PI/PSLF Based Model Validation Application. Eric Bakie and Milorad Papic WECC JSIS Meeting Tempe, AZ January 21-23, 2014
|
|
|
- Brett Goodman
- 10 years ago
- Views:
Transcription
1 PI/PSLF Based Model Validation Application Eric Bakie and Milorad Papic WECC JSIS Meeting Tempe, AZ January 21-23,
2 OUTLINE 1. Background Information 2. What is PI/PSLF Based PPMV Application? 3. IPCO PI/PSLF Based Tools 4. Play-In validation examples using PI data 5. Lessons Learned and Future Work 2
3 1. Background Information 3 Grid Planning and Operating Decisions relay on good/realistic models of power system and its elements such as (generators, lines, transformers, loads, etc.) Having realistic models is very important for safe, reliable and economic system operation Validation and benchmarking of planning and operation models have always received a great deal of attention in the past and will receive increasing attention in the future by the utility industry Need for Validation exist for both Component and System-wide Models Observation, measurement and analysis of multiple system events provide the best opportunity for model validation
4 1. Background Information 4 After major disturbances on July 2 and August 10, 1996, the WSCC Control Work Group (CWG) and the Modeling and Validation Work Group (M&VWG) were tasked with developing guidelines for testing generators, excitation systems, power system stabilizers (PSS) and turbine governors for all units greater than 10 MW for verification of reactive limits, proper performance of the dynamic control systems, and validation of the computer models used for stability analysis. NERC Recommendation 14 from August 14, 2003 The regional reliability councils shall within one year establish and begin implementing criteria and procedures for validating data used in power flow models and dynamics simulations by benchmarking model data with actual system performance. Validated modeling data shall be exchanged on an inter-regional basis as needed for reliable system planning and operation. NERC/FERC Recommendation 17 from September 8, WECC, as the RE, should lead other entities, including TOPs and BAs, to ensure that all facilities that can adversely impact BES reliability are either designated as part of the BES or otherwise incorporated into planning and operations studies and actively monitored and alarmed in RTCA systems.
5 1. Background Information 5 Study of WECC frequency Events by BPA over years and by IPC just recently indicates in many cases a wide discrepancy between simulations and recording of disturbance events. Finding from BPA show that differences in frequency have been noted in both the initial transient dips and in the settling frequencies. Assessment of the first transient dip is important for load shedding while the settling frequency is a measure of the responsiveness of turbine-governors in the system. Model validation by IPCO System Planning was performed to screen the quality of the dynamics models used to represent the turbine-governor system for all Units in Idaho system for ten major events in PI Data was used as the model validation input data.
6 1. Component & system-wide Model validation Component Model Validation Generator model Load model HVDC, SVC model, etc. System-wide model validation is not done routinely at present. Power flow simulation results are compared with time-synchronized recordings of bus voltages, angles, and key paths flows. The following aspects of a power system model that need to be matched to a specific event include: Network topology Generation dispatch Load profile Load dynamics and composition Power plant dynamics 6
7 1. Background Information 7 Several NERC MOD Standards deal with power system models and their verification/validation to ensure they are accurate and up to date. MOD 012 requires power plant owners to provide power plant data for dynamic simulations MOD 026 requires power plant owners to verify that the provided dynamic models of excitation controls are accurate and up to date MOD 027 requires power plant owners to verify that the provided dynamic models of governors and turbine controls are accurate and up to date MOD exists in conjunction with MOD 033 1, both of which are related to system level modeling and validation. Reliability Standard MOD is a consolidation and replacement of existing MOD 010 0, MOD 011 0, MOD 012 0, MOD 013 1, MOD 014 0, and MOD , and it requires data submission by applicable data owners. Standard MOD is a new standard, and it requires each Planning Coordinator to implement a documented process to perform model validation within its planning area. Validation using disturbance recordings has been recognized to be an acceptable method for periodic model validation.
8 1. Background Information 8 Disturbance based model validation provides: A very effective way of filling in aspects of the models that cannot be validated effectively or safely through baseline testing A very effective way of detecting when baseline testing has produced misleading or inaccurate modeling The opportunity to observe and analyze generating unit behavior in operational situations that cannot possibly (or safely) be realized in the staged conditions of baseline testing. The opportunity to detect failures, changed adjustments, drifting, and improper operation of equipment that have occurred since baseline tests were done. [Ref. Power Plant Model Validation in BPA, July 12, 2012]
9 2. PPMV Application [Ref. BPA PPMV, Nov. 2011] 9 General Electric implemented a disturbance play-in function in their PSLF simulator in The function plays in recorded voltage bus, voltage and frequency at a power plant Point of Interconnection. The power plant active and reactive power are compared between the actual disturbance data and play-in simulations. BPA found that were quite few instances when a power plant model failed to match a disturbance response event. The most common modeling deficiencies include Power System Stabilizers (PSS) Turbine-governor models Generator Inertia
10 2. PPMV Application Power Plant Model Validation (PPMV) Application 10 Build a sub system by extracting data from the latest base case. Create a *.dyd file by extracting data from the latest dynamic file and solve load flow and confirm. Before running model validation studies, a mini-base case representing power plant conditions just prior to a disturbance is created. PPMV includes an automated mini-state estimation routine which sets up power plant initial condition using SCADA unit status information and PMU bus voltage, and active and reactive power. The model validation process is to play-in the recorded voltage and frequency of the disturbance and calculate real and reactive power using GE PSLF simulation tool.
