PMO-1.7 Cost Estimating. Project Management
|
|
|
- Margery Bryan
- 10 years ago
- Views:
Transcription
1 Project Management Office Title: Section where used: PMO-1.7 Cost Estimating Project Management Prepared by Date Approved by Date Kurt Deshayes, LBNL EVMS Surveillance Officer Jim Krupnick, Laboratory Project Management Officer Revision Log: Rev. No. Effective Date Pgs. Affected Brief Description of Revision 0.0 June 1, 2005 All Original Document 1.0 February 2009 All Miscellaneous Updates, Review and Revisions to EIA-748B 1.0 PURPOSE This document describes the methodology for establishing cost estimates for projects managed by LBNL in a manner that is compliant with the standards for implementation of appropriate Project Management controls and Earned Value Management. 2.0 SCOPE Cost estimates, including Estimate to Complete (ETC), are prepared in a clear, consistent, comprehensive format that facilitates review of details and assumptions throughout the cost estimation process. Activities to be estimated are identified in sufficient detail to support the cost estimate methodology used. The objectives of the cost estimating process are to: (1) support the establishment of the Performance Measurement Baseline (PMB); (2) serve as the basis for change control; and (3) support the establishment of the ETC. Project cost estimates shall be traceable to documented sources and based on accepted methodologies. 3.0 REFERENCES DOE Order 413.3A. LBNL Earned Value Management System Description. Revision February of 6
2 PMO-1.7 Cost Estimating LBNL CFO Rate Book. PMO Procedure 1.2, Work Breakdown Structure (WBS). PMO Procedure 1.5, Control Account Plan/Work Authorization. PMO Procedure 1.6, Project Schedule. Indirect/Overhead Rates for collaborating institutions 4.0 PROCEDURE 4.1 Estimate Preparation and Review The estimate preparation phase begins with the issuance of guidance and instructions from the Project Manager and encompasses those activities that translate technical design and fabrication into detailed labor and procurement elements (organized by Work Breakdown Structure (WBS)) and identified costs. Labor rate tables, indirect costs, and escalation rates will be provided by Project Controls to assist Control Account Managers (CAMs) in budget development. The Project Manager will review this information and approve all budget plans prior to implementation. Escalation should generally be based on rates provided by the Department of Energy (DOE) as published in the LBNL Forward Pricing Sheet (aka CFO Rate Book). If work is being executed by collaborator or subcontractor in another geographic area where the escalation rates are different, rates for those areas should be used in lieu of the LBNL rates. Judgment should be used to verify the appropriateness of the published rate in light of current market conditions. Documentation of the rates used and the basis should be maintained. The resulting cost estimate should be analyzed for appropriate time-phasing with budget authority and budget outlay, consistent with the project appropriation profile, as directed by the Funding Agency Preparation of Detailed Estimate CAMs shall be responsible for preparing or obtaining cost estimates for Work Packages and Planning Packages. The CAMs will forward copies of the estimates to Project Controls for validation Cost Estimate Methodology The result of the project cost estimate process shall be the CAMs most current, detailed cost estimate, commensurate with design maturity. The CAM will use one of the approved methodologies: Revision February of 6
