Bentle Branch Storm Water and Stream Bank Stability Study ABSTRACT

Size: px
Start display at page:

Download "Bentle Branch Storm Water and Stream Bank Stability Study ABSTRACT"

Transcription

1 Bentle Branch Storm Water and Stream Bank Stability Study Walter Skipwith, PE 1, Jeffrey Alvarez, EIT 2 and Dr. Peter Allen, PhD 3 ABSTRACT In the summer of 2004, flooding caused 2 deaths and an estimated $20,000,000 in damages throughout southern Dallas County and surrounding areas as reported by the National Weather Service. Property owners along Bentle Branch in Cedar Hill and Duncanville became concerned about flooding and stream bank erosion that occurred as a result of the July 2004 storm. As a result, both the cities of Duncanville and Cedar Hill commissioned a storm water management/stream bank stability study of the watershed. In the study, new hydrology and hydraulic models were developed and floodplain delineations were updated. Several road and driveway crossings were found to be inundated by the 10- and 100-year flood events. Existing storm water detention facilities are located at multiple sites throughout the upper basin. These facilities were evaluated as to their effectiveness in reducing peak flood events. As a result of the study, a storm water master plan has been developed for the basin. A Regional Storm Water Detention Basin is a key component of the plan. In addition, stream stability problem areas were identified and solutions proposed in both cities. 1 Vice President, Halff Associates, Inc., 8616 Northwest Plaza Drive, Dallas, Texas 75225, Phone (214) , FAX (214) , ; wskipwith@halff.com 2 Engineer, Halff Associates, Inc., 8616 Northwest Plaza Drive, Dallas, Texas 75225, Phone (214) , FAX (214) , ; jalvarez@halff.com 3 Professor of Geology, Baylor University, Department of Geology, 500 Speight, Waco, TX , Phone (254) , Fax (254) ; Peter_Allen@baylor.edu 1

2 INTRODUCTION Bentle Branch is one of three watersheds in the City of Cedar Hill that drain to Tenmile Creek. Portions of Stewart Branch, Bee Branch, and Bentle Branch drainage basins are located within the Cedar Hill city limits and are part of the 101 square mile Tenmile Creek watershed. Bentle Branch drains approximately 3.65 square miles of the Tenmile Creek watershed from its headwaters near Beltline Road to its confluence with Tenmile Creek. This stormwater management study covers Tributaries 2, 3, and an Unnamed Tributary of Bentle Branch in addition to Bentle Branch from its headwaters to just upstream of Joe Wilson Road. Bentle Branch is an attractive stream with a limestone channel overlain by mostly alluvial material covered with thick vegetation and trees. The Bentle Branch riparian corridor in Cedar Hill is primarily composed of American Elm, Black Walnut, Bois d Arc, Cedar Elm, Eastern Red Cedar, Green Ash, Hackberry, and Shumard Oak underlain by the Austin Chalk outcrop and the Frio silty clay soils. Erosion is occurring due to the natural channel evolutionary process on Bentle Branch, but this process has been accelerated due to increasing urbanization in the watershed. Much of this development has occurred within the last ten years, but large undeveloped tracts still remain. Currently, plans exist to convert most of the remaining vacant and agricultural acreage to residential, commercial, and industrial development. One such plan 2

3 is the Uptown Village development currently under construction, which will affect both Bentle Branch and Tributary 2 between Pleasant Run Road and FM HYDROLOGY AND HYDRAULICS For this study, the floodplain is defined by the 100-year flood based on ultimate (fully developed) land use. New hydrology and hydraulic models were developed based upon ultimate conditions land use determined from zoning information provided by the City of Cedar Hill. Field surveys were conducted to obtain cross sections along the channel and at all stream crossings. Water surface elevations were computed and the floodplain delineated based on 100-year flood discharges. Figure 1 shows floodplain delineations within the study area. Ten private road crossings are inundated by the 10- and 100-year floods and are considered dangerous for the 100-year flood. However, only 5 of the crossings are considered dangerous for the smaller, 10-year flood. This flood has a much greater chance (10% vs. 1%) of occurring in any given year compared to the 100-year flood and thus is an increased risk to pedestrians and motorists. Figure 1: Example Floodplain Delineation STORM WATER DETENTION AT EXISTING SITES Site detention facilities are located throughout the basin in the study area. These facilities were evaluated as to their effectiveness in reducing peak flood events. The analysis 3

4 shows that most of the existing site detention facilities along Tributary 2 do reduce discharges just downstream of their outfall location, but the effects are greatly reduced downstream at Pleasant Run Road and the confluence with Bentle Branch. Commercial Area Stormwater Detention Basin in Cedar Hill STORMWATER MANAGEMENT ALTERNATIVES Stormwater management alternatives were considered to address the erosion and flooding concerns. Results of the hydrology and hydraulic analyses showed that there are no homes inundated by the 100-year flood in the Bentle Branch watershed in Cedar Hill. Channel alterations for flood reduction were considered, but eliminated due to their probable significant environmental impact. Stormwater detention was also investigated as a stormwater management alternative. Several of the existing basins were evaluated to determine if reconfiguration would enhance their performance in terms of flood reduction especially along Tributary 2. This analysis shows that enhancements to the Plaza at Cedar Hill Mall pond could reduce 100-year discharges by up to 6% (fully developed landuse conditions) downstream at Pleasant Run Road by further restricting the outfall and raising the elevation of the exterior walls of the pond. Another stormwater detention alternative was evaluated on Tributary 2. The detention facility is created by restricting the culvert openings underneath Pleasant Run Road. Analysis shows that for (fully developed landuse conditions) as much as a 12% reduction in peak 100-year discharges could be achieved downstream of Pleasant Run Road. Some facilities, such as the site detention ponds on the Wal-Mart property along Bentle Branch and the two ponds located on the Target Shopping Center property along Tributary 2 could be altered to provide water quality enhancement, in addition to flood reduction benefits. These detention facility enhancements analyzed here do reduce discharges somewhat 4

5 downstream, but are not recommended as part of the Stormwater Management Plan because the reductions and therefore the benefits are very limited. REGIONAL STORMWATER DETENTION Regional stormwater detention was also evaluated from a flood reduction perspective. A location for a regional detention facility was identified that benefits both Cedar Hill and Duncanville. This facility is proposed just upstream of FM 1382 on Bentle Branch and would reduce flood discharges and base flood elevations on Bentle Branch. The regional stormwater detention facility concept was evaluated as to its effect on reducing peak flood discharges. The facility would provide peak 100-year flood discharge reductions ranging from 4 and 43 % through Cedar Hill and up to 4% reductions through Duncanville based on a comparison with current landuse conditions. Figure 2: Proposed Regional Stormwater Detention Facility 5

6 STREAM BANK STABILITY Halff Associates, in conjunction with Dr. Peter Allen, performed geomorphology and hydraulic analyses to evaluate and prioritize stream stability problems along Bentle Branch. The analyses included field assessment and stream hydraulic computations. Stability assessments were performed on Bentle Branch main stem and Tributary 2 only. Both Tributary 3 and Unnamed Tributary did not exhibit significant erosion and properties along the banks did not appear to be threatened at this time. Specifically, drainage/erosion complaints at sixteen locations along Bentle Branch and Tributary 2 were recorded by the City of Cedar Hill after the July 2004 flood. The field assessment entailed a walk-through of the entire reach of stream bed, including preparing detailed field notes, taking photographs, and identifying certain definitive characteristics of channel erosion. The geomorphology review also included a study of the channel evolution and potential degradation with time. A detailed Geomorphology Report was prepared by Dr. Peter Allen for use in the stream bank stability evaluation. Figure 3 illustrates Bentle Branch s different stages of channel evolution. Bentle Branch is experiencing an accelerated evolutionary process due to increasing urbanization within the watershed. The Channel Stability Assessment part of this study categorizes erosion sites based on location within the 30-year potential erosion zone. The encroachment zone is calculated based on standard setbacks used for channels in Dallas County. From the rock line, a 3:1 setback is extended away from the stream. The amount of encroachment within this setback is recorded as (-) if the structure falls within the setback zone and (+) if the structure falls outside the setback zone. Another simple weighting technique is used to establish future priorities along the channel. Based on the erosion category mapped in the field, the lateral erosion rates are assumed. Using a design lifetime of 30 years, the encroachment is adjusted for erosion of the alluvial material in the channel during this time. Figure 4 shows how the limit of this zone was determined. 6

7 Hydraulic analyses were performed to obtain parameters indicative of erosion. The HEC-RAS hydraulic model of Bentle Branch and Tributaries developed by Halff Associates (2005) for this study was executed for the 1-, 10-, and 100-year flood events to represent small, bank-full (1-year), and larger, rarer (10- and 100-year) floods. Table 1 tabulates discharge, velocity, energy grade, and shear stress for the bankfull (approximate 1-year) flood event in the areas identified in the field with moderate to severe erosion. The results do show erosive velocities in these areas and maximum shear stresses in excess of 3 pounds per square foot. Table 1 Bentle Branch and Tributary 2 Slope Stability Parameters (1-yr Event) Q Total Energy Grade Velocity Shear Stress Location (cfs) (ft/ft) (ft/s) (lb/sq ft) Bentle Branch MS (Erosion Sites) Tributary Note: shear stress = ãrs f Figure 3: Bentle Branch Channel Evolution Model 7

8 Figure 4: Encroachment Zone Determination Erosion sites identified from field observations were ranked based on severity of erosion, likelihood of slope failure and potential for damages to public and private improvements. Severity of erosion was identified in the field as slight, moderate, and severe erosion. The geomorphology report includes a ranking of erosion sites based on the erosion potential and a field score. The field score is how far the structure lay within the encroachment zone. Furthermore the structures were broken down into three categories: houses, garage, sheds and fences. Halff Associates utilized these rankings to establish a prioritization of erosion sites. Priority was given to the structures based upon the channel s severity of erosion, slope failure likelihood, field score, and engineering judgment as to the structure s potential for failure. Repeated priority numbers indicate that severity of the erosion threat was indistinguishable between structures. Figure 5 shows an example of the field identified erosion sites and encroachment zones color coded by severity of erosion. 8

9 Figure 5: Field Identified Erosion Sites 9

10 RECOMMENDED STORMWATER MANAGEMENT PLAN Storm Water Management and Stream Stabilization Plans that address increased flood discharges due to urbanization and erosion concerns along Bentle Branch in Duncanville and Cedar Hill have been developed. In Cedar Hill, the Stormwater Management Plan and stream stability alternatives combine regional detention with stream bank stabilization. A regional stormwater detention facility is recommended in the upper basin of Bentle Branch in Cedar Hill. The basin as proposed significantly reduces flooding along Bentle Branch in Cedar Hill, stabilizes the flood risk in Duncanville even with future urbanization and reduces stream erosion in downstream reaches. The plan also proposes that the stream banks in areas where private property is susceptible to erosion be stabilized with appropriate measures that preserve Bentle Branch in a natural condition. Three erosion site locations were identified as needing stream bank stabilization. Existing channel erosion has placed several structures adjacent to the stream banks in danger at these sites. The three erosion sites are located on Bentle Branch and Tributary 2 along Cedar Hill Road, Nottingham Road, Joe Wilson Road, and Balfour Drive. Recommended Stream Bank stabilization alternatives are to construct retaining wall type structures using gabions, vegetated geogrid cells, vegetated geoweb cells, or stone faced retaining walls to prevent further erosion from occurring. The estimated cost of the Stormwater Management Plan and stream stability alternatives are shown on Table 2. Table 2 Cedar Hill Stormwater Management Recommended Plan and Stream Bank Stabilization Alternative Costs Alternative Cost Regional Stormwater Detention Facility $500,000 Site 1 (Bentle Branch Along Nottingham Dr. and Cedar Hill Rd.) Gabion Option $450,000 Site 1 (Bentle Branch Along Nottingham Dr. and Cedar Hill Rd.) - Geogrid/SGRW * Option $230,000 Site 1 (Bentle Branch Along Nottingham Dr. and Cedar Hill Rd.) Geoweb Option $340,000 Site 2 (Tributary 2 Along Balfour Drive) Gabion Option $430,000 Site 2 (Tributary 2 Along Balfour Drive) - Geogrid/SGRW * Option $290,000 Site 2 (Tributary 2 Along Balfour Drive) Geoweb Option $360,000 Site 3 ( Bentle Branch Along Cedar Hill Rd. and Joe Wilson Rd.) Gabion Option $300,000 Site 3 ( Bentle Branch Along Cedar Hill Rd. and Joe Wilson Rd.) Geogrid Option $100,000 Site 3 ( Bentle Branch Along Cedar Hill Rd. and Joe Wilson Rd.) Geoweb Option $240,000 *SGRW = Stone Gravity Retaining Wall Note: Recommended alternative shown in bold. In Duncanville, the Recommended Management Plan combines property buyout, regional stormwater detention, and stream bank stabilization. The Duncanville plan depends on the regional stormwater detention basin proposed at the upstream end of Bentle Branch in Cedar Hill to provide up to a 7% reduction in 100-year flood discharges through Duncanville. The plan includes stream bank stabilization in areas where private property improvements are threatened by erosion. The proposed stabilization measures should keep Bentle Branch in a 10

11 more natural condition. The purchase of residential properties at 303 and 307 W. Cedar Creek Dr. is also recommended to reduce the flood risk. However, the properties should be acquired by voluntary purchase, allowing residents to remain until they are ready to sell their property. Plan costs are summarized in Table 3. Table 3 Duncanville Recommended Stormwater Management and Streambank Stabilization Plan Costs Recommended Plan Component Cost Purchase 303 and 307 W. Cedar Creek Dr. $265,000 Streambank Stabilization Recommendations Site 1 - Geoweb Wall $380,000 Site 2 - Geoweb Wall $390,000 Site 3 - Geoweb Wall $350,000 Total (w/o Regional Stormwater Detention Facility cost) $1,385,000 Other recommendations include updating the City s flood damage prevention ordinance to reflect higher regulatory standards providing additional protection to lives and properties similar to other cities in the area. The ordinance should institute the no rise criteria where floodplain development must not cause any rise in the 100-year flood water surface elevation as a result of the floodplain encroachment. Valley storage requirements should also be included requiring that development within the floodplain preserve valley storage. Guidelines such as these are useful in reducing the impact of urbanization on flooding. Both Cities should also consider adopting parts of iswm in their Stormwater Management program. It may be helpful to form a Technical Review Committee to consider iswm components and local criteria to be included. This is the approach currently being pursued by the city of Fort Worth. It may also be helpful to jointly pursue aspects of iswm with neighboring cities such as Desoto, especially in the area of soliciting input from the development community. To be most effective, the adoption of iswm should be accompanied by the development of stormwater master plans on a watershed basis in conjunction with adjoining communities if possible. These studies also identified several private bridge crossings inundated by the 10- and 100-year storms that are categorized as exhibiting a high risk of danger to vehicles and pedestrians. Because these structures are privately owned, this study does not recommend that the City replace these structures. However, the City should mandate certain flood hazard guidelines be adhered to if replaced in the future by the property owner. Replacement structures should be designed so as to not cause increased flooding on neighboring property Existing structures as well as replacement structures should be made safer by installing guardrails and flood gages with easy to read flood depth markings. Also replacement 11

12 structures should be designed to some level of flood protection, such as the 10-year flood event. CONCLUSIONS A comprehensive Storm Water Management and Stream Stability Study was conducted for the Bentle Branch Watershed in the Cities of Duncanville and Cedar Hill. As a result, several important points and accomplishments were made: Existing Site Stormwater Detention Basins were found to be of limited effectiveness in reducing downstream flood discharges in this watershed. Basin-wide Stormwater Management Master Plans were developed that received citizen and council support as far as flood reduction is concerned. The principal component of the Stormwater Management Master Plan, a Regional Stormwater Detention Basin, was proven effective at achieving both flood damage reduction and stream stability goals. Specific Stream Bank Stability problems were identified and appropriate corrective measures, including soil biotechnical methods, were recommended. 12

13 BIBLIOGRAPHY Annandale, G.W., (1995) Erodibility. Journal of Hydraulic Research. Volume 33, No. 4, Allen, P.M., Arnold, J.G., Skipwith, W. (2002) Erodibility of Urban Bedrock and Alluvial Channels, North, Texas. Journal American Water Resources Association, Vol. 38, No. 5. pp Allen, P.M. (1975) Urban Geology of an Interstate Growth Corridor from Hillsboro to Dallas County, Texas. Baylor Geological Studies Bulletin No. 28., 36p. Coffee, D.R., Hill, R.H., and Ressel, D.D.(1980) Soil Survey of Dallas County. USDA, SCS., US Gov. Printing Office,153p. Dallas Geological Society (1965) Geology of Dallas County, DGS. Dallas, Tx., 211pp. Federal Emergency Management Agency, Flood Insurance Study, Dallas County, Texas and Incorporated Areas, Revised August 4, 2004, 8 Volumes. Fischenich, C. (2001) Stability Thresholds for Stream Restoration Materials. USAE Research and Development Center, ERDC TN-EMRRP-SR-29. Halff, Albert H., Associates, Inc. Hydrology and Hydraulics of Floodplain Studies. Prepared for the City of Dallas. Dallas, Texas: Albert H. Halff Associates, Inc., January, Halff, Albert H., Associates, Inc. A Flood Control Feasibility Study of Tenmile Creek and Tributaries. Prepared for the City of Duncanville. Duncaville, Texas: Albert H. Halff Associates, Inc., January, Shakoor, A., and Rodgers, J.P. (1992) Predicting the rate of Shale Undercutting Along Highway Cuts. Association of Engineering Geologists, Vol. 29, No. 1. United States Geological Survey, Atlas of Depth-Duration Frequency of Precipitation Annual Maxima for Texas, Scientific Investigations Report Prepared for Texas Department of Transportation. 13

1.7.0 Floodplain Modification Criteria

1.7.0 Floodplain Modification Criteria 1.7.0 Floodplain Modification Criteria 1.7.1 Introduction These guidelines set out standards for evaluating and processing proposed modifications of the 100- year floodplain with the following objectives:

More information

CITY UTILITIES DESIGN STANDARDS MANUAL

CITY UTILITIES DESIGN STANDARDS MANUAL CITY UTILITIES DESIGN STANDARDS MANUAL Book 2 (SW) SW9 June 2015 SW9.01 Purpose This Chapter provides information for the design of open channels for the conveyance of stormwater in the City of Fort Wayne.

More information

URBAN DRAINAGE CRITERIA

URBAN DRAINAGE CRITERIA URBAN DRAINAGE CRITERIA I. Introduction This division contains guidelines for drainage system design and establishes a policy for recognized and established engineering design of storm drain facilities

More information

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department Land Disturbance, Erosion Control and Stormwater Management Checklist Walworth County Land Conservation Department The following checklist is designed to assist the applicant in complying with the Walworth

More information

Flood Protection in Garland Past, Present, and Future. Presented by: R. Lyle Jenkins, P.E., CFM City of Garland, Texas

Flood Protection in Garland Past, Present, and Future. Presented by: R. Lyle Jenkins, P.E., CFM City of Garland, Texas Flood Protection in Garland Past, Present, and Future Presented by: R. Lyle Jenkins, P.E., CFM City of Garland, Texas A few facts about Garland: Originally incorporated in 1891 Population 226,876 (2010

More information

5.14 Floodplains and Drainage/Hydrology

5.14 Floodplains and Drainage/Hydrology I-70 East Final EIS 5.14 Floodplains and Drainage/Hydrology 5.14 Floodplains and Drainage/Hydrology This section discusses floodplain and drainage/hydrology resources and explains why they are important

More information

City of Austin Stream Restoration Program Mid-Atlantic Stream Restoration Conference, Rocky Gap, MD November 2011

City of Austin Stream Restoration Program Mid-Atlantic Stream Restoration Conference, Rocky Gap, MD November 2011 Welcome City of Austin Stream Restoration Program Mid-Atlantic Stream Restoration Conference, Rocky Gap, MD November 2011 Morgan Byars, P.E. City of Austin Watershed Protection Department Environmental

More information

ROSE CREEK WATERSHED HYDROLOGIC, HYDRAULIC, SEDIMENT TRANSPORT, AND GEOMORPHIC ANALYSES TASK 1 EXISTING DATA AND INFORMATION SUMMARY REPORT BACKGROUND

ROSE CREEK WATERSHED HYDROLOGIC, HYDRAULIC, SEDIMENT TRANSPORT, AND GEOMORPHIC ANALYSES TASK 1 EXISTING DATA AND INFORMATION SUMMARY REPORT BACKGROUND ROSE CREEK WATERSHED HYDROLOGIC, HYDRAULIC, SEDIMENT TRANSPORT, AND GEOMORPHIC ANALYSES TASK 1 EXISTING DATA AND INFORMATION SUMMARY REPORT BACKGROUND The Rose Creek Watershed (RCW) consists of three planning

More information

Lower Raritan Watershed Management Area Stormwater & Flooding Subcommittee Strategy Worksheet LRSW-S3C1

Lower Raritan Watershed Management Area Stormwater & Flooding Subcommittee Strategy Worksheet LRSW-S3C1 Strategy Name: Reduce Existing Potential for Flood Damages LRSW-S3C1. Develop and implement a program to: Minimize flood damages through the use of structural measures. Minimize flood damages through the

More information

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE 1008 STORM DRAINAGE (3/24/05) 1008.01 PURPOSE To minimize the amount of stormwater runoff resulting from development utilizing nonstructural controls where possible, maintain and improve water quality,

More information

FLOOD PROTECTION BENEFITS

FLOOD PROTECTION BENEFITS IV. (340 points) Flood Protection Benefits A. Existing and potential urban development in the floodplain (50) 1. Describe the existing and potential urban development at the site and the nature of the

More information

Frequently-Asked Questions about Floodplains and Flood Insurance FLOOD INSURANCE

Frequently-Asked Questions about Floodplains and Flood Insurance FLOOD INSURANCE Frequently-Asked Questions about Floodplains and Flood Insurance What is a floodplain? The floodplain is any area covered by water during normal water flows, and which could be inundated as a result of

More information

Prattsville Berm Removal Project. 1.0 Project Location

Prattsville Berm Removal Project. 1.0 Project Location Prattsville Berm Removal Project 1.0 Project Location The project site is located between the New York State Route 23 Bridge over the Schoharie Creek and the Schoharie Reservoir. The restoration plan encompassed

More information

GLOSSARY OF TERMS CHAPTER 11 WORD DEFINITION SOURCE. Leopold

GLOSSARY OF TERMS CHAPTER 11 WORD DEFINITION SOURCE. Leopold CHAPTER 11 GLOSSARY OF TERMS Active Channel The channel that contains the discharge Leopold where channel maintenance is most effective, sediment are actively transported and deposited, and that are capable

More information

DRAFT SOUTH FORK SKYKOMISH RIVER

DRAFT SOUTH FORK SKYKOMISH RIVER DRAFT SOUTH FORK SKYKOMISH RIVER 9 levees and revetments / Approximately 1.1 miles of river bank are armored Revetments provide limited, localized erosion protection, but impact habitat Frequent and costly

More information

The Basics of Chapter 105 Waterways and Wetlands Permitting in PA

The Basics of Chapter 105 Waterways and Wetlands Permitting in PA The Basics of Chapter 105 Waterways and Wetlands Permitting in PA April 17, 2013 Goal To develop a basic understanding of PA Department of Environmental Protection (DEP) and US Army Corps of Engineers

More information

Catchment Scale Processes and River Restoration. Dr Jenny Mant Jenny@therrc.co.uk. The River Restoration Centre therrc.co.uk

Catchment Scale Processes and River Restoration. Dr Jenny Mant Jenny@therrc.co.uk. The River Restoration Centre therrc.co.uk Catchment Scale Processes and River Restoration Dr Jenny Mant Jenny@therrc.co.uk The River Restoration Centre therrc.co.uk 3 Main Catchment Elements Hydrology Energy associated with the flow of water affects

More information

7.0 Stream Restoration

7.0 Stream Restoration 7.0 Stream Restoration 7.1 Issue Statements One of the primary concerns of residents in the Bassett Creek watershed is the maintenance of the natural beauty of the creek in residential and recreational

More information

Project Manager. Geoff Masotti, P.Eng. T. 905.940.6161 Ext. 254 T. 905.940.6161 416.987.6161

Project Manager. Geoff Masotti, P.Eng. T. 905.940.6161 Ext. 254 T. 905.940.6161 416.987.6161 Rainbow Creek Master Plan Update Study The City of Vaughan june 2014 COLE ENGINEERING GROUP LTD. 70 Valleywood Drive Project Manager. Geoff Masotti, P.Eng. Markham, ON CANADA L3R 4T5 T. 905.940.6161 Ext.

More information

3.4 DRAINAGE PLAN. 3.4.1 Characteristics of Existing Drainages. 3.4.2 Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN

3.4 DRAINAGE PLAN. 3.4.1 Characteristics of Existing Drainages. 3.4.2 Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN 3.4 DRAINAGE PLAN This section describes the existing onsite drainage characteristics and improvements proposed within this Specific Plan. Following this description, drainage plan development standards

More information

Mission Creek Flood Control & Restoration Project. City of Fremont, Alameda County

Mission Creek Flood Control & Restoration Project. City of Fremont, Alameda County Mission Creek Flood Control & Restoration Project City of Fremont, Alameda County Agenda Background Why are proposed improvements necessary? Proposed project components Challenges Construction schedule/phasing

More information

Swannanoa River Flood Risk Management Study

Swannanoa River Flood Risk Management Study Swannanoa River Flood Risk Management Study Measures Evaluated to Reduce Future Flood Damages City of Asheville U.S. Army Corps of Engineers Flooding History Part of the 132 square mile Swannanoa River

More information

CHAPTER 3 STORM DRAINAGE SYSTEMS

CHAPTER 3 STORM DRAINAGE SYSTEMS CHAPTER 3 STORM DRAINAGE SYSTEMS 3.7 Storm Drains 3.7.1 Introduction After the tentative locations of inlets, drain pipes, and outfalls with tail-waters have been determined and the inlets sized, the next

More information

BLACK/HARMONY/FAREWELL CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT

BLACK/HARMONY/FAREWELL CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT Harmony Creek subwatershed Harmony Creek subwatershed BLACK/HARMONY/FAREWELL CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT April 2011 TABLE OF CONTENTS 1.0 INTRODUCTION...

More information

DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES. Run-off Analysis Methods

DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES. Run-off Analysis Methods DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES Run-off Analysis Methods This document sets forth the minimum design, technical criteria and specifications for the

More information

Outlet stabilization structure

Outlet stabilization structure Overview of Sedimentation and Erosion Control Practices Practice no. 6.41 Outlet stabilization structure Erosion at the outlet of channels, culverts, and other structures is common, and can cause structural

More information

County Watersheds. Total Project Cost - $11.1 M. Project Description. Funding Sources. Project Milestones. Service Impact

County Watersheds. Total Project Cost - $11.1 M. Project Description. Funding Sources. Project Milestones. Service Impact County Watersheds Total Project Cost - $11.1 M Project Description These funds are for watershed capital projects throughout the County. Projects can include stream restoration, best management practices

More information

Pervious Pavers. By: Rich Lahren. Hebron Brick & Block Supply

Pervious Pavers. By: Rich Lahren. Hebron Brick & Block Supply Pervious Pavers By: Rich Lahren Hebron Brick & Block Supply Stormwater Management and Control Issues Past emphasis was on flood control Today s emphasis is also on pollution More impermeable areas are

More information

Flood Plain Reclamation to Enhance Resiliency Conserving Land in Urban New Jersey

Flood Plain Reclamation to Enhance Resiliency Conserving Land in Urban New Jersey Flood Plain Reclamation to Enhance Resiliency Conserving Land in Urban New Jersey Rutgers Cooperative Extension Water Resources Program Christopher C. Obropta, Ph.D., P.E. Email: obropta@envsci.rutgers.edu

More information

Shooks Run Drainage Study Basic Terminology

Shooks Run Drainage Study Basic Terminology Shooks Run Drainage Study Basic Terminology PREPARED FOR: PREPARED BY: City of Colorado Springs CH2M DATE: April 9, 2015 Introduction This document is intended to provide an introduction to Colorado Springs

More information

UNION COUNTY, FLORIDA AND INCORPORATED AREAS

UNION COUNTY, FLORIDA AND INCORPORATED AREAS UNION COUNTY, FLORIDA AND INCORPORATED AREAS COMMUNITY NAME COMMUNITY NUMBER LAKE BUTLER, CITY OF 120595 RAIFORD, TOWN OF 120593 UNION COUNTY 120422 (UNINCORPORATED AREAS) WORTHINGTON SPRINGS, CITY OF

More information

Architectural Processing and Inspections for Home Mortgage Insurance

Architectural Processing and Inspections for Home Mortgage Insurance Page 1 of 5 [Text Only] Architectural Processing and Inspections for Home Mortgage Insurance Directive Number: 4145.1 SITE GRADING AND DRAINAGE GUIDELINES Construction complaints and structural defect

More information

STORMWATER MANAGEMENT CHECKLIST

STORMWATER MANAGEMENT CHECKLIST STORMWATER MANAGEMENT CHECKLIST *This checklist must be completed and part of the Land Disturbing Permit submittal for review if the acreage disturbed is one (1) acre or more: I. SUPPORTING DATA Narrative

More information

Fort Dodge Stormwater Master Planning. Prepared By: Ralph C. Stark, Jr., P.E., C.F.M. Joel N. Krause, P.E., C.F.M.

Fort Dodge Stormwater Master Planning. Prepared By: Ralph C. Stark, Jr., P.E., C.F.M. Joel N. Krause, P.E., C.F.M. Fort Dodge Stormwater Master Planning Prepared By: Ralph C. Stark, Jr., P.E., C.F.M. Joel N. Krause, P.E., C.F.M. Project Location Project Background Flooding History Localized flooding and storm sewer

More information

Riprap-lined Swale (RS)

Riprap-lined Swale (RS) Riprap-lined Swale (RS) Practice Description A riprap-lined swale is a natural or constructed channel with an erosion-resistant rock lining designed to carry concentrated runoff to a stable outlet. This

More information

Travel Time. Computation of travel time and time of concentration. Factors affecting time of concentration. Surface roughness

Travel Time. Computation of travel time and time of concentration. Factors affecting time of concentration. Surface roughness 3 Chapter 3 of Concentration and Travel Time Time of Concentration and Travel Time Travel time ( T t ) is the time it takes water to travel from one location to another in a watershed. T t is a component

More information

1800 Washington Boulevard, Baltimore, MD 21230-1718 www.mde.maryland.gov 410-537-3000 800-633-6101 TTY Users 800-735-2258 Larry Hogan, Governor Boyd

1800 Washington Boulevard, Baltimore, MD 21230-1718 www.mde.maryland.gov 410-537-3000 800-633-6101 TTY Users 800-735-2258 Larry Hogan, Governor Boyd ENVIRONMENTAL SITE DESIGN (ESD) REDEVELOPMENT EXAMPLES OCTOBER 2010 1800 Washington Boulevard, Baltimore, MD 21230-1718 www.mde.maryland.gov 410-537-3000 800-633-6101 TTY Users 800-735-2258 Larry Hogan,

More information

Flood Damage Prevention in Delaware County, NY

Flood Damage Prevention in Delaware County, NY Flood Damage Prevention in Delaware County, NY Susquehanna Basin 2 Villages, 8 Hamlets Schoharie Basin 1 Hamlet Cannonsville Basin 4 Villages, 6 Hamlets Pepacton Basin 2 Villages, 6 Hamlets Upper Delaware

More information

Salt Lake County June 2010 Flooding and Restoration

Salt Lake County June 2010 Flooding and Restoration Salt Lake County June 2010 Flooding and Restoration Little Cottonwood (LCC) and Big Cottonwood (BCC) Kade Moncur, PE, CFM Salt Lake County Engineering August 10 th - 12 th SLCo Symposium 2011 August 10

More information

Lansdowne Stormwater UPDATE

Lansdowne Stormwater UPDATE Lansdowne Stormwater UPDATE August 22, 2012 Ann Arbor Footing Drain Disconnection Stormwater Review Presentation Agenda Welcome and introductions Background on stormwater and sanitary sewer issues Footing

More information

ECONOMIC ANALYSIS FLOOD DAMAGE REDUCTION. Lower Carmel River Floodplain Restoration and Enhancement Project

ECONOMIC ANALYSIS FLOOD DAMAGE REDUCTION. Lower Carmel River Floodplain Restoration and Enhancement Project ECONOMIC ANALYSIS FLOOD DAMAGE REDUCTION Lower Carmel River Floodplain Restoration and Enhancement Project I. Description of the Project and its Relationship to Other Projects in the Proposal The Lower

More information

How To Amend A Stormwater Ordinance

How To Amend A Stormwater Ordinance Regulatory Alternatives to Address Stormwater Management and Flooding in the Marlboro Street Study Area Alternative 1: Amend Existing Local Regulations This proposed alternative provides an incremental

More information

Chapter 3 SENSITIVE AREAS AND VEGETATED CORRIDORS

Chapter 3 SENSITIVE AREAS AND VEGETATED CORRIDORS Chapter 3 3.01 General Provisions 3.01.1 Introduction 3.01.2 Application and Interpretation of Chapter 3.01.3 Unbuildable Lots 3.01.4 Other Permits 3.01.5 Prohibited Activities 3.02 Service Provider Letter

More information

King County Flood Hazard Management Plan Update Cedar/ Sammamish Rivers. Public Meeting December 5, 2012

King County Flood Hazard Management Plan Update Cedar/ Sammamish Rivers. Public Meeting December 5, 2012 King County Flood Hazard Management Plan Update Cedar/ Sammamish Rivers Public Meeting December 5, 2012 Goals of the Presentation Cedar and Sammamish R. Plan Update Context - Brief summary info about the

More information

Innovative Approaches in Flood Damage Reduction

Innovative Approaches in Flood Damage Reduction Innovative Approaches in Flood Damage Reduction Solutions for the Stormwater Management High Level Results 3D geospatial model of storm water management pond (GRCA, 2013) Enhanced understanding of storm

More information

CHICKASAW COUNTY, MISSISSIPPI, AND INCORPORATED AREAS

CHICKASAW COUNTY, MISSISSIPPI, AND INCORPORATED AREAS CHICKASAW COUNTY, MISSISSIPPI, AND INCORPORATED AREAS Chickasaw County Community Name Community Number CHICKASAW COUNTY 280269 (UNINCORPORATED AREAS) HOUSTON, CITY OF 280030 NEW HOULKA, TOWN OF 280067

More information

Tookany Creek Flood Damage Reduction Feasibility Study Section 205 Continuing Authorities Program

Tookany Creek Flood Damage Reduction Feasibility Study Section 205 Continuing Authorities Program Tookany Creek Flood Damage Reduction Feasibility Study Section 205 Continuing Authorities Program Field Inspection Notes 27 29 September 2012 Introduction The U.S. Army Corps of Engineers (Corps), in

More information

HCP Team Meeting. November 18, 2015. icfi.com

HCP Team Meeting. November 18, 2015. icfi.com HCP Team Meeting November 18, 2015 icfi.com 1 Welcome and Introductions Where are we in the HCP process Hydrology modeling update Native fish survey Fish translocation Finalize covered activities Next

More information

Floodplain Connectivity in Restoration Design

Floodplain Connectivity in Restoration Design Floodplain Connectivity in Restoration Design 2015 Symposium on Restoration in a Contaminated Environment: Lessons Learned and Challenges in Moving Forward Part II April 2015 Karin Boyd Applied Geomorphology,

More information

Adopted 9/23/98 CHATTAHOOCHEE CORRIDOR PLAN. The goals of the Chattahoochee Corridor Plan (hereinafter also referred to as the Plan ) are:

Adopted 9/23/98 CHATTAHOOCHEE CORRIDOR PLAN. The goals of the Chattahoochee Corridor Plan (hereinafter also referred to as the Plan ) are: CHATTAHOOCHEE CORRIDOR PLAN Adopted 9/23/98 PART 1: GOALS. POLICY. COVERAGE. A. Goals The goals of the Chattahoochee Corridor Plan (hereinafter also referred to as the Plan ) are: 1. Preservation and protection

More information

Drainage Analysis for the McKownville Area

Drainage Analysis for the McKownville Area Drainage Analysis for the McKownville Area Town of Guilderland Albany County, New York Prepared by: DELAWARE ENGINEERING, P.C. 28 Madison Avenue Extension Albany, New York 12203 June 2010 Town of Guilderland

More information

Carlton Fields Memorandum

Carlton Fields Memorandum Carlton Fields Memorandum TO: FROM: RE: DAN WEEDE FRED RUSHING RIPARIAN BUFFER DATE: JULY 26, 2013 BACKGROUND Both the state of Georgia and the city of Atlanta 1 have certain guidelines that must be followed

More information

4. Environmental Impacts Assessment and Remediation Targets

4. Environmental Impacts Assessment and Remediation Targets 4. Environmental Impacts Assessment and Remediation Targets 4.1 Environmental Impacts Significant additional development in the Alder Creek watershed is not anticipated at this time; however, there are

More information

LYNDE CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT

LYNDE CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT Whitby CLOCA Whitby CLOCA LYNDE CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT June 2008 TABLE OF CONTENTS 1.0 INTRODUCTION... 3 2.0 STUDY AREA AND SCOPE... 4 3.0 METHODOLOGY...

More information

Flood Hazard Area Technical Manual Section 8 Bank Stabilization and Stream Restoration

Flood Hazard Area Technical Manual Section 8 Bank Stabilization and Stream Restoration Flood Hazard Area Technical Manual Section 8 Bank Stabilization and Stream Restoration Prepared by: New Jersey Section American Water Resources Association Stream Restoration Committee FHA Subcommittee

More information

5.0 OVERVIEW OF FLOOD DAMAGE REDUCTION MEASURES

5.0 OVERVIEW OF FLOOD DAMAGE REDUCTION MEASURES 5.0 OVERVIEW OF FLOOD DAMAGE REDUCTION MEASURES Flood damage reduction consists of two basic techniques structural and non-structural. Structural methods modify the flood and take the flood away from people

More information

San Diego Integrated Regional Water Management Implementation Grant Proposal Economic Analysis Flood Damage Reduction Costs and Benefits

San Diego Integrated Regional Water Management Implementation Grant Proposal Economic Analysis Flood Damage Reduction Costs and Benefits Attachment 9 San Diego Integrated Regional Water Management Economic Analysis Flood Damage Reduction Costs and Benefits Attachment 9 consists of the following items: Flood Damage Reduction Costs and Benefits.

More information

TENNESSEE GAS PIPELINE COMPANY, L.L.C.

TENNESSEE GAS PIPELINE COMPANY, L.L.C. TENNESSEE GAS PIPELINE COMPANY, L.L.C. HYDROLOGIC & HYDRAULIC CALCULATIONS FOR WATERBODIES CROSSED BY CONNECTICUT PIPELINE EXPANSION PROJECT CONNECTICUT LOOP Submitted by: Tennessee Gas Pipeline Company,

More information

Development of Technical Data For Long Term Flood Solutions For the Red River Basin

Development of Technical Data For Long Term Flood Solutions For the Red River Basin IDENTIFYING WHAT WE DIDN T KNOW Development of Technical Data For Long Term Flood Solutions For the Red River Basin LTFS Study Area U.S. Portion of Red River Basin (MN, ND & SD) Main Stem Red River Tributaries

More information

Environmental Case Study Decatur, Georgia, DeKalb County A Suburban Creek Resists Channelization

Environmental Case Study Decatur, Georgia, DeKalb County A Suburban Creek Resists Channelization Introduction A visual examination of Doolittle Creek in a highly developed suburban county in Georgia yielded telltale signs of a creek whose original streambed had been altered. Examination of official

More information

Homeowner s Guide to Drainage

Homeowner s Guide to Drainage Homeowner s Guide to Drainage a scottsdale homeowner s guide to drainage produced by the city of scottsdale s stormwater management division Transportation Department TABLE OF CONTENTS Introduction 2 Drainage

More information

EFFECTS OF ARUNDO DONAX ON RIVER HYDRAULICS, SEDIMENT TRANSPORT, AND GEOMORPHOLOGY, SANTA MARGARITA RIVER, CALIFORNIA

EFFECTS OF ARUNDO DONAX ON RIVER HYDRAULICS, SEDIMENT TRANSPORT, AND GEOMORPHOLOGY, SANTA MARGARITA RIVER, CALIFORNIA EFFECTS OF ARUNDO DONAX ON RIVER HYDRAULICS, SEDIMENT TRANSPORT, AND GEOMORPHOLOGY, SANTA MARGARITA RIVER, CALIFORNIA René Leclerc Geomorphologist Robert C. MacArthur, Ph.D., P.E. Principal Headwaters

More information

3. Design Procedures. Design Procedures. Introduction

3. Design Procedures. Design Procedures. Introduction Design Procedures 3. Design Procedures Introduction This chapter presents a procedure for the design of natural channels. The chapter primarily focuses on those physical properties of the channel required

More information

Lisgar District Basement Water Infiltration Investigation Answers to Residents Written Questions Received by Councillors Ward 10 Office

Lisgar District Basement Water Infiltration Investigation Answers to Residents Written Questions Received by Councillors Ward 10 Office Lisgar District Basement Water Infiltration Investigation Part A Answers to Technical Questions 1. There has been a tremendous amount of work done everywhere along the creek. If there was nothing wrong

More information

DELAWARE COUNTY STREAM CORRIDOR MANAGEMENT PROGRAM TWO-YEAR ACTION PLAN FOR THE WEST BRANCH DELAWARE RIVER CANNONSVILLE RESERVOIR BASIN

DELAWARE COUNTY STREAM CORRIDOR MANAGEMENT PROGRAM TWO-YEAR ACTION PLAN FOR THE WEST BRANCH DELAWARE RIVER CANNONSVILLE RESERVOIR BASIN DELAWARE COUNTY STREAM CORRIDOR MANAGEMENT PROGRAM TWO-YEAR ACTION PLAN FOR THE WEST BRANCH DELAWARE RIVER CANNONSVILLE RESERVOIR BASIN May 2011 - April 2013 1. Introduction 2. Recommendations Table of

More information

IMPROVING SOUTH FORK PEACHTREE CREEK WATERSHED USING THE TRIPLE BOTTOM LINE DEKALB COUNTY, GEORGIA

IMPROVING SOUTH FORK PEACHTREE CREEK WATERSHED USING THE TRIPLE BOTTOM LINE DEKALB COUNTY, GEORGIA IMPROVING SOUTH FORK PEACHTREE CREEK WATERSHED USING THE TRIPLE BOTTOM LINE DEKALB COUNTY, GEORGIA David Chastant AUTHORS:DeKalb County, 330 West Ponce De Leon Ave, Decatur, Georgia 30030 REFERENCE:Proceedings

More information

What We Do: Wetlands, Wildlife Habitat & Flood Hazards in the Root River Watershed

What We Do: Wetlands, Wildlife Habitat & Flood Hazards in the Root River Watershed What We Do: Wetlands, Wildlife Habitat & Flood Hazards in the Root River Watershed presented by Ceil Strauss, State Floodplain Manager DNR Ecological & Water Resources 1 EWR Roles In Floodplains Regulatory:

More information

GRAND COUNTY STORM DRAINAGE DESIGN AND TECHNICAL CRITERIA MANUAL. OFFICIALLY ADOPTED: August 1 st, 2006

GRAND COUNTY STORM DRAINAGE DESIGN AND TECHNICAL CRITERIA MANUAL. OFFICIALLY ADOPTED: August 1 st, 2006 GRAND COUNTY STORM DRAINAGE DESIGN AND TECHNICAL CRITERIA MANUAL OFFICIALLY ADOPTED: August 1 st, 2006 TABLE OF CONTENTS CHAPTER TITLE PAGE 1 GENERAL PROVISIONS 1.1 Short Title.. 1 1.2 Jurisdiction 1 1.3

More information

HYDROLOGIC/HYDRAULIC MODELING OF WESTMINSTER WATERSHED ORANGE COUNTY, CALIFORNIA

HYDROLOGIC/HYDRAULIC MODELING OF WESTMINSTER WATERSHED ORANGE COUNTY, CALIFORNIA HYDROLOGIC/HYDRAULIC MODELING OF WESTMINSTER WATERSHED ORANGE COUNTY, CALIFORNIA James Chieh, Ph.D., P.E., Senior Hydraulic Engineer, USACE, Los Angeles, California, Shih.H.Chieh@usace.army.mil; Jay Pak,

More information

Updates on Pervious Pavement Design and Construction. Jason T. Peterein, P.E. June 19, 2012

Updates on Pervious Pavement Design and Construction. Jason T. Peterein, P.E. June 19, 2012 Updates on Pervious Pavement Design and Construction Jason T. Peterein, P.E. June 19, 2012 Program Outline Pervious Pavement Basics Pervious Pavement Construction Maintenance MSD Regulations Update Permeable

More information

2. BENEFIT:COST ECONOMIC ANALYSIS

2. BENEFIT:COST ECONOMIC ANALYSIS 2. BENEFIT:COST ECONOMIC ANALYSIS 2.1 Riverine and Coastal A-Zone Flood Model Overview The Riverine and Coastal A-Zone Flood model (RCAZF) (Version 1.0, January 1995), a spreadsheetbased model developed

More information

General Permit for Activities Promoting Waterway - Floodplain Connectivity [working title]

General Permit for Activities Promoting Waterway - Floodplain Connectivity [working title] General Permit for Activities Promoting Waterway - Floodplain Connectivity [working title] Purpose These rules set forth the conditions under which a person may, without an individual removal-fill permit

More information

Green Spaces to Improve Waterways and Communities

Green Spaces to Improve Waterways and Communities Green Spaces to Improve Waterways and Communities Thomas M. Evans, ASLA LEED AP Green Infrastructure Design Services Director Cleveland, Ohio Northern Michigan Green Infrastructure Conference June 4, 2015

More information

Estimating Potential Reduction Flood Benefits of Restored Wetlands

Estimating Potential Reduction Flood Benefits of Restored Wetlands Estimating Potential Reduction Flood Benefits of Restored Wetlands Kenneth W. Potter University of Wisconsin Introduction Throughout the summer of 1993 a recurring question was the impact of wetland drainage

More information

Vermont Economic Resiliency Initiative (VERI) Community Forum Barre City & Barre Town

Vermont Economic Resiliency Initiative (VERI) Community Forum Barre City & Barre Town Vermont Economic Resiliency Initiative (VERI) Community Forum Barre City & Barre Town MEETING NOTES April 16, 2015 6:00 8:00 PM VERI Project Overview With funding from the US Economic Development Administration

More information

Sample DEQ Plan Submitter s Checklist for Stormwater Management Plans

Sample DEQ Plan Submitter s Checklist for Stormwater Management Plans APPENDIX IV Version: February 2, 2015 Sample DEQ Plan Submitter s Checklist for Stormwater Management Plans Please fill in all blanks and please reference the plan sheets/pages where the information may

More information

California Alluvial Fan Task Force

California Alluvial Fan Task Force California Alluvial Fan Task Force County of San Diego Alluvial Fan Flooding and Risk Reduction Sara Agahi, PE, CFM January 4, 2008 Outline of Presentation Show location of San Diego County Alluvial Fan

More information

Rational Method Hydrologic Calculations with Excel. Rational Method Hydrologic Calculations with Excel, Course #508. Presented by:

Rational Method Hydrologic Calculations with Excel. Rational Method Hydrologic Calculations with Excel, Course #508. Presented by: Rational Method Hydrologic Calculations with Excel, Course #508 Presented by: PDH Enterprises, LLC PO Box 942 Morrisville, NC 27560 www.pdhsite.com Calculation of peak storm water runoff rate from a drainage

More information

4.2 Buena Vista Creek Watershed

4.2 Buena Vista Creek Watershed Buena Vista Creek Watershed 4.2 Buena Vista Creek Watershed Watershed Overview The Buena Vista Creek Watershed is the fourth-largest system within the Carlsbad Hydrologic Unit. The watershed extends approximately

More information

Chehalis River Basin Flood Damage Reduction 2013-2015 Capital Budget Approved by Legislature in June 2013

Chehalis River Basin Flood Damage Reduction 2013-2015 Capital Budget Approved by Legislature in June 2013 Chehalis River Basin Flood Damage Reduction 2013-2015 Capital Budget Approved by Legislature in June 2013 1. Design alternatives for large capital flood projects (basinlevel water retention and Interstate

More information

STORM DRAINS CHAPTER 7

STORM DRAINS CHAPTER 7 CHAPTER 7 Chapter 7 - Storm Drains A storm drain is a drainage system that conveys water or stormwater, consisting of two or more pipes in a series connected by one or more structures. Storm drains collect

More information

Sustainable Road Drainage Asset Management Strategy and Financial Requirements

Sustainable Road Drainage Asset Management Strategy and Financial Requirements Sustainable Road Drainage Asset Management Strategy and Financial Requirements Liane Welch, P.E., Director, Tillamook County Public Works Patricia Bugas-Schramm, PBS Consulting Jeff Roorda, P.E., JRA TRB

More information

Standard Operating Procedures for Flood Preparation and Response

Standard Operating Procedures for Flood Preparation and Response Standard Operating Procedures for Flood Preparation and Response General Discussion Hurricanes, tropical storms and intense thunderstorms support a conclusion that more severe flooding conditions than

More information

Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile

Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile Chapter 3 CULVERTS Description A culvert is a closed conduit used to convey water from one area to another, usually from one side of a road to the other side. Importance to Maintenance & Water Quality

More information

Coldwater Heritage Partnership Implementation Grant Final Report Morrison Run Watershed Restoration Project Western Pennsylvania Conservancy Project Summary The goal of the Morrison Run Watershed Restoration

More information

Challenges. Estimated Damages from 100-Year Flood

Challenges. Estimated Damages from 100-Year Flood Suffield Suffield is a rural community located along the Massachusetts border. It encompasses about 42.2 square miles and has a population of about 15,735. Suffield s terrain rises from an elevation of

More information

Flash Flood Science. Chapter 2. What Is in This Chapter? Flash Flood Processes

Flash Flood Science. Chapter 2. What Is in This Chapter? Flash Flood Processes Chapter 2 Flash Flood Science A flash flood is generally defined as a rapid onset flood of short duration with a relatively high peak discharge (World Meteorological Organization). The American Meteorological

More information

Appendix A. Lists of Accomplishments and Project Costs. UMRWD 10 Year Plan Update. Appendix A UPPER MINNESOTA RIVER WATERSHED DISTRICT

Appendix A. Lists of Accomplishments and Project Costs. UMRWD 10 Year Plan Update. Appendix A UPPER MINNESOTA RIVER WATERSHED DISTRICT UPPER MINNESOTA RIVER WATERSHED DISTRICT Lists of Accomplishments and Project Costs 10 Year Plan Update UMRWD 10 Year Plan Update Page A 1 UMRWD LIST OF ACCOMPLISHMENTS Since its inception in 1967, the

More information

Multi-Jurisdictional Hazard Mitigation Plan

Multi-Jurisdictional Hazard Mitigation Plan Flooding General Flooding is the leading cause of death among all types of natural disasters throughout the United States, with its ability to roll boulders the size of cars, tear out trees, and destroy

More information

CHAPTER 9 STORM DRAINAGE DESIGN AND STORMWATER QUALITY REGULATIONS

CHAPTER 9 STORM DRAINAGE DESIGN AND STORMWATER QUALITY REGULATIONS June 27, 2011 Chapter 9 Storm Drainage Design and Stormwater Quality Regulations Table of Contents CHAPTER 9 STORM DRAINAGE DESIGN AND STORMWATER QUALITY REGULATIONS Table of Contents Chapter 9 Storm Drainage

More information

Building Olive s Flood Resiliency

Building Olive s Flood Resiliency Building Olive s Flood Resiliency Informed Flood Mitigation Planning The Local Flood Analysis Flood Advisory Committee Meeting #1 Town of Olive s Community Room 4/14/15 What is an LFA? 1. Uses science

More information

HERE COMES THE RAIN AGAIN Stormwater Management in a Changing Climate at the City of Toronto

HERE COMES THE RAIN AGAIN Stormwater Management in a Changing Climate at the City of Toronto HERE COMES THE RAIN AGAIN Stormwater Management in a Changing Climate at the City of Toronto Evergreen s Urban Watershed Forum 20 March 2015 Presented by Kurtis Elton Policy & Program Advisor, Toronto

More information

Develop hazard mitigation policies and programs designed to reduce the impact of natural and human-caused hazards on people and property.

Develop hazard mitigation policies and programs designed to reduce the impact of natural and human-caused hazards on people and property. 6.0 Mitigation Strategy Introduction A mitigation strategy provides participating counties and municipalities in the H-GAC planning area with the basis for action. Based on the findings of the Risk Assessment

More information

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (SSBMP) PLAN/STORM WATER POLLUTION PREVENTION PLAN (SWPPP) REVIEW CHECKLIST

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (SSBMP) PLAN/STORM WATER POLLUTION PREVENTION PLAN (SWPPP) REVIEW CHECKLIST This checklist may be used by applicants for encroachment permits, and contractors in development of Site Specific Best Management Practice (SSBMP) Plans or Storm Water Pollution Prevention Plans (SWPPP)

More information

RIPRAP From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas http://www.mass.gov/dep/water/laws/policies.

RIPRAP From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas http://www.mass.gov/dep/water/laws/policies. RIPRAP From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas http://www.mass.gov/dep/water/laws/policies.htm#storm Definition: A permanent, erosion-resistant ground cover

More information

APPLICATION PROCESS FOR LAND DISTURBING PERMIT

APPLICATION PROCESS FOR LAND DISTURBING PERMIT PREFACE: APPLICATION PROCESS FOR LAND DISTURBING PERMIT The property owner, developer and designated planners and engineers shall review the general development plans and detailed plans of the Local Issuing

More information

Micromanagement of Stormwater in a Combined Sewer Community for Wet Weather Control The Skokie Experience

Micromanagement of Stormwater in a Combined Sewer Community for Wet Weather Control The Skokie Experience Micromanagement of Stormwater in a Combined Sewer Community for Wet Weather Control The Skokie Experience Robert W. Carr 1 * and Stuart G. Walesh 2 1 Water Resources Modeling, LLC, 4144 S. Lipton Ave,

More information

SECTION 5 - STORM DRAINS

SECTION 5 - STORM DRAINS Drainage Criteria Manual SECTION 5 - STORM DRAINS 5.1.0 GENERAL This The purpose of this section discusses briefly is to consider the hydraulic aspects of storm drains and their appurtenances in a storm

More information

DANIELS RUN STREAM RESTORATION, FAIRFAX, VIRGINIA: FLOODPLAIN ANALYSIS REPORT

DANIELS RUN STREAM RESTORATION, FAIRFAX, VIRGINIA: FLOODPLAIN ANALYSIS REPORT DANIELS RUN STREAM RESTORATION, FAIRFAX, VIRGINIA: FLOODPLAIN ANALYSIS REPORT By: Conor C. Shea Stream Habitat Assessment and Restoration Program U.S. Fish and Wildlife Service CBFO-S07-01 Prepared in

More information

Appendix F Benefit-Cost Analysis of Flood Protection Measures

Appendix F Benefit-Cost Analysis of Flood Protection Measures Appendix F Benefit-Cost Analysis of Flood Protection Measures Acronyms used in Appendix F: AA B AA C AA D BC BFE EAD FEMA NED O&M PV RED USACE Average Annual Benefits Average Annual Cost Average Annual

More information