1 Join the UK Nuclear Renaissance AREVA Presentation & EPR Reactor Product 1 AREVA NP UK Supplier Day, March 16th Birmingham EPR is a trademark of the AREVA Group 1
2 Luc Oursel AREVA NP CEO 2 AREVA NP 2
3 My Objective for today You to understand the opportunity that exists for UK equipment manufacturers & suppliers to support EPR new build projects in UK and external to UK, How you become an AREVA global supplier And, to outline, Scope, Process, Timeline & Next Steps... 3 AREVA NP EPR is a trademark of the AREVA Group 3
4 Energy: Our Core Business Front End Division Reactors and Services Division Back End Division Transmission & Distribution Division Enrichment services Fuel fabrication Reactors Chemistry Renewable energies Mining Recycling MOX fuel fabrication Used fuel treatment Services Transmission Other sources of electric power Distribution Unique integrated supplier able to manage nuclear assets throughout their lifetime 4 AREVA NP EPR is a trademark of the AREVA Group 4
5 Global New Build Anticipated Global New Build & Lifetime Extension Programme = 350GW AREVA ambition is to win 30% AREVA expects to deliver some 60 new power plants by 2030 all over the world 5 AREVA NP EPR is a trademark of the AREVA Group 5
6 EPR reactor, the FIRST Generation III+ under construction: First project site: Olkiluoto 3 October 2006 July 2007 April 2008 January AREVA NP EPR is a trademark of the AREVA Group 6
7 Progress in construction: activities on site IRWST Turbine hall Reactor Pressure Vessel s arrival on site 7 AREVA NP EPR is a trademark of the AREVA Group 7
8 EPR reactor, the FIRST Generation III+ under construction: Second project site: Flamanville 3 First of the new EDF EPR reactor fleet Generating power and revenue by 2012 Copyright EDF 8 AREVA NP EPR is a trademark of the AREVA Group 8
9 EPR reactor, the FIRST Generation III+ under construction: Third project site: Taishan 1 & 2 SG Tube Plate 9 AREVA NP EPR is a trademark of the AREVA Group 9
10 Industry leaders moving towards EPR reactor projects COL submitted to NRC USA Technology selected South-Africa Short-listed (offer submitted) UK Pre-licensing (GDA) Under preparation India France January 29, 2009, French Government announced the launching of the Penly 3 project, second EPR of French fleet Italy February 24, 2009, EDF and ENEL announced intent to develop a fleet 10 AREVA NP EPR is a trademark of the AREVA Group 10
11 UK Market Objectives & Strategy Multiple & Concurrent new builds in the first wave Estimate total new build market: GW Estimate «first wave new build» = 5-6 sites, 4 to 10+ EPR projects EPR Alliance of Major European Utilities About 2 4 EPRs JV1 About 2 EPRs JV2 4 EPRs By Spring, we should know which clients, which sites, By Autumn, we should know which vendors, By Christmas, we should know which Consortia, which Tier 1s 2009 = the year to develop industrial landscape & start 1st wave Projects 11 AREVA NP EPR is a trademark of the AREVA Group 11
12 Forging the industrial landscape in 2009 Developing skills and supply chain UK partners are working with AREVA on two parallel campaigns AREVA has done this before and is doing it today on 4 projects worldwide Skills Skills development Skills Skills to to deliver deliver EPRs EPRs Skills Skills for for lifetime lifetime support support of of EPRs EPRs Work Work with with Nat Nat Skills Skills Academy, Academy, trade trade associations associations & Universities Universities Rejuvenating UK UK supply supply chain chain An An open open transparent transparent system, system, Engage, Engage, then then qualify qualify UK UK supply supply chain chain Form Form a group group of of qualified qualified suppliers. suppliers. Maximising UK s industrial horsepower 12 AREVA NP EPR is a trademark of the AREVA Group 12
13 Creating a UK industrial supplier base Signing Flagship Partners to bring certainty Balfour Beatty Construction, Civils, Mechanical & Electrical. (Supported by Vinci) Rolls-Royce Engineering, Manufacturing, Supply Chain. Two key Flagship companies to partner AREVA to Forge the landscape... Prepare new build.. Build Flagships with complementary skills and expertise 13 AREVA NP EPR is a trademark of the AREVA Group 13
14 New build, an economic opportunity for UK UK skills & investments needed 25 GW new build programme represents between 10,000 and 15,000 British jobs in manufacturing & construction for 25 years, plus jobs associated with 60 years of operations, Civil, Construction, Installation & Commissioning will be dominated by UK companies The major opportunity to be maximised is UK Equipment Suppliers & Equipment Manufacturers, Start National with AREVA, Go Global with AREVA A significant opportunity, an industrial rejuvenation 14 AREVA NP EPR is a trademark of the AREVA Group 14
15 Creating qualified UK suppliers Start in UK, then go Global with AREVA A 2 step process, first step achieved in 6 months Together we can achieve local UK delivery for EPR projects 15 AREVA NP EPR is a trademark of the AREVA Group 15
