Stakeholder Involvement in Rehabilitation of Former Uranium Mining Sites International Case Studies
|
|
|
- Daniella Morton
- 10 years ago
- Views:
Transcription
1 IAEA Training Course on Development of Remediation Infrastructures at WISMUT, Chemnitz, Germany, 3-7 December 2012 Stakeholder Involvement in Rehabilitation of Former Uranium Mining Sites International Case Studies Peter Schmidt, Wismut GmbH Chemnitz, Germany
2 2 Stakeholder Involvement Background / Definitions What is stakeholder involvement? Decisions in modern society in general cannot be left only to experts (media, politics, perceptions) Stakeholder involvement first of all is an integral part of a of decision making process. At different phases and with different stakeholder groups, involvement may take the form of sharing information, consulting, participating in dialogue, or deliberating on decisions
3 3 Stakeholder Involvement Background / Definitions Who are stakeholders Very site specific and project specific Narrow mapping Employes, Communities, Shareholders, Creditors, Investors, Government, Costumers Broader Mapping Suppliers, Labor Unions, Government Regulatory Agencies, Government Legislative Bodies, Government, Tax-collecting Agencies, Industry Trade Groups, Professional Organizations, NGOs and other Advocacy Groups, Prospective Employees, Prospective Costumers, Local Communities, National Communities, Public at Large (Global Community), Competitors, Schools, Future Generations, Analysts and Media, Alumni (Ex-employers), Research Centers, Each Person Very important stakeholders at U mining sites Local Public, Regulatory Agencies, Operator
4 Common characteristics of pre-remedial conditions in former uranium producing countries in East Europe, in Central Asia and in Africa 4 (1) Uranium production was carried out in disregard for elementary rules of occupational health and safety and of environmental protection. As a consequence, an existing radiological situation was left behind which required the application of RP principles for intervention situations. (2) Operations were terminated in an abrupt way. No preparations had been made for closure (no remediation concepts, no regulations, lack of qualified staff/know-how, lack of equipment necessary to conduct remediation) (3) No financial provisions had been made for rehabilitation. Remediation had to be implemented under the conditions of constrained resources. (4) The old culture of secrecy was still prevailing. Building bridges with the local population or even a culture of stakeholder involvement were hardly developed. Problems which had to be solved also in East Germany (WISMUT) in 1990/1991
5 5 WISMUT, Germany: - once one of the biggest uranium producer worldwide - since 1990: Rehabilitation of the Wismut sites As a consequence: Interests of the countries to use German (i. e. WISMUT) know how WISMUT/WISUTEC: From 1996 to 2011, engagement in more than 25 international projects (funded by EC, World Bank, Germany, IAEA), in 16 countries Stakeholder Involvement in many projects a central issue, often a key element to reach the project goals
6 6 Why is stakeholder involvement in rehabilitation of uranium mining legacies so important: Decisions in modern society in general cannot be left only to experts (media, politics, NGO s) Rehabilitation of former uranium mining sites is very complex process and goes much beyond identification of technical solutions for the safety of the radioactive legacies. There is a pertinent need to arrive at a certain level of sustainability (Brundlandt Report our common future, 1987) "Sustainable development is development that meets the needs of the present without compromising the ability of future generations to meet their own needs The public perception of radioactivity ( Tschernobyl effect ) has to be recognized. Identification of optimized remedial measures requires a top-down approach (cost-benefit analysis, multi-attribute analysis).
