Instituto Superior Técnico. Theme 1: Transport networks design and evaluation Case study presentation and synthesis
|
|
|
- Nicholas Woods
- 10 years ago
- Views:
Transcription
1 Instituto Superior Técnico REGIÕES E REDES (REGIONS AND NETWORKS) Theme 1: Transport networks design and evaluation Case study presentation and synthesis Luis Martinez 1
2 OUTLINE Case study: Soybean transportation in Brazil (Fajardo, A. P., Uma Contribuição ao Estudo do Transporte Intermodal -Otimização da Expansão Dinâmica das Redes Intermodais de Soja Produzida no Estado de Mato Grosso. Dissertation submitted in Universidade Federal do Rio de Janeiro (UFRJ), Rio de Janeiro: 170) Description Present situation Base Optimization model (initial solution) Network expansion Optimization model Analysis of the results Synthesis of the topic 2
3 IN BRAZIL - DESCRIPTION Soy produced in the State of Mato Grosso tons around 8 production centers Almost all the production of soybean is exported (mainly to Asia) The soybean production must reach the ports located at the South and North of Brazil Capacity, cost Soy transportation problem 3
4 IN BRAZIL PRESENT SITUATION Ports available: Santos (São Paulo) Paranaguá (Paraná) Vila do Conde (Belém) Itaqui (São Luís) Santos handles nearly 50% of the country s soybean exports Existing transportation options of soybean production 4
5 IN BRAZIL BASE OPTIMIZATION MODEL (I) Mathematical modeling (Min-cost-flow): Each node representing a production center (centroid) - Source Final port Sink Super-source + Super-sink Intermodal transfer nodes Each intermodal node split into: Transport arcs constrained by transport capacity Processing arcs interchange processing capacity 5
6 CASE STUDY: SOYBEAN TRANSPORTATION IN BRAZIL BASE OPTIMIZATION MODEL (II) Variables: For arcs: A : set X c U j j j of : all arcs flow passingin arc( : unitcost of : capacity (max flowin arc( flow)of arc( For nodes: B i : Load balanceof nodei 6
7 IN BRAZIL BASE OPTIMIZATION MODEL (III) Objective function (Cost): Constraints: ( A c( X ( Node equilibrium X ( X ( j, i) j: ( A j:( j, i) A Arcs capacity B( i)... i N 0 X ( U(... ( A Cost: R$ ,57 Optimal solution with currently available transportation options. Expensive, but capacity is enough 7
8 IN BRAZIL NETWORK EXPANSION MODEL (I) The purpose is to invest in existing or new arcs, with the aim of reducing operating costs Two models runs were made: Free investments (no amortization) to compute minimum possible operating costs Real investments (amortization considered over a 15 year period) to get a realistic optimal solution Initially, all apparently interesting investments (road, rail, rivers, ports, interchange stations) identified and budgeted Some investments for capacity (to take advantage of lower costs along a favorable path which was strangled by a bottleneck) Some investments for replacement (lower costs, no additional capacity) In some cases, successive investments considered at same place 8
9 CASE STUDY: SOYBEAN TRANSPORTATION IN BRAZIL NETWORK EXPANSION MODEL (II) All investments modeled for arcs (even when physically in nodes) Each node with possible investments modeled as a local network No two arcs ( may exist in the network (Staged) Capacity increase in node C New arcs or arcs replacement 2X 3X Y j : decision variable of investmentin arc ( Two stages of capacity increase Y( E2) Y( E3) Arc replacement Y( A, C1) Y( A, C2) 1 9
10 CASE STUDY: SOYBEAN TRANSPORTATION IN BRAZIL NETWORK EXPANSION MODEL (III) New variable: Objective function: Constraints: K j : Annualizedcost of c( X ( ( A ( Y( A i investmenton arc ( K( Node equilibrium X ( X ( j, i) B( i)... i N j: ( A j:( j, i) A Arcs capacity 0 X( j ) U( j )... ( j ) A 0 0 X ( Y( * U(... ( ( Abs Ais Aia ) Binary Expansion variables Y ( j ) { 01, } j A / 10