11 2. PPMV Application Model Validation Setup 11 An infinite-bus model was developed and implemented in General Electric PSLF program. The model injects recorded bus voltage and frequency in dynamic simulations. The infinite bus is modeled with a large synchronous machine with fast-responding exciters and governors. Recorded bus voltage and frequency are input as references for the governor voltage regulator and governor respectively. If the turbine-governor model is correct, the simulated power should be very similar to the recorded power for events of system frequency excursions
12 2. PPMV Application Validation Overview - GE PSLF Simulations Inject Recorded Voltage and Frequency Compare Recorded and Simulated Power: MW and MVAR ~ Disturbance playback is a standard feature in PSLF
13 2. PPMV Application PPMVa_SetBaseCase_v1b.p Power Flow Template (plant.sav) SCADA Data File: SCADA_Plant_Event. dat Event Data File: PMU_Plant_Event.csv PSLF - Mini State Estimator Powerflow File: PLANT_EVENT.sav 13
14 2. PPMV Application PPMVa_SetBaseCase_v1b.p Purpose: Create a validation base case with initial conditions matching those prior to a disturbance Pre-requisites: A template file with power flow model (*.sav) A disturbance data file compatible with play-in format (*.csv) A SCADA file with generating unit status and loading (*.dat) Result A powerflow file with initial conditions matching those during the event (*.sav) 14
15 2. PPMVa_SetBaseCase_v1b.p 15 Powerflow case with kv, MW, MVAR at POI matching initial conditions of disturbance record EPCL is setup for one facility - one disturbance
16 2. FRresponse_v1r.xls Event on at 18:14 mdt Plot Function FREQUENCY :10 18:11 18:12 18:14 18:15 18:17 BROWNLEE UNIT 5 MW :10 18:11 18:12 18:14 18:15 18:17 16
17 2. PPMV Application PPMVa_RunValidation_v1b.p Power Flow File: PLANT_EVENT.sav Plant Dynamic Data: PLANT.dyd PSLF Channel File: PLANT_EVENT. chf Event Data File: PMU_PLANT_EVENT. csv 17
18 2. PPMV Application PPMVa_RunValidation_v1b.p Purpose: Perform play-in simulation of a disturbance event Pre-requisites: A powerflow file with initial conditions matching those during the event (*.sav) A disturbance data file compatible with play-in format (*.csv) Dynamic data file with a power plant model (*.dyd) Result Channel file with disturbance data (*.chf) 18
19 2. PPMVa_RunValidation_v1b.p 19 Validation Comparison of Model to Disturbance Recording EPCL is setup for one validation run of one facility
20 2. Minimum File Requirements for Play-In in PSLF Input Files Powerflow case representing disturbance I.C. (*.sav) Dynamics data (*.dyd) Disturbance data in PSLF Play-In format (*.txt, *.csv) EPCL that calls the PSLF Play-In Functions (*.p) Output File 20
21 3. IPCO Tools: Modified FRresponse_v1r.xls 21
22 3. IPCO Tools: Plot Macro 22
23 3. IPCO Tools: *.csv Macro Separate Tab for each unit with disturbance data in PSLF Play-In format Macro writes a (*.csv) file to the specified working directory for each unit 23
24 3. IPCO Tools: *.dat Macro Separate Tab with SCADA Initial Conditions Data for each unit Macro writes a (*.dat) text file to the specific working directory with bus number, bus name, base kv, ID, status, generator kv, MW, MVAR, and baseload flag status data for each unit that was on-line during the disturbance 24
25 3. IPCO Tools: Set Base Case Batch (*.p) Macro 25 Macro writes a (*.p) text file containing the mailbox variables called by the Set Base Case batch EPCL Only writes records for units that were on-line during the disturbance
26 3. IPCO Tools: Run Validation Batch (*.p) Macro 26 Macro writes a (*.p) text file containing the mailbox variables called by the Run Validation batch EPCL Only writes records for units that were on-line during the disturbance
27 3. IPCO Tools: Get Plot Data Batch (*.p) Macro 27 Macro writes a (*.p) text file containing the mailbox variables called by the Get Plot Data batch EPCL Only writes records for units that were on-line during the disturbance
28 3. IPCO Tools: SetBaseCase_PI_FR_batch.p Template File (*.sav) 28 Disturbance Data File (*.csv) SCADA I.C. File (*.dat) PSLF EPCL to Match Boundary Conditions (*.p) Disturbance Case (*.sav)
29 3. IPCO Tools: RunValidation_PI_FR_batch.p Disturbance Case (*.sav) 29 Disturbance Data File (*.csv) Dynamics Data File (*.dyd) PSLF Play-In (*.p) Channel File (*.chf)
30 3. IPCO Tools: Create Validation Files Macro 30
31 3. IPCO Tools: GetPlotData_PI_FR_batch.p Channel File (*.chf) SCADA I.C. (*.dat) PSLF Plot (*.p) Tab Delimited Text File (*.txt) 31
32 3. Play-In process using developed Tools 32
