PAVEMENT REHABILITATION MANUAL
|
|
|
- Letitia Casey
- 10 years ago
- Views:
Transcription
1 PAVEMENT REHABILITATION MANUAL Chapter 6 - Comparison of Alternative Rehabilitation Strategies Issued by: Queensland Department of Transport and Main Roads Pavements, Materials & Geotechnical Branch For document content enquiries: For administrative enquiries: Principal Engineer (Pavement Rehabilitation) Phone: (07) Facsimile: (07) Technical Reference Centre Engineering and Technology Division GPO Box 1412, Brisbane, Q, 4001 Phone: (07) Facsimile: (07)
2 TRADEMARKS ACKNOWLEDGEMENT Terms mentioned in this document that are known or understood to be trademarks, whether registered or not, have been identified. Where trademarks have been confirmed as registered in Australia, this has been indicated by the addition of the symbol, otherwise the symbol is used. While all care has been taken to identify trademarks, users should rely on their own inquiries to determine trademark ownership. Use of a term in this document as a trademark should not be regarded as affecting the validity of any trademark. IMPORTANT INFORMATION The requirements of this document represent Technical Policy of the department and contain Technical Standards. Compliance with the department s Technical Standards is mandatory for all applications for the design, construction, maintenance and operation of road transport infrastructure in Queensland by or on behalf of the State of Queensland. This document will be reviewed from time to time as the need arises and in response to improvement suggestions by users. Please send your comments and suggestions to the feedback given below. FEEDBACK Your feedback is welcomed. Please it to: [email protected]. DISCLAIMER This publication has been created for use in the design, construction, maintenance and operation of road transport infrastructure in Queensland by or on behalf of the State of Queensland. Where the publication is used in other than the department s infrastructure projects, the State of Queensland and the department give no warranties as to the completeness, accuracy or adequacy of the publication or any parts of it and accepts no responsibility or liability upon any basis whatever for anything contained in or omitted from the publication or for the consequences of the use or misuse of the publication or any parts of it. If the publication or any part of it forms part of a written contract between the State of Queensland and a contractor, this disclaimer applies subject to the express terms of that contract. COPYRIGHT Copyright protects this publication. Except for the purposes permitted by and subject to the conditions prescribed under the Copyright Act, reproduction by any means (including electronic, mechanical, photocopying, scanning, microcopying or otherwise) is prohibited without the prior written permission of the Queensland Department of Transport and Main Roads. Enquiries regarding such permission should be directed to Pavements, Materials, and Geotechnical Branch, Engineering and Technology Division, Queensland Department of Transport and Main Roads. State of Queensland (Department of Transport and Main Roads)
3 PAVEMENT REHABILITATION MANUAL Chapter 6 Comparison of Alternative Rehabilitation Strategies
4 Issue/ Rev No. Reference Section Chapter 6 Amendments Revision Register Description of Revision Authorised by Date 1 First Issue. June Manual completely reviewed and rewritten. See sign-off page above. Also Principal Engineer (Pavement Rehabilitation) 3 - Manual checked See sign-off page above. Also Principal Engineer (Pavement Rehabilitation July
5 Contents of Chapter 1 Overview Chapter 2 Pavement Evaluation Chapter 3 Selection of Alternative Rehabilitation Options Chapter 4 Technical Details of Specific Rehabilitation Treatments Chapter 5 Design of Pavement Rehabilitation Treatments: Mechanistic and Deflection Reduction Methods Chapter 6 Comparison of Alternative Rehabilitation Strategies
6 This page has been left blank intentionally.
7 Department of Transport and Main Roads Chapter 6 Comparison of Alternative Rehabilitation Strategies Table of Contents 6.1 INTRODUCTION SCOPE ECONOMIC COMPARISON Key principles Page Assessment period and design period Methods Whole of life costs using the present worth of cost method Benefit-cost analysis Preconstruction costs Capital (initial construction) costs Provision for traffic/traffic management Wet weather Establishment and disestablishment Supervision and overheads Relocation of public utility plant (services) Testing Economies of scale Staging and other costs associated with pavement rehabilitation Maintenance and Rehabilitation Costs Typical maintenance requirements Salvage or residual value Discount rate Road user costs Optimal strategy Economics Network considerations Sensitivity analysis Risk OTHER CONSIDERATIONS Multi-criteria analysis REFERENCES List of Tables Table 6.1 Simplified, illustrative example of MCA calculations using ranking 6-13 Page 6-i
8 Department of Transport and Main Roads Chapter 6 - Comparison of Alternative Rehabilitation Strategies List of Figures Figure 6.1 Analysis of Pavement Strategies Using Discounted Costs (modified from Markow. 1985) List of Equations Equation PWOC formula Page 6-ii
9 Department of Transport and Main Roads Chapter 6 Comparison of Alternative Rehabilitation Strategies Chapter 6 - Comparison of Alternative Rehabilitation Strategies 6.1 INTRODUCTION Often more than one option is a viable solution. In such cases options need to be compared (e.g. by identifying and comparing costs and benefits). Commonly this comparison includes consideration of: the capability and/or capacity of industry; financial considerations or constraints; the technical merits of each option (as discussed in previous Chapters); and an economic comparison (refer to Section 6.3). Where appropriate other relevant factors (e.g. environmental impact, refer to Section 6.4) should also be considered. Generally the comparison of rehabilitation options should be undertaken as discussed in the Pavement Design Manual (PDM) (QDMR 2009). Notwithstanding this, Chapter 6 of this manual takes precedence. There are many factors that may influence the choices made for projects. Therefore the pavement can not always be considered discretely or in isolation (e.g. refer to Section 6.4). It is important to note however that the pavement rehabilitation designer may not: have knowledge of, or access to, information about all such factors; have the expertise to evaluate factors not related to pavement rehabilitation design; and/or be responsible for considering all factors. For example on a large project with a multi-disciplinary team the pavement rehabilitation designer may not have access to information about the cost of upgrading structures/bridges to maintain vertical clearances, the adequacy of the surface drainage of the existing or rehabilitated pavement or local issues such as those related to noise and vibration. Given the above the Customer needs to determine the appropriate level and type(s) of analysis, and consider the alternatives in a holistic fashion (e.g. by using multi-criteria analysis, see Section 6.4.1). 6.2 SCOPE This manual is focused on pavement rehabilitation investigation and design. Therefore this chapter is limited to providing guidance about how to compare pavement rehabilitation options based primarily on pavement rehabilitation factors (i.e. a simplified method of analysis is presented). Further this is limited to comparing: the technical merits of each option (refer to previous Chapters); and the Whole Of Life Costs (WOLCs) of each option calculated using the Present Worth Of Costs (PWOC) method for pavement related costs (as described in this Chapter). Note: The WOLC is calculated over the same assessment period for all options. Page 6-1