11 CASE STUDY: SOYBEAN TRANSPORTATION IN BRAZIL NETWORK EXPANSION MODEL (IV) Constraints (cont d): Sequential investments Y ( j1) Y( j2) Y( j3)... ( j n ) A ia Arcs replacement / upgrade Identical use of both part of real arcs (with auxiliary node introduced) Y( m) Y( m,... ( m),( m, ( A bs Ais ) Alternate use due to arc replacement Y( m) Y( n) 1... ( m),( n) ( A bs Ais ) 11
12 IN BRAZIL ANALYSIS OF RESULTS (I) Results for free investments (all K=0): Transport costs: R$ ,87 Only 35% of current operating costs Results with real investments (K>0): Annualized Investment costs: R$ ,66 Transport costs: R$ ,87 Total Costs: R$ ,53 Only 62% of current operating costs Optimal solution with network expanded and unconstrained budget 12
13 IN BRAZIL DYNAMIC NETWORK EXPANSION MODEL (I) Optimal network expansion plan computed without considering Possible capital restrictions Time needed to make several (possibly many) investments operational, all across Brazil So, a dynamic network expansion problem was defined Adding a constraint of available capital at z% of the full optimal package With z varying from 1% to 100% ( j ) Y( A i j )*K( j ) TOTINV * it 1 it
14 Custos anuais Milhões REGIONS AND NETWORKS IN BRAZIL ANALYSIS OF RESULTS (II) Incremental investment analysis (thresholds of investment for total cost reduction) Transport costs reduction % of Investment Resulting cost w.r.t. current cost 0,4% 81,8% 2,5% 76,4% 11,8% 76,04% 31,2% 71,55% 40,5% 71,2% 42,2% 68,21% 44,3% 62,8% 53,6% 62,46% Redução dos Custos com a Intensidade de Investimento Custo total (bilhões reais) Custo Transporte Invest (Custo Anualizado) em % 100% 62,19% Total costs and transport cost reduction with growing investment 14
15 Investment arcs in the optimal solution Arcos de Investimento no Opção Ótima REGIONS AND NETWORKS IN BRAZIL ANALYSIS OF RESULTS (III) Incremental investment analysis (types of investment arcs) a) Arcs that became part of the optimal solution and remain until the total investment b) Arcs that became part of the optimal solution, exit and reenter again until the total investment c) Arcs that became part of the optimal solution and exit and do not reenter again until the total investment d) Arcs that became part of the optimal solution, exit, reenter, exit again and are not part of the total investment solution e) Arcs that are only part of the optimal solution with the total investment % % % % % % % % 8100% Porcentagem de Investimento da Solução Ótima Percentage of Investment of the optimal solution Identification of different types of investment arcs 15
16 Investment arcs in the optimal solution Arcos de Investimento no Opção Ótima REGIONS AND NETWORKS IN BRAZIL ANALYSIS OF RESULTS (III) Preparing a staged investment without regret (aiming at full investment) Incremental investment analysis (removal of arcs type c and d ) Solutions with these arcs Increment in total cost w.r.t. optimal dynamic path 0%=< Inv<0.4% 0,00% 0.36%<=Inv<2.5% 0,00% 2.5%<=Inv<11.8% 6,60% 11.8%<=Inv<31.2% 0,00% 31.2%<=Inv<40.5% 5,91% 40.5%<=Inv<42.2% 0,00% 42.2%<=Inv<44.3% 4,19% 44.3%<=Inv<53.6% 11,77% 53.6%<=Inv<59.9% 12,27% 59.9%<=Inv<71.3% 12,11% 71.3%<=Inv<100% 4,37% Inv = 100% 0,00% % % % % % 5100% Percentagem de Investimento da Solução Ótima Percentage of Investment of the optimal solution Identification of different types of investment arcs 16
