1 CASE STUDY Runway 12R-30L Lambert St. Louis International Airport
2 Reconstruction of Runway 12R-30L Lambert St. Louis International Airport Sponsor: City of St. Louis Design: Crawford, Murphy and Tilly Inc. CM: Kwame/Green Joint Venture Contractor: The Harper Company
3 Runway 12R-30L Runway 12R-30L
4 Airport Program Runway 12R-30L identified in Airport s Pavement Management System Key Challenges Key Operational Airfield Pavement Feature Size/Scale of Runway too big to replace all at once Programmed as partial Keel Section replacement Initial Investigation/Recommendation planned Budget = $10 Million
5 Project Development & Formulation OWNER S CONSIDERATION AND OBJECTIVES Transition from Large to Medium Hub Maintain 524 acres of airfield pavement Replacement value of over $650 million Pavement Management Strategy Majority of pavements constructed from 1978 to 1983 Strategic repair initiative aimed at reducing peak in infrastructure needs Budget $8-12 million in annual rehabilitation funding
6 Investigation/Recommendation Phase Records Research Pavement Condition Study (PCI) & Analysis Testing Program Coring Falling Weight Deflectometer Ground Penetrating Radar Petrographic Investigation Recommendation
7 Project Development & Formulation FAA Input, Comments and Priorities AIP $ for major rehab, not for maintenance Airport must justify CPR costs Preferred larger full reconstruction areas Limited participation to center 150 of 200 runway Design should facilitate future reconstruction Willing to provide additional funding to increase reconstruction areas
8 Construction History
9 Construction History
10 PCI Survey Overall PCI 68
11 PCI Survey Runway Distress
12 PCI Survey Distress Development
13 PCI Survey Crack Map
14 PCI Survey Crack Map
15 PCI Survey Sample Unit Analysis
16 PCI Survey Distress Development
17 Testing Program Pavement coring Falling Weight Deflectometer Measure of structural integrity of pavement Ground Penetrating Radar Determine thickness of pavement layer Look for anamolies Conclusion: Finite element analysis projected 20 years of remaining structural capacity. Analysis Performed by Engineering & Research Intl. (ERI)
18 Petrographic Testing Confirmed presence of Alkali-Silica Reaction (ASR) Interviewed Maintenance Staff Continued Monitoring
19 Project Development & Formulation Reconstruction vs. Concrete Pavement Restoration (CPR) Full reconstruction = $60-$80 million Fully CPR = $4.5 million Recommendation = combination of reconstruction and CPR to fit budget
20 Recommended Alternative $15.5M Construction $450k in CPR 79,000 SY (32%) Reconstructed
21 Project Development & Formulation Life Cycle Cost Analysis Alternatives First Cost $/yd2 Present Value Life Cycle $/yd2 Full Rehabilitation, Year Recommended Option - Year 0, Full Rehabilitation - Year 10 Recommended Option - Year 0, Major Repair - Year 10, Full Rehabilitation - Year
22 Layout Plan
23 Design Key Design Features 18 PCC Pavement 6 Cement Treated Aggregate Drainable Subbase Subsurface Drainage System Recycled base/construction platform
24 Design Challenges Asbestos Typical Section from overlay
25 Design Challenges Asbestos Special Removal Areas: 61,000 sy of special removal areas Isolation of work areas Worker Protection (coveralls and respirators) Keep material moist Utilize all special material in recycled base ACM Removal Area: 1,798 SY of ACM removal Certified asbestos contractor Disposed of as asbestos waste in landfill
26 Design Challenges Asbestos
27 Design Challenges BAK 12/14M
28 Design Challenges BAK 12/14M
29 Project Construction Timeline Letting: March 13, 2012 Notice to Proceed: May 29, 2012 Primary Runway Closure: June 26, 2012 Flight Check (PCC in place): October 4, 2012 Re-Open Runway: November 19, 2012