10 Department of Transport and Main Roads Chapter 6 - Comparison of Alternative Rehabilitation Strategies Given the simplicity of the method of economic comparison presented in this Chapter, designers and the Customer should carefully consider the merit of the results obtained from its use. In addition it may not be appropriate to use any such results as the only determinant of the most appropriate option. Advice should be sought and/or relevant literature should be referenced if an analysis more detailed than that described in this Chapter is warranted (e.g. for major projects or projects involving high traffic volumes). Some other methods are briefly discussed for the reader s information (e.g. Sections 0, and 6.4.1) however detailed guidance with respect to them is beyond the scope of this manual 6.3 ECONOMIC COMPARISON A prime consideration when comparing various alternative rehabilitation options is their WOLC, or life cycle cost. It is used in one form or another, by most road authorities to compare pavement rehabilitation options. The definition of WOLC is: all ownership and user costs necessary to provide a serviceable pavement over the assessment period. These include: the costs associated with construction, maintenance, rehabilitation, traffic disruption/road user delay costs; and the salvage value. The option(s) with the lowest WOLC are often preferred. However a decision can not necessarily be made based on the results of a WOLC analysis alone. The decision must also take other relevant factors into consideration (e.g. Section 6.4). Some of these are as follows: The relative importance of initial capital expenditure compared to future expected expenditures. Maintenance requirements. Road safety considerations. The scale of the project. Noise and spray effects. The potential for differential settlement. Traffic management during construction. The method of rehabilitation. The option which best suits the road authority s/ owner s requirements. For example an alternative that had a low WOLC but required equipment or personnel that were not available would obviously be a poor choice. Likewise, an alternative with a moderate overall WOLC beyond the project s budget would be an equally poor choice. The alternative chosen must be a viable one. The discussion is Section 6.4 provides more examples of factors that may need to be considered Key principles Four basic principles of economic analysis are as follows: 1. Economic analysis is not intended to provide a decision, it is merely a tool to aid the decision-making process. 2. Any economic analysis must consider all viable alternatives. 3. The same assessment period must be used for all alternatives (see Section 6.3.2). 4. Where possible costs, including road user costs, as well as benefits should be included in the economic analysis. Page 6-2
11 Department of Transport and Main Roads Chapter 6 Comparison of Alternative Rehabilitation Strategies Modelling and costing road user costs is complex and beyond the scope of this manual however Assessment period and design period The assessment period is the length of time for which comparisons of the WOLC are to be made. It should be the same for all options evaluated and should not be less than the longest effective life the options considered. For example if Option A has a 20 year design life and Option B is a staged 10 year design then the assessment period would be 20 years for all options. If Option C with a 40 year design life was included then the assessment period would be 40 years for all options It is important to note, as indicated above, that the assessment period does not always equal the design period. For example a rehabilitation designs may be developed for design lives of 10 and 20 years but in this case the assessment period, to compare all options, must be 20 years. Except for lower trafficked roads the PDM (QDMR 2009) recommends a minimum analysis period of 40 years or the life of the alignment, whichever is the lesser, for new pavements. For rehabilitation projects where assessment periods of 10 (e.g. for low volume roads) to 40 years may be more appropriate. The designer must confirm the assessment period to be used with the Customer. When selecting the assessment period the expected life of the road should be considered. For example if a complete realignment is expected 15 years after opening then the assessment period should not exceed 15 years from opening Methods Keeping the key principles outlined in Section in mind, there are a number methods available for performing an economic analysis. These include the following: Equivalent annual cost which divides all costs into equal payments over the analysis period. PWOC which discounts future costs to present costs. (This is different to determining a net present value.) Internal rate of return which determines the rate at which costs and benefits are equal. Cost effectiveness, which is useful when significant non-monetary outputs are involved. Benefit-Cost Analysis (BCA, see Section 0). This may include the calculation and consideration of one or more of the following items: o A Benefit-Cost Ratio (BCR), which is the ratio of present worth of benefits to present worth of costs. o The Net Present Value (NPV, see Section ). The above methods are further described in the RTA Economic Analysis Manual (RTA 1999), the Austroads Benefit Cost Analysis Manual (Austroads 1996) and Part 2 of Austroads Pavement Evaluation Methodology (Austroads 2005). Typically a simplified economic comparison is used by the pavement rehabilitation designer. This entails calculating WOLCs via the PWOC method to compare pavement rehabilitation options (where the only costs considered are those for constructing, rehabilitating and maintaining a pavement). Road user costs for instance are ignored. It is a relatively simple approach and most relevant where the effect of various Page 6-3
12 Department of Transport and Main Roads Chapter 6 - Comparison of Alternative Rehabilitation Strategies pavement rehabilitation options on other aspects (e.g. on road safety) is the same or very similar. More complex analyses may be warranted however (refer to Section 6.2) Whole of life costs using the present worth of cost method The purpose, in the economic comparison described in this section, is to evaluate alternatives primarily according to the criterion of minimum total WOLC calculated using the PWOC method described in this Chapter. The PWOC method described in this Chapter only considers the construction, rehabilitation and maintenance costs of pavement rehabilitation options/treatments. The method effectively allows for both routine and periodic maintenance and rehabilitation costs which will occur during the assessment period. Ignoring any maintenance costs between the present and the year of opening the WOLC can be calculated using the PWOC formula given Equation 6.1 and including all costs during the assessment period. (In most cases the maintenance costs would be the same for each option and in this case ignoring them would not lead to a different conclusion.) When evaluating options using their WOLCs the lower the WOLC the better, in economic terms. Equation PWOC formula -(y i PWOC = C(1+r) + M(1+r) +x) -S(1+r) -x -(z+x) i i Where: PWOC = present worth of costs = WOLC when PWOC of all costs within assessment period are included. C = cost of initial construction x = number of years from the present to the year of opening (provided by the Customer), zero if the year of opening is the present year. M i = cost of i th maintenance and/or rehabilitation work for all such work which takes place within the assessment period r = real discount rate expressed (e.g. for a real discount rate of 3%/annum 0.03 is used in the formula, see Section 6.3.9) y i = number of years from the year of opening to the i th maintenance or rehabilitation work, within the analysis period S = salvage value of pavement at the end of assessment period expressed in terms of present value Z = assessment/analysis period measured from the year of opening, in years To estimate the WOLC of options using the methodology described in this Chapter, the principle elements to be considered are the: opening (or base or evaluation) year; pre-construction costs; initial construction costs; staging costs, if any; Page 6-4
