1 Ozark and Webbers Falls Powerhouse Major Rehabilitation Lee Beverly- SWL Project Manager Dan Brueggenjohann SWT Project Manager Byron Floyd Resident Engineer 12 June 2013 US Army Corps of Engineers

2 Ozark Scope, Cost and Schedule Project Scope: Rehabilitation of the Ozark Powerhouse to include replacement of five turbines, rehabilitation of all cranes, rehab of water Treatment, and misc aux systems Project Cost including management expenses: $125.7M ($32.9M Customer Funded) Turbine Contract Notice to Proceed : July 2005 Awarded Turbine Contract Amount: $74.5M Current Turbine Contract Amount: $99.0M Current Required Completion Date : April 20, 2014 Anticipated Completion Date: March 24, 2017

3 Ozark Funding Status Ozark Rehab Project Estimate Cranes, Gates, Generator Coolers, Plant Prep (note, includes speed increaser credit mod) Turbine Contract Engineering, Project Support, Contract Mgmt Remaining Escalation Payments (based on 7 th yr esc. Factors) Contingency $125.7M $3.9M $93.5M $17.6M $5.8M $4.9M Funding Received to Date Regular Appropriations Recovery Act Funding FY06-FY07 Customer Funding FY12 Customer Funding $107.2M $44.6M $29.7M $20.1M $12.8M Balance To Complete $18.5M Ozark/Webbers Falls Major Rehab

4 Ozark Turbine Replacement Contract Major Modifications to date- Replace Cooling Water Systems- $800,000 Replace Unwatering Systems- New Upper Shafts- Correct Misalignments, Unit 4- $1.0 Million 3.2 Million $2.0 Million Paint Blades and Wicket Gates $800,000 Stay Vane Repair, 3 Units (est)- Additional Interior Painting Escalation Thru June 2012 $1.6 Million $1.4 Million $5.3 Million BUILDING 4 STRONG

5 Ozark/Webbers Falls Economic Price Adjustments (escalation) The 7 th year escalation payment was 8.8% of the total invoicing

6 Webbers Falls Scope, Cost and Schedule Project Scope: Rehabilitation of the Webbers Falls Powerhouse to include replacement of three turbines, the rewinding of three generators and rehabilitation of all cranes, tailrace and intake gates and bulkheads. Project Cost including management expenses: $72.7M ($67.9M Customer Funded) Turbine Contract Awarded: February 2008 Awarded Turbine Contract Amount: $39.3M Current Turbine Contract Amount: $45.9M Current Required Completion Date : 4 October 2012 Anticipated Completion Date: 16 January 2016

7 Webbers Falls Project Cost Breakdown 2013 Current Cost Est. - $72.7M Turbine Rehab Cont Generator Rewind Cont Intake/Draft Tube Cranes 4.0* Rehab Two Bridge Cranes 2.6 Misc. Electrical Mech ** New 13.8KV Breakers - 0.8* Total - $72.7M *ARRA Funded **Partial ARRA Funded Cost include S&A and Contingency

8 Webbers Falls Modifications Major Modifications to date- New Upper Shafts- $1.6 Million Replace low speed gears and Pinions- $5.5 Million Paint Blades and Wicket Gates- $300,000 Stay Vane Repair, 3 Units (est)- $850,000 Additional Painting- $1.0 Million Machine Embedded Components- $700,000 Escalation Thru June $1.7 Million BUILDING 8 STRONG

9 Webbers Falls Turbine Rehab Sub Agreement Funding Unit 3 Unit 2 Unit 1 Sub Agreement Totals $19,500,000 $17,900,000 $17,900,000 Contracts, Executed Modifications, and S&A $18,912,000 $15,686,000 $16,748,000 Est. Remaining Escalation $125,000 1,550,000 1,827,000 Estimated Outstanding Modifications & Contingency 2,025,000 1,900,000 1,500,000 Estimated Required S&A $0 $1,650,000 1,050,000 Total Requirement $21,062,000 $20,786,000 $21,125,000 Projected Shortfall 1,562,000 2,886,000 3,225,000

10 Additional Project Sub Agreements SW00431-S138 Rewind Generators Units 1,2 & 3 = $6.0M Ongoing - $4.9M contract with Andritz SW00431-S092- Rehab Bridge Cranes - $2.62M Contract Complete SW00431-S137- Intake Gate, Bulkhead and Misc. Electrical - $4.0M Ongoing - $3.5M contract, additional $518K funded through ARRA.

11 Pending Sub Agreements/modifications SW00431-M001 Replace Upper Shaft Unit 1. Cost = $800,000 Status Sub-agreement sent to SWD. Replace the Low Speed Gear and Pinions Unit 1. Cost - $5,500,000 Status Sent to SWPA May 8. Replace Upper Shaft Unit 2. Cost = $800,000 Status Awaiting Draft Sub-agreement from SWPA.

12 Pending Sub Agreements/modifications Supplemental Funding for Unit 3 Cost - $1,600,000 Status Approved by the Customer Council Supplemental Funding for Unit 1 Cost - $3,300,000 Status Awaiting Customer Council Approval Supplemental Funding for Unit 2 Cost - $2,900,000 Status Awaiting Customer Council Approval

13 Projected Schedule WF Contract Req. Completion: 4 Oct Pending mods will push CRC to approx 26 Feb 2013 OZ Contract Req. Completion: April 20, Projected mods will push CRC to approx 19 Jul 2014 Work on two units simultaneously at Ozark has reduced the total contract time by three years. Potential opportunities to reduce project completion date by 1 year at each site by early turnover of OZ U5 and WF U2 as shown in the above schedule (requires customer approval). Performing stay vane crack repair concurrent with disassembly saves from 2-3 months per unit. Disassembly of the turbine has been reduced from 4.5 months (WF Unit 3) to 2.5 months (WF Unit 1 and OZ Unit 3). In-place machining of embedded wicket gate assembly mounting flanges has reduced wicket gate filing time by 6 weeks per unit.