3 PMO-1.7 Cost Estimating A description of these methodologies is provided in the Appendix. CAMs should use Categories 1, 2, 3, and 7 when possible, especially for high-cost items, as this will provide maximum estimate support. The CAMs basis for all estimates will be documented for each project and retained by the Project Manager, with a copy provided to Project Controls. The documentation includes files to support project cost estimates (such as books, vendor quotes, engineering notes, memos, records of conversations with vendors, drawings, code output) with appropriate safeguards for proprietary information provided. Cost estimates are developed for each WBS element at the Work Package level or lower as deemed necessary by the CAMs. They shall be broken down by project phase, institution, and labor discipline as appropriate. Items and activities in the estimate shall be of sufficient detail to support interpretation by independent reviewers. When the project includes collaborating institutions, estimates prepared by non-lbnl CAMs shall use equivalent methodologies. 4.2 Documentation The Project Manager shall control supporting documentation and ensure that it is retained by WBS element. The Project Manager shall forward copies of the documentation to Project Controls. Proper care shall be given to protect business-confidential and proprietary information from unauthorized disclosure. Documents and records generated as a result of implementing this procedure shall be generated in a manner suitable for reproduction and signed and dated at the time of completion or approval. Official signed documents shall be retained by the Project Manager, with copies to Project Controls. Documents, records, and work papers shall include but not be limited to the following: Estimate spreadsheets. Work papers, including vendor quotes, telephone records, material take-offs, basis notes, calculations, etc. Analysis, such as contingencies, escalation application, and quantity discounts. Estimating codes, such as labor disciplines and phase codes. Application rates and associated application methodology. 4.3 Management Reserve/Contingency The Project Manager, CAMs, and other Stakeholders shall work together to determine a risk-based level of Management Reserve/Contingency. Revision February of 6
4 PMO-1.7 Cost Estimating 5.0 APPENDIX Appendix A: Cost Estimating Process Flow Diagram. Appendix B: Estimate Methodologies. Revision February of 6
5 Title APPENDIX A: Cost Estimating Process Revision February of 6
6 Title APPENDIX B: Estimate Methodologies Estimate Methodologies Code Type of Estimate Description 1 Catalog Listing or Industrial/ Construction Databases 2 Documented vendor Estimate Based on Drawings/Sketches and Specifications 3 Engineering Estimate Based on Drawings/Sketches and Specifications. 4 Engineering Estimated Based on Similar Items or Procedures 5 Engineering Estimate Based on Analysis 6 Expert Opinion (Engineering Allowance) This category will be used when most of the costs in an estimate can be documented from current vendor catalogs or from published or proprietary industrial or construction databases. The estimate is primarily based on vendor estimates obtained for the specific item or activity. To the extent possible, these estimates will be written rather than oral. If the latter, they will be documented. Such quotes by a vendor indicate that a design is sufficiently mature that its cost can be independently estimated (i.e., significant detail in drawings and specifications have been prepared), although the quotes will not be taken as an offer to sell at that price. Estimates in this category have the same level of detail available as in (2) above, but the estimates are done by an expert estimator at LBNL, or a subcontractor who is not likely to be a vendor. Estimates are chiefly based on items or activities that have previously been procured or undertaken. The basis for scaling up or down, or factoring (e.g., known cost sensitivities) should be documented in the Estimate Files. Given the variable degree of similarity between components of various LBNL projects, judgment must be used in selecting between (4) and (5). Estimates of items or procedures that are different from previous experience, and while sketches and specifications may exist, the level of detail is not sufficient to quality for (3) above. Some labor costs, such as assembly of an item not previously built, may fall into this category. Supporting background for procured items would include, for example, standard costs for fabricating a given material and the mass of material needed. This category should be used for items or procedures having little documented basis for the estimate. It indicates little confidence in the estimate. Its use should obviously be minimized in the final estimate. It will be used as the estimate preparation develops, however, to measure the maturity of the estimate at any given point. 7 Existing Lien A contract has already been awarded. Revision February of 6