13 Department of Transport and Main Roads Chapter 6 Comparison of Alternative Rehabilitation Strategies routine and periodic maintenance costs; (structural) rehabilitation costs; salvage value; real discount rate; and assessment/analysis period. Calculation of the WOLC of pavement rehabilitation options can be relatively easily completed using spreadsheet software Benefit-cost analysis An alternative to the use of the PWOC method is the use of benefit-cost, or cost-benefit, analysis. It is commonly used in the Department of Transport and Main Roads (TMR) for road infrastructure projects and is an input to the evaluation and comparison of projects. It typically involves the calculation of Benefit-Cost Ratio (BCR) and where this is > 1 there is economic benefit and merit in undertaking the project. It is important to note however that options for pavement rehabilitation are generally mutually exclusive (i.e. if Option A is constructed Options B and C are not constructed). This means the use of an absolute BCR can be misleading when comparing pavement rehabilitation options for the same section of road. (Incremental BCR analysis however may be used to rank options. For further details refer to the Austroads Benefit Cost Analysis Manual [Austroads 1996].) BCR can be used as an input when deciding which independent projects are undertaken (e.g. when comparing the benefit of doing works on road Section X as opposed to Section Y) Net present value Net present value (NPV) analysis is a form of benefit-cost (economic) analysis. It requires the calculation of costs and benefits accruing from each option. Net present value is an absolute measure equal to discounted benefits (user + non-users) over the life of the project less discounted costs (Austroads 1996). A positive NPV indicates an option or project has an economic benefit and hence economic merit. Based solely on a NPV analysis the option with the highest NPV would be selected. NPV is not used in this manual however, partly because quantifying benefits can be difficult and may be outside a pavement rehabilitation designer s area of expertise Preconstruction costs Preconstruction costs include the costs associated with any design, development of contract documentation, tendering and contract administration. This may be particularly important for staged options where new contracts, designs (e.g. for changes to drainage), etc will need to be developed for future interventions Capital (initial construction) costs Unit costs for alternative pavement rehabilitation designs will vary widely depending on factors such as degree of competition, locality, availability of suitable resources (e.g. plant, personnel and material), types of resources employed and how they are employed (e.g. product standards required in standards and specifications) and the scale of the project. TMR has records of unit costs from past TMR (and Queensland Transport and Queensland Main Roads) road infrastructure projects. For TMR works these can be used to Page 6-5
14 Department of Transport and Main Roads Chapter 6 - Comparison of Alternative Rehabilitation Strategies estimate the costs of the options being compared. If this information is not available then costs may be assessed from experience. There are, however, several other less obvious costs which warrant consideration. Some alternatives will require more excavation (cut) or more fill (e.g. where surface levels are fixed by extraneous constraints), may interfere with public utility plant (services), or require more shoulder material than others. For example, a significant saving in shoulder material (e.g. with respect to excavation and supply) can be made, for equivalent performance, by using a full-depth asphalt or pavement, with a modified or stabilised layer. (These will be thinner compared to an unbound granular pavement.) Consequently, comparing the cost per square metre of the pavement alone is often misleading. Comparative costs should be expressed as a cost per kilometre for the treatments for the full carriageway formation (cross section) or as a total cost per project. The costs should include all ancillary works such as shoulder improvements and the relocation of public utility plant (services). Alternatively the total cost of the project, including overheads, can be used. Where costs associated with overheads and non-pavement activities differ between options these should also be included. Overheads and other costs which are not necessarily included in the pavement unit costs, may vary with each option. Such costs include those associated with: provision for traffic/traffic management; wet weather; establishment and disestablishment; supervision; overheads; relocation of public utility plant (services); testing; and economies of scale. These are discussed further in the following sections. In many cases, designers may not have sufficient information to make an accurate comparison of the construction costs of various alternatives, and in such cases, it may be desirable to call for both conforming and non-conforming (i.e. alternative) tenders Provision for traffic/traffic management Alternatives which take longer to construct, have more complicated traffic management plans or have to be constructed under traffic usually have a higher cost. Some alternatives can be built under traffic while others may require a side track. In some road corridors side tracks may not be possible which will affect the cost and practicality of alternatives Wet weather The costs associated with dealing with wet weather will need to be considered (e.g. to rework or dry materials, providing bituminous seals between asphalt layers). In wet climates these costs can be very significant and often unpredictable. Alternatives using bound material tend to be quicker to build and may help avoid costs associated with reworking. However the use of bound materials may introduce other costs (e.g. the cost of providing bituminous seals between asphalt layers likely to be exposed to rain, refer to the PDM [QDMR 2009]). Page 6-6
15 Department of Transport and Main Roads Chapter 6 Comparison of Alternative Rehabilitation Strategies Establishment and disestablishment Establishment and disestablishment costs such as those for the transport and set up of plant, etc. can vary between alternatives. Specialised equipment (e.g. for producing, mixing, laying or compacting) may be required for some options and not others. Options that involve a number of different types of pavement/materials are likely to involve higher plant establishment and disestablishment costs Supervision and overheads Supervision and overhead costs are time dependant. Therefore alternatives which take longer to construct tend to cost more to supervise. Similarly, longer construction periods involve higher overheads costs such as those for camp maintenance, power, phone and project cost management Relocation of public utility plant (services) Pavement alternatives which have significantly different total thicknesses may involve greatly different costs in relation to the relocation of public utility plant (services) such as electricity or communications cables, sewerage pipelines, water or gas supply pipelines and drainage installations. These relocation costs may be extremely high, particularly in urban areas. In such situations the use of full depth asphalt, special high strength cementitiously stabilised materials or concrete may be required to keep the pavement as thin as possible Testing Different pavement types will differ in their demand for testing contributing to cost differentials. The use of new or unfamiliar materials may require an extensive pre-construction testing program also resulting in cost differences between options. In the latter case a considerable expense may be incurred. (It also requires an adequate lead time to allow the testing required to be completed during design and/or before construction.) Economies of scale There are significant economies of scale in some pavement operations. Economies of scale may also be realised by combining projects Staging and other costs associated with pavement rehabilitation As mentioned in Chapter 3 a staged approach may result in a lower initial (capital) cost but result in a higher WOLC. (Note: A staged approach is one in which at least one of the future interventions is structural.) This is because of the future costs associated with things such as: Constructing structural interventions during the analysis period. Traffic management during future interventions/works. Reconstruction of bridges and/or pavements to provide the required vertical clearances. Raising or reconstructing road safety barriers. Raising or reconstructing kerb and kerb and channel, or other roadside furniture. Modifying or reconstructing drainage systems and structures. Correcting the surface shape to satisfy geometric requirements (e.g. for widening where cross fall and superelevation may need to be changed and/or a crown may need to be introduced or changed). Page 6-7