30 Construction
31 Construction
32 Construction
33 Construction
34 Construction
35 Runway 12R-30L Questions?
Date: 10/10/2014 Initiated by: AAS-100
U.S. Department of Transportation Federal Aviation Administration Advisory Circular Subject: Airport Pavement Management Program (PMP) Date: 10/10/2014 Initiated by: AAS-100 AC No: 150/5380-7B Change:
Rehabilitation for Concrete Pavements
Rehabilitation for Concrete Pavements www.asphaltalliance.com Overview Effective rehab for PCC Break PCC into small segments Overlay with Hot Mix Asphalt Road-userfriendly Rubblize and pave in off-peak
Airfield Pavement Rehabilitation Planning Choosing the right fix. Rob McLure, M.Eng., P.Eng. Senior Associate Hatch Mott MacDonald
Airfield Pavement Rehabilitation Planning Choosing the right fix Rob McLure, M.Eng., P.Eng. Senior Associate Hatch Mott MacDonald Presentation Objective ¾ Review the pavement rehabilitation strategy development
OHIO ASPHALT PAVING CONFERENCE
OHIO ASPHALT PAVING CONFERENCE 38 th Annual Conference Wednesday, 2/6/2013 Fawcett Center Campus of The Ohio State University 2400 Olentangy River Road Columbus, Ohio 43210 REHAB STRATEGIES FOR LOCAL
MICHIGAN AIRPORT DEVELOPMENT PROGRAM PACKAGE MDOT Office of Aeronautics. Airport Capital Improvement Plan 2014-2018
MICHIGAN AIRPORT DEVELOPMENT PROGRAM PACKAGE MDOT Office of Aeronautics Airport Capital Improvement Plan 20142018 Prepared for: West Michigan Regional Airport Holland, Michigan August 2013 Contact: Mr.
Chapter 7: Pavement Rehabilitation 7-1 Asphalt Pavement Overlays 7-1 Surface Preparation Methods 7-2 Concrete Pavement Preparation 7-3 Recycling
7-1 Asphalt Pavement Overlays 7-1 Surface Preparation Methods 7-2 Concrete Pavement Preparation 7-3 Recycling Asphalt Pavements 7-7 Chapter 7 Pavement Rehabilitation Pavement rehabilitation can be accomplished
Construction Management Program
Use and Limitation: The Sponsor may use this document as a guide in preparing a construction management program for their specific project. Sponsors and Consultants are cautioned that the provision of
Evaluation of Long-Lasting Perpetual Asphalt Pavement Using Life-Cycle Cost Analysis. Arnar Agustsson Sulton Azamov
Evaluation of Long-Lasting Perpetual Asphalt Pavement Using Life-Cycle Cost Analysis Arnar Agustsson Sulton Azamov Contents 1. Perpetual Asphalt Pavement 2. Scope 3. Methodology 4. Performance 5. Alternatives
Cost Considerations of In-Place Recycling as a Pavement Rehabilitation Alternative Brian Diefenderfer, PhD, PE Alex Apeagyei, PhD, PE
Cost Considerations of In-Place Recycling as a Pavement Rehabilitation Alternative Brian Diefenderfer, PhD, PE Alex Apeagyei, PhD, PE A partnership of the Virginia Department of Transportation and the
CID STREET INFRASTRUCTURE ASSESSMENT
ABSTRACT An evaluation of the street infrastructure in Foxberry Estates Phase 1, including pavement condition, verification of construction techniques, and subgrade quality. Recommendations and costs for
Thin Whitetopping Application at Williamsburg Regional Airport and Other Thin Whitetopping Airport Applications.
