste Services. David Cox ENVIRONMENT SCRUTINY None Project Name: Replace existing contracts

More information

Gary Cooke, Cabinet Member for Corporate and Democratic Services. Rebecca Spore, Director of Infrastructure

Gary Cooke, Cabinet Member for Corporate and Democratic Services. Rebecca Spore, Director of Infrastructure From: Gary Cooke, Cabinet Member for Corporate and Democratic Services Rebecca Spore, Director of Infrastructure To: Subject: Classification: The Policy and Resources Cabinet Committee Total Facilities

More information

Attached is the 2015-16 business plan for Transport Services for consideration by OPCC. (Please see attached)

Attached is the 2015-16 business plan for Transport Services for consideration by OPCC. (Please see attached) Financial Performance Programme 2014-15 Report to: the Office of the Police and Crime Commissioner for Essex Report from: Essex Police Meeting Date: 21 st May 2015 Topic: Transport Services 15-16 Business

More information

Project Appraisal and Scrutiny Committee Recommendation. E-mail, file storage system and server upgrades

Project Appraisal and Scrutiny Committee Recommendation. E-mail, file storage system and server upgrades Cambridge City Council To: Report by: Scrutiny committee: Wards affected: Executive Councillor for Customer Services and Resources James Nightingale, Head of ICT Client Services Strategy and Resources

More information

CABINET. 21 October 2014. Accountable Divisional Director: Glynis Rogers, Divisional Director of Commissioning and Partnerships

CABINET. 21 October 2014. Accountable Divisional Director: Glynis Rogers, Divisional Director of Commissioning and Partnerships CABINET 21 October 2014 Title: Re-tender of Translating and Interpreting Services Report of the Leader of the Council Open Report Wards Affected: All Report Author: Mark Tyson, Group Manager, Integration

More information

CABINET 17 JANUARY 2012 MERGER/ACQUISITION OF RIDGEWAY PARTNERSHIP NHS TRUST

CABINET 17 JANUARY 2012 MERGER/ACQUISITION OF RIDGEWAY PARTNERSHIP NHS TRUST [Type text] Division(s): CABINET 17 JANUARY 2012 MERGER/ACQUISITION OF RIDGEWAY PARTNERSHIP NHS TRUST Introduction Report by Director for Social & Community Services 1. Ridgeway Partnership (Oxfordshire

More information

Cabinet Member for Adults Services

Cabinet Member for Adults Services Cabinet Member for Adults Services Adult and Community Learning Part-time Tutors Pay Award and Fee Rates 2010-2011 Ref No. AS19(09/10) Key Decision: Yes Part I Report by Executive Director Adults and Children

More information

REVIEW OF FLEET SERVICES - FINAL REPORT OF THE ENVIRONMENT SCRUTINY PANEL

REVIEW OF FLEET SERVICES - FINAL REPORT OF THE ENVIRONMENT SCRUTINY PANEL REVIEW OF FLEET SERVICES - FINAL REPORT OF THE ENVIRONMENT SCRUTINY PANEL PURPOSE OF REPORT 1. To present the Environment Scrutiny Panel s findings following its examination of Middlesbrough Council s

More information

LIABILITY INSURANCE AND LIABILITY CLAIMS HANDLING TENDER AND BROKERAGE SERVICES IN RESPECT THEREOF

LIABILITY INSURANCE AND LIABILITY CLAIMS HANDLING TENDER AND BROKERAGE SERVICES IN RESPECT THEREOF LIABILITY INSURANCE AND LIABILITY CLAIMS HANDLING TENDER AND BROKERAGE SERVICES IN RESPECT THEREOF Cabinet Date 4 February 2015 Finance and Change Key Decision Background Documents Location/Contact for

More information

This report outlines a proposal to enable a chargeable element to be introduced to the West Sussex Educational Psychology Service.