17 Investment arcs in the optimal solution Arcos de Investimento no Opção Ótima REGIONS AND NETWORKS IN BRAZIL ANALYSIS OF RESULTS (IV) Preparing a staged investment without regret (possibly stopping without at full investment) Incremental investment analysis (network only with arcs type a ) Solutions with these arcs Increment in total cost w.r.t. optimal dynamic path 0%=< Inv<0.4% 0,00% 0.36%<=Inv<2.5% 0,00% 2.5%<=Inv<11.8% 6,60% 11.8%<=Inv<31.2% 0,00% 31.2%<=Inv<40.5% 5,91% 40.5%<=Inv<42.2% 0,00% 42.2%<=Inv<44.3% 4,19% 44.3%<=Inv<53.6% 11,77% 53.6%<=Inv<59.9% 12,27% 59.9%<=Inv<71.3% 0,00% 71.3%<=Inv<100% 0,00% Inv = 100% 0,00% % 0, % 1, % 2, % 3, Percentagem de Investimento da Solução Ótima Identification of different types of investment arcs Percentage of Investment of the optimal solution 17
18 IN BRAZIL ANALYSIS OF RESULTS (V) Incremental investment analysis (Final solutions) Investment = 1% Investment = 12% 18
19 IN BRAZIL ANALYSIS OF RESULTS (V) Incremental investment analysis (Final solutions) Investment = 41% Investment = 100% 19
20 SYNTHESIS OF THE TOPIC (I) Some of the main transport design problems result from the combination or adaptation of some basic NP-hard or NP-complete problems (e.g. Min-cost-flow) All these models use linear programming optimization tools with: Linear Objective Function Linear Constraints Where the decision variables present commonly binary or integer form, which do not have a trivial linear programming solution method But fortunately there are sophisticated algorithms to obtain (quasi) optimal solutions in acceptable time for many of them 20
21 SYNTHESIS OF THE TOPIC (II) The objective function and constraints of the model should contain the main strategic goals of the decision makers the network design: Coverage all settlements must be accessible Accessibility Travel distances, times, operating costs must be reasonable Public Economy Avoid excessive investment cost Level of Service Low levels of delay Redundancy / Low level of vulnerability Preserve functionality in case of some breakdown Induce efficient and sustainable land-use patterns promote compact settlements, low need for motorized travel 21
22 SYNTHESIS OF THE TOPIC (III) The consideration of all the goals simultaneously in the optimization process can turn the problem unfeasible or take to long to find n optimal solution, due to the conflict between some of them Some of these goals should be left of the optimization process and assessed after to find out if the obtained solution satisfies all the established goals The result of this evaluation can be a multicriteria process were several optimal solutions are evaluated and the final solution will result from the multicriteria evaluation considering the decision maker s preferences 22
Brazil s Response to Lower Commodity Prices Will Infrastructure Improvements Support Further Expansion?
Brazil s Response to Lower Commodity Prices Will Infrastructure Improvements Support Further Expansion? By Dr. Michael Cordonnier www.soybeansandcorn.com [email protected] 630-325-0192 (Chicago) Overview
Instituto Superior Técnico Masters in Civil Engineering. Lecture 2: Transport networks design and evaluation Xpress presentation - Laboratory work
Instituto Superior Técnico Masters in Civil Engineering REGIÕES E REDES () Lecture 2: Transport networks design and evaluation Xpress presentation - Laboratory work Eng. Luis Martínez OUTLINE Xpress presentation
Costa Monteiro Participações. MC Logistica. Logistic Barge Company: 120.000 Ton/Mo. US$ 450 MM (2006) Capacity Largest Pig Iron
Mar 2007 Who we are... Costa Monteiro Participações Cosipar Usipar Pig Iron Producer 8 yr. Project 20 years Start-up: 01/2007 634 (Valor 1000 Brasil 2006) Pig Iron 200 Largest Brazilian Exporter (2005)
