1 Environmental and Social Monitoring Report Number 1: Semestral Report June 2014 SAMOA: Power Sector Expansion Project Prepared by the Electric Power Corporation for the Ministry of Finance, Independent State of Samoa and the Asian Development Bank.
2 Semi Annual Safeguard Monitoring Report Period: January June Samoa: Power Sector Expansion Project June 2014
3 This six monthly safeguard report is prepared by the Electric Power Corporation for the Government of Samoa and the Asian Development bank. This safeguard monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. Page 2
4 Table of Contents ACRONYMS... 4 EXECUTIVE SUMMARY... 5 INTRODUCTION... 6 PROJECT DESCRIPTION... 7 Salelologa Substation... 7 Supervisory Control and Data Acquisition (SCADA)... 7 SITES DESCRIPTIONS... 8 MONITORINGS... 9 STATUTORY CONSIDERATIONS... 9 INVESTIGATIONS and PERMITS FINDINGS Salelologa substation SCADA OHER PROJECTS Proposed Vaiaata Power Station Afulilo Odor Fuluasou to Malifa Underground SAFETY, SOCIAL and RE-SETTLEMENT GRIEVANCE REDNESS MECHANISM CONCLUSIONS Page 3
5 ACRONYMS ADB - Asian Development Bank ADF - Asian Development Fund COEP - Codes of Environmental Practice db - Decibels DEC - Division for Environment and Conservation EPC - Electric Power Corporation ESU - Environment and Social Unit HV - high voltages IEE - Initial Environmental Examination JBIC - Japan Bank for International Cooperation LTA - Land Transport Authority LV - low voltages MNRE - Ministry of Natural Resources and Environment MWTI - Ministry of Works Transport and Infrastructure OMP - Odor Management Plan PMU - Project Management Unit PSEP - Power Sector Expansion Project PUMA - Planning and Urban Management Agency SCADA - Supervisory Control and Data Acquisition SLC - Samoa Land Corporation SROS - Scientific Research of Samoa Page 4
6 EXECUTIVE SUMMARY 1. Environment and Social Unit (ESU) carried out monitoring of 2 subprojects that were under construction during this monitoring period. ESU conducted weekly inspections of each construction site. 2. The 2 subprojects that were under construction are: Salelologa Substation and Supervisory Control and Data Acquisition (SCADA) System. Other subprojects monitored and ESU involved in are: Vaiaata power plant preliminary work, Afulilo odor, and Fuluasou to Malifa underground. 3. ESU did not find any major safeguard issues that were impossible to resolve. 4. Main contractors, subcontractors and Electric Power Corporation (EPC) crew involved in all these subprojects complied with all relevant safeguard requirements under National laws. Traffic controls were properly planned and executed by contractor. 5. There were also no social or environment issues raised by members of the public and other stakeholders, with relation to the monitored projects. Compensations for Resettlement to affected people were all properly settled and paid. 6. There were no safety issues or reports of any injuries or near misses from contractors and subcontractors. Page 5
7 INTRODUCTION The Power Sector Expansion Project (PSEP) is an 8 years long project from 2008 to 2016 to implement various improvements to power sector to improve supply of electricity in Samoa and improve financial capacity of EPC. System improvements include: construction of new power station to increase generating capacity to meet growing demand now and future, increasing capacity of transmission and distribution power lines, reduce line loss, improve efficiency of operation, new SCADA system to closely monitor and remotely control generators and other equipment, substations and National Control Center, underground of backbone transmission and distribution lines and conversion to prepayment electric meters. EPC is in need to improve its collection performance; remove transmission obstacles to improve reliability and quality of supply; and capacity requirements to meet growing peak demands. In the longer term, the objective is to reduce Samoa s reliance on imported fuels by promoting clean and renewable energy using hydro, sun, wind, biogas and waste to energy generation. Project is funded by Asian Development Fund (ADF), Asian Development Bank (ADB) loan, Japan Bank for International Cooperation (JBIC) loan, Government of Australia grant, Samoa Government and EPC. The Project Management Unit (PMU) was established for the management and implementation of the Power Sector Expansion Project. This includes project planning, design, construction, project and construction management, monitoring, reporting, procurement, evaluation, cost and quality control. The ESU under the PMU is responsible for managing land acquisition, resettlement, social and environmental impacts under the project. Page 6
8 PROJECT DESCRIPTION Below are two subprojects under construction that ESU closely monitored to identify any social and environment impacts and address them, to avoid any delays to their implementation. Salelologa Substation Part of the old Salelologa powerhouse was renovated and renewed to house this new 22kv substation and the Mini Control Center for Savaii. Generators inside this section of powerhouse were removed. Substation includes air conditioned new 22kv switchgear room where all new 22kv and 415 volts electrical switchgear are housed. All generators are now connected to new switchgear via 415volts to 22kv transformers. Before, old switchgear was defective and malfunctioned. Generators were connected directly to overhead power lines through step transformers. This created unsafe situation and unreliability in system. The new substation replaced old switchgear to improve generation and transmission systems in Savaii. Old switchgear was rundown, unreliable, and unsafe for operators. Bad conditions caused unreliability in power supply in Savaii. Mini Control Center will house SCADA system so that system can be closely monitored remotely and control generators and other facilities. Project was completed and commissioned in April There were no land nor do resettlement issues during this report period because works were done inside EPC compound. Work area was congested because of operating generators in same area. Plus there were lots of live 415 volts and 22kv cables lying on ground awaiting completion of new substation. So safety was a major concern that contractor supervisor and EPC operators had to closely manage. Supervisory Control and Data Acquisition (SCADA) SCADA is a centralized database management that will assist EPC in improving its operation efficiency, reduce unplanned outages, and provide early detection of such outages and early restoration responses. Schneider Electric (Australia) Pty Limited is the main contractor and PPG Engineering is the sub-contractor for civil works and Telecom-Tronics Company for cables, antenna installation and construction of towers. Fiaga and Salelologa Towers were completed while Vaiaata Tower is yet to construct. Page 7
