Upper Workings. Waste Rock. Adit. Millsite
|
|
|
- Berniece Newman
- 10 years ago
- Views:
Transcription
1 Hydraulic Adit Plug Closure World s Fair Mine, Patagonia, Arizona Region 3 Coronado NF Mine Design, Operations & Closure Conference May 1-5, 2011 Allan Kirk Matt Wetter Nathan Stormzand Eli Curiel, USFS
2 General Location Map
3 1915 Photo by F.C. Schrader, USGS Bulletin 191
4 World s Fair Mine Overview Today Upper Workings Adit Waste Rock Waste Rock Millsite
5 World s Fair Mine Harshaw Mining District in the Patagonia Mountains Mined from Ag - Pb - Cu - mine Produced 30,000 tons of 58 opt Ag, 6.6 % Pb, 0.7% Cu, minor gold /zinc. North-south trending vein system dips at about 80 o to SW. Occurs at contact of quartz diorite intrusive and rhyolitic volcanic flows
6 Mined along strike for about 600 feet Mine Workings Plan Map Over a dip-slope distance of about 1,000 feet 15,000 ft of drifts, tunnels, stopes, shafts, and winzes
7 Mine Workings 3-D Model Developed to a depth of 450 feet below the main haulage level adit
8
9 Site Visit to Adit Portal All you could see in feet to drop-out and thigh deep water ph = 3.0 Elevated metals
10 The (1.8) Million Dollar Question Given what you see - can you provide us with a firm fixed price for the cost to reopen this mine, set two hydraulic plugs, and reclaim the site? Simple answer: No Consultant s answer:.well Sure!
11 Water Quality Table 1. Dissolved metal concentrations (mg/l) from monitoring locations 1. World s Fair Mine Metal Arsenic Barium Cadmium Chromium (III) Copper Iron Lead Manganese Mercury Nickel Selenium Silver Zinc Alum Gulch Upstream Adit Discharge Alum Gulch Downstream N/R N/R < < < N/R N/R N/R Adapted from USGS (2003). Data are believed to be means from 16 monitoring events. N/R = Not reported Red font = exceeds human health standards
12 Metals Loading (1) 0.25 Concentration (mg/l) Barium Cadmium Lead Nickel 0 Alum Gulch Upstream Adit Discharge Alum Gulch Downstream
13 Metals Loading (2) 120 Concentration (mg/l) Iron Manganese Zinc 0 Alum Gulch Upstream Adit Discharge Alum Gulch Downstream
14 World s Fair Adit Flow and Water Quality Flow typically 3-5 gpm, maximum 18 gpm ph Geochemically degraded waters with respect to Cd, Cu, Fe, Pb, Mn, Ni, and Zn Significant source of loading to Alum Gulch However, sources other than the World s Fair Mine adit are responsible for the majority of metal loading to Alum Gulch
15 Reasons to Conduct Evaluation and Construct Closure Water quality - Low ph and metals concentration and loading to Alum Gulch Closure principally to eliminate a point source discharge from the adit portal.