Brazilian Mission to Denmark. Brazil s Port Sector. Fernando Antonio Brito Fialho National Agency for Waterway Transportation Director-General
Brazilian Mission to Denmark Brazil s Port Sector Fernando Antonio Brito Fialho National Agency for Waterway Transportation Director-General Denmark, January 28th, 2009 Rio de Janeiro Sao Paulo Iguassu
The sight of a Port Operator
Cool Logistics The sight of a Port Operator São Paulo, May 15 th 214 Patrício Junior CEO PORTO ITAPOÁ VP Associação dos Terminais Portuários Privados - ATP Making the difference to always make it better
Brazilian Program for Investment in Logistics: Roads, Railways and Ports
Brazilian Program for Investment in Logistics: Roads, Railways and Ports Antonio Henrique P. Silveira Executive Secretary Secretariat of Ports of Brazilian Presidency Presentation for the 2014 Brazil-Germany
Now, I ll turn the conference over to Mr. Bernardo Hees, who will start the presentation. Mr. Hees, you may begin the conference
Operator: Good morning ladies and gentlemen. At this time we would like to welcome everyone to América Latina Logística () s 2Q06 results conference call. Today with us we have Bernardo Hees the CEO; and
Erasmus Mundus External Cooperation Windows. EU-BRAZIL STARTUP Call for applications outcome 08/02/2010
L15a0900007 L15a0900027 L15a0900041 L15a0900051 L15a0900057 L15a0900080 L15a0900081 L15a0900084 L15a0900088 L15a0900090 L15a0900093 L15a0900095 L15a0900096 L15a0900099 L15a0900106 L15a0900107 L15a0900115
Agri Commodities ABN AMRO Bank NV
Agri Commodities ABN AMRO Bank NV Fausto Caron Head of Commodities Brazil Chicago, June 2013 1 Agenda Brazilian Agriculture A Historical Perspective Infra-Structure: The Brazilian quest for competitiveness
Abstract Number: 002-0427. Critical Issues about the Theory Of Constraints Thinking Process A. Theoretical and Practical Approach
Abstract Number: 002-0427 Critical Issues about the Theory Of Constraints Thinking Process A Theoretical and Practical Approach Second World Conference on POM and 15th Annual POM Conference, Cancun, Mexico,
XLVI Pesquisa Operacional na Gestão da Segurança Pública
DESIGN NETWORK MODEL WITH LOCATION TO THE SOYBEAN CHAIN IN BRAZIL Ana Paula Milanez Faculty of Electrical and Computing Engineering University of Campinas Av. Albert Einstein, 400, CEP 13083-852, Campinas-SP-Brazil
The Brazilian water transportation sector Regulation overview
The Brazilian water transportation sector Regulation overview SEP Mission Shanghai Fernando Antonio Brito Fialho Director-General of ANTAQ Brazil: General information Total area Area total 8,514,876Km²
Industrial area with Hangar. Land area: 90.000 sqm Hangar area: 5.000 sqm Office area: 250 sqm Brazil Espírito Santo Serra Highway BR 101 North
Industrial area with Hangar Land area: 90.000 sqm Hangar area: 5.000 sqm Office area: 250 sqm Brazil Espírito Santo Serra Highway BR 101 North Property Location Brasil, Espírito Santo, Serra - Highway
THE CASE STUDY OF BRAZIL. ANDRE DE FAZIO, MSc PORT DEVELOPMENTS IN AN EMERGING COUNTRY
THE CASE STUDY OF BRAZIL ANDRE DE FAZIO, MSc PORT DEVELOPMENTS IN AN EMERGING COUNTRY São Paulo, May 2014 ANDRE DE FAZIO, MSC Academic Record: MSc - Maritime Economics and Logistics (MEL) Erasmus Univ.
Application of ARIMA models in soybean series of prices in the north of Paraná
78 Application of ARIMA models in soybean series of prices in the north of Paraná Reception of originals: 09/24/2012 Release for publication: 10/26/2012 Israel José dos Santos Felipe Mestrando em Administração
BRAZIL MEANS BUSINESS. In spite of the world financial crisis, Brazil remains an appealing business destination.
