Specialized services include:
|
|
|
- Rosa Cannon
- 10 years ago
- Views:
Transcription
1
2 COMPANY PROFILE
3 Progetti e Opere S.r.l. is an Italian Consulting Engineering firm specialized in Civil, Coastal Maritime and Environmental Engineering (registered according to the Italian law L.N. 109/1994, art. 17 c. 5 lett. b). The Company offers global solutions in Engineering Consulting and Contracting Services to Public Administrations and Private Organizations. Our professional services areas include civil and maritime engineering; coastal engineering (I.C.Z.M.) and restoration; port and off shore facilities engineering; infrastructure engineering; water resources engineering; marina, and waterfront development; urban, residential and commercial development; environmental services. Specialized services include: 1. Technical and Economic Studies 2. Research and Development Studies 3. Marketing and Financing Studies 4. Civil, Infrastructure and Industrial Engineering Planning and Design 5. Construction Management and Supervision 6. Environmental Impact Assessment Studies 7. Surveying, Mapping and Investigation Progetti e Opere operates through devices and tools to support the different phases of investigation, planning and design: sophisticated measuring instrumentation for field services (topographic and bathymetric surveys, environmental and hydraulic monitoring instrumentations), working stations for computerized drawing activities, and high specialized soft wares for numerical and physical modeling. The knowledge and experience acquired in more than 10 years of professional activity and a highly qualified technical staff of engineers, scientist and consultants enables us to promptly and effectively resolve complex problems, both in national and international projects, in efficient, fast and successful approach. The Company Quality Management System is certified ISO 9001: 2000 (Certificate Sincert CSQ n.9175 PROG) for Engineering Consulting and Contracting Services. Address: tel (++39) Via delle Magnolie, Palermo fax (++39) e mail: [email protected]
4 waterfront, ports and marina
5 COMPLETION OF THE PORT QUAYED, TERMINI IMERESE, PALERMO, ITALY CLIENT: PORT AUTORITY OF PALERMO LOCATION: Termini Imerese, Palermo, Italy YEAR: 2013 BUDGET: PROVIDED SERVICES: Final level design Environmental Impact Study CURRENT LAYOUT PROJECT LAYOUT REDEVELOPMENT OF THE EXISTING BREAKWATER NEW PIER EXTENSION OF OUTER BREAKWATER
6 TYPICAL CROSS SECTION WAVE PROPAGATION STUDIES HYDRODYNAMIC STUDIES SISMIC AND GEOTECHNICAL STUDIES INTERNAL AGITATION ANALYSIS SEDIMENT TRANSPORT STUDIES STRUCTURAL STUDIES ENVIRONMENTAL IMPACT STUDY
7 MARINA DI CARRARA PORT MASTER PLAN, MASSA CARRARA, ITALY CLIENT: PORT AUTORITY OF MARINA DI CARRARA LOCATION: Marina di Carrara, Massa Carrara, Italy YEAR: 2011 BUDGET: PROVIDED SERVICES: alternatives layouts and preliminary outlines master plan field studies Strategic Environmental Assessment CURRENT LAYOUT MASTER PLAN SEABED EVOLUTION HYDRODYNAMIC STUDIES WAVE HEIGHTS DISTRIBUTION SEDIMENT TRANSPORT STUDIES INTERNAL AGITATION ANALYSIS COASTAL ENGINEERING STUDIES
8 WATER QUALITY STUDIES TYPICAL CROSS SECTION HYDROLOGICAL, HYDRAULIC AND MORPHODYNAMIC STUDIES OF RIVERS NAVIGABILITY STUDY: MANOUVRE SIMULATIONS CITY-PORT INTERFACE ROAD ACCESS ATMOSPHERIC AND ACUSTIC POLLUTION STUDIES TRAFFIC AND MOBILITY STUDIES
9 REDEVELOPMENT OF THE WATERFRONT OF MARINA DI CARRARA, MASSA CARRARA, ITALY CLIENT: PORT AUTORITY OF MARINA DI CARRARA LOCATION: Marina di Carrara, Massa Carrara, Italy YEAR: 2012 BUDGET: PROVIDED SERVICES: feasibility study CURRENT LAYOUT ROAD ACCESS STUDY ORGANIZATION OF THE VIABILITY ON WATERFRONT PROMENADE ON THE QUAY PATTERNS OF INTERVENTION
10 MAZARA DEL VALLO PORT MASTER PLAN, TRAPANI, ITALY CLIENT: MUNICIPALITY OF MAZARA DEL VALLO LOCATION: Mazara del Vallo, Trapani, Italy YEAR: 2012 BUDGET: PROVIDED SERVICES: Preliminary outlines Preliminary environmental report CURRENT LAYOUT HYDRAULIC-MARITIME STUDIES MASTER PLAN SHORELINE EVOLUTION STUDY GUIDELINES AND PORT-CITY INTERFACE BATHYMETRIC SURVEY SEDIMENTOLOGICAL SURVEY
11 SYRACUSE MARINA, ITALIA CLIENT: S.P.E.R.O. S.r.l. LOCATION: Syracuse, Italia YEAR: 2010 BUDGET: 82,000,000 PROVIDED SERVICES: preliminary and final level design PROJECT LAYOUT CURRENT LAYOUT STUDI DI INGEGNERIA COSTIERA RENDERINGS TYPICAL CROSS SECTIONS
12 TREMESTIERI INTERMODAL LOGISTIC PLATFORM AND PORT INFRASTRUCTURE, MESSINA, ITALY CLIENT: R.T.I. INTERCANTIERI VITTADELLO, BRUNO TEODORO SPA, ACMAR ASSOCIAZIONE COOPERATIVA MURATORI E AFFINI RAVENNA LOCATION: Tremestieri, Messina, Italy YEAR: 2010 BUDGET: 75,000,000 PROVIDED SERVICES: final level design environmental impact assessment study CURRENT LAYOUT TYPICAL CROSS SECTIONS PROJECT LAYOUT: PORT INFRASTRUCTURE RENDERING OF BREAKWATER COSTAL ENGINEERING STUDIES PROJECT LAYOUT: PROTCTED AND SEMI-PROTECTED NOURISHMENT HYDROGEOLOGICAL AND GEOTECHNICAL STUDIES MAP OF THE MARINE BIOTIC
13 RIQUALIFICATION AND COMPLETION OF THE MAIN BREAKWATER OF THE ARENELLA PORT, PALERMO, ITALY CLIENT: PORT AUTORITY OF PALERMO LOCATION: Arenella, Palermo, Italy YEAR: 2010 BUDGET: 9,650,000 PROVIDED SERVICES: final level design enviromental impact assessment study CURRENT LAYOUT CURRENT LAYOUT PROJECT LAYOUT TECHNICAL ROOM PARTICULAR COASTAL ENGINEERING STUDIES CAISSON, PARTICULAR TYPICAL CROSS SECTION
14 PORTICELLO MARINA, SANTA FLAVIA, PALERMO, ITALY CLIENT: MUNICIPALITY OF SANTA FLAVIA LOCATION: Porticello District, Santa Flavia, Palermo, Italy YEAR: 2010 BUDGET: 50,400,000 PROVIDED SERVICES: Preliminary and final level design environmental impact assessment study CURRENT LAYOUT PROJECT LAYOUT SECTIONS COASTAL ENGINEERING STUDIES TYPICAL CROSS SECTIONS
15 ASPRA MARINA, BAGHERIA, PALERMO, ITALY CLIENT: MUNICIPALITY OF BAGHERIA LOCATION: Aspra District, Bagheria, Palermo, Italy YEAR: 2010 BUDGET: 38,500,000 PROVIDED OF SERVICES: preliminary level design environmental impact assessment study CURRENT LAYOUT PROJECT LAYOUT RENDERING TYPICAL CROSS SECTIONS SECTIONS
16 MARINA OF MARSALA, TRAPANI, ITALY CLIENT: MARSALA YACHTING RESORT s.r.l. LOCATION: Marsala (TP), Italy YEAR: 2009 BUDGET: 20,733,915 PROVIDED SERVICES: preliminary, final, construction level design environmental impact assessment study COSTAL ENGINEERING STUDIES PHOTOREALISM PROJECT LAYOUT CURRENT LAYOUT TYPICAL CROSS SECTIONS
17 INTERNATIONAL DESIGN TENDER FOR THE REORGANIZATION AND REGENERATION OF WATERFRONT IN PANTELLERIA, TRAPANI, ITALY ANNOUNCED BY: MUNICIPALITY OF PANTELLERIA LOCATION: Pantelleria Island, Trapani, Italy YEAR: 2009 DIGITAL ELEVATION MODEL OF BEDSEA PROJECT LAYOUT THE KASBAH AND THE HERB GARDEN CONCEPT: 4 POLES WATER, EARTH, HISTORY, HUMANITY TRAFFIC PLAN FISH MARKET PLANT LAYOUTS