33 33 3. Desired Play-In Validation Tool Features Batch processing capability for validation multiple units Ability to easily process multiple events Retain program structure similar to ALLDYNS batch processor Query PI Data and plot disturbance records for all units Generate disturbance record files in PSLF Play-In format Generate SCADA Initial Conditions files for each generator Generate Powerflow files that reflect I.C. for each generator Create tab delimited text files from channel files for each validation run for external plotting in MATLAB Ability to re-run the process with modified dynamics data
34 4. Play-In validation examples using PI data A List of WECC Frequency Events used to perform Model Validation at IPCO Event 1814 mdt (59.89 Hz) Event 1905 mdt (59.90 Hz) Event 0908 mdt (59.84 Hz) Event 1148 mdt (59.86 Hz) Event 1137 mdt (59.88 Hz) Event 1621 mdt (59.88 Hz) Event 1621 mdt (59.70 Hz) Event 0351 mdt (59.88 Hz) Event 1630 mdt (59.89 Hz) Event 1704 mdt (59.82 Hz) 34
35 35 4. Examples
36 36 4. Examples
37 37 4. Examples
38 4. Examples Red = Recording Blue = Simulation 38 Modified hyg3 Ki from 0.35 to 3.25 Added lcfb1 model
39 4. Play-In Validation Process 10 Frequency Events (2013) Step 4 Post Process Results Create Validation Report 39
40 4. Cautions 40 SCADA Problems Noise, Poor Resolution PI update rate and dead band - Sampling intervals can be as high as 10 s Aliasing can result in incorrect conclusions if the sampling frequency is not sufficiently high. The minimum of 4-s resolution must be maintained. Another problem in SCADA could be the megawatt threshold before a new number is recorded. In some cases, the threshold is set as high as 10 MW, creating a dead band effect, exceeding the governor response during recordings of frequency disturbances. SCADA thresholds for unit and plant power recordings must therefore be set to appropriate lower threshold levels
41 5. Lessons Learned Approach works for Governor validation Bigger events to get outside of input data dead bands provided better matches Good for identifying undesired control behavior Good for identifying units represented with sustained frequency response but actually operate under load control 41
42 5. Future Work Develop automation tools for creating validation reports Expand validation tool set for compatibility with PMU database Expand validation tool set for compatibility with DFR records Work with Generator Owners to identify areas for improving model performance Identify how the developed PSLF Play-In tools can be incorporated into the data validation process used to meet the proposed requirements of NERC MOD Steady-State and Dynamic System Model Validation 42
43 Questions? 43
System Protection Schemes in Eastern Denmark
System Protection Schemes in Eastern Denmark Joana Rasmussen COWI A/S, Energy Department System Protection Schemes in Eastern Denmark 1.Advanced system protection schemes are investigated and perspectives
Scope of Restoration Plan
RWG Area Restoration Review Worksheet (10/28/09) EOP-006-02 Directory 8 EOP-005 NYSRG Rule G Text Restoration Plan Requirement R1.Each Reliability Coordinator shall have a Reliability Coordinator Area
ATTACHMENT G. Network Operating Agreement
ATTACHMENT G Network Operating Agreement 1. PURPOSE OF NETWORK OPERATING AGREEMENT The purpose of this Agreement is to identify contractual requirements related to Network Integration Transmission Service
Request for Payment Instructions Wholesale Distribution Access Tariff (WDAT) Attachment I - GIP
Grid Interconnection & Contract Development Request for Payment Instructions Wholesale Distribution Access Tariff (WDAT) Attachment I - GIP Submittal Instructions Prior to submitting your application and
Dynamic Security Assessment in the Future Grid. Vijay Vittal Ira A. Fulton Chair Professor Arizona State University
1 Dynamic Security Assessment in the Future Grid Vijay Vittal Ira A. Fulton Chair Professor Arizona State University 2 Key requirements for DSA Need to perform DSA as close to real time as possible Need
General Validation Test Program for Wind Power Plants Connected to the Hydro-Québec Transmission System
General Validation Test Program for Wind Power Plants Connected to the Hydro-Québec Transmission System Direction Planification des actifs et expertise de transport February 2011 TABLE OF CONTENTS 1. CONDUCTING
Generation Interconnection Feasibility Study Report-Web Version. PJM Generation Interconnection Request Queue Position Z1-055
Generation Interconnection Feasibility Study Report-Web Version For PJM Generation Interconnection Request Queue Position Z1-055 South Bend Generation Project March 2014 PJM Interconnection 2014. All rights
Summary of CIP Version 5 Standards
Summary of CIP Version 5 Standards In Version 5 of the Critical Infrastructure Protection ( CIP ) Reliability Standards ( CIP Version 5 Standards ), the existing versions of CIP-002 through CIP-009 have
Oscillation Monitoring System
Oscillation Monitoring System Mani V. Venkatasubramanian Washington State University Pullman WA Oscillation Monitoring System IEEE C37.118 Real-time PMU data stream TCP or UDP OpenPDC OMS SQL server OMS
