UNDER FLOOR AIR DISTRIBUTION (UFAD) SOLUTIONS
|
|
|
- Rosanna Parsons
- 10 years ago
- Views:
Transcription
1 UNDER FLOOR AIR DISTRIBUTION (UFAD) SOLUTIONS OVERHEAD SYSTEM UFAD SYSTEM
2 ......
3
4 - A product of AirFixture USA I DON T CARE ZONE B R E A T H I N G Z O N E W E L L M I X E D CONSTANT VOLUME DIFFUSER WITH PERSONAL CONTROL 4 WAY DEFLECTION CONSTANT VOLUME DIFFUSER VAV TIME MODULATED DIFFUSER WITH ROUND GRILL VAV TIME MODULATED DIFFUSER WITH SQUARE GRILL
5 0% FLOW FIG 1 100% FLOW FIG 2 Process of Time Modulation 50% Flow really means 100% flow to 50% of the area FIG 3 50% Flow with Time Modulation = 50% flow to 100% of the area FIG 4 50% SMART FIG 5 50% Flow really means 100% flow to 50% of the area FIG 6 25% SMART FIG 7 25% SMART FIG 8 25% SMART FIG 9 25% SMART FIG 10 25% SMART FIG 11
6 The conditioned air is supplied by the zone AHU to the under floor plenum but the return spent air shall be drawn back to the AHU through the false ceiling or the space above the access floor. The whole under floor void shall be used as a supply air plenum to distribute the conditioned air thus enhancing thermal mass storage. The Zone air handling unit must operate in a Variable Volume mode to avoid over pressurization of the floor void The Terminal Units (AET-TU) operation shall automatically determine the air flow needed from the quantity of terminal units dampers which are open or closed. This shall automatically and simply guarantee constant under floor pressure within the specified limits. The air flow change will be caused by a variation in voltage input to the fans approx between V(0%) and 230V(100%) through communication between the Controller of the AET-TUs (open-close dampers) and the Controller of the AHU (namely the Hiromatic) operating the change by means of a well proven algorithm. The AET-V could be allocated into a technical room with grilles for air return. The fresh air could be directly introduced into the room and it will be mixed with recycling air. A FANTILE UNIT
7 Under floor supply and return channels are created by means of baffles (underfloor air partitioning) placed in the access floor void. Return air grilles are positioned in the floor over return Plenum to permit the return of spent air to the AHU unit for re-conditioning. Set into the floor over supply Plenum are individually controlled Fan terminals of either recessed or floor standing configuration. These terminals, AET-TUs., introduce air into the space above in accordance with the dictates of their own on board control system. AET-C Conditioned Air Modules are suitably located throughout the office space to suit thermal demand and supply conditioned air locally to serve the needs of the space. A FANTILE UNIT The low underfloor pressure in the two sections, supply and return, is kept at the desired level by means of a suitably sized under floor by pass in the underfloor air partitioning, this can be easily changed and baffle can also be repositioned or modified, if necessary as space reconfiguration demands.
8
9 Flexibility Because the rate of business growth and the rate of change in office equipment technology places flexibility of systems much higher on the list of priorities. In speculative developments the need to meet unknown requirements of unknown user s effectively must be the aim. The Flexiblespace system permits major swings in usage in the space and the incorporation of such a system virtually future-proofs the building s ability to service change for the expected life of the building. Conventionally, designs are carried out against a set of assumed design criteria and systems are installed to meet them. In some cases the incoming user s requirements are for less than the initial design provided and this is wasteful. In other cases the system provided falls seriously short of the user s requirements and the whole system requires changing. This too is wasteful. With the Flexiblespace systems approach the demands of each incoming user can be met quickly and effectively and during the occupancy can be easily adapted and upgraded to meet the increasing or decreasing needs in each area of the space occupied. With simple facility management, redundant equipment from one area can be re-utilized elsewhere. Partitioning changes to meet new working arrangements are easily catered for and simple relocation or provision of additional diffuser and / or fan air terminal in the floor quickly adapts the air conditioning. This flexibility permits a higher efficiency of space usage and maximizes business activity to the advantage of the owner and user. Longer occupancies can be achieved because the building can continue to meet the user s needs. Ease of Installation Because with the Flexiblespace systems heat loads in area s can change without the need to re-design ductwork and pipework thus reducing engineering and drafting inputs. For example, to double the cooling demand in a cellular office, an additional diffuser and / or fan air terminal would be brought to the room, a floor tile lifted and the diffuser and / or fan terminal inserted in its place and plugged into the below-floor power supply. This