16 Department of Transport and Main Roads Chapter 6 - Comparison of Alternative Rehabilitation Strategies (Where possible these costs should be minimised. For example some road safety barriers can be constructed to allow, to a limited extent, for future overlays.) Therefore when calculating the WOLC for each option ALL future costs that can be practically estimated need to be estimated and included. For example the cost of raising or reconstructing road safety barriers can be included however the costs associated with amount of greenhouse gases generated may currently be difficult to estimate and include). Reference should be made to Chapter 3 for a more detailed discussion on staged construction Maintenance and Rehabilitation Costs Refer to Section F.3.2 of Appendix F of the AGTPT Part 5 (Austroads 2009) for a discussion about subsequent maintenance and rehabilitation costs Typical maintenance requirements Some typical maintenance considerations are discussed below Granular pavements with bituminous seals Granular pavements with bituminous sprayed seals normally require routine maintenance from early in the life of the pavement. Resealing to maintain a competent seal is typically required every five to ten years. Some reduction of the reseal frequency, particularly on roads with lower traffic volumes, can be achieved by applying periodic surface enrichments. Double (two) coat bituminous sprayed seals typically perform adequately for six to twelve years Asphalt surfaced pavements Asphalt surfaced pavements typically require less routine maintenance during their life than do granular pavements with bituminous sprayed seals, but unit costs for repairs may be higher. Because of oxidation of the bitumen in the asphalt surfacing layer and the resultant wear or cracking, the milling and replacement of the surfacing layer or resurfacing is normally required every seven to twelve years. For full depth asphalt and deep strength asphalt High Intensity, Low Intervention (HILI) type pavements without staging milling and replacement may be preferred as surface heights will not be affected Pavements with cementitiously modified/stabilised layers Pavements with cementitiously modified/stabilised layers close to the surface normally require increased maintenance to deal with reflective cracking (e.g. seal cracks). Unsealed cracks will allow water to ingress into the pavement and result in reduced pavement life Pavements with concrete layers Pavements with concrete layers and a concrete surfacing typically require less maintenance than other pavement types. However concrete pavements are more sensitive to inadequate or incorrect design, or unanticipated increases in traffic loading. Where this is the case maintenance costs can be significant and unanticipated Salvage or residual value As a guide, the salvage value of unbound granular and bitumen stabilised materials is generally high while that of asphalt (unless recycled) and cementitiously stabilised materials may be relatively low if they are Page 6-8
17 Department of Transport and Main Roads Chapter 6 Comparison of Alternative Rehabilitation Strategies severely cracked or otherwise distressed. In cases where the existing pavement must be removed, the salvage value can be negative (i.e. there is a cost rather than a salvage value). Where asphalt fatigue in a flexible granular pavement is the dominant distress mode then, in most cases, the other pavement layers will be quite sound. In these circumstances, provided the asphalt is in reasonable condition, the salvage value is high. In this case rehabilitation using an asphalt overlay is one appropriate option. Sound layers within a full depth asphalt or deep strength asphalt HILI type pavement will generally be high provided all underlying layers are in sound condition. It is important to note that the salvage value can vary between options. Refer also to Section F.3.3 of Appendix F of the AGTPT Part 5 (Austroads 2009) for further discussion about salvage costs Discount rate It is important to understand that there is a difference between interest rates and discount rates. Interest rates are normally associated with the borrowing and lending of money, whereas discount rates are used to express future costs to costs in present-day terms. An appropriate (real) discount rate must be selected and used to calculate the PWOC of future expenditure. This rate is expressed in real terms (i.e. it excludes inflation). For TMR projects the discount rate should be obtained from the Queensland Treasury Department before the analysis begins. Real discount rates as low as 4% have been used when evaluating alternative strategies. In most cases, it is desirable to carry out a sensitivity analysis with the discount rate varying between say 4% and 10%. Refer also to Section F.3.4 of Appendix F of the AGTPT Part 5 (Austroads 2009) for further discussion about real discount rates Road user costs Road user costs are the most complex of the costs considered in a WOLC analysis and are excluded from the simple economic comparison methodology described in this Chapter. It is important to note that different pavement rehabilitation options or strategies will often result in different roughness profiles (e.g. initial roughness plus increases in roughness over time). This can impact on road user costs. Refer also to Section F.3.3 of Appendix F of the AGTPT Part 5 (Austroads 2009) for further discussion about road user costs Optimal strategy What the optimal strategy is can depend on a number of factors Economics In economic terms the optimal pavement strategy is one with the lowest WOLC. This is as shown in Figure 6.1. This is the case when making comparisons in isolation on a particular project. Attachment F of the Page 6-9
18 Department of Transport and Main Roads Chapter 6 - Comparison of Alternative Rehabilitation Strategies AGTPT Part 5 provides an example of an economic comparison. However the economics of options may be only one of the aspects considered when choosing an option (viz. Section 6.3). PWOC (over assessment period) User Total Maintenance and Rehabilitation Optimal strategy is the one with the lowest total WOLC Construction Pavement Strategy Optimal Strategy Figure 6.1 Analysis of Pavement Strategies Using Discounted Costs (modified from Markow. 1985) Network considerations The method of economic comparison described in this Chapter focuses on selecting the option with the lowest WOLC. Often using this criterion alone means an option with a relatively high capital cost is identified as the best. However the impact of constructing such options on the state of the road network as a whole should be considered. Adopting options with a relatively high capital cost may not be the most effective way to improve the state of the network as a whole. This is the case where doing so would compromise the capacity to improve Page 6-10
19 Department of Transport and Main Roads Chapter 6 Comparison of Alternative Rehabilitation Strategies other/more links in the network and so compromise the ability of the road authority to raise the overall standard of the network. This applies even if such options have the lowest WOLC. Conversely the overall state of the network can deteriorate when low cost capital works requiring repeat interventions at relatively short intervals are undertaken. A balance must be sought between what is best at the project and network levels while considering the available road funding. To this end the use of what if scenario analyses using a pavement management system may be used to inform decisions Sensitivity analysis When comparing options a sensitivity analysis may be warranted. It helps assess the impact of uncertainty and helps identify which variables are most critical in determining the outcome of an evaluation. This may include sensitivity to changes such as discount rates (as described in Section 6.3.9), the timing and cost of future interventions, and changes in traffic growth Some Austroads publications provide guidance with respect to what factors and limits can be considered (e.g. Austroads 1996; Austroads 2005). A sensitivity analysis must be done in a systematic way with the results presented clearly Risk Risks should be managed in accordance with TMR polices and documents (e.g. the Project Manager s Risk Management Guidelines [QDMR 2004] and OnQ intranet site [TMR 2010]). Depending on the mitigating measures employed, how risk is managed may influence the cost of an option. 6.4 OTHER CONSIDERATIONS While the economics of various options is an important consideration when comparing them, other factors often need to be considered. In particular large, complex or difficult projects often require that many factors be considered. The interrelationships or interdependencies that exist across a range of aspects need to be taken into account (e.g. effect of geometry on surfacing choice). These may or may not be more important than the economics of the option(s). Factors that may need to be considered include the following: Effect of options on future road operation and vice versa (e.g. with respect to geometry and vertical clearances). Risks associated with options and mitigating measures (e.g. with certain pavement materials or techniques, accuracy of traffic forecasts, settlement). Types of road users, including cyclists, pedestrians and motorcyclists, and the impact of options on them. Project constraints (e.g. structural capacity of existing bridges, budget). Availability of plant, personnel and materials. Road safety (such as performance/effect on crash rate during and after construction). Environmental impacts such as: o o use of scarce recourses; use of recycled water or materials; Page 6-11