BRAZIL MEANS BUSINESS In spite of the world financial crisis, Brazil remains an appealing business destination. GDP compared Latin America (in trillions of US$) REGIONAL DISPARITIES % of total GDP (2008)
Investment Opportunities in Infrastructure Projects in Brazil
Investment Opportunities in Infrastructure Projects in Brazil Summary 1. Airports 2. Ports 3. Highways 4. Railways 5. Urban Transportation 6. Hospitals 7. Defense 8. Solid Waste and Sanitation 9. Other
A hierarchical multicriteria routing model with traffic splitting for MPLS networks
A hierarchical multicriteria routing model with traffic splitting for MPLS networks João Clímaco, José Craveirinha, Marta Pascoal jclimaco@inesccpt, jcrav@deecucpt, marta@matucpt University of Coimbra
Introduction and context
A procedure to integration of AQWA with FriendShip for the application of optimization techniques in design of PSV vessels Miguel Altimari Peli Tancredi Pontin Tancredi Laboratório de Otimização e Projeto
HYBRID INTELLIGENT SUITE FOR DECISION SUPPORT IN SUGARCANE HARVEST
HYBRID INTELLIGENT SUITE FOR DECISION SUPPORT IN SUGARCANE HARVEST FLÁVIO ROSENDO DA SILVA OLIVEIRA 1 DIOGO FERREIRA PACHECO 2 FERNANDO BUARQUE DE LIMA NETO 3 ABSTRACT: This paper presents a hybrid approach
Belo Horizonte and Rio de Janeiro, October 15th 2015
Belo Horizonte and Rio de Janeiro, October 15th 2015 Minas Gerais: a large and important state 226,000 square miles (Larger than France or Spain) 20 million people (Comparable to Australia) 2 nd largest
Heuristics for Dynamically Adapting Constraint Propagation in Constraint Programming
Heuristics for Dynamically Adapting Constraint Propagation in Constraint Programming Kostas Stergiou AI Lab University of the Aegean Greece CPAIOR 09 Workshop on Bound reduction techniques for CP and MINLP
Title: Integrating Management of Truck and Rail Systems in LA. INTERIM REPORT August 2015
Title: Integrating Management of Truck and Rail Systems in LA Project Number: 3.1a Year: 2013-2017 INTERIM REPORT August 2015 Principal Investigator Maged Dessouky Researcher Lunce Fu MetroFreight Center
B-bleaching: Agile Overtraining Avoidance in the WiSARD Weightless Neural Classifier
B-bleaching: Agile Overtraining Avoidance in the WiSARD Weightless Neural Classifier Danilo S. Carvalho 1,HugoC.C.Carneiro 1,FelipeM.G.França 1, Priscila M. V. Lima 2 1- Universidade Federal do Rio de
Discuss the size of the instance for the minimum spanning tree problem.
3.1 Algorithm complexity The algorithms A, B are given. The former has complexity O(n 2 ), the latter O(2 n ), where n is the size of the instance. Let n A 0 be the size of the largest instance that can
An Interactive Train Scheduling Tool for Solving and Plotting Running Maps
An Interactive Train Scheduling Tool for Solving and Plotting Running Maps F. Barber 1, M.A. Salido 2, L. Ingolotti 1, M. Abril 1, A. Lova 3, P. Tormos 3 1 DSIC, 3 DEIOAC, Universidad Politécnica de Valencia,
Distributed Systems LEEC (2005/06 2º Sem.)
Distributed Systems LEEC (2005/06 2º Sem.) Introduction João Paulo Carvalho Universidade Técnica de Lisboa / Instituto Superior Técnico Outline Definition of a Distributed System Goals Connecting Users
Initially pupils put the description of the stages of Brazil s railway network into the correct order (d, a, e, b, c).
*** geog.2 activity Teacher s notes Aims Pupils are able to understand the history of the growth of Brazil s railway network Pupils can relate the history of the growth of Brazil s railways to a general
Projects for High-speed Trains in Brazil BRAZILIAN HIGH SPEED LINE (RIO DE JANEIRO SÃO PAULO CAMPINAS)
Projects for High-speed Trains in Brazil BRAZILIAN HIGH SPEED LINE (RIO DE JANEIRO SÃO PAULO CAMPINAS) Hélio Mauro França Executive Superintendent - ANTT Berlim, September 22 2010 RIO SÃO PAULO HIGH SPEED
Routing in Road Networks: the toll booth problem
Routing in Road Networks: the toll booth problem Fernando Stefanello, Luciana S. Buriol, Marcus Ritt Instituto de Informática Universidade Federal do Rio Grande do Sul Caixa Postal 15.064 91.501-970 Porto
Kuehne + Nagel Germany. Paola Ploß Manager Route Sales Development Latin America
Export Kuehne & + Logistic Nagel Germany Kuehne + Nagel Germany Paola Ploß Manager Route Sales Development Latin America The Kühne + Nagel Group Global Logistics Reach Global reach with local know-how
MCLI RAIL FOCUS WORKGROUP 27 SEPTEMBER 2005 MCLI RAIL FOCUS WORKGROUP 27 SEPTEMBER 2005
MCLI RAIL FOCUS WORKGROUP 27 SEPTEMBER 2005 MCLI RAIL FOCUS WORKGROUP 27 SEPTEMBER 2005 1 AGENDA Welcome Call to order Meeting Objectives Approval of previous meeting s minutes - (30 August 2005) Follow
Why? A central concept in Computer Science. Algorithms are ubiquitous.
