1 Ozark and Webbers Falls Powerhouse Major Rehabilitation Lee Beverly- SWL Project Manager Dan Brueggenjohann SWT Project Manager Byron Floyd Resident Engineer 12 June 2013 US Army Corps of Engineers
2 Ozark Scope, Cost and Schedule Project Scope: Rehabilitation of the Ozark Powerhouse to include replacement of five turbines, rehabilitation of all cranes, rehab of water Treatment, and misc aux systems Project Cost including management expenses: $125.7M ($32.9M Customer Funded) Turbine Contract Notice to Proceed : July 2005 Awarded Turbine Contract Amount: $74.5M Current Turbine Contract Amount: $99.0M Current Required Completion Date : April 20, 2014 Anticipated Completion Date: March 24, 2017
3 Ozark Funding Status Ozark Rehab Project Estimate Cranes, Gates, Generator Coolers, Plant Prep (note, includes speed increaser credit mod) Turbine Contract Engineering, Project Support, Contract Mgmt Remaining Escalation Payments (based on 7 th yr esc. Factors) Contingency $125.7M $3.9M $93.5M $17.6M $5.8M $4.9M Funding Received to Date Regular Appropriations Recovery Act Funding FY06-FY07 Customer Funding FY12 Customer Funding $107.2M $44.6M $29.7M $20.1M $12.8M Balance To Complete $18.5M Ozark/Webbers Falls Major Rehab
4 Ozark Turbine Replacement Contract Major Modifications to date- Replace Cooling Water Systems- $800,000 Replace Unwatering Systems- New Upper Shafts- Correct Misalignments, Unit 4- $1.0 Million 3.2 Million $2.0 Million Paint Blades and Wicket Gates $800,000 Stay Vane Repair, 3 Units (est)- Additional Interior Painting Escalation Thru June 2012 $1.6 Million $1.4 Million $5.3 Million BUILDING 4 STRONG
5 Ozark/Webbers Falls Economic Price Adjustments (escalation) The 7 th year escalation payment was 8.8% of the total invoicing
6 Webbers Falls Scope, Cost and Schedule Project Scope: Rehabilitation of the Webbers Falls Powerhouse to include replacement of three turbines, the rewinding of three generators and rehabilitation of all cranes, tailrace and intake gates and bulkheads. Project Cost including management expenses: $72.7M ($67.9M Customer Funded) Turbine Contract Awarded: February 2008 Awarded Turbine Contract Amount: $39.3M Current Turbine Contract Amount: $45.9M Current Required Completion Date : 4 October 2012 Anticipated Completion Date: 16 January 2016
7 Webbers Falls Project Cost Breakdown 2013 Current Cost Est. - $72.7M Turbine Rehab Cont Generator Rewind Cont Intake/Draft Tube Cranes 4.0* Rehab Two Bridge Cranes 2.6 Misc. Electrical Mech ** New 13.8KV Breakers - 0.8* Total - $72.7M *ARRA Funded **Partial ARRA Funded Cost include S&A and Contingency
8 Webbers Falls Modifications Major Modifications to date- New Upper Shafts- $1.6 Million Replace low speed gears and Pinions- $5.5 Million Paint Blades and Wicket Gates- $300,000 Stay Vane Repair, 3 Units (est)- $850,000 Additional Painting- $1.0 Million Machine Embedded Components- $700,000 Escalation Thru June $1.7 Million BUILDING 8 STRONG
9 Webbers Falls Turbine Rehab Sub Agreement Funding Unit 3 Unit 2 Unit 1 Sub Agreement Totals $19,500,000 $17,900,000 $17,900,000 Contracts, Executed Modifications, and S&A $18,912,000 $15,686,000 $16,748,000 Est. Remaining Escalation $125,000 1,550,000 1,827,000 Estimated Outstanding Modifications & Contingency 2,025,000 1,900,000 1,500,000 Estimated Required S&A $0 $1,650,000 1,050,000 Total Requirement $21,062,000 $20,786,000 $21,125,000 Projected Shortfall 1,562,000 2,886,000 3,225,000
10 Additional Project Sub Agreements SW00431-S138 Rewind Generators Units 1,2 & 3 = $6.0M Ongoing - $4.9M contract with Andritz SW00431-S092- Rehab Bridge Cranes - $2.62M Contract Complete SW00431-S137- Intake Gate, Bulkhead and Misc. Electrical - $4.0M Ongoing - $3.5M contract, additional $518K funded through ARRA.
11 Pending Sub Agreements/modifications SW00431-M001 Replace Upper Shaft Unit 1. Cost = $800,000 Status Sub-agreement sent to SWD. Replace the Low Speed Gear and Pinions Unit 1. Cost - $5,500,000 Status Sent to SWPA May 8. Replace Upper Shaft Unit 2. Cost = $800,000 Status Awaiting Draft Sub-agreement from SWPA.