14 Schedule Cont. Each successive unit will have a reduced duration through application of lessons learned, utilization of the schedule, and better visibility of potential differing site conditions as shown below in order of completion at each plant. Ozark OZ Unit 4 required approximately 56 months through completion of 72 hour test OZ Unit 2 will take approximately 43 months through completion of 72 hour test OZ Unit 3 will take approximately 27 months through completion of 72 hour test OZ Unit 1 will take approximately 20 months through completion of 72 hour test OZ Unit 5 will take approximately 21 months through completion of 72 hour test (includes additional speed increaser work not included on other units) Webbers Falls WF Unit 3 required approximately 43 months through completion of 72 hour test WF Unit 1 will take approximately 23 months through completion of 72 hour test WF Unit 2 will take approximately 20 months through completion of 72 hour test

15 Webbers Falls Unit 1 Speed Increaser A chipped tooth on a low speed pinion and multiple cracks on the low speed gear were found during inspection of the speed increaser. Deficiencies required replacement of the low speed gear set. Replacement occurred off of the critical path so no additional time was added to the contract.

16 Contract was modified to add a vinyl paint coating system to the series 400 stainless steel. First three units were painted after installation but remaining unit components will be painted off site to remove this work from the critical path. Corrosion The cathodic protection system is being recommissioned following the completion of painting. Adjustments to the protection potential will continue until corrosion is stopped. Changes to WF Unit 3 have shown much improved protection.

17 Stay Vane Crack Repair Performing stay vane crack repair concurrent with disassembly saves from 2-3 months per unit.

18 Improve Method of Scrapping Old Runner Improved process for removal of runner has reduced this activity duration from 4 weeks per unit to 1 day per unit.

19 Remove Wicket Gate Assembly Before Lower Shaft Initial units were disassembled with the lower shaft being removed prior to the wicket gate assembly. Due to the long duration to repair and reassemble the wicket gate assembly the removal of the assembly is now being accomplished prior to removal of the lower shaft which allows more time for the repair process on these components.

20 Machining Embedded Flanges Machining the embedded gate barrel mounting flanges reduced the wicket gate filing time by 6 weeks per unit.

21 Wicket Gate filing Initial units required the governor to be operational prior to start of wicket gate filing making this a critical path activity. Contractor is now utilizing a portable hydraulic power unit allowing the gates to be filed prior to completion of the governor. This allows the wicket gate filing to be removed from the critical path which reduced the unit duration by 6 weeks.

22 Goals Reduce installation time for each successive unit. Limit turnover of personnel. Resolve non-controversial outstanding issues, Ozark Unit 4 and Webbers Falls Unit 3. Resolve controversial outstanding issues, corrosion repair and wicket gate filing. Maintain outstanding partnering relationship.

23 Key Challenges Timely response and negotiation of RFPs. Resolution of Cathodic Protection System issues. Resolution of Oil Head Design issues. Proposal for new governors at Ozark. Removing silt from Ozark Unit 1. Rewind Webbers Unit 1 generator. Contracting for new gears for Ozark Unit 5 speed increaser. Improving communications between Operations, E&C construction office, and contractor.

Risk Mitigation Strategy. Lewiston Pump Generating Plant Life Extension and Modernization Program

Risk Mitigation Strategy. Lewiston Pump Generating Plant Life Extension and Modernization Program Risk Mitigation Strategy Lewiston Pump Generating Plant Life Extension and Modernization Program John Canale Vice President Project Management May 21, 2013 Trustee Meeting NYPA Previous and Current Life

More information

HYDROMATRIX Jebel Aulia - Sudan

HYDROMATRIX Jebel Aulia - Sudan HYDROMATRIX Jebel Aulia - Sudan www.andritz.com HYDROMATRIX - Concept Jebel Aulia - Sudan HYDROMATRIX is a new concept of hydraulic energy generation, which has been developed by an American engineer in

More information

Wolf Creek Hydropower Rehabilitation Analysis Report

Wolf Creek Hydropower Rehabilitation Analysis Report Wolf Creek Hydropower Rehabilitation Analysis Report David Bishop Kris Atanassov Team Cumberland, September 16, 2015 US Army Corps of Engineers Agenda Overview Water Availability Energy Modeling Preliminary

More information

Performance Improvement of Pump-turbine for Large Capacity Pumped Storage Power Plant in USA

Performance Improvement of Pump-turbine for Large Capacity Pumped Storage Power Plant in USA Performance Improvement of Pump-turbine for Large Capacity Pumped Storage Power Plant in USA 198 Performance Improvement of Pump-turbine for Large Capacity Pumped Storage Power Plant in USA 300-MW Pump-turbine

More information

Chelan County PUD. Rock Island Rehabilitation Powerhouse One Units B5 to B8

Chelan County PUD. Rock Island Rehabilitation Powerhouse One Units B5 to B8 Chelan County PUD Rock Island Rehabilitation Powerhouse One Units B5 to B8 Follow-up from October 19 th, 2015 Use of New Turbines vs. Refurbishment of Existing December 7, 2015 From Oct. 19 - Next Steps

More information

Online Hydro Machinery Monitoring Protection, Prediction and Performance Monitoring Solutions

Online Hydro Machinery Monitoring Protection, Prediction and Performance Monitoring Solutions Online Hydro Machinery Monitoring Protection, Prediction and Performance Monitoring Solutions 2011, Emerson Process Management. The contents of this publication are presented for informational purposes