Reactive Power Control of an Alternator with Static Excitation System Connected to a Network
Reactive Power Control of an Alternator with Static Excitation System Connected to a Network Dr. Dhiya Ali Al-Nimma Assist. Prof. Mosul Unoversity Dr. Majid Salim Matti lecturer Mosul University Abstract
LAB1 INTRODUCTION TO PSS/E EE 461 Power Systems Colorado State University
LAB1 INTRODUCTION TO PSS/E EE 461 Power Systems Colorado State University PURPOSE: The purpose of this lab is to introduce PSS/E. This lab will introduce the following aspects of PSS/E: Introduction to
Alberta Reliability Standard Cyber Security Configuration Change Management and Vulnerability Assessments CIP-010-AB-1
A. Introduction 1. Title: 2. Number: 3. Purpose: To prevent and detect unauthorized changes to BES cyber systems by specifying configuration change management and vulnerability assessment requirements
4.1.1 Generator Owner 4.1.2 Transmission Owner that owns synchronous condenser(s)
A. Introduction 1. Title: Verification and Data Reporting of Generator Real and Reactive Power Capability and Synchronous Condenser Reactive Power Capability 2. Number: MOD-025-2 3. Purpose: To ensure
FULL ELECTRICAL LNG PLANTS: HIGHEST AVAILABILITY AND ENERGY EFFICIENCY THROUGH OVERALL SYSTEM DESIGN
FULL ELECTRICAL LN PLANTS: HIHEST AVAILABILITY AND ENERY EFFICIENCY THROUH OVERALL SYSTEM DESIN Dr. Edwin Lerch Siemens A Infrastructure and Cities Sector, IC S SE PTI, ermany Phone: 49-9131-7-34052 Fax:
REAL TIME DYNAMICS MONITORING SYSTEM (RTDMS ) AND PHASOR GRID DYNAMICS ANALYZER (PGDA) USER TRAINING FOR ERCOT
REAL TIME DYNAMICS MONITORING SYSTEM (RTDMS ) AND PHASOR GRID DYNAMICS ANALYZER (PGDA) USER TRAINING FOR ERCOT SEPTEMBER 16-17, 2014 Electric Power Group. Built upon GRID-3P platform, U.S. Patent 7,233,843,
When this standard has received ballot approval, the text boxes will be moved to the Guidelines and Technical Basis section of the Standard.
CIP-002-5 Cyber Security BES Cyber System Categorization When this standard has received ballot approval, the text boxes will be moved to the Guidelines and Technical Basis section of the Standard. A.
Wide Area Monitoring Current Continental Europe TSOs Applications Overview
Wide Area Monitoring Current Continental Europe TSOs Applications Overview Version 5 System Protection & Dynamics Working Group 20th September 2015 1. Content 1. Content... 2 2. Introduction... 3 3. Main
DOE/OE Transmission Reliability Program. Data Validation & Conditioning
DOE/OE Transmission Reliability Program Data Validation & Conditioning Jianzhong Mo [email protected] Kenneth Martin [email protected] June 3-4, 2014 Washington, DC 2 Presentation Introduction
FRCC Standards Handbook. FRCC Automatic Underfrequency Load Shedding Program. Revision Date: July 2003
F R C C FRCC Standards Handbook FRCC Automatic Underfrequency Load Shedding Program Revision Date: July 2003 FRCC Underfrequency Load Shedding Program Modification and Approval Process Requests to modify
Modeling of Deadband Function of Governor Model and its Effect on Frequency Response Characteristics
Modeling of Deadband Function of Governor Model and its Effect on Frequency Response Characteristics Saeed Mohajeryami, Aanand R. Neelakantan, Iman N. Moghaddam, Zia Salami Electrical and Computer Engineering,
Midwest Reliability Organization Procedure For NERC PRC-012
Midwest Reliability Organization Procedure For NERC PRC-012 A. Introduction The following procedure developed by the MRO Protective Relay Subcommittee (PRS) and Transmission Assessment Subcommittee (TAS)
Team Members: Adam Wroblaski Jared Kline Mark Reisinger Yu Chan. Advisor: Dr. Chen-Ching Liu Client: General Electric
Team Members: Adam Wroblaski Jared Kline Mark Reisinger Yu Chan Advisor: Dr. Chen-Ching Liu Client: General Electric April 25, 2007 Overview of Presentation Acknowledgements Definitions Introduction Project
TURBOtech srl. SED-635 Digital Excitation System. Industrial Electronics Sector FEATURES
SED-635 Digital Excitation System SED-635 is a complete excitation system capable of adapting to control synchronous generators of any size. The integration of the TOUCH SCREEN operator interface and a
Evolution of Control for the Smart Transmission Grid
Evolution of Control for the Smart Transmission Grid Anjan Bose Washington State University Pullman, WA SCE Smart Grid Research Symposium California Institute Of Technology October, 2011 The Past (before
Grid of the Future. Integration of Renewables Energy Storage Smart Grid. Presentation by David Hawkins Lead Renewables Power Engineer Grid Operations
Grid of the Future Integration of Renewables Energy Storage Smart Grid Presentation by David Hawkins Lead Renewables Power Engineer Grid Operations Grid of the Future Current Power System Gen. Trans. Dist.Cust.