Thin Whitetopping Application at Williamsburg Regional Airport and Other Thin Whitetopping Airport Applications. Author: Gary L. Mitchell, P.E. Director Airports, American Concrete Pavement Association
Case Studies - Concrete Overlays
Case Studies - Concrete Overlays Lessons Learned - Concrete Overlays Purdue Road School March 6, 2013 Today s Topic 1. Overlays 2. New Full-depth 3. Pervious 4. Roller Compacted 5. Full Depth Patching
VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST-09-06 BID PROPOSAL
VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST-09-06 BID PROPOSAL I/We hereby agree to furnish to the Village of Lombard all necessary materials, equipment, and labor, to complete the North Industrial
Advancements in GPR for a Sustainable Tomorrow
Advancements in GPR for a Sustainable Tomorrow Shawn Lapain, BSc. E., EIT Pavement Specialist Applied Research Associates Inc. 5401 Eglinton Avenue West, Suite 105, Toronto, ON, Canada, M9C 5K6 Tel: 416-621-9555,
DEPARTMENT OF THE AIR FORCE AIR FORCE CIVIL ENGINEER CENTER TYNDALL AIR FORCE BASE FLORIDA
FROM: AFCEC/DD 139 Barnes Drive, Suite 1 Tyndall AFB, FL 32403-5319 DEPARTMENT OF THE AIR FORCE AIR FORCE CIVIL ENGINEER CENTER TYNDALL AIR FORCE BASE FLORIDA 18 AUGUST 2014 SUBJECT: Engineering Technical
Pavement Management Program
Pavement Management Program ALACPA Short Course on Pavements Maintenance Course Objective Pavement Management Program Benefits of a Pavement Management System Components of a Pavement Management System
Final Report Evaluation of I-Pave Low Volume Road Design Software
Final Report Evaluation of I-Pave Low Volume Road Design Software May 2015 Michael I Darter, William R. Vavrik, Dinesh Ayyala 2015 2014 Applied Research Associates, Inc. 1 Objectives 1. Obtain all documentation
Cement-Based Pavement Solutions. Full Depth Reclamation with Cement A Useful and Cost Saving Tool
Cement-Based Pavement Solutions October 30, 2013 Concrete Airport Pavement Workshop Atlanta, Georgia Full Depth Reclamation with Cement A Useful and Cost Saving Tool Stan Bland, PE Pavement Applications
CHAPTER 3 ALTERNATIVES CONSIDERED
3.0 INTRODUCTION CHAPTER 3 ALTERNATIVES CONSIDERED The existing Afton Airport parallel taxiway, with its approximate 4,360 foot length, only accommodates one half of the runway s length, and is too short
Pavement Maintenance Management Katie Zimmerman, P.E. Applied Pavement Technology, Inc. (APTech)
Pavement Maintenance Management Katie Zimmerman, P.E. Applied Pavement Technology, Inc. (APTech) Presentation Approach Definitions Importance System Components Use of Technology Wrap-Up How Would You Describe
Washington Airport Pavement Management System. Pavement Management Manual
Washington Airport Pavement Management System Pavement Management Manual Washington Airport Pavement Management System Pavement Management Manual Prepared for WSDOT Aviation 3704 172nd Street NE, Suite
Session 7: Retrofitted Edge Drains 7.1
Session 7: Retrofitted Edge Drains 7.1 Learning Outcomes 1. List benefits of drainage 2. List components of edge drain systems 3. Describe recommended installation procedures 4. Identify typical construction
LIFE-CYCLE COST COMPARISON FOR MUNICIPAL ROAD PAVEMENTS
LIFE-CYCLE COST COMPARISON FOR MUNICIPAL ROAD PAVEMENTS HEIN, David K., P.Eng. Applied Research Associates, Inc., 5401 Eglinton Avenue West, Suite 105, Toronto, ON, CANA- DA, M9C 5K6. Tel: 416-621-9555
Concrete Pavement Rehabilitation
