GOOD NEIGHBOURLY RELATIONS COMMITTEE MUHC Glen Campus: construction and road work
|
|
|
- Flora Shepherd
- 10 years ago
- Views:
Transcription
1 GOOD NEIGHBOURLY RELATIONS COMMITTEE MUHC Glen Campus: construction and road work MINUTES Meeting held on Thursday, October 28, 2010 (7 p.m. to 8:45 p.m.) Committee members present Donna Allen (citizen) Garry Bernard (Bus Network Management Consultant, Development and Planning Department, Société de transport de Montréal) Charles Chebl (Senior Vice-President and General Manager, SNC-Lavalin) Mario Duguay (Division Supervisor, Development and Operational Services, Public Works Department, City of Montreal) Mathieu Durand (Police Officer, Service de police de la Ville de Montréal) Louise Fournier (citizen) Louise Labre (Division Supervisor, Bus Network Mangement and Public Affairs, Société de transport de Montréal) Anouk Laurent (citizen) Valérie Legris (Technical Officer, Traffic and Circulation, City of Montreal) Sharon Leslie (citizen) Pierre Major (Associate Director, Facilities Development & Construction, Redevelopment Project, McGill University Health Centre) Marie-Josée Mastromonaco (citizen) Luciano Michetti (citizen) Jody Negley (citizen) Nick Patulli (merchant) Wanda Potrykus (citizen) Derek Robertson (citizen) Pierre Tessier (independent moderator) Michel Therrien (Assistant Director, CDN-NDG Borough, Head of Communications, CDN-NDG Borough) Alain Trudeau (Project Manager, Project Management Office, City of Montreal) Session opening Word of welcome from Pierre Tessier (independent moderator) Explanation of the committee s mandate and meeting objectives: The topics discussed must involve the work scheduled in the coming months. Explanation of the role of the moderator Adoption of the agenda Minutes of the October 28, 2010 meeting Page 1 of 7
2 Presentation of participants At the request of Louise Fournier, a list of participants and their titles will be sent to committee members. Description of the roadwork Alain Trudeau explained the nature of the current and upcoming roadwork to the east of Décarie Blvd. between St-Jacques and De Maisonneuve. The reconstruction of the collector sewer will be carried out in three phases: Phase 1: Buried pipe under the viaduct (begins in November) Phase 2: Collector sewer (begins in November) Phase 3: St-Jacques / Décarie intersection (begins in December) Alain Trudeau explained why this work must be done in winter: Less water in the pipes The excavation is 10 metres deep, and workers can take advantage of the winter period due to the ground being frozen. Alain Trudeau explained the impact the work would have on traffic on Saint-Jacques and De Maisonneuve: Décarie Boulevard north will need to be closed to traffic, but Décarie Boulevard south will be open for local traffic only and for trucks exiting the Glen Campus. The reason for this change is primarily due to the construction trucks and cranes that will be in the east lane and part of the centre lane as work progresses in phase 2. These factors will hinder traffic and increase the risk of accidents. An opening will be made in the median on Saint-Jacques at Prud homme to allow residents to turn onto their street when driving east. Access to Mazda Gabriel on Décarie will be closed. STM buses 17 and 420 will be re-routed via Saint-Jacques and Girouard. Discussion on road work NAME AND QUESTION (Donna Allen) Will water be cut off in the area at any time during the fall? (Donna Allen) Will pedestrians still be able to use the sidewalks on the east side of Décarie this fall? (Luciano Michetti) There will be a lot of traffic on Girouard. How do you ANSWER (Alain Trudeau) No, there are no plans to cut water during this project, as the work involves only the sewers and not the water mains. (Alain Trudeau) During this period (fall), pedestrians will still be able to use the sidewalks. However, the situation will change next spring when the crews begin to reconstruct the underground infrastructures on the west side of Décarie. (Valérie Legris) We will synchronize the traffic lights to assure the safety of both cyclists and Minutes of the October 28, 2010 meeting Page 2 of 7