7 7 Case studies: (1) Remediation Concept Lermontov, Russia (2) Tailings Pond Relocation in Kitwe, Zambia (3) Building Bridges with the Public, WISMUT, Germany
8 Case study Lermontov Stakeholder Involvement during Remediation of Uranium Mining Liabilities in a Mineral Water and Spa Region in Lermontov, Northern Caucasus, Russia
9 9 Lermontov more than the name of a great Russian novelist? (Michail Y. Lermontov, )
10 10 Stakeholder Involvment during remediation of U mining liabilities in a mineral water / spa region in Lermontov, Russia at the northern foothills of the Caucasus Mountains region of unique mineral water resources, home of internationally important health resorts, spas, tourist centres (Pjatigorsk, Kislowodsk, Essentucki, Mineralnye Vody, Shelesnogorsk) each year visited by more than one million patients and tourists
11 Key elements of the Lermontov rehabilitation concept 11 Object Business as usual concept Remarks Tailings management facility Industrial site Waste rock dumps Mines EU TACIS Project, Wismut/WISUTEC in charge to develop a remediation concept Surface water Access ways to the objects Establishment of a final state of the art cover to guarantee long-term reduced percolation of water through tailings Demolition of contaminated structures Site reclamation Repair of cover constructions Re-shaping of steep slopes No complete sealing / flooding Closure of the adits and shafts At each mine one discharge point for mine water Removal of the existing precipitation ponds Treatment of the discharges mine water Restricted use of the treated water Repair / construction Stakeholder issue 1 OK OK Stakeholder issue 2 Stakeholder issue 3 OK
12 12 Stakeholder issue 1: immediate establishment of a state of the art cover would have consequently result in termination of the local fertilizer production (having a strong socio-economic impact since GMZ was the biggest employer at the Lermontov site) Phosphorous gypsum (waste of fertilizer production) used as cover material Decision: Postpone the relevant concept part, give GMZ time to develop a new waste management concept
13 13 Stakeholder issue 2: Fomer mine Beshtau: radon containing water was provided to Pjatigorsk; Curing of diseases with radon containing water was essential for Pjatigorsk to retain the status of a top spa
14 14 Stakeholder issue 2 Owner ARMZ and the relevant Authorities in Moscow wanted to have complete mine closure, sealing of adits, Complete flooding Closure of all adits at mine Beshtau would have terminated the provision of high radon concentrations containing water from well #113 reconstruction of radon water well #113 Beshtau mine: Suggested Option remediation of adit #16, rehabilitation and further usage of radon pipeline closure of all other adits and connections with the mine workings Radon water to Pjatigorsk adit #16 passive mine water treatment
15 15 Stakeholder issue 3: Traditional Management of contaminated mine water (floding, closure of discharges, reduced access, treatment, restrictions for the use of treated water) would result in no-longer availabilityof water for irrigation of the gardens/fields on the foothills of mountain Beshtau. Need of compensation Measures!
16 16 Conclusions 1. For all objects technically feasible and economic solutions for remedial measures existed. 2. Building bridges with the public and stakeholder involvement was more challenging than development of technical solutions. Stakeholder Beneficiary KMV, town Lermontov, local public, former owner MINATOM, Atomredmetsoloto, VNIPI Promtechnolly, GMZ Lermontov, Stavropolski krai, town Pjatigorsk, KMV spa administration, church representatives, Russian government, environmental activists, EC,. Measures: Presentations at the site and in Moscow by WISMUT, organisation of stakeholder meetings in Pjatigorsk and Lermontov, workshop in Chemnitz with participation of experts from other sites in Russia faced with rehabilitation of U mining iabilities [Pilot character of the project], site visits to Schlema and Jachimov Key Element of the concept developed by WISMUT: use the great potential to integrate the Lermontov mining sites into the future development of the Caucasian Mineral Water and Spa District.
17 Case study Kitwe Stakeholder Involvement during Clean-up of the AMCO Site in Kitwe, Zambia
18 18 Situation: Remediation of the AMCO site in Kitwe (Zambia) m³ uranium mill tailings from Uranium production in the 1950ies; poor region; in the centre of the Zambian Copper belt where millions of tonnes of mining residues are managed (ongoing intensive mining in the region, existing infra-structure, Kitwe: inhabit.) Local stakeholders: Zambian Rad. Protection Agency, Lusaka Environmental Council of Zambia, Lusaka Mopany Copper Mine in Kitwe/Ndola, Copper Belt University in Kitwe, Local Population, NGO s, etc.