Guidelines for Large Photovoltaic System Integration
1 Guidelines for Large Photovoltaic System Integration Silviu Darie, PhD(EE), PE(EE) Abstract- The paper summarizes the result of a research project funded by the Department of Energy (DOE) in collaboration
BIGDATAANALYTICS FOR ELECTRICPOWERGRID OPERATIONS MANU PARASHAR CORPORATE POWER SYSTEMS ENGINEER JULY 29, 2015
BIGDATAANALYTICS FOR ELECTRICPOWERGRID OPERATIONS MANU PARASHAR CORPORATE POWER SYSTEMS ENGINEER JULY 29, 2015 Agenda Big Data in the Energy Industry Solution Architecture/Approach for Managing Big Data
Modern Power Systems for Smart Energy Society
Modern Power Systems for Smart Energy Society Zhe CHEN Professor, PhD Email: [email protected] Website: http://homes.et.aau.dk/zch http://www.et.aau.dk 1 Contents Energy background in Denmark Challenges to
Study to Determine the Limit of Integrating Intermittent Renewable (wind and solar) Resources onto Pakistan's National Grid
Pakistan Study to Determine the Limit of Integrating Intermittent Renewable (wind and solar) Resources onto Pakistan's National Grid Final Report: Executive Summary - November 2015 for USAID Energy Policy
Advanced Protection of Distribution Networks with Distributed Generators
Date:- 8 10 March 2011 Venue: University of Manchester EES-UETP Course title Advanced Protection of Distribution Networks with Distributed Generators Peter Crossley Director of the Joule Centre School
References... 4. Appendices... 5. I. INTRODUCTION... 6 A. Background... 6 B. Standards... 6
ISO New England Operating Procedure No. 14 - Technical Requirements for Generators, Demand Resources, Asset Related Demands and Alternative Technology Regulation Resources Effective Date: January 29, 2015
Increasing situational awareness of system operators by highly aggregated dynamic security results. Dr. Uros Kerin
1 Increasing situational awareness of system operators by highly aggregated dynamic security results Dr. Uros Kerin Introduction Renewables feeding all voltage levels Bulk wind farms onshore and offshore
Renewable Energy Interconnection Requirements for the US. IEEE PES Meeting Denver, CO July 26-30, 2015 J. Charles Smith, Executive Director, UVIG
1 Renewable Energy Interconnection Requirements for the US IEEE PES Meeting Denver, CO July 26-30, 2015 J. Charles Smith, Executive Director, UVIG 2 Outline of Topics Background and Introduction NERC Integrating
Power System review W I L L I A M V. T O R R E A P R I L 1 0, 2 0 1 3
Power System review W I L L I A M V. T O R R E A P R I L 1 0, 2 0 1 3 Basics of Power systems Network topology Transmission and Distribution Load and Resource Balance Economic Dispatch Steady State System
Toward standards for dynamics in future electric energy systems The basis for plug and play industry paradigm
Toward standards for dynamics in future electric energy systems The basis for plug and play industry paradigm Marija Ilić [email protected] Electric Energy Systems Group (EESG) http://www.eesg.ece.cmu.edu/,
Modelling framework for power systems. Juha Kiviluoma Erkka Rinne Niina Helistö Miguel Azevedo
S VISIONS SCIENCE TECHNOLOGY RESEARCH HIGHLIGHT 196 Modelling framework for power systems Juha Kiviluoma Erkka Rinne Niina Helistö Miguel Azevedo VTT TECHNOLOGY 196 Modelling framework for power systems
Transmission Planning Study (Year 2022) for Cherokee 4 Replacement Alternatives. Final Report
Transmission Planning Study (Year 2022) for Cherokee 4 Replacement Alternatives (Required per CPUC Decision No. C10-1328) Final Report (Submitted with Public Service s 2011 ERP) Executive Summary The objective
Transient Stability Analysis with PowerWorld Simulator
Transient Stability Analysis with PowerWorld Simulator T6: Storage of Transient Stability Results 2001 South First Street Champaign, Illinois 61820 +1 (217) 384.6330 [email protected] http://www.powerworld.com
Load Dispatcher (Class Code 5223) Task List
A. Load Dispatching, General Load Dispatcher (Class Code 5223) Task List 1. Prior to work shift speaks to Load Dispatcher(s), reviews hardcopy and computer logs, and looks at the dispatcher's diagram board
Risks and Controls for VAR-001-4 and EOP-004-2. Richard Shiflett Ruchi Ankleshwaria
Risks and Controls for VAR-001-4 and EOP-004-2 Richard Shiflett Ruchi Ankleshwaria 2 Introductions Richard Shiflett Compliance Risk Engineer Joined WECC in February 2014 11 years experience with Bureau
Control Development and Modeling for Flexible DC Grids in Modelica
Control Development and Modeling for Flexible DC Grids in Modelica Andreas Olenmark 1 Jens Sloth 2 Anna Johnsson 3 Carl Wilhelmsson 3 Jörgen Svensson 4 1 One Nordic AB, Sweden, [email protected].