3 plan to keep traffic flowing? (Sharon Leslie) Will the changes and the synchronization of traffic lights be done prior to the beginning of phase 2? pedestrians. (Valérie Legris) Yes, but we must first request the proper authorizations. (Luciano Michetti) Will Girouard be one-way southbound or two-way at Sherbrooke? (Sharon Leslie) Will traffic on Girouard be restricted to local traffic only? (Louise Fournier) Is there a light for pedestrians at the intersection of Girouard / Saint-Jacques? (Alain Trudeau) We are looking at the possibility of changing traffic on Girouard to two-way, but we need to first negotiate this with the Ministère des Transports du Québec because of the access ramp to Highways 20 W and 15 S. (Valérie Legris) No, only Prud homme and Crowley Streets. (Valérie Legris) No. (Louise Fournier) What is the difference between a collector sewer and a sewer pipe? Will it resolve the backup problems? (Mario Duguay) The collector sewer is much larger than a simple pipe and will somewhat resolve the sewer backup problems by facilitating the flow of wastewater. (Alain Trudeau) In 2011, the crews from the Ville de Montréal will prepare the plans and specifications to carry out the reconstruction of the sewer pipes in the other streets in the area, notably to improve the local system on De Maisonneuve and Northcliff. (Louise Fournier) What is the roadwork schedule? (Louise Fournier) The work will make it difficult to park on Prud homme. Is it possible to offer permits to allow people to park on Saint-Jacques and Décarie? (Alain Trudeau) Crews will work during the day, from 7:30 a.m. to 5 p.m. However, during drilling (phase 1), it is possible that the crews may have to work in the evening due to CP Rail requirements that no drilling take place when trains are going past. But the crews will be underground and the work should not be heard. (Michel Therrien) There is currently no problem with parking, but we want to keep access to parking open behind the homes on Décarie, so the alleyways will be cleared of snow in the winter. (Louise Fournier) Will the work disrupt bus routes 105 and 102 on Vendôme? (Louise Labre) No, the work will have no impact on these routes. Minutes of the October 28, 2010 meeting Page 3 of 7
4 (Nick Patulli) Is it possible to open up access between Upper Lachine and Crowley more quickly? (Marie-Josée Mastromonaco) Who will advise the school buses that use Décarie / Prud homme / Crowley? (Sharon Leslie) How can traffic be controlled on Prud homme and Crowley? (Derek Robertson) Will Local traffic only signs be put up? And will the median on Saint-Jacques be opened up? (Valérie Legris) We are currently waiting for the installation of traffic lights on Upper Lachine to enable us to open this access. The installation is expected before the work begins on the railway viaduct in spring (Alain Trudeau) The City will advise the school boards in question. (MJM will provide the contact info for the CSDM) (Alain Trudeau) It can t be, but the first time drivers transiting the area take Prud homme to try to get to De Maisonneuve, they will find themselves back on Saint-Jacques and will avoid the area after that. (Valérie Legris) Yes to both questions. (Question from the room: Peter McQueen) Will the 105 bus route still be able to take Décarie towards De Maisonneuve during phase 1? (Alain Trudeau) Yes. (Question from the room: Peter McQueen) Will Saint-Jacques be closed during the work on this intersection (phase 3)? (Sharon Leslie) Will the alternatives be implemented and the info campaign deployed before the beginning of the disruptions? (Alain Trudeau) Phase 3 work will be done at the centre of the Saint-Jacques / Décarie intersection, so there is no question that traffic will be disrupted, but the intersection will not be completely closed. We will use the local papers to widely publicize this situation and make the public aware of it. (Alain Trudeau) During phase I, we will put out information in preparation for phase 2 to advise the public to avoid this area. (Sharon Leslie) Will Girouard be twoway in November? (Jody Negley) Could drivers not go via (Alain Trudeau) The solution to detour traffic on Girouard northbound is already sufficient. However, it might be improved if Girouard was two-way between Sherbrooke and Upper Lachine. (Alain Trudeau) This option is no longer possible Minutes of the October 28, 2010 meeting Page 4 of 7
5 the Turcot yards? (Louise Fournier) Drivers could be encouraged to use other routes, notably Cavendish. due to ongoing and upcoming work in the the Turcot yards. (Valérie Legris) We will in fact use variable message signs (VMS) to encourage drivers to take other routes more to the west. We are also looking at the possibility of closing the Saint- Jacques exit from the 720. (Pierre Major) We will make an opening in the retaining wall on Saint-Jacques to allow trucks to access the Glen Campus Description of work at the Glen Campus Charles Chebl provided the following information. Excavation work is 60% complete. The temporary retaining wall along the railway line is finished. The building retaining wall will be finished within 2 weeks. The pile driving has begun. We brought in equipment from the United States to drive the piles. This equipment is faster and quieter (hydraulic). Work scheduled for November: Pile driving Installation of 10 cranes Excavation completed before Christmas Working hours are: There will be no construction