operation takes minutes rather than days as with conventional systems. Avoidance of Co-ordination problems Because with conventional systems the major co-ordination problems occur attempting to route ductwork, pipework and other services in false ceiling areas along with lighting, power and the false ceiling support structure itself. Pressure-testing of pipework and ductwork and final fixing of grilles and diffuser s into the finished false ceiling cause major problems and damage. The Flexiblespace system does away almost entirely with the need for horizontal air conditioning ductwork and pipework and thus reduces co-ordination problems dramatically. With correct programming it is possible to eliminate the need for multiple trade activity in areas, resulting in reduced damage to finished work and a faster overall installation programme. Operation Costs Because the Flexiblespace space system operates with very low air pressure within the floor void ( in the order of 20 pascals ).As a result, installed fan power is approximately 50 % of that required for a conventional system. The central plant operation costs are similar to those of a fan coil system with the advantage of reduced fan power on the ventilation system as a result of the reduction of horizontal ductwork and the associated resistance Maintenance Aspects Because the floor void being easily accessible and highly reduced or no duct work, the system can be far more easily cleaned. Trained maintenance staff can simply lift the floor tiles and vacuum if the need arises, but in tests the system has been shown to be generally far cleaner in operation than conventional systems. Safety Because the provision of all essential services below an easily accessible raised floor does away with the need for erection towers and high level working. Accuracy of electrical work can be much improved and many of techniques employed in the Flexible Space approach permit factory assembly of modular units further improving quality control and accuracy of installation. The removal of high level piping and the effects of flooding during commissioning are avoided not only improving safety, but also reducing possible damage to second fix trades, carpets and other finishes. Re-configurations of office spaces later in the life of the building are much more easily and safely carried out. Fit Out Contractor Work Because the Flexible Space system incorporates a raised access floor, the need for leveling screeds is totally eliminated with the tolerances being taken up by the adjustable pedestals of the raised floor. It avoids entirely the early jumble of trades fighting for space during the first fix crevassing exercise, permitting a more easily managed, faster constructed, and much tidier and safer site generally. It is an ideal system for the shell and core approach to building as no decisions on heating and cooling loads, duct layouts or power data and telecom provisions have to be made until the user requirements are defined. Potential LEED Points with Flexible Space Concept Energy & Atmosphere Optimized energy performance reduce building energy use below levels specified in ASHRAE Standard 90.1 (1-10 pts) Indoor Environmental Quality Improved ventilation effectiveness performance of UFAD system results in ventilation effectiveness greater than 0.9 (average for overhead mixing systems), as measured according to ASHRAE Standard (1 pt) Controllability of systems provide individual control of thermal, ventilation, and lighting systems to support improved occupant comfort, health, and productivity (1-2 pts) UFAD LEED CREDIT Points Optimize Energy Performance 3 to 4 pts Measurement & Verification 1 pt Increased Ventilation Effectiveness 1 pt Construction IAQ Management plan 1 pt Controllability of Systems 1 pt Thermal Comfort 1 pt Total Point Opportunity 8 to 9 Points LEED CREDIT RAISED ACCESS FLOOR Recycled Content Local/Regional Materials Low-Emitting Materials Total Additional Points Points 1 to 2 pts 1 to 2 pts 1 to 3 pts 3 to 7 Points
10
11 American Waterworks Bldg. One Century Place Foundry Square 160 King Street Mission Bay Catellus The Soffer Tech Office Bldg. AT&T GTE Global Crossing INFLOW Data Centers Level 3 CoLo Centers MCI Worldcom NYNEX Sprint PCS American Express Blue Cross Blue Shield British Airways Dell Computers Hewlett Packard IBM Motorola United Parcel Service Jack Henry & Associates Capital One Chase Financial Services Citibank Lloyd s of London Morgan Stanley Dean Witter Shearson Lehman American Express World Bank Headquarters
12
UNDER FLOOR AIR CONDITIONING SAVE MONEY AND TRANSFORM YOUR WORK SPACE
UNDER FLOOR AIR CONDITIONING SAVE MONEY AND TRANSFORM YOUR WORK SPACE flexiblespace.com Making use of a raised access floor system as the ventilation duct introduces so many ways to save; reverse your
UNDERFLOOR AIR DISTRIBUTION
FINAL REPORT NCEMBT-080801 UNDERFLOOR AIR DISTRIBUTION AN EXPERIMENTAL COMPARISON OF AIR DIFFUSION PERFORMANCE BETWEEN UNDERFLOOR AIR DISTRIBUTION AND CONVENTIONAL OVERHEAD AIR DISTRIBUTION SYSTEMS AUGUST
Displacement Ventilation in Schools