20 Department of Transport and Main Roads Chapter 6 - Comparison of Alternative Rehabilitation Strategies o o o o noise (during and after construction); impacts on flora, fauna and (above ground and underground) water quality; vibration (during and after construction); and air quality (during and after construction). How geometry affects pavement rehabilitation design or choices (e.g. open graded asphalt may be required where aquaplaning is an issue such as where superelevation is developed). Availability of current and future funding. The degree of certainty that the required amount of future funding will be committed at the required time (in terms of Design Equivalent Standard Axles [DESAs]), particularly for staged options. Competing network priorities. Community opinion/feedback, including that of adjacent or adjoining landholders. Effect on amenity. Political aspects. Some of these may be able to be costed in part or in total and included in an economic analysis. As discussed in Section 6.2 detailed guidance about how to consider all relevant factors is beyond the scope of this manual. However, for the reader s information, one tool that may be used to consider multiple factors is briefly discussed Multi-criteria analysis One tool that allows comparison of alternatives is multi-criteria analysis (MCA), sometimes also known as multi-criteria assessment or multi-criteria evaluation. Its use may be warranted in some cases. However its results may not be the only input into the decision making process MCA is a decision-support tool rather than a decision making one. There are various MCA methods. The one described herein is a simple weighting method. For detailed guidance with respect to MCA relevant literature should be referenced and/or specialist advice should be sought. When using the MCA approach assessment criteria are developed. This may be on a project by project basis. Each of these criteria is given a weighting based on their importance on influencing the final outcome: a value (weighting) is assigned to each criteria such that the total of the weightings equals 1 (or 100%); each option is given a score, rating or rank for each of the criteria; for each option the weighting is multiplied by the score, rating or rank; and the total for each option is determined. Options can then be ranked and/or compared. A simplified, illustrative example is shown in Table 6.1 using rankings. Qualitative and/or quantitative measures can be used to assign scores, ratings or rankings. Often there is some subjectivity involved in determining the criteria and assigning the weightings and scores. Notwithstanding this the acceptance of the framework, weightings, scores, etc can possibly be enhanced by Page 6-12
21 Department of Transport and Main Roads Chapter 6 Comparison of Alternative Rehabilitation Strategies including stakeholders in the process of determining them (e.g. through facilitated workshops including internal and external stakeholders). Table 6.1 Simplified, illustrative example of MCA calculations using ranking Option 1 Criteria Weighting ,3 Rank 2 Score 2,3 Rank 2 Score 2,3 Rank 2 Score Economics (lowest WOLC) 0.6 (60%) (= 0.6 x 2) (= 0.6 x 3) (= 0.6 x 1) Minimising increase in road surface height Minimising road traffic noise 0.2 (20%) (10%) Minimising impact community during construction on 0.1 (10%) Total 1 (100%) Overall rank Criteria are for illustrative purposes only. Criteria used in any MCA should be determined on a case by case basis. 2. Values are for illustrative purposes only. Values used in any MCA should be determined on a case by case basis. 3. In this example 3 is highest and 1 is lowest. 4. Based on the MCA Option 2 would be selected for this example. Page 6-13
22 Department of Transport and Main Roads Chapter 6 - Comparison of Alternative Rehabilitation Strategies REFERENCES Austroads 1996 Austroads 2005 Austroads 2009 TMR 2011 Markow 1985 QDMR 2004 QDMR 2009 RTA 1999 Benefit cost analysis manual (Austroads Publication No. AP-42/96), Austroads, Sydney. Guide to Project Evaluation Part 2: Project Evaluation Methodology (Austroads Publication No. AGPE02/05), Austroads, Sydney. Guide to Pavement Technology Part 5: Pavement Evaluation and Treatment Design (Austroads Publication No. AGTP05/09), Austroads, Sydney. OnQ project management intranet site, Queensland Department of Transport and Main Roads. Details unknown. Project Manager's Risk Management Guidelines, Queensland Department of Main Roads. Pavement Design Manual, Queensland Department of Main Roads, Branch, Brisbane. Economic analysis manual (Version 2), Roads and Traffic Authority (NSW), Economic Services and Support Branch, Sydney. Page 6-14
Pavement Rehabilitation Manual
PAVEMENT REHABILITATION MANUAL Chapter 1 - Overview Issued by: Queensland Department of Transport and Main Roads Pavements, Materials & Geotechnical Branch For document content enquiries: For administrative
Life Cycle Cost Analysis (LCCA)
v01-19-11 Life Cycle Cost Analysis (LCCA) Introduction The SHRP2 R-23 Guidelines provide a number of possible alternative designs using either rigid of flexible pavements. There is usually not a single
700 Life-Cycle Cost Analysis... 700-1
Table of Contents 700 Life-Cycle Cost Analysis... 700-1 701 Introduction... 700-1 701.1 Discount Rate... 700-1 702 Initial Construction... 700-1 703 Future Rehabilitation... 700-1 703.1 Introduction...
Traffic volumes adopted for pavement designs are based on the parameters contained in Section 7 of this report.
11. Pavements 11.1 Pavement design Preliminary pavement designs have been developed for the highway travel lanes (through carriageways), the inner and outer shoulders, on and off ramps and service roads.
STATE HIGHWAY ASSET MANAGEMENT MANUAL
STATE HIGHWAY ASSET MANAGEMENT MANUAL Manual Number: SM020 Effective From: October 1996 Re-issued: August 2000 Transit New Zealand PO Box 5084 WELLINGTON Telephone (04) 499 6600 Facsimile (04) 499 6666
www.nams.au.com AN INNOVATIVE APPROACH TO LOCAL GOVERNMENT ROAD NETWORK MANAGEMENT
AN INNOVATIVE APPROACH TO LOCAL GOVERNMENT ROAD NETWORK MANAGEMENT Peter Clewer: Asset Management Officer (Roads), Mornington Peninsula Shire Amy Wade, Manager Axim - A Downer EDI Works Business Abstract
DRAFT ENRICHMENT DESIGN MANUAL. Pavements Engineering No. 1988-45M. R D Leach SENIOR RESEARCH OFFICER. MAIN ROADS Western Australia R:1988-45M
DRAFT ENRICHMENT DESIGN MANUAL Pavements Engineering No. 1988-45M R D Leach SENIOR RESEARCH OFFICER ABSTRACT This report takes the form of a draft surface enrichment design manual. It describes the design
Delineation. Section 4 Longitudinal markings
Delineation Section 4 Longitudinal markings The delineation guidelines have been developed to assist in designing and maintaining a quality delineation system. The guidelines are to comprise 19 sections
SUMMARY: LAND TRANSPORT ASSET MANAGEMENT PLAN
SUMMARY: LAND TRANSPORT ASSET MANAGEMENT PLAN Introduction This Asset Management Plan (AMP) for Land Transport Network 2012 describes in detail how the District s land transport network will be managed
KENTUCKY TRANSPORTATION CABINET POLICY FOR FEDERALLY FUNDED PAVEMENT REHABILITATION AND PREVENTATIVE MAINTENANCE PROJECTS
KENTUCKY TRANSPORTATION CABINET POLICY FOR FEDERALLY FUNDED PAVEMENT REHABILITATION AND PREVENTATIVE MAINTENANCE PROJECTS I. GENERAL The following policy shall apply when the intent of the project is to
SECTION 3.3 - PAVEMENT DESIGN
SECTION 3.3-3.3.1 GENERAL 3.3.2 SUBSURFACE DRAINAGE 3.3.3 DETERMINATION OF DESIGN TRAFFIC 3.3.4 SUBGRADE EVALUATION 3.3.5 PAVEMENT THICKNESS 3.3.5.1 GRANULAR PAVEMENTS WITH THIN BITUMINOUS SURFACING 3.3.5.2
Engineering Policy 146. Severe Weather Management Plans
Engineering Policy 146 Severe Weather Management Plans January 2014 Contents Engineering Policy... 1 1 Policy statement... 1 2 Applicability... 1 3 Context... 1 4 Objectives and benefits... 1 5 Consultation...