work during the Holiday period from December 17, 2010, to January 3, a.m. to 11 p.m. for excavation work Daytime for retaining work, 7 a.m. to 5 p.m. for pile driving If the pace is too slow, the work will continue later into the evening Measures taken to reduce the impacts: No work done on Sundays (last Sunday was an error); and no work at night Installation of a sound level meter to monitor noise Cleaning of streets and sidewalks Mud/dust kept to a minimum Launch of an enewsletter Discussion on the Glen Campus construction NAME AND QUESTION (Sharon Leslie) There are a lot of trucks on Décarie northbound and it s ANSWER (Charles Chebl) Some materials must be transported to Laval, and northbound Décarie is Minutes of the October 28, 2010 meeting Page 5 of 7
6 creating traffic problems in an area that already has a lot of traffic between Sherbrooke and De Maisonneuve. Bus 105 takes another route when there is too much traffic, and users are not always informed. Some must wait up to 25 minutes before learning that the bus has been re-routed. the most obvious and shortest route. We looked at the possibility of using Highway 13, but it is faster via Décarie North. (Derek Robertson) Why not send this earth to the Turcot interchange? (Charles Chebl) Because it is not the right earth to use to build the interchange; it s clay. Some materials are also sent to the south shore. (Pierre Major) There may be a possibility of improving the traffic lights at the Décarie / Sherbrooke intersection. (Valérie Legris has taken note) (Derek Robertson) Will trucks travelling eastbound be able to turn left on Saint-Jacques and cross the road to reach the Glen Campus entrance at the retaining wall? (Charles Chebl) No, it will be an entrance for westbound trucks only. (Louise Fournier) Many students walk through this area and cross the Sherbrooke/Décarie intersection. Is it possible to prohibit truck traffic at around 3 p.m. when school finishes? (Charles Chebl) We will check. (Louise Fournier) Why not use the route in front of the Home Depot for trucks (Glen Road)? (Louise Fournier) The community has the mandate to ask the Ministre de la Santé about this issue. There is a law that can overstep a municipal zoning. (Pierre Major) We already asked the City of Westmount, but we were refused, we cannot even use this road for workers vehicles. (Pierre Major) We are open to any help from the community. (Donna Allen) Can the cleaning trucks reduce or turn off their jets when pedestrians are close by? (Charles Chebl) We have already made this request, but we ll ask again. (Louise Fournier) Can the cleaning trucks turn off their engines when they are stopped (lunch or breaks)? (Charles Chebl) We have already made this request, but we ll ask again. Minutes of the October 28, 2010 meeting Page 6 of 7
7 Miscellaneous NAME AND QUESTION ANSWER (Sharon Leslie) Is it possible to have a PowerPoint presentation to facilitate the explanations during the Good Neighbourly Relations Committee Project? (Question from the room: Peter McQueen) How will citizens be informed? (Jody Negley) Will the Good Neighbourly Relations Committee be involved regarding the access for South-West citizens? (Louise Fournier) Is the Glen Campus project now completely approved? (Pierre Major / Julie Paquet) meetings of the Good Neighbourly Relations Committee will be held monthly; they will be communicated directly to members and posted on the MUHC s website. A letter by Dr. Porter has been published in local and regional papers. Other public information sessions will be organized for the next construction phases. (Pierre Major) We are currently discussing with the Ministère des Transports du Québec regarding questions that influence these access points, we will keep the committee informed. (Pierre Major) Yes, it is final. Meeting adjournment The meeting was adjourned at 8:45 p.m. Invitation for the next meeting will be sent by in the coming weeks and posted on the MUHC website. Minutes of the October 28, 2010 meeting Page 7 of 7
11 p.m. to. Tuesday, June. will remain open. 14. closed
June 3, 2011 CONTACT: Marcia McAllister T: 703 572 0506 C: 571 730 9117 [email protected] Important Lane Closures June 5 11 Include Northbound Beltway Lanes, Eastbound Dulles Airport Access
SEMINOLE PRATT WHITNEY ROAD & NORTHLAKE BLVD. FREQUENTLY ASKED QUESTIONS
UPDATED: 01/31/14 SEMINOLE PRATT WHITNEY ROAD & NORTHLAKE BLVD. FREQUENTLY ASKED QUESTIONS Q. 1. What are the County s plans for Seminole Pratt Whitney Road between SR 80 (Southern Blvd) and the Bee Line
Turcot Complex Reconstruction Project
Turcot Complex Reconstruction Project The project The Turcot Complex is located on the Island of Montréal south-west of downtown, specifically in the cities of Montréal, Montréal-Ouest and Westmount. The
FOR IMMEDIATE RELEASE September 17, 2013 Contact:
NEWS RELEASE FOR IMMEDIATE RELEASE September 17, 2013 Contact: Diana L. Klink 757.514.4104 757.359.1845 Tim Kelley 757.514.4103 757.871.3039 UPDATE (Bridge Road/Mills Godwin Bridge) The work scheduled
Planning of the Pre-Concept Architectural Design For the McGill University Health Centre, Montreal
Planning of the Pre-Concept Architectural Design For the McGill University Health Centre, Montreal Robert Hamilton Robert A. Hamilton MRAIC, OAQ Robert Hamilton is Senior Associate responsible for Architectural
Belmont Street Bridge Rehabilitation Project
Belmont Street Bridge Rehabilitation Project Christian Gospel Church Worcester 43 Belmont Street Worcester MA February 20, 2015 7:00PM Agenda Introductions Project site and overview Project history Construction
ORDINANCE CODES FOR PARKING TICKETS
ORDINANCE CODES FOR PARKING TICKETS Ordinance Ordinance Fine Fine if towed Code 001 Expired Meter (Municipal Lot) - Did park a motor vehicle in a municipal lot without paying or depositing in the meter,
chapter 3 basic driving skills
chapter 3 basic driving skills When curving to the left, keep the front wheels close to the right edge of the lane to keep your driver s side rear wheels out of the next lane of traffic. Curve ahead slow
The partnership has selected three intersections where enforcement, education, and engineering initiatives are being implemented to improve safety:
Hamilton-Finn Suite 310 Tel. (403) 207-6000 Road Safety 3016 5th Avenue N.E. Fax. (403) 273-3440 Consultants Ltd. Calgary, Alberta dawatt.dawatt.com www.hamiltonfinn.ca January 19, 2005 Mr. Don Szarko,
CONSTRUCTION TRAFFIC MANAGEMENT PLAN (CTMP)
CONSTRUCTION TRAFFIC MANAGEMENT PLAN (CTMP) [Colston Budd Hunt & Kafes Pty Ltd AS AMENDED BY City of Sydney] 23 March 2010 1. PREAMBLE 1.1 This document constitutes the Demolition and Traffic Management
Effect on structures. Uniform settlement - no concerns. Angular distortion - causes damage due to tensile strain
Effect on structures Uniform settlement - no concerns Angular distortion - causes damage due to tensile strain 1/500 - safe limit for no cracking of buildings 1/150 - potential structural damage 36 37
City of Kamloops Notre Dame Corridor Access Plan
FINAL REPORT This report is prepared for the sole use of ICBC. No representations of any kind are made by Urban Systems Ltd. or its employees to any party with whom Urban Systems Ltd. does not have a contract.
Mayors Welcome Strong Surrey Votes Yes Coalition Support. Yes Vote Would Vastly Improve Transit and Transportation in Fast Growing City
Mayors Welcome Strong Surrey Votes Yes Coalition Support Yes Vote Would Vastly Improve Transit and Transportation in Fast Growing City February 11, 2015 Vancouver, BC The Mayors Council on Regional Transportation
Traffic Management Plan
China Civil Engineering Construction Corporation The Rarotonga Water Ring Mains Upgrade Project (Te Mato Vai) of the Cook Islands Traffic Management Plan Compilation: Chinese Civil Engineering Corporation
Jurisdictional Scan of Traffic Management during Incidents on Bridges
Jurisdictional Scan of Traffic Management during Incidents on Bridges Discussion Paper Engineering Branch BC Ministry of Transportation and Infrastructure September 2008 1.0 Purpose Unplanned closures
Construction Management Plan (CMP) Application
About this form Principal Contractor (Applicant) Applicant Details (Person lodging application and main contact for CMP) DA and Site Details Development Consent for Works you are carrying out Construction
Improving Access in Florida International University Biscayne Bay Campus Executive Summary
EXECUTIVE SUMMARY Improving Access in Florida International University Biscayne Bay Campus Executive Summary Prepared for: Miami-Dade County Metropolitan Planning Organization (Miami-Dade MPO) Prepared
Whitby. Key Requirements. Primary Municipal Contact. Documentation
Key Requirements Application should be submitted 10 business days in advance Location fee Required for filming on streets and property, including parks and facilities, under the jurisdiction of the Corporation
MID-HUDSON SOUTH TRANSPORTATION COORDINATING COMMITTEE APRIL 6, 2011. TIP Public Review Meeting
MID-HUDSON SOUTH TRANSPORTATION COORDINATING COMMITTEE APRIL 6, 2011 TIP Public Review Meeting Meeting Agenda New York Metropolitan Transportation Council Major Products Transportation Improvement Program
Crash data may not contain complete information, some elements may be unknown
Crash Data Introduction: Crash data are information that comes from a reportable crash. A reportable crash according to Title 75, Pennsylvania Consolidated Statutes, Section 3746(a) is: an incident that
Overview... Bus Options... Carpooling, Biking or Walking to School... Driving to Campus: The Loop... The Queue: Managing Lincoln Ave Traffic...