Cost Estimating Procedure. Table of Contents
Cost Estimating Procedure Table of Contents 1.0 PURPOSE... 1 2.0 SCOPE... 1 3.0 REFERENCES... 1 4.0 DESCRIPTION... 1 5.0 PROCEDURE DETAILS... 2 5.1 Developing a Detailed Cost Estimate... 2 5.2 Basis of
NUMBER: 12.PM-004 RESPONSIBILITY: Office of Project Support Services REVISION: 4 APPROVED BY: TITLE SUBJECT: Head, Office of Project Support Services
SUBJECT: FERMI RESEARCH ALLIANCE PROCEDURES PROJECT MANAGEMENT NUMBER: 12.PM-004 RESPONSIBILITY: Office of Project Support Services REVISION: 4 APPROVED BY: TITLE Head, Office of Project Support Services
300 Scheduling and Budgeting
Jefferson Science Associates, LLC 300 Scheduling and Budgeting Project Control System Manual Revision 7-16 - 300 Scheduling and Budgeting This chapter of the JSA Project Control System Manual describes
Head, Office of Project Management Oversight
SUBJECT: FERMI RESEARCH ALLIANCE PROCEDURES PROJECT MANAGEMENT NUMBER: 12.PM-004 RESPONSIBILITY: Office of Project Management Oversight REVISION: 43 APPROVED BY: TITLE Head, Office of Project Management
Summary of GAO Cost Estimate Development Best Practices and GAO Cost Estimate Audit Criteria
Characteristic Best Practice Estimate Package Component / GAO Audit Criteria Comprehensive Step 2: Develop the estimating plan Documented in BOE or Separate Appendix to BOE. An analytic approach to cost
CHAPTER 4 TYPES OF COST ESTIMATES
CHAPTER 4 TYPES OF COST ESTIMATES 1. INTRODUCTION All projects, both construction and environmental restoration, require cost estimates to plan and budget the project efficiently. Numerous estimates are
PROJECT COST MANAGEMENT
7 PROJECT COST MANAGEMENT Project Cost Management includes the processes required to ensure that the project is completed within the approved budget. Figure 7 1 provides an overview of the following major
Quick Reference Guide Interactive PDF Project Management Processes for a Project
Project Processes for a Project Click the Knowledge Area title (below and left in blue underline) to view the details of each Process Group. Project Process Groups and Knowledge Areas Mapping Project Process
This EVMS Training Snippet sponsored by the Office of Acquisition and Project Management (OAPM) covers Firm Fixed Price (or FFP type) subcontracts.
This EVMS Training Snippet sponsored by the Office of Acquisition and Project Management (OAPM) covers Firm Fixed Price (or FFP type) subcontracts. To begin, how does the Prime integrate the subcontractor
Project Integration Management
Integration Initiating ning Executing Monitoring & Controlling Closing 4.1 Develop Charter Statement Of Work Business Case 4.2 Develop 4.3 Direct and Manage Work 4.4 Monitor and Control Work 4.5 Perform
FAR 15.408 Table 15-2 -- Instructions for Submitting Cost/Price Proposals When Cost or Pricing Data Are Required
FAR 15.408 Table 15-2 -- Instructions for Submitting Cost/Price Proposals When Cost or Pricing Data Are Required This document provides instructions for preparing a contract pricing proposal when cost
FRA s Earned Value Management System Overview for Self Assessment Surveillance March 07-09, 2011
FRA s Earned Value Management System Overview for Self Assessment Surveillance March 07-09, 2011 Dean Hoffer Head, Office of Project Management Oversight Outline EVMS History at the Lab FRA EVMS Documents
Program Lifecycle Methodology Version 1.7