12 Pending Sub Agreements/modifications Supplemental Funding for Unit 3 Cost - $1,600,000 Status Approved by the Customer Council Supplemental Funding for Unit 1 Cost - $3,300,000 Status Awaiting Customer Council Approval Supplemental Funding for Unit 2 Cost - $2,900,000 Status Awaiting Customer Council Approval
13 Projected Schedule WF Contract Req. Completion: 4 Oct Pending mods will push CRC to approx 26 Feb 2013 OZ Contract Req. Completion: April 20, Projected mods will push CRC to approx 19 Jul 2014 Work on two units simultaneously at Ozark has reduced the total contract time by three years. Potential opportunities to reduce project completion date by 1 year at each site by early turnover of OZ U5 and WF U2 as shown in the above schedule (requires customer approval). Performing stay vane crack repair concurrent with disassembly saves from 2-3 months per unit. Disassembly of the turbine has been reduced from 4.5 months (WF Unit 3) to 2.5 months (WF Unit 1 and OZ Unit 3). In-place machining of embedded wicket gate assembly mounting flanges has reduced wicket gate filing time by 6 weeks per unit.
14 Schedule Cont. Each successive unit will have a reduced duration through application of lessons learned, utilization of the schedule, and better visibility of potential differing site conditions as shown below in order of completion at each plant. Ozark OZ Unit 4 required approximately 56 months through completion of 72 hour test OZ Unit 2 will take approximately 43 months through completion of 72 hour test OZ Unit 3 will take approximately 27 months through completion of 72 hour test OZ Unit 1 will take approximately 20 months through completion of 72 hour test OZ Unit 5 will take approximately 21 months through completion of 72 hour test (includes additional speed increaser work not included on other units) Webbers Falls WF Unit 3 required approximately 43 months through completion of 72 hour test WF Unit 1 will take approximately 23 months through completion of 72 hour test WF Unit 2 will take approximately 20 months through completion of 72 hour test
15 Webbers Falls Unit 1 Speed Increaser A chipped tooth on a low speed pinion and multiple cracks on the low speed gear were found during inspection of the speed increaser. Deficiencies required replacement of the low speed gear set. Replacement occurred off of the critical path so no additional time was added to the contract.
16 Contract was modified to add a vinyl paint coating system to the series 400 stainless steel. First three units were painted after installation but remaining unit components will be painted off site to remove this work from the critical path. Corrosion The cathodic protection system is being recommissioned following the completion of painting. Adjustments to the protection potential will continue until corrosion is stopped. Changes to WF Unit 3 have shown much improved protection.
17 Stay Vane Crack Repair Performing stay vane crack repair concurrent with disassembly saves from 2-3 months per unit.
18 Improve Method of Scrapping Old Runner Improved process for removal of runner has reduced this activity duration from 4 weeks per unit to 1 day per unit.
19 Remove Wicket Gate Assembly Before Lower Shaft Initial units were disassembled with the lower shaft being removed prior to the wicket gate assembly. Due to the long duration to repair and reassemble the wicket gate assembly the removal of the assembly is now being accomplished prior to removal of the lower shaft which allows more time for the repair process on these components.
20 Machining Embedded Flanges Machining the embedded gate barrel mounting flanges reduced the wicket gate filing time by 6 weeks per unit.
21 Wicket Gate filing Initial units required the governor to be operational prior to start of wicket gate filing making this a critical path activity. Contractor is now utilizing a portable hydraulic power unit allowing the gates to be filed prior to completion of the governor. This allows the wicket gate filing to be removed from the critical path which reduced the unit duration by 6 weeks.
22 Goals Reduce installation time for each successive unit. Limit turnover of personnel. Resolve non-controversial outstanding issues, Ozark Unit 4 and Webbers Falls Unit 3. Resolve controversial outstanding issues, corrosion repair and wicket gate filing. Maintain outstanding partnering relationship.
23 Key Challenges Timely response and negotiation of RFPs. Resolution of Cathodic Protection System issues. Resolution of Oil Head Design issues. Proposal for new governors at Ozark. Removing silt from Ozark Unit 1. Rewind Webbers Unit 1 generator. Contracting for new gears for Ozark Unit 5 speed increaser. Improving communications between Operations, E&C construction office, and contractor.