16 The Product: The UK EPR Reactor Pierre-Jean Phliponeau International Marketing EPR Reactor Project Manager 16 AREVA NP EPR is a trademark of the AREVA Group 16
17 17 17 AREVA NP EPR is a trademark of the AREVA Group
18 Reactor Cooling System Primary loops Steam Generators Pressurizer Reactor Coolant Pumps Reactor Pressure Vessel Reactor Cooling System (Primary pipes) 18 AREVA NP EPR is a trademark of the AREVA Group 18
19 EPR Reactor Plot Plan 1/2 Nuclear Island Turbine Island Diesel Generators 3-4 Building Safeguard Building 1 Fuel Building Reactor Building Turbine Building Safeguard Buildings 2+3 Nuclear Auxiliary Building Diesel Generators 1-2 Building Safeguard Building 4 Waste Building 19 AREVA NP EPR is a trademark of the AREVA Group 19
20 EPR Reactor Plot Plan 2/2 Nuclear Island (NI) Turbine Island (TI) Balance Of Plant (BOP) + Civil Works 1 Reactor Building 2 Fuel Building 3 The Safeguard Buildings 4 The Diesel Buildings 5 Nuclear Auxiliary Building 6 Waste Building 7 Turbine Building 20 AREVA NP EPR is a trademark of the AREVA Group 20
21 The Reactor Cooling System needs support functions to be sheltered in dedicated surrounding buildings To fill and drain during outages To control chemistry in daily operation To control Pressurizer level (water inventory) In daily operation In upset conditions (safeguard systems) To process the effluents (liquid, gazeous) To transfer fuel to and from the fuel storage pool Additionally, all the buildings need support functions Electrical distribution HVAC systems (Heating, Ventilation and Air Conditioning) Fire protection systems Audio systems Control systems of all sorts (access, security, activity, ) / 21 AREVA NP EPR is a trademark of the AREVA Group 21
22 Inside the buildings The Reactor Building shelters the Reactor Cooling System Reactor Pressure Vessel Steam Generators Reactor Cooling Pumps Pressurizer And much other large and small equipment The Nuclear Auxiliary Building shelters most of the equipment dealing with daily operation support functions (primary water inventory and chemistry control) The Wastes Building collects, stores and treats liquid and solid radioactive wastes The 4 Safeguard Buildings shelter most of the safeguard equipment 4x100% redundant safeguard systems 4 Safeguard Buildings The Control-Room is located in one of the Safeguard Buildings The Fuel Building shelters the fresh fuel, the spent fuel in an interim storage pool and the associated handling equipment The two Diesel Buildings shelter the four emergency diesel generators and their support systems 22 AREVA NP EPR is a trademark of the AREVA Group 22
23 Possible scope of supply for an EPR Reactor NSSS (Nuclear Steam Supply System) 23 AREVA NP EPR is a trademark of the AREVA Group 23
24 Possible scope of supply for an EPR Reactor BNI (Balance of Nuclear Island) 24 AREVA NP EPR is a trademark of the AREVA Group 24
25 Possible scope of supply for an EPR Reactor NI (Nuclear Island = NSSS + BNI) 25 AREVA NP EPR is a trademark of the AREVA Group 25
26 The EPR Reactor: from paper to concrete The path to greatest certainty 26 AREVA NP EPR is a trademark of the AREVA Group 26
27 EPR Reactor, the best from French and German technology German KONVOI (~1300 MWe) Neckar 2 Emsland Isar 2 French N4 (~1450 MWe) Chooz 1-2 Civaux 1-2 The EPR reactor provides more safety and better economics with the certainty of a proven and evolutionary technology 27 AREVA NP EPR is a trademark of the AREVA Group 27
28 EPR reactor, the FIRST Generation III+ under construction: Nth of a Kind Under Construction Olkiluoto 3, Finland Flamanville 3, France Under Construction Project Preparation Taishan 1&2, China Calvert Cliffs 3, U.S. Predictability based on experience 28 AREVA NP EPR is a trademark of the AREVA Group 28
29 AREVA never stopped designing and building PWRs Generation I Generation II Generation III+ 1 PWR 1 unit, France 77 PWR (up-to 1400 MWe) 54 units, France 10 units, Germany 15 units, export 7 PWR (1300 to 1500 MWe) 4 units, France 3 units, Germany 4 PWR under construction (1600+ MWe) 1 unit, Finland 1 unit, France 2 units, China model 6 models N4, KONVOI EPR reactor 102 NPP built, of which 87 PWRs feeding innovation and providing certainty 29 AREVA NP EPR is a trademark of the AREVA Group 29
30 EPR reactor design currently being licensed by leading safety authorities Construction License February 2005 April 2007 Licensing Launched Design Certification Application December 2007 Submission June 2007 On-going We have experience in meeting different national licensing requirements and processes. AREVA supports a shorter licensing process by providing comprehensive reference documents 30 AREVA NP EPR is a trademark of the AREVA Group 30
31 Outstanding safety level 31 AREVA NP EPR is a trademark of the AREVA Group 31
32 EPR reactor aircraft hazard protection in the post 9-11 World EPR reactor designed to withstand impact of: Large Commercial Jet & Military Aircraft At various Elevations & From different Sides Simply, yes, the EPR reactor resists commercial and military aircraft crashes 32 AREVA NP EPR is a trademark of the AREVA Group 32