16 RFP to stem the flow of water from the Adit Tetra Tech chose to - Evaluate possibility of using two hydraulic, water tight plugs to stem the flow. Objectives: Eliminate or reduce the flow of contaminated water from adit Eliminate or reduce metals loading to Alum Gulch from adit Elimination of a point source discharge in exceedence of water quality standards and in volition of the Clean Water Act (for discharging without a permit)
17 Schematic Sketch of Two-Plug System
18 Infrastructure to Support Project
19 Eli Curiel, USFS OSC and a TT Exploration (?) Geologist
20 Nathan Stormzand TT Civil Engineer
21 Rich Dombrouski TT Geotechnical Engineer
22 Closure Plan
23 Adit Closure Plan Map
24 Adit Plug Details (after Bogert, 2003)
25 6-inch steel H-beams
26 Faced with 2 x 6 Nailing Strip
27 Nailer faced with 3 lagging on inside of Bulkhead
28 Jimmy Hoffa Window
29 Cement pumping lines and grout pumping lines
30 Perimeter of lagging packed with burlap and grouted
31 Atlas-Fausett Contracting, Inc. Frank Fausett Ron Short
32 Pumper and Concrete Trucks
33 After the Concrete Pour ~ 30 cubic yards Prior to grouting the interior plug station arch
34 Greatest Job Safety Risk
35 Adit Closure Plan and Infiltration Basin
36 Constructing Dam near Portal
37 Piping Through Dam
38 Mixing Cement for Dam - Atlas Fausett Mobile Mixer (just kidding)
39 Dam Partway Through Pour
40 Piping Behind Dam Not Perforated yet
41 Beginning of Adit Surface - Closure Looking from Portal
42 Goin Back for More Rocks
43 Final Underground Portal Closure
44 Infiltration Basin
45 Reclaimed Portal Site
46 Reclaimed Waste Rock Dump
47 Closure Effectiveness and Cost Reduction in flow 100% No metal loading from adit source Uses existing engineering technology Cost of: Engineering design Rehabilitating the adit Construction of plugs and closure of site - Relatively high - but one time cost of $1,105,000
48 Comparison Glengarry Mine vs. World s Fair Mine World s Fair Mine, AZ Mine rehab to 500 Two hydraulic plugs Limited plug backfill Portal closure Infiltration basin 100% flow reduction Cost = $1,105,000 Glengarry Mine, MT Mine Rehab to 1900 Shaft rehab to 290 Shaft collar grout curtain Shaft Plug and backfill Four hydraulic plugs Extensive plug backfill Underground fault grouting Portal Closure 98% flow reduction Cost = $2,900,000
49 Most Importantly Hydraulic Plug Mine Closures Can Provide A Walk-Away Solution
50 Questions?
CHAPTER 7. Conclusions
CHAPTER 7 Conclusions 7.1 Environmental conclusions The conclusions in this section incorporate the work that was carried out to examine the chemical characteristics of each of the mine sites and their
Rapid Thermophilic Digestion Technology
Rapid Thermophilic Digestion Technology Biomax Technologies Pte Ltd Mr Sim Eng Tong, CEO Block 4 Kaki Bukit Avenue 1, #05-07/08, Singapore 417939 Phone: + 65 6274 8606 Fax: + 65 6274 8607 Website: www.biomaxtech.com
The ground water region in the area of the proposed Project site is made-up of sedimentary rocks (Figure 5.6-1)
EIS Section 5.6 Groundwater Quantity and Quality 5.6 GROUNDWATER QUANTITY AND QUALITY For the purpose of this EIS, the inventory and description of groundwater resources (hydrogeology) within the footprint
Appendix B: Water Treatment Scenarios from AMD Treat
Appendix B: Water Treatment Scenarios from AMD Treat 103 of 104 Jeddo Tunnel Abandoned Mine Drainage Passive vs. Active Treatment Cost Estimates Provided by Office of Surface Mining AMD Treat Software
Neutralization of Acid Mine Drainage Using Stabilized Flue Gas Desulfurization Material
Neutralization of Acid Mine Drainage Using Stabilized Flue Gas Desulfurization Material W. Wolfe 1, C.-M. Cheng 1, R. Baker 1, T. Butalia 1, J. Massey-Norton 2 1 The Ohio State University, 2 American Electric
Compliance Guidance for Motor Vehicle Waste Disposal Wells in Oregon September 2015
Compliance Guidance for Motor Vehicle Waste Disposal Wells in Oregon September 2015 Underground Injection Control Program 700 NE Multnomah Street Suite 600 Portland, OR 97232 Phone: 503-229-6371 800-452-4011
PMR EXPLORATION, LLC CHERRY CLAIMS PROJECT MONARCH MINE GOLDEN IDOL MINE (HILLSIDE) CHERRY KING MINE GOLD EAGLE MINE
PMR EXPLORATION, LLC CHERRY CLAIMS PROJECT MONARCH MINE GOLDEN IDOL MINE (HILLSIDE) CHERRY KING MINE GOLD EAGLE MINE PMR EXPLORATION, LLC - ALL RIGHTS RESERVED - 2011 PMR EXPLORATION, LLC - property information
Wastewater Collection Practice Test #3 Page 1 of 15
Wastewater Collection Practice Test #3 Page 1 of 15 1) A 54 in. storm sewer flowing half full, at a velocity of 1.35 Ft./sec., will discharge how much flow into a creek in MGD? 13.85 MGD 10.73 MGD 1.85
SECTION 33 11 00.19 ABANDONMENT OF WATER MAINS. A. Conform to requirements of Section 01 33 00 - Submittals.
SECTION 33 11 00.19 ABANDONMENT OF WATER MAINS PART 1: GENERAL 1.01 SCOPE A. Abandonment in place, by cutting and capping, of existing water mains, hydrants, service lines, and valves. B. Abandonment in
SECTION 33 31 00.13 ABANDONMENT OF SEWER MAINS
SECTION 33 31 00.13 ABANDONMENT OF SEWER MAINS PART 1: GENERAL 1.01 SECTION INCLUDES A. Abandonment in place, by cutting and capping, of existing sewers, junction structures, manholes, service lines, and
AQUIFER STORAGE RECOVERY
AQUIFER STORAGE RECOVERY This continuing education unit has been created to acquaint the reader with the topic of Aquifer Storage Recovery. The International School of Well Drilling gratefully acknowledges
Section 402. STORM SEWERS
402.02 Section 402. STORM SEWERS 402.01. Description. This work consists of constructing storm sewers of the size and class required, including excavation, bedding, and backfill. 402.02. Materials. Provide
STRUCTURES. 1.1. Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL.
STRUCTURES 1. General. Critical structures may impact the integrity of a flood control project in several manners such as the excavation for construction of the structure, the type of foundation, backfill
Marcellus Fast Facts
1 Marcellus Fast Facts Covers about 95,000 square miles in 6 states Occurs at depths of up to 9,000 feet Thickness of 250 feet or more Largest natural gas reservoir in North America (est. 500 TCF recoverable
Environmental Technology March/April 1998
Treating Metal Finishing Wastewater Sultan I. Amer, Ph.D. AQUACHEM INC. Environmental Technology March/April 1998 Wastewater from metal finishing industries contains high concentrations of contaminants
Practice Problems on Pumps. Answer(s): Q 2 = 1850 gpm H 2 = 41.7 ft W = 24.1 hp. C. Wassgren, Purdue University Page 1 of 16 Last Updated: 2010 Oct 29
_02 A centrifugal with a 12 in. diameter impeller requires a power input of 60 hp when the flowrate is 3200 gpm against a 60 ft head. The impeller is changed to one with a 10 in. diameter. Determine the
Dewatering - Time and Cost Relief by way of Trenchless Construction
North American Society for Trenchless Technology (NASTT) NASTT s 2015 No-Dig Show Denver, Colorado March 15-19, 2015 TA-T3-04 Dewatering - Time and Cost Relief by way of Trenchless Construction Jenn Stillman,
Chalcophile and Key Element Distribution in the Eastern Goldfields: seismic traverse EGF01. Aleks Kalinowski Geoscience Australia, pmdcrc Y2 project
pmd CR C Chalcophile and Key Element Distribution in the Eastern Goldfields: seismic traverse EGF01 predictive mineral discovery Aleks Kalinowski Geoscience Australia, pmdcrc Y2 project [email protected]
MILWAUKEE CITY HALL FOUNDATION RESTORATION. Project Update November 12, 2014
MILWAUKEE CITY HALL FOUNDATION RESTORATION Project Update November 12, 2014 Milwaukee City Hall Building History/Fast Facts - City Hall is a masonry and iron superstructure - Originally constructed from
Remediation Weekly Activity Summary Report Ameren LaSalle Former MGP - Soil Removal Action
Remediation Weekly Activity Summary Report Ameren LaSalle Former MGP - Soil Removal Action Page 1 Period: August 11 through 17, 2014 (Week 48) PSC Project Number Completed By: Jeff Adams 624-1202-0012
Determination of Metals in a 3% Sodium Chloride (NaCl) Matrix by Axially-Viewed ICP-OES
Determination of Metals in a 3% Sodium Chloride (NaCl) Matrix by Axially-Viewed ICP-OES Application Note Inductively Coupled Plasma-Optical Emission Spectrometers Author Deen Johnson Introduction The development
SECTION 02400 - STORM DRAIN SYSTEM
SECTION 02400 - STORM DRAIN SYSTEM CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement And
Storm Sewer Trenchless Upgrade Alternatives and Recommendations
Storm Sewer Trenchless Upgrade Alternatives and Recommendations Background Approximately 1,930 feet of the 40-inch and 42-inch CMP storm sewer pipe from manhole M22 to manhole M12 will be evaluated for
Produced water from oil and gas production
Produced water from oil and gas production Lisa Sumi Oil and Gas Accountability Project Presentation at the 2005 People s Oil and Gas Summit Farmington, New Mexico October 28, 2005 Produced Water Any water
A Guide for Private Domestic Well Owners
A Guide for Private Domestic Well Owners March 2015 Compiled by: The California State Water Resources Control Board Groundwater Ambient Monitoring and Assessment (GAMA) Program A Guide for Private Domestic
Innovative Removal of Agricultural Related Water Pollutants in the Chesapeake Bay Watershed
Innovative Removal of Agricultural Related Water Pollutants in the Chesapeake Bay Watershed William E. Roper, Kelly P. Rock, and Howard E. Sorber III Micronic Technologies, Wise, VA National Capital Regional
GALVANIC CATHODIC PROTECTION 1.0 CONTENTS. 1.1 Aluminium Anodes. 1.2 Zinc Anodes. 1.3 Magnesium Anodes SECTION
SECTION 1 GALVANIC CATHODIC PROTECTION 1.0 CONTENTS 1.1 Aluminium Anodes 1.1.1 Aluminium Tank Anodes 1.1.2 Aluminium Hull Anodes 1.1.3 Aluminium Platform / Jetty Anodes 1.2 Zinc Anodes 1.2.1 Zinc Tank
Trip to Pulacayo. Pulacayo - Paca
Disclaimer This Presentation contains forward-looking information as defined under applicable securities law in Canada. Forward-looking information can be identified by the use of words such as "anticipated",
SANITARY SEWER SPECIFICATIONS
SANITARY SEWER SPECIFICATIONS OCTOBER 2003 HARVEST-MONROVIA WATER, SEWER, AND FIRE PROTECTION AUTHORITY SECTION 1.00 1.10 Purpose The purpose of this document is to assemble the sewer specifications, policies,
Impact of utilised bottom ash
Impact of utilised bottom ash Raul Grönholm, MSc, Sysav Jan Hartlén, PhD, JH Geoconsulting 24 januari 2012 1 Agenda SYSAV BOTTOM ASH FROM WASTE INCINERATION USE OF BOTTOM ASH MONITORING AND ESTIMATION
Christopher Harto Argonne National Laboratory
Managing Water from CCS Programs Christopher Harto Argonne National Laboratory John A. Veil - Argonne National Laboratory Andrea McNemar - DOE/NETL GWPC Energy and Water Sustainability Symposium Pittsburgh,
GOLD RESOURCE CORPORATION INTERCEPTS ADDITIONAL MULTIPLE HIGH-GRADE PARALLEL VEINS AT SWITCHBACK INCLUDING 6.32 METERS OF 5.
FOR IMMEDIATE RELEASE JANUARY 26, 2016 NEWS NYSE MKT: GORO GOLD RESOURCE CORPORATION INTERCEPTS ADDITIONAL MULTIPLE HIGH-GRADE PARALLEL VEINS AT SWITCHBACK INCLUDING 6.32 METERS OF 5.87 G/T GOLD Colorado
Lead Testing and On Site Calibration for Water Testing Detection Range: 2 100ppb
Document: AND Lead 100 7 2013 Lead Testing and On Site Calibration for Water Testing Detection Range: 2 100ppb July, 2013 Edition 1 ANDalyze, Inc., 2012. All rights reserved. Printed in USA. Table of Contents
SECTION 812 SEWER LINE, MANHOLE AND WET WELL CLEANING
812-1 SCOPE OF WORK: SECTION 812 SEWER LINE, MANHOLE AND WET WELL CLEANING a. The Contractor shall provide all labor, materials, equipment, and incidentals necessary to perform the cleaning of sewer lines,
How To Remove Selenium From Water
Information Technology Solutions ABSTRACT The discharge of selenium to natural water systems is regulated by law. Those with permitted outfalls must treat the waste stream to below the US EPA regulatory
Module 9: Basics of Pumps and Hydraulics Instructor Guide
Module 9: Basics of Pumps and Hydraulics Instructor Guide Activities for Unit 1 Basic Hydraulics Activity 1.1: Convert 45 psi to feet of head. 45 psis x 1 ft. = 103.8 ft 0.433 psi Activity 1.2: Determine
A Guide for Private Domestic Well Owners
A Guide for Private Domestic Well Owners Compiled by the California State Water Resources Control Board Division of Water Quality GAMA Program TABLE OF CONTENTS INTRODUCTION... 4 GROUNDWATER BASICS...