Displacement Ventilation in Schools Price Displacement Ventilation in Schools Introduction Displacement Ventilation (DV) originated in industrial facilities in Europe as an effective way to remove contaminants
Methods for Effective Room Air Distribution. Dan Int-Hout Chief Engineer, Krueger Richardson, Texas
Methods for Effective Room Air Distribution Dan Int-Hout Chief Engineer, Krueger Richardson, Texas Agenda Overview LEED issues and Update Perimeter Acoustics Thermal Comfort IAQ / Standard 62.1 Update
Element D Services Heating, Ventilating, and Air Conditioning
PART 1 - GENERAL 1.01 OVERVIEW A. This section supplements Design Guideline Element D3041 on air handling distribution with specific criteria for projects involving design of a Data Center spaces B. Refer
Glossary of HVAC Terms
Glossary of HVAC Terms Heating, Ventilation and Air Conditioning (HVAC) is a major sub- discipline of mechanical engineering. The goal of HVAC design is to balance indoor environmental comfort with other
SPECIAL ISSUE: NATIONAL SCIENCE FOUNDATION WORKSHOP
research journal 2013 / VOL 05.01 www.perkinswill.com SPECIAL ISSUE: NATIONAL SCIENCE FOUNDATION WORKSHOP ARCHITECTURE AND ENGINEERING OF SUSTAINABLE BUILDINGS Current Trends in Low-Energy HVAC Design
Challenges and Failures in Green Building Design Using Under-Floor Air Distribution. Ken Urbanek, PE, HBDP, LEED AP Director of Engineering
Challenges and Failures in Green Building Design Using Under-Floor Air Distribution Ken Urbanek, PE, HBDP, LEED AP Director of Engineering Agenda UFAD Overview Challenges / Failures Steps for a Successful
ASTACEA4 Inspect complex/central air conditioning systems
Overview This Unit covers the competences required to inspect complex/central air conditioning systems as defined by the CIBSE TM 44 Figure 1.1: Summary of system types and their component parts. The air
HVAC Systems: Overview
HVAC Systems: Overview Michael J. Brandemuehl, Ph.D, P.E. University of Colorado Boulder, CO, USA Overview System Description Secondary HVAC Systems Air distribution Room diffusers and air terminals Duct
Design Consultant (Electrical Services) Design Deliverables and Responsibilities Allocation (Stage E+)
Design Consultant (Electrical Services) Design Deliverables and Responsibilities Allocation (Stage E+) 1. In addition to the information scheduled below, the pre-tender designer is responsible for: (i)
SPECIAL APPLICATIONS
Page 1 SPECIAL APPLICATIONS The protection of microelectronics clean rooms using aspirating smoke detection systems requires special consideration. The physical configuration of the room(s) and the direction
Tate s Wire & Cable Solution
Access Floors Tate s Wire & Cable Solution A Flexible & Sustainable Management System Access Flooring to the Power of Your company will discover complete flexibility and reconfiguration capability 2 Creating
Chilled Beam Solutions ADVANCING THE SCIENCE OF AIR DISTRIBUTION. Redefine your comfort zone. www.titus-hvac.com
Chilled Beam Solutions ADVANCING THE SCIENCE OF AIR DISTRIBUTION k-12 education Redefine your comfort zone. www.titus-hvac.com woodgrains dual-function energy solutions table of contents The CBAL-24 is
Topics for Today. Order of Magnitude Mechanical Estimating. Order of Magnitude Estimate Goal. Project Delivery Methods. Questions for Client
Order of Magnitude Mechanical Estimating Justin Apprill, P.E. Topics for Today Estimate Goals A Concept for Accurate Conceptual Estimating HVAC Systems Common System Types and Rules of Thumb Pricing Example
Acoustic Design Practices for Sustainable Buildings
Acoustics 2008 Geelong, Victoria, Australia 24 to 26 November 2008 Acoustics and Sustainability: How should acoustics adapt to meet future demands? Acoustic Design Practices for Sustainable Buildings Danny
L EED & G r e e n B u i ldi ngs
L EED & G r e e n B u i ldi ngs A P P L I C AT I O N G U I D E contents 3 - General 3 - Introduction 3 - Leadership in Energy & Environment 3 - Purpose 3 - LEED Rating System 4 - Energy & Atmosphere 4
Mechanical Systems Proposal revised
Mechanical Systems Proposal revised Prepared for: Dr. William Bahnfleth, Professor The Pennsylvania State University, Department of Architectural Engineering Prepared by: Chris Nicolais Mechanical Option
Advanced Energy Design Guide LEED Strategies for Schools. and High Performance Buildings
Advanced Energy Design Guide LEED Strategies for Schools and High Performance Buildings Today s Presenters Stephen Koontz, LEED AP Energy Services Leader Tampa Bay Trane Allen Irvine General Sales Manager
UNIVERSITY OF MISSOURI 23 0000 - Heating Ventilating and Air-Conditioning (HVAC) March 2015.01
GENERAL: This section provides general standards for overall sizing and design of Heating, Ventilating, and Air Conditioning (HVAC) systems. Other sections contain specific standards for each system per
Design Guide. Retrofitting Options For HVAC Systems In Live Performance Venues
Design Guide Retrofitting Options For HVAC Systems In Live Performance Venues Heating, ventilation and air conditioning (HVAC) systems are major energy consumers in live performance venues. For this reason,
High Density Data Centers Fraught with Peril. Richard A. Greco, Principal EYP Mission Critical Facilities, Inc.