Risk Mitigation Strategy. Lewiston Pump Generating Plant Life Extension and Modernization Program
Risk Mitigation Strategy Lewiston Pump Generating Plant Life Extension and Modernization Program John Canale Vice President Project Management May 21, 2013 Trustee Meeting NYPA Previous and Current Life
HYDROMATRIX Jebel Aulia - Sudan
HYDROMATRIX Jebel Aulia - Sudan www.andritz.com HYDROMATRIX - Concept Jebel Aulia - Sudan HYDROMATRIX is a new concept of hydraulic energy generation, which has been developed by an American engineer in
Wolf Creek Hydropower Rehabilitation Analysis Report
Wolf Creek Hydropower Rehabilitation Analysis Report David Bishop Kris Atanassov Team Cumberland, September 16, 2015 US Army Corps of Engineers Agenda Overview Water Availability Energy Modeling Preliminary
Performance Improvement of Pump-turbine for Large Capacity Pumped Storage Power Plant in USA
Performance Improvement of Pump-turbine for Large Capacity Pumped Storage Power Plant in USA 198 Performance Improvement of Pump-turbine for Large Capacity Pumped Storage Power Plant in USA 300-MW Pump-turbine
Chelan County PUD. Rock Island Rehabilitation Powerhouse One Units B5 to B8
Chelan County PUD Rock Island Rehabilitation Powerhouse One Units B5 to B8 Follow-up from October 19 th, 2015 Use of New Turbines vs. Refurbishment of Existing December 7, 2015 From Oct. 19 - Next Steps
Online Hydro Machinery Monitoring Protection, Prediction and Performance Monitoring Solutions
Online Hydro Machinery Monitoring Protection, Prediction and Performance Monitoring Solutions 2011, Emerson Process Management. The contents of this publication are presented for informational purposes
MICRO HYDRO POWER GENERATING EQUIPMENT
MICRO HYDRO POWER GENERATING EQUIPMENT TOSHIBA TOSHIBA ENGINEERING In general, specifications of hydroelectric power system vary depending upon the installation location. The hydro turbine and generator
Propeller Equipment Sale. For Questions please contact Dan Cork [email protected] 918-636-3567
Propeller Equipment Sale For Questions please contact Dan Cork [email protected] 918-636-3567 Propeller Equipment Sale The equipment for sale is used in the repair and overhaul of aircraft propellers. Propeller
WEIR AMERICAN HYDRO. Excellent Engineering Solutions
WEIR AMERICAN HYDRO Excellent Engineering Solutions Weir Power & Industrial Division Sites Worldwide The Weir Group PLC Values Customer focus Listening to the voice of our external and internal customers
HYDROPOWER SYSTEMS BY APPOINTMENT TO H.M. THE QUEEN WATER TURBINE ENGINEERS, GILBERT GILKES & GORDON LTD, KENDAL
HYDROPOWER SYSTEMS BY APPOINTMENT TO H.M. THE QUEEN WATER TURBINE ENGINEERS, GILBERT GILKES & GORDON LTD, KENDAL 1 WWW.GILKES.COM CONTENTS THE COMPANY 3 GILKES HYDROPOWER 5 GILKES PACKAGE 7 TURBINE SELECTION
PRESENTATION TITLE. Corps of Engineers Agreement with. Columbia Riverkeeper Regarding Hydropower Plant Discharges
Corps of Engineers Agreement with PRESENTATION TITLE Columbia Riverkeeper Regarding Hydropower Plant Discharges 2015 Southwestern Federal Hydropower Meeting June 18, 2015 Wayne Todd Sr. Hydropower Program
US Army Corps of Engineers. Little Rock District
US Army Corps of Engineers Little Rock District COL Ed Jackson District Commander Little Rock District 2 September 2009 US Army Corps of Engineers Little Rock District DeQueen Beaver Gillham Ozark Blue
INDUSTRIAS G.E S.A. E n g ineering Solut i o n s
INDUSTRIAS G.E S.A. E n g ineering Solut i o n s INDUSTRIAS G.E S.A. Heavy Fabrication Heavy Machining Equipment Rental Industrial Equipment Services Manpower Hire Consumable Supply Welcome to IGESA
NASHVILLE DISTRICT JETS SAME
NASHVILLE DISTRICT JETS SAME Regional Program Review Savannah, GA 26 June 2014 US Army Corps of Engineers Agenda District Boundaries Cumberland & TN River Systems Major Construction Projects Hydropower/Navigation
This is the civilian transfer case with the cooling loop only found in the driven gear half of the front case.