33 Redundant and diverse EPR reactor safety systems EPR reactor is protected against: Multiple failure while providing online maintenance flexibility 4 times redundant safeguard systems Common cause failures safety system diversity: - Every system has a diversified back-up Four Train concept and physical separation External hazards through systematic physical separation of the safety systems Proven yet evolutionary safety systems deliver high reliability levels 33 AREVA NP EPR is a trademark of the AREVA Group 33
34 Consequences of a severe accident are limited by both passive and active safety systems Passive System (Short term) Active System (Long term) IRWST Reactor pit & Sacrificial concrete Spreading area 1. Temporary retainment in the reactor pit (gravity and metal gate) 2. Spreading in the large surface dedicated area (metal gate melting and gravity) 3. Flooding and cooling of the spreading area using IRWST (In-containment Refueling Water Storage Tank) 1. Removal of containment heat: Recirculation and coolant heat exchange Containment spray system No need for significant off-site measures improves public acceptance 34 AREVA NP EPR is a trademark of the AREVA Group 34
35 AREVA s EPR reactor, a worldwide fleet in the making! Thank you for your attention 35 AREVA NP EPR is a trademark of the AREVA Group 35
36 36 AREVA NP 36
New nuclear project financing Warsaw, June 26, 2013 p. 1
New nuclear project financing Warsaw, June 26, 2013 p. 1 The EPR design: a reference technology Loïc ELOY Director of New Builds Offers Poland Platts Conference Warsaw, 26 June 2013 EPR reactor design
More informationAREVA, an unparalleled experience in building nuclear reactors
AREVA, an unparalleled experience in building nuclear reactors Frank APEL Senior Vice President Sales Central Europe and Nordic Countries AREVA, International Commercial Organisation 9 th Annual European
More informationThe EPR reactor the reference for New Build
The EPR reactor the reference for New Build The reference for New Build The Reference for Safety The EPR design offers the highest level of safety: Already licensed in France, Finland and China Strong
More informationAREVA: supply chain network principles and company s vision
AREVA: supply chain network principles and company s vision Virginie MOUCQUOT-LAIHO AREVA Finland Communications Director & Vice Country Manager Oulu, Finland 18.09.2012 1 AREVA & nuclear industry The
More informationOlkiluoto 3 Project June 2010
Olkiluoto 3 Project June 2010 Author: R&S Communications Department, La Défense, France. The reproduction, transmission or use of this document or its contents is not permitted without express written
More informationBuilding New Generation Nuclear Plants Worldwide : AREVA's Experience
Building New Generation Nuclear Plants Worldwide : AREVA's Experience Philippe Guay Senior Vice President, New Builds Offers AREVA 37 th WNA Symposium 12-14 September 2012 LONDON Projects status The value
More informationU.S. EPR Design Overview
U.S. EPR Design Overview Brian A. McIntyre U.S. EPR Design Certification Project Manager WM2009 Conference March 4, 2009 The EPR Story 1989: Agreement between Framatome and Siemens on development of common
More informationDrivers and approach for the design of the EPR reactor
Drivers and approach for the design of the EPR reactor Martine Mayousse Reactor & Services / Safety & Licensing IAEA Vienna June 27, 2013 1 Agenda 1. Introduction 2. EPR design objectives and principles
More informationOlkiluoto 3 Project. AREVA Suppliers Day Warsaw October 4, 2011
Olkiluoto 3 Project AREVA Suppliers Day Warsaw October 4, 2011 Virginie MOUCQUOT-LAIHO AREVA OL3 Project Management Office & Communications Manager AREVA Reactor & Services - New Builds EPR Project Fleet
More informationA Nuclear New Deal. Jacques Besnainou. President, AREVA Inc. AREVA
AREVA Building Energy Certainty: A Nuclear New Deal Jacques Besnainou President, AREVA Inc. AREVA EnergyBiz Leadership Forum, Session Two: Resource Review Washington, D.C. March 9, 2009 Three ways forward
More informationThe EPR design: the European reference
The EPR design: the European reference Jean-Bernard Ville Executive Vice-President, New Builds June 25 th, London 1 EPR Design safety 2 EPR project delivery 3 A partnership-based approach Platts 7 th European
More informationAP1000 Overview. 2011 Westinghouse Electric Company LLC - All Rights Reserved
AP1000 Overview AP1000 is a registered trademark in the United States of Westinghouse Electric Company LLC, its subsidiaries and/or its affiliates. This mark may also be used and/or registered in other
More informationDESIGN OF EPR. Bernard DEBONTRIDE France, bernard.debontride @framatome-anp.com. AREVA FRAMATOME ANP Plants Sector Nuclear Engineering
DESIGN OF EPR Bernard DEBONTRIDE France, bernard.debontride @framatome-anp.com AREVA FRAMATOME ANP Plants Sector Nuclear Engineering Key Words: EPR, Design Abstract: At the origin was the common decision
More informationPhysics and Engineering of the EPR