Concrete Pavement Rehabilitation Rehabilitating Concrete Pavements using CPR 3 Restoration Resurfacing Reconstruction By Tim Smith Director Transportation & Public Works Cement Association of Canada, April
Pavement Design. Guest Lecturer Dr. Sirous Alavi, P.E. SIERRA TRANSPORTATION. 1005 Terminal Way, Suite 125 Reno, Nevada 89502
Pavement Design Guest Lecturer Dr. Sirous Alavi, P.E. SIERRA TRANSPORTATION ENGINEERS,, INC. I 1005 Terminal Way, Suite 125 Reno, Nevada 89502 Topics Introduction Design Factors Pavement Types Fundamentals
2006 Report Card for Pennsylvania s Infrastructure
AVIATION C- 2006 Report Card for Pennsylvania s Infrastructure Philadelphia International Airport (PHL) is currently one of the fastest growing airports in the world. It is also one of the most delay-prone
Pavement Management Program
Pavement Management Program 2014 Street Maintenance Program Executive Summary 01/21/2014 Presented by Mark Thiel Assistant Director of Public Works Program Overview Start of current program 2005 825.1
Airport Safety and Construction Management Under The FAA
U.S. Department of Transportation Federal Aviation Administration Advisory Circular Subject: Quality Management for Federally Funded Airport Construction Projects Date: DRAFT Initiated by: AAS-100 AC No.:
Pavement Engineering & Asset Management. Meeting the requirements of our existing & future diverse road networks
Pavement Engineering & Asset Management Meeting the requirements of our existing & future diverse road networks 3 Introduction Pavement Engineering Services Jean Lefebvre (UK) are able to provide analysis
Standards for Specifying Construction Of Airports
Standards for Specifying Construction Of Airports FAA Standard Materials in FAARFIELD Thickness Design Presented to: X ALACPA Seminar on Airport Pavements and VIII FAA Workshop By: David R. Brill. P.E.,
I-66 Pavement Rehabilitation
I-66 Pavement Rehabilitation Fall Asphalt Conference Richmond, VA David Shiells, P.E. Virginia Department of Transportation David White Superior Paving Corporation October 2, 2012 Project Location 2 Goal
AirCost LCCA Software An overview of AAPTP 06 06 Paul M. Dalbey, P.E.
AirCost LCCA Software An overview of AAPTP 06 06 Paul M. Dalbey, P.E. American Concrete Pavement Association, Southeast Chapter Concrete Airport Pavement Workshop Atlanta, GA Otb October 28, 2010 Overview
CHAPTERS 600 670 PAVEMENT ENGINEERING CHAPTER 600 GENERAL ASPECTS
HIGHWAY DESIGN MANUAL 600-1 May 7, 2012 CHAPTERS 600 670 PAVEMENT ENGINEERING CHAPTER 600 GENERAL ASPECTS Topic 601 - Introduction Pavement engineering involves the determination of the type and thickness
SECTION III-06 Surfacing Page 1 Revised 3/2/10. See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway.
Page 1 Revised 3/2/10 See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway. For New/Reconstruction projects: The cross slope of the driving lanes range from 1.5% to
MASTER PLAN PREPARATION
Located in the East Valley of the Phoenix Metropolitan Area, Phoenix-Mesa Gateway Airport is a former military airfield that has successfully made the transition to a full service commercial passenger
TAC Primer Pavement Asset Design and Management
Transportation Association of Canada TAC Primer Pavement Asset Design and Management Introduction Transportation infrastructure plays an important role in the social and economic development of a country,
Operations at Coulter Airfield
Operations at Coulter Airfield Outline Background Assets Budget Options Questions/Direction Vision (January 2010) 1. Maximize Economic Viability of Coulter Field as an Asset to the City Strategic Issue