This report outlines a proposal to enable a chargeable element to be introduced to the West Sussex Educational Psychology Service. Cabinet Member for Education and Skills West Sussex Educational Psychology Service Development of a Chargeable Element of the Service Report by Executive Director, Care Wellbeing & Education and Interim

More information

Item No. 15.2.2 Capital Project Appraisal & Procurement Report. Target Completion Date November 2008

Item No. 15.2.2 Capital Project Appraisal & Procurement Report. Target Completion Date November 2008 Item No. 15.2.2 Capital Project Appraisal & Procurement Report Project Title Supply, installation, maintenance, support and upgrade of car park Pay on Foot and Associated Control Equipment (Phased approach)

More information

I N BVRG H + Lochend Care Home. I Purpose of report. The Executive of the Council. 31 January 2006

I N BVRG H + Lochend Care Home. I Purpose of report. The Executive of the Council. 31 January 2006 + D I N BVRG H + THE CITY OF EDINBURGH COUNCIL Lochend Care Home The Executive of the Council 31 January 2006 I Purpose of report 1.I To outline to the Executive the options available to the Council for

More information

Cabinet Member for Adult Social Care and Health ASCH04 (14/15)

Cabinet Member for Adult Social Care and Health ASCH04 (14/15) Cabinet Member for Adult Social Care and Health ASCH04 (14/15) Commissioning of Telecare as part of wider Assistive Technology Services for West Sussex July 2014 Report by Director of Public Health and

More information

CABINET. 24 April 2012. Title: Term Contract for Maintenance, Repair and Minor Works on Security and Protection Systems

CABINET. 24 April 2012. Title: Term Contract for Maintenance, Repair and Minor Works on Security and Protection Systems CABINET 24 April 2012 Title: Term Contract for Maintenance, Repair and Minor Works on Security and Protection Systems Report of the Cabinet Member for Finance and Education Open Report Wards Affected:

More information

SCARBOROUGH BOROUGH COUNCIL

SCARBOROUGH BOROUGH COUNCIL SCARBOROUGH BOROUGH COUNCIL CABINET 4 APRIL 2006 A ITEM AGENDA ITEM NO A8 JOINT REPORT OF THE HEAD OF LEGAL SERVICES HLS/06/17 AND THE STRATEGIC DIRECTOR OF OPERATIONS SDO/06/16 on THE COUNCIL S PROCUREMENT

More information

Project Appraisal and Scrutiny Committee Recommendation STRATEGY & RESOURCES 23 MARCH 2015

Project Appraisal and Scrutiny Committee Recommendation STRATEGY & RESOURCES 23 MARCH 2015 Cambridge City Council Project Appraisal and Scrutiny Committee Recommendation Project Name: Telecommunications To: Report by: Scrutiny committee: Wards affected: Recommendation/s Executive Councillor

More information

Overview of the Transfer of Undertakings (Protection of Employment) Regulations 2006

Overview of the Transfer of Undertakings (Protection of Employment) Regulations 2006 TUPE Overview of the Transfer of Undertakings (Protection of Employment) Regulations 2006... 1 Service Provision Changes... 1 Employer Liability Information... 2 Liability for Failure to Inform and Consult

More information

HAMIS. Highways Asset Management Integrated Service. Delivering Highway Maintenance Efficiency Savings

HAMIS. Highways Asset Management Integrated Service. Delivering Highway Maintenance Efficiency Savings HAMIS Highways Asset Management Integrated Service Delivering Highway Maintenance Efficiency Savings The additional efficiency savings of almost 300k in the first year of HAMIS is impressive and welcomed,

More information

Report by Director Workforce, Organisational Development and Delivery Support

Report by Director Workforce, Organisational Development and Delivery Support Agenda Item No. 8 Performance and Finance Select Committee 3 October 2014 Sickness Absence and Employee Health and Wellbeing Report by Director Workforce, Organisational Development and Delivery Support

More information

LONDON BOROUGH OF WALTHAM FOREST

LONDON BOROUGH OF WALTHAM FOREST LONDON BOROUGH OF WALTHAM FOREST Meeting / Date 22 nd June 2015 Report Title Cabinet Portfolio Report Author/ Contact details Wards affected Public Access Contract for the provision of Total Facilities

More information

HERTSMERE BOROUGH COUNCIL EXECUTIVE. Urgency: The proposals are not exempt from call-in on PLANNING IMPROVEMENT PROGRAMME REPLACEMENT SOFTWARE

HERTSMERE BOROUGH COUNCIL EXECUTIVE. Urgency: The proposals are not exempt from call-in on PLANNING IMPROVEMENT PROGRAMME REPLACEMENT SOFTWARE HERTSMERE BOROUGH COUNCIL EXECUTIVE PART 1 Agenda Item No 8.1 Document Reference No EX/12/45 Date of Meeting / Decision: 7 November 2012 This is a key decision. the grounds of urgency. Urgency: The proposals

More information

JE PANEL/BENCHMARKING REF NO: 867/4 EVALUATION DATE:

JE PANEL/BENCHMARKING REF NO: 867/4 EVALUATION DATE: 1. JOB TITLE Job Title: Project Manager (Transport Infrastructure) Reports to: Design Programme Manager Service: Highways and Transport Environment & Infrastructure Date: November 2014 2. JOB PURPOSE To

More information

SODEXO FACILITIES MANAGEMENT SERVICES CONTRACT; OPTIONS FOR SCHOOLS FROM 9th APRIL 2011 FOR CATERING AND BUILDING CLEANING SERVICES

SODEXO FACILITIES MANAGEMENT SERVICES CONTRACT; OPTIONS FOR SCHOOLS FROM 9th APRIL 2011 FOR CATERING AND BUILDING CLEANING SERVICES WILTSHIRE COUNCIL SCHOOLS FORUM 02 December 2010 SODEXO FACILITIES MANAGEMENT SERVICES CONTRACT; OPTIONS FOR SCHOOLS FROM 9th APRIL 2011 FOR CATERING AND BUILDING CLEANING SERVICES Purpose of Report 1.

More information

Peter Bole, Director Information & Communication Technology. Gary Cooke, Cabinet Member for Corporate and Democratic Services

Peter Bole, Director Information & Communication Technology. Gary Cooke, Cabinet Member for Corporate and Democratic Services From: To: Peter Bole, Director Information & Communication Technology Gary Cooke, Cabinet Member for Corporate and Democratic Services Decision No: 14/00062 Subject: Procurement of School Management Information

More information

SOMERSET COUNTY COUNCIL KEY DECISION TAKEN BY THE COMMERCIAL AND BUSINESS SERVICES DIRECTOR

SOMERSET COUNTY COUNCIL KEY DECISION TAKEN BY THE COMMERCIAL AND BUSINESS SERVICES DIRECTOR SOMERSET COUNTY COUNCIL KEY DECISION TAKEN BY THE COMMERCIAL AND BUSINESS SERVICES DIRECTOR Report title: Procurement of a preferred Software Licence Reseller and support services Officer(s): Richard Williams,

More information

LONDON BOROUGH OF WALTHAM FOREST

LONDON BOROUGH OF WALTHAM FOREST LONDON BOROUGH OF WALTHAM FOREST Meeting / Date Cabinet 13 th November 2012 Agenda Item 10 Report Title Cabinet Portfolio Report Author/ Contact details Wards affected Public Access Appendices OneSAP ERP

More information

Annex 1. South East Business Services Business Case

Annex 1. South East Business Services Business Case South East Business Services Business Case 1 113 Contents 1. Executive Summary... 3 2. Purpose... 3 3. Background information... 3 4. Vision... 5 5. Partnership Creation and Delivery Challenges... 7 6.

More information

NOT PROTECTIVELY MARKED

NOT PROTECTIVELY MARKED Approved By: Mark Gilmartin. Chief Officer Classification of Paper: Report to PCC/Deputy PCC (delete as appropriate) Date of Decision Date of Report (delete/insert as appropriate) Report reference number

More information

HAMPSHIRE COUNTY COUNCIL. Decision Report. Customer Relationship Management Software

HAMPSHIRE COUNTY COUNCIL. Decision Report. Customer Relationship Management Software HAMPSHIRE COUNTY COUNCIL Decision Report Decision Maker: Executive Member Economic Development and Rural Affairs Date: 7 November 2012 Title: Customer Relationship Management Software Reference: 4358 Report

More information

EDGE public solutions. Review of Transport Operations. For: Vale of Glamorgan Council. Brian Cotter Stuart Cooper. April 2014

EDGE public solutions. Review of Transport Operations. For: Vale of Glamorgan Council. Brian Cotter Stuart Cooper. April 2014 Review of Transport Operations For: Vale of Glamorgan Council Brian Cotter Stuart Cooper April 2014 Page: 1 Commercial in Confidence April 2014 CONTENTS Section: Title: Page: 1.0 Introduction 3 2.0 Executive

More information

JOB DESCRIPTION. Team Leader Fleet Engineering. Environment & Sustainable Communities / Highways. Transport Operations / Vehicle Fleet & Depot

JOB DESCRIPTION. Team Leader Fleet Engineering. Environment & Sustainable Communities / Highways. Transport Operations / Vehicle Fleet & Depot JOB DESCRIPTION JOB TITLE: DIRECTORATE: SECTION: GRADE: Team Leader Fleet Engineering Environment & Sustainable Communities / Highways Transport Operations / Vehicle Fleet & Depot BBCU11 DATE PREPARED:

More information

London Borough of Bromley COMMISSIONING - PROPOSED TOTAL FACILITY MANAGEMENT CONTRACT

London Borough of Bromley COMMISSIONING - PROPOSED TOTAL FACILITY MANAGEMENT CONTRACT Report No. DRR14/089 London Borough of Bromley PART 1 - PUBLIC Decision Maker: Executive Date: 15 th October 2014 Decision Type: Non-Urgent Executive Key Title: COMMISSIONING - PROPOSED TOTAL FACILITY

More information

Report by the Members of the Governance & Scrutiny Committee

Report by the Members of the Governance & Scrutiny Committee EAST AYRSHIRE COUNCIL GOVERNANCE AND SCRUTINY COMMITTEE REVIEW OF THE VEHICLE TRACKER SYSTEM (MASTERNAUT) Report by the Members of the Governance & Scrutiny Committee JUNE 2010 EAST AYRSHIRE COUNCIL REVIEW

More information

Date: 7 February 2013

Date: 7 February 2013 Item No. Report title: Classification: Open Ward(s) or groups affected: From: Date: 7 February 2013 Meeting Name: Deputy Leader and Cabinet Member for Housing Management GW2: Leasehold and Ancillary Properties

More information

Ian Parry, Deputy Leader and Cabinet Member for Strategy, Finance and Corporate Issues said,

Ian Parry, Deputy Leader and Cabinet Member for Strategy, Finance and Corporate Issues said, Cabinet Meeting on Wednesday 16 December 2015 Support Services Service and System Replacement Ian Parry, Deputy Leader and Cabinet Member for Strategy, Finance and Corporate Issues said, As a well-run

More information

Housing and Communities Overview & Scrutiny Committee

Housing and Communities Overview & Scrutiny Committee AGENDA ITEM: 7 SUMMARY Report for: Date of meeting: 14 th September 2011 PART: 1 Housing and Communities Overview & Scrutiny Committee If Part II, reason: Sensitive commercial questions Title of report:

More information

(1) To approve the proposals set out in paragraphs 3.1-2 to ensure greater transparency of partnership board activity; and

(1) To approve the proposals set out in paragraphs 3.1-2 to ensure greater transparency of partnership board activity; and Agenda Item No. 7 Governance Committee 23 November 2015 Partnership Governance for Contract Management Report by Director of Law Assurance and Strategy Executive Summary This report sets out some areas

More information

Manchester City Council Report for Information. Resources and Governance Overview and Scrutiny Committee- 15 December 2011

Manchester City Council Report for Information. Resources and Governance Overview and Scrutiny Committee- 15 December 2011 Manchester City Council Report for Information Report To: Subject: Report of: Resources and Governance Overview and Scrutiny Committee- 15 December 2011 Contract Management City Treasurer Summary This

More information

Initial Equality Impact Assessment. Driving restrictions on Fleet Motor Insurance Policy

Initial Equality Impact Assessment. Driving restrictions on Fleet Motor Insurance Policy Directorate Service Person responsible for the assessment: Date assessment completed: Resources Risk Management Stephen Bull July 2008 Title of the policy being assessed The status of the policy Driving

More information

Report by Director of Health and Social Care Commissioning and Interim Director of Joint Commissioning

Report by Director of Health and Social Care Commissioning and Interim Director of Joint Commissioning Agenda Item No. 5 Policy and Resources Select Committee 21 February 2013 Progress Report on the Joint Commissioning Unit Report by Director of Health and Social Care Commissioning and Interim Director

More information

The ESCC Framework Agreement - A Guide for Local Authorities

The ESCC Framework Agreement - A Guide for Local Authorities POLICY & RESOURCES COMMITTEE Agenda Item 166 Brighton & Hove City Council Subject: Date of Meeting: 19 March 2015 Report of: Procurement of Schools Management Information Systems (MIS) Interim Executive

More information

AWARD OF CONTRACT MAINTENANCE AND UPGRADE OF THE HIGHWAYS ASSET MANAGEMENT SYSTEM (REF: CU2373)

AWARD OF CONTRACT MAINTENANCE AND UPGRADE OF THE HIGHWAYS ASSET MANAGEMENT SYSTEM (REF: CU2373) Wards Affected: All Wards ITEM 9 CABINET PROCUREMENT COMMITTEE 5 AUGUST 2014 AWARD OF CONTRACT MAINTENANCE AND UPGRADE OF THE HIGHWAYS ASSET MANAGEMENT SYSTEM (REF: CU2373) Author: Rachael Kingsley, Head

More information

Leader Ref No: LDR19 (14/15) Be the Business Programme 2014/15: Funding allocations. Report by Director of Economy and Strategic Manager-Economy

Leader Ref No: LDR19 (14/15) Be the Business Programme 2014/15: Funding allocations. Report by Director of Economy and Strategic Manager-Economy Leader Ref No: LDR19 (14/15) Be the Business Programme 2014/15: Funding allocations Report by Director of Economy and Strategic Manager-Economy Key Decision: No Part I Electoral Division(s): Chichester

More information

Outsourcing of Vale customer services

Outsourcing of Vale customer services Cabinet report Report of Head of HR, IT and Customer Services Author: Geoff Bushell Telephone: 01235 547689 Textphone: 18001 01235 547689 E-mail: geoff.bushell@southandvale.gov.uk Cabinet member responsible:

More information

Agenda item: Environment & Community Safety Decision meeting

Agenda item: Environment & Community Safety Decision meeting Title of meeting: Agenda item: Environment & Community Safety Decision meeting Date of meeting: 14 th November 2014 Subject: Report by: Wards affected: Key decision: Full Council decision: Waste Disposal

More information

DERBYSHIRE COUNTY COUNCIL. Cabinet. 28th November 2006. Report of the Deputy Chief Executive and Strategic Director Corporate Resources

DERBYSHIRE COUNTY COUNCIL. Cabinet. 28th November 2006. Report of the Deputy Chief Executive and Strategic Director Corporate Resources DERBYSHIRE COUNTY COUNCIL Cabinet 28th November 2006 Report of the Deputy Chief Executive and Strategic Director Corporate Resources County-wide PC Commissioning Unit (Strategic Policy and Budget) 1. PURPOSE

More information

Cllr Ray Theodoulou. Yes Lead Member report dated 18 th March 2013 Tender documents Draft Contracts from the framework

Cllr Ray Theodoulou. Yes Lead Member report dated 18 th March 2013 Tender documents Draft Contracts from the framework IT Managed Services/SAP Support Services Contract Cabinet Date 10th July 2013 Finance and Change Cllr Ray Theodoulou Key Decision Background Document Location/Contact for inspection of Background Documents

More information

Vehicle Replacement & Fleet Utilisation Policy To be considered as part of the overarching Fleet Strategy. Submitted: 29 September 2013

Vehicle Replacement & Fleet Utilisation Policy To be considered as part of the overarching Fleet Strategy. Submitted: 29 September 2013 Vehicle Replacement & Fleet Utilisation Policy To be considered as part of the overarching Fleet Strategy Submitted: 29 September 2013 To be Reviewed: September 2015 VERSION: AUTHOR: OWNER: v2.3 Barry

More information

Contract Management Case Studies

Contract Management Case Studies Report to Cabinet Scrutiny Committee 29 th June 2010 Item No 7(ii) Contract Management Case Studies Report by the Director of Resources Summary This report sets out, as requested by the committee, a series

More information

(Cabinet 10 December 2014) The supply of Hard Facilities Management (Hard FM) maintenance services to the County Council estate

(Cabinet 10 December 2014) The supply of Hard Facilities Management (Hard FM) maintenance services to the County Council estate Somerset County Council Cabinet 10 th December 2014 (Cabinet 10 December 2014) Paper H Item No. 11 The supply of Hard Facilities Management (Hard FM) maintenance services to the County Council estate Cabinet

More information

SD10: HIGHWAY NETWORK MANAGEMENT BEST VALUE REVIEW. (reproduced review document)

SD10: HIGHWAY NETWORK MANAGEMENT BEST VALUE REVIEW. (reproduced review document) SD10: HIGHWAY NETWORK MANAGEMENT BEST VALUE REVIEW (reproduced review document) Highway Network Management Best Value Review Report of the Member Panel Summary of Key Findings Leicestershire County Council

More information

PUBLIC REALM COMMUNITY SAFETY, ECONOMIC DEVELOPMENT AND REGENERATION OVERVIEW AND SCRUTINY COMMITTEE

PUBLIC REALM COMMUNITY SAFETY, ECONOMIC DEVELOPMENT AND REGENERATION OVERVIEW AND SCRUTINY COMMITTEE PUBLIC REALM COMMUNITY SAFETY, ECONOMIC DEVELOPMENT AND REGENERATION OVERVIEW AND SCRUTINY COMMITTEE 19 FEBRUARY 2013 SHARED SERVICE FOR PARKING WITH THE LONDON BOROUGH OF BROMLEY 1 SHARED SERVICES BACKGROUND