High Density Data Centers Fraught with Peril Richard A. Greco, Principal EYP Mission Critical Facilities, Inc. Microprocessors Trends Reprinted with the permission of The Uptime Institute from a white
IEQ Management Plan. Denver Museum of Nature and Science ECF Addition
IEQ Management Plan GH Phipps Construction Companies 5995 Greenwood Plaza Blvd., Suite 100 Greenwood Village, Colorado 80111-4710 303.571.5377 PHONE www.ghphipps.com Denver Museum of Nature and Science
Air-water systems for efficient air conditioning
Air-water systems for efficient air conditioning The art of handling air System overview Passive cooling systems Induction units Façade ventilation units Page 4 Page 6 Page 10 Passive Chilled ceiling Undersill
The Future is Raised Access Floors
Access Floors CI/SfB (33.1) X June 2008 The Future is Raised Access Floors Low Energy - Low Carbon Buildings SYSTEM CERTIFICATION SYSTEM CERTIFICATION ISO 9001:2000 ISO SGS 14001 SGS Kingspan Access Floors
HVAC Checklist - Long Form
HVAC Checklist - Long Form Page 1 of 14 Appendix B discusses HVAC system components in relation to indoor air quality. utside Air Intake Location pen during occupied hours? Unobstructed? Standing water,
COMPARATIVE LIFE-CYCLE ANALYSIS OF ENERGY-EFFICIENCY MEASURES AT TVA S CHATTANOOGA OFFICE COMPLEX: PHASE II RESULTS & FINAL DESIGN
COMPARATIVE LIFE-CYCLE ANALYSIS OF ENERGY-EFFICIENCY MEASURES AT TVA S CHATTANOOGA OFFICE COMPLEX: PHASE II RESULTS & FINAL DESIGN Umesh Atre Innovative Design Inc 850 W Morgan St Raleigh, NC 27603 [email protected]
2 STEPS TO CONDUCTING YOUR HVAC ASSESSMENT
Presentation Synopsis Heating, Ventilating and Air Conditioning Building Condition Assessment Vancouver, B.C. Prepared for: EPIC Prepared by: Douglas Spratt, P.Eng Douglas Spratt & Associates Ltd. www.dspratt-associates.com
Building Energy Systems. - HVAC: Heating, Distribution -
* Some of the images used in these slides are taken from the internet for instructional purposes only Building Energy Systems - HVAC: Heating, Distribution - Bryan Eisenhower Associate Director Center
RFI Response RFP: HSCG88-16-R-PQQ015 Replace HVAC Bldg A & C San Diego, CA.