Pavement Management Office
Department of Transportation and Public Works Puerto Rico Pavement Management Office PAVEMENT PRESERVATION SEPPP 1 GOALS AND OBJECTIVES PRHTA has been collecting data for more than twenty (20) years with
DRAFT MAINTAINING HOUSTON S STREETS REPAIR, REHABILITATION, RECONSTRUCTION. Using the Full Range of Tools for a Challenging Job
MAINTAINING HOUSTON S STREETS REPAIR, REHABILITATION, RECONSTRUCTION Using the Full Range of Tools for a Challenging Job Report To: TTI Committee May 13, 2014 1 Pavement Management - Suggested Treatments
SKER HUESKER HUESKER HUESKER HUESKER HUESKERHUES
rhuesker HUESKER HaTelit HUESKER HUESKER HUESKER HUESKERr SKER HUESKER HUESKER Asphalt HUESKER HUESKER HUESKERHUES SKER HUESKERHUES HUESKERr SKER HUESKERHUES rhueskerreinforcement HUESKERr Long-term retardation
Construction Specifications for Keyhole Pavement Coring and Reinstatement
F I N A L Construction Specifications for Keyhole Pavement Coring and Reinstatement Gas Technology Institute 1700 S. Mount Prospect Rd. Des Plaines, Illinois 60018 www.gastechnology.org Version 13 October
Pavement Rehabilitation Using Hot Mix Asphalt. - National Perspective -
Pavement Rehabilitation Using Hot Mix Asphalt - National Perspective - Rehabilitation Process Evaluate Existing Pavement and Conditions Evaluate Options Construct Project Monitor Performance Evaluate Existing
Rehabilitation Strategies for Bonded Concrete Overlays of Asphalt Pavements
University of Pittsburgh Rehabilitation Strategies for Bonded Concrete Overlays of Asphalt Pavements Authors: J. M Vandenbossche S. Sachs August 2013 1. Introduction Bonded concrete overlays of asphalt
Pavement Management Implementation: Success Stories for Maryland Counties
Pavement Management Implementation: Success Stories for Maryland Counties September 25, 2015 Aaron D. Gerber, P.E. How Does Your Organization Manage Pavement Assets? By Experience/Past Practice? By Customer
Reinforcement HUESKER. HaTelit. Engineering with geosynthetics
HUESKER Engineering with geosynthetics rhuesker HUESKER HUESKER HUESKER HUESKER HUESKERr SKER HUESKER HUESKER Asphalt HUESKER HUESKER HUESKERHUES Reinforcement - the answer to reflective cracking in asphalt
PAVEMENT STRUCTURE DESIGN GUIDELINES
PAVEMENT STRUCTURE DESIGN GUIDELINES Technical Circular T- 01/15 (Replaces Technical Circular T-01/04) Final Update: Jan. 26, 2015 Geotechnical, Materials and Pavement Engineering TABLE OF CONTENTS 1.0
REGIONAL TRANSPORTATION COMMISSION OF WASHOE COUNTY
REGIONAL TRANSPORTATION COMMISSION OF WASHOE COUNTY FLEXIBLE PAVEMENT DESIGN MANUAL February 2007 PREPARED BY: SIERRA TRANSPORTATION ENGINEERS, INC 1005 TERMINAL WAY, SUITE 125 RENO, NV 89502 EXECUTIVE
USE OF A DIGITAL SURVEY VEHICLE FOR PAVEMENT CONDITION SURVEYS AT AIRPORTS. Paul W. Wilke, P.E. Applied Research Associates, Inc.
USE OF A DIGITAL SURVEY VEHICLE FOR PAVEMENT CONDITION SURVEYS AT AIRPORTS Paul W. Wilke, P.E. Applied Research Associates, Inc. August 11, 2014 Words: 3,280 Figures: 3 Tables: 0 Photographs: 3 ABSTRACT
Surface Treatment Cost - Based on 100,000 Sq. Yds.
$7.96 PCMO $2.07 Thermo seal w/o aggregate $3.72 Thermo Slurry Fine $2.00 Slurry Seal $2.40 Chip Seal $1.08 Rejuvenator $1.65 FOG Seal $5.00 Ekrete $9.00 Surtreat $5.00 Magnesium Phosphate Cement $18.00
The AASHO Road Test site (which eventually became part of I-80) at Ottawa, Illinois, was typical of northern climates (see Table 1).