More information

MICRO HYDRO POWER GENERATING EQUIPMENT

MICRO HYDRO POWER GENERATING EQUIPMENT MICRO HYDRO POWER GENERATING EQUIPMENT TOSHIBA TOSHIBA ENGINEERING In general, specifications of hydroelectric power system vary depending upon the installation location. The hydro turbine and generator

More information

Propeller Equipment Sale. For Questions please contact Dan Cork [email protected] 918-636-3567

Propeller Equipment Sale. For Questions please contact Dan Cork Propdoc@aol.com 918-636-3567 Propeller Equipment Sale For Questions please contact Dan Cork [email protected] 918-636-3567 Propeller Equipment Sale The equipment for sale is used in the repair and overhaul of aircraft propellers. Propeller

More information

WEIR AMERICAN HYDRO. Excellent Engineering Solutions

WEIR AMERICAN HYDRO. Excellent Engineering Solutions WEIR AMERICAN HYDRO Excellent Engineering Solutions Weir Power & Industrial Division Sites Worldwide The Weir Group PLC Values Customer focus Listening to the voice of our external and internal customers

More information

HYDROPOWER SYSTEMS BY APPOINTMENT TO H.M. THE QUEEN WATER TURBINE ENGINEERS, GILBERT GILKES & GORDON LTD, KENDAL

HYDROPOWER SYSTEMS BY APPOINTMENT TO H.M. THE QUEEN WATER TURBINE ENGINEERS, GILBERT GILKES & GORDON LTD, KENDAL HYDROPOWER SYSTEMS BY APPOINTMENT TO H.M. THE QUEEN WATER TURBINE ENGINEERS, GILBERT GILKES & GORDON LTD, KENDAL 1 WWW.GILKES.COM CONTENTS THE COMPANY 3 GILKES HYDROPOWER 5 GILKES PACKAGE 7 TURBINE SELECTION

More information

PRESENTATION TITLE. Corps of Engineers Agreement with. Columbia Riverkeeper Regarding Hydropower Plant Discharges

PRESENTATION TITLE. Corps of Engineers Agreement with. Columbia Riverkeeper Regarding Hydropower Plant Discharges Corps of Engineers Agreement with PRESENTATION TITLE Columbia Riverkeeper Regarding Hydropower Plant Discharges 2015 Southwestern Federal Hydropower Meeting June 18, 2015 Wayne Todd Sr. Hydropower Program

More information

US Army Corps of Engineers. Little Rock District

US Army Corps of Engineers. Little Rock District US Army Corps of Engineers Little Rock District COL Ed Jackson District Commander Little Rock District 2 September 2009 US Army Corps of Engineers Little Rock District DeQueen Beaver Gillham Ozark Blue

More information

INDUSTRIAS G.E S.A. E n g ineering Solut i o n s

INDUSTRIAS G.E S.A. E n g ineering Solut i o n s INDUSTRIAS G.E S.A. E n g ineering Solut i o n s INDUSTRIAS G.E S.A. Heavy Fabrication Heavy Machining Equipment Rental Industrial Equipment Services Manpower Hire Consumable Supply Welcome to IGESA

More information

NASHVILLE DISTRICT JETS SAME

NASHVILLE DISTRICT JETS SAME NASHVILLE DISTRICT JETS SAME Regional Program Review Savannah, GA 26 June 2014 US Army Corps of Engineers Agenda District Boundaries Cumberland & TN River Systems Major Construction Projects Hydropower/Navigation

More information

This is the civilian transfer case with the cooling loop only found in the driven gear half of the front case.

This is the civilian transfer case with the cooling loop only found in the driven gear half of the front case. INTRODUCTION The Transfer case used in the AMG Hummer is a New Venture Gear, model 242. This case has been in use for the H-1/Hummer since the early 1990 s. There have been modifications to the internal

More information

IMIA. Wind Turbine Generators. Claims. Codan Insurance / September 2007 Risk Engineer Truels Kjer

IMIA. Wind Turbine Generators. Claims. Codan Insurance / September 2007 Risk Engineer Truels Kjer IMIA. Wind Turbine Generators. Claims. Codan Insurance / September 2007 Risk Engineer Truels Kjer Claims involving the main components of the turbine. September 2007 / Codan Insurance / Truels Kjer Page

More information

The Comprehensive Coatings Service Provider to Industry

The Comprehensive Coatings Service Provider to Industry Coating Systems Excellent Engineering Solutions The Comprehensive Coatings Service Provider to Industry 2 Coating Systems Weir Coatings specialises in the application of high performance protective linings

More information

Power Recovery Turbines

Power Recovery Turbines Power Recovery Turbines Fixed and Variable Geometry Vertical Horizontal Bulletin PS-90-1 (E) Pump Supplier To The World Flowserve is the driving force in the global industrial pump marketplace. No other

More information

SB96-11B FAA APPROVED Supersedes SB96-11A, SB96-11, M84-16

SB96-11B FAA APPROVED Supersedes SB96-11A, SB96-11, M84-16 TELEDYNE CONTINENTAL AIRCRAFT ENGINE SERVICE ULLETIN Compliance Will Enhance Safety SUJECT: PROPELLER STRIKES AND HYDRAULIC LOCKS. CATEGORY 3 S96-11 FAA APPROVED Supersedes S96-11A, S96-11, M84-16 PURPOSE:

More information

AGENDA STAFF REPORT. Budgeted: Yes Current Year Cost: $695,000 Annual Cost: N/A

AGENDA STAFF REPORT. Budgeted: Yes Current Year Cost: $695,000 Annual Cost: N/A AGENDA STAFF REPORT Agenda Item ASR Control 13-001267 MEETING DATE: 10/22/13 LEGAL ENTITY TAKING ACTION: Board of Supervisors BOARD OF SUPERVISORS DISTRICT(S): 2 SUBMITTING AGENCY/DEPARTMENT: John Wayne