1. There is verbiage in the hazardous material report referring to a state licensed abatement contractor. Within the recommendations part of the report (page 64 of 111 of the specification pdf) is the
Analysis of HVAC Control Strategies
PUBLICATION DATE: Q1 2009 REF NUMBER: HVAC SWGII 006 03 HVAC SPECIAL WORKING GROUP Analysis of HVAC Control Strategies 06 Table of Contents 1 Introduction 2 2 Scope 3 3 Analysis 4 3.1 Strategy 1 4 3.2
EnergyPro Building Energy Analysis. Assisted Living Building
EnergyPro Building Energy Analysis Assisted Living Building EnergyPro Building Energy Analysis for an assisted living building Project Scope The purpose of the EnergyPro energy model was to evaluate the
T 3 Series VAV Diffusers Analog Diffuser Steel Square Panel Horizontal Pattern Model: T 3 SQ
TSQ--0 7-7-07 T Series VAV Diffusers Analog Diffuser Steel Square Panel Horizontal Pattern Model: T SQ Model Configuration T SQ- Heating / Cooling Border Type (Lay-In) Full Face Nominal Round Duct Size
The New Data Center Cooling Paradigm The Tiered Approach
Product Footprint - Heat Density Trends The New Data Center Cooling Paradigm The Tiered Approach Lennart Ståhl Amdahl, Cisco, Compaq, Cray, Dell, EMC, HP, IBM, Intel, Lucent, Motorola, Nokia, Nortel, Sun,
Presentation Outline. Common Terms / Concepts HVAC Building Blocks. Links. Plant Level Building Blocks. Air Distribution Building Blocks
Presentation Outline Common Terms / Concepts HVAC Building Blocks Plant Level Building Blocks Description / Application Data Green opportunities Selection Criteria Air Distribution Building Blocks same
REAL OPERATING COST SAVINGS FROM RETRO- COMMISSIONING OPPORTUNITIES FOR SAVINGS IN ACADEMIC MEDICAL CENTERS
REAL OPERATING COST SAVINGS FROM RETRO- COMMISSIONING OPPORTUNITIES FOR SAVINGS IN ACADEMIC MEDICAL CENTERS Ken L. Hansen P.E. University of Nebraska Medical Center [email protected] 402-559- 5301 402-630-
HVAC Systems in Schools & Commercial Buildings and Radon
HVAC Systems in Schools & Commercial Buildings and Radon References US EPA Radon Prevention in the Design and Construction of Schools and Other Large Buildings http://www.epa.gov/ordntrnt/ord/nrmrl/pubs/1993/air/
NEBB STANDARDS SECTION-8 AIR SYSTEM TAB PROCEDURES
NEBB STANDARDS SECTION-8 AIR SYSTEM TAB PROCEDURES 8.1 INTRODUCTION Testing, adjusting, and balancing of HVAC systems can best be accomplished by following a series of systematic procedures. The NEBB TAB
HIGH EFFICIENCY RTU. www.reznorhvac.com HIGH EFFICIENCY, PACKAGED SPACE CONDITIONING. DX System IEER> 13.2 Gas Heat Efficiency > 92% Capacities Tons
Capacities 10-25 Tons 100-400 MBH HIGH EFFICIENCY, PACKAGED SPACE CONDITIONING DX System IEER> 13.2 Gas Heat Efficiency > 92% HIGH EFFICIENCY RTU 30-120 kw 3,000-11,550 CFM Comfort Comfort is determined
AIR DISTRIBUTION FOR COMFORT AND IAQ
AIR DISTRIBUTION FOR COMFORT AND IAQ Heating Piping and Air Conditioning March 1998 Dan Int-Hout Chief Engineer KRUEGER EXCELLENCE IN AIR DISTRIBUTION Modern environmentally controlled spaces consume significant
Lesson 36 Selection Of Air Conditioning Systems
Lesson 36 Selection Of Air Conditioning Systems Version 1 ME, IIT Kharagpur 1 The specific objectives of this chapter are to: 1. Introduction to thermal distribution systems and their functions (Section
250 St Georges Tce, Perth, WA (QV1)
250 St Georges Tce, Perth, WA (QV1) Building Profile Building Construction date 1991 Refurbishment date Owner Building Size Refurbishment Team Building Management Awards Ratings QV.1, 250 St Georges Terrace,
APC APPLICATION NOTE #112
#112 Best Practices for Deploying the InfraStruXure InRow SC By David Roden Abstract The InfraStruXure InRow SC (ACSC100 and ACSC101) is a self-contained air conditioner for server rooms and wiring closets.
Rev. No. 0 January 5, 2009
ENERGY & ENVIRONMENTAL ENERGY ISSUES COMMITTEE 415 Main Building Telephone (574) 631-6666 Notre Dame, Indiana Facsimile (574) 631-5883 46556 USA Energy Conservation Plan For HVAC Systems Rev. No. 0 January
Sustainable Strategies for Rehabilitation Projects: 9th Street Office Building Adaptive Reuse Case Study
Sustainable Strategies for Rehabilitation Projects: 9th Street Office Building Adaptive Reuse Case Study Robert C. Burns, AIA, LEED AP Principal Director of Historic Architecture 804. 648. 5040, ext. 1107
Your Guide to Buying an Energy-Efficient Central Air Conditioner
NJ Clean Energy Cool Advantage Rebates 866-NJSMART For more information on energy efficiency and renewable energy programs for New Jersey, visit New Jersey s Clean Energy website, www.njcleanenergy.com.
Outline. CC objectives Site and building description Typical data floor overview CC measures Results Lessons learned
Outline CC objectives Site and building description ypical data floor overview CC measures Results Lessons learned 2 CC Objectives Identify and solve existing operating problems Improve building thermal
SECTION EG. Engineering Guide Air Distribution. Please refer to the Price Engineer s HVAC Handbook for more information on Air Distribution.
SECTION EG Air Distribution Please refer to the Price Engineer s HVAC Handbook for more information on Air Distribution. Space Air Diffusion AIR DISTRIBUTION ENGINEERING GUIDE Proper selection of air diffusion
Direct Fresh Air Free Cooling of Data Centres
White Paper Introduction There have been many different cooling systems deployed in Data Centres in the past to maintain an acceptable environment for the equipment and for Data Centre operatives. The
Benefits of. Air Flow Management. Data Center
Benefits of Passive Air Flow Management in the Data Center Learning Objectives At the end of this program, participants will be able to: Readily identify if opportunities i where networking equipment
Energy Saving Fact Sheet Air Conditioning
Energy Saving Fact Sheet Air Conditioning Get your air conditioning into better shape Everyone wants air conditioning. But don t let your existing system, or one that you re considering installing, burn
HVAC Systems and Indoor Air Quality. Douglas K. Spratt, M.Sc., P.Eng.
HVAC Systems and Indoor Air Quality Douglas K. Spratt, M.Sc., P.Eng. The 5 Senses Architecture Electrical Structural Mechanical Hearing Seeing Smelling Feeling Tasting HVAC Systems are Dynamic Heat Gains
More efficiency in hotels with HVAC, lighting and security
The worldwide standard for home and building control More efficiency in hotels with HVAC, lighting and security Simply comfortable: Higher energy efficiency and more flexibility thanks to Synco HVAC controllers
Construction Indoor Air Quality Management Plans for LEED. Matt Gregg, PE, LEED AP
Construction Indoor Air Quality Management Plans for LEED Matt Gregg, PE, LEED AP Agenda What is a Construction IAQ Management Plan? What are the LEED Requirements? What is the Mechanical Contractor s
Cannon T4 Modular Data Centres. For Outside Deployment & Challenging Environments
Cannon T4 Modular Data Centres For Outside Deployment & Challenging Environments A high performance, full specification Data Centre, up to Tier 4* resilience, instantly deployable A highly secure Data
SPACE TYPE: AUTOMATED DATA PROCESSING CENTER (ADP) (MAINFRAME)
SPACE TYPE: AUTOMATED DATA PROCESSING CENTER (ADP) (MAINFRAME) Construction Criteria The unit costs for ADP Mainframe space types are based on the construction quality and design features in the following
Basic Selection & Proper Application of Overhead Air Distribution Devices
Basic Selection & Proper Application of Overhead Air Distribution Devices GRD Selection & Application Terms Selection Throw Sound Installation Variations affect Performance Inlet Effects Basics Return
Key energy-efficient features of your new home
Key energy-efficient features of your new home Your thermal envelope The thermal envelope, or shell, of your home (walls, roof and floor) is designed to keep you dry and comfortable. It protects you from
ENHANCED LABORATORY HVAC SYSTEM
ENHANCED LABORATORY HVAC SYSTEM INTRODUCTION Since the early 1980's the attention to more energy efficient laboratory designs has been on the rise due to the increase in energy cost and the emergence of
Energy Efficiency HOSPITALITY. www.energia.ie
Energy Efficiency HOSPITALITY www.energia.ie Your chance to reduce your business energy usage by as much as 20%! 20% is a significant figure and reducing your energy bill by this amount could make a real
Dehumidification Design
Dehumidification Design Using Data-Center Heat Utilizing free heat from a server room was the concept behind an air-handling system in a college-campus building Considerable energy savings are possible
A Prototype Alternative Ventilation System for Retrofit, Rehab and Renovation of Rural Alaska Houses
A Prototype Alternative Ventilation System for Retrofit, Rehab and Renovation of Rural Alaska Houses Robert L Crosby Jr, Biorealis Systems, Inc. Abstract: Bristol Bay Housing Authority (BBHA) currently
NADCA GENERAL SPECIFICATIONS FOR THE CLEANING OF COMMERCIAL HEATING, VENTILATING AND AIR CONDITIONING SYSTEMS
NADCA GENERAL SPECIFICATIONS FOR THE CLEANING OF COMMERCIAL HEATING, VENTILATING AND AIR CONDITIONING SYSTEMS National Air Duct Cleaners Association 1518 K Street, N.W. Suite 503 Washington, DC 20005 (202)
Variable Refrigerant Flow Systems vs. Geothermal Water Source Heat Pump Systems
Variable Refrigerant Flow Systems vs. Geothermal Water Source Heat Pump Systems Presented by: Matt Green Agenda Section I: Case Study Northern Illinois Food Bank NIFB challenge/goal System choices considered
Greening Commercial Data Centres
Greening Commercial Data Centres Fresh air cooling giving a PUE of 1.2 in a colocation environment Greater efficiency and greater resilience Adjustable Overhead Supply allows variation in rack cooling
Application Guide. www.titus-hvac.com www.titus-energysolutions.com
Application Guide leed AND GREEN BUILDINGS www.titus-hvac.com www.titus-energysolutions.com table of contents General 3 Introduction 3 Leadership in Energy & Environment 3 Purpose 3 LEED Rating System
Dealing with Thermal Issues in Data Center Universal Aisle Containment
Dealing with Thermal Issues in Data Center Universal Aisle Containment Daniele Tordin BICSI RCDD Technical System Engineer - Panduit Europe [email protected] AGENDA Business Drivers Challenges
Active & Passive Beams
Active & Passive Beams Active & Passive Beams Introduction Beam systems are an alternative to traditional all-air conditioning systems. Beams use water to move energy through a building and service the
Pool Dehumidification Basics
Copyright 2009 Wescor. All rights reserved. Permission granted to reproduce for personal and educational use only. When energy costs were low, many pool owners considered only first cost when choosing
HVAC Processes. Lecture 7
HVAC Processes Lecture 7 Targets of Lecture General understanding about HVAC systems: Typical HVAC processes Air handling units, fan coil units, exhaust fans Typical plumbing systems Transfer pumps, sump
Infrastructure & Cities Sector
Technical Article Infrastructure & Cities Sector Building Technologies Division Zug (Switzerland), October 18, 2011 Saving Energy in a Data Center A Leap of Faith? New guidelines from ASHRAE (American
Residential Duct Systems for New and Retrofit Homes
Residential Duct Systems for New and Retrofit Homes Why it is important to properly design and install high quality, efficient ducted air systems? The efficiency of air distribution systems has been found
Basics of HVAC Cleaning
Basics of HVAC Cleaning Seminar Outline Residential 1. Types of systems used and why 2. Types of air distribution systems 3. System components 4. Determining the need for cleaning (ACR2002) 5. Project
Data Center Planning. PUE Overview
Data Center Planning PUE Overview Steve Carter, Americas Managing Principal Charles Prawdzik Jr., Project Manager HP Critical Facility Services delivered by EYP Mission Critical Facilities, Inc. 2008 Hewlett-Packard
Digital Realty Data Center Solutions Digital Chicago Datacampus Franklin Park, Illinois Owner: Digital Realty Trust Engineer of Record: ESD Architect
Digital Realty Data Center Solutions Digital Chicago Datacampus Franklin Park, Illinois Owner: Digital Realty Trust Engineer of Record: ESD Architect of Record: SPARCH Project Overview The project is
KNX for building and room automation simple and efficient
The worldwide standard for home and building control KNX for building and room automation simple and efficient Save energy and effort with a comprehensive portfolio for electrical and HVAC applications.
Fläkt Woods Building Future
Energy, Expertise and Environment with Fläkt Woods Fläkt Woods Building Future Saving energy in building ventilation You must save 20% on energy before 2020. Following the Kyoto protocol the European Union
Bring the fresh in. Dedicated Outside Air Systems
Bring the fresh in. Dedicated Outside Air Systems The inside story on outside air. On average, we breathe in 3,400 gallons of air each day. Ambient indoor air pollution is a major problem, affecting health
Raised Floor Data Centers Prepared for the Future
Raised Floor Data Centers Prepared for the Future Raised Floors Protect My Investment by Providing a Foundation for Current and Future Technologies. Creating the Future Proof Data Center Environment The
Proper Applications & Sequences for Constant Volume Pressure Dependent Zoning Systems. History
Proper Applications & Sequences for Constant Volume Pressure Dependent Zoning Systems Ryan R. Hoger, LEED AP 708.670.6383 [email protected] History VAV systems came into favor for mid and large size
More efficiency in office buildings with HVAC, lighting and security
The worldwide standard for home and building control More efficiency in office buildings with HVAC, lighting and security Simply more productive: Higher energy efficiency and more flexibility thanks to
Hanson Building Products. precast basement solutions
Hanson Building Products precast basement solutions Hanson Building Products Basement Systems Add an extra dimension and combine the inherent flexible, structural and waterproof properties of concrete
Air Conditioning in Green Office Buildings?