Physics and Engineering of the EPR Keith Ardron UK Licensing Manager, UK Presentation to IOP Nuclear Industry Group Birchwood Park, Warrington UK, November 10 2010 EPRs in UK EPR is Generation 3+ PWR design
More informationJoin the UK Nuclear Renaissance. Procurement & Quality Process
Join the UK Nuclear Renaissance Procurement & Quality Process 1 AREVA NP UK Supplier Day, March 16th Birmingham EPR is a trademark of the AREVA Group 1 The Process: AREVA Supply Chain Strategy Didier David
More informationSolutions for Nuclear & Renewable Power Generation
Solutions for Nuclear & Renewable Power Generation Integrated Business Model Luc Oursel AREVA CEO AREVA has become the undisputed global leader in low carbon power generation solutions through its unique
More informationOlkiluoto 3 Basic Facts
Olkiluoto 3 Basic Facts TVO a world-class nuclear power company Teollisuuden Voima Oy (TVO) is a Finnish limited liability company established in 1969. The operating idea of the Company is to produce electricity
More informationAREVA is Clean Energy and American Jobs Ohio Manufacturers Association April 28, 2010 Columbus, OH
AREVA is Clean Energy and American Jobs Ohio Manufacturers Association April 28, 2010 Columbus, OH Thomas M. Williamson, P.E. VP, New Plant Market Strategy AREVA Inc. Introduction AREVA Overview Nuclear
More informationUS EPR nuclear technology and market outlook
US EPR nuclear technology and market outlook Bruno Blotas Vice-President, Business Development 29 May 2013 Mexico City Conference The future of nuclear energy AREVA at a glance The US-EPR Status of ongoing
More informationHEALTH & SAFETY EXECUTIVE NUCLEAR DIRECTORATE ASSESSMENT REPORT. New Reactor Build. EDF/AREVA EPR Step 2 PSA Assessment
HEALTH & SAFETY EXECUTIVE NUCLEAR DIRECTORATE ASSESSMENT REPORT New Reactor Build EDF/AREVA EPR Step 2 PSA Assessment HM Nuclear Installations Inspectorate Redgrave Court Merton Road Bootle Merseyside
More informationNuclear Design Practices and the Case of Loviisa 3
Nuclear Design Practices and the Case of Loviisa 3 Harri Tuomisto Fortum Power, Finland Third Nuclear Power School, 20-22 October 2010, Gdańsk, Poland 22 October 2010 Harri Tuomisto 1 Objectives The objective
More informationAREVA Advanced nuclear power plants
AREVA Advanced nuclear power plants Bernard Bastide AREVA Brazil and South America VP University of Rio de Janeiro III Semana da Engenharia Nuclear UFRJ August 2013 AREVA presentation AREVA EPR projects
More informationBest Practices and Approaches to Supply Chain Management
Best Practices and Approaches to Supply Chain Management ATOMEX Forum 2012 Moscow 12.12. 14.12.2012 AF-Consult Switzerland Ltd Jan Kocourek 1 Objectives Provide information available regarding both the
More informationQ1 2013 Q1 2012 1 Change Change LFL
At March 31, 2013: Strong revenue growth of 12.5% to 2.279bn (+15.5% like for like) Stable backlog year on year: 44.9bn (-1.0% over the quarter) Paris, April 25, 2013 Luc Oursel, Chief Executive Officer,
More informationWorkshop GESEL - UFRJ: O presente e o futuro da energia nuclear no Brasil
Workshop GESEL - UFRJ: O presente e o futuro da energia nuclear no Brasil Jürgen Czech Diretor Técnico AREVA NP Johannes Höbart Diretor Presidente AREVA Brasil Rio de Janeiro - Dezembro/2009 Introduction
More informationAREVA. Solutions for Nuclear & Renewable Power Generation
AREVA Solutions for Nuclear & Renewable Power Generation 1 AREVA Group Arlit, Niger Melox, France La Hague, France Lynchburg, U.S.A. Alpha Ventus, Germany 2 AREVA Group 2011 Key Figures 8.872Bn in Annual
More informationPublic SUMMARY OF EU STRESS TEST FOR LOVIISA NUCLEAR POWER PLANT
1 (8) SUMMARY OF EU STRESS TEST FOR LOVIISA NUCLEAR POWER PLANT 1 LOVIISA NUCLEAR POWER PLANT Loviisa town is located approximately 90 km eastwards from Helsinki at the coast of Gulf of Finland. Loviisa
More informationNEW NUCLEAR POWER PLANTS FOR ONTARIO - THE CONTENDERS - 2008 October
NEW NUCLEAR POWER PLANTS FOR ONTARIO - THE CONTENDERS - 2008 October (THIS OVERVIEW IS AN UPDATED VERSION OF AN EARLIER ONE THAT WAS PUBLISHED IN THE BULLETIN OF THE CANADIAN NUCLEAR SOCIETY, MARCH 2008,
More informationNUCLEAR POWER OVERALL GOOD FOR THE SOCIETY Finnish German Energy Day, 7th November 2012
NUCLEAR POWER OVERALL GOOD FOR THE SOCIETY Finnish German Energy Day, 7th November 2012 Tanhua Jarmo Teollisuuden Voima Oyj 2 EU ENERGY ROADMAP 2050 NUCLEAR POWER IN ALL SCENARIOS Consumption of electricity
More informationWestinghouse AP1000 PWR and the Growing Market for New Nuclear Power Plants
Westinghouse AP1000 PWR and the Growing Market for New Nuclear Power Plants Westinghouse Electric Company & The Nuclear Fuel Cycle Royal Commission - South Australia November 4, 2015 1 AP1000 is a trademark
More informationAREVA: Global leader in low-carbon power generation
AREVA: Global leader in low-carbon power generation Premium Review Société Générale Paris, November 29 th, 2012 Agenda AREVA overview Strategy & performance Financial Outlook AREVA Presentation November
More informationSwiss media visit to Olkiluoto August 15, 2014