18 CAPACI PORT MASTER PLAN, CAPACI, PALERMO, ITALY CLIENT: MUNICIPALITY OF CAPACI LOCATION: Capaci, Palermo, Italy YEAR: 2009 BUDGET: 100,000,000 PROVIDED SERVICES: feasibility port master plan preliminary environmental impact assessment CURRENT LAYOUT MASTER PLAN VIEW OF PROJECT SITE COASTAL ENGINEERING STUDIES
19 PORTO D ELBA, PORTOFERRAIO, ELBA ISLAND, ITALY CLIENT: PORTO D ELBA s.r.l. LOCATION: Portoferraio, Elba Island, Livorno, Italy YEAR: BUDGET: 75,600,000 PROVIDED SERVICES: preliminary, final, construction level design environmental impact assessment study supervision of construction works health and safety duties CURRENT LAYOUT COASTAL ENGINEERING STUDIES PROJECT LAYOUT RENDERING OF MULTIFUNCTIONAL DOCK SERVICE APARTMENTS TYPICAL CROSS SECTIONS MULTIFUNCTIONAL AREA NEW MARINA AND SHOPPING VILLAGE SECTION
20 DRY STORAGE AND FACILITIES IN CARINI, PALERMO, ITALY CLIENT: CALEFATI F. LOCATION: Carini (PA), Italy YEAR: 2008 BUDGET: 4,300,000 PROVIDED SERVICES: preliminary, final, construction level design enviromental impact assessment study supervision of construction works health and safety duties PROJECT LAYOUT FUNCTIONAL PLAIN PHOTOREALISTIC FRAME OF SWIMMING POOL CURRENT LAYOUT LONGITUDINAL PROFILE S FRAME OF FACILITIES AREA PHOTOREALISTIC FRAME OF FACILITIES AREA PILE JETTY AND FLOATING DOCK TYPOLOGY
21 PORTO DEI NEBRODI, SANT AGATA DI MILITELLO, MESSINA, ITALY CLIENT: Porto dei Nebrodi s.r.l. LOCATION: Sant Agata di Militello, Messina, Italy YEAR: 2008 BUDGET: 98,300,000 PROVIDED SERVICES: preliminary, final, construction level design environmental impact assessment study supervision of construction works health and safety duties FUNCTIONAL PLAN CURRENT LAYOUT PROJECT LAYOUT COASTAL ENGINEERING STUDIES YACHTING CLUB TYPICAL CROSS SECTIONS
22 CALA DEI NORMANNI MARINA, PALERMO, ITALY CLIENT: Marina Arenella s.r.l. LOCATION: Arenella, Palermo, Italy YEAR: 2007 BUDGET: 5,000,000 PROVIDED SERVICES: preliminary, final, construction level design enviromental impact assessment study supervision of construction works health and safety duties CURRENT LAYOUT PROJECT LAYOUT SEA WORKS TYPE SECTION COASTAL ENGINEERING STUDIES FACILITIES AREA RENDERING OF PROJECT LAYOUT
23 MARINA OF CAPO D ORLANDO, MESSINA, ITALY CLIENT: VITTADELLO SPA COSTRUZIONI BRUNO TEODORO SPA LOCATION: Capo d Orlando, Messina, Italy YEAR: 2006 BUDGET: 35,000,000 PROVIDED OF SERVICES: preliminary, final, construction level design environmental impact assessment study CURRENT LAYOUT PROJECT LAYOUT CROSS SECTION OF SERVICE BUILDING TYPICAL CROSS SECTIONS ICONIC BUILDING ELMO D ORLANDO SERVICE AREA
24 S.NICOLA PORT MASTER PLAN, TRABIA, PALERMO, ITALY CLIENT: MUNICIPALITY OF TRABIA LOCATION: S.NICOLA L ARENA, TRABIA, PALERMO, ITALY YEAR: 2006 PROVIDED SERVICES: preliminary and final level design COASTAL ENGINEERING STUDIES CURRENT LAYOUT MASTER PLAN LAYOUT SEA WORKS TYPICAL CROSS SECTIONS FUNCTIONALPLAIN PRLIMINARY DESIGN
25 PROJECT OF TAORMINA MARINA, SUPER YACHTS BERTHINGS, SERVICES AND SHOPPING VILLAGE, TAORMINA, MESSINA, ITALY CLIENT: K TOURISM s.r.l. LOCATION: Taormina, Messina, Italy YEAR: 2005 BUDGET: 89,000,000 PROVIDED SERVICES: preliminary, final, construction level design environmental impact assessment study supervision of construction works health and safety duties CURRENT LAYOUT PROJECT LAYOUT COASTAL ENGINEERING STUDIES TYPICAL CROSS SECTIONS 3D MODEL
26 ENLARGAMENT OF S.NICOLA L ARENA MARINA, TRABIA, PALERMO, ITALY CLIENT: MUNICIPALITY OF TRABIA LOCATION: S. Nicola l Arena, Trabia, Palermo, Italy YEAR: 2005 BUDGET: 4,520,000 PROVIDED SERVICES: preliminary, final, construction level design CURRENT LAYOUT [t/mq] ,06 20 PROJECT LAYOUT ' [t/mq] 50 Y [m] ecopode Modello del terreno: rockfill/1,2 g:0,97 scogli di 2^ Modello del terreno: rockfill/1,4 g:0, pietrame Modello del terreno: rockfill/1,5 g:0,97 sabbia gialla Mod. terreno: Mohr-Coulomb g:0,87 c'=0,0 t/mq f'= Limo argilloso sabbioso Modello del terreno: Mohr Coulomb g:0,87 c'=0,3 t/mq f'= GEOTECHNICAL STUDIES STRCTURAL STUDIES COSTAL ENGINEERING STUDIES
27 NEW BREAKWATER REEF: PLAIN AND TYPE SECTIONS NEW COASTALINE DEFENSE WORKS: PLAIN AND TYPICAL CROSS SECTIONS NEW DOCKS: PLAIN AND TYPICAL CROSS SECTIONS
28 PORTICELLO PORT MASTER PLAN, SANTA FLAVIA, PALERMO, ITALY CLIENT: MUNICIPALITY OF SANTA FLAVIA LOCATION: Porticello District, Santa Flavia, Palermo, Italy YEAR: 2004 BUDGET: 100,000,000 PROVIDED SERVICES: Preliminary and final level design 3D MODEL MASTER PLAN CURRENT LAYOUT PRELIMINARY DESIGN COASTAL ENGINEERING STUDIES
29 PORTO GRANDE MARINA, SIRACUSA, ITALY CLIENT: Marina del Porto Grande S.p.a. LOCATION: Siracusa, Italy YEAR: 2004 BUDGET: PROVIDED SERVICES: preliminary design LAYOUT A LAYOUT B RENDERING LAYOUT A RENDERING LAYOUT B COASTAL ENGINEERING STUDIES SEA WORKS TYPE SECTIONS LAND WORKS
30 TERMINI IMERESE PORT, PALERMO, ITALY CLIENT:MUNICIPALITY OF TERMINI IMERESE LOCATION: Termini Imerese, Palermo, Italy YEAR: 2002 PROVIDED SERVICES: master plan environmental impact assessment study CURRENT LAYOUT PHOTOREALISM SEA WORKS TYPE SECTIONS MASTER PLAN LAYOUT COSTAL ENGINEERING STUDIES RENDERINGS LOGISTIC PLAN ENVIRONMENTAL ANALISYS GEOLOGICAL STUDIES
31 ASPRA PORT MASTER PLAN, BAGHERIA, PALERMO, ITALY CLIENT: MUNICIPALITY OF BAGHERIA LOCATION: Aspra District, Bagheria, Palermo, Italy YEAR: 2002 BUDGET: 35,000,000 PROVIDED OF SERVICES: Preliminary and final level design CURRENT LAYOUT PRELIMINARY DESIGN RENDERINGS MASTER PLAN SECTIONS
32 PORTO PALO PORT, MENFI, AGRIGENTO, ITALY CLIENT: MUNICIPALITY OF MENFI LOCATION: Menfi, Agrigento, Italy YEAR: BUDGET: 25,000,000 PROVIDED OF SERVICES: masterplan preliminary and final level design environmental impact assessment study MASTER PLAN RENDERINGS DIRECTIONAL CENTER 3D MODEL COASTAL MANAGEMENT STUDIES
33 coastal and off shore engineering
34 CONSTRUCTION OF A BREAKWATER TO PROTECT THE ASPRA VILLAGE, BAGHERIA, PALERMO, ITALY CLIENT: MUNICIPALITY OF BAGHERIA LOCATION: Aspra, Bagheria, Palermo, Italy YEAR: BUDGET: 1,820,000 PROVIDED SERVICES: preliminary, final and construction level design supervision of costruction works CURRENT LAYOUT TYPICAL CROSS SECTION PROJECT LAYOUT COASTAL ENGINEERING STUDIES STRUCTURAL AND GEOTECHNICAL STUDIES EXPERIMENTAL INVESTIGATION BY PHYSICAL MODEL
35 PRODUCTION OF CONCRETE CUBIC BLOKS PRODUCTION OF CONCRETE HEXAPOD BLOCKS CONSTRUCTION
36 STRUCTURAL CONSOLIDATION AND RESTORATION OF THE WALLS OF ANCIENT ORTIGIA EASTERN SEAFRONT, SYRACUSE, ITALY CLIENT: REGIONE SICILIANA, DEPARTMENT OF CIVIL PROTECTION LOCATION: Siracuse, Italy YEAR: BUDGET: 3,615,200 PROVIDED SERVICES: health and safety duties GENERAL PLAN OF WORKS WORKSITE PLAN RESTORE OF VOLUMES DETACHED AND MORTAR JOINTS CONSOLIDATION OF THE FOUNDATION