9 Electric Power Corporation SITES DESCRIPTIONS The Salelologa Substation is located within the village of Salelologa in Faasaleleaga Number 1 district on the island of Savaii. The property is a 2 acre Government land transferred to EPC. The area is categorized as a mix use area (commercial and residential) and it is not within any hazard zone. Noise and exhaust fume has been a problem to village people and they objected to having this power plant here. That was reason why Cabinet approved to build the new power station in a Government land in Vaiaata. Any generator left installed in Salelologa will be for backup only. Two SCADA System Towers were constructed at Fiaga Power Station (Upolu Island) and Salelologa Power Station (Savaii Island), one tower is yet to construct at the proposed Vaiaata power station (Savaii). Sites are Government lands and it s within areas that are mix used (commercial, residential, farming, etc.) and not within any hazard zones. Page 8
10 MONITORINGS Monitoring s were and continued to be conducted by Mr. Asi Tuuau - Resettlement Specialist, Moetuasivi Asiono - Public Relation Specialist and Iosefa Aiolupotea - Environment Officer, of Environmental Social Unit of the Project Management Unit. ESU strictly monitor critical cases every day (Mondays to Saturdays) to ensure progress of works and compliance with conditions. Developments with minor effects on the environment were monitored twice or three time a week. Environment Officer or the Resettlement Specialist went once a week to Savaii Island to monitored the Salelologa substation and the SCADA tower; ESU took photos of areas of concerns during inspection and talked to contractor s supervisor on site to fix these areas as soon as possible. After inspection, ESU findings with photos to the contractor s Project Manager and suggest measures to remedy problems on site with specific time for compliance. Overall, ESU conducted random inspections and took photos of areas that were compliant and/or non-compliant with health, safety, social and environmental standards. Upon indication of areas of concerns, contractors were always informed right away on site and through reports, of the need to address these concerns and fix them as soon as possible, so as to avoid complaints as well as harm to workers, visitors and neighboring properties, as these concerns can be categorized as major threats if not tend to immediately. STATUTORY CONSIDERATIONS The Planning and Urban Management Act 2004 requires all developments to attain a Development Consent and ensures compliance with conditions. National Noise Policy 2011; all construction noise must be within the average of 75 Decibels (db) from 7am to 6pm and 60dB from 6pm to 10pm. Samoa Codes of Environmental Practice (COEP) 2006; all earthworks shall be conducted in accordance with COEP section 13. National Building Code 1992; all buildings in Samoa must adhere with all the statutory conditions under the Code. Page 9
11 INVESTIGATIONS and PERMITS The Planning and Urban Management Board granted subject to conditions the Development Consent DCA 367/13 for Salelologa Substation. Ministry of Works, Transport and Infrastructure (MWTI) approved the constructions of the Salelologa Substations after comprehensive examining of detailed designs submitted by EPC. The Planning and Urban Management Agency granted subject to conditions the Development Consent DCA 072/13 to construct SCADA microwave towers. The Planning and Urban Management Agency (PUMA) of the Ministry of Natural Resources and Environment (MNRE) granted with conditions the Development Consent DCA 780/12 for drilling of boreholes for Vaiaata Geotechnical study. FINDINGS Salelologa substation a. Officially opened on Friday 11 April 2014; b. No Environment, Social, Safety or Health effects identified on site throughout construction; c. Neighboring families, workers and pedestrians were free of any hazards that could harm their wellbeing and properties; d. Contractors were in compliance with Consent conditions and National Standards; e. No complaints rose to relevant authorities or voiced to EPC throughout the project. Figure 1: Completed Salelologa substation. Photo on Thursday 10 April Figure 2: New switchgears at the substation. Photo on Thursday 10 April Page 10
12 Electric Power Corporation SCADA a. Installation of fiber optic cable between Fiaga power station and Fuluasou substation is complete. This allows commissioning of differential protections of 33kv underground tie between Fiaga and Fuluasou; b. Construction of SCADA tower at Fiaga and Salelologa is completed. No land issues because construction sites belongs to EPC. Construction of Vaiaata tower is yet to start; c. Safety was highly prioritized by contractor during construction of Fiaga and Salelologa towers. No accidents occurred so far. Fiaga Salelologa Figures 3 & 4: SCADA towers at Fiaga and Salelologa. Photos on Friday 30 May OTHER PROJECTS Proposed Vaiaata Power Station The proposed site for the new power station at Vaiaata located 900meters from the nearest residence and 20km from the Salelologa wharf (Savaii Island). The 100 acres land for the development is a Government land, leased by EPC from the Samoa Land Corporation (SLC). The site is strongly recommended in terms of location distant from residential area for environmental, health and safety precautions of the public. The new power station will be able to provide efficient supply of electricity to meet the increasing demand and minimize maintenance costs in the power sector on the big island. Works have been done at Vaiaata which includes the clearance of the vegetation for access roads and power station site, the resistivity tests and the Geo Tech study. Page 11
13 The proposed development includes the construction of access roads, power house with its utilities, fencing of property, landscaping and water supply. The construction total cost is approximately US$15,000,000. Series of events: January June 2014 March ADB instructed PMU to rewrite Feasibility Study and update Resettlement Plan and Initial Environmental Examination (IEE); April PMU submitted to ADB Feasibility Study, Resettlement Plan and IEE for ADB s comments; 9 May ESU conducted its latest visit of Vaiaata and confirmed that the site for the proposed Vaiaata power station is still untouched by neighboring villages, (refer figure 5); May PMU resubmitted Feasibility Study, Resettlement Plan and IEE taken into consideration ADB s comments; PMU now awaiting ADB s final approval of submitted documents, then PMU will submit applications to PUMA/MNRE and MWTI for appropriate permits. Figure 5: Vaiaata site remains unoccupied. Afulilo Odor Afulilo Dam was constructed in 1990 and Taelefaga station is Samoa s only storage hydro-power station and is fed by the Afulilo reservoir. Over the years, the people of Taelefaga (where the powerhouse located) complained regarding foul smell from EPC s Page 12