Road Asset Management
CHAPTER FIVE Road Asset Management Is the existing surface suitable for resealing? P/17 Resealing Specification Design Life Consideration Rethink treatment options Why are you resealing? Macrotexture Microtexture
REVIEW OF AS5100.1 SCOPE AND GENERAL PRINCIPLES
REVIEW OF AS5100.1 SCOPE AND GENERAL PRINCIPLES Nigel Powers, VicRoads, Australia Frank Rapattoni, Parsons Brinckerhoff, Australia ABSTRACT AS5100, the Australian Bridge Design Code, is currently under
SPECIFICATION FOR CONSTRUCTION OF UNBOUND GRANULAR PAVEMENT LAYERS
TNZ B/02:2005 SPECIFICATION FOR CONSTRUCTION OF UNBOUND 1. SCOPE This specification shall apply to the construction of unbound granular pavement layers. The term pavement layer shall apply to any layer
CHAPTER 2 LCCA APPROACHES
2.1 LCCA Basis CHAPTER 2 LCCA APPROACHES When making decisions about pavement design, LCCA: Compares pavement alternatives; and Identifies the best strategy based on current information as well as meeting
Date: 10/10/2014 Initiated by: AAS-100
U.S. Department of Transportation Federal Aviation Administration Advisory Circular Subject: Airport Pavement Management Program (PMP) Date: 10/10/2014 Initiated by: AAS-100 AC No: 150/5380-7B Change:
Rehabilitation Strategies for Bonded Concrete Overlays of Asphalt Pavements
University of Pittsburgh Rehabilitation Strategies for Bonded Concrete Overlays of Asphalt Pavements Authors: J. M Vandenbossche S. Sachs August 2013 1. Introduction Bonded concrete overlays of asphalt
CHAPTERS 600 670 PAVEMENT ENGINEERING CHAPTER 600 GENERAL ASPECTS
HIGHWAY DESIGN MANUAL 600-1 May 7, 2012 CHAPTERS 600 670 PAVEMENT ENGINEERING CHAPTER 600 GENERAL ASPECTS Topic 601 - Introduction Pavement engineering involves the determination of the type and thickness
ASSET MANAGEMENT GUIDE FOR PROJECT DESIGN FORMAT
ASSET MANAGEMENT GUIDE FOR PROJECT DESIGN FORMAT 1. BACKGROUND There has been an increasing awareness of design features, which produce poor whole-of-life costs. These poor whole-of-life costs manifest
TAC Primer Pavement Asset Design and Management
Transportation Association of Canada TAC Primer Pavement Asset Design and Management Introduction Transportation infrastructure plays an important role in the social and economic development of a country,
Project Evaluation Guidelines
Project Evaluation Guidelines Queensland Treasury February 1997 For further information, please contact: Budget Division Queensland Treasury Executive Building 100 George Street Brisbane Qld 4000 or telephone
T2: Reduce overall transport cost by cost effective road rehabilitation and maintenance
PROJECT REPORT PR/INT/277/04 Dynamic Cone Penetrometer tests and analysis Technical Information Note By Colin Jones Sector: Theme: Project Title: Project Reference: Transport T2: Reduce overall transport
CGAM022.1/12/10. Asset Management Improvement Strategy 2010
Asset Management Improvement Strategy 2010 Version Control Version No. Date Details Author/s 1.0 July 2009 Adopted Strategy 2.0 October 2010 Update TABLE OF CONTENTS OF CONTENTS 4 OF THE ASSET MANAGEMENT
APPENDIX B. I. Background Information
APPENDIX B GUIDELINES FOR IDENTIFYING AND REPAIRING LOCALIZED AREAS OF DISTRESS IN AC PAVEMENTS PRIOR TO CAPITAL PREVENTIVE MAINTENANCE OR REHABILITATION REPAIRS I. Background Information A. AC Pavement
LCCA Defined (FHWA) LCCA Policy Statement (9/96) LCCA Policy Statement (9/96) Policy Statement Con t... Use of LCCA. CE 4401 Pavement Design
LCCA Defined (FHWA) CE 4401 Pavement Design Introduction to Life Cycle Cost Analysis A process for evaluating the total economic worth of a useable project segment by analyzing initial costs and discounted
Operations Committee. District Engineer and Utilities Manager. Appendix A: Significance Assessment
Report To: From: Operations Committee District Engineer and Utilities Manager Date: Thursday, 3 July 2014 File reference: Document: 1227007 Appendix A: Significance Assessment Decision-making: Subject:
H: Road Asset Management Plan February 2015
H: Road Asset Management Plan February 2015 Document Format This plan forms one part of a suite of Asset Management Plans that have been developed: A. Bridges B. Buildings C. Drainage D. Footpath E. Levee
Transportation Asset Management
Transportation Asset Management The Role of Engineering Economic Analysis Presented by: Eric Gabler Economist, Office of Asset Management Federal Highway Administration Introduction The mission of the
ROAD NETWORK ASSET MANAGEMENT AS A BUSINESS PROCESS. Paper prepared for the REAAA Conference in Japan, 4 9 September 2000
ROAD NETWORK ASSET MANAGEMENT AS A BUSINESS PROCESS Paper prepared for the REAAA Conference in Japan, 4 9 September 2000 Florentina Mihai, BEng, GDipMgt, MIEAust Main Roads Western Australia Neville Binning,
5 ALTERNATIVE SOLUTIONS AND EVALUATION
Page 23 5 ALTERNATIVE SOLUTIONS AND EVALUATION The process used for the assessment and evaluation of the alternatives follows the procedures of the Municipal Class EA, as described below: Identify a reasonable
A Guide For Preparing The Financial Information Component Of An Asset Management Plan. Licensing, Monitoring and Customer Protection Division
A Guide For Preparing The Financial Information Component Of An Asset Management Plan Licensing, Monitoring and Customer Protection Division July 2006 Contents 1 Important Notice 2 2 Scope and purpose
Transportation Risk Management: International Practices for Program Development and Project Delivery
Transportation Risk Management: International Practices for Program Development and Project Delivery Sponsored by: In cooperation with: American Association of State Highway and Transportation Officials
Chapter 7: Pavement Rehabilitation 7-1 Asphalt Pavement Overlays 7-1 Surface Preparation Methods 7-2 Concrete Pavement Preparation 7-3 Recycling
7-1 Asphalt Pavement Overlays 7-1 Surface Preparation Methods 7-2 Concrete Pavement Preparation 7-3 Recycling Asphalt Pavements 7-7 Chapter 7 Pavement Rehabilitation Pavement rehabilitation can be accomplished
CHAPTER 24: ENVIRONMENTAL MANAGEMENT
Central Eyre Iron Project Environmental Impact Statement CHAPTER 24: ENVIRONMENTAL MANAGEMENT CHAPTER 24 ENVIRONMENTAL MANAGEMENT COPYRIGHT Copyright Iron Road Limited, 2015 All rights reserved This document
6. FINANCIAL MANAGEMENT
6. FINANCIAL MANAGEMENT Syllabus Financial Management: Investment-need, Appraisal and criteria, Financial analysis techniques-simple pay back period, Return on investment, Net present value, Internal rate
Australian Standard. Bridge design. Part 1: Scope and general principles AS 5100.1 2004 AP-G15.1/04 AS 5100.1
AS 5100.1 2004 AP-G15.1/04 AS 5100.1 Australian Standard Bridge design Part 1: Scope and general principles This Australian Standard was prepared by Committee BD-090, Bridge Design. It was approved on
Bruce Highway (Cooroy to Curra) Section A (Cooroy southern interchange to Sankeys Road)
Bruce Highway (Cooroy to Curra) Section A (Cooroy southern interchange to Sankeys Road) Industry Briefing - 13 February 2013 Bruce Highway Upgrade (Cooroy to Curra) The Bruce Highway Upgrade (Cooroy to
LIFE-CYCLE COST ANALYSIS PROCEDURES MANUAL
LIFE-CYCLE COST ANALYSIS PROCEDURES MANUAL Note to the User To use this manual, the reader must have the life-cycle cost analysis software program RealCost, Version 2.2 California Edition. The program
Status of Asset Management in the Roads Sector. L Kannemeyer
Status of Asset Management in the Roads Sector L Kannemeyer Why Asset Management? Road Condition 100 80 60 40 20 Good Fair Poor B A Very Poor (Typically Designed for Traffic Expected over 20-30 Years)
Ironwork in Highways -Whole Life Cost Perspective. Reducing cost through collaboration
Ironwork in Highways -Whole Life Cost Perspective Reducing cost through collaboration About Instarmac... Instarmac The Company Quality Systems ISO 9001 Environmental Systems ISO 14001 Preferred Supplier
Special Purpose Reports on the Effectiveness of Control Procedures
Auditing Standard AUS 810 (July 2002) Special Purpose Reports on the Effectiveness of Control Procedures Prepared by the Auditing & Assurance Standards Board of the Australian Accounting Research Foundation
HIGHWAYS DEPARTMENT GUIDANCE NOTES ON ROAD SURFACE REQUIREMENTS FOR EXPRESSWAYS AND HIGH SPEED ROADS
HIGHWAYS DEPARTMENT GUIDANCE NOTES ON ROAD SURFACE REQUIREMENTS FOR EXPRESSWAYS AND HIGH SPEED ROADS Research & Development Division RD/GN/032 June 2007 1. Purpose ROAD SURFACE REQUIREMENTS FOR EXPRESSWAYS
Supplement to Part 2: Pavement Structural Design of the Austroads Guide to Pavement Technology
Pavement Design Supplement Supplement to Part 2: Pavement Structural Design of the Austroads Guide to Pavement Technology November 2013 Copyright http://creativecommons.org/licenses/by/3.0/au/ State of
Chapter 6: Design Management
Chapter : Design Management Department of Main Roads Chapter Design Management June 2005 i Department of Main Roads Chapter : Design Management Manual Contents Chapter 1 Planning and Design Framework Chapter
CHAPTER 2 PAVEMENT MANAGEMENT SYSTEM
CHAPTER 2 PAVEMENT MANAGEMENT SYSTEM 2.1. INTRODUCTION TO PAVEMENT MANAGEMENT The ability of a pavement system to serve a society is largely a function of planning. Planning is the intersection between
Report No. CDOT-2006-17 Final Report LIFE CYCLE COST ANALYSIS AND DISCOUNT RATE ON PAVEMENTS FOR THE COLORADO DEPARTMENT OF TRANSPORTATION
Report No. CDOT-2006-17 Final Report LIFE CYCLE COST ANALYSIS AND DISCOUNT RATE ON PAVEMENTS FOR THE COLORADO DEPARTMENT OF TRANSPORTATION October 2006 The contents of this report reflect the views of
Pavement Management Implementation: Success Stories for Maryland Counties
Pavement Management Implementation: Success Stories for Maryland Counties September 25, 2015 Aaron D. Gerber, P.E. How Does Your Organization Manage Pavement Assets? By Experience/Past Practice? By Customer
TOTAL ASSET MANAGEMENT. Risk Management Guideline
TOTAL ASSET MANAGEMENT Risk Management Guideline September 2004 TAM04-12 Risk Management Guideline September 2004 TAM04-12 ISBN 0 7313 3325 X (set) ISBN 0 7313 32849 1. Asset management New South Wales.
SUPPLEMENTARY GREEN BOOK GUIDANCE
SUPPLEMENTARY GREEN BOOK GUIDANCE ADJUSTING FOR TAXATION IN PFI vs PSC COMPARISONS 1 INTRODUCTION 1.1 This guidance looks at the differential tax receipts that arise from the use of the Private Finance
SECTION III-06 Surfacing Page 1 Revised 3/2/10. See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway.
Page 1 Revised 3/2/10 See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway. For New/Reconstruction projects: The cross slope of the driving lanes range from 1.5% to
Glenorchy City Council Asset Management Strategy for Infrastructure Assets
Glenorchy City Council Asset Strategy for Infrastructure Assets 2014/15 to 2017/18 Version 1.3 June 2014 Glenorchy City Council Asset Strategy for Infrastructure Assets Document Control Document Control
LIFE-CYCLE COST COMPARISON FOR MUNICIPAL ROAD PAVEMENTS
LIFE-CYCLE COST COMPARISON FOR MUNICIPAL ROAD PAVEMENTS HEIN, David K., P.Eng. Applied Research Associates, Inc., 5401 Eglinton Avenue West, Suite 105, Toronto, ON, CANA- DA, M9C 5K6. Tel: 416-621-9555
CAPITAL PLANNING GUIDELINES
CAPITAL PLANNING GUIDELINES 1. INTRODUCTION... 2 2. EXTENSION OF EXISTING INFRASTRUCTURE PROJECTS... 2 3. NEW CAPITAL PROJECTS... 2 4. MINIMUM INFORMATION REQUIRED... 3 5. PREPARATORY WORK... 3 5.1 NEEDS
COMMENTARY TO AG:PT/T251 - BALL PENETRATION TEST
COMMENTARY TO AG:PT/T251 - BALL PENETRATION TEST PREFACE This test method is an update of the method originally prepared by the Bituminous Surfacings Research Reference Group on behalf of Austroads. FOREWORD
Road Rehabilitation and Reconstruction Using AutoCAD Civil 3D
Road Rehabilitation and Reconstruction Using AutoCAD Civil 3D Contents Introduction... 3 Introduction to Corridor Targets... 3 Surface Targets... 4 Width and Offset Targets... 5 Elevation or Slope Targets...
Department of State Development, Infrastructure and Planning. State Planning Policy state interest guideline. State transport infrastructure
Department of State Development, Infrastructure and Planning State Planning Policy state interest guideline State transport infrastructure July 2014 Great state. Great opportunity. Preface Using this state
Draft TMH 22 ROAD ASSET MANAGEMENT MANUAL
-- South Africa COTO Committee of Transport Officials Draft TMH 22 ROAD ASSET MANAGEMENT MANUAL M a r c h 2013 C ommittee of Transport Officials Contents Background Process Contents of Manual Quo Vadis
Advancements in GPR for a Sustainable Tomorrow
Advancements in GPR for a Sustainable Tomorrow Shawn Lapain, BSc. E., EIT Pavement Specialist Applied Research Associates Inc. 5401 Eglinton Avenue West, Suite 105, Toronto, ON, Canada, M9C 5K6 Tel: 416-621-9555,
Capital Investment Analysis and Project Assessment
PURDUE EXTENSION EC-731 Capital Investment Analysis and Project Assessment Michael Boehlje and Cole Ehmke Department of Agricultural Economics Capital investment decisions that involve the purchase of
Tunnelling & Underground. Specialists
Tunnelling & Underground Specialists Mined Tunnels Excavation at Ayer Rajah Avenue, Singapore Introduction Amberg & TTI Engineering Pte Ltd (AETTI) was established in Singapore in 2002 by Amberg Engineering
Ausgrid s Policy on Public Lighting - Contestable Projects. AUSPL CONPOL01 September 2012
Ausgrid s Policy on Public Lighting - Contestable Projects AUSPL CONPOL01 September 2012 Ausgrid s Policy on Public Lighting - Contestable Projects September 2012 Contents 1 OBJECTIVE... 3 2 SCOPE AND
How To Improve Safety
Collision Diagrams Collision diagrams are used to display and identify similar accident patterns. They provide information on the type and number of accidents; including conditions such as time of day,
How To Account For Construction Contracts In Indian Accounting Standard (Indas)
Contents Indian Accounting Standard (Ind AS) 11 Construction Contracts Paragraphs OBJECTIVE SCOPE 1 2 DEFINITIONS 3 6 COMBINING AND SEGMENTING CONSTRUCTION CONTRACTS 7 10 CONTRACT REVENUE 11 15 CONTRACT
asphalt applications Construction and surfacing of footways and cycleways using asphalt mpa asphalt Asphalt Information Service
asphalt applications 11 Construction and surfacing of footways and cycleways using asphalt Asphalt Information Service mpa asphalt November 2009 Mineral Products Association Introduction The main use of
Capital Expenditure Guidelines
Division of Local Government Department of Premier and Cabinet Capital Expenditure Guidelines December 2010 These are Director General s Guidelines issued pursuant to section 23A of the Local Government
Shire of Murchison Long Term Strategic Financial Plan
Long Term Strategic Financial Plan 2009/10 to 2018/19 CONTENTS SECTION Subsection Page 1.1 Foreword 1.0 INTRODUCTION 1.2 CEO Executive Summary 1.3 Document Status 2.1 District Profile 2.2 Linkage with
ROADING ASSET MANAGEMENT PLAN
ROADING ASSET MANAGEMENT PLAN 1 EXECUTIVE SUMMARY 1.1 Overview This Roading Asset Management Plan (RAMP) follows the format recommended by the National Asset Management Steering Group (NAMS) and is largely
Cost Benefits analysis
Cost Benefits analysis One of the key items in any business case is an analysis of the costs of a project that includes some consideration of both the cost and the payback (be it in monetary or other terms).
AER reference: 52454; D14/54321 ACCC_09/14_865
Commonwealth of Australia 2014 This work is copyright. In addition to any use permitted under the Copyright Act 1968, all material contained within this work is provided under a Creative Commons Attribution
A FRAMEWORK FOR ASSESSING ASSET MANAGEMENT PERFORMANCE IN AUSTRALIA. Neville Binning, MBA, AEng, GCertHRDev, MIEAust, CPEng, MCIT
A FRAMEWORK FOR ASSESSING ASSET MANAGEMENT PERFORMANCE IN AUSTRALIA Florentina Mihai, BEng, GDipMgt, MIEAust Neville Binning, MBA, AEng, GCertHRDev, MIEAust, CPEng, MCIT Laurie Dowling, BSc, BEng, FIEAust,
Construction Specifications for Keyhole Pavement Coring and Reinstatement
F I N A L Construction Specifications for Keyhole Pavement Coring and Reinstatement Gas Technology Institute 1700 S. Mount Prospect Rd. Des Plaines, Illinois 60018 www.gastechnology.org Version 13 October
THE ROAD SAFETY RISK MANAGER GAME, SET, MATCH FOR MANAGING YOUR ROAD SAFETY INTERVENTIONS
THE ROAD SAFETY RISK MANAGER GAME, SET, MATCH FOR MANAGING YOUR ROAD SAFETY INTERVENTIONS Rob McInerney [email protected] Business Manager, ARRB Transport Research Victoria Australia Abstract Local government
Pavement Management Systems
Pavement Management Systems Presented by Bill Weiss, P.E. Applied Pavement Technology, Inc. (APTech) At the 2015 Municipal Streets Seminar Ames, Iowa Why Pavement Management??? Pavements are expensive
Understanding Financial Management: A Practical Guide Guideline Answers to the Concept Check Questions
Understanding Financial Management: A Practical Guide Guideline Answers to the Concept Check Questions Chapter 8 Capital Budgeting Concept Check 8.1 1. What is the difference between independent and mutually
ASPHALT PAVEMENT RECYCLING
HOT IN-PLACE RECYCLING THE ENERGY SAVING METHOD ASPHALT PAVEMENT RECYCLING Hot In-Place alt ec cl n The Energy Saving Method! HIGHWAY REHAB CORP Highway Rehab Corp 2258 Route 22 Brewster, NY 10509 Tel
3.1 Historical Considerations
3. Recommended Scope of Bridge improvements 3.1 Historical Considerations In the fall of 2000, an outside consultant, Fraser Design, suggested that the existing 4 th St. Bridge is potentially eligible
Predictive Modeling of Bridges
Predictive Modeling of Bridges transport community industrial & mining carbon & energy Prepared for: Small Bridge Conference 2015 Date: 23 November 2015 Rev00 Table of Contents Synopsis... i Authors Biography...
Scrim And Texture Data Collection Contract Management S Chamberlain
Scrim And Texture Data Collection Contract Management S Chamberlain Introduction Transit New Zealand (Transit) has been successfully managing SCRIM and texture data collection through external suppliers
ASSET MANAGEMENT STRATEGY
ASSET MANAGEMENT STRATEGY Adopted May 2011 Table of Contents Page 1. Introduction 3 2. Purpose 4 3. Asset Register System 4 4. Asset Management Working Group 4 5. Asset Management Plans 5 6. Condition
Paving Capitalization Work Categories and Treatments
Statement of ODOT Infrastructure Capitalization Policy Government Accounting Standards Board (GASB) 34 requires public agencies to capitalize infrastructure assets on their financial statements for periods
HIGHWAYS DEPARTMENT GUIDANCE NOTES ON THE USE OF WATERPROOFING MEMBRANES ON CONCRETE BRIDGE DECKS
HIGHWAYS DEPARTMENT GUIDANCE NOTES ON THE USE OF WATERPROOFING MEMBRANES ON CONCRETE BRIDGE DECKS Research & Development Division RD/GN/033 June 2008 THE USE OF WATERPROOFING MEMBRANES ON CONCRETE BRIDGE
Road safety assessment methods: deciding which one to use
Towards safer roads ` PUBLISHED JULY 2011 Supersedes Nil TSR 11/01 Road safety assessment methods: deciding which one to use Purpose There are a number of methods offered to assess roads from a road safety
Procurement Transformation Division. Procurement guidance. Engaging and managing consultants. Includes definitions for consultants and contractors
Procurement guidance Engaging and managing consultants Includes definitions for consultants and contractors Procurement guidance: Engaging and managing consultants Page 2 of 17 Table of contents Table
GENERAL SPECIFICATION
R64 - PAVEMENT MARKING August 1996 GENERAL SPECIFICATION G3 TRAFFIC MANAGEMENT Date JUNE 2013 Edition 1 / Revision 0 Department 1 DOT Spec R64 of Infrastructure, Energy and Resources REVISION REGISTER
Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin PLAN SUBGRADES
Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering Geotechnical Bulletin GB 1 PLAN SUBGRADES Geotechnical Bulletin GB1 was jointly developed by the Offices
ASSET MANAGEMENT OF ROADS Bob Lloyd ARRB Transport Research Ltd
26 th Australasian Transport Research Forum Wellington New Zealand 1-3 October 2003 ABSTRACT ASSET MANAGEMENT OF ROADS ARRB Transport Research Ltd The World Bank s initial approach to road project / network