Analysis of Algorithms: A Brief Introduction Why? A central concept in Computer Science. Algorithms are ubiquitous. Using the Internet (sending email, transferring files, use of search engines, online
PROFILE. www.fibria.com.br/r2014/profile/
PROFILE 28 www.fibria.com.br/r2014/profile/ Brazilian company and world leader in eucalyptus pulp production, Fibria focuses its operation on forest plantations in the states of Bahia, Espírito Santo,
ANHANGUERA EDUCACIONAL PARTICIPAÇÕES S.A. Publicly Held Company
ANHANGUERA EDUCACIONAL PARTICIPAÇÕES S.A. Publicly Held Company Company Registry No. (NIRE) 35.300.184.092 Corporate Taxpayers Id. (CNPJ): 04.310.392/0001-46 Anhanguera Educacional Participações S.A. (
Yusen Logistics do Brazil. Supply Chain Solutions
Yusen Logistics do Brazil Supply Chain Solutions Yusen Logistics Group NYK Yusen Logistics is an NYK Group company (founded in Tokyo in 1885), which acts in the management of the flow of goods, services
The Goldberg Rao Algorithm for the Maximum Flow Problem
The Goldberg Rao Algorithm for the Maximum Flow Problem COS 528 class notes October 18, 2006 Scribe: Dávid Papp Main idea: use of the blocking flow paradigm to achieve essentially O(min{m 2/3, n 1/2 }
ANALYSIS OF A ANTROPIC INFLUENCES IN A FLOODPLAN
ANALYSIS OF A ANTROPIC INFLUENCES IN A FLOODPLAN M.C.S. Pereira 1&2 ; J.R.S. Martins 1 ; R.M. Lucci 2 and L.F.O.L, Yazaki 2 1. Escola Politécnica da Universidade de São Paulo, Brazil 2. Fundação Centro
Multi-layer MPLS Network Design: the Impact of Statistical Multiplexing
Multi-layer MPLS Network Design: the Impact of Statistical Multiplexing Pietro Belotti, Antonio Capone, Giuliana Carello, Federico Malucelli Tepper School of Business, Carnegie Mellon University, Pittsburgh
Latin American Feedstocks
Latin American Feedstocks Professor: Márcia Miguel Castro Ferreira. PhD Student: Magale Rambo. University of Campinas (UNICAMP), Institue of Chemistry, Labor for Theoretical and Applied Chemometrics LQTA
Fleet Assignment Using Collective Intelligence
Fleet Assignment Using Collective Intelligence Nicolas E Antoine, Stefan R Bieniawski, and Ilan M Kroo Stanford University, Stanford, CA 94305 David H Wolpert NASA Ames Research Center, Moffett Field,
15th Discussion Meeting on Thermodynamics of Alloys
15th Discussion Meeting on Thermodynamics of Alloys Cláudio Geraldo Schön Departamento de Engenharia Metalúrgica e de Materiais Escola Politécnica da Universidade de São Paulo September 09, 2014 Organization
A Branch and Bound Algorithm for Solving the Binary Bi-level Linear Programming Problem
A Branch and Bound Algorithm for Solving the Binary Bi-level Linear Programming Problem John Karlof and Peter Hocking Mathematics and Statistics Department University of North Carolina Wilmington Wilmington,
INTEGER PROGRAMMING. Integer Programming. Prototype example. BIP model. BIP models
Integer Programming INTEGER PROGRAMMING In many problems the decision variables must have integer values. Example: assign people, machines, and vehicles to activities in integer quantities. If this is
A Service Design Problem for a Railway Network
A Service Design Problem for a Railway Network Alberto Caprara Enrico Malaguti Paolo Toth Dipartimento di Elettronica, Informatica e Sistemistica, University of Bologna Viale Risorgimento, 2-40136 - Bologna
Scheduling Shop Scheduling. Tim Nieberg
Scheduling Shop Scheduling Tim Nieberg Shop models: General Introduction Remark: Consider non preemptive problems with regular objectives Notation Shop Problems: m machines, n jobs 1,..., n operations
Curriculum Vitae. January, 2005
Curriculum Vitae January, 2005 Paulo Jorge Marques de Oliveira Ribeiro Pereira Invited Assistant Lecturer Management Department School of Economics and Management University of Minho Office: University