SECTION 02763 POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe.
SECTION 02763 PART 1 G E N E R A L 1.01 SECTION INCLUDES A. Repairs to existing sewer lines by replacing short lengths of failed pipe. 1.02 UNIT PRICES A. Measurement for point repairs is on a unit price
Material Expansion Coefficients
17 Material Expansion Coefficients Linear Thermal Expansion Coefficients of Metals and Alloys Table 17-1 provides the linear thermal expansion coefficients of the most frequently used metals and allows.
University of Arizona Bulletin
Bulletin NO.2 Economic Series No..2 University of Arizona Bulletin CHARLES F. WILLIS, Director. SCOPE OF THE WORK OF THE ARIZONA STATE BUREAU OF MINES By CHARLES F. WILLIS Application tor entry as second
GOLD RESOURCE CORPORATION REPORTS PRELIMINARY INDEPENDENT RESOURCE ESTIMATE; ANNOUNCES COMPANY CONFERENCE CALL
FOR IMMEDIATE RELEASE April 26, 2012 NEWS NYSE Amex: GORO GOLD RESOURCE CORPORATION REPORTS PRELIMINARY INDEPENDENT RESOURCE ESTIMATE; ANNOUNCES COMPANY CONFERENCE CALL COLORADO SPRINGS April 26, 2012
This example of a completed sampling plan worksheet has been included to illustrate the information
APPENDIX B EXAMPLE OF A COMPLETED SAMPLING PLAN WORKSHEET This example of a completed sampling plan worksheet has been included to illustrate the information necessary to document a sampling program for
Swamp Area Passive Treatment System Kettle Creek Watershed, Clinton County, PA
Swamp AMD Chemistry Swamp Area Passive Treatment System Kettle Creek Watershed, Clinton County, PA A Technical Report for Trout Unlimited and the Kettle Creek Watershed Association Prepared by Hedin Environmental
Foundation Code compliance and Best Practices By Michael Coello
Foundation Code compliance and Best Practices By Michael Coello Background Graduated cum laude in 1992 with a Bachelor of Science degree in finance from University of Wisconsin - Parkside Started poured
Types of Mining - Expert Table
See page 6 Minerals Downunder Teacher Guide (2002) - Activity 4a Types of Mining - Expert Table How to Jigsaw Information 1. Divide the class into Home Groups of five for the five different types of mining
Applications of Bauxsol in Reclamation, Remediation, and Water Treatment. James M. Castro, Ph.D.
TM Applications of Bauxsol in Reclamation, Remediation, and Water Treatment James M. Castro, Ph.D. Common Problems at Precious and Base Metal Mines with Sulfide Ores Acid rock drainage Neutral metal leaching
A History of Non-ferrous Metal Mining and Exploration in Maine. By Frederick M. Beck F. M. Beck, Inc. Yarmouth, Maine
A History of Non-ferrous Metal Mining and Exploration in Maine By Frederick M. Beck F. M. Beck, Inc. Yarmouth, Maine Note The following set of slides were used as part of an oral presentation given by
How To Use The Nexion 300
APPLICATION NOTE ICP - Mass Spectrometry Authors Ewa Pruszkowski, Ph.D. Senior ICP-MS Application Scientist Cynthia P. Bosnak Senior Product Specialist PerkinElmer, Inc. Shelton, CT USA The Analysis of
Mining with Paste Fill
Mining with Paste Fill Mehmet Yumlu, Principal Mining Engineer AMC Consultants Pty Ltd AusIMM Cobar Mining Seminar AMC Con nsultants Pty Ltd Outline Introduction ti What is Paste Fill? Why Using Paste
A. Contractor shall furnish, to the Engineer, all materials certifications available from the manufacturer for all required materials.