14 Electric Power Corporation hydro station at Taelefaga. They threatened EPC that they will shut down the operation of this powerhouse if foul smell continues. PMU with the assistance of a JICA volunteer, Scientific Research Organization of Samoa (SROS) is researching mitigate measures using of a micro bubble technology. EPC is presently using a compressor to pump oxygen into dam deep part of dam to mitigate generating of gas which causes smell when discharge from power station in Taelefaga. This helps reduced formation of gas. Series of events: January June February 2014 PMU met with Division for Environment and Conservation (DEC), PUMA/MNRE to discuss progress and actions taken by EPC to address this odor issue; 20 February 2014 Joint inspection with SROS, MNRE, EPC, and gathered samples for SROS s investigations/testing s. During the joint inspection NO FOUL SMELL emitted from Afulilo Reservoir and tail race at Taelefaga station; 21 February PUMA/MNRE instructed ESU/PMU to submit Odor Management Plan (OMP) for Afulilo as soon as possible; ESU/PMU and PUMA/MNRE planned to conduct joint odor monitoring randomly to investigate/confirm foul odor from EPC s Taelefaga station; ESU to investigate other measures to address this odor issue; 04 March 2014 PMU submitted OMP to PUMA with a brief report on the 20 February 4 joint inspection; and PMU s proposed micro bubble project for PUMA s information; Awaiting micro bubble nozzle from Japan because no local business sell/import the relevant nozzle. Experiment of the micro bubble technique will commence as soon as PMU receives the nozzle from Japan; 13, 19 & 20 March 2014 Conducted joint smell monitoring/investigation with PUMA. No foul smell emitted from EPC Taelefaga tail race. Time of monitoring: 1pm, 1:30pm, 11pm, 12midnight, 2am, 5:30am, 6am, 6:30am. Village people told us that 12midnights and early mornings are often the times to observed foul smell; EPC continuously undertaking the two methods at Afulilo Reservoir. (1) Aeration Pumping of air/oxygen into the reservoir to eliminate H2S. (2) Pumping Pumping/exposing of the bottom water into the surface to eliminate H2S. Page 13
15 Figure 6: Aeration and pumping of the Afulilo reservoir bottom water into the surface. Photo on Thursday 20 February Figure 7: Collecting sample water from Afulilo reservoir for experiment at SROS. Photo on Thursday 20 February Fuluasou to Malifa Underground PMU linesman is continuing with installation of high voltages (HV) and low voltages (LV) cables, pad mount transformers, pillar boxes, and service connections to customers along Vaitele Street from Lepea to Malifa. All HV and LV overhead power lines along Lepea to Malifa will be removed. This underground project is properly planned to avoid frequent shutdowns and interrupted power supplies to customers; Safety of workers and pedestrians is the primary objective to overseers on site; and work is carried out properly to avoid traffic jams and accidents; Power outages were well planned to cater for business and peak hours; Consultations with families frontage the Vaitele street were conducted so that they are aware of the development and confirmed that underground cables will only touched the road reserve not private properties; No complaints from neighboring families, businesses and relevant authorities. The development does not need resettlement or compensation of affected properties since no such issue arises and the project is on the road reserve. Page 14
16 Figure 8 & 9: PMU linesmen s in the progress of removing overhead electric lines and post. Photos on Wednesday 09 April 2014, and 24 May SAFETY, SOCIAL and RE-SETTLEMENT Workers on project sites were provided with proper safety gears in compliance with the Occupational, Health, and Safety Act. Compliance with the Planning and Urban Management Act 2004 ensured all environment grievances were taken care of on site. Projects generated employment opportunities for the locals. For the current EPC s projects funded by ADB, there were no issues of land grievances due to all projects were free of any land acquisition or resettlement as all works were undertaken on EPC and government properties. Compensations were paid to land owners according to the amount of trees and crops encroached onto the project sites. GRIEVANCE REDNESS MECHANISM EPC have enquiry boxes where the public can deposit complains or suggestions and a customer complaints center open 24 hours and the public are urged to contact the call center via numbers and regarding complaints and any aspect of electricity services. PMU have a Grievance Redress Mechanism to address complaints relating to Projects under PMU pertaining to the PSEP as well as EPC Projects. All records of complaints and responses will be well kept for future reference and in case of lawsuits. The mechanism is equipped with a step-by-step procedure to receive, register and track all grievances concerning the environment and social issues. A grievance form has been created and will be used to address complaints for each PMU projects. Complaints can be filed in person, via or via a letter to EPC. Page 15
17 The public communication officer is responsible for receiving complaints, facilitating, tracking and reporting on grievances and their resolutions. CONCLUSIONS PMU/ESU concludes that construction poses no health, social, safety and environmental issues. Contractors also complied with National Laws in regards to safety gears, installation and stabilization of caution signs to avoid risks to workers, visitors and the public. Public and relevant stakeholders raised no complaints to PMU concerning Environment, Health and Social issues with relation to the construction of the aforementioned projects. Compliance of contractors to national environmental laws, policies and regulations as well as conditions laid out by relevant authorities will be highly and continuously supervised by ESU. Prepared by Environmental & Social Unit (ESU) Date: Sept. 16, 2014 Reviewed and endorsed by: Fonoti Perelini S. Perelini Project Manager Project Management Unit Page 16
Semi Annual Environmental Monitoring Report. July 2013 L2557/2558. SRI: Greater Colombo Wastewater Management Project
Semi Annual Environmental Monitoring Report July 2013 L2557/2558 SRI: Greater Colombo Wastewater Management Project This environmental monitoring report is a document of the borrower. The views expressed
TRAFFIC MANAGEMENT PLAN
TRAFFIC MANAGEMENT PLAN For: The construction and operation of a Photovoltaic (PV) Facility in Dabenoris, South Africa Prepared for: Alternative Energy Solutions (Pty) Ltd PO Box 4939 Tygervalley, South
Triton Knoll Offshore Wind Farm Limited Electrical System. Outline Traffic Management Plan
Triton Knoll Offshore Wind Farm Limited Electrical System Outline Traffic Management Plan October 2014 RWE Innogy UK Triton Knoll TMP Copyright 2014 RWE Innogy UK Ltd All pre-existing rights reserved.