Version 1.7 March 30, 2011 REVISION HISTORY VERSION NO. DATE DESCRIPTION AUTHOR 1.0 Initial Draft Hkelley 1.2 10/22/08 Updated with feedback Hkelley 1.3 1/7/2009 Copy edited Kevans 1.4 4/22/2010 Updated
Project Cost & Schedule Monitoring Process Using MS Excel & MS Project
Project Cost & Schedule Monitoring Process Using MS Excel & MS Project Presented by: Rajesh Jujare About Us Solutions is founded with objectives a. To share its expertise and experiences to overcome the
Impact of PMBOK 5 th Edition
PMP Exam Changes Impact of PMBOK 5 th Edition When the PMI exam will change Major Updates X1.1 Scope of Update Comments and feedbacks for prior version Overall review for accuracy Appropriate alignment
Assessment of NCTD Program Management Framework for Positive Train Control Program
Assessment of NCTD Program Management Framework for Positive Train Control Program Subtask 2: Analysis Gap Analysis Prepared for: Brad Hansen, M.S., PMP Director, PMO Capital Projects May 2013 0 icfi.com/transportation
Earned Value Management System (EVMS) Manual. System Description and Implementing Procedures
Manual System Description and Implementing Procedures Manual System Description and Implementing Procedures Contact Information This document is maintained, updated, and formally revised electronically
The 10 Knowledge Areas & ITTOs
This document is part of a series that explain the newly released PMBOK 5th edition. These documents provide simple explanation and summary of the book. However they do not replace the necessity of reading
FOREWORD. Page 2 of 88
FOREWORD Earned Value Management (EVM) is one of the DoD s and industry's most powerful program management tools. Government and industry program managers use EVM to assess cost, schedule and technical
Master Document Audit Program. Version 7.4, dated November 2006 B-1 Planning Considerations. Purpose and Scope
Activity Code 24010 B-1 Planning Considerations Estimating System Survey (ICR) Purpose and Scope The major objectives of this audit are to: Evaluate the adequacy of and the contractor s compliance with
Develop Project Charter. Develop Project Management Plan
Develop Charter Develop Charter is the process of developing documentation that formally authorizes a project or a phase. The documentation includes initial requirements that satisfy stakeholder needs
Project Management Guidelines
Project Management Guidelines 1. INTRODUCTION. This Appendix (Project Management Guidelines) sets forth the detailed Project Management Guidelines. 2. PROJECT MANAGEMENT PLAN POLICY AND GUIDELINES OVERVIEW.
Certification Exam Objectives: PK0-003
Certification Exam Objectives: PK0-003 INTRODUCTION The CompTIA Project + examination is designed for business professionals involved with projects. This exam will certify that the successful candidate
A Guide To The Project Management Body of Knowledge (PMBOK) Significant Changes from the 3 rd edition to the 4 th edition
A Guide To The Project Body of Knowledge (PMBOK) Significant Changes from the 3 rd edition to the 4 th edition Major Changes The adoption of the verb-noun format for process names Amplification as to Enterprise
The Program Managers Guide to the Integrated Baseline Review Process
The Program Managers Guide to the Integrated Baseline Review Process April 2003 Table of Contents Foreword... 1 Executive Summary... 2 Benefits... 2 Key Elements... 3 Introduction... 4 IBR Process Overview...
Guidelines: Project Schedule Project Management Office (PMO)
Guidelines: Project Schedule Project Management Office (PMO) Process The project Schedule outlines the tasks and activities of the project; the duration; start and end dates for each individual task and
PROJECT MANAGEMENT PLAN CHECKLIST
PROJECT MANAGEMENT PLAN CHECKLIST The project management plan is a comprehensive document that defines each area of your project. The final document will contain all the required plans you need to manage,
Accounting System. Page 1 of 9
Page 1 of 9 Accounting System In support of program management and Earned Value Management, the accounting system must be able to relate costs incurred to work accomplished. Not all accounting systems
PURCHASE ORDER TERMS AND CONDITIONS FOR MANUFACTURING MANAGEMENT PROGRAMS MIL-STD-1528A APPENDIX 2
08/27/91 PURCHASE ORDER TERMS AND CONDITIONS FOR MANUFACTURING MANAGEMENT PROGRAMS MIL-STD-1528A APPENDIX 2 1. The Seller, upon acceptance of this purchase order, shall establish and/or maintain a Manufactured
Project Start Up. Start-Up Check List. Why a Project Check List? What is a Project Check List? Initial Release 1.0 Date: January 1997
Why a Project Check List? A good way to ensure that all start-up tasks are completed prior to actually starting the project is to develop a start-up check list. The check list can be developed and then
Risk Management Plan template <TEMPLATE> RISK MANAGEMENT PLAN FOR THE <PROJECT-NAME> PROJECT
RISK MANAGEMENT PLAN FOR THE PROJECT Prepared by: Approved by: Reference: Version: Date: INTRODUCTION This document is the Risk Management
Baseline Change Control Procedure
Earned Value Management System (EVMS) Implementing Procedures Baseline Change Control Procedure EVMS-P-7 Revision 0 - October, 2006 Change Log Earned Value Management System Procedure Change Log Revision
Training Seminars. Description. Core Courses: The core courses consist of the following:
Training Seminars Description The POI consists of training courses known as core. The purpose of the core courses is to provide a principles or foundation knowledge baseline to the student in the fundamentals
Project Management System Description (PMSD)
Project Management System Description (PMSD) Revision 3 Project Management System Description (PMSD) Revision 3 February 2016 Prepared by: Date: Steve Langish Planning & Control Division Approved by: Date:
How to successfully manage your mega-project
BUILDING, CONSTRUCTION & REAL ESTATE How to successfully manage your mega-project Part II Stakeholder communication and project controls integration kpmg.com 2 Building, Construction & Real Estate How
Project Management Using Earned Value
Project Management Using Earned Value Third Edition Gary C. Humphreys Earned Value Management Consulting Training 2002, 2011, 2014 Gary C. Humphreys Humphreys & Associates, Inc. All rights reserved. No
Project Cost Management
Project Skills Team FME www.free-management-ebooks.com ISBN 978-1-62620-982-9 Copyright Notice www.free-management-ebooks.com 2014. All Rights Reserved ISBN 978-1-62620-982-9 The material contained within
Earned Value Management Systems Application Guide
National Defense Industrial Association Integrated Program Management Division Earned Value Management Systems Application Guide January 27, 2015 Revision 2 National Defense Industrial Association (NDIA)
Minnesota Health Insurance Exchange (MNHIX)
Minnesota Health Insurance Exchange (MNHIX) 1.2 Plan September 21st, 2012 Version: FINAL v.1.0 11/9/2012 2:58 PM Page 1 of 87 T A B L E O F C O N T E N T S 1 Introduction to the Plan... 12 2 Integration
PROJECT MANAGEMENT PLAN TEMPLATE < PROJECT NAME >
PROJECT MANAGEMENT PLAN TEMPLATE < PROJECT NAME > Date of Issue: < date > Document Revision #: < version # > Project Manager: < name > Project Management Plan < Insert Project Name > Revision History Name
pm4dev, 2008 management for development series Project Budget Management PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS
pm4dev, 2008 management for development series Project Budget Management PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS A methodology to manage development
THE COMPLETE PROJECT MANAGEMENT METHODOLOGY AND TOOLKIT
THE COMPLETE PROJECT MANAGEMENT METHODOLOGY AND TOOLKIT GERARD M. HILL CRC Press Taylor & Francis Group Boca Raton London New York CRC Press is an imprint of the Taylor & Francis Croup, an informa business
Project Management Plan for
Project Management Plan for [Project ID] Prepared by: Date: [Name], Project Manager Approved by: Date: [Name], Project Sponsor Approved by: Date: [Name], Executive Manager Table of Contents Project Summary...
Integration Mgmt / Initiating Process Group 4.1 Develop Project Charter
1 Mgmt / Initiating Process Group 4.1 Develop Project Charter Project statement of work Business case Agreements Facilitation techniques Project charter 26/02/2013 18:23:36 1 2 Mgmt / Planning Process
Earned Value Management System Description
LCLS Project Management Document # 1.1-015 Project Management Revision 3.0 Earned Value Management System Description Patricia Mast (LCLS Project Controls Manager) Signature Date Mark Reichanadter (LCLS
THE PROJECT MANAGEMENT KNOWLEDGE AREAS
THE PROJECT MANAGEMENT KNOWLEDGE AREAS 4. Project Integration Management 5. Project Scope Management 6. Project Time Management 7. Project Cost Management 8. Project Quality Management 9. Project Human
Earned Value Management Systems Application Guide
National Defense Industrial Association Integrated Program Management Division Earned Value Management Systems Application Guide May 4, 2011 Revision 1* National Defense Industrial Association (NDIA) 2111
INTERNAL CONTROL MATRIX FOR AUDIT OF ESTIMATING SYSTEM CONTROLS Version No. 3.2 June 2006. 31-d Page 1 of 7
INTERNAL CONTROL MATRIX FOR AUDIT OF ESTIMATING SYSTEM CONTROLS Version No. 3.2 June 2006 Control Objectives Example Control Activities Audit Procedures 1. INTERNAL AUDITS Management should periodically
Auditing Capital Projects and Project Controls. March 2013
Auditing Capital Projects and Project Controls March 2013 Internal Audit Perspective Oversight Insight Foresight Is the process operating as planned? Are controls, resources, and performance measures adequate
PRODUCT DEVELOPMENT TRAINING COURSE
PRODUCT DEVELOPMENT TRAINING COURSE DETAILED COURSE OUTLINE Course Overview The purpose of this course is to provide education and guidance to a product manager and other product management professionals,
How To Write Ansi/Eia Evm System Acceptanceance Guide
National Defense Industrial Association (NDIA) Program Management Systems Committee (PMSC) ANSI/EIA 748 Earned Value Management System Acceptance Guide Working Release For User Comment January 23, 2006
Chapter 7. (PMBOK Guide)
Chapter 7 Project Cost Management (PMBOK Guide) Mohammad A. Rajabi Dept. of Geomatics Eng., University it of Th Tehran Tel: +98 21 8833 4341, Cell: +98 912 132 5823 Email: [email protected] ir Homepage:
Project Management Fundamentals. Office of the Senior Associate Vice President for Finance
Project Management Fundamentals Project Management Institute PMI is an aggregation of best practices from thousands of professional project managers Principles in this training are based on PMI methodologies,
Project Management Standards: A Review of Certifications/Certificates
Project Standards: A Review of Certifications/Certificates Standards for Project Supporting Certification and Certificates Certificate Certification The Project Body of Knowledge PMBOK Guide Projects in
A COMPARISON OF PRINCE2 AGAINST PMBOK
Introduction This comparison takes each part of the PMBOK and gives an opinion on what match there is with elements of the PRINCE2 method. It can be used in any discussion of the respective merits of the
Project Management Guidebook
METHOD 12 3 empowering managers to succeed Project Management Guidebook ISBN 0-473-10445-8 A bout this e-book This e-book was created by Method123 (see www.method123.com) to help provide you with a simple
FedRAMP Standard Contract Language
FedRAMP Standard Contract Language FedRAMP has developed a security contract clause template to assist federal agencies in procuring cloud-based services. This template should be reviewed by a Federal
Chapter 14 Special Report for the Public Accounts Committee Evergreen and Wackenhut Leases
Special Report for the Public Accounts Committee Evergreen and Wackenhut Leases Contents Background.............................................................. 183 Scope...................................................................
The Project Manager's Guide to Sarbanes-Oxley
The Project Manager's Guide to Sarbanes-Oxley November 2007 EXECUTIVE GUIDE SERIES Executive Guide to Business Process Management for Project Managers Occupational fraud and abuse in 2006 will slice 6%
DATA ITEM DESCRIPTION Title: Integrated Program Management Report (IPMR) Number: DI-MGMT-81861 Approval Date: 20120620
DATA ITEM DESCRIPTION Title: Integrated Program Management Report (IPMR) Number: DI-MGMT-81861 Approval Date: 20120620 AMSC Number: D7549 Limitation: DTIC Applicable: No GIDEP Applicable: No Preparing
The Project Management Life Cycle By Jason Westland (A book review by R. Max Wideman)
The Project Management Life Cycle By Jason Westland (A book review by R. Max Wideman) 11/17/07 Introduction Editor's Note: We liked so much of this book that we asked for the author's permission to quote
Family Computer Centre
PMP - Project Professional 35 Contact Hours Comprehensive Training Program Designed on the basis of Project Body of Knowledge (PMBOK Guide) Family Computer Centre Ground Floor, Al Rayyan Complex P. O Box:
FAC-P/PM CROSSWALK FULFILLMENT OF REQUIRED COMPETENCIES THROUGH EXPERIENCE, PROFESSIONAL CERTIFICATION, AND/OR TRAINING. Professional Certification
FAC-P/PM CROSSWALK FULFILLMENT OF REQUIRED COMPETENCIES THROUGH EXPERIENCE, PROFESSIONAL CERTIFICATION, AND/ TRAINING FAC P/PM Required Competencies Fulfillment via Professional Fulfillment Options via
Project Management Planning
Develop Project Tasks One of the most important parts of a project planning process is the definition of activities that will be undertaken as part of the project. Activity sequencing involves dividing
SCOPE MANAGEMENT PLAN <PROJECT NAME>
SCOPE MANAGEMENT PLAN TEMPLATE This Project Scope Management Plan Template is free for you to copy and use on your project and within your organization. We hope that you find this template useful and welcome
TOPIC 12 CONTRACT COST AND PRICE ANALYSIS
CONTRACT AUDIT GUIDE FRAMEWORK TOPIC 12 CONTRACT COST AND PRICE ANALYSIS Objective To determine whether the agency effectively conducts cost or price analysis to arrive at fair and reasonable prices for
Project Management Office (PMO)
Contents I. Overview of Project Management...4 1. Project Management Guide (PMG)...4 1.1 Introduction...4 1.2 Scope...6 1.3 Project Types...6 2. Document Overview, Tailoring, and Guidance...7 3. The Project
PROCUREMENT, FABRICATION & CONSTRUCTION
SmartPlant Enterprise PROCUREMENT, FABRICATION & CONSTRUCTION 2 Balancing Act PROCUREMENT, FABRICATION, AND CONSTRUCTION represent a complex balancing act between profit-making and risk-taking that requires
Guidelines. Project Management Methodology. & Step-by-Step Guide to Managing Successful Projects
Project Management Methodology Guidelines Project Management Methodology & Step-by-Step Guide to Managing Successful Projects Table of Contents Table of Contents 1. Project Management Overview...1 1.1.
Project Management Certificate (IT Professionals)
Project Management Certificate (IT Professionals) Whether your field is architecture or information technology, successful planning involves a carefully crafted set of steps to planned and measurable goals.
6500m HOV Project Stage 1: A-4500 HOV
6500m HOV Project Stage 1: A-4500 HOV Systems Engineering, Integration & Testing Plan Document Control No.: 0000000 01-November-2009 WOODS HOLE OCEANOGRAPHIC INSTITUTION WOODS HOLE, MA 02543 Document Control
Robla School District
Robla School District e-rate Y14 2011-2012 RFP 2011-02 CELLULAR PHONE SERVICE WITH WIRELESS INTERNET ACCESS November 3, 2010 Robla School District 5248 Rose St. Sacramento, CA 95838 SUMMARY The Robla School
Risk/Issue Management Plan
Risk/Issue Management Plan Centralized Revenue Opportunity System November 2014 Version 2.0 This page intentionally left blank Table of Contents 1. Overview... 3 1.1 Purpose... 3 1.2 Scope... 3 2. Roles
Application of Standard Project Management Processes in Fiber Optic Cable Plant Project Management. Introduction. Alfred Sankara, DigiBridge TelCo
Application of Standard Project Management Processes in Fiber Optic Cable Plant Project Management Alfred Sankara, DigiBridge TelCo Introduction The Project Management Institute (PMI) is the world's leading
Project Management Institute (PMBOK 2000) PMP Preparation Worksheet
Project Integration Management Processes required to ensure that the various elements of the project are properly coordinated to meet / exceed stakeholder expectations. Project Plan Development Other ning
CRITICAL PATH METHOD (CPM) SCHEDULES
96 CRITICAL PATH METHOD (CPM) SCHEDULES How-to for Reading, Understanding, and Using CPM Schedules (without Direct Primavera Access.) 1 Objectives Learn to read, understand, and use CPM schedules (without
Superconducting Magnet Division
Magnet Division Specification Specification Number: SMD-MAG-1001 Superconducting Magnet Division Revision: A Procedure for Preparation and Processing of ECR/ECN Prepared by: Design Group Supervisor: Production
ACCOUNTS PAYABLE AUDIT RECOVERING LOST DOLLARS AT NO COST
ACCOUNTS PAYABLE AUDIT RECOVERING LOST DOLLARS AT NO COST 1 Our Objective To assist organizations in finding lost thousands of dollars in profits through duplicate payments, duplicate billings, overpayments,
Project Management Body of Knowledge (PMBOK) (An Overview of the Knowledge Areas)
Project Management Body of Knowledge (PMBOK) (An Overview of the Knowledge Areas) Nutek, Inc. 3829 Quarton Road, Suite 102 Bloomfield Hills, Michigan 48302, USA. Phone: 248-540-4827, Email: [email protected]
Project Cost Management
Project Cost Management Study Notes PMI, PMP, CAPM, PMBOK, PM Network and the PMI Registered Education Provider logo are registered marks of the Project Management Institute, Inc. Points To Note Please
Job Manager for Metal Fabrication
Job Manager for Metal Fabrication What makes Metal Fabrication unique? First, most metal shops are building to unique specifications. The Jobs are service type jobs, not production type jobs. Mass Production
A Project Manager's Book of Forms. A Companion to the PMBOK Guide. 2nd Edition
Brochure More information from http://www.researchandmarkets.com/reports/2326795/ A Project Manager's Book of Forms. A Companion to the PMBOK Guide. 2nd Edition Description: A compendium of ready made
CPM -100: Principles of Project Management
CPM -100: Principles of Project Management Lesson E: Risk and Procurement Management Presented by Sam Lane [email protected] Ph: 703-883-7149 Presented at the IPM 2002 Fall Conference Prepared by the Washington,
July 6, 2015 11(1) CHAPTER 11
July 6, 2015 11(1) CHAPTER 11 Table of Contents Paragraph Page 11-000 Audit of Contractor Compliance with Contract Financial Management Requirements 11-001 Scope of Chapter... 1101 11-100 Section 1 ---
PMI PMP & CAPM sertifikacija
PMI PMP & CAPM sertifikacija Priprema članova PMI Serbia Chapter-a Project Integration Management припремио: 28.Јануар 2014. Београд Милан Шмигић, ПМП [email protected] www.pmi-serbia.rs PMBOK Intro
Services Contracts and Earned Value Management (EVM)
Services Contracts and Earned Value Management (EVM) National Defense Industrial Association 2111 Wils on Blvd, Suite 400 Arlington, VA 22201 www.ndia.org February 17, 2010 www.ndia.org 2010 National Defense
Project Management Planning
Initial Release 1. Overview of Project Paralleling the development of the schedule is the development of a budget. At the initial stages of project planning, budgeting is the determination of costs associated
RSMeans Plumbing Estimating Methods. 3rd Edition
Brochure More information from http://www.researchandmarkets.com/reports/2489152/ RSMeans Plumbing Estimating Methods. 3rd Edition Description: PlumbingEstimating Methods Joseph J. Galeno and Sheldon T.
AACE International Recommended Practices
AACE International Recommended Practice No. 18R-97 COST ESTIMATE CLASSIFICATION SYSTEM AS APPLIED IN ENGINEERING, PROCUREMENT, AND CONSTRUCTION FOR THE PROCESS INDUSTRIES TCM Framework: 7.3 Cost Estimating
Paychex Accounting Online Terms of Use
Paychex Accounting Online Terms of Use Paychex recommends that Client read the Terms of Use prior to using the Paychex Accounting Online Software ( Software ). If Client does not accept and agree with
Best Practices Statement Project Management. Best Practices for Managing State Information Technology Projects
State of Arkansas Office of Information Technology 124 W. Capitol Ave. Suite 990 Little Rock, AR 72201 501.682.4300 Voice 501.682.4020 Fax http://www.cio.arkansas.gov/techarch Best Practices Statement