19 19 World bank TOR Remediation of the AMCO site in Kitwe (Zambia) I Development of a concept for relocation of one identified tailings dump (TD #13, 30 T m³ radioactive tailings) During project implementation: I Discovery of a second dump I Confirmation through studies in the Mining Archive Ndola (TD#11) (simply forgotten; lack of institutional control) I Detection of more contaminated areas (altogether 80 m³ radioactive material)
20 20 Identified exposure pathways of relevance site specific exposure pathways People living very close to the sites / babies laid down on the ground Harvesting on the tailings (food production); babies laid down on ground
21 21 Identified exposure pathways of relevance - site specific exposure pathways Peanuts from TD 11 Building material from the TD 13 foreland In general: No awareness of the problem
22 22 Remediation Options Option 1: Natural attenuation Option 2: Containment on site Option 3: Engineered Facility Option 4: Disposal at Existing Tailings Dam Option 5: Open Pit Disposal Option 6: Disposal to an underground mine Multi-Attribute Analysis, stakeholder involvement, feasibility analysis; Decision: Disposal of the uranium tailings at an existing and still operated tailings pond owner: Mopani Copper Mine TP15a, >100 Mio. m³ sludge's from Cu production
23 23 Relocation of TP11/13 to TP 15a (copper mining tailings, Mopani Copper Mining Company)
24 24
25 25 Capacity building the Zambian RP Agency RP Agency staff: 2 experts, two assistants RP Ordinance, not qualified for NORM no regulations guiding RP in connection with rehabilitation of U mining and milling legacies Measurements presentation of the EIA /RIA approach joint definition of remediation criteria presentation of the results of the EIA licensing by RP Agency involvement of the Agency and local staff (ZCCM, CBU) in environmental monitoring during relocation of TP11/13 to TP15a Involvement of the Agency in supervision activities
26 Case study Wismut Wismut: Remediation Work Challenges in Building Bridges with the Public
27 27 The WISMUT inheritance a military run company; operated under strict conditions of secrecy state inside the state (former GDR (East Germany) was structured in14 regional districts plus WISMUT as an independent organisation on a par with the districts) operation with insufficient provisions for working safety; violation of the fundamental rules of radiation protection (high rates of lung cancer incidences due to extremely bad working conditions during the wild WISMUT years ) overexploitation of natural resources; insufficient protection of the environment; ecological devastation of whole areas
28 28 The WISMUT inheritance
29 29 The WISMUT inheritance Situation after fall of the iron curtain in Germany: - mistrust, even hate - yellow press: Second Tschernobyl in the Centre of Europe? Question in 1990 after termination of 40 years of uranium production in East Germany: How can the new-built state-run company WISMUT GmbH restore public confidence? How to built bridges with the local public?
30 30 Policy for implementation of the WISMUT Environmental Remediation Project implementation of the project with the staff of the former mining company SDAG WISMUT, involvement of local experts and companies Opening of the books ; openness, frankness, - in particular disclose of data on environmental pollution Involvement of the local public in decision making; stakeholder involvement in general active public relation policy preservation of mining traditions returning the WISMUT legacy to productive use
31 31 WISMUT staff ca ca SDAG WISMUT WISMUT GmbH involvement of local engineering companies, collaboration with scientific institutes/universities more than 100 apprentices each year the WISMUT Remediation Project as an important social and economic factor in the affected regions
32 32 Opening of the books local public has access to the environmental data (is in line with the German Umweltinformationsgesetz law on information about environmental data) - internet presentation - requests of the local public are answered - annually an environmental report is published - compilation of all site-specific environmental data in a so- called Environmental Atlas for each site (Umweltatlas); the atlas is handed over to communities and other interested parties environmental monitoring is carried out by WISMUT (self control); the authorities check the monitoring by simultaneous measurements at ca. 10 % of the points of measurements; strong QA requirements monthly data transfer to the authorities; data bank structure at the side of the authorities is exactly the same as at WISMUT
33 33 Stakeholder Involvement development of remediation concepts for each site whereby the interests of the local public for further development of the community were taken into account plans for regional development as an essential base for the concepts; the future use of the reclaimed areas/objects should be specified prior to reclamation contribution to the regional revitalization and development must be given (sometimes even decisive) consideration presentation of the concepts to the public and discussion; the same applies to remedial measures for individual objects as far as concerns of the public are touched
34 34 Stakeholder Involvement Proc. environmental impact assessment EIA for all environmentally relevant remedial measures (Umweltverträglichkeitsprüfung); presentation of the EIA results to the stakeholders implementation of the remedial measures as an iterative process rather than linear succession of tasks; progressive licensing approach; ( licensing conferences under participation of involved parties)
35 35 Active public relation policy publication of all relevant data workshops every year at the sites a day of the open door is organized WISMUT exhibition opened in 2007 at the Ronneburg site presentation of WISMUT in the internet ( presentation of WISMUT during the World Exhibition in Hannover in 2000
36 36 Active public relation policy - International Workshop on Remediation of Mining Sites, Gera experts from 16 different nations Excursion to the Seelingstädt tailings ponds - since 1991: six international workshops - since 1991: almost 200 scientific visits from abroad (via IAEA, EU projects, Worldbank projects, etc.)