FIXED CHARGE: This is a cost that goes towards making the service available, including
ELECTRICITY BILL COMPONENTS FIXED CHARGE: This is a cost that goes towards making the service available, including installation and maintenance of poles, power lines and equipment, and 24-hour customer
COMPLIANCE REVIEW OF 2006/07 ASSET MANAGEMENT PLAN. Top Energy Limited
PB ASSOCIATES COMPLIANCE REVIEW OF 2006/07 ASSET MANAGEMENT PLAN Prepared for PB Associates Quality System: Document Identifier : 153162 Top Energy Final Report Revision : 2 Report Status : Final Date
Certificate of Registration
Certificate of Registration This is to certify that Clancy Docwra Limited Supplier Number: 061973 are now fully registered as a supplier on UVDB for the following products/services 1.4.25 Communication
POWER NETWORKS. 2014-15 Electricity Network Tariffs and Charges and Future Price Trends
POWER NETWORKS 2014-15 Electricity Network Tariffs and Charges and Future Price Trends August 2014 Power and Water Corporation Table of Contents 1 Business Characteristics... 3 2 2014 Network Price Determination...
Transmission Business Electrical Incident & Safety Performance Reporting Guide
Transmission Business Electrical Incident & Safety Performance Reporting Guide December 2011 Version 1.0 Energy Safe Victoria PO Box 262 Collins Street West MELBOURNE VIC 8007 AUSTRALIA Telephone (03)
AVOIDANCE OF ELECTRICAL HAZARDS WHEN WORKING NEAR OVERHEAD ELECTRIC LINES
overhead 23/11/04 2:28 PM Page 1 AVOIDANCE OF ELECTRICAL HAZARDS WHEN WORKING NEAR OVERHEAD ELECTRIC LINES ESB Code 9803203 overhead 23/11/04 2:28 PM Page 2 overhead 23/11/04 2:28 PM Page 3 Page 1 of 20
CHUGACH ELECTRIC ASSOCIATION, INC. Anchorage, Alaska. February 10, 2014
CHUGACH ELECTRIC ASSOCIATION, INC. Anchorage, Alaska February 10, 2014 QUESTIONS AND ANSWERS TO: Prospective Proposers FROM: Chugach Electric Association, Inc. 5601 Electron Drive Anchorage, Alaska SUBJECT:
APPENDIX 7 : PHYSICAL CULTURAL RESOURCES MANAGEMENT PLAN
APPENDIX 7 : PHYSICAL CULTURAL RESOURCES MANAGEMENT PLAN Contents 1.0 Introduction... 2 1.1 Definitions... 3 1.2 Purpose / Goals of the Plan... 3 1.3 Timing... 3 1.4 EMP Framework... 3 1.5 Plan Revision,
Environmental Compliance Audit Report. MFF 0054-VIE: Water Sector Investment Program Tranche 2
Environmental Compliance Audit Report Project Number: 41456-033 June 2012 MFF 0054-VIE: Water Sector Investment Program Tranche 2 This environmental comliance audit report is a document of the borrower.
TERMS OF REFERENCE. ASSIGNMENT INFORMATION Position Title:
TERMS OF REFERENCE Pacific Integrated Water Resources Management (IWRM) National Planning Programme Development of a National Water Resources Allocation Policy for the Government of Samoa BACKGROUND The
This document must be read in conjunction with the Permit to Work and Service Interruption Notice policy.
UNIVERSITY OF HERTFORDSHIRE HIGHER EDUCATION CORPORATION SITE RULES FOR CONTRACTORS The University s Site Rules for Contractors are issued on the authority of the Director of Estates, Hospitality and Contract
City of Buffalo Municipal Electric Utility Energy Emergency Response
City of Buffalo Municipal Electric Utility Energy Emergency Response Table of Contents Page 1. Goals 2 2. Types of Energy Emergencies..3 3. Utility Emergency Operating Plans.4 4. Link to General Reliability/Outage
Who is National Grid?