Swiss media visit to Olkiluoto August 15, 2014 Käthe Sarparanta Senior Adviser, Project Department Teollisuuden Voima Oyj NUCLEAR POWER PLANTS IN FINLAND Olkiluoto, Eurajoki Population 5.4 million Power
More informationAP1000 Technology: Passive & Proven
AP1000 Technology: Passive & Proven The Right Fit for Brazil Jeff Benjamin Senior Vice President Nuclear Power Plants (NPP) AP1000 is a trademark or registered trademark of Westinghouse Electric Company
More informationNuclear Consultancy & Engineering Services
Insert a caption to go with the photograph in here ITER, France Wednesday, 14 December 2011 Nuclear Consultancy & Engineering Services T H E N U C L E A R A T K I N S A S S Y S T E M A L L I A N C E CONSTRUCTION
More informationIntroductions: Dr. Stephen P. Schultz
Introductions: Dr. Stephen P. Schultz Vienna, Austria 1 3 September 2015 Work Experience Current Member Advisory Committee on Reactor Safeguards, U.S. Nuclear Regulatory Commission, 12/2011 Chair, Fukushima
More informationBoiling Water Reactor Systems
Boiling Water (BWR) s This chapter will discuss the purposes of some of the major systems and components associated with a boiling water reactor (BWR) in the generation of electrical power. USNRC Technical
More informationThe Supply Chain for a UK Nuclear New Build Programme
The Supply Chain for a UK Nuclear New Build Programme A report submitted to the Department for Business Enterprise & Regulatory Reform (BERR) by the National Metals Technology Centre (NAMTEC) Updated February
More informationGovernment Degree on the Safety of Nuclear Power Plants 717/2013
Translation from Finnish. Legally binding only in Finnish and Swedish. Ministry of Employment and the Economy, Finland Government Degree on the Safety of Nuclear Power Plants 717/2013 Chapter 1 Scope and
More informationHow To Clean Up A Reactor Water Cleanup
General Electric Systems Technology Manual Chapter 2.8 Reactor Water Cleanup System TABLE OF CONTENTS 2.8 REACTOR CLEANUP SYSTEM... 1 2.8.1 Introduction... 2 2.8.2 System Description... 2 2.8.3 Component
More informationFire Protection Program Of Chashma Nuclear Power Generating Station Pakistan Atomic Energy Commission 5/28/2015 1
Fire Protection Program Of Chashma Nuclear Power Generating Station Pakistan Atomic Energy Commission 5/28/2015 1 Nuclear Power in Pakistan Nuclear Power Plants Capacity (MWe) Year of Commissioning In
More informationFlamanville 3 Nuclear Power Plant
Flamanville 3 Nuclear Power Plant Prepared by: Giorgio Locatelli (University of Lincoln) and Mauro Mancini (Politecnico di Milano) Contacts: Giorgio Locatelli University of Lincoln Lincoln School of Engineering
More informationGlobal Nuclear Power Developments Asia Leads The Way
Global Nuclear Power Developments Asia Leads The Way Edward Kee Nuclear Energy Asia 2010 - Hong Kong (1400 1430) Global Nuclear Power Developments - Asia Leads The Way What is the competitive global position
More informationWestinghouse and the AP1000 Offering Great Opportunity for the Czech Republic
Westinghouse Non-Proprietary Class 3 2010 Westinghouse Electric Company LLC. All Rights Reserved. Westinghouse and the AP1000 Offering Great Opportunity for the Czech Republic Aziz Dag Vice-President,
More informationSPANISH NUCLEAR INDUSTRY. Antonio Cornadó Quibus President Spanish Nuclear Industry Forum
SPANISH NUCLEAR INDUSTRY Antonio Cornadó Quibus President Spanish Nuclear Industry Forum WHAT IS SPANISH NUCLEAR IDUSTRY FORUM? An association of companies that support activities related to nuclear energy:
More informationIntroduction to Nuclear Fuel Cycle and Advanced Nuclear Fuels
Introduction to Nuclear Fuel Cycle and Advanced Nuclear Fuels Jon Carmack Deputy National Technical Director Fuel Cycle Technology Advanced Fuels Program February 27, 2011 The Evolution of Nuclear Power
More informationTeollisuuden Voima Oyj - General Presentation January 2009. Ilkka Mikkola Senior Adviser (Former Fuel Manager) Teollisuuden Voima Oyj
Teollisuuden Voima Oyj - General Presentation January 2009 Ilkka Mikkola Senior Adviser (Former Fuel Manager) Teollisuuden Voima Oyj Nuclear Power Plants in Finland in 2008 Olkiluoto OL1 BWR 860 MW 1978
More informationKERNREACTOREN EEN OVERZICHT VAN GENERATIE III+ KERNREACTOREN
KERNREACTOREN EEN OVERZICHT VAN GENERATIE III+ KERNREACTOREN Frank Bertels Tractebel Engineering (GDF Suez) KVAB debatavond: Nieuwe generatie kernreactoren 13 november 2014 CHOOSE EXPERTS, FIND PARTNERS
More informationNuclear power plant systems, structures and components and their safety classification. 1 General 3. 2 Safety classes 3. 3 Classification criteria 3
GUIDE 26 June 2000 YVL 2.1 Nuclear power plant systems, structures and components and their safety classification 1 General 3 2 Safety classes 3 3 Classification criteria 3 4 Assigning systems to safety
More informationNuclear Safety First POWER
Nuclear PRoduct SOLUTIONS Emergency Diesel Generators Nuclear Safety First POWER Welcome to Alstom Power Alstom is a global leader in power generation with a portfolio of products covering all fuel types.