More information

Cabinet Portfolio Holder

Cabinet Portfolio Holder REPORT TO CABINET TO BE HELD ON 18 JANUARY 2011 Key Decision Forward Plan Ref No YES N/A Corporate Priority: To improve the performance of our Services and ensuring they provide Value for Money Cabinet

More information

Officer Delegated Decision Report - Procurement. For All Procurement Awards, Waivers, Contract Extensions & Variations

Officer Delegated Decision Report - Procurement. For All Procurement Awards, Waivers, Contract Extensions & Variations G atew a y T h r ee For All Procurement Awards, Waivers, Contract Extensions & Variations Fuel Cards Payment Solutions Contract Requisition Number R000760 Wards All Report authorised by: (Enter name and

More information

SCARBOROUGH BOROUGH COUNCIL

SCARBOROUGH BOROUGH COUNCIL SCARBOROUGH BOROUGH COUNCIL CABINET 26 JULY 2005 AGENDA ITEM NO REPORT OF THE HEAD OF ENVIRONMENTAL HEALTH SERVICES HEHS/05/43 on THE NORTH YORKSHIRE 'WISH' PURPOSE OF REPORT This report outlines the progress

More information

Drug and Alcohol Treatment

Drug and Alcohol Treatment CABINET Drug and Alcohol Treatment Report of Executive Director, People, Communities and Society Portfolio Holder: Cllr Phil Harrison; Adult Social Service and Health 27 February 2012 Officer Contact:

More information

Contract management: renewal and transition. Report to Parliament 10 : 2013 14

Contract management: renewal and transition. Report to Parliament 10 : 2013 14 Contract management: renewal and transition Report to Parliament 10 : 2013 14 Queensland Audit Office Location Level 14, 53 Albert Street, Brisbane Qld 4000 PO Box 15396, City East Qld 4002 Telephone (07)

More information

JOB DESCRIPTION. Procurement and Contract Management Advisor. Commercial Procurement, Property, and Contracts Team

JOB DESCRIPTION. Procurement and Contract Management Advisor. Commercial Procurement, Property, and Contracts Team JOB DESCRIPTION POST: SERVICE: SECTION: Procurement and Contract Management Advisor Solicitor to the Council Commercial Procurement, Property, and Contracts Team BAND: 8 MAIN PURPOSE 1. Provide support

More information

National Archives of Australia - Administrative Functions Disposal Authority March 2010

National Archives of Australia - Administrative Functions Disposal Authority March 2010 Accidents The activities involved in dealing with mishaps causing injury or damage. Includes damage or injury to the organisation's property or member of staff incurred while coming to, at, or leaving

More information

CABINET. Deputy Leader of the Council and Cabinet Member for Environment. Chief Officer (Streetscene and Transportation)

CABINET. Deputy Leader of the Council and Cabinet Member for Environment. Chief Officer (Streetscene and Transportation) CABINET Date of Meeting 15 September 2015 Report Subject Portfolio Holder Report Author Type of Report Vehicle Management System Policy Deputy Leader of the Council and Cabinet Member for Environment Chief

More information

Governments implement PPP programmes in the healthcare sector for one or more of a number of reasons:

Governments implement PPP programmes in the healthcare sector for one or more of a number of reasons: UNECE Healthcare PPP Project Team Project Brief Introduction This is a very active time globally for the healthcare sector as demand for services continues to grow exponentially, driven by rising life

More information

Savings arising from moving services into LGSS - MTP Ref. 166

Savings arising from moving services into LGSS - MTP Ref. 166 Equality Impact Assessment Working in Progress Document Part 1: Screening Savings arising from moving services into LGSS - MTP Ref. 166 Section 1. Programme Details: LGSS Programme Section 2. Screening

More information

Business Case - Automotive Purchases and Alternative Solutions

Business Case - Automotive Purchases and Alternative Solutions THE SCOTTISH AMBULANCE SERVICE BOARD FULL BUSINESS CASE FOR THE REPLACEMENT OF EMERGENCY, PATIENT TRANSPORT AND SUPPORT VEHICLES 2009/10-2011/12 Scottish Ambulance Service National Headquarters Tipperlinn