PART 1 GENERAL 1.1 SCOPE A. This item shall include the work necessary for the installation of storm sewer line construction. B. Reference Section 3800 Trenching and Backfill and the General Conditions,
The Wismut Rehabilitation Project: Present State, Outlook and Lessons Learned
IAEA-Workshop: Regional Training Course on Remedation Infrastructure Development at a Test Site, Chemnitz, Germany, 3 7 December 2012 The Wismut Rehabilitation Project: Present State, Outlook and Lessons
Mine Water Treatment Solutions for Discharge and Re-Use
Mine Water Treatment Solutions for Discharge and Re-Use Bernhard Doll Pall Corporation Summary This paper focusses on the description of reliable, safe and economical treatment of mine water from different
Characterizing Beauty Salon Wastewater for the Purpose of Regulating Onsite Disposal Systems
Characterizing Beauty Salon Wastewater for the Purpose of Regulating Onsite Disposal Systems Fred Bowers 1,2, Ph.D. New Jersey Department of Environmental Protection Division of Water Quality August 14,
COST AND PERFORMANCE REPORT
COST AND PERFORMANCE REPORT Pump and Treat of Contaminated Groundwater at the United Chrome Superfund Site Corvallis, Oregon September 1998 Prepared by: SITE INFORMATION Identifying Information: United
Small Dam Repair The Stone Lake Dam Story. Joe Barron, P.E. SynTerra formerly the Fletcher Group, Inc. 148 River St. Suite 220 Greenville, S.C.
Small Dam Repair The Stone Lake Dam Story Joe Barron, P.E. SynTerra formerly the Fletcher Group, Inc. 148 River St. Suite 220 Greenville, S.C. 29601 1 Historical background of Stone Lake A series of three
Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation
Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation Jeff R. Hill, P.E. Hayward Baker Inc. 111 W. Port Plaza Drive Suite 600 St. Louis, MO 63146 314-542-3040 [email protected]
Secondary Lead Smelting
Secondary Lead Smelting Secondary Lead Smelting Objectives Describe the basic smelting process terms: smelting, refining, and alloying List key chemicals associated with secondary lead smelting Define
SEWER BACKUPS & BASEMENT FLOODING PREVENTATIVE SOLUTIONS FOR THE BUILDING OWNER
Village of Shorewood, Wisconsin SEWER BACKUPS & BASEMENT FLOODING PREVENTATIVE SOLUTIONS FOR THE BUILDING OWNER Prepared By: Thomas A. Zoulek, P.E., LEED A.P. Vice President Mid City Plumbing & Heating
Illinois Environmental Protection Agency Division of Water Pollution Control Class K Study Guide Industrial Wastewater Operator Certification
Illinois Environmental Protection Agency Division of Water Pollution Control Class K Study Guide Industrial Wastewater Operator Certification Revised March 2003 The purpose of this study guide is to help
Section 02702 SEWER PIPE INSTALLATION AND TESTING
PART 1 - GENERAL Section 02702 SEWER PIPE INSTALLATION AND TESTING 1-1. SCOPE. This section covers the installation and testing of all sewer pipe furnished under the following specification sections: Concrete
812-3 LIMITATIONS: b. No fire hydrant shall be obstructed or used when there is a fire in the area.
812-1 SCOPE OF WORK: SECTION 812 SEWER LINE, MANHOLE AND WET WELL CLEANING a. The Contractor shall provide all labor, materials, equipment, and incidentals necessary to perform the cleaning of sewer lines,
Removing Heavy Metals from Wastewater
Removing Heavy Metals from Wastewater Engineering Research Center Report David M. Ayres Allen P. Davis Paul M. Gietka August 1994 1 2 Removing Heavy Metals From Wastewater Introduction This manual provides
1332 CHAPTER 18 Sample Questions
1332 CHAPTER 18 Sample Questions Couple E 0 Couple E 0 Br 2 (l) + 2e 2Br (aq) +1.06 V AuCl 4 + 3e Au + 4Cl +1.00 V Ag + + e Ag +0.80 V Hg 2+ 2 + 2e 2 Hg +0.79 V Fe 3+ (aq) + e Fe 2+ (aq) +0.77 V Cu 2+
Chapter 20. MULTIPLE CHOICE. Choose the one alternative that best completes the statement or answers the question.