Who is National Grid? National Grid is a leading international energy infrastructure business In the UK, our business includes electricity and gas transmission networks and gas distribution networks. We
Electric Field Operations Organization
NSTAR Electric Transmission Function Job Summaries Electric Field Operations Organization Vice President, Electric Field Operations (Transmission) This position has primary responsibility for the planning,
ATTACHMENT G. Network Operating Agreement
ATTACHMENT G Network Operating Agreement 1. PURPOSE OF NETWORK OPERATING AGREEMENT The purpose of this Agreement is to identify contractual requirements related to Network Integration Transmission Service
Construction Management Plan Template
Plan Template Planning Permit Number:... Date Planning Permit Issued:... Approval Stamp (Office Use only): Standard Plan Template Project details Company Operational Details.. Directors Name Company Name
Ex-Ante Evaluation (for Japanese ODA Loan)
Japanese ODA Loan Ex-Ante Evaluation (for Japanese ODA Loan) 1. Name of the Project Country: The Republic of the Union of Myanmar Project: Urgent Rehabilitation and Upgrade Project Phase I Loan Agreement:
ENGINEERING COMPETENCIES ENTRY LEVEL ENGINEER. Occupation Specific Technical Requirements
ENGINEERING COMPETENCIES ENTRY LEVEL ENGINEER Responsible for performing entry level engineering analysis, design, plan, review and inspection for small to medium projects and/or designated segments of
TERMS OF REFERENCE FOR PROJECT MANAGEMENT AND SUPERVISION CONSULTANTS REHABILITATION AND UPGRADE OF SCADA SYSTEM AND EMS
A. Background TERMS OF REFERENCE FOR PROJECT MANAGEMENT AND SUPERVISION CONSULTANTS REHABILITATION AND UPGRADE OF SCADA SYSTEM AND EMS 1. The Government of Armenia has received financing from the Asian
Audit Report Rottnest Island 2015 Network Quality and Reliability of Supply Performance Audit - Operation of Compliance Monitoring Systems
ABN 20 009 454 111 Rottnest Island 2015 Network Quality and Reliability of Supply Performance Audit - Operation of Compliance Monitoring Systems Telephone: +61 8 9260 0003 Fax: +61 8 9225 7447 E-Mail:
PART 3: RIGHTS AND RESPONSIBILITIES
PART 3: RIGHTS AND RESPONSIBILITIES When program required OCCUPATIONAL HEALTH AND SAFETY PROGRAMS 3.1 (1) An occupational health and safety program as outlined in section 3.3 must be initiated and maintained
Ladies and Gentlemen,
Ladies and Gentlemen, I would like to begin my speech by thanking deeply the Maniatakeion Foundation and especially the Chairman, Mr. Dimitris Maniatakis for his invitation and to congratulate him for
Ex-Ante Evaluation (for Japanese ODA Loan)
Japanese ODA Loan Ex-Ante Evaluation (for Japanese ODA Loan) 1. Name of the Project Country: The Democratic Socialist Republic of Sri Lanka Project: New Bridge Construction Project over the Kelani River
CenterPoint Energy responds to frequently asked questions
Page 1 of 5 CenterPoint Energy responds to frequently asked questions Houston Sept. 19, 2008 CenterPoint Energy responds to the questions customers are asking. When will you restore my power? We are working
The Leader in Wind Energy
The Leader in Wind Energy About the Cover: The 102-megawatt Red Mesa Wind Energy Center in New Mexico is capable of generating enough electricity to power more than 30,000 homes. NextEra Energy Resources
Service Level Agreement/Specification
Service Level Agreement/Specification For Maintenance and Associated Risk Management Services at New College Campus and Associated properties May 2007 INDEX 1. SCOPE 2. MAINTENANCE SERVICE LEVELS a. Staffing
UNDERGROUND TELECOMMUNICATIONS CABLES ACROSS PRIVATE LAND
FACT SHEET TELEPHONE 0800 327 646 I WEBSITE WWW.FEDFARM.ORG.NZ UNDERGROUND TELECOMMUNICATIONS CABLES ACROSS PRIVATE LAND BACKGROUND The Rural Broadband Initiative envisages substantially improved broadband
Storm Restoration. Bill Smeaton Distribution Superintendent Provincial Lines
Storm Restoration Bill Smeaton Distribution Superintendent Provincial Lines About Hydro One Hydro One owns and operates Ontario's 29,000 km high voltage transmission network that delivers electricity to
Programme Manager/Procurement Specialist. Suva. Capital Works Manager. As soon as possible. As follows
JOB DESCRIPTION Position: Location of position: Reporting to: Special functional relationships: Term of Appointment: Programme Manager/Procurement Specialist Suva Capital Works Manager Capital Works Programme
SAFETY and HEALTH MANAGEMENT STANDARDS
SAFETY and HEALTH STANDARDS The Verve Energy Occupational Safety and Health Management Standards have been designed to: Meet the Recognised Industry Practices & Standards and AS/NZS 4801 Table of Contents
Last revised: September 1, 2014 TRANSMISSION FUNCTION TITLES AND JOB DESCRIPTIONS
Last revised: September 1, 2014 TRANSMISSION FUNCTION TITLES AND JOB DESCRIPTIONS EVP, Chief Operations Officer, has primary responsibility for the overall planning, operations and control of the transmission
VIE: Second Upper Secondary Education Development Project (USEDP II) - Ha Giang Province
Due Diligence Report November 2014 VIE: Second Upper Secondary Education Development Project (USEDP II) - Ha Giang Province Quyet Tien Upper Secondary School Prepared by the Ministry of Education and Training,
Living with Electricity Easements
The Basslink electricity interconnector spans a total of 370 kilometers, from Georgetown in Tasmania, across Bass Straight to Gippsland where it connects with the Victorian electricity grid at Loy Yang.
The main directions of developing renewable energy sources in Uzbekistan Otabek Sharipov
The main directions of developing renewable energy sources in Uzbekistan Otabek Sharipov Head of the Main Department Ministry of Economy of the Republic of Uzbekistan Potential of renewable energy sources
Addendum #2 Contract UK-11-13
Addendum #2 Contract UK-11-13 Utilities Kingston Purchase and Replacement of Switchgear at Kingston Hydro Substation MS11 March 25, 2011 Delivered to: All RFP recipients Total number of pages: Nine (9)
Building over or close to a public sewer
Building over or close to a public sewer thameswater.co.uk/developerservices thameswater.co.uk/developerservices 1 Questions and answers Did you know Thames Water is legally responsible for more than 100,000
S/o Vishnudas Chakraborty, residence at R/o Narsinghgarh, District Rajgarh (M.P.).