Mconf: Global Webconferencing based on Open Source
Mconf: Global Webconferencing based on Open Source Felipe Cecagno ([email protected]) NRENs in the Dissemination of Innovative Low Cost Global Solutions: From Universities to the World Denver, April 9th
Henrique Bursztyn Organizing Committee
We hereby certify that, Alberto Tacchella, Inst. de Ciências Matemáticas e de Computação, participated in the IV Iberoamerican Meeting on Geometry, Mechanics and Control. Celebrating Jair Koiller s 65
APRIL 2014 PORT OF ITAQUI
APRIL 2014 PORT OF ITAQUI PORT LOCATION Suez Canal Panama Canal Strategic location on the coast of the northeastern region; Shorter routes to Europe and USA comparing to ports of the South and Southeast
Algorithm Design and Analysis
Algorithm Design and Analysis LECTURE 27 Approximation Algorithms Load Balancing Weighted Vertex Cover Reminder: Fill out SRTEs online Don t forget to click submit Sofya Raskhodnikova 12/6/2011 S. Raskhodnikova;
The Need for International Weather Data and Related Products at the U.S. Department of Agriculture. Presented to. CoCoRaHS
The Need for International Weather Data and Related Products at the U.S. Department of Agriculture Presented to CoCoRaHS Weather Talk Webinar Series February 26, 2015 WASDE Report USDA Situation and Outlook
INDUSTRIALIZED PRODUCTS
INDUSTRIALIZED PRODUCTS 1 Agenda Summary 1Q07 Results Market Strategy Projects with Clients 2 Summary Industrialized Products Industrialized products business - Intermodality Area of operation: Brazil
Logistics and Infrastructure
The Steel Industry Mining Cement Logistics and Infrastructure CSN presents CSN Logistics Platform in Itaguaí Rio de Janeiro State CSN Logistics Platform in Itaguaí A project that supplies Brazil s needs
Labs D Or Acquisition
FLRY3 IBGC 2010 Corporate Governance Award Listed Companies IBGC - Brazilian Institute of Corporate Governance Labs D Or Acquisition TODOS OS DIREITOS RESERVADOS 2011 2 Disclaimer This document contains
Regulation in the Brazilian waterway sector
Regulation in the Brazilian waterway sector Fernando Fialho Director-general Netherlands February, 2011 General data about Brazil Total area 8.514.876 Km² States 27 Coast 8.511 Km Population 192 million
Development of an Automated Tool for Demand Forecasting in Unitywater
Development of an Automated Tool for Demand Forecasting in Unitywater Ken Goraya Unitywater Bradley Rasmussen Sizztech Pty Ltd 2013 Asia Pacific Water Industry Modelling Conference Brisbane (4-5 September,
CONTENTS AREA STUDIES - REGIONAL SUSTAINABLE DEVELOPMENT: BRAZIL
CONTENTS AREA STUDIES - REGIONAL SUSTAINABLE DEVELOPMENT: BRAZIL Area Studies - Regional Sustainable Development: Brazil - Volume 1 No. of Pages: 400 ISBN: 978-1-84826-171-6 (ebook) ISBN: 978-1-84826-621-6
Vector storage and access; algorithms in GIS. This is lecture 6
Vector storage and access; algorithms in GIS This is lecture 6 Vector data storage and access Vectors are built from points, line and areas. (x,y) Surface: (x,y,z) Vector data access Access to vector
Classifying Large Data Sets Using SVMs with Hierarchical Clusters. Presented by :Limou Wang
Classifying Large Data Sets Using SVMs with Hierarchical Clusters Presented by :Limou Wang Overview SVM Overview Motivation Hierarchical micro-clustering algorithm Clustering-Based SVM (CB-SVM) Experimental
Classification - Examples
Lecture 2 Scheduling 1 Classification - Examples 1 r j C max given: n jobs with processing times p 1,...,p n and release dates r 1,...,r n jobs have to be scheduled without preemption on one machine taking
Hydrocarbon reservoir modeling: comparison between theoretical and real petrophysical properties from the Namorado Field (Brazil) case study.