More informationNuclear Safety. Policy 2013-2016
Nuclear Safety Policy 2013-2016 Nuclear Safety Policy 2013-2016 T he organisational principles and actions defined in the Nuclear Safety Charter and applied within the group have achieved significant improvements
More informationSource Term Determination Methods of the Slovenian Nuclear Safety Administration Emergency Response Team
IAEA TM on Source Term Evaluation for Severe Accidents, Vienna, 21-23 October 2013 Source Term Determination Methods of the Slovenian Nuclear Safety Administration Emergency Response Team Tomaž Nemec Slovenian
More informationMay 23, 2011 Tokyo Electric Power Company
Analysis and evaluation of the operation record and accident record of Fukushima Daiichi Nuclear Power Station at the time of Tohoku-Chihou-Taiheiyou-Oki-Earthquake (summary) May 23, 2011 Tokyo Electric
More informationFukushima 2011. Fukushima Daiichi accident. Nuclear fission. Distribution of energy. Fission product distribution. Nuclear fuel
Fukushima 2011 Safety of Nuclear Power Plants Earthquake and Tsunami Accident initiators and progression Jan Leen Kloosterman Delft University of Technology 1 2 Nuclear fission Distribution of energy radioactive
More informationADDITIONAL INFORMATION ON MODERN VVER GEN III TECHNOLOGY. Mikhail Maltsev Head of Department JSC Atomenergoproekt
ADDITIONAL INFORMATION ON MODERN VVER GEN III TECHNOLOGY Mikhail Maltsev Head of Department JSC Atomenergoproekt February 12, 2015 Introduction The main intention of this presentation is to provide: -
More information7.1 General 5 7.2 Events resulting in pressure increase 5
GUIDE YVL 2.4 / 24 Ma r ch 2006 Primary and secondary circuit pressure control at a nuclear power plant 1 Ge n e r a l 3 2 General design requirements 3 3 Pressure regulation 4 4 Overpressure protection
More informationSafety of New Nuclear Power Plants
Safety of New Nuclear Power Plants Example: VVER-1200/V491 H. Hirsch A. Y. Indradiningrat Workshop on the Paks II NPP Project Budapest, Energiaklub, 08.10.2014 New NPP in Paks: Reactor Type In the EIA
More informationTOSHIBA s Nuclear Energy Activities
December 12, 2010 IGARASHI, Yasuharu Toshiba Corporation, Executive Officer Corporate Senior Vice President President & CEO, Power Systems Company Export Control No. PSN-2010-1406 Document No. G3-1109
More informationBelgian Stress tests specifications Applicable to all nuclear plants, excluding power reactors 22 June 2011
Belgian Stress tests specifications Applicable to all nuclear plants, excluding power reactors 22 June 2011 Introduction Considering the accident at the Fukushima nuclear power plant in Japan, the European
More informationThe EPR in Crisis. Professor Steve Thomas. November 2010. Steve Thomas (stephen.thomas@gre.ac.uk) PSIRU (www.psiru.org), Business School
The EPR in Crisis by Professor Steve Thomas November 2010 Steve Thomas (stephen.thomas@gre.ac.uk) PSIRU (www.psiru.org), Business School University of Greenwich, London 1 Contents Introduction... 3 The
More informationPRESS RELEASE. At September 30, 2015: Progress on the transformation plan in the third quarter:
At September 30, 2015: Rise in revenue to 2.947bn: +10.3% vs. September 2014 (+8.7% like for like) Backlog of 31.595bn Discontinued operations, including AREVA NP: Revenue of 2.732bn: -7.5% vs. September
More informationGeneration IV Fast Reactors. Dr Richard Stainsby AMEC Richard.Stainsby@amec.com
Generation IV Fast Reactors Dr Richard Stainsby AMEC Richard.Stainsby@amec.com Contents The Generation IV international research programme on advanced reactors The case for fast reactors The technology:
More informationLogistics BU. General overview 2009 July -p.1
General overview 2009 July -p.1 The Logistics Business Unit General overview 2009 July -p.2 An International Network TRANSNUCLEAR Inc. Laurentide PNTL TN International LMC Mainco Mecagest Transnubel Nuremberg
More informationHINKLEY POINT C: THE LONG MARCH TO FID
HINKLEY POINT C: THE LONG MARCH TO FID ELECTRIC POWER SPECIAL REPORT JULY 216 Benjamin Leveau, Editor, France and Belgium, Platts nuclear publications Oliver Adelman, Managing Editor, EMEA, Platts nuclear
More informationXA0302230 EVALUATION OF TRAINING ACTIVITIES IN ARGENTINA
XA0302230 EVALUATION OF TRAINING ACTIVITIES IN ARGENTINA Alejandro D. SANDA ATUCHANPP ARGENTINA I came from Argentina. Do you know where Argentina is? Argentina is in South America, below Brazil. The area
More informationChemical Decontamination and Fluid Handling Services
Chemical Decontamination and Fluid Handling Services Westinghouse is a global industry expert in decontamination and fluid handling processes, with proven abilities in decontamination and remediation work.