More information

CHAPTER 65 TAIL ROTOR DRIVE SYSTEM. Section Title Page

CHAPTER 65 TAIL ROTOR DRIVE SYSTEM. Section Title Page CHAPTER 65 TAIL ROTOR DRIVE SYSTEM Section Title Page 65-00 Description........................................ 65.1 65-10 Tail Rotor Drive Fan Shaft.............................. 65.1 65-20 Tail Rotor

More information

EXPERT REMANUFACTURED WIND TURBINE

EXPERT REMANUFACTURED WIND TURBINE EXPERT REMANUFACTURED WIND TURBINE Repowering Solutions is a division of Jeraneas Group of companies. Our core business is the remanufacturing of wind turbines of different sizes; a work that we have been

More information

Los Angeles Trade Technical College Student Employment Center. Diesel & Related Technology Full Time

Los Angeles Trade Technical College Student Employment Center. Diesel & Related Technology Full Time Job Title: Composite Mechanic Job Number: 923 Hours/Days: 7a-3p Salary: $22.29-22.53/ hr Requirements: Skills Requirement: Be familiar with AC/DC power and control systems; Maintain certification acquired;

More information

Tube Type Oil Skimmer Comparison

Tube Type Oil Skimmer Comparison Process Overview- Tube Type Oil Skimmers Oil flows down the face of the skimmer and into a sludge pan that is plumbed to a barrel. Model BG01 & BG34 or 6V Oil Skimmer 1.0 or 3/4 Diameter Collector Tube

More information

A.1 Obligations and reporting of the gaining Society. Plans to be Submitted by the Owner to the Gaining Society

A.1 Obligations and reporting of the gaining Society. Plans to be Submitted by the Owner to the Gaining Society (Rev.0 July 2009) (Rev.1 June 2012) (Rev.2 Oct 2013) (Rev.3 Jan 2015) (Rev.4 July 2015) (Rev.5 Jan 2016) Procedure for Transfer of Class TABLE OF CONTENTS Procedure for Transfer of Class Application Definitions

More information

Industrial Metrology and Engineering Applications in the Wind Turbine Industry

Industrial Metrology and Engineering Applications in the Wind Turbine Industry Industrial Metrology and Engineering Applications in the Wind Turbine Industry 1. Company Introduction M-7 Technologies is a privately owned, ISO 9001 certified company offering engineered solutions for

More information

Jeff Haby, P.E. Director Sewer System Improvements. September 15, 2015. Agenda

Jeff Haby, P.E. Director Sewer System Improvements. September 15, 2015. Agenda SAWS Sanitary Sewer Overflow Reduction Program Jeff Haby, P.E. Director Sewer System Improvements SA Military Engineers Meeting Agenda SAWS Overview Consent Decree CD Compliance Programs Program Transition

More information

1.3 Turbochargers are categorised in three groups depending on served power by cylinder groups with:

1.3 Turbochargers are categorised in three groups depending on served power by cylinder groups with: (Feb 2015) Turbochargers 1. Scope 1.1 These requirements are applicable for s with regard to design approval, type testing and certification and their matching on engines. Turbochargers are to be type

More information

Mini & Micro Hydro Power Generation. EBARA Hatakeyama Memorial Fund Tokyo, Japan

Mini & Micro Hydro Power Generation. EBARA Hatakeyama Memorial Fund Tokyo, Japan Mini & Micro Hydro Power Generation EBARA Hatakeyama Memorial Fund Tokyo, Japan Definitions Large Scale hydro power generation : Capacity 100(MW) Most of them involve major construction of dams. Small

More information

Backup Fuel Oil System Decommissioning & Restoration Plan

Backup Fuel Oil System Decommissioning & Restoration Plan Backup Fuel Oil System Page 1 of 19 Overview of Physical Fuel Oil System and Decommissioning Steps The fuel oil system at Milford Power consists of a number of subsystems. These include the following:

More information

Chapter 7 Hydraulic System Troubleshooting

Chapter 7 Hydraulic System Troubleshooting Chapter 7 Hydraulic System Troubleshooting General The following troubleshooting information is provided as a general guide to identify, locate and correct problems that may be experienced with the hydraulic

More information

4.4 Commissioning, Handover and Warranty

4.4 Commissioning, Handover and Warranty 4.4 Commissioning, Handover and Warranty 4.4.1 Building Commissioning and Manuals The Building Commissioning formalizes the review and integration of all project expectations during the planning and design,

More information

Optolite Indicators. General Purpose INDICATOR LIGHTS. Sub-Miniature. Miniature, Neon

Optolite Indicators. General Purpose INDICATOR LIGHTS. Sub-Miniature. Miniature, Neon Sub- Lockwasher, stainless steel or steel, nickel plate. Brass T-1 sub-midget flange base. See Selection Guide. Assembly mounts from front of panel. All mounting hardware Approximately.12 oz. less lamp.,

More information

Inspections Standard Operating Procedure 5 Aboveground Storage Tanks

Inspections Standard Operating Procedure 5 Aboveground Storage Tanks Aboveground Storage Tanks Aboveground Storage Tank Inspection This Standard Operating Procedure describes the steps that campus units that manage aboveground oil storage tanks (ASTs) or containers must

More information

SECTION 807 PUMP STATION REHABILITATION

SECTION 807 PUMP STATION REHABILITATION SECTION 807 PUMP STATION REHABILITATION 807-1 DESCRIPTION: Rehabilitation of pump stations shall be defined as the cleaning, removal, repair and/or replacement of any and/or all components including but

More information

COMMON EQUIPMENT FAILURES AND CAUSES. How breakdowns can impact the bottom line. A handy reference guide from Hartford Steam Boiler.