37 ENVIRONMENTAL REHABILITATION AND URBAN RIVER PARK ON COAST AND ESTUARY OF THE MILICIA RIVER, CASTELDACCIA, PALERMO, ITALY CLIENT: MUNICIPALITY OF CASTELDACCIA LOCATION: Casteldaccia, Palermo, Italy YEAR: 2004 BUDGET: 2,500,000 PROVIDED SERVICES: preliminary, final, construction level design CURRENT LAYOUT PROJECT LAYOUT 10 Q [m 3 s -1 ] Q = d d[giorni] HYDROLOGICAL STUDIES GEOLOGICAL STUDIES NATURALISTIC ENGINEERING WORKS AGRARIAN STUDIES NATURALISTICENGINEERING STUDIES SEA WORKS: TYPE SECTION LAND WORKS: TYPE SECTIONS
38 TRANSPORT INFRASTRUCTURES
39 REGIONAL LOGISTIC AREAS NETWORK OF TREMONZELLI, POLIZZI GENEROSA, PALERMO, ITALY CLIENT: CONSORZIO AREA SVILUPPO INDUSTRIALE PALERMO LOCATION: Polizzi Generosa, Palermo, Italy YEAR: 2004 BUDGET: 37,000,000 PROVIDED SERVICES: preliminary level design CURRENT LAYOUT PROJECT LAYOUT SERVICE CENTER PHOTOREALISM
40 DOUBLING OF THE RAILWAY LINE BETWEEN THE STATIONS OF, CARINI AND CAPACI, PALERMO, ITALY CLIENT: COSAVID S.C.A.R.L. LOCATION: Carini and Capaci, Palermo, Italy YEAR: 2002 BUDGET: 8,000,000 PROVIDED SERVICES: Concrete works structural testing DOUBLE TRACK RAILWAY LINE STRUCTURAL CALCULATION HAMMER TEST PASSENGER SHELTER ARTIFICIAL TUNNEL RAILWAY UNDERPASS
41 environmental surveys and assessments
42 TOPOGRAPHIC AND BATHYMETRIC SURVEY FOR THE EXTENSION OF THE PORT QUAYED, TERMINI IMERESE, PALERMO, ITALY CLIENT: PORT AUTORITY OF PALERMO LOCATION: Termini Imerese, Palermo, Italy YEAR: 2012 PROVIDED SERVICES: Bathymetric survey Topographic survey Visual data collection (ROV) ISOBATH LINES BATHYMETRIC DEPTHS VISUAL DATA COLLECTION TAKE-OVER OF CROSS SECTIONS ROV INSTRUMENT PANEL ROV POSITIONING OF INSTRUMENTATION ON BOARD POSITIONING OF THE GPS RECEIVER
43 QUAYS AND CAISSON STATUS UNDERWATER SURVEY IN THE COMMERCIAL BASIN PORT OF TERMINI IMERESE, PALERMO, ITALY CLIENT: PORT AUTORITY OF PALERMO LOCATION: Termini Imerese, Palermo, Italy YEAR: 2007 BUDGET: 19,5000 PROVIDED SERVICES: morpho bathymetric and stratigraphic survey. caisson damage analysis LAPTOP AND ACQUISITION UNIT TRANSDUCTOR TRANSDUCTOR IMAGES OF SCAN ANALISYS SURVEY PLAN DETAILS OF CAISSON DAMAGE SUBBOTTOM EQUIPMENT
44 BATHYMETRIC AND TOPOGRAPHICAL SURVEY OF TREMESTIERI PORT, MESSINA, ITALY CLIENT: PORT AUTHORITY OF MESSINA PLACE: Tremestieri, Messina, Italy YEAR: 2007 PROVIDED SERVICES: bathymetric and topographical survey POSITIONING OF GPS RECEVIER ON DATUM POINT DIGITAL ELEVATION MODEL OF BEDSEA SB DATA ACQUISITION NAVIGATION SENSOR Area da rilevare a terra Area da rilevare a mare BATHYMETRIC AND TOPOGRAPHICAL SURVEY AREA 2D BATHYMETRIC PLAN BATHYMETRIC DEPTHS AND TOPOGRAPHICAL HEIGHTS ISOBATH LINES AND TOPOGRAPHICAL HEIGHTS DEPTH SOUNDER
45 PORT OF TERMINI IMERESE, PALERMO, ITALY CLIENT: SI.AR TRIVELLAZIONI LOCATION: Termini Imerese, Palermo, Italy YEAR: 2006 PROVIDED SERVICES: Morpho bathymetric and topographical survey ISOBATH LINES MB ACQUISITION UNIT BOTTOM DIGITAL ELEVATION MODEL SBM PROFILE BATHYMETRIC DEPTHS MB EQUIPMENT POSITIONING OF GPS RECEVIER ON DATUM POINT SEDIMENTATION AREA BOTTOM MORPHOLOGY MB DATA ACQUISITION
46 PORT OF TREMESTIERI, MESSINA, ITALY CLIENT: Società Consortile Approdi S.C.A.R.L. LOCATION: Tremestieri, Messina, Italy YEAR: 2006 PROVIDED SERVICES: Morpho bathymetric survey. DATA ACQUISITION ISOBATH LINES MORPHO BATHYMETRIC SURVEY: 2D BATHYMETIC PLAN POSITIONING OF GPS RECEVIER ON DATUM POINT MORPHO BATHYMETRIC SURVEY: DIGITAL ELEVATION MODEL OF BEDSEA MORPHO BATHYMETRIC SURVEY:BATHYMETRIC DEPTH MORPHO BATHYMETRIC SURVEY: ISOBATH LINES SOUND SPEED TRANSDUCTOR
47 ENLARGMENT OF SAN NICOLA L ARENA MARINA, TRABIA, PALERMO, ITALY CLIENT: MUNICIPALITY OF TRABIA LOCATION: San Nicola l Arena, Trabia, Palermo, Italy YEAR: 2006 BUDGET: 26,200,000 PROVIDED SERVICES: Enviromental Impact Assessment study CONSTRUCTION LAYOUT COSTRUCTION STEPS ANALYSIS ANTE OPERAM VIEW BIOCENOTICAL, GEOLOGICAL AND SEDIMENTOLOGICAL ANALYSIS ENVIRONMENTAL ANALISYS POST OPERAM VIEW
48 MARINA OF SAN NICOLA L ARENA, PALERMO, ITALY CLIENT: TRABIA MUNICIPALITY PLACE: Trabia, Palermo, Italy YEAR: 2006 PROVIDED SERVICES: bathymetric and stratigraphic survey POSITIONING OF GPS RECEVIER ON DATUM POINT SB DATA ACQUISITION ISOBATH LINES POSITIONING OF THE INSTRUMENTS ON THE BOAT DEPTH SOUNDER BATHYMETRIC DEPTHS IN WEST AREA BATHYMETRIC DEPTHS IN EAST AREA A PARTICULAR IMAGE OF BREAKWATER
49 PORT OF PANTELLERIA ISLAND, TRAPANI, ITALY CLIENT: BEFUMO S. PLACE: Pantelleria Island, Trapani, Italy YEAR: 2006 PROVIDED SERVICES: Morpho bathymetric and topographical survey PROBE FOR MEASURING THE SPEED OF SOUND IN WATER ISOBATH LINES BOTTOM DIGITAL ELEVATION MODEL POSITION OF THE INSTRUMENTS ON BOARD POSITIONING OF GPS RECEVIER ON DATUM POINT BATHYMETRIC DEPTHS BOTTOM MORPHOLOGY MB EQUIPMENT
50 BATHYMETRIC SURVEY FOR A PIER CONSTRUCTION, GIAMMORO, MESSINA, ITALY CLIENT: Damen s.r.l. PLACE: Giammoro, Milazzo (ME), Italy YEAR: 2006 DESCRIPTION OF SERVICES: bathymetric survey GPS LANDMARK ISOBATH LINES BATHYMETRIC DEPTH PROFILES
51 BATHYMETRIC SURVEY OF THE SEABED IN FRONT OF AND ADJACENT TO THE PIER OF SMEB CANTIERI NAVALI IN THE PORT OF MESSINA, ITALY CLIENT: TESECO S.p.A. PLACE: Messina, Italy YEAR: 2005 DESCRIPTION OF SERVICES: bathymetric and stratigraphic survey POSITIONING OF GPS RECEVIER ON DATUM POINT ISOBATH LINES SURVEY AREA BATHYMETRIC DEPTHS POSITIONING OF THE INSTRUMENTS ON THE BOAT DEPTH SOUNDER
52 PORTS OF MILAZZO AND MESSINA, ITALY CLIENT: AUTHORITY PORT OF MESSINA LOCATION: Milazzo and Messina, Italy YEAR: 2005 PROVIDED SERVICES: Bathymetric survey POSITIONING OF THE INSTRUMENTS ON THE BOAT BATHYMETRIC DEPTHS (PORT OF MESSINA) POSITIONING OF GPS RECEVIER ON DATUM POINT ISOBATH LINES (PORT OF MILAZZO) THE LIGHTHOUSE IN PORT OF MESSINA THE JETTY IN PORT OF MILAZZO
53 MORPHO BATHYMETRIC SURVEY OF PORT OF AUGUSTA, SIRACUSA, ITALY CLIENT: SOCIETA SCUTTARI S.A.S. PLACE: Augusta, Siracusa, Italy YEAR: 2005 DESCRIPTION OF SERVICES: Morpho bathymetric survey POSITIONING OF ROVER GPS RECEIVER ON BOAT DIGITAL ELEVATION MODEL OF BOTTOM BOTTOM MORPHOLOGY (SOUTH BREAKWATER) POSITIONING OF MASTER GPS RECEIVER ON DATUM POINT 3D BATHYMETRY OF SOUTH MOUTH MB DATA ACQUISITION BATHYMETRIC DEPHTS (NORTH BREAKWATER) ISOBATH LINES (SOUTH BREAKWATER) MB IMAGES 3D BATHYMETRY OF NORTH MOUTH SEA WORK TYPE SECTION SOUND SPEED EQUIPMENT
54 BATHYMETRIC AND TOPOGRAPHIC SURVEY IN THE ZETA 10 NAUTICAL POLE AT POZZILLO, CINISI, PALERMO, ITALY CLIENT: THALASSOKRATA s.r.l. PLACE: Pozzillo, Cinisi, Palermo, Italy YEAR: 2005 DESCRIPTION OF SERVICES: bathymetric and topographic survey ISOBATH LINES TOPOGRAPHIC HEIGHTS POSITIONING OF GPS RECEVIER ON DATUM POINT SB DATA ACQUISITION BATHYMETRIC DEPTHS POSITIONING OF THE INSTRUMENTS ON THE BOAT DEPTH SOUNDER
55 REGIONAL LOGISTIC AREAS NETWORK, VITTORIA, RAGUSA, ITALY CLIENT: COMMON OF VITTORIA (RG) LOCATION: Vittoria,Ragusa, Italy YEAR: 2008 BUDGET: 26,200,000 PROVIDED SERVICES: Enviromental Impact Assessment study LOGISTIC AREAS NETWORK CURRENT LAYOUT TRANSPORT NETWORK AND TRAFFIC ANALYSIS GEOLOGICAL CHART ENVIRONMENTAL ANALISYS LOCATION VIEW