INTRODUCTION The Transfer case used in the AMG Hummer is a New Venture Gear, model 242. This case has been in use for the H-1/Hummer since the early 1990 s. There have been modifications to the internal
IMIA. Wind Turbine Generators. Claims. Codan Insurance / September 2007 Risk Engineer Truels Kjer
IMIA. Wind Turbine Generators. Claims. Codan Insurance / September 2007 Risk Engineer Truels Kjer Claims involving the main components of the turbine. September 2007 / Codan Insurance / Truels Kjer Page
The Comprehensive Coatings Service Provider to Industry
Coating Systems Excellent Engineering Solutions The Comprehensive Coatings Service Provider to Industry 2 Coating Systems Weir Coatings specialises in the application of high performance protective linings
Power Recovery Turbines
Power Recovery Turbines Fixed and Variable Geometry Vertical Horizontal Bulletin PS-90-1 (E) Pump Supplier To The World Flowserve is the driving force in the global industrial pump marketplace. No other
SB96-11B FAA APPROVED Supersedes SB96-11A, SB96-11, M84-16
TELEDYNE CONTINENTAL AIRCRAFT ENGINE SERVICE ULLETIN Compliance Will Enhance Safety SUJECT: PROPELLER STRIKES AND HYDRAULIC LOCKS. CATEGORY 3 S96-11 FAA APPROVED Supersedes S96-11A, S96-11, M84-16 PURPOSE:
AGENDA STAFF REPORT. Budgeted: Yes Current Year Cost: $695,000 Annual Cost: N/A
AGENDA STAFF REPORT Agenda Item ASR Control 13-001267 MEETING DATE: 10/22/13 LEGAL ENTITY TAKING ACTION: Board of Supervisors BOARD OF SUPERVISORS DISTRICT(S): 2 SUBMITTING AGENCY/DEPARTMENT: John Wayne
CHAPTER 65 TAIL ROTOR DRIVE SYSTEM. Section Title Page
CHAPTER 65 TAIL ROTOR DRIVE SYSTEM Section Title Page 65-00 Description........................................ 65.1 65-10 Tail Rotor Drive Fan Shaft.............................. 65.1 65-20 Tail Rotor
EXPERT REMANUFACTURED WIND TURBINE
EXPERT REMANUFACTURED WIND TURBINE Repowering Solutions is a division of Jeraneas Group of companies. Our core business is the remanufacturing of wind turbines of different sizes; a work that we have been
Los Angeles Trade Technical College Student Employment Center. Diesel & Related Technology Full Time
Job Title: Composite Mechanic Job Number: 923 Hours/Days: 7a-3p Salary: $22.29-22.53/ hr Requirements: Skills Requirement: Be familiar with AC/DC power and control systems; Maintain certification acquired;
Tube Type Oil Skimmer Comparison
Process Overview- Tube Type Oil Skimmers Oil flows down the face of the skimmer and into a sludge pan that is plumbed to a barrel. Model BG01 & BG34 or 6V Oil Skimmer 1.0 or 3/4 Diameter Collector Tube
A.1 Obligations and reporting of the gaining Society. Plans to be Submitted by the Owner to the Gaining Society
(Rev.0 July 2009) (Rev.1 June 2012) (Rev.2 Oct 2013) (Rev.3 Jan 2015) (Rev.4 July 2015) (Rev.5 Jan 2016) Procedure for Transfer of Class TABLE OF CONTENTS Procedure for Transfer of Class Application Definitions
Industrial Metrology and Engineering Applications in the Wind Turbine Industry
Industrial Metrology and Engineering Applications in the Wind Turbine Industry 1. Company Introduction M-7 Technologies is a privately owned, ISO 9001 certified company offering engineered solutions for
Jeff Haby, P.E. Director Sewer System Improvements. September 15, 2015. Agenda
SAWS Sanitary Sewer Overflow Reduction Program Jeff Haby, P.E. Director Sewer System Improvements SA Military Engineers Meeting Agenda SAWS Overview Consent Decree CD Compliance Programs Program Transition
1.3 Turbochargers are categorised in three groups depending on served power by cylinder groups with:
(Feb 2015) Turbochargers 1. Scope 1.1 These requirements are applicable for s with regard to design approval, type testing and certification and their matching on engines. Turbochargers are to be type
Mini & Micro Hydro Power Generation. EBARA Hatakeyama Memorial Fund Tokyo, Japan
Mini & Micro Hydro Power Generation EBARA Hatakeyama Memorial Fund Tokyo, Japan Definitions Large Scale hydro power generation : Capacity 100(MW) Most of them involve major construction of dams. Small
Backup Fuel Oil System Decommissioning & Restoration Plan
Backup Fuel Oil System Page 1 of 19 Overview of Physical Fuel Oil System and Decommissioning Steps The fuel oil system at Milford Power consists of a number of subsystems. These include the following:
Chapter 7 Hydraulic System Troubleshooting
Chapter 7 Hydraulic System Troubleshooting General The following troubleshooting information is provided as a general guide to identify, locate and correct problems that may be experienced with the hydraulic
4.4 Commissioning, Handover and Warranty
4.4 Commissioning, Handover and Warranty 4.4.1 Building Commissioning and Manuals The Building Commissioning formalizes the review and integration of all project expectations during the planning and design,
Optolite Indicators. General Purpose INDICATOR LIGHTS. Sub-Miniature. Miniature, Neon
Sub- Lockwasher, stainless steel or steel, nickel plate. Brass T-1 sub-midget flange base. See Selection Guide. Assembly mounts from front of panel. All mounting hardware Approximately.12 oz. less lamp.,
Inspections Standard Operating Procedure 5 Aboveground Storage Tanks
Aboveground Storage Tanks Aboveground Storage Tank Inspection This Standard Operating Procedure describes the steps that campus units that manage aboveground oil storage tanks (ASTs) or containers must
SECTION 807 PUMP STATION REHABILITATION
SECTION 807 PUMP STATION REHABILITATION 807-1 DESCRIPTION: Rehabilitation of pump stations shall be defined as the cleaning, removal, repair and/or replacement of any and/or all components including but
COMMON EQUIPMENT FAILURES AND CAUSES. How breakdowns can impact the bottom line. A handy reference guide from Hartford Steam Boiler.