COMMON EQUIPMENT FAILURES AND CAUSES. How breakdowns can impact the bottom line. A handy reference guide from Hartford Steam Boiler. COMMON EQUIPMENT FAILURES AND CAUSES How breakdowns can impact the bottom line. A handy reference guide from Hartford Steam Boiler. A WORLD THAT DEPENDS ON EQUIPMENT. Businesses, institutions and municipalities

More information

JAGAN RAO ADELAIDE, TUESDAY, 3 DECEMBER 2013

JAGAN RAO ADELAIDE, TUESDAY, 3 DECEMBER 2013 JAGAN RAO ADELAIDE, TUESDAY, 3 DECEMBER 2013 Relate to this? Outline 1. Safety & Housekeeping 2. Aim 3. Introduction SKM and Jagan Rao 4. Project Controls Overview 5. Cost Estimating 6. Planning & Scheduling

More information

APPENDIX F. Baker County. Mason Dam Hydroelectric Project FERC No. P-12686. Turbidity Monitoring Plan

APPENDIX F. Baker County. Mason Dam Hydroelectric Project FERC No. P-12686. Turbidity Monitoring Plan APPENDIX F Baker County Mason Dam Hydroelectric Project FERC No. P-12686 Turbidity Monitoring Plan April 2011 857 Table of Contents 1.0 Introduction 1 2.0 Purpose and Scope 2 3.0 Turbidity Monitoring and

More information

Facility Support Services

Facility Support Services Facility Support Services The Precision Group has a breadth of experience delivering innovative, first class facility support service solutions to clients across the public and private sectors. Our expert

More information

Audit Report. The Radioactive Liquid Waste Treatment Facility Replacement Project at Los Alamos National Laboratory

Audit Report. The Radioactive Liquid Waste Treatment Facility Replacement Project at Los Alamos National Laboratory U.S. Department of Energy Office of Inspector General Office of Audits and Inspections Audit Report The Radioactive Liquid Waste Treatment Facility Replacement Project at Los Alamos National Laboratory

More information

SERVICE LETTER SZ43-002-1A

SERVICE LETTER SZ43-002-1A FREON CYCLE AIR CONDITIONING SYSTEM - MOTOR COMPRESSOR CONDENSER ASSEMBLY - FAN ASSEMBLY CONVERSION OF P/N: SZ43-002-1 TO SZ43-002-1A. 1. PLANNING INFORMATION A. EFFECTIVITY All ZEE Systems Part Number

More information

TYPE APPROVAL CERTIFICATION SCHEME MASS PRODUCED DIESEL ENGINES

TYPE APPROVAL CERTIFICATION SCHEME MASS PRODUCED DIESEL ENGINES 1. Introduction TYPE APPROVAL CERTIFICATION SCHEME MASS PRODUCED DIESEL ENGINES 1.1 This scheme details the tests and inspection of diesel engines manufactured by mass production system for use in marine

More information

SERVICE. 28R-7135001 thru 28R-7135229 PA-28R-200 Arrow II 28R-7235001 thru 28R-7635545

SERVICE. 28R-7135001 thru 28R-7135229 PA-28R-200 Arrow II 28R-7235001 thru 28R-7635545 Piper Aircraft, Inc. 2926 Piper Drive Vero Beach, Florida, U.S.A. 32960 SERVICE NO. 1242 BULLETIN PIPER CONSIDERS COMPLIANCE MANDATORY Date: January 30, 2015 (S) (M) Service Bulletin (SB) 1242 supersedes

More information

ASPHALT PAVEMENT RECYCLING

ASPHALT PAVEMENT RECYCLING HOT IN-PLACE RECYCLING THE ENERGY SAVING METHOD ASPHALT PAVEMENT RECYCLING Hot In-Place alt ec cl n The Energy Saving Method! HIGHWAY REHAB CORP Highway Rehab Corp 2258 Route 22 Brewster, NY 10509 Tel

More information

Volkswagen Jetta, Golf, GTI 1999, 2000 2.8 Liter VR6 2V Engine Mechanical, Engine Code(s): AFP 17 Engine-Lubrication (Page GR-17)

Volkswagen Jetta, Golf, GTI 1999, 2000 2.8 Liter VR6 2V Engine Mechanical, Engine Code(s): AFP 17 Engine-Lubrication (Page GR-17) 17 Engine-Lubrication (Page GR-17) Lubrication system components, removing and installing Oil filter housing, disassembling and assembling Oil pan, removing and installing Oil pressure and oil pressure

More information

Reliability. The Essentials of Eliminating Downtime of your Electric Motor. Asset Management? Or, Maintenance Management, Re-branded?

Reliability. The Essentials of Eliminating Downtime of your Electric Motor. Asset Management? Or, Maintenance Management, Re-branded? for maintenance reliability and asset management professionals feb/march 14 Reliability The Essentials of Eliminating Downtime of your Electric Motor Asset Management? Or, Maintenance Management, Re-branded?

More information

SEWER CHEWER Wastewater / Sludge Grinder Submersible Gearmotor

SEWER CHEWER Wastewater / Sludge Grinder Submersible Gearmotor INSTALLATION, OPERATION AND MAINTENANCE MANUAL For SEWER CHEWER Wastewater / Sludge Grinder Submersible Gearmotor Yeomans Chicago Corporation 3905 Enterprise Court P.O. Box 6620 Aurora, IL 60598-0620 Phone:

More information

Decision Method for Unit Rehabilitation. John Yale Hydro Plant Engineering Manager Chelan County PUD

Decision Method for Unit Rehabilitation. John Yale Hydro Plant Engineering Manager Chelan County PUD Decision Method for Unit Rehabilitation John Yale Hydro Plant Engineering Manager Chelan County PUD Public utility in Washington State, 1936 1,988 MW nameplate Two dams, three powerhouses on the Columbia