56 engineering modeling
57 TECHNICAL ADVICE FOR THE WORK OF DEFENSE, REDEVELOPMENT AND ENHANCEMENT OF THE COAST OF THE CITY OF SALERNO, ITALY CLIENT: CONSORZIO STABILE GRANDI LAVORI s.c.r.l. LOCATION: Salerno, Italy YEAR: 2013 BUDGET: PROVIDED SERVICES: technical advice CURRENT LAYOUT PROJECT LAYOUT IMPROVING SOLUTIONS STUDY CONSTRUCTION METHOD AND LAYING HYDRODYNAMIC STUDIES COASTAL ENGINEERING STUDIES ANALYSIS OF DIFFUSION OF POLLUNTANTS BEACH NOURISHMENT PROTECTION TYPE SECTION DETAILS OF LAND WORKS
58 MASTER PLAN OF PALERMO HARBOURS SYSTEM CLIENT: PORT AUTORITY OF PALERMO LOCATION: Palermo, Italy YEAR: 2009 PROVIDED SERVICES: Identification of the existing docks Meteomarine and morphological study Navigability study Flushing and Spill modelling studies Hydrological, hydraulic and geotechnical studies Study of the basins internal agitation and the mouths and verifications of the new and existing defensive works Diffraction studies, analysis of existing and proposed protection structures Integrated port safety relationship Environmental Impact Assessament study MASTERPLAN OF PALERMO HARBOURS SYSTEM VERIFICATION OF STABILITY OF SEA WORKS ANALYSIS OF DIFFUSION OF POLLUTANTS HYDROLOGIC ANALYSIS FLUSHING STUDY
59 HYDROGEOLOGIC, GEOLOGIC AND GEOTECHNICAL STUDIES TYPOLOGICAL CHARACTERIZATION OF DOCKS ANALYSIS OVERTOPPING PHENOMENA NAVIGABILTY STUDIES : MANOUVRE SIMULATION DIFFRACTION STUDIES E.I.A. STUDIES
60 STUDIES FOR THE MASTER PLAN OF THE MARINA DI PALMA PORT, PALMA DI MONTECHIARO, AGRIGENTO, ITALY CLIENT: MINISTERO DELLE INFRASTRUTTURE E DEI TRASPORTI S.I.I.T. SICILIA CALABRIA GENIO CIVILE OPERE MARITTIME PER LA SICILIA PLACE: Marina di Plama, Palama di Montechiaro, Agrigento, Italy YEAR: 2005 DESCRIPTION OF SERVICES: bathymetric and topographic survey hydrological study sedimentological study BATHYMETRIC AND TOPOGRAPHIC SURVEY: ISOBATH LINES BATHYMETRIC AND TOPOGRAPHIC SURVEY: BATHYMETRIC DEPTHS SITE IMAGES BATHYMETRIC AND TOPOGRAPHIC SURVEY: BATHYMETRIC SECTIONS HYDROLOGICAL ANALYSIS: PALMA RIVER BASIN SENDMENTOLOGICAL ANALYSIS: TAKING AND POSITION OF THE SAMPLES SENDMENTOLOGICAL ANALYSIS: SEDIMENTS SIZE MAP
61 URBAN AREAS AND BUILDING
62 REFITTING AND RESTYLING OF RESIDENZA UNIVERSITARIA MEDITERRANEA, PALERMO, ITALY CLIENT: FONDAZIONE RUI LOCATION: Palermo, Italy YEAR: 2007 BUDGET: 2,300,000 PROVIDED SERVICES: preliminary, final level design supervision of construction works health and safety duties SUNBREAKERS PARTICULARS DINING ROOM RESTYLING PLAN OF THE NEW VERTICAL CONNECTION IN THE BASEMENT ROOMS RESTYLING NEW VERTICAL CONNECTION WITH A CURTAIN OF HORIZONTAL SUNBREAKERS CROSS SECTION OF THE NEW VERTICAL CONNECTION: ANTE OPERAM AND POST OPERAM STANDARD PLAN: ANTE OPERAM AND POST OPERAM HALLWAY RESTYLING
63 EXTRAORDINARY MAINTENANCE OF COMMON PARTS OF BUILDING IN PALERMO, ITALY CLIENT: CONDOMINIO VIA REMO SANDRON 25/27/29/31 LOCATION: Palermo, Italy YEAR: 2005 BUDGET: 300,000 PROVIDED SERVICES: final and construction level design supervision of construction works health and safety duties ELEVATION ON VIA REMO SANDRON GROUND FLOOR PLAN: ANTE OPERAM AND POST OPERAM NEW ROOF SECTION OF THE NEW VERTICAL CONNECTION: ANTE OPERAM AND POST OPERAM ELEVETION ON VIA REMO SANDRON: ANTE OPERAM AND POST OPERAM NEW VERTICAL CONNECTION
64 RESTORATION AND IMPLEMENTATION OF UNITS AT THE ATANASIO-MONTEDORO PALACE, PALERMO, ITALY CLIENT: COSTRUZIONI MERIDIONALI 1978 s.r.l. LOCATION: Palermo, Italy YEAR: 2002 BUDGET: PROVIDED SERVICES: design supervision of works CURRENT LAYOUT PROJECT LAYOUT RENDERING OF THE INTERIOR RENDERING OF THE FRONT
65 CONSTRUCTION OF AN OFFICE BUILDING IN PALERMO, ITALY CLIENT: CORECA SRL LOCATION: Palermo, Italy YEAR: 1995 BUDGET: PROVIDED SERVICES: Construction level design Supervision of works PLAN TECHNOLOGICAL SYSTEMS FRONT CONSTRUCTION COMPLETED WORKS
66 RENEWAL OF EXISTING BUILDING Client: Red A s.r.l. Relief, return architectural consistency and structural analysis of the Palazzo Castrofilippo, total surface 5000 m 2, Via Alloro, Palermo 1990 Client: Palazzo Trinacria s.r.l. Building, structural and engineering consulting to convert the Palazzo Trinacria in a Meetings Center, via Butera n.24, Palermo. Lit
67 Client: CI.Mer. s.r.l. Relief and original wall system investigation after the world war destruction of the Palazzo de Francisci, via Butera, Palermo 1991 Client: Costruzioni Meridionali 1978 s.r.l. Design and works supervision for restoration of the Palazzo Atanasio Montedoro, P.tta S.Sofia n.5, Palermo Lit
68 Client: ITECO Ingegneria s.r.l. (MI) Engineering consulting to the works supervision for the structural and plant building adaptation of the new T.I.M. (Telecom Italia Mobile) Headquarters, via E. Albanese Palermo Lit Client: SAT S.p.A. Draft maintenance roof and rainwater disposal in the Palazzo Tagliavia, via Cavour 117, Palermo Lit
69 Client: Condominio via Remo Sandron 25/27/29/31 Design and works supervision of the building common parts restoration in via Remo Sandron 27/29, Palermo 2005 Client: Fondazione RUI Design and works supervision for receptive expansion and functional and regulatory adaptation of the RUME (Mediterranean Universitary Residence) in Palermo 2007
70 Client: Immobiliare Eucaliptus s.r.l. Maintenance design of the residential building in Mondello (PA), v.le Orfeo n , Client: Baglio di Cala Bruca snc Engineering contracting for a building renovation in Palermo, Cortile Trapani n ,
71 retail
72
73
74
75
76 RELEVANT PROJECTS
77 2001 Provincia Regionale of Palermo Coordination for health and safety, ex D.Lgs. 494/96, in Project of enlargement of I.T.C. L. Sturzo in Bagheria (PA) 2002 Municipality of Isola delle Femmine (PA) Project for Construction of the new Fish Market of Isola delle Femmine 1, GESAP S.p.A. Feasibility Study for the Airplanes Maintenance Area in the Falcone-Borsellino Airport, Palermo 7,500, Municipality of Termini Imerese (PA) Project for Termini Imerese (PA) Port General Master Plan 2002 COSAVID s.c.a r.l., concessionaire Rete Ferroviaria Italiana S.p.A. Structural Final Tests for Civil Works of the railway in Palermo - Airport Falcone-Borsellino Station 2002 Area of Industrial Development (A.S.I.) Prov. Palermo Project for restructuring of rain drainage network of Industrial District of Termini Imerese (PA) - 2,000, Area of Industrial Development (A.S.I.) Prov. Palermo Project of Maintenance of Berthing Facility for Gas Oil Cargo Ships ex CHIMED Industrial District Termini Imerese (PA) - 4,000, Municipality of Bagheria (PA) Project for Aspra Port General Master Plan 2003 Area of Industrial Development (A.S.I.) Prov. Palermo Consultant Engineering for Intermodal Transport