COMMON EQUIPMENT FAILURES AND CAUSES How breakdowns can impact the bottom line. A handy reference guide from Hartford Steam Boiler. A WORLD THAT DEPENDS ON EQUIPMENT. Businesses, institutions and municipalities
JAGAN RAO ADELAIDE, TUESDAY, 3 DECEMBER 2013
JAGAN RAO ADELAIDE, TUESDAY, 3 DECEMBER 2013 Relate to this? Outline 1. Safety & Housekeeping 2. Aim 3. Introduction SKM and Jagan Rao 4. Project Controls Overview 5. Cost Estimating 6. Planning & Scheduling
APPENDIX F. Baker County. Mason Dam Hydroelectric Project FERC No. P-12686. Turbidity Monitoring Plan
APPENDIX F Baker County Mason Dam Hydroelectric Project FERC No. P-12686 Turbidity Monitoring Plan April 2011 857 Table of Contents 1.0 Introduction 1 2.0 Purpose and Scope 2 3.0 Turbidity Monitoring and
Facility Support Services
Facility Support Services The Precision Group has a breadth of experience delivering innovative, first class facility support service solutions to clients across the public and private sectors. Our expert
Audit Report. The Radioactive Liquid Waste Treatment Facility Replacement Project at Los Alamos National Laboratory
U.S. Department of Energy Office of Inspector General Office of Audits and Inspections Audit Report The Radioactive Liquid Waste Treatment Facility Replacement Project at Los Alamos National Laboratory
SERVICE LETTER SZ43-002-1A
FREON CYCLE AIR CONDITIONING SYSTEM - MOTOR COMPRESSOR CONDENSER ASSEMBLY - FAN ASSEMBLY CONVERSION OF P/N: SZ43-002-1 TO SZ43-002-1A. 1. PLANNING INFORMATION A. EFFECTIVITY All ZEE Systems Part Number
TYPE APPROVAL CERTIFICATION SCHEME MASS PRODUCED DIESEL ENGINES
1. Introduction TYPE APPROVAL CERTIFICATION SCHEME MASS PRODUCED DIESEL ENGINES 1.1 This scheme details the tests and inspection of diesel engines manufactured by mass production system for use in marine
SERVICE. 28R-7135001 thru 28R-7135229 PA-28R-200 Arrow II 28R-7235001 thru 28R-7635545
Piper Aircraft, Inc. 2926 Piper Drive Vero Beach, Florida, U.S.A. 32960 SERVICE NO. 1242 BULLETIN PIPER CONSIDERS COMPLIANCE MANDATORY Date: January 30, 2015 (S) (M) Service Bulletin (SB) 1242 supersedes
ASPHALT PAVEMENT RECYCLING
HOT IN-PLACE RECYCLING THE ENERGY SAVING METHOD ASPHALT PAVEMENT RECYCLING Hot In-Place alt ec cl n The Energy Saving Method! HIGHWAY REHAB CORP Highway Rehab Corp 2258 Route 22 Brewster, NY 10509 Tel
Volkswagen Jetta, Golf, GTI 1999, 2000 2.8 Liter VR6 2V Engine Mechanical, Engine Code(s): AFP 17 Engine-Lubrication (Page GR-17)
17 Engine-Lubrication (Page GR-17) Lubrication system components, removing and installing Oil filter housing, disassembling and assembling Oil pan, removing and installing Oil pressure and oil pressure
Reliability. The Essentials of Eliminating Downtime of your Electric Motor. Asset Management? Or, Maintenance Management, Re-branded?
for maintenance reliability and asset management professionals feb/march 14 Reliability The Essentials of Eliminating Downtime of your Electric Motor Asset Management? Or, Maintenance Management, Re-branded?