More information

Chapter 22. Lump Sum Project Guidelines

Chapter 22. Lump Sum Project Guidelines Chapter 22 Lump Sum Project Guidelines 22.1 General...22-1 22.2 Project Selection...22-3 22.3 Plans Preparation...22-5 22.4 Preliminary Estimate...22-7 22.5 Specifications...22-9 22.6 Contracts Administration...22-11

More information

Geareducer Solutions NEW, REBUILD AND REPAIR OPTIONS FOR EXTENDING THE LIFE OF YOUR COOLING TOWER

Geareducer Solutions NEW, REBUILD AND REPAIR OPTIONS FOR EXTENDING THE LIFE OF YOUR COOLING TOWER Geareducer Solutions NEW, REBUILD AND REPAIR OPTIONS FOR EXTENDING THE LIFE OF YOUR COOLING TOWER 2 PROVEN HISTORY SPX Cooling Technologies, Inc. designs and manufactures Marley Geareducers for cooling

More information

Series 53, 71, 92 and 149 Engines

Series 53, 71, 92 and 149 Engines 3.5 million two-cycle engines built since 1940 Nearly 500,000 still in operation around the world $100 million in parts inventory to cover your needs Series 53, 71, 92 and 149 Engines Over 2,500 factory

More information

UPDATE: Contingency Requirements for Close Out of the RREM Program

UPDATE: Contingency Requirements for Close Out of the RREM Program UPDATE: Contingency Requirements for Close Out of the RREM Program If you are participating in the RREM Program and meet the following conditions; Reconstruction, Rehabilitation, Elevation, and Mitigation

More information

Transformer Oil Containment Risk Assessment

Transformer Oil Containment Risk Assessment Transformer Oil Containment Risk Assessment A Team Approach SWPA / SPRA / USACE Marshall Boyken Blake Elliott Rod Shank 1 Project Timeline Team Formed - June 2006 Mission Statement & Questionnaire First

More information

Brushless Motors Instructions

Brushless Motors Instructions Brushless Motors Instructions Thank you for purchasing the Dynamite Fuze Brushless Motor. Fuze brushless motors are high torque motors designed for direct-drive applications. The 1/18 versions feature

More information

Char-Lynn Hydraulic Motor. Repair Information. 10 000 Series. October, 1997

Char-Lynn Hydraulic Motor. Repair Information. 10 000 Series. October, 1997 Char-Lynn Hydraulic Motor October, 1997 Repair Information Geroler Motor Two Speed 001 27 Retainer inside bore of valve plate bearingless motors only 4 15 16 3 6 35 Parts Drawing 25 2 2 1 19 17 36 40 47

More information

Greater New Orleans Hurricane & Storm Damage Risk Reduction System

Greater New Orleans Hurricane & Storm Damage Risk Reduction System Greater New Orleans Hurricane & Storm Damage Risk Reduction System SLFPA-East Update Col. Robert Sinkler, Commander Hurricane Protection Office July 15, 2010 US US Army Army Corps Corps of of Engineers

More information

Nominal Life Expectancy for Building Components

Nominal Life Expectancy for Building Components Nominal Life Expectancy for Building Components Building System Page A. HVAC 2 B. Elevator/Escalator 6 C. Plumbing 7 D. Roofing 8 E. Electrical 10 F. Fire/Life/Safety/Security System 11 G. Interior Finishes

More information

REHABILITATION OF UNDERGROUND SEWER LATERAL PIPES WITH CURED-IN-PLACE-PIPE LINER SECTION 02542

REHABILITATION OF UNDERGROUND SEWER LATERAL PIPES WITH CURED-IN-PLACE-PIPE LINER SECTION 02542 1.0 INTENT REHABILITATION OF UNDERGROUND SEWER LATERAL PIPES 1.01 It is the intent of this specification to provide for the reconstruction of pipelines and conduits by the installation of a resin-impregnated

More information

in-service inspections www.sgs.com

in-service inspections www.sgs.com in-service inspections www.sgs.com Minimising down -time for wind turbines One of the major concerns in investing in wind farm projects is related to turbine availability, which represents the risk of

More information

Drive shaft, servicing

Drive shaft, servicing Volkswagen Passat B6 - Drive shaft, servicing Стр. 1 из 41 40-7 Drive shaft, servicing Drive shafts, overview I - Assembly overview: Drive axle with CV joint VL100 40-7, Drive axle with CV joint VL100,

More information

SMALL GAS OPERATOR OPERATION AND MAINTENANCE PLAN

SMALL GAS OPERATOR OPERATION AND MAINTENANCE PLAN SMALL GAS OPERATOR OPERATION AND MAINTENANCE PLAN Facility Name: Address: QUALIFIED PERSONNEL All tasks shall be completed by a person that is qualified to that task (see operators qualification of individuals

More information

DIVISION: 22 00 00 PLUMBING SECTION: 22 11 16 DOMESTIC WATER PIPING REPORT HOLDER: CURAFLO IP LLC 4035 E. OASIS STREET MESA, AZ 85215

DIVISION: 22 00 00 PLUMBING SECTION: 22 11 16 DOMESTIC WATER PIPING REPORT HOLDER: CURAFLO IP LLC 4035 E. OASIS STREET MESA, AZ 85215 0 ICC ES Report ICC ES (800) 423 6587 (562) 699 0543 www.icc es.org 000 Most Widely Accepted and Trusted PMG 1057 Valid: 02/15 to 02/16 DIVISION: 22 00 00 PLUMBING SECTION: 22 11 16 DOMESTIC WATER PIPING

More information

The Ford Model A Water Pump

The Ford Model A Water Pump The Ford Model A Water Pump George Washington Chapter, Inc. 3903 Old Lee Highway Fairfax, VA 22030 1 Table of Contents Introduction/Specifications.. 3 1. Water Pump Inspection and Removal. 4 a. Removal..