RISK ASSESSMENT The Crusher stone deposit lease area is located at Village Badodiya Jagir, Tehsil - Narsinghgarh, District - Rajgarh (M.P.). 02.00 Ha quarry lease area with production of 3306 cubic meter/year
environment briefing02
PRODUCED BY THE SAFETY, HEALTH & ENVIRONMENT GROUP OF THE ENERGY NETWORKS ASSOCIATION - JULY 2006 environment briefing02 transporting electricity Overhead Lines or Underground Cables? Introduction The
THE UNIVERSITY OF SHEFFIELD WORK AT HEIGHT POLICY
THE UNIVERSITY OF SHEFFIELD WORK AT HEIGHT POLICY CONTENTS Page No 1 INTRODUCTION 2 2 LEGISLATION 2 3 HIERARCHY OF CONTROL 2 4 WORK AT HEIGHT POLICY 3 5 ROLES AND RESPONSIBILITIES 3 6 RISK ASSESSMENTS
TOWNSVILLE WATER Customer Service Standards
TOWNSVILLE WATER Customer Service Standards CONTENTS Townsville Water who are we? 3 What is the Customer Service Standard? 3 >> Does the Customer Service Standard apply to me? 3 >> What will Townsville
Service Level Agreement (SLA)
Hertford College, Oxford Service Level Agreement (SLA) For Maintenance, Risk Management, and Domestic Accommodation Services At Hertford College, its residential annexes and non- residential properties
PROJECT PREPARATORY TECHNICAL ASSISTANCE
A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The Government of Azerbaijan, the Ministry of Transport and Baku Metro Company requested ADB to help improving its urban transport system and
Trees and powerlines. Office of the Technical Regulator. Web: sa.gov.au/energysafe Phone: 8226 5500 Email: [email protected]
Trees and powerlines Office of the Technical Regulator For more energy information: Web: sa.gov.au/energysafe hone: 8226 5500 Email: [email protected] owerlines are an important part of our everyday
Bi-Annual Environmental Monitoring Report
Bi-Annual Environmental Monitoring Report Project Number: 2727-PAK-Tranche-II (January-June, 2012) Islamic Republic of Pakistan: Power Distribution Enhancement Investment Project Financed by the Asian
THE PROVISIONAL CENTRAL PRODUCT CLASSIFICATION
THE PROVISIONAL CENTRAL PRODUCT CLASSIFICATION GROUP 867 ARCHITECTURAL, ENGINEERING AND OTHER TECHNICAL SERVICES Excerpt from CPCprov-en-Publication.doc - United Nation Statistic Division Group Class Subclass
R000. Revision Summary Revision Number Date Description of Revisions R000 Feb. 18, 2011 Initial issue of the document.
2 of 34 Revision Summary Revision Number Date Description of Revisions Initial issue of the document. Table of Contents Item Description Page 1. Introduction and Purpose... 5 2. Project Management Approach...
Environmental and Social Monitoring Report
Environmental and Social Monitoring Report Project Number: 44932-054 July 2015 INDIA: 145 MW Grid Connected Solar Project Sand Land Real Estate Private Limited Safeguards Monitoring Report (April 2013
Storm Ready. 3 Gulf Power Ready for the storm. 4 Be prepared, be safe. 5 Getting the lights back on. 6 Damage to your home s service connection
Storm Ready Prep and Safety Power Restoration Your Service Connection Generator Safety Power Outage Map Stay Connected with Gulf Power Storm Ready 3 Gulf Power Ready for the storm 4 Be prepared, be safe
PROPOSED RESIDENTIAL DEVELOPMENT LAND OFF MACCLESFIELD OLD ROAD, BUXTON. Construction Management Plan
PROPOSED RESIDENTIAL DEVELOPMENT LAND OFF MACCLESFIELD OLD ROAD, BUXTON Construction Management Plan May 2013 CONTENTS Page No: 1.0 INTRODUCTION 1 2.0 PROJECT ORGANISATION AND RESPONSIBILITIES 2 2.1 Client
Electrical Safety Tips. Help us keep you safe
Electrical Safety Tips Help us keep you safe To help you stay safe when using electricity, ActewAGL has compiled these electrical safety tips. For natural gas safety tips please see ActewAGL s natural
OCCUPIERS DUTIES SITE ACCESS
OCCUPIERS DUTIES SITE ACCESS Health and Safety at Work Act 1974 - Section 4 - Persons in control of premises Must ensure as far as they are in control that the premises are so as is reasonably practicable
Galloper Wind Farm Project. Traffic Management Plan May 2013 Draft v1 Document Reference GWF/TMP/100513. Galloper Wind Farm Limited
Galloper Wind Farm Project Traffic Management Plan May 2013 Draft v1 Document Reference GWF/TMP/100513 Galloper Wind Farm Limited Document title Galloper Wind Farm Project Traffic Management Plan Status
Tasmanian Transmission Revenue Proposal
Tasmanian Transmission Revenue Proposal An overview for Tasmanian electricity consumers Regulatory control period 1 July 2014 30 June 2019 Tasmanian Networks Pty Ltd About TasNetworks We are Tasmania s
Work Health & Safety Policy Document Number: WH&S 023 003 Ver 1
Work Health & Safety Policy Document Number: WH&S 023 003 Ver 1 Approved by: Senior Leadership Team Page 1 of 7 POLICY OWNER: Human Resources PURPOSE: To ensure, so far as is reasonably practicable, that
THE BUDAPEST STOCK EXCHANGE LTD. REGULATIONS ON THE USE OF REMOTE TRADING
THE BUDAPEST STOCK EXCHANGE LTD. REGULATIONS ON THE USE OF REMOTE TRADING Date and reference no. of approval/modification resolutions by the Board of Directors: Date and reference no. of approval by Supervisory
Power products and systems. Intelligent solutions for power distribution Zone concept
Power products and systems Intelligent solutions for power distribution Zone concept Securing continuous power supply ABB is one of the world's leading power and automation technology companies whose products,
Inquiring Minds Want to Know: Questions Landowners Should Ask in Negotiations with Companies Seeking Easements
Inquiring Minds Want to Know: Questions Landowners Should Ask in Negotiations As a property owner, you should make a decision about granting an easement based on the same level of information available
VILLAGE OF PLEASANT PRAIRIE COMMERCIAL COMMUNICATION PERMIT
VILLAGE OF PLEASANT PRAIRIE COMMERCIAL COMMUNICATION PERMIT CLASS 1 COLLOCATION New Commercial Communication Structure Substantial Modification Please check one of the following: CLASS 2 COLLOCATION OTHER
Knock Down Rebuild. Building Process Building process - knock down rebuild 1
Knock Down Rebuild Building Process Building process - knock down rebuild 1 Building Process Your action Our action REMINDER Pre site Step 1 New Home Selection Congratulations. This marks the start of
We are the regulator: Our job is to check whether hospitals, care homes and care services are meeting essential standards.