Air Conditioning in Green Office Buildings? How to implement Demand Controlled Ventilation Stuttgart Rechte allein bei ICEBO 08 10.10.2008 CI / DrRo 1 Air Conditioning in Green Office Buildings ventilation
Air Conditioning. The opportunity for energy efficiency. Low cost actions to reduce energy usage now
Fact Sheet #6 Air Conditioning In this fact sheet you will discover: The opportunity for energy efficiency How air conditioning works Low cost actions to reduce energy usage now Investments to reduce costs
Causes of High Relative Humidity Inside Air Conditioned Buildings. Roger G.Morse AIA, Paul Haas CSP, CIH Morse Zehnter Associates
Causes of High Relative Humidity Inside Air Conditioned Buildings Roger G.Morse AIA, Paul Haas CSP, CIH Morse Zehnter Associates S. FLORIDA AVE. AMBIENT 91 F db / 78 F wb 16,000 HOURS ANNUALLY THAT wb
SECTION 23 01 30.51 HVAC AIR-DISTRIBUTION SYSTEM CLEANING
SECTION 23 01 30.51 HVAC AIR-DISTRIBUTION PART 1 - GENERAL 1.1 SUMMARY A. Section includes cleaning of interior surfaces of HVAC equipment. The HVAC equipment cleaning work includes the following: 1. Air
Center for the Built Environment UC Berkeley
Center for the Built Environment UC Berkeley Peer Reviewed Title: Analysis of a hybrid UFAD and radiant hydronic slab HVAC system Author: Raftery, Paul, National University of Ireland Galway Lee, Kwang
Energy Efficiency Opportunities in Federal High Performance Computing Data Centers
Energy Efficiency Opportunities in Federal High Performance Computing Data Centers Prepared for the U.S. Department of Energy Federal Energy Management Program By Lawrence Berkeley National Laboratory
Energy Efficiency. Bars & RestauRants. www.energia.ie
Energy Efficiency Bars & RestauRants www.energia.ie 2 Your chance to reduce your business energy usage by as much as 20%! 20% is a significant figure and reducing your energy bill by this amount could
1. What percent of a commercial business s energy usage comes from their HVAC system? A. 13% B. 23% C. 33% D. 43% E. 53%
1 1. What percent of a commercial business s energy usage comes from their HVAC system? A. 13% B. 23% C. 33% D. 43% E. 53% 2. How much money do commercial facilities spend per square foot on energy costs
The Different Types of Air Conditioning Equipment for IT Environments
The Different Types of Air Conditioning Equipment for IT Environments By Tony Evans White Paper #59 Executive Summary Cooling equipment for an IT environment can be implemented in 10 basic configurations.
Venice Library Humidity Study. for Williams Building Diagnostics, LLC 305 15 th Street West Bradenton, FL 34205. Report April 13, 2015
for Williams Building Diagnostics, LLC 305 15 th Street West Bradenton, FL 34205 Report April 13, 2015 Moses & Associates, Inc. 2209 NW 40 th Terrace, Suite A Gainesville, FL 32605 FL License EB-0003097
Comparing Energy Savings of Different VAV Systems
Comparing Energy Savings of Different VAV Systems Prepared By: Martyn Dodd [email protected] EnergySoft LLC 1025 5th Street, Suite A Novato, CA 94945 415-897-6400 www.energysoft.com Last Modified: March
Portable Air Conditioner
Portable Air Conditioner Owner's Manual Model:3 in 1 12,000 Btu/h Series 3 Please read this owner s manual carefully before operation and retain it for future reference. CONTENTS 1. SUMMARY...1 2. PORTABLE
Preliminary Final Proposal
1 Butler Memorial Hospital New Inpatient Tower Senior Capstone Project Mechanical Option Preliminary Final Proposal Mechanical System Re-design and Breadth Topics Butler Memorial Hospital New Inpatient
SPACE TYPE: LABORATORY (WET) FOR CHEMISTRY AND BIOLOGY
SPACE TYPE: LABORATORY (WET) FOR CHEMISTRY AND BIOLOGY Construction Criteria The unit costs for (Wet) space types are based on the construction quality and design features in the following table. This
Guide Specification SECTION 23 08 00 - COMMISSIONING OF HVAC PART 1 - GENERAL 1.1 SUMMARY
SECTION 23 08 00 - COMMISSIONING OF HVAC PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. HVAC Commissioning description. 2. HVAC Commissioning responsibilities. 1.2 REFERENCES A. American Society
Glossary of Heating, Ventilation and Air Conditioning Terms
Glossary of Heating, Ventilation and Air Conditioning Terms Air Change: Unlike re-circulated air, this is the total air required to completely replace the air in a room or building. Air Conditioner: Equipment
plenum slot diffusers
light powered Redefine your comfort zone. www.titus-hvac.com dual-function smart logic light powered energy solutions Table of Contents PLENUM SLOT IFFUSERS products Plenum Slot iffusers Products... 4