Chapter 20 MULTIPLE CHOICE. Choose the one alternative that best completes the statement or answers the question. 1) The gain of electrons by an element is called. A) oxidation B) reduction C) sublimation
SILVERCORP REPORTS RESULTS FROM ITS 2012 EXPLORATION PROGRAM AT THE SGX MINE, YING MINING DISTRICT, CHINA
NEWS RELEASE Trading Symbol: TSX: SVM NYSE: SVM SILVERCORP REPORTS RESULTS FROM ITS 2012 EXPLORATION PROGRAM AT THE SGX MINE, YING MINING DISTRICT, CHINA VANCOUVER, British Columbia June 4, 2013 Silvercorp
The checklist utilized by the Authority will be similar to that which is shown below. Project Name: Location: Consulting Engineering Firm:
Page 1 of 6 Section 1. PURPOSE This policy is an Engineering checklist of the Local Review Program for sanitary sewer improvement projects by the Bedford Regional Water Authority ( Authority ). Section
Corrosivity of Water Supplies
WD-DWGB-3-4 2009 Corrosivity of Water Supplies What is meant by Corrosivity? Corrosive water can be defined as a condition of water quality which will dissolve metals from metallic plumbing at an excessive
Copper and Copper Alloy Tube, Pipe and Fittings
Copper and Copper Alloy Tube, Pipe and Fittings COPPER and COPPER ALLOY TUBE and PIPE Seamless Copper Pipe: Copper pipe is almost pure copper manufactured to the requirements of ASTM B 42 - Standard Specification
Life After Getting a BS and MS Degree Working as a Professional in PA
Life After Getting a BS and MS Degree Working as a Professional in PA Presented by: Mr. Brian Oram, PASEO Soil Scientist Professional Geologist B.F. Environmental Consultants Inc. 15 Hillcrest Drive Dallas,
Coast Trunk Sewer Rehabilitation Project for the Orange County Sanitation District
Coast Trunk Sewer Rehabilitation Project for the Orange County Sanitation District Paul F. Wilson 1 and Robert J. Warren 2 1 1525 Faraday Ave, Suite 290, Carlsbad, California, USA 92008; e-mail: [email protected].
PTS HELICAL PIERS INSTALLATION SPECIFICATIONS NOTICE
FORM A PTS HELICAL PIERS INSTALLATION SPECIFICATIONS NOTICE The following suggested specifications are written as a guide to assist the specifier in writing his own specifications. Specific circumstances
TABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth
TABLE OF CONTENTS NO. MP-1 MP-2 MP-3 MP-4 MP-4.01 MP-4.02 MP-4.03 MP-5 MP-5.01 MP-5.02 MP-5.03 MP-5.04 MP-5.05 MP-5.06 MP-5.07 MP-5.08 MP-5.11 MP-5.12 MP-5.13 MP-5.14 MP-5.15 MP-5.16 MP-5.18 MP-5.19 MP-5.20
SECTION 33 41 13 PUBLIC STORM UTILITY DRAINAGE PIPING
SECTION 33 41 13 PUBLIC STORM PART 1 - GENERAL 1.01 SECTION INCLUDES A. Storm drainage piping, fittings, and accessories at proposed station areas and locations other than under and immediately adjacent
AIR RELEASE, CLEANOUT, AND SEWER MANHOLES
AIR RELEASE, CLEANOUT, AND SEWER MANHOLES **From Hartford IM BLDG(10) DESCRIPTION. This work shall consist of the construction of air release, cleanout, and sanitary sewer manholes; and the furnishing
City of Largo Environmental Services Department Environmental Control Program 5100 150 th Avenue North Clearwater, FL 33760 Phone: (727) 518-3076
POCTS # (To be assigned by City of Largo Environmental Control.) City of Largo Environmental Services Department Environmental Control Program 5100 150 th Avenue rth Clearwater, FL 33760 Phone: (727) 518-3076
FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation
644-10-569 Page 1 of 9 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING
Outokumpu Oyj. Mining Business. Stainless Steel Business Area AvestaPolarit Chrome Oy Kemi Mine. Base Metals Mines Tara Mines Ltd Hitura Mine
Outokumpu Oyj Mining Business Stainless Steel Business Area AvestaPolarit Chrome Oy Kemi Mine Base Metals Mines Tara Mines Ltd Hitura Mine Precious Metals Mines Orivesi Mine Vammala Plant Exploration for
CHAPTER 3 STORM DRAINAGE SYSTEMS
CHAPTER 3 STORM DRAINAGE SYSTEMS 3.7 Storm Drains 3.7.1 Introduction After the tentative locations of inlets, drain pipes, and outfalls with tail-waters have been determined and the inlets sized, the next
A MINING ENGINEER: A GLOBAL CITIZEN
Photo courtesy of Teck. Being a mining engineer is about a lot more than rocks, minerals, and hard hats. The opportunities are vast and varied. Mining Engineering includes everything to do with the extraction
SILVERCORP INTERCEPTS 18.8 METRES TRUE WIDTH GRADING 368 G/T SILVER AND 1.78 PERCENT LEAD AT THE LM MINE WEST, YING MINING DISTRICT, CHINA
NEWS RELEASE Trading Symbol: TSX: SVM NYSE: SVM SILVERCORP INTERCEPTS 18.8 METRES TRUE WIDTH GRADING 368 G/T SILVER AND 1.78 PERCENT LEAD AT THE LM MINE WEST, YING MINING DISTRICT, CHINA VANCOUVER, British
SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.