More information

CUTTER-CRUSHER RAMMER RC 22

CUTTER-CRUSHER RAMMER RC 22 11/99 PARTS MANUAL PMRC22EN.A99 CUTTER-CRUSHER RAMMER RC 22 SERIAL NO. RC22BC0015-UP RC22RC0021-UP TABLE OF CONTENTS 1. Cylinder RC 22.......................................................... 4 2. Hydraulics

More information

NAVSEA Enterprise Resource Planning Overview March 2011

NAVSEA Enterprise Resource Planning Overview March 2011 NAVSEA Enterprise Resource Planning Overview March 2011 Mark Montella NUWC Newport ERP Site Implementation Lead 7 Months Until NAVSEA WCF Go-Live Navy Navy ERP ERP What is it? Navy Enterprise Resource

More information

PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES

PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES ADDRESS: 123 MAIN ST MIAMI, FL CLIENT: BUYER ID No: 2014193 DATE: 5/13/2014 INSPECTION OR ASSESSMENT BY: GAIA CONSTRUCTION INC. CGC 1516136 FLORIDA HI-2792

More information

USAID ENERGY POLICY PROGRAM SITE VISIT REPORT STATUS OF 4 RUN OF RIVER HYDROPOWER PROJECTS. October 2013

USAID ENERGY POLICY PROGRAM SITE VISIT REPORT STATUS OF 4 RUN OF RIVER HYDROPOWER PROJECTS. October 2013 USAID ENERGY POLICY PROGRAM SITE VISIT REPORT STATUS OF 4 RUN OF RIVER HYDROPOWER PROJECTS October 2013 This program is made possible by the support of the American people through the United States Agency

More information

AFE424 SERVICE PARTS

AFE424 SERVICE PARTS This is the parts list for the AFE. When looking up part numbers, always check the complete model and serial numbers to be certain of ordering the correct parts. The Air Cooled model has also been manufactured

More information

Society of American Military Engineers Omaha District

Society of American Military Engineers Omaha District Society of American Military Engineers Omaha District Kim Thomas Deputy Chief, Plans, Programs, and Project Management Division Omaha District July 21, 2015 US Army Corps of Engineers Omaha District Spotlight

More information

SERVICE PARTS LIST PAGE 1 OF 6 BASE ASSEMBLY SPECIFY CATALOG NO. AND SERIAL NO. WHEN ORDERING PARTS 12" DUAL BEVEL COMPOUND MITER SAW B27A

SERVICE PARTS LIST PAGE 1 OF 6 BASE ASSEMBLY SPECIFY CATALOG NO. AND SERIAL NO. WHEN ORDERING PARTS 12 DUAL BEVEL COMPOUND MITER SAW B27A PAGE 1 OF 6 BASE ASSEMBLY 00 0 EXAMPLE: Component Parts (Small #) Are Included When Ordering The Assembly (Large #). SPECIFY CATALOG NO. AND NO. WHEN ORDERING PARTS 1 02-80-0050 Thrust Bearing (1) 2 05-80-0510

More information

REQUEST FOR PROPOSAL. for CONSTRUCTION MANAGEMENT SERVICES. for the ENCINA WASTEWATER AUTHORITY FY 2015 MAJOR PLANT REHABILITATION PROJECT

REQUEST FOR PROPOSAL. for CONSTRUCTION MANAGEMENT SERVICES. for the ENCINA WASTEWATER AUTHORITY FY 2015 MAJOR PLANT REHABILITATION PROJECT REQUEST FOR PROPOSAL for CONSTRUCTION MANAGEMENT SERVICES for the ENCINA WASTEWATER AUTHORITY FY 2015 MAJOR PLANT REHABILITATION PROJECT Ref: Admin.15 12265c September 23, 2015 Proposals Due November 2,

More information

Federal Wage System Job Grading Standard for Powered Support Systems Mechanic, 5378. Table of Contents

Federal Wage System Job Grading Standard for Powered Support Systems Mechanic, 5378. Table of Contents Federal Wage System Job Grading Standard for Powered Support Systems Mechanic, 5378 Table of Contents WORK COVERED... 2 WORK NOT COVERED...2 GRADES... 2 TITLES... 3 HELPER AND INTERMEDIATE JOBS... 3 NOTE

More information

Construction Management Standards of Practice

Construction Management Standards of Practice Construction Management Standards of Practice 2010 Edition Advancing Professional Construction/ Program Management Worldwide. 7926 Jones Branch Drive, Suite 800 McLean, VA 22102-3303 USA 703.356.2622 703.356.6388

More information

INCREASE OF DURABILITY AND LIFETIME OF EXISTING BRIDGES. PIARC TC 4.4 EXPERIENCE.

INCREASE OF DURABILITY AND LIFETIME OF EXISTING BRIDGES. PIARC TC 4.4 EXPERIENCE. INCREASE OF DURABILITY AND LIFETIME OF EXISTING BRIDGES. PIARC TC 4.4 EXPERIENCE. M.Sc. Gediminas Viršilas Head of Bridge Division, Lithuanian Road Administration Working group 2 of PIARC Technical Committee

More information

ENGLISH FORK GUIDE 2013

ENGLISH FORK GUIDE 2013 FORK GUIDE 2013 ENGLISH 1 With a brand which is synonymous with specialists in forest products handling attachments, BOLZONI AURAMO offers its expertise and market leading attachments for all requirements,

More information

Commonwealth of Puerto Rico PUERTO RICO ELECTRIC POWER AUTHORITY. ANNUAL BUDGET OF CAPITAL EXPENDITURES FISCAL YEAR 2003-2004 (Dollars in thousands)

Commonwealth of Puerto Rico PUERTO RICO ELECTRIC POWER AUTHORITY. ANNUAL BUDGET OF CAPITAL EXPENDITURES FISCAL YEAR 2003-2004 (Dollars in thousands) No. Title Amount Production Plant Thermal Production Plant 100 New Generation 15,865 160 Improvements to Steam Boilers 13,289 165 Improvements to Steam Turbine Generator 11,093 170 Improvements to Steam

More information

Controlling Our Critical Path: A CDOT Guide to Better Project Management Practices

Controlling Our Critical Path: A CDOT Guide to Better Project Management Practices : A CDOT Guide to Better Project Management Practices Project Management practices have been a part of the CDOT culture for many years. However, with a transitioning workforce and increasing demands, it

More information

Electric Operations Manager

Electric Operations Manager CITY OF ANAHEIM invites applications for the position of: Electric Operations Manager SALARY: $10,602.75 - $14,578.75 Monthly $127,233.00 - $174,945.00 Annually OPENING DATE: 04/07/16 CLOSING DATE: Continuous

More information

Risk Management in Interior Design

Risk Management in Interior Design Risk Management in Interior Design Presented by: Stephen Polozola Decker Jones P.C 801 Cherry Street, Suite 2000 Fort Worth, Texas 76102 817.336.2400 Cannot hold out as Registered Interior Designer if

More information

Construction Practice Group

Construction Practice Group Advising and counseling our clients through every phase of even the most complex construction matters is what differentiates the lawyers in Gould & Ratner s construction practice. As a group, they possess

More information

Availability Assessment of Generating Units of Balimela Hydro Electric Power Station (510 MW) A Markovian Approach

Availability Assessment of Generating Units of Balimela Hydro Electric Power Station (510 MW) A Markovian Approach American Journal of Engineering Research (AJER) 24 American Journal of Engineering Research (AJER) e-issn : 232-847 p-issn : 232-936 Volume-3, Issue-2, pp-44-49 www.ajer.org Research Paper Open Access

More information

USACE Dam Safety Program Current Approach & Methodology

USACE Dam Safety Program Current Approach & Methodology USACE Dam Safety Program Current Approach & Methodology Siamac Vaghar, PE, MASCE Chief, Geotechnical Engineering Section Dam Safety Program Manager US Army Corps of Engineers New England District Corps

More information

products 22 º C Ventilation Air Conditioning Refrigeration Energy & Cost Saving Products Inside PROVIDED BY HEINEN & HOPMAN

products 22 º C Ventilation Air Conditioning Refrigeration Energy & Cost Saving Products Inside PROVIDED BY HEINEN & HOPMAN products > Energy & Cost Saving Products OUTSIDE 35 C HUMIDITY 90% 22 º C Inside PROVIDED BY HEINEN & HOPMAN Heating Ventilation Air Conditioning Refrigeration HVAC energy & COST SAVING POSSIBILITIES A

More information

Aircraft Technician Training

Aircraft Technician Training Aircraft Technician On the following pages you find detailed course descriptions. All courses are available on request. Nevertheless to facilitate your yearly planning we have fixed dates for type training

More information

Re-engineering and function testing at Handtmann Zittau WELCOME

Re-engineering and function testing at Handtmann Zittau WELCOME Re-engineering and function testing at Handtmann Zittau WELCOME Handtmann Maschinenfabrik GmbH & Co. KG / VVZ 3/01/2015 page 1 Agenda Generell Information Handtmann Zittau Re-engineering Handtmann Zittau

More information

PRODUCT MANUAL - M090

PRODUCT MANUAL - M090 PRODUCT MANUAL - M090 MODEL 203/266 ELECTRIC CAN OPENER 1 SAFETY CAUTION: SEVERED CAN LIDS HAVE CUTTING EDGES. USE OF A PROTECTIVE GLOVE OR TONGS IS ADVISED WHEN HANDLING LIDS. WARNING To avoid risk of

More information

ABB ! CAUTION. Type COQ Negative Sequence Generator Relay. (50/60 Hertz) 41-161J. Instruction Leaflet

ABB ! CAUTION. Type COQ Negative Sequence Generator Relay. (50/60 Hertz) 41-161J. Instruction Leaflet ABB Instruction Leaflet 41-161J Effective: May 1997 Supersedes I.L. 41-161H Dated July 1984 ( ) Denotes Change Since Previous Issue Type COQ Negative Sequence Generator Relay (50/60 Hertz)! CAUTION Before

More information

Construction Management Functions CMGT 500/700

Construction Management Functions CMGT 500/700 Construction Management Functions CMT 500/700 Project Planning and Design Master Planning Planning Phase Designer Selection Design Phase Bid Phase Award Phase Construction Phase Master Planning AKA Capital

More information

*Specify Oversize When Ordering

*Specify Oversize When Ordering Cylinder Block Deck Cracks On Caterpillar 3208 Engines and Caterpillar explain how to inspect the Caterpillar 3208 engines for block cracks. Part No. Location Insert OD Size Depth Tapered ID 3906854 Intake

More information

4-Point Inspection Personal Lines (Edition 9/2012)

4-Point Inspection Personal Lines (Edition 9/2012) (Edition 9/2012) INSURED/APPLICANT NAME: Mr. and Mrs. America APPLICATION/POLICY #: ADDRESS INSPECTED: 1234 Surfing Villa Way, Riverview, FL 33569 ACTUAL YEAR BUILT: 1987 DATE OF INSPECTION: 5/09/2014

More information

What to Look for in a Vibration Consultant By Alan Friedman, DLI Engineering. Introduction. The Most Basic Form of Vibration Analysis

What to Look for in a Vibration Consultant By Alan Friedman, DLI Engineering. Introduction. The Most Basic Form of Vibration Analysis What to Look for in a Vibration Consultant By Alan Friedman, DLI Engineering Introduction Many corporations are currently looking to outsource their machinery condition monitoring program, others wish

More information