More informationBelgian Stress tests specifications Applicable to power reactors 17 May 2011
Belgian Stress tests specifications Applicable to power reactors 17 May 2011 Introduction Considering the accident at the Fukushima nuclear power plant in Japan, the European Council of March 24 th and
More informationDecommissioning situation of Nuclear Power Plant in Japan
Decommissioning situation of Nuclear Power Plant in Japan April, 2015 The Japan Atomic Power Co. The Kansai Electric Power Co., Inc. General Description 1 Operational years of commercial NPP in Japan 40
More informationStructural Integrity and NDE Reliability II
Structural Integrity and NDE Reliability II Preparing for EPR TM Reactor Vessel Inspection J. Laube, AREVA NDE Solutions / intelligendt, Germany Y. Bouveret, AREVA NDE Solutions / Intercontrole, France
More informationUOP Career Development. Career development program for mechanical and civil engineers
UOP Career Development Career development program for mechanical and civil engineers MAKING OUR WORLD SAFER AND MORE SECURE, MORE COMFORTABLE AND ENERGY EFFICIENT, AND MORE INNOVATIVE AND PRODUCTIVE Our
More informationIAEA INTERNATIONAL FACT FINDING EXPERT MISSION OF THE NUCLEAR ACCIDENT FOLLOWING THE GREAT EAST JAPAN EARTHQUAKE AND TSUNAMI
IAEA INTERNATIONAL FACT FINDING EXPERT MISSION OF THE NUCLEAR ACCIDENT FOLLOWING THE GREAT EAST JAPAN EARTHQUAKE AND TSUNAMI Tokyo, Fukushima Dai-ichi NPP, Fukushima Dai-ni NPP and Tokai NPP, Japan 24
More informationOperational Reactor Safety 22.091/22.903
Operational Reactor Safety 22.091/22.903 Professor Andrew C. Kadak Professor of the Practice Lecture 19 Three Mile Island Accident Primary system Pilot operated relief valve Secondary System Emergency
More informationFirst Quarter 2014 Earnings Conference Call. New Nuclear Presentation Section. April 24, 2014 First Quarter 2014 Earnings Conference Call 1
First Quarter 2014 Earnings Conference Call New Nuclear Presentation Section April 24, 2014 1 Safe Harbor Statement/Regulation G Information Statements included in this presentation which are not statements
More informationHOW DOES A NUCLEAR POWER PLANT WORK?
HOW DOES A NUCLEAR POWER PLANT WORK? O n t a r i o P o w e r G e n e r a t i o n P U T T I N G O U R E N E R G Y T O U S G O O D E O N T A R I O P O W E R G E N E R A T I O N What a Nuclear Reactor Does
More informationPublished in the Official State Gazette (BOE) number 166 of July 10th 2009 [1]
Nuclear Safety Council Instruction number IS-22, of July 1st 2009, on safety requirements for the management of ageing and long-term operation of nuclear power plants Published in the Official State Gazette
More informationHow To Understand And Understand Tvo
Nuclear Power Plant Unit Olkiluoto Contents TVO a pioneer in its own field Olkiluoto One unit, many buildings n PRIMARY CIRCUIT Reactor pressure vessel and internal structures Reactor core and fuel Reactor
More informationOutlook for RWE s nuclear operations. Prof. Dr. Gerd Jäger London, 16 January 2012
Outlook for RWE s nuclear operations Prof. Dr. Gerd Jäger London, 16 January 2012 Overview of German nuclear power plants Power plant Net capacity MW Commercial commissioning Shutdown German nuclear power
More informationManagement of Radioactive Waste and Spent Fuel, Balance of Reprocessing
Management of Radioactive Waste and Spent Fuel, Balance of Reprocessing Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management Second Review Meeting May
More informationParis, April 26, 2012
At March 31, 2012: 2.4% revenue growth to 2.026bn (+1.3% like for like) Backlog growth year on year to 45.1bn (+3.7%), down slightly over 3 months (-1.0%) Paris, April 26, 2012 AREVA generated consolidated
More informationRadiological objectives and severe accident mitigation strategy for the generation II PWRs in France in the framework of PLE
IAEA-CN-194-027 Radiological objectives and severe accident mitigation strategy for the generation II PWRs in France in the framework of PLE G. Cenerino, M. Dubreuil, E. Raimond, F. Pichereau Institut
More informationA - GENERAL INTRODUCTION... 1
A - GENERAL INTRODUCTION... 1 1 THE ORGANISATION OF NUCLEAR SAFETY AND RADIATION PROTECTION REGULATION IN FRANCE...1 2 FRENCH NUCLEAR SAFETY REGULATIONS...1 2.1 Acts...1 2.2 Main decrees and ministerial
More information10 Nuclear Power Reactors Figure 10.1
10 Nuclear Power Reactors Figure 10.1 89 10.1 What is a Nuclear Power Station? The purpose of a power station is to generate electricity safely reliably and economically. Figure 10.1 is the schematic of
More informationDRAFT Milestones and Recommendations: Fuel Cycle OECD/IEA 2010
DRAFT Milestones and Recommendations: Fuel Cycle 1 OECD/IEA 2010 Fuel cycle: - established technologies for all steps of the NFC, though R&D can help improve technologies, reduce costs, Front end: uranium
More informationNuclear Education & Training in France. Support to Newcomer and Expanding Countries
Nuclear Education & Training in France Support to Newcomer and Expanding Countries H.E. Ms. Marion Paradas Permanent Representative of France to the IAEA Mr. Yves Fanjas Academia & Research: Mr. François
More informationStrengthening UK Based Supply Chains: Construction and Infrastructure
Industrial strategy: government and industry in partnership Strengthening UK Based Supply Chains: Construction and Infrastructure Introduction Setting the scene We have set out our vision for an Industrial
More informationC. starting positive displacement pumps with the discharge valve closed.