More information

REVIEW OF CORPORATE SERVICES HR BUSINESS CASE

REVIEW OF CORPORATE SERVICES HR BUSINESS CASE REVIEW OF CORPORATE SERVICES HR BUSINESS CASE 1. The Strategic Case for Integration The alignment with Council strategies 1.1 The Lewes Change Management Programme (CMP) outlines the need to redesign the

More information

Section 1 Summary and Recommendations

Section 1 Summary and Recommendations REPORT FOR: CABINET Date of Meeting: 10 December 2015 Subject: Key Decision: Responsible Officer: Portfolio Holder: Exempt: Decision subject to Call-in: Wards affected: Homes for Harrow: Building homes

More information

CHESHIRE EAST COUNCIL

CHESHIRE EAST COUNCIL CHESHIRE EAST COUNCIL Cabinet Date of Meeting: 9 th December 2014 Report of: Director of Economic Growth and Prosperity Subject/Title: Vulnerable and Older Persons Handyperson Service (Ref CE 14/15-34)

More information

(2) That further work is carried out to secure the recovery of 0.641m of outstanding debt as outlined in paragraph 3.2.

(2) That further work is carried out to secure the recovery of 0.641m of outstanding debt as outlined in paragraph 3.2. Cabinet Member for Finance Write-off of Adults Services Bad Debts July 2015 Report by Executive Director Corporate Resources and Services and Deputy Director of Finance Ref No: FIN06(15/16) Key Decision:

More information

CABINET. 19 January 2016. Accountable Divisional Director: Martin Rayson, Divisional Director for Human Resources and Organisational Development

CABINET. 19 January 2016. Accountable Divisional Director: Martin Rayson, Divisional Director for Human Resources and Organisational Development CABINET 19 January 2016 Title: Oracle R12 - Proposal to Extend Contract for Hosting and Support Report of the Cabinet Member for Finance and Central Services Open Report Wards Affected: None Report Author:

More information

Outline Business Case (OBC) Full Business Case (FBC) Project Initiation Document (PID) Strategic Waste Facility Project Hub No.

Outline Business Case (OBC) Full Business Case (FBC) Project Initiation Document (PID) Strategic Waste Facility Project Hub No. /PROJECT INITIATION DOCUMENT 01202 458213 pmo@bournemouth.gov.uk (template version 0.20) Outline Business Case (OBC) Full Business Case (FBC) Project Initiation Document (PID) Strategic Waste Facility

More information

GREENING THE FLEET STAFF TRAVEL OPTIONS

GREENING THE FLEET STAFF TRAVEL OPTIONS ITEM NO: 5 Report To: ENERGY PANEL Date: 3 September 2009 Reporting Officer: Robin Monk - Assistant Executive Director Technical and Property Services Paul Jennings Engineering Operations Manager Subject:

More information

The Future of Adventure Play in Islington

The Future of Adventure Play in Islington Children s Services 222 Upper Street, London N1 1XR Report of: Executive Member for Children and Families Meeting of: Date Ward(s) Executive 27 th November All Delete as appropriate Non-exempt SUBJECT:

More information

Outsourcing Factsheet

Outsourcing Factsheet Outsourcing Factsheet Are you considering outsourcing a function of your organisation which contains members of the LGPS? If the answer is yes, then this factsheet should assist you in ensuring that the

More information

STRATEGIC RISK BOARD MINUTES

STRATEGIC RISK BOARD MINUTES STRATEGIC RISK BOARD Wednesday, 10 September 2014 from 11.30am to 12.20pm MINUTES Present: Apologies: Nick Eveleigh (Chairman), Alison Chessell, Tony Preston, Averil Price, Lita Smith, Dan Wright and Councillor

More information

Chief Executive. Board. Over 500,000. Up to 500,000

Chief Executive. Board. Over 500,000. Up to 500,000 10. SUMMARY OF FINANCIAL DELEGATED LIMITS s Business Cases The introduction or discontinuance of any significant activity or operation not already approved within the Business Plan. This includes outsourcing

More information

Outcome of Brokerage Services(encompassing payroll) Tender

Outcome of Brokerage Services(encompassing payroll) Tender Report to Cabinet Outcome of Brokerage Services(encompassing payroll) Tender Portfolio Holder: Cllr Jenny Harrison, Social Care & Safeguarding Officer Contact: Maggie Kufeldt, Executive Director - Health

More information

Authority to Award Contract for the Supply of ACD Call Centre Software for Customer Services

Authority to Award Contract for the Supply of ACD Call Centre Software for Customer Services Cabinet 29 June 2015 Report from the Chief Operating Officer Wards Affected: ALL Authority to Award Contract for the Supply of ACD Call Centre Software for Customer Services 1.0 Summary 1.1 This report

More information

Records Disposal Schedule. NT Fleet Management. Department of Corporate and Information Services. Disposal Schedule No. 2004/2

Records Disposal Schedule. NT Fleet Management. Department of Corporate and Information Services. Disposal Schedule No. 2004/2 DISPOSAL SCHEDULE FOR RECORDS OF THE NT FLEET SEPTEMBER 2003 Records Disposal Schedule NT Fleet Management Department of Corporate and Information Services Disposal Schedule No. 2004/2 June 2004 For information

More information

Department of Treasury and Finance. To Outsource Fleet Management Services or Not?

Department of Treasury and Finance. To Outsource Fleet Management Services or Not? Department of Treasury and Finance To Outsource Fleet Management Services or Not? To Outsource Fleet Management Services or Not? Background Alternative Fleet Management Arrangements (AFMA) Project Outcome

More information

Cabinet Member for Finance and Treasury. AGENDA ITEM: Background document to item 14 Cabinet 15.12.14

Cabinet Member for Finance and Treasury. AGENDA ITEM: Background document to item 14 Cabinet 15.12.14 Part A Report REPORT TO: Cabinet Member for Finance and Treasury AGENDA ITEM: Background document to item 14 Cabinet 15.12.14 SUBJECT: Payroll Administration and Management Services for Corporate Staff,

More information

ITEM NO: 9 ENERGY PANEL. Report To: 24 th July 2008. Date:

ITEM NO: 9 ENERGY PANEL. Report To: 24 th July 2008. Date: ITEM NO: 9 Report To: Date: Reporting Officer: Subject: Report Summary: Recommendations: Links to Community Strategy: Policy Implications: Financial Implications: (Authorised by the Borough Treasurer)

More information

LONDON BOROUGH OF WALTHAM FOREST

LONDON BOROUGH OF WALTHAM FOREST LONDON BOROUGH OF WALTHAM FOREST Meeting / Date Cabinet /December 2015 Report Title Cabinet Portfolio Report Author/ Contact details Wards affected Public Access Appendices ICT Data Centre & Infrastructure

More information

Wolverhampton City Council

Wolverhampton City Council Agenda Item No: 11a Wolverhampton City Council OPEN INFORMATION ITEM Scrutiny Panel AUDIT COMMITTEE Date 24 SEPTEMBER 2012 Originating Service Group(s) DELIVERY Contact Officer(s)/ PAT MAIN PETER OAKESHOTT

More information

Corporate Director Environment & Community Services

Corporate Director Environment & Community Services CABINET Meeting date: 23 July 2015 From: Corporate Director Environment & Community Services DIGITAL STRATEGY 1.0 EXECUTIVE SUMMARY 1.1 This paper presents Cabinet with a draft Digital Strategy for approval.

More information

Gravesham Borough Council. Report to Cabinet. Digital Performance Manager. Single Customer Contact Platform

Gravesham Borough Council. Report to Cabinet. Digital Performance Manager. Single Customer Contact Platform Classification: N/A Key Decision: No Gravesham Borough Council Report to: Report to Cabinet Date: 6 July 2015 Reporting officer: Subject: Digital Performance Manager Single Customer Contact Platform Purpose

More information

Property & Asset Maintenance Business Unit Service Plan 2015/16

Property & Asset Maintenance Business Unit Service Plan 2015/16 Business Unit Leader: Emma Grundy Head of Service: Tom Clark 1. Service Objectives for 2015/16 Property & Asset Maintenance Business Unit Service Plan 2015/16 Issue Work to be undertaken Impact / outcome

More information

Governing Body meeting (held in public)

Governing Body meeting (held in public) ENCLOSURE: H Agenda Item: 114/15 Governing Body meeting (held in public) DATE: 30 July 2015 Title Procurement of Non Emergency Patient Transport Services (to Dartford & Gravesham Hospital Trust Non-emergency

More information

Section 1 Summary and Recommendations

Section 1 Summary and Recommendations REPORT FOR: CABINET Date of Meeting: 13 January 2011 Subject: Key Decision: Responsible Officer: Portfolio Holder: Exempt: Decision subject to Call-in: Enclosures: Sports and Leisure Facilities Management

More information