SEWER CHEWER Wastewater / Sludge Grinder Submersible Gearmotor
INSTALLATION, OPERATION AND MAINTENANCE MANUAL For SEWER CHEWER Wastewater / Sludge Grinder Submersible Gearmotor Yeomans Chicago Corporation 3905 Enterprise Court P.O. Box 6620 Aurora, IL 60598-0620 Phone:
Decision Method for Unit Rehabilitation. John Yale Hydro Plant Engineering Manager Chelan County PUD
Decision Method for Unit Rehabilitation John Yale Hydro Plant Engineering Manager Chelan County PUD Public utility in Washington State, 1936 1,988 MW nameplate Two dams, three powerhouses on the Columbia
Chapter 22. Lump Sum Project Guidelines
Chapter 22 Lump Sum Project Guidelines 22.1 General...22-1 22.2 Project Selection...22-3 22.3 Plans Preparation...22-5 22.4 Preliminary Estimate...22-7 22.5 Specifications...22-9 22.6 Contracts Administration...22-11
Geareducer Solutions NEW, REBUILD AND REPAIR OPTIONS FOR EXTENDING THE LIFE OF YOUR COOLING TOWER
Geareducer Solutions NEW, REBUILD AND REPAIR OPTIONS FOR EXTENDING THE LIFE OF YOUR COOLING TOWER 2 PROVEN HISTORY SPX Cooling Technologies, Inc. designs and manufactures Marley Geareducers for cooling
Series 53, 71, 92 and 149 Engines
3.5 million two-cycle engines built since 1940 Nearly 500,000 still in operation around the world $100 million in parts inventory to cover your needs Series 53, 71, 92 and 149 Engines Over 2,500 factory
UPDATE: Contingency Requirements for Close Out of the RREM Program
UPDATE: Contingency Requirements for Close Out of the RREM Program If you are participating in the RREM Program and meet the following conditions; Reconstruction, Rehabilitation, Elevation, and Mitigation
Transformer Oil Containment Risk Assessment
Transformer Oil Containment Risk Assessment A Team Approach SWPA / SPRA / USACE Marshall Boyken Blake Elliott Rod Shank 1 Project Timeline Team Formed - June 2006 Mission Statement & Questionnaire First
Brushless Motors Instructions
Brushless Motors Instructions Thank you for purchasing the Dynamite Fuze Brushless Motor. Fuze brushless motors are high torque motors designed for direct-drive applications. The 1/18 versions feature
Char-Lynn Hydraulic Motor. Repair Information. 10 000 Series. October, 1997
Char-Lynn Hydraulic Motor October, 1997 Repair Information Geroler Motor Two Speed 001 27 Retainer inside bore of valve plate bearingless motors only 4 15 16 3 6 35 Parts Drawing 25 2 2 1 19 17 36 40 47
Greater New Orleans Hurricane & Storm Damage Risk Reduction System
Greater New Orleans Hurricane & Storm Damage Risk Reduction System SLFPA-East Update Col. Robert Sinkler, Commander Hurricane Protection Office July 15, 2010 US US Army Army Corps Corps of of Engineers
Nominal Life Expectancy for Building Components
Nominal Life Expectancy for Building Components Building System Page A. HVAC 2 B. Elevator/Escalator 6 C. Plumbing 7 D. Roofing 8 E. Electrical 10 F. Fire/Life/Safety/Security System 11 G. Interior Finishes
REHABILITATION OF UNDERGROUND SEWER LATERAL PIPES WITH CURED-IN-PLACE-PIPE LINER SECTION 02542
1.0 INTENT REHABILITATION OF UNDERGROUND SEWER LATERAL PIPES 1.01 It is the intent of this specification to provide for the reconstruction of pipelines and conduits by the installation of a resin-impregnated
in-service inspections www.sgs.com
in-service inspections www.sgs.com Minimising down -time for wind turbines One of the major concerns in investing in wind farm projects is related to turbine availability, which represents the risk of
Drive shaft, servicing
Volkswagen Passat B6 - Drive shaft, servicing Стр. 1 из 41 40-7 Drive shaft, servicing Drive shafts, overview I - Assembly overview: Drive axle with CV joint VL100 40-7, Drive axle with CV joint VL100,
SMALL GAS OPERATOR OPERATION AND MAINTENANCE PLAN
SMALL GAS OPERATOR OPERATION AND MAINTENANCE PLAN Facility Name: Address: QUALIFIED PERSONNEL All tasks shall be completed by a person that is qualified to that task (see operators qualification of individuals
DIVISION: 22 00 00 PLUMBING SECTION: 22 11 16 DOMESTIC WATER PIPING REPORT HOLDER: CURAFLO IP LLC 4035 E. OASIS STREET MESA, AZ 85215
0 ICC ES Report ICC ES (800) 423 6587 (562) 699 0543 www.icc es.org 000 Most Widely Accepted and Trusted PMG 1057 Valid: 02/15 to 02/16 DIVISION: 22 00 00 PLUMBING SECTION: 22 11 16 DOMESTIC WATER PIPING
The Ford Model A Water Pump
The Ford Model A Water Pump George Washington Chapter, Inc. 3903 Old Lee Highway Fairfax, VA 22030 1 Table of Contents Introduction/Specifications.. 3 1. Water Pump Inspection and Removal. 4 a. Removal..