KNOWLEDGE: K1.04 [3.4/3.6] P78 The possibility of water hammer in a liquid system is minimized by... A. maintaining temperature above the saturation temperature. B. starting centrifugal pumps with the
More informationFebruary 19, 2014. Senior Fellow, Nuclear Energy Systems & Services Division Power Systems Company
JAPAN-U.S. DECOMISSIONING AND REMEDIATION FUKUSHIMA RECOVERY FORUM February 19, 2014 Senior Fellow, Nuclear Energy Systems & Services Division Power Systems Company Toshiba global formation Information
More informationThis document is the property of and contains Proprietary Information owned by Westinghouse Electric Company LLC and/or its subcontractors and
This document is the property of and contains Proprietary Information owned by Westinghouse Electric Company LLC and/or its subcontractors and suppliers. It is transmitted to you in confidence and trust,
More informationWall Thinning Trend Analyses for Secondary Side Piping of Korean NPPs
Transactions of the 17 th International Conference on Structural Mechanics in Reactor Technology (SMiRT 17) Prague, Czech Republic, August 17 22, 2003 Wall Thinning Trend Analyses for Secondary Side Piping
More informationNuclear Power Plant & Systems David Downing / Kenneth Green. WSP Parsons Brinckerhoff / Sargent & Lundy TUESDAY, 6 OCTOBER 2015
Nuclear Power Plant & Systems David Downing / Kenneth Green WSP Parsons Brinckerhoff / Sargent & Lundy TUESDAY, 6 OCTOBER 2015 The Brief To develop whole-of-life cost estimates for the development of nuclear
More informationResults and Insights of Internal Fire and Internal Flood Analyses of the Surry Unit 1 Nuclear Power Plant during Mid-Loop Operations*
BNL-NUREG-61792 Results and Insights of Internal Fire and Internal Flood Analyses of the Surry Unit 1 Nuclear Power Plant during Mid-Loop Operations* Tsong-Lun Chu, Zoran Musicki, and Peter Kohut Brookhaven
More informationKACARE s SUSTAINABLE ENERGY INITIATIVES
KACARE s SUSTAINABLE ENERGY INITIATIVES Saudi Arabia s Nuclear Energy Program for Electricity Generation: Pre-Project Engineering for SMR Development Dr. Maher Al Odan Head of Research & Development &
More informationPlant-specific safety review (RSK-SÜ) of German nuclear power plants in the light of the events in Fukushima-1 (Japan)
Note: This is a translation of Chapter 1 of the RSK statement entitled Anlagenspezifische Sicherheitsüberprüfung (RSK-SÜ) deutscher Kernkraftwerke unter Berücksichtigung der Ereignisse in Fukushima-I (Japan).
More informationLiquid Effluent Treatment Plant (LETP) Land Clean-Up
Liquid Effluent Treatment Plant (LETP) Land Clean-Up Frequently Asked Questions What is proposed? Magnox Ltd is proposing to remove the redundant Liquid Effluent Treatment Plant (LETP) at Harwell and to
More informationAdvanced Construction Methods for New Nuclear Power Plants
Advanced Construction Methods for New Nuclear Power Plants A. Introduction Relative to coal fired and natural gas fired power plants, nuclear power plants are more expensive to build but less expensive
More informationSafePoint RMS. Sustainable Committed Secure. SafePoint. Monitoring Solutions
SafePoint RMS Sustainable Committed Secure SafePoint SafePoint Radiation Monitoring Solutions Nuclear Measurements Business Unit of AREVA www.canberra.com SafePoint RMS Radiation Monitoring Solutions Nuclear
More informationSmart solutions for fleets of all types & sizes of power generation. Marcus König, E F IE SGS / September 2013
Smart solutions for fleets of all types & sizes of power generation Marcus König, E F IE SGS / September 2013 Instrumentation, Controls & Electrical The Siemens structure: Four Sectors close to the customer
More informationProspect of Hitachi Nuclear Business (Boiling Water Reactor)
Prospect of Hitachi Nuclear Business (Boiling Water Reactor) 42 Prospect of Hitachi Nuclear Business (Boiling Water Reactor) Masahito Yoshimura Shoichiro Kinoshita Hiroshi Arima Nobuo Tada OVERVIEW: To
More information( 1 ) Overview of Safety Measures ( 2 ) Overview of Measures for Attaining Greater Safety and Reliability
Contents 1 Effort for New Regulatory Requirements ( 1 ) Overview of a Gist of New Regulatory Requirements in Nuclear Regulation Authority ( 2 ) Major Requirements of a Gist of New Regulatory Requirements
More informationThe World Nuclear Supply
The World Nuclear Supply Chain An Overview Greg KASER Staff Director NEA International WPNE Workshop Paris 11 March 2014 Outline of Presentation 1. About WNA 2. Value of: New construction Early dismantlement
More informationPower Island. Industrial Power Plants. www.siemens.com / energy
Power Island Industrial Power Plants www.siemens.com / energy Flexible combined-cycle power plants With today s increasing demands for flexible power plants, intensified by the increased amount of electricity
More information