Página 1 de 12 AASHO Road Test The AASHO Road Test, a $27 million (1960 dollars) investment and the largest road experiment of its time, was conceived and sponsored by the American Association of State
1.0 INDEX TO SHEETS URGENT STORM DAMAGE REPAIR AVON PARK AIR FORCE RANGE LOCATION MAP LEGEND LOCATION MAP
5 INDEX TO SHEETS. NOTES AND TYPICAL SECTIONS. H. R. SMITH RD.CULVERT.3 0/5 END BARRIER ACCESS ROAD REPAIR. KISSIMMEE RD. AT MORGAN HOLE CR. ROAD REPAIR.5 RANGE INFRASTRUCTURE REPAIR N 0 000' 3 0,000'
Minimizing Reflective Cracking With Applications of the Rolling Dynamic Deflectometer and Overlay Tester
Minimizing Reflective Cracking With Applications of the Rolling Dynamic Deflectometer and Overlay Tester Dar-Hao Chen, 1 Moon Won, 2 Tom Scullion, 3 and John Bilyeu 4 ABSTRACT Since reflective cracking
2012 Environmental Report
The Airport is committed to integrate economic, social, and environmental aspects into new projects, existing operations and management strategies while providing a quality service to the greater St. Louis
Improving Rehabilitation Selection for Pavement Life Cycle Cost Analysis
Improving Rehabilitation Selection for Pavement Life Cycle Cost Analysis ACPA Mid Year Meeting Applying Life Cycle Cost Analysis for Fair Pavement Type Selection Workshop June 24, 2014 Jim Mack, PE, MBA
Developing and Maintaining Your Airport Property Map Lessons from St. Louis
Developing and Maintaining Your Airport Property Map Dana Ryan, St Louis Airport Authority Todd Madison, Central Region, FAA Chuck Reitter, Reitter Consulting, LLC Craig Bowles, St. Louis Airport Authority
COST EFFECTIVE ROAD MAINTENANCE MARCH 2015
COST EFFECTIVE ROAD MAINTENANCE MARCH 2015 According to the University of New Hampshire technology transfer Center the goal of a Road Surface Management Plan should be the following: Maximize Return on
Joint Rehabilitation. Driving Forces for Concrete Pavement Joint Repairs
Long Life Concrete Pavement Joint Performance Joint Rehabilitation Gary Fick, Trinity Construction Management Services, Inc. Representing the National CP Tech Center Driving Forces for Concrete Pavement
Impacts of Increased Loading Due to Heavy Construction Traffic on Thin Pavements
Impacts of Increased Loading Due to Heavy Construction Traffic on Thin Pavements Author: Harry Sturm, P. Eng. Stantec Consulting Ltd. 16-77 Mississauga Road Mississauga, ON L5N 7G2 Phone: (95) 817-296
Transportation Infrastructure Asset Management
2015 NW Region TTAP& BIA Symposium Transportation Infrastructure Asset Management March, 2015 Happy Longfellow, PE [email protected] (206) 394-3649 ASSET MANAGEMENT OVERVIEW What? Why? How? Inventory
CITY AND BOROUGH OF JUNEAU JNU RUNWAY 8/26 REHABILITATION ENGINEER S DESIGN REPORT
CITY AND BOROUGH OF JUNEAU JNU RUNWAY 8/26 REHABILITATION AIP No. 3-02-0133-0XX-2014 ENGINEER S DESIGN REPORT Prepared For: City and Borough of Juneau Juneau International Airport Prepared by: USKH, Inc.