Matters, Integrated Goods Transport System and on Logistic Platform Feasibility in new A.S.I. District Master Plan 2002 SACCNE Rete S.r.l. Final Structural Tests for Strengthening and Restructuring of the Dock for Bunker Facility in Messina, C.da Paradiso, S.P. Annunziata Granatari km Municipality of Capaci (PA) Project for Capaci (PA) Port Master Plan 2003 Refinery of Milazzo SpA Final Structural Tests for Template Dock n.2 A Platform, C.da Mangiavacca, Messina 2003 Marina of Porto Grande SpA Coastal Hydrodynamics Studies for Porto Grande in Siracusa 2003 Municipality of Bagheria (PA) Project of a Breakwaters System to Protect Aspra District 1,800, Marina of Porto Grande SpA Project of new Marina del Porto Grande of Siracusa - 25,000, Ministry of Infrastructures and Transportation, S.I.T Sicilia e Calabria, Genio Civile per le Opere Marittime della Sicilia Coastal Hydrodynamics Studies and Environmental Impact Assessment for Marina of Palma of Montechiaro 2004 Municipality of Santa Flavia (PA) Porticello, new Port Master Plan 2004 Palermo Port Authority Consulting Engineering for the morpho-bathymetric and stratigraphic survey of the basin between the Molo Trapezoidale and the Molo Sud in the Port of Palermo 2004 Consorzio A.S.I. Palermo Project for a new Highway Trucks Facility (Autoporto) in Tremonzelli (PA) 37,000, Provincia Regionale of Palermo Final Administrative and Technical Tests for Works of a Yachts Harbour in Termini Imerese (PA) 6,000, Municipality of Lipari (ME) Consultant for Geotechnical Studies and Surveys in Project of Emergency Safety Works for Ports and Harbours of Eolie Islands 2004 Palermo Port Authority Consulting Engineering for the Morpho-bathymetric and Stratigraphic Survey of the basin Cala in the Port of Palermo 2004 Municipality of Casteldaccia (PA) Project of Naturalistic Rehabilitation of the Coast and the Estuary of Milicia River Consulting Engineering, 5,000, Palermo Port Authority Dry Dock in Industrial, Consulting Engineering for the Morpho-bathymetric and Stratigraphic Survey 2005 Municipality of Lipari (ME) Consulting Engineering for Coastal Hydrodynamic Studies in Project of Emergency Safety Works for Ports and Harbours of Eolie Islands
78 2005 Ministry of Transport and Infrastructures, S.I.T Sicilia e Calabria, Genio Civile of Maritime Works of Sicily Consulting Engineering for Coastal Hydrodynamics, Hydrologic, Hydraulic, Sedimentologic Studies for the Project of the new Marina of Palma, Palma of Montechiaro (AG) Master Plan 2005 Municipality of Mazara del Vallo (TP) Project of new Port of Mazara del Vallo (TP). General Master Plan 2005 K Tourism S.r.l. (KALOS SpA) Project of Taormina Marina, Super Yachts Berthing, Facilities and Shopping Village 67,000, Regione Siciliana, Assessorato Cooperazione, Commercio Artigianato e Pesca. Consulting Port Engineering for Logistic and Infrastructural Matters for the Regional Fishing Program and Assets Planning Municipality of Trabia (PA) Project of Enlargement of the S.Nicola l Arena Marina 5,000, Municipality of Trabia (PA) Project of new S.Nicola Port General Master Plan Approved Decree Law A.R.T.A del 09/01/2007 su GURS n. 8 of 16/02/ Regione Siciliana, Tourism Department new Strategic Master Plan for Developing of Recreational Navigation Facilities in Sicily, published with Decree Law n. 69 of 26/05/ Municipality of Trabia (PA) Consultant Engineering for Environmental Impact Assessment Study of Enlargement S. Nicola Harbour Works 2006 Regione Siciliana, Regional Authority for Tourism, Transportation and Communication Guidelines Preparation for Operative Plan - P.O. Programming EU funds for period TG Intercantieri Vittadello SpA, Costruzioni Bruno Teodoro SpA Project for completing of Capo d Orlando (ME) Marina Consultant Engineer, 40,000, Fondazione RUI Consultant Engineer for Project and Works Supervision for refitting and restyling of Residenza Universitaria Mediterranea of Palermo 2007 Marina d Arechi SpA, Gallozzi Group Environmental Impact Study for a new Marina in Marina Corta in Lipari (ME) 2007 Marina Arenella Srl Project and Works Managing for enlargement of Marina dei Normanni, Arenella, Palermo - 5,000, Palermo Port Authority Consulting Engineering for the Morpho-bathymetric and Stratigraphic Survey for the Status of Quays of the Commercial Basin Port of Termini Imerese (PA) 2007 TIME SpA Preliminary design for the waterfront rehabilitation and construction of a fishing port and a marina in ex S.P.E.R.O. Syracuse, Italy_ 15,000, Porto d Elba Srl Design and Supervision of Works for the Construction of the new marina in Portoferraio, Elba Island (LI), Italy 18,000, Porto dei Nebrodi Srl Design and Supervision of the Works for completing the Fishing Port and Marina in S. Agata of Militello (ME) 85,000, Municipality of Vittoria (RG) Consultant Engineering for Environmental Impact Assessment Study of a regional logistic areas network in Vittoria (RG) 26,200, Calefati F. Design and Supervision of the Works for the construction of the dry storage and facilities in Carini (PA) 4,300, Port Autority of Palermo Consultant Engineering for the Master Plan of Palermo harbours system 2009 Marsala Yachting Resort Srl Design and Environmental Impact Study for the construction of the new marina in Marsala (TP), 20,700, Comune di Bagheria (PA) Consulting engineering for the preliminary design of the Aspra marina 38,474, Comune di Santa Flavia (PA) Consulting engineering for the design of the new marina as an extension of the port of Porticello (PA) 50,394, Autorità Portuale di Palermo Consulting engineering for the design of the final draft of the work to complete the breakwater of the port of Arenella 15,000,000.00
79 2010 TG Intercantieri Vittadello S.p.A./Costruzioni Bruno Teodoro S.p.A./Associazione Cooperativa Muratori e Affini Ravenna Soc. Coop. per Azioni (ACMAR) Design and construction of the Tremestieri intermodal logistics platform and port infrastructure 80,000, S.P.E.R.O. s.r.l. Final and construction level design and supervision of works of Syracuse Marina 82,000, Autorità Portuale Marina di Carrara Project for Marina di Carrara Port General Master Plan 2011 Autorità Portuale di Palermo Final design of the work to complete the break water of the port of Termini Imerese 2012 Sviluppo Italia Sicilia S.p.A. Consulting for the baths of Sciacca and Acireale 2012 Autorità Portuale Marina di Carrara Preliminary feasibility study to the design of the interface port-city redevelopment 2012 Circolo Unione Coastal Hydrodynamics Studies for a pontoon-bridge in the Syracuse s Club
80 REPRESENTATIVE CLIENTS