Inspection Report We are the regulator: Our job is to check whether hospitals, care homes and care services are meeting essential standards. Bury DCA United Response, City View Business Centre, 9 Long
1. Name of the Project 2. Necessity and Relevance of JBIC s Assistance
Ex-ante Evaluation 1. Name of the Project Country: India Project: Goa Water Supply and Sewerage Project (Loan Agreement: 09/14/2007; Loan Amount: 22,806 million yen; Borrower: The President of India )
Health and Safety Policy
Health and Safety Policy October 2014 1 October 2014 Contents: Introduction 1. STATEMENT OF INTENT AND POLICY OBJECTIVES 2. RESPONSIBILITIES AND ACCOUNTABILITIES FOR HEALTH AND SAFETY 2.1 The Director
COMPRESSION. Bureau of Forestry. Natural Gas Advisory Committee January 15, 2014. Presentation to the. www.dcnr.state.pa.us
COMPRESSION Bureau of Forestry Presentation to the Natural Gas Advisory Committee January 15, 2014 Gas Well Decline Gas wells decline in volume and pressure as produced As the pressure declines so does
Iowa Smart Planning. Legislative Guide March 2011
Iowa Smart Planning Legislative Guide March 2011 Rebuild Iowa Office Wallace State Office Building 529 East 9 th St Des Moines, IA 50319 515-242-5004 www.rio.iowa.gov Iowa Smart Planning Legislation The
Bi-annual Environmental Monitoring Report
Project Number: 2974-GEO (SF) Reporting period: Jul 2014-Jan 2015 GEORGIA: POWER TRANSMISSION ENHANCEMENT PROJECT (Financed by the Asian Development Bank) Bi-annual Environmental Monitoring Report Prepared
Description of Selected Services under the UN CPC system in which the EC made Market Access Commitments in the EPA
Description of Selected Services under the UN CPC system in which the EC made Market Access Commitments in the EPA 7471 Travel agency and tour operator services Services rendered for passenger travel by
REPORT TO WILDERNESS MOUNTAIN WATER SERVICE COMMISSION MEETING OF TUESDAY, MARCH 31, 2015
REPORT TO WILDERNESS MOUNTAIN WATER SERVICE COMMISSION MEETING OF TUESDAY, MARCH 31, 2015 SUBJECT COST ESTIMATE FOR A PROPOSED ELECTRICAL CABLE CONNECTION FOR PORTABLE GENSET ISSUE To conceptualize and
PROJECT : LAKE TURKANA WINDFARM ACCESS ROAD REHABILITATION COUNTRY : KENYA EXECUTIVE SUMMARY OF THE ABBREVIATED RESETTLEMENT ACTION PLAN
PROJECT : LAKE TURKANA WINDFARM ACCESS ROAD REHABILITATION COUNTRY : KENYA Project reference: P-KE-FZ0-001 EXECUTIVE SUMMARY OF THE ABBREVIATED RESETTLEMENT ACTION PLAN Head of team: M. GABISCH Investment
APPENDIX D DISTRIBUTION WIRES ONLY RATE BASE
APPENDIX D PAGE 1 APPENDIX D DISTRIBUTION WIRES ONLY RATE BASE This appendix is composed of the following three parts: 1. Part I - Guidelines for determining the distribution or wires only assets and activities;
S Y S T E M M O D E R N I Z A T I O N
S Y S T E M M O D E R N I Z A T I O N T H E L I N E M B E X T E N S I O N P R O J E C T B A L T I M O R E A N D H A R F O R D C O U N T I E S, M A R Y L A N D Project Overview Columbia Gas Transmission
Event Planning Guidance Notes EVENT PLANNING GUIDANCE NOTES
EVENT PLANNING GUIDANCE NOTES 1 Event Planning Guidance Notes Important issues This documentation is not a full and authoritative statement of the law, statutory guidance or best practice in planning,
CITY OF BEAVERCREEK, OHIO QUOTES FOR MOWING AND GENERAL CLEANUP OF PRIVATE PROPERTIES
CITY OF BEAVERCREEK, OHIO QUOTES FOR MOWING AND GENERAL CLEANUP OF PRIVATE PROPERTIES The City of Beavercreek is seeking quotes for mowing, trimming and general cleanup of private properties found to be
MINISTERIAL REGULATION ON THE PRESCRIBING OF STANDARD FOR ADMINISTRATION AND MANAGEMENT OF OCCUPATIONAL SAFETY, HEALTH AND ENVIRONMENT B.E.