02150-1 of 6 SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING 02150.01 GENERAL A. Description Removal or abandonment of existing utilities and underground structures shall include, but not necessarily
ARTICLE II (2) ARTICLE II - REQUIRED USE OF PUBLIC SEWERS. PARAGRAPH 020001 Purpose and Application.
ARTICLE II - REQUIRED USE OF PUBLIC SEWERS. PARAGRAPH 020001 Purpose and Application. Article II provides rules governing the allowable connection to the City POTW and the construction and inspection of
A Revolution for Telecom, Electric, Gas, & Water"
"Pipe Bursting A Revolution for Telecom, Electric, Gas, & Water" Presented by the Leadership of the IPBA International Pipe Bursting Association A Division of NASSCO National Association of Sewer Service
FY08 SEWER POINT REPAIRS BID TABULATION
6-07-831 Page 1 of 12 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING "
Construction Site Inspection Checklist for OHC000004 By making use of some simple Best Management Practices (BMPs) a construction site operator can
Construction Site Inspection Checklist for OHC000004 By making use of some simple Best Management Practices (BMPs) a construction site operator can do his or her share to protect Ohio's water resources
Distribution of Chemical Elements In Urban Sediments in Slovenia (Extended Abstract)
Robert SAJN and Simon PIRC Distribution of Chemical Elements In Urban Sediments in Slovenia (Extended Abstract) The goal of the study work was to assess the distribution of chemical elements in anthropogenic
South Dakota s Statewide Ground Water Quality Monitoring Network
South Dakota s Statewide Ground Water Quality Monitoring Network Derric L. Iles State Geologist Geological Survey Program Department of Environment and Natural Resources 2014 Eastern South Dakota Water
SECTION 6 SANITARY SEWER MAIN 6.01 SCOPE
6.01 SCOPE The work covered by this section of the specifications consists of the furnishing of all plant, labor, materials, equipment and supervision and performing all operations involved in the construction
2. Write the chemical formula(s) of the product(s) and balance the following spontaneous reactions.
1. Using the Activity Series on the Useful Information pages of the exam write the chemical formula(s) of the product(s) and balance the following reactions. Identify all products phases as either (g)as,
LOS ANGELES UNIFIED SCHOOL DISTRICT INDUSTRIAL WASTEWATER MANAGEMENT PROCEDURES
LOS ANGELES UNIFIED SCHOOL DISTRICT INDUSTRIAL WASTEWATER MANAGEMENT PROCEDURES Office of Environmental Health and Safety 333 S. Beaudry Avenue, 20 th Floor Los Angeles, California 90017 (213) 241-3199
Sewer Rehabilitation Design Requirements
Sanitary Sewer Overflow (SSO) Control and Wastewater Facilities Program Sewer Rehabilitation Design Requirements City of Baton Rouge/Parish of East Baton Rouge Department of Public Works Submitted by Prepared
Water Supply, Distribution and Storage Sabana Grande, Nicaragua
Our School Logo Water Supply, Distribution and Storage Sabana Grande, Nicaragua Project Description: Sabana Grande, Nicaragua reached out to our team of forty student engineers to provide a new water supply,