81 Public Ministry of Public Works and Transportation Ministry of Environment and Territory Consiglio Nazionale delle Ricerche Presidenza della Regione Siciliana Regione Siciliana, Civil Protection Department Regione Siciliana, Tourism Department Provincia Regionale di Palermo University of Palermo Messina Port Authority Palermo Port Authority Consorzio A.S.I. Palermo Municipality of Bagheria (PA) Municipality of Caltagirone (CT) Municipality of Capaci (PA) Municipality of Caprileone (ME) Municipality of Casteldaccia (PA) Municipality of Cattolica Eraclea (AG) Municipality of Isola delle Femmine (PA) Municipality of Lipari (ME) Municipality of Mazara del Vallo (TP) Municipality of Menfi (AG) Municipality of Palermo Municipality of Pantelleria (TP) Municipality of Santa Flavia (PA) Municipality of Termini Imerese (PA) Municipality of Terrasini (PA) Municipality of Trabia (PA) Municipality of Ustica (PA) Municipality of Valdina (ME) Municipality of Vittoria (ME) Private Angelo Randazzo S.p.A. ACMAR - Associazione Cooperativa Muratori e Affini Ravenna Astrim S.r.l. Co.Re.Ca S.r.l. Costruzioni Bruno Teodoro S.p.A. COSAVID s.c.a.r.l. Damen S.r.l. Diesse 70 S.p.A. Fondazione RUI GESAP S.p.A. Gioiosa Marea S.p.A. IBM SEMEA S.p.A. Intercantieri Vittadello S.p.A. Italpomice S.p.A. Italia Navigando S.p.A. Ktourism S.r.l. Libertà 80 S.p.A. Marina del Porto Grande S.p.A. Marina Arenella S.r.l. Marsala Yachting Resort Srl Porto d Elba S.r.l. Porto dei Nebrodi S.r.l. Pumex S.p.A. Raffineria di Milazzo S.p.A. Rete Ferroviaria Italiana S.p.A. Saccne Rete S.p.A. Seat Pagine Gialle S.p.A. Si.Ar. Trivellazioni Società Bonifica, I.R.I. Group Società Scuttari S.a.s. Thalassokrata S.r.l. Telecom Italia Mobile S.p.A. Teseco S.p.A. TIME S.p.A. Vedo Group S.p.A.
82
Specialized services include:
COMPANY PROFILE Progetti e Opere S.r.l. is an Italian Consulting Engineering firm specialized in Civil, Coastal Maritime and Environmental Engineering (registered according to the Italian law L.N. 109/1994,
References airports and ports
Umbria International Airport Sant Egidio, Perugia Client: Presidenza del Consiglio dei Ministri Prime minister cabinet Head designer: Via Ingegneria SrL Eng. Matteo Di Girolamo Assignment: Detailed design
References on tube and transport analysis
References on tube and transport analysis Line C - New tube line in Rome - Section T4 S.Giovanni-Malatesta Client: Metro C S.C.P.A. Team mebers: VIA ingegneria SrL Mission: Detailed design of the new
SULTANATE OF OMAN SPECIAL ECONOMIC ZONE AUTHORITY AT DUQM
SULTANATE OF OMAN SPECIAL ECONOMIC ZONE AUTHORITY AT DUQM www.duqm.gov.om 1. INTRODUCTION 2. ACCESSIBILITY TO DUQM 3. SEZAD PREVIOUS MASTERPLAN 4. DUQM URBAN PLANNING 5. SPECIAL ECONOMIC ZONE DISTRICTS
CONTENTS. Marettimo 85. Lonely Planet Publications Pty Ltd INTRODUCING SICILY 4 THE BEST OF SICILIAN ART & ARCHITECTURE 97
Lonely Planet Pulications Pty Ltd LONELYPLANET.COM CONTENTS 25 CONTENTS INTRODUCING SICILY 4 GETTING STARTED 8 FESTIVALS & EVENTS 1 CULTURE 12 FOOD & DRINK 16 OUTDOORS 2 FAMILY TRAVEL 24 THE AUTHORS 28
Practical Information for Participants
Union for the Mediterranean High Level Conference on the financing of the future Trans-Mediterranean Transport Network (TMN-T) 'Porto di Roma' (Civitavecchia), 9 & 10 December 2014 Practical Information
MLD: Domestic Maritime Transport Project
Environmental Monitoring Report Project Number: 37265 December 2010 MLD: Prepared by Japan Port Consultants Co., Ltd. Malé, Maldives For Ministry of Finance and Treasury Ministry of Transport and Communication
Catalog. Energy Division. CMP Group. CMP Group S.r.l. Member Company
Energy Division Catalog S.r.l. Member Company Office Italia Legal and Administrative Office Scala Greca n 371/b 96100 Siracusa Italy Tel. +39 0931 751006 Fax + 39 0931 449644 Romanian s Branch Commercial
REHABILITATION AND EXTENSION PROJECT FOR PORT OF LOBITO
REHABILITATION AND EXTENSION PROJECT FOR PORT OF LOBITO Advantages of Port Lobito (1) Predominant geological locations Facing the Atlantic, Port Lobito locates around 30km north to Beguela City, and it
Shortlist of projects. References viaducts, bridges and infrastructures
Shortlist of projects Client: Provincia di Roma Assignment: Detailed design inside the PRUSST asse Tiburtino Nodo di Ponte Lucano Team members: VIA Ingegneria srl Mission: Preliminary design-build contract
IHCANTABRIA and Marine Renewables
IHCANTABRIA and Marine Renewables Assessment and forecast of energy resources in the marine environment (waves, wind, currents, tides) Design, development and testing of marine renewable energy technologies
How To Design A Smart City
DBA Group Srl Urban Development & Architecture Index About DBA Group Urban Development & Architecture La Bolognina Case del Sole Cesena Novello La Metamorfosi - Spina 4 Arezzo Ugnano Brescia Magazzini
Porto La Spezia, Italia. the sustainable regeneration of an urban waterfront JM Tomás Llavador, architect
Porto La Spezia, Italia the sustainable regeneration of an urban waterfront JM Tomás Llavador, architect Londres Paris Madrid La Spezia Roma portovenere sciacchetrà cinque-terre lerici Lerici, 1933 Fillia
HARBOR INFRASTRUCTURE INVENTORIES Port Austin Harbor, Michigan
HARBOR INFRASTRUCTURE INVENTORIES Port Austin Harbor, Michigan Harbor Location: Port Austin Harbor is located at the tip of the thumb of Michigan, about 80 miles northeast of Saginaw, MI Authority: Rivers
Advanced Electronic Not Invasive Buoy-Field System. System Description and Application
Advanced Electronic Not Invasive Buoy-Field System System Description and Application What is MarPark MarPark is an innovative mooring system, based on electronic and not invasive buoys, studied for a
Area planning and economic development
LIFE AMBIENTE ENTE PER LE NUOVE TECNOLOGIE L ENERGIA E L AMBIENTE Area planning and economic development PROVINCIA DI ROVIGO INIZIATIVE IMMOBILIARI INDUSTRIALI UNIVERSITA DEGLI STUDI DI PADOVA COMUNE DI
Union for Mediterranean Motorways of the Sea Initiative: a way to a re-equilibrium in the Mediterranean. Transport and Urban Development Division
1 Union for Mediterranean Motorways of the Sea Initiative: a way to a re-equilibrium in the Mediterranean Transport and Urban Development Division 3 UfM MoS The concept of MoS The Motorways of the Sea
DBA Group Srl Telecommunication & IT Infrastructures Power & Energy
Telecommunication & IT Infrastructures Power & Energy Index About DBA Group Telecommunication & IT Infrastructures Power & Energy Mobile Networks System Mobile Networks System Mobile Networks Implementation
Interporto Padova SpA
Interporto Padova SpA Freight Village AREA 2 Interporto Padova S.P.A. Owned Land Surface : Sq.m 1.040.000 Owned Warehouses: Sq.m 270.000 (116.000 mc = 23.000 sq.m of cold stores) Owned offices Sq.m 36.490
SANTA TERESA RESEARCH CENTRE
SANTA TERESA RESEARCH CENTRE THE CENTRE Address ENEA S. Teresa Marine Environment Centre 19036 Pozzuolo di Lerici (La Spezia) C.P. 224 19100 La Spezia Tel. +39-0187-9781, fax +39-0187-978213 Director Eng.