MINISTERIAL REGULATION ON THE PRESCRIBING OF STANDARD FOR ADMINISTRATION AND MANAGEMENT OF OCCUPATIONAL SAFETY, HEALTH AND ENVIRONMENT B.E. 2549 (A.D.2006) «à ß 4 MINISTERIAL REGULATION ON THE PRESCRIBING
NETWORK OUTPUT MEASURES CONSULTATION
NETWORK OUTPUT MEASURES CONSULTATION Great Britain s electricity transmission network transmits high-voltage electricity from where it is produced to where it is needed throughout the country. It broadly
Building Electrical Infrastructure
Building Electrical Infrastructure Industrial & Commercial Connections, Industrial / Urban Residential Development, Asset Relocation, Street Lighting Our Company Our vision is to combine electrical engineering
Corporate Health and Safety Policy
Corporate Health and Safety Policy November 2013 Ref: HSP/V01/13 EALING COUNCIL Table of Contents PART 1: POLICY STATEMENT... 3 PART 2: ORGANISATION... 4 2.1 THE COUNCIL:... 4 2.2 ALLOCATION OF RESPONSIBILITY...
Health, Security, Safety and Environment (HSE)
Health, Security, Safety and Environment (HSE) Content: 1 Objective 2 Application and Scope 21 Application of HSE Directive with underlying documents 22 Scope of HSE Management system 3 Framework for our
On Site Sewage System Maintenance Inspections. March 2011. Building and Development Branch Ministry of Municipal Affairs and Housing
On Site Sewage System Maintenance Inspections March 2011 Building and Development Branch Ministry of Municipal Affairs and Housing Introduction The Building Code Act, 1992 and Building Code (Ontario Regulation
EARTHING AND BONDING AT SECONDARY SUBSTATIONS
DISTRIBUTION CONSTRUCTION MANUAL SECTION 4 - SUBSTATIONS ISSUE B SEPT 1996 4.4.4 EARTHING AND BONDING AT SECONDARY SUBSTATIONS 1 SCOPE This section of the Distribution Construction Manual lays down the
CUSTOMER REQUIREMENTS AT POWER SUBSTATIONS
CUSTOMER REQUIREMENTS AT POWER SUBSTATIONS Customer Handout Date Aug 2, 2010 Version 1.0 File Name Customer Requirements At Power Substations Document Id Outside Plant Engineering 1 Table Of Contents 1.0
WHS Contractor Management Procedure
Procedure Approved: 09/07/2013 Next Review: 09/07/2015 1. Overview The District council of Mount Remarkable Council is committed to engaging quality Contractors who have a sound understanding and commitment
About T&D Europe : The association
G. onizza Electra: Doing Business with Energy G. onizza Electra: Doing Business with Energy Electra Doing Business with Energy Efficiency Thursday 15. October 2009, Ljubljana (SI) Electra conclusions in
ESB Networks Response. ERGEG Consultation. Voltage Quality Regulation in Europe
NETWORKS ESB Networks Response to ERGEG Consultation on Voltage Quality Regulation in Europe Date: 22 February 2007 Distribution System Operator ESB Networks Page 1 of 12 Contents 1.0 INTRODUCTION...3
CONSTRUCTION TRAFFIC MANAGEMENT PLAN (CTMP)
CONSTRUCTION TRAFFIC MANAGEMENT PLAN (CTMP) [Colston Budd Hunt & Kafes Pty Ltd AS AMENDED BY City of Sydney] 23 March 2010 1. PREAMBLE 1.1 This document constitutes the Demolition and Traffic Management
Traffic Management Issue 1.0 Revision: v2 October 2014
Disclaimer IMPORTANT: The information in this guide is of a general nature, and should not be relied upon as individual professional advice. If necessary, legal advice should be obtained from a legal practitioner
SECTOR ASSESSMENT (SUMMARY): ENERGY 1. 1. Sector Performance, Problems, and Opportunities
Country Partnership Strategy: Bangladesh, 2011 SECTOR ASSESSMENT (SUMMARY): ENERGY 1 Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Power generation gap. Bangladesh endures long
ELECTRICAL ENGINEERING DESIGN CRITERIA APPENDIX F
ELECTRICAL ENGINEERING DESIGN CRITERIA APPENDIX F TABLE OF CONTENTS Appendix F - Electrical Engineering Design Criteria F.1 Introduction...F-1 F.2 Codes and Standards...F-1 F.3 Switchyard and Transformers...F-1
ENERGY NETWORKS ASSOCIATION. Electricity Industry EMF Measurement Protocol for High Field Areas
ENERGY NETWORKS ASSOCIATION Electricity Industry EMF Measurement Protocol for High Field Areas Contents 1 Introduction 1.1 Background 1.2 High Field Areas 2 High Field Area - Generation Businesses 2.1
Power cut. Powering your business is our priority
Power cut Powering your business is our priority Contents 2 Preventing power cuts 3 Who are UK Power Networks 4 Plans for your business in case of a power cut 6 My business has lost money 8 Your rights
INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION. Infrastructure Flood Protection Remediation Policies
INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION Infrastructure Flood Protection Remediation Policies DRAFT POOLBEG PLANNING SCHEME 196 FIGURE 9.1: UTILITIES WAYLEAVES Electricity Cables 8m Wayleave for