La Nueva AASHTO Guia de Diseno de Pavimentos Hormigon
La Nueva AASHTO Guia de Diseno de Pavimentos Hormigon Michael I. Darter Emeritus Prof. Civil Engineering, University of Illinois & Applied Research Associates, Inc. USA October 2012 Cordoba, Argentina
APPENDIX B. I. Background Information
APPENDIX B GUIDELINES FOR IDENTIFYING AND REPAIRING LOCALIZED AREAS OF DISTRESS IN AC PAVEMENTS PRIOR TO CAPITAL PREVENTIVE MAINTENANCE OR REHABILITATION REPAIRS I. Background Information A. AC Pavement
Using Accelerated Pavement Testing to Evaluate Permeable Interlocking Concrete Pavement Performance
Using Accelerated Pavement Testing to Evaluate Permeable Interlocking Concrete Pavement Performance Rongzong Wu, David Jones, Hui Li and John Harvey University of California Pavement Research Center Prepared
asphalt applications Construction and surfacing of footways and cycleways using asphalt mpa asphalt Asphalt Information Service
asphalt applications 11 Construction and surfacing of footways and cycleways using asphalt Asphalt Information Service mpa asphalt November 2009 Mineral Products Association Introduction The main use of
SCOPE OF WORK VAN BUREN WATERPROOFING AND PAINTING MAY 2011 US DEPARTMENT OF STATE ATHENS BY NP
SCOPE OF WORK VAN BUREN WATERPROOFING AND PAINTING MAY 2011 US DEPARTMENT OF STATE ATHENS BY NP CONTENTS 1. Site address... 3 2. Background... 4 3. Scope of work... 4 4. General conditions... 5 4.1 Materials,
SECTION 03400 PRECAST CONCRETE STRUCTURES
SECTION 03400 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for precast concrete structures, including fabrication and erection. 1.02 REFERENCE STANDARDS A. American Society for
High-Speed Nondestructive Testing and Intelligent Construction Systems
High-Speed Nondestructive Testing and Intelligent Construction Systems 1st International Conference on Transportation Construction Management February 9-11, 9 2008 Orlando, Florida Ted Ferragut, P.E. NDT
Decision Matrix for Pavement Preservation. Mike Mamlouk Arizona State University
Decision Matrix for Pavement Preservation Mike Mamlouk Arizona State University Outline 1. Concept of preventive maintenance 2. Effectiveness of treatments 3. Treatment selection 2 Pavement Pavement Preservation
Cuyahoga County Airport - A Guide to Funding Capital Improvements
7.01 General CHAPTER 7 - FINANCIAL PLAN This chapter presents a financial plan to assist with future capital improvements and provide a guide for implementing the development of Cuyahoga County Airport.
CCTV PIPE INSPECTION AND EVALUATION RUNWAY 17L-35R
CCTV PIPE INSPECTION AND EVALUATION For RUNWAY 17L-35R At ST. PETERSBURG CLEARWATER INTERNATIONAL AIRPORT February 2011 CCTV PIPE INSPECTION AND EVALUATION RUNWAY 17L-35R ST. PETERSBURG CLEARWATER INTERNATIONAL
ASPHALT PAVEMENT RECYCLING
HOT IN-PLACE RECYCLING THE ENERGY SAVING METHOD ASPHALT PAVEMENT RECYCLING Hot In-Place alt ec cl n The Energy Saving Method! HIGHWAY REHAB CORP Highway Rehab Corp 2258 Route 22 Brewster, NY 10509 Tel
Fly Ash Slurry Injection (FASI) of Bituminous Thermal Cracks
Fly Ash Slurry Injection (FASI) of Bituminous Thermal Cracks Schedule What is Fly Ash Slurry Injection (FASI) Thermal Cracks and Why They Depress Pavement Rehab Strategies Special Provisions Upcoming Projects
FWD/HWD Void Detection Beneath Concrete Pavements or Overlaid Concrete Pavements. SWIFT 2010 Calgary, AB
FWD/HWD Void Detection Beneath Concrete Pavements or Overlaid Concrete Pavements SWIFT 2010 Calgary, AB Presentation Outline Voids what s the big deal? What causes them? How can we detect them? Oops Development
CITY OF GLENDALE CALIFORNIA REPORT TO CITY COUNCIL
FORM CM 36 5 0 CITY OF GLENDALE CALIFORNIA REPORT TO CITY COUNCIL April 28, 2009 AGENDA ITEM Report on bids received for the Greenbriar Road and Adjacent Streets Rehabilitation Project. (1) Motion Awarding