APPLICATION CASE OF THE END-TO-END RELAY TESTING USING GPS-SYNCHRONIZED SECONDARY INJECTION IN COMMUNICATION BASED PROTECTION SCHEMES
APPLICATION CASE OF THE END-TO-END RELAY TESTING USING GPS-SYNCHRONIZED SECONDARY INJECTION IN COMMUNICATION BASED PROTECTION SCHEMES J. Ariza G. Ibarra Megger, USA CFE, Mexico Abstract This paper reviews
Synchronized real time data: a new foundation for the Electric Power Grid.
Synchronized real time data: a new foundation for the Electric Power Grid. Pat Kennedy and Chuck Wells Conjecture: Synchronized GPS based data time stamping, high data sampling rates, phasor measurements
GOVERNMENT OF INDIA MINISTRY OF RAILWAYS TI/STR/028. (Revision 1)
GOVERNMENT OF INDIA MINISTRY OF RAILWAYS TI/STR/028 (Revision 1) SCHEDULE OF TECHNICAL REQUIREMENT FOR APPROVAL OF VENDORS FOR SUPPLY OF COMPLETE SUPERVISORY CONTROL AND DATA ACQUISITION SYSTEM FOR 25
Reclamation Manual Directives and Standards
Subject: Purpose: Ancillary Generation Services Establishes standards for ancillary generation services. Authority: The Reclamation Act of 1902 (Act of June 17, 1902, 32 Stat. 388), the Town Sites and
Voltage regulation in distribution systems - Tap changer and Wind Power
CODEN:LUTEDX/(TEIE-5270)/1-59/(2010) Industrial Electrical Engineering and Automation Voltage regulation in distribution systems - Tap changer and Wind Power David Sáez Romero D of Industrial Electrical
Qatar University College of Engineering Electrical Engineering Department. A Graduation Project Report
Qatar University College of Engineering Electrical Engineering Department A Graduation Project Report Design of Power System Stabilizer Based on Microcontroller for Power System Stability Enhancement By
PG&E Web Tool for Reporting Information Related to. NERC Reliability Requirement Compliance
PG&E Web Tool for Reporting Information Related to NERC Reliability Requirement Compliance Overview On June 18, 2007, mandatory reliability standards adopted by the Federal Energy Regulatory Commission
Electric utilities may vary in their application of end-to-end testing
An Application Case of End-to-End Relay Testing of Communication-Based Protection Schemes Using GPS-Synchronized Secondary Injection Feature by J. Ariza, Megger USA G. Ibarra, CFE, Mexico Electric utilities
Colorado Springs Utilities Interconnection Guidelines For Transmission to Transmission Interconnections Version 1 12/04/2007
Colorado Springs Utilities Interconnection Guidelines For Transmission to Transmission Interconnections Version 1 12/04/2007 I.INTRODUCTION AND GENERAL POLICY 5 A. INTRODUCTION...5 B. THE COLORADO SPRINGS
Oracle Fusion Middleware
Oracle Fusion Middleware Oracle WebCenter Forms Recognition/Capture Integration Guide 11g Release 1 (11.1.1) E49971-01 November 2013 Oracle WebCenter Forms Recognition is a learning-based solution that
System Operator Certification Program Administrative Guidelines
System Operator Certification Program Send your comments to [email protected] by September 24, 2004 Maintaining NERC System Operator Credential Through the Use of Continuing Education Credit Hours North
CO-ORDINATION OF PARALLEL AC-DC SYSTEMS FOR OPTIMUM PERFORMANCE
CO-ORDINATION OF PARALLEL AC-DC SYSTEMS FOR OPTIMUM PERFORMANCE Ana Diez Castro & Rickard Ellström Ying Jiang Häfner Christer Liljegren Vattenfall Utveckling AB ABB Power Systems Gotlands Energiverk AB
Data Mining to Characterize Signatures of Impending System Events or Performance from PMU Measurements
Data Mining to Characterize Signatures of Impending System Events or Performance from PMU Measurements Final Project Report Power Systems Engineering Research Center Empowering Minds to Engineer the Future
Example #1: Controller for Frequency Modulated Spectroscopy
Progress Report Examples The following examples are drawn from past student reports, and illustrate how the general guidelines can be applied to a variety of design projects. The technical details have