37 37 Active public relation policy 2012: visitors Ronneburg site annual day of the open door
38 Active public relation policy: Wismut exhibition, Ronneburg site 38 Opening during the German Horticultural Exhibition BUGA 2007
39 Active public relation policy: Wismut exhibition, Ronneburg site 39 Since opening 2007: visitors
40 40 Preservation of mining traditions Wismut participates actively in the application of the Saxonian Ore Mountain Region to become an UNESCO World Culture Heritage (unique ensemble of technical monuments, old mines, relicts of mining, etc. from the 14 th century up to the present)
41 41 Returning the WISMUT legacy to productive use Remediated waste rock dumps and tailings ponds are areas of restricted reuse! Most common utilizations of reclaimed areas are forestation or establishment of green fields. Advantage: low maintenance, sustainable in the long run But: Why not to have more creative types of re-utilization? Why not to use remediated areas as a leisure or game park? Why not to install a solar panel farm for use of sun energy on a covered tailings pond? Why not to integrate mining legacies as technical monuments in developing regions as touristic attractive sites? To top it: Why not to built a gulf course on covered waste rock piles?
42 42 Example: Rebirth of the health spa in Schlema Bad Schlema: Conversion of a devastated uranium mining site back to a radon health spa
43 43 Example: Rebirth of the health spa in Schlema Gulf course built on a covered waste rock dump
44 44 Example: The Horticultural Exhibition BUGA 2007 in Gera/Ronneburg Open pit Lichtenberg 1990 BUGA impression 2007
45 Example: Solar panels on a remediated waste rock dump footprint, Ronneburg site 45 To date, appr. 800 hectares of reclaimed areas have been sold by WISMUT
46 46 P. Schmidt: Remediation Work Challenges in Building Bridges with the Public 46 Example: The Horticultural Exhibition BUGA 2007 in Gera/Ronneburg
47 47 WISMUT experience regarding productive reuse of reclaimed sites The effect of environmental reclamation goes well beyond containment of the health and environmental risks and can greatly contribute to regional revitalization and development. Value added results can be achieved at no additional (or at reimbursable) costs, if reclamation is done with a well-defined utilization goal in mind. The goal is best developed in cooperation with the future user, regulatory authorities and should be specified already prior to reclamation. If a consensus can be achieved with all stakeholders, reclamation by objectives becomes practicable, i.e. the objectives for the individual remedial steps can be already set consistent with the ultimate utilization goal, which is cost efficient and time saving. After the responsibility for long term monitoring has been reliably established, the sustainability of the remediation results is best achieved by turning over the reclaimed areas/remediated objects to productive use.
48 48 WISMUT: Is an export of ideas possible? Of course, the experiences of WISMUT cannot be transferred one by one to countries in Central Asia, Russia or South America. However, the key elements of the WISMUT policy, i. e. development of a culture of involvement of stakeholders openness, progressive public relation activities, and in particular returning the affected sites to productive use, - : should these elements not become part of a strategy to combine also at other places modern mining with environmental protection? and should these elements not become part of a strategy to open perspectives for the revitalization and further development of the regions after termination of the mining activities?
49 49 General Conclusions - Stakeholder issues are site- and/or country-specific