CUTTER-CRUSHER RAMMER RC 22
11/99 PARTS MANUAL PMRC22EN.A99 CUTTER-CRUSHER RAMMER RC 22 SERIAL NO. RC22BC0015-UP RC22RC0021-UP TABLE OF CONTENTS 1. Cylinder RC 22.......................................................... 4 2. Hydraulics
NAVSEA Enterprise Resource Planning Overview March 2011
NAVSEA Enterprise Resource Planning Overview March 2011 Mark Montella NUWC Newport ERP Site Implementation Lead 7 Months Until NAVSEA WCF Go-Live Navy Navy ERP ERP What is it? Navy Enterprise Resource
PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES
PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES ADDRESS: 123 MAIN ST MIAMI, FL CLIENT: BUYER ID No: 2014193 DATE: 5/13/2014 INSPECTION OR ASSESSMENT BY: GAIA CONSTRUCTION INC. CGC 1516136 FLORIDA HI-2792
USAID ENERGY POLICY PROGRAM SITE VISIT REPORT STATUS OF 4 RUN OF RIVER HYDROPOWER PROJECTS. October 2013
USAID ENERGY POLICY PROGRAM SITE VISIT REPORT STATUS OF 4 RUN OF RIVER HYDROPOWER PROJECTS October 2013 This program is made possible by the support of the American people through the United States Agency
AFE424 SERVICE PARTS
This is the parts list for the AFE. When looking up part numbers, always check the complete model and serial numbers to be certain of ordering the correct parts. The Air Cooled model has also been manufactured
Society of American Military Engineers Omaha District
Society of American Military Engineers Omaha District Kim Thomas Deputy Chief, Plans, Programs, and Project Management Division Omaha District July 21, 2015 US Army Corps of Engineers Omaha District Spotlight
SERVICE PARTS LIST PAGE 1 OF 6 BASE ASSEMBLY SPECIFY CATALOG NO. AND SERIAL NO. WHEN ORDERING PARTS 12" DUAL BEVEL COMPOUND MITER SAW B27A
PAGE 1 OF 6 BASE ASSEMBLY 00 0 EXAMPLE: Component Parts (Small #) Are Included When Ordering The Assembly (Large #). SPECIFY CATALOG NO. AND NO. WHEN ORDERING PARTS 1 02-80-0050 Thrust Bearing (1) 2 05-80-0510
REQUEST FOR PROPOSAL. for CONSTRUCTION MANAGEMENT SERVICES. for the ENCINA WASTEWATER AUTHORITY FY 2015 MAJOR PLANT REHABILITATION PROJECT
REQUEST FOR PROPOSAL for CONSTRUCTION MANAGEMENT SERVICES for the ENCINA WASTEWATER AUTHORITY FY 2015 MAJOR PLANT REHABILITATION PROJECT Ref: Admin.15 12265c September 23, 2015 Proposals Due November 2,
Federal Wage System Job Grading Standard for Powered Support Systems Mechanic, 5378. Table of Contents
Federal Wage System Job Grading Standard for Powered Support Systems Mechanic, 5378 Table of Contents WORK COVERED... 2 WORK NOT COVERED...2 GRADES... 2 TITLES... 3 HELPER AND INTERMEDIATE JOBS... 3 NOTE
Construction Management Standards of Practice
Construction Management Standards of Practice 2010 Edition Advancing Professional Construction/ Program Management Worldwide. 7926 Jones Branch Drive, Suite 800 McLean, VA 22102-3303 USA 703.356.2622 703.356.6388
INCREASE OF DURABILITY AND LIFETIME OF EXISTING BRIDGES. PIARC TC 4.4 EXPERIENCE.