Sensitivity Analysis of Waveform Distortion Assessment for Wind Plants
Sensitivity Analysis of Waveform Distortion Assessment for Wind Plants Mariana B. Pereira 1, Einar V. Larsen 2, Sebastian A. Achilles 3 Energy Consulting General Electric 1 Av. Magalhães de Castro 4800,
The design and performance of Static Var Compensators for particle accelerators
CERN-ACC-2015-0104 [email protected] The design and performance of Static Var Compensators for particle accelerators Karsten Kahle, Francisco R. Blánquez, Charles-Mathieu Genton CERN, Geneva, Switzerland,
INTRODUCTION TO SYNCHRONIZING AUTOMATIC SYNCHRONIZING CONSIDERATIONS AND APPLICATIONS
INTRODUCTION TO SYNCHRONIZING AUTOMATIC SYNCHRONIZING CONSIDERATIONS AND APPLICATIONS INTRODUCTION It is the intention of this presentation to provide an explanation of the automatic synchronizing process,
CHAPTER 1 INTRODUCTION
CHAPTER 1 INTRODUCTION Power systems form the largest man made complex system. It basically consists of generating sources, transmission network and distribution centers. Secure and economic operation
PSS E. High-Performance Transmission Planning Application for the Power Industry. Answers for energy.
PSS E High-Performance Transmission Planning Application for the Power Industry Answers for energy. PSS E architecture power flow, short circuit and dynamic simulation Siemens Power Technologies International
Multiregional Modeling Working Group (MMWG) Procedural Manual
SC MC MMWG Eastern Interconnection Reliability Assessment Group Multiregional Modeling Working Group (MMWG) Procedural Manual Version 14 Version History Original: November 8, 2007 Version 2: April 10,
ENTSO-E Network Code for Requirements for Grid Connection Applicable to all Generators
ENTSO-E Network Code for Requirements for Grid Connection Applicable to all Generators 8 March 2013 Notice This document reflects the work done by ENTSO-E in line with the ACER Framework Guidelines on
Windows Performance Monitor Troubleshooting Guide
Windows Performance Monitor Troubleshooting Guide Document Owner - Support Version Control Alan Davis Author John Nuttall Windows Performance counter troubleshooting guide This document is designed to
VOLTAGE CONTROL IN DISTRIBUTION SYSTEMS AS A LIMITATION OF THE HOSTING CAPACITY FOR DISTRIBUTED ENERGY RESOURCES
VOLTAGE CONTROL IN DISTRIBUTION SYSTEMS AS A LIMITATION OF THE HOSTING CAPACITY FOR DISTRIBUTED ENERGY RESOURCES C. Schwaegerl*, M.H.J. Bollen, K. Karoui #, A. Yagmur + *Siemens AG, # Tractebel STRI AB
Capturing Real-Time Power System Dynamics: Opportunities and Challenges. Zhenyu(Henry) Huang, PNNL, [email protected]
1 Capturing Real-Time Power System Dynamics: Opportunities and Challenges Zhenyu(Henry) Huang, PNNL, [email protected] Frequency trending away from nominal requires tools capturing real-time dynamics
Entity Name ( Acronym) NCRnnnnn Risk Assessment Questionnaire
Entity Name ( Acronym) NCRnnnnn Risk Assessment Questionnaire Upcoming Audit Date: March 16, 2015 Upcoming Audit Type: O&P Audit Start of Audit Period: March 16, 2012 Date Submitted: Table of Contents
ABB PSPS Erich Steinmann; Generator control-2013
ABB PSPS Erich Steinmann; Generator control-2013 GENERATOR CONTROL THE MODULAR SOLUTION FOR GENERATORS To make sure that power is efficiently converted into electric energy, it is necessary to supervise
Synchrophasors Redefining SCADA Systems
Synchrophasors Redefining SCADA Systems Mangapathirao V. Mynam, Ala Harikrishna, and Vivek Singh Schweitzer Engineering Laboratories, Inc. Presented at GRIDTECH 2013 New Delhi, India April 3 4, 2013 Previous
SCADA System Overview
Introduction SCADA systems are critical to the control and monitoring of complex cyber-physical systems. Now with advanced computer and communications technologies, SCADA systems are connected to networks
Generation Interconnection System Impact Study Report. For. PJM Generation Interconnection Request Queue Position X1-114.
Generation Interconnection System Impact Study Report For PJM Generation Interconnection Request Queue Position X1-114 Sandyston January 2012 Preface The intent of the System Impact Study is to determine
Product Bulletin. D20MX v1.40 Release Notification. GE Digital Energy. Release Notification of D20MX v1.40
GE Digital Energy D20MX v1.40 Release Notification Date: September 10, 2014 Classification: GE Information Product Bulletin Release Notification of D20MX v1.40 The D20MX Substation Gateway is a specialized
DISCUSSION PAPER: Peak Reliability Performance Metrics
DISCUSSION PAPER: Peak Reliability Performance Metrics Executive Summary Performance metrics are critical for any organization in order to encourage improvement, effectiveness and efficiency; to assess
Reactive Power and Importance to Bulk Power System OAK RIDGE NATIONAL LABORATORY ENGINEERING SCIENCE & TECHNOLOGY DIVISION
Reactive Power and Importance to Bulk Power System OAK RIDGE NATIONAL LABORATORY ENGINEERING SCIENCE & TECHNOLOGY DIVISION Outline What is Reactive Power and where does it come from? Why is it important?
Dually Fed Permanent Magnet Synchronous Generator Condition Monitoring Using Stator Current
Summary Dually Fed Permanent Magnet Synchronous Generator Condition Monitoring Using Stator Current Joachim Härsjö, Massimo Bongiorno and Ola Carlson Chalmers University of Technology Energi och Miljö,
NPCC Regional Reliability Reference Directory # 8 System Restoration
NPCC Regional Reliability Reference Directory # 8 Task Force on Coordination of Operations Revision Review Record: October 21, 2008 Adopted by the Members of the Northeast Power Coordinating Council, Inc.
Asset Management Business Update
Asset Management Business Update Improvements through Asset Management Mark Davis, Director, Asset Management & AW October 29, 2008 1 From Maintenance to Asset Management Maintain the System -Initial Focus
Application of SVCs by CenterPoint Energy to Address Voltage Stability Issues: Planning and Design Considerations
1 Application of SVCs by CenterPoint Energy to Address Voltage Stability Issues: Planning and Design Considerations Wesley Woitt, Alberto Benitez, David Mercado; CenterPoint Energy Frank Schettler, Heinz
Record Specification and File Format for Specifying Contingency Definitions and Remedial Actions Schemes
Record Specification and File Format for Specifying Contingency Definitions and Remedial Actions Schemes Date : October 22, 2013 December 6, 2013 January 21, 2015 August 28, 2015 November 6, 2015, November
Interconnection of Generators to EDI s Distribution System
Interconnection of Generators to EDI s Distribution System May 22, 2002 This document sets forth the guidelines for connecting a power producing facility to the Alberta Interconnected Electric System through
300 MW Variable Speed Drives for Pump-Storage Plant Application Goldisthal
May 24 MW Variable Speed Drives for Aurélie Bocquel APCG / 4BOC4 (MW-Goldisthal 1-5-24).PPT MW Variable Speed Drives for Content Major benefits of the cyclo-converter driven doubly-fed induction machines
Turbine Controls Update
Turbine Controls Update David Cicconi, Business Development Manager Emerson Process Management Power & Water Solutions Define Project Scope and Objectives Address obsolescence Best solution for new operational
EGCP-3 MC 8406-114 Revision H Software 5448-145 Revision F. Explanation of Software Changes Made for the EGCP-3 MC Control. Application Note 51298
EGCP-3 MC 8406-114 Revision H Software 5448-145 Revision F Explanation of Software Changes Made for the EGCP-3 MC Control Application Note 51298 WARNING DANGER OF DEATH OR PERSONAL INJURY WARNING FOLLOW
Iowa State University Electrical and Computer Engineering. E E 452. Electric Machines and Power Electronic Drives. Laboratory #3 Figures of Merit
Electrical and Computer Engineering E E 452. Electric Machines and Power Electronic Drives Laboratory #3 Figures of Merit Summary Simple experiments will be conducted. Experimental waveforms will be measured,
Effective: September 10, 2006 Vermont Attachment 1 to Rule 5.500 Public Service Board Page 1 of 6
Public Service Board Page 1 of 6 STANDARD APPLICATION FOR INTERCONNECTION OF GENERATION RESOURCES IN PARALLEL TO THE ELECTRIC SYSTEM OF: (Interconnecting Utility) Preamble and Instructions: An owner of
OVERVIEW AND TERMINOLOGY
ACH Online Services OVERVIEW AND TERMINOLOGY There are ACH terms and definitions that are helpful to understand in order to use the ACH Online Service. In addition, there are basic tasks (accessing ACH