ESTIMATES OF EXPENDITURE ON DEVELOPMENT ACCOUNT 2012/2013
ESTIMATES OF EXPENDITURE ON DEVELOPMENT ACCOUNT 2012/2013 HEAD 11 PRISONS DEPARTMENT Acquisition, Construction & Improvement of Equipment 711700 Military, Police, Prison Equipment 38,987 12,402 50,000
SELITECH ENERGY WATER SYSTEMS COMPANY PROFILE
ENERGY WATER SYSTEMS COMPANY PROFILE EN 04/2012 srl are a service company, previously part of SELECO GROUP. They supply design, engineering and supervision of the rehabilitation, renewal or refurbishment
The Innovation Center for Transport Logistics and Transformation
The Innovation Center for Transport Logistics and Transformation The Centers of innovation fall under the Regional Strategy for Research and Innovation which has the following objectives facilitate the
THE LIVORNO PLATFORM
THE LIVORNO PLATFORM Operational capabilities of the Livorno transport and logistics platform the infrastructures and services, intangible assets, the main development projects The Port of Livorno Livorno
MAREMED kick off meeting
MAREMED kick off meeting MEDITERRANEAN BASIN (Italy) Spatial Planning Department Orietta Gattulli economic management Marino Fiorito computer service center 22 June 2010 REGION PROVENCE-ALPES-CÔTE D AZUR
A.P.I.C.E. Common Mediterranean strategy and local practical Actions for the mitigation of Port, Industries and Cities Emissions
A.P.I.C.E. Common Mediterranean strategy and local practical Actions for the mitigation of Port, Industries and Cities Emissions The study area of Venice ARPA Veneto and Veneto Region Kick off meeting
DEVELOPMENT OF RENEWABLE ENERGY IN SICILY
DEVELOPMENT OF RENEWABLE ENERGY IN SICILY Claudio Basso (1), Fabio V. Matera* (2) (1) Regione Siciliana Assessorato Industria Ufficio Speciale per il Coordinamento delle Iniziative Energetiche, Unità Operativa
HYDRAULICS. H91.8D/C - Computerized Open Surface Tilting Flow Channel - 10, 12.5, 15 and 20 m long
HYDRAULICS H91.8D/C - Computerized Open Surface Tilting Flow Channel - 10, 12.5, 15 and 20 m long 1. General The series of channels H91.8D has been designed by Didacta Italia to study the hydrodynamic
Martin County Coastal GIS Program St Lucie Inlet Planning Tool
Martin County Coastal GIS Program St Lucie Inlet Planning Tool Alexandra Carvalho, Ph.D., GISP Kathy Fitzpatrick, P.E. Jessica Garland Martin County, Florida Presentation Overview County Coastal Programs
Ownership and Management of Port Administration
Ownership and Management of Port Administration Yi-Chih Yang Associate Professor, Department of Shipping and Transportation Management, National Kaoshiung Marine University 1.Port management objectives
Progress of SIGC -Coastal Geographical Information System
Progress of SIGC -Coastal Geographical Information System Filippo D Ascola, Angela Barbano ISPRA -Istituto Superiore per la Protezione e la Ricerca Ambientale Dip.to Tutela Acque Interne e Marine - Servizio
Emergency Safeguarding. of the World Heritage. Site of Byblos
Emergency Safeguarding of the World Heritage Site of Byblos Emergency Safeguarding of the World Heritage Site of Byblos Introduction Located on the Eastern Mediterranean, 40 km north of Beirut (Lebanon),
GOOD DESIGN FOR A BETTER IMPLEMENTATION
GOOD DESIGN FOR A BETTER IMPLEMENTATION ABOUT US MORE THAN 30 YEARS ACCURACY, EFFICIENCY, QUALITY, SCHEDULE COMPLIANCE A A TECHNOLOGY OF CHOICE YOUR NEEDS ARE OUR GOALS EXPERIENCE IN THE FIELD COMPANY
Ravenna, 28 Giugno 2013
Ravenna, 28 Giugno 2013 From installation of the new experimental small wind turbine of Project Powered to a systematic project of green port in Ravenna F. Matteucci, M.Rialti Tozzi Nord // TRE Tozzi Renewable
History Who We Are OMEGA Cisco Microsoft Panduit Honeywell Alcatel, Motorola Gruppomega Vision Mission Gruppomega Gruppomega
History GRUPPOMEGA was founded in 1980 as center of research and experimentation within the Information & Communication Technology sector. Over the years it has grown to become a partner able to satisfy
Failing Coastal Wood Infrastructure on the Great Lakes
University of Wisconsin Sea Grant Institute Contact Gene Clark [email protected] 715-392-3246 Failing Coastal Wood Infrastructure on the Great Lakes Gene Clark/UW Sea Grant Institute Introduction Many
REGISTERED OFFICE AND HEADQUARTER Via Melchiorre Gioia, 64 20125 Milano Tel: 02 6694887 r.a. Fax: 02 6704199 e-mail: segreteria@spssrl-mi.
REGISTERED OFFICE AND HEADQUARTER Via Melchiorre Gioia, 64 20125 Milano Tel: 02 6694887 r.a. Fax: 02 6704199 e-mail: [email protected] www.spssrl-mi.it MAIN ACTIVITIES STRUCTURAL DESIGN (R.C., P.R.C.,
Tunnelling & Underground. Specialists
Tunnelling & Underground Specialists Mined Tunnels Excavation at Ayer Rajah Avenue, Singapore Introduction Amberg & TTI Engineering Pte Ltd (AETTI) was established in Singapore in 2002 by Amberg Engineering
SITE INVESTIGATIONS OF THE BEACH EROSION PROBLEM AT MAHO BEACH, ST. MAARTEN
SITE INVESTIGATIONS OF THE BEACH EROSION PROBLEM AT MAHO BEACH, ST. MAARTEN Performed February 2003 Performed by: Dr. Lee E. Harris, Ph.D., P.E. Associate Professor of Ocean Engineering & Oceanography
Waterfront Redevelopment: a Strategic factor of Urban Regeneration in Venice
WaRe Waterfront Regeneration Learning from European best practices for a sustainable urban life Parnü, Estonia, March 30 th April 1 rst 2012 Venice, March 30th 2012 Waterfront Redevelopment: a Strategic
Ocean Engineering, Surveying and Mapping Services
Ocean Engineering, Surveying and Mapping Services FUGRO PELAGOS, INC. Fugro collects and interprets data related to the earth s surface and the soils and rocks beneath. It provides advice based on the
Description of Selected Services under the UN CPC system in which the EC made Market Access Commitments in the EPA
Description of Selected Services under the UN CPC system in which the EC made Market Access Commitments in the EPA 7471 Travel agency and tour operator services Services rendered for passenger travel by
company profile via Ma co n 3 0-2 3 9 0 0 L e c c o - t e l 0 3 4 1. 2 8 2 0 8 1 f a x 0341.287303 - t h l c@tecn o h a b i t a t.
company profile 2012 T e cn o H a b i t a t s. p. a. se d e l e g a l e : v i a B a t t a g l i a 2 2-2 0 1 2 7 M i l a n o - t e l 0 2. 2 6 1 4 8 3 22 f a x 02.26145697 - thmi@ t e c n o h a b i t a t.
The main objective of this proposal is to enhance the quality of life in Kársnes. It embraces the positive features of the peninsula s tip and weaves
The main objective of this proposal is to enhance the quality of life in Kársnes. It embraces the positive features of the peninsula s tip and weaves them together to create multi-functional and dynamic
Regione Siciliana District Council for Tourism, Communication and Transport Department of Tourism, Sport and Entertainment
Regione Siciliana District Council for Tourism, Communication and Transport Department of Tourism, Sport and Entertainment District Councillor: General Director: Service 5 - Tourist port affairs : U.O.B.
Company Presentation
Company Presentation 1 Company Presentation Company History Certification Organization References Customers Business Systems Division Plants Division 2 Company Sysco S.p.A. designs, manufactures and installs
Catalog. Environment Division. CMP Group. CMP Group S.r.l. Member Company
Catalog Environment Division S.r.l. Member Company Office Italia Legal and Administrative Office Scala Greca n 371/b 96100 Siracusa Italy Tel. +39 0931 751006 Fax + 39 0931 449644 Romanian s Branch Commercial
Dr. Lidija Globevnik Luka Snoj, Neven Verdnik, Peter Muck. Meta Povž
The concept of ecological restoration of a sub-alpine river and its tributaries in Slovenia Suggestions for regulation of riverbed and reconstruction of hydrotechnical facilities Dr. Lidija Globevnik Luka
ARCHITETTO ANDREA FERRARO
ARCHITETTO ANDREA FERRARO Via F. Baldinucci n. 3-20158 Milano - Italia Tel. (+39).02.56.81.43.93 r.a. - Fax (+39) 02.56.94.110 e-mail: [email protected] www.architettoferraro.com CAREER AND PROFESSIONAL
Tourist mature destinations as complex spaces. Notes about the elaboration process of an atlas of Costa del Sol
Tourist mature destinations as complex spaces. Notes about the elaboration process of an atlas of Costa del Sol Sergio J. Reyes Corredera Universidad de Málaga, ETS Arquitectura, Málaga, España. e-mail:
CONTENTS TRAFFIC ACCIDENTS AND SAFETY POLICIES INTRODUCTION BOOK 1 TRAFFIC ACCIDENTS
CONTENTS TRAFFIC ACCIDENTS AND SAFETY POLICIES INTRODUCTION 1. General Accident Statistics 3 2. Promotion of Traffic Safety Policy and Accident Trends 3 3. The Future Direction of Traffic Safety Measures
How to reach. the Research Centre on Sea Technologies
How to reach Research Centre on Sea Technologies and Marine Robotics of the Scuola Superiore Sant Anna Address: viale Italia, 6, Leghorn (Livorno), Italy Phone: +39 3346986900 Planning your journey The
Contents. 1. PROFILE p2. 2. SERVICES 2.1 Offshore Support Services p 4 Offshore support p 6 ROV operations p 8
OCTOBER 2013 22 Contents 1. PROFILE p2 2. SERVICES 2.1 Offshore Support Services p 4 Offshore support p 6 ROV operations p 8 2.2 Hydrographic & Geophysical services p 10 Bathymetric surveys p 12 High resolution
Coastal Erosion Risk Mitigation Strategies applied in a Small Island Developing State: The Barbados Model
Coastal Erosion Risk Mitigation Strategies applied in a Small Island Developing State: The Barbados Model BY Dr. Leo Brewster, Director Coastal Zone Management Unit, Barbados Presented At UNFCCC Expert
Larnaca Urban Sustainable Development Strategy
Larnaca Urban Sustainable Development Strategy USUDS LARNACA - ACTION PLAN Larnaca undertook a thorough process of diagnosis of the city which formed the base for the identification of the future vision
The Integration of Hydrographic and Oceanographic Data in a Marine Geographic Information System U.S. Hydro 2015
The Integration of Hydrographic and Oceanographic Data in a Marine Geographic Information System U.S. Hydro 2015 Karen Hart CARIS USA Oceanography and Hydrography Defined Oceanography: The branch of Earth
Illinois Coastal Management Program 2011
4 Coastal Erosion Assessment and Planning The Lake Michigan coast is a dynamic setting influenced by waves, ice, and changing lake levels. The potential for coastal erosion exists along nearly the entire
RESUME for Christopher G. Creed, P.E.
Page One of Five Current Position Senior Engineer / Vice-President for Olsen Associates, Inc. a coastal engineering consulting firm in Jacksonville, Florida. Education Master of Civil Engineering, 1992.
1.0 INTRODUCTION 2.0 SCOPE OF WORK. DATE July 29, 2010 PROJECT No. 09-1436-5008/2000
DATE July 29, 2010 PROJECT No. 09-1436-5008/2000 TO Geoff Sinnett Ministry of Agriculture and Lands, Crown Land Restoration Branch cc Dawn Flotten FROM Karl Manzer EMAIL [email protected] LADYSMITH HARBOUR
4D ENGINEERING S.r.l. COMPANY PROFILE
4D ENGINEERING S.r.l. COMPANY PROFILE CAPITALE SOCIALE 65.100 ISCR. C.C.I.A.A. 708573 Aut. Trib. Velletri n. 9359/90 Reg. Soc. P.IVA 03869371009 00041 ALBANO LAZIALE ROMA ITALY C.SO MATTEOTTI, 69 TEL.
ap Observing System (FOOS)
SSD-Pesca: the Fisheries es Oceanography ap Observing System (FOOS) Bernardo Patti CNR-IAMC, Capo Granitola, Campobello di Mazara (TP), Italy The fishing Vessel Monitoring System (VMS) is a satellite-based
CITY OF HELSINKI World Design Capital 2012 Introducing major urban development projects. Helsinki
CITY OF HELSINKI World Design Capital 2012 Introducing major urban development projects Helsinki Dynamic Helsinki Introducing Major Urban Development Projects West Harbour JÄTKÄSAARI Urban Dwelling by
Basements and Deep Building Construction Policy 2014
Basements and Deep Building Construction Policy 2014 APPROVAL Council / CEO 27 October 2014 VERSION NO: Version 1.0 TRIM REF: 14/67838 REVIEW 30/10/2019 RESPONSIBLE EXECUTIVE General Manager City Assets
A Case Study Documenting the Dubai Coastal Zone Monitoring Programme An International Example.
A Case Study Documenting the Dubai Coastal Zone Monitoring Programme An International Example. prepared in the framework of the MESSINA project December 2005 Project part-financed by the European Union
HV Submarine Cable Systems Design, Testing and Installation
HV Submarine Cable Systems Design, Testing and Installation CIGRE Ireland Technical Seminar 6 th October 2010 Robert Donaghy Senior Consultant Engineer, ESB International Presentation Overview Applications
S.I.A. Sicilian Islands Award
S.I.A. Sicilian Islands Award Rules of the S.I.A. (HF) Rules of the S.I.A. (VHF & UP) Rules of the S.I.A. (HF) 1) For the S.I.A. are considered valid the islands, the reefs, the faraglioni and, in general,
Studio di ARCHITETTURA
Pirina & Spano Founded in1991 Address VAT number Tel & fax Email via Da Campione 27, 07026 (OT) 01542640909 +39 0789 51 375 [email protected] Enlgish Speaking Contact Riccardo Pirina +39 348 23 54
FORTY-TWO PORTS TO DISCOVER THE ISLAND S HEART
FORTY-TWO PORTS TO DISCOVER THE ISLAND S HEART Department of Tourism, Sport and Entertainment Regione Siciliana District Council for Tourism, Communication and Transport Department of Tourism, Sport and
Section E2 Coastal Engineering: Reconstruction Management and Mitigation
271 Section E2 Coastal Engineering: Reconstruction Management and Mitigation 272 Objectives To familiarize the assessor with the process that should be followed in organizing any reconstruction efforts.
A Brief Study Of The Development Of Falmouth Within The Context Of The Cruise Ship Pier
HERITAGE PROTECTION, ECOLOGICAL SUSTAINABILITY AND ECONOMIC DEVELOPMENT... AN UNSUSTAINABLE TRIO? A Brief Study Of The Development Of Falmouth Within The Context Of The Cruise Ship Pier Laleta Davis Mattis
SECTION 10.0 MANAGEMENT UNIT 5: HORNSEA
10.1 Summary Information 10.1.1 Location SECTION 10.0 MANAGEMENT UNIT 5: HORNSEA The limits of Management Unit 5, a 2.9km stretch of shoreline fronting the town of Hornsea on the Holderness coast, are
U l t i m a t e e f f i c i e n c y D re D ging
1 Ultimate efficiency Dredging We have a deep attitude. 2 Ultimate efficiency 3 Growth of global population, tourism, transportation of people and goods together with increased awareness of the need to
cardno Phu My Bridge Queensland s first light rail system Creative Village Redevelopment Marine Corps environmental reviews
shaping the future www.cardno.com cardno shapes the future for communities around the world Cardno s vision is to be a world leader in the provision of professional services to improve the physical and
Sergison Bates architects. 90 Masterplan for landscape and urban housing, Newham, London
90 Masterplan for landscape and urban housing, Newham, London 1 Client Barratt East London / London Development Agency Project duration: 005-1 Contract value: 10 million Gross internal area: 71,000m Housing
THE PORT OF LOS ANGELES JOBSPORTFOLIO
THE PORT OF LOS ANGELES JOBSPORTFOLIO We re America s Port Global trade and goods movement are Southern California s strongest industries in terms of jobs and economic activity. The Port of Los Angeles
Portfolio. umbertoalesi.it
Portfolio Business Center - Ancona, Italy Client: Ubaldi costruzioni S.p.a Location: Ancona, Italy Period: 2006-2013 GFA: 25.000,00 mq Sector: Commerciale & Office Services: Feasibility Scheme design Detailed
London Array. Operations and Maintenance
London Array londonarray.com London Array Operations & Maintenance Base Port of Ramsgate Military Road Ramsgate CT11 9LG Registered in England and Wales No 04344423 Operations and Maintenance 1 2 Operations
Paolo Pissarello Deputy Mayor
SUSTAINABLE CITIES TODAY. INVENTING A NEW URBANITY FOR TOMORROW 20-21 January 2011 MUNICIPALITY OF GENOA Paolo Pissarello Deputy Mayor TOWARDS THE NEW SUSTAINABLE CITY September 29th 2007: the idea of
Floodplain Development Land Use Review
COMMUNITY DEVELOPMENT DEPARTMENT Planning Division P.O. Box 490 333 Broadalbin Street SW Albany, OR 97321 Phone 541-917-7550 Fax 541-791-0150 www.cityofalbany.net Floodplain Development Land Use Review