INCREASE OF DURABILITY AND LIFETIME OF EXISTING BRIDGES. PIARC TC 4.4 EXPERIENCE. M.Sc. Gediminas Viršilas Head of Bridge Division, Lithuanian Road Administration Working group 2 of PIARC Technical Committee
ENGLISH FORK GUIDE 2013
FORK GUIDE 2013 ENGLISH 1 With a brand which is synonymous with specialists in forest products handling attachments, BOLZONI AURAMO offers its expertise and market leading attachments for all requirements,
Commonwealth of Puerto Rico PUERTO RICO ELECTRIC POWER AUTHORITY. ANNUAL BUDGET OF CAPITAL EXPENDITURES FISCAL YEAR 2003-2004 (Dollars in thousands)
No. Title Amount Production Plant Thermal Production Plant 100 New Generation 15,865 160 Improvements to Steam Boilers 13,289 165 Improvements to Steam Turbine Generator 11,093 170 Improvements to Steam
Controlling Our Critical Path: A CDOT Guide to Better Project Management Practices
: A CDOT Guide to Better Project Management Practices Project Management practices have been a part of the CDOT culture for many years. However, with a transitioning workforce and increasing demands, it
Electric Operations Manager
CITY OF ANAHEIM invites applications for the position of: Electric Operations Manager SALARY: $10,602.75 - $14,578.75 Monthly $127,233.00 - $174,945.00 Annually OPENING DATE: 04/07/16 CLOSING DATE: Continuous
Risk Management in Interior Design
Risk Management in Interior Design Presented by: Stephen Polozola Decker Jones P.C 801 Cherry Street, Suite 2000 Fort Worth, Texas 76102 817.336.2400 Cannot hold out as Registered Interior Designer if
Construction Practice Group
Advising and counseling our clients through every phase of even the most complex construction matters is what differentiates the lawyers in Gould & Ratner s construction practice. As a group, they possess
Availability Assessment of Generating Units of Balimela Hydro Electric Power Station (510 MW) A Markovian Approach
American Journal of Engineering Research (AJER) 24 American Journal of Engineering Research (AJER) e-issn : 232-847 p-issn : 232-936 Volume-3, Issue-2, pp-44-49 www.ajer.org Research Paper Open Access
USACE Dam Safety Program Current Approach & Methodology
USACE Dam Safety Program Current Approach & Methodology Siamac Vaghar, PE, MASCE Chief, Geotechnical Engineering Section Dam Safety Program Manager US Army Corps of Engineers New England District Corps
products 22 º C Ventilation Air Conditioning Refrigeration Energy & Cost Saving Products Inside PROVIDED BY HEINEN & HOPMAN
products > Energy & Cost Saving Products OUTSIDE 35 C HUMIDITY 90% 22 º C Inside PROVIDED BY HEINEN & HOPMAN Heating Ventilation Air Conditioning Refrigeration HVAC energy & COST SAVING POSSIBILITIES A
Aircraft Technician Training
Aircraft Technician On the following pages you find detailed course descriptions. All courses are available on request. Nevertheless to facilitate your yearly planning we have fixed dates for type training
Re-engineering and function testing at Handtmann Zittau WELCOME
Re-engineering and function testing at Handtmann Zittau WELCOME Handtmann Maschinenfabrik GmbH & Co. KG / VVZ 3/01/2015 page 1 Agenda Generell Information Handtmann Zittau Re-engineering Handtmann Zittau
PRODUCT MANUAL - M090
PRODUCT MANUAL - M090 MODEL 203/266 ELECTRIC CAN OPENER 1 SAFETY CAUTION: SEVERED CAN LIDS HAVE CUTTING EDGES. USE OF A PROTECTIVE GLOVE OR TONGS IS ADVISED WHEN HANDLING LIDS. WARNING To avoid risk of
ABB ! CAUTION. Type COQ Negative Sequence Generator Relay. (50/60 Hertz) 41-161J. Instruction Leaflet
ABB Instruction Leaflet 41-161J Effective: May 1997 Supersedes I.L. 41-161H Dated July 1984 ( ) Denotes Change Since Previous Issue Type COQ Negative Sequence Generator Relay (50/60 Hertz)! CAUTION Before
Construction Management Functions CMGT 500/700
Construction Management Functions CMT 500/700 Project Planning and Design Master Planning Planning Phase Designer Selection Design Phase Bid Phase Award Phase Construction Phase Master Planning AKA Capital
*Specify Oversize When Ordering
Cylinder Block Deck Cracks On Caterpillar 3208 Engines and Caterpillar explain how to inspect the Caterpillar 3208 engines for block cracks. Part No. Location Insert OD Size Depth Tapered ID 3906854 Intake
4-Point Inspection Personal Lines (Edition 9/2012)
(Edition 9/2012) INSURED/APPLICANT NAME: Mr. and Mrs. America APPLICATION/POLICY #: ADDRESS INSPECTED: 1234 Surfing Villa Way, Riverview, FL 33569 ACTUAL YEAR BUILT: 1987 DATE OF INSPECTION: 5/09/2014
What to Look for in a Vibration Consultant By Alan Friedman, DLI Engineering. Introduction. The Most Basic Form of Vibration Analysis
What to Look for in a Vibration Consultant By Alan Friedman, DLI Engineering Introduction Many corporations are currently looking to outsource their machinery condition monitoring program, others wish