Overview... Bus Options... Carpooling, Biking or Walking to School... Driving to Campus: The Loop... The Queue: Managing Lincoln Ave Traffic... 2 3 4 5 6 What is the Queue?... 7 How the Queue and Loop
Transportation Management Plan Template
DATE: TO: FROM: SUBJECT: Date Name Position Transportation Service Center Name Position Transportation Service Center Transportation Management Plan Job Number(s) Control Section(s) Route Details County
THE CORPORATION OF THE TOWN OF AURORA. By-law Number 4787-06.P
THE CORPORATION OF THE TOWN OF AURORA By-law Number 4787-06.P BEING A BY-LAW to regulate and prohibit the causing of noise in the Town of Aurora. WHEREAS Subsection 129 (1) of the Municipal Act 2001, S.O.
Bicycle riding is a great way to get into shape
Bicycle riding is a great way to get into shape and have fun. To remain safe on Illinois roads, it is important to follow the same traffic safety laws that govern vehicle drivers. No amount of bicycle
A Guidebook for Film and Television Production
A Guidebook for Film and Television Production January 21, 2014 Welcome, Cast and Crew! The Town of Parry Sound is a film-friendly community, recognizing the positive economic and social impacts this industry
Madras College Site Traffic Management Plan (South Street) August 2015
Madras College Site Traffic Management Plan (South Street) August 2015 South Street, St. Andrews, KY16 9EJ Kilrymont Road, St. Andrews, KY16 8DE Telephone (01334) 659402 Telephone (01334) 659401 Email
Re: Truck Route Management and Community Impact Reduction Study Report
Hon. Iris Weinshall Commissioner, NYC Dept. of Transportation New York City Department of Transportation Room 1105 Attn: Truck Study 40 Worth Street New York, NY 10013 Re: Truck Route Management and Community
Principles of Traffic Management on sites / road network
IOSH Ireland, Construction Specialist Section Springfield Hotel, Leixlip, County Kildare. 25 March 2015 Principles of Traffic Management on sites / road network Padraig Watters, Chartered Engineer This
Patriots Motorcycle Club. Prospect Package
Prospect Package WELCOME! Please take the time to browse the entire web site to acquaint yourself with us. All areas are accessible to the public except Members Only. The Patriots Motorcycle Club welcomes
Smart Cycling IN SANTA MONICA SANTA MONICA POLICE DEPARTMENT BE SMART. BE VISIBLE. BE ATTENTIVE. HAVE FUN!
Smart Cycling IN SANTA MONICA BE SMART. BE VISIBLE. BE ATTENTIVE. HAVE FUN! Safety Tips and Rules of the Road for Cyclists SANTA MONICA POLICE DEPARTMENT Rules of the Road Drivers, bicyclists, and pedestrians
The leader in trenchless rehabilitation
The leader in trenchless rehabilitation The trenchless rehabilitation of underground water and sewer pipes is a solution that s more ecological, more cost efficient, faster and less invasive for taxpayers
HIGHWAY DESIGN REPORT. Appendix 4. Proposed Design Principles for City Passings
HIGHWAY DESIGN REPORT Appendix 4 Proposed Design Principles for City Passings June 2000 Contents Page 1 Introduction 2 1.1 Purpose 2 1.2 Definition of city passing 2 1.3 Safety Problems 2 1.4 Planning
Measuring the Street:
Measuring the Street: New Metrics for 21st Century Streets 1 Measuring the Street: New Metrics for 21st Century Streets New York City s streets are constantly called on to the meet new and varied needs
Evanston Main Street Station TOD Plan and Study. Appendix A.1: Station Area Existing Conditions
Evanston Main Street Station TOD Plan and Study Appendix A.1: Station Area Existing Conditions EvanstonMainStreetStation TODPlanandStudy A 1 AppendixA.1: ExistingConditions Table of Contents Station Locations
SAFE CYCLING GUIDE. 7th Edition
SAFE CYCLING GUIDE 7th Edition BEFORE SETTING OUT A Check tire pressure B Check that the chain does not slip C Check the brakes D Check lights and reflectors: 1 A WELL-MAINTAINED BICYCLE is key 3 4 5 Adjust
Informational Workshop Public Meeting Kanawha Falls Bridge Project
Informational Workshop Public Meeting Kanawha Falls Project WV Department of Transportation Division of Highways in Cooperation with the Federal Highway Administration State Project S310-13-0.02 00 Federal
City of Kelowna Traffic Management Guide. December 2010
City of Kelowna Traffic Management Guide December 2010 City of Kelowna Traffic Management Guide December 2010 Prepared by: Urban Systems Ltd. 304-1353 Ellis Street Kelowna, BC V1Y 1Z9 T: (250) 762-2517
Bedford s Network Management Strategy (2011 2021) November 2010
Bedford s Network Management Strategy (2011 2021) November 2010 Page 1 of 13 1. Introduction 1.1. The Bedford Borough Council Network Management Strategy has been developed to support local and national
Appendix J Transportation Management Plan Report. Traffic Operational Analysis Report
Appendix J Transportation Management Plan Report Traffic Operational Analysis Report Transportation Management Plan Report VIRGINIA AVENUE TUNNEL RECONSTRUCTION PROJECT WASHINGTON, DC PRELIMINARY TRANSPORTATION
Q. What do you think the most important transportation issues are in this area with regard to east-west travel?
The following are the comments received in a survey of homeowner and neighborhood representatives conducted prior to the three Open Houses on August 2nd and 3rd, 2000. The opinions are presented as part
Sharing the road safely
6 sharing the road in this chapter Sharing the road safely Pedestrians Cyclists Motorcycle riders Passenger vehicles Large vehicles School buses Public transit buses Emergency vehicles Emergency workers
HAPPY MOTORING IN QUÉBEC!
HAPPY MOTORING IN QUÉBEC! Whether you are in Québec on vacation or business, you may well need information about the main rules for road use in this province, as set forth in the Highway Safety Code. Seat
6: LANE POSITIONS, TURNING, & PASSING
6: LANE POSITIONS, TURNING, & PASSING BASIC LANE POSITIONS Traffic law says that slower vehicles should stay to the right. But where exactly should bicycles ride? Here are some basics. Never Ride Against
STANDARD ELEMENTS OF A CONSTRUCTION MANAGEMENT PLAN
STANDARD ELEMENTS OF A CONSTRUCTION MANAGEMENT PLAN JULY 2015 Standard Elements of a Construction Management Plan (CMP) This guidance tool was developed through partnership between the Department of Planning
TRAFFIC SAFETY COUNCIL THE CORPORATION OF THE CITY OF MISSISSAUGA WEDNESDAY, DECEMBER 9, 2009-6:00 P.M. OFF SITE www.mississauga.
MINUTES TRAFFIC SAFETY COUNCIL THE CORPORATION OF THE CITY OF MISSISSAUGA WEDNESDAY, DECEMBER 9, 2009-6:00 P.M. OFF SITE www.mississauga.ca Members Present: Members Absent Councillor Frank Dale Brian MacKinnon
Town of Bellingham DEPARTMENT OF PUBLIC WORKS. Snow and Ice Control FAQs. Q. Can I push snow from my property onto the sidewalk or street?
Frequently Asked Questions Town of Bellingham DEPARTMENT OF PUBLIC WORKS Snow and Ice Control FAQs Q. Can I push snow from my property onto the sidewalk or street? Bylaw 15.02 restricts this act and you
Walking Route the assigned or authorized route a pupil walks to arrive at school or at the designated bus stop.
BUSINESS NON-INSTRUCTION OPERATION 3541 TRANSPORTATION I. GENERAL It is the goal of the Board of Education to establish for the public schools an appropriate transportation system one which will enable
Safety Evidence for Bicycling
Photo: Boegh (Flickr) Cycling in Cities Research Program School of Population & Public Health The University of British Columbia Faculty of Health Sciences Simon Fraser University Driving near bicyclists
PRAIRIE ROSE SCHOOL DIVISION SECTION E: SUPPORT SERVICES (PART 3: TRANSPORTATION)
EMJ ACCIDENTS INVOLVING SCHOOL BUSES File EMJ The Bus Driver shall immediately verbally inform the Supervisor of Operations who shall call the police to the scene of all accidents involving the school
3 Tappan Zee Bridge Rehabilitation Options
3 Tappan Zee Bridge Rehabilitation Options 3.1 Introduction This chapter describes possible options that rehabilitate and enhance the existing Tappan Zee Bridge. Four Rehabilitation Options have been developed:
Goals & Objectives. Chapter 9. Transportation
Goals & Objectives Chapter 9 Transportation Transportation MISSION STATEMENT: TO PROVIDE A TRANSPORTATION NETWORK CAPABLE OF MOVING PEOPLE AND GOODS EFFICIENTLY AND SAFELY. T he transportation system
Beginner s Permit. Survival Guide. Compliments of. (843) 263-5023 www.123drivedrivingacademy.com [email protected]
Beginner s Permit Survival Guide Compliments of (843) 263-5023 www.123drivedrivingacademy.com [email protected] Please use this study guide to assist you in studying for your written knowledge
Accident Analysis of Sheridan Road between Isabella Street and South Boulevard
Accident Analysis of Sheridan Road between Isabella Street and South Boulevard Prepared for TranSystems Corporation for the City of Evanston Submitted by Regina Webster & Associates, Inc. Date: 08/15/2008
Atlanta, Georgia Road Test
1. When driving your car Into traffic from a parked position, you should: A. Sound your horn and pull Into the other lane. B. Signal and proceed when safe. C. Signal other traffic and pull directly into
Framework Traffic Management for Shared Zones in Large Private Estates AITPM 2014 National Conference
Framework Traffic Management for Shared Zones in Large Private Estates AITPM 2014 National Conference Presented by : Wayne Johnson Senior Project Manager GTA Consultants [email protected] Outline
Squrriel Hill Tunnel Rehabilitation Detours. The following pages are detour routes for weekend daytime/nightime traffic.
Squrriel Hill Tunnel Rehabilitation Detours The following pages are detour routes for weekend daytime/nightime traffic. 1 P:\1555 s\21535146 - Squirrel Hill Tunnel Rehab\Cadd\Presentation\Press Release\WB_Day_Detour.dgn
EMERGENCY STORAGE PROJECT
EMERGENCY STORAGE PROJECT San Vicente Pipeline San Vicente Pumping Facilities San Vicente Interconnect Pipeline San Vicente Dam Raise Carryover Storage Project Briefing Summary DATE: May 21, 2008 ORGANIZATION:
Delineation. Section 4 Longitudinal markings
Delineation Section 4 Longitudinal markings The delineation guidelines have been developed to assist in designing and maintaining a quality delineation system. The guidelines are to comprise 19 sections
TRAFFIC MANAGEMENT PLAN (TMP) FRENCH-AMERICAN SCHOOL OF NEW YORK
Environmental and Planning Consultants 34 South Broadway Suite 401 White Plains, NY 10601 tel: 914 949-7336 fax: 914 949-7559 www.akrf.com TRAFFIC MANAGEMENT PLAN (TMP) *************************************************************
Managing Public Use of Freeway Emergency Access Gates and Median Crossovers
Managing Public Use of Freeway Emergency Access Gates and Median Crossovers Operational Instruction Transport Services Division TRAFFIC MANAGEMENT Operational Instructions Managing Public Use of Freeway
Public Works Operations Manual Standard Operating Procedures for Water and Sewer WS-A412 Water Connection Repair
Public Works Operations Manual Standard Operating Procedures for Water and Sewer WS-A412 Water Connection Repair 1. Objective: 1.1. To repair the water connection in a timely and efficient manner, minimizing
FMCSA Webinar Nov.18th to Examine Large Truck Crash Fatalities Involving Pedestrians & Bicyclists. New Technology for Better Fleet Management
In This Issue: FMCSA Webinar Nov.18th to Examine Large Truck Crash Fatalities Involving Pedestrians & Bicyclists Help Prevent Roadway Accidents involving Pedestrians How to Steer Clear of Accidents with
INSTRUCTIONS FOR ARRIVING & DEPARTING RAGBRAI OVERNIGHT TOWNS 2015
INSTRUCTIONS FOR ARRIVING & DEPARTING RAGBRAI OVERNIGHT TOWNS 2015 SIOUX CITY Directions for RAGBRAI Vehicles Arriving Sioux City Note: There is considerable construction on Interstate 29 coming into Sioux
Open House Public Meeting for the Thurmond Bridge Rehabilitation Project State Project: State Project S310-25/2-0.10 Federal Project: BR-0252(001)D
Open House Public Meeting for the State Project: State Project S310-25/2-0.10 Federal Project: BR-0252(001)D May 7, 2015 Old Glen Jean Bank Glean Jean, WV 4:00-7:00 PM www.transportation.wv.gov PROJECT
Bicycle Safety Quiz Answers Parental Responsibilities
Bicycle riding is a great way to get into shape and enjoy the outdoors. To remain safe on Illinois roads, it is important to follow the same traffic safety laws that govern vehicle drivers. No amount of
Traffic Management During Construction
Traffic Management During Construction The construction of Dublin Port Tunnel couldn t begin until a traffic management plan had been developed and agreed to facilitate construction of the Tunnel and to
TORONTO PEARSON INTERNATIONAL AIRPORT TRANSPORTATION AND PARKING
TORONTO PEARSON INTERNATIONAL AIRPORT TRANSPORTATION AND PARKING Getting to the Airport Toronto Pearson International Airport is located 25 km northwest of downtown Toronto. Direct access to the airport
Frequently asked questions July 2014
Carlton Main Sewer Frequently asked questions July 2014 We understand you might have some questions for us, so we ve prepared a selection of FAQs to provide you with some general information. If you would
8+ %!0"% 8+1!%"'$%,$"$
8+ 8+ %!0"% The next step in developing recommendations for improvements to Grand Avenue was to identify, develop and evaluate alternatives to address the issues and needs identified in the previous chapter.
Construction Phase Traffic Management Plan
Construction Phase Traffic Management Plan The Construction Phase Traffic Management Plan is in connection with the application for the development of a single Wind Turbine and Ancillary Works on land
Alphington sewer replacement
Alphington sewer replacement Frequently asked questions We understand you might have some questions for us so here are a few to provide you with more information. You are also welcome to call us on 1800
EXHIBIT A Accessible Truck Routes Map
EXHIBIT A Accessible Truck Routes Map ASHEVILLE, NORTH CAROLINA ROUTE: A ROUTE: B ROUTE: C ROUTE: D ROUTE: E EXHIBIT A EXHIBIT B Craven Street Improvements Map ASHEVILLE, NORTH CAROLINA EXHIBIT B EXHIBIT
Copy of black and white photograph of Montreal Tramways Company sweeper engine #40, original photograph in Box 2, Folder 6
photographs Includes black and white photographs related to the early days of the Montreal Tramways Company/Compagnie des tramways de Montréal, 1904-1956. Included are photographs of personnel, a variety
Disputed Red Light Accidents: A Primer on Signal Control. Jon B. Landerville, MSME, PE Edward C. Fatzinger, MSME, PE Philip S.
Disputed Red Light Accidents: A Primer on Signal Control Jon B. Landerville, MSME, PE Edward C. Fatzinger, MSME, PE Philip S. Wang, MSME Intersection Accident Statistics Intersection accidents occur on
MAIN STREET IMPROVEMENTS Water, Sewer, Stormwater and Streetscape Improvements
MAIN STREET IMPROVEMENTS Water, Sewer, Stormwater and Streetscape Improvements Presentation July 23, 2014 A. Morton Thomas and Associates, Inc. 800 King Farm Boulevard, 4 th Floor Rockville, Maryland 20850
METROPOLITAN PARATRANSIT LIST OF TRANSFER POINTS
SUMMARY Page 1. ISLAND OF MONTREAL TERRITORY... 1 1.1 Centre de réadaptation Lucie-Bruneau... 1 1.2 Montréal-Trudeau International Airport... 2 1.3 Beaconsfield Shopping Centre... 3 1.4 Carrefour Angrignon
Golf Cart/Utility Vehicle Operation Policy & Procedures
Golf Cart/Utility Vehicle Operation Policy & Procedures Purpose To establish standards for to the safe operation and use of Golf Cart/Utility Vehicles at Florida Institute of Technology. Background Information
Back to School Car Safety. Direct Buy Warranty Staff September 19, 2014
Back to School Car Safety Direct Buy Warranty Staff September 19, 2014 It s back to school season, and that means kids are picking out new clothes, putting on their backpacks, and hitting the road to get
Transportation Policy and Design Strategies. Freight Intensive. Level of Freight Presence
Appendix G Transportation Policy and Design Strategies CONTEXT SENSITIVE SOLUTIONS To address the need to describe freight systems which account for the population distress which may result, an analysis
PART I TRAFFIC VIOLATIONS
PART I TRAFFIC VIOLATIONS A. MOTOR VEHICLE STATUTES N.J.S.A. 39:3-4 Driving or parking unregistered motor vehicle 39:3-9a Failure to notify change in name $22 39:3-9a Failure to endorse license $42 39:3-10
Chapter 13 Route Window C11 Isle of Dogs station. Transport for London
Chapter 13 Route Window C11 Isle of Dogs station ISLE OF DOGS STATION 13 Route Window C11 Isle of Dogs station Introduction 13.1 The Crossrail Line lies completely in tunnel through this section, just
SAFE CYCLING GUIDE. 6th Edition
SAFE CYCLING GUIDE 6th Edition BEFORE SETTING OUT A WELL-MAINTAINED BICYCLE is key A Check tire pressure B Check that the chain does not slip C Check the brakes D Check lights and reflectors: 3 4 1 5 2
Crash Analysis. Identify/Prioritize. Gather Data. Analyze Crashes and Identify Improvements. Review Funding Options. Implement Improvements
Crash Analysis Identify/Prioritize 1. Find high crash areas 2. Review citizen input 3. Access City/County Safety Improvement Candidate Locations Gather Data 1. Use DOT-provided crash analysis programs
New Jersey SRTS Travel Plan Guide
New Jersey SRTS Travel Plan Guide Prepared For: Funded By: Prepared By: New Jersey Department of Transportation Federal Highway Administration Alan M. Voorhees Transportation Center Edward J. Bloustein