Airport and Aviation Funding Programs
Chapter 7 Airport and Aviation Funding Programs Airports and aviation projects across the nation benefit from many funding sources including the federal, state, and local units of government. Some improvement
ASBESTOS IN ROOFING SYSTEMS WORK PRACTICES AND DISPOSAL IN ASSOCIATION WITH ROOFING PROJECTS
ASBESTOS IN ROOFING SYSTEMS WORK PRACTICES AND DISPOSAL IN ASSOCIATION WITH ROOFING PROJECTS 1.0 GENERAL 1.1 SUMMARY A. The following procedures apply to the project manual and drawings for asbestos in
Evaluation of PMS Recommendations for Flexible Pavement Rehabilitation Using RWD Deflection Data
Evaluation of PMS Recommendations for Flexible Pavement Rehabilitation Using RWD Deflection Data Zhongjie Zhang Pavement & Geotech Research Administrator Louisiana Transportation Research Center Louisiana
CHAPTER 2 PAVEMENT MANAGEMENT SYSTEM
CHAPTER 2 PAVEMENT MANAGEMENT SYSTEM 2.1. INTRODUCTION TO PAVEMENT MANAGEMENT The ability of a pavement system to serve a society is largely a function of planning. Planning is the intersection between
Pavement Management Program
Pavement Management Program 2013 Street Maintenance Program Executive Summary 1/15/2013 Presented by Mark Thiel Assistant Director Public Works Program Overview Start of current program 2005 812.5 Lane
Road maintenance policy based on an expert asset management system. - Concept and case study - Author Philippe LEPERT IFSTTAR Nantes
Road maintenance policy based on an expert asset management system - Concept and case study - Author Philippe LEPERT IFSTTAR Nantes Outline of the presentation Road asset impacts rating Road asset maintenance
BRIDGE RESTORATION AND LANDSLIDE CORRECTION USING STRUCTURAL PIER AND GRADE BEAM
BRIDGE RESTORATION AND LANDSLIDE CORRECTION USING STRUCTURAL PIER AND GRADE BEAM Swaminathan Srinivasan, P.E., M.ASCE H.C. Nutting/Terracon David Tomley, P.E., M.ASCE KZF Design Delivering Success for
AGREGADOS RECICLADOS MITOS Y REALIDADES
The Production and Use of Recycled Concrete in the USA Thomas Van Dam, Ph.D., P.E., FACI Principal Engineer CTL Group Introduction In the United States, concrete is the most commonly used recycled material
Portland Cement Concrete Pavement Best Practices Summary Report
Portland Cement Concrete Pavement Best Practices Summary Report WA-RD 744.1 Stephen T. Muench August 2010 Office of Research & Library Services WSDOT Research Report Research Report Agreement T2695, Task
Notice of Passenger Facility Charge (PFC) Approvals and Disapprovals.
[4910-13-M] DEPARTMENT OF TRANSPORTATION Federal Aviation Administration Notice of Passenger Facility Charge (PFC) Approvals and Disapprovals. AGENCY: Federal Aviation Administration (FAA), DOT. ACTION:
Coal Ash Production and Use Survey 2014
Coal Ash Production and Use Survey 2014 News Conference Washington DC Thomas H. Adams, ACAA Executive Director December 15, 2015 Founded in 1968 Headquartered in Farmington Hills, MI 160 members utilities,
AdMaS centre Structure of the centre: Development of Advanced Building Materials Development of Advanced Structures and Technologies
AdMaS centre (Advanced Materials, Structures and Technologies) is modern science centre and complex civil engineering research institution affiliated to the Faculty of Civil Engineering, Brno University
Reformulated Pavement Remaining Service Life Framework
Reformulated Pavement Remaining Service Life Framework Publication No. FHWA-HRT-13-038 november 2013 Research, Development, and Technology Turner-Fairbank Highway Research Center 6300 Georgetown Pike McLean,
Pavement Management Systems
Pavement Management Systems Presented by Bill Weiss, P.E. Applied Pavement Technology, Inc. (APTech) At the 2015 Municipal Streets Seminar Ames, Iowa Why Pavement Management??? Pavements are expensive