ANNUAL MEETING MASTER OF PETROLEUM ENGINEERING Hydrocarbon reservoir modeling: comparison between theoretical and real petrophysical properties from the Namorado Field (Brazil) case study. Marcos Deguti
The Problem of Scheduling Technicians and Interventions in a Telecommunications Company
The Problem of Scheduling Technicians and Interventions in a Telecommunications Company Sérgio Garcia Panzo Dongala November 2008 Abstract In 2007 the challenge organized by the French Society of Operational
Constrained Clustering of Territories in the Context of Car Insurance
Constrained Clustering of Territories in the Context of Car Insurance Samuel Perreault Jean-Philippe Le Cavalier Laval University July 2014 Perreault & Le Cavalier (ULaval) Constrained Clustering July
Research Topics in Renewable Energies in Brazil
WORKSHOP BRAZIL-ITALY ROME 29-31/03/2012 Research Topics in Renewable Energies in Brazil Prof. Dr.-Ing. João Tavares Pinho Full Professor at the Universidade Federal do Pará Head of the Grupo de Estudos
Two objective functions for a real life Split Delivery Vehicle Routing Problem
International Conference on Industrial Engineering and Systems Management IESM 2011 May 25 - May 27 METZ - FRANCE Two objective functions for a real life Split Delivery Vehicle Routing Problem Marc Uldry
Master Degree in Manufacturing Engineering: Preparing Professionals for the Challenging Work Market
Master Degree in Manufacturing Engineering: Preparing Professionals for the Challenging Work Market C. da R. Brito 1, and M. M. Ciampi 2 1 President of Council of Researches in Education and Sciences -
FORECASTING MODEL FOR THE PRODUCTION AND CONSUMPTION OF COTTON FIBER VERSUS POLYESTER
1 FORECASTING MODEL FOR THE PRODUCTION AND CONSUMPTION OF COTTON FIBER VERSUS POLYESTER Elisa Mauro Gomes Otávio Lemos de Melo Celidonio Daniel Latorraca Ferreira Leandro Gustavo Alves Johnnattann Pimenta
Dynamic Vehicle Routing in MATSim
Poznan University of Technology Department of Motor Vehicles and Road Transport ZPSiTD Dynamic Vehicle Routing in MATSim Simulation and Optimization Michal Maciejewski [email protected]
A MODEL TO SOLVE EN ROUTE AIR TRAFFIC FLOW MANAGEMENT PROBLEM:
A MODEL TO SOLVE EN ROUTE AIR TRAFFIC FLOW MANAGEMENT PROBLEM: A TEMPORAL AND SPATIAL CASE V. Tosic, O. Babic, M. Cangalovic and Dj. Hohlacov Faculty of Transport and Traffic Engineering, University of
Charles Fleurent Director - Optimization algorithms
Software Tools for Transit Scheduling and Routing at GIRO Charles Fleurent Director - Optimization algorithms Objectives Provide an overview of software tools and optimization algorithms offered by GIRO
BIRCH: An Efficient Data Clustering Method For Very Large Databases
BIRCH: An Efficient Data Clustering Method For Very Large Databases Tian Zhang, Raghu Ramakrishnan, Miron Livny CPSC 504 Presenter: Discussion Leader: Sophia (Xueyao) Liang HelenJr, Birches. Online Image.
The Rolling Stock Recovery Problem. Literature review. Julie Jespersen Groth *α, Jesper Larsen β and Jens Clausen *γ
The Rolling Stock Recovery Problem Julie Jespersen Groth *α, Jesper Larsen β and Jens Clausen *γ DTU Management Engineering, The Technical University of Denmark, Produktionstorvet, DTU Building 424, 2800
NEW INVESTMENT OPPORTUNITIES IN INFRASTRUCTURE
Associação Brasileira da Infra-estrutura e Indústrias de Base (Brazilian Association of Infrastructure and Basic Industries) NEW INVESTMENT OPPORTUNITIES IN INFRASTRUCTURE Paulo Godoy President XII Joint
Public Funding and the Beginning of a New Era in Higher Education in Brazil
80 Comparative & International Higher Education 5 (2013) Public Funding and the Beginning of a New Era in Higher Education in Brazil Danilo de Melo Costa a,* a Federal University of Minas Gerais, Brazil
Isabela Nogueira de Morais Education Ph.D. in Economics M.A. in Political Science B.A. in Social Communication (Journalism)
Isabela Nogueira de Morais Corresponding address: CIGEV, Université de Genève 54 Route des Acacias, 1225, Carouge, GE, Switzerland [email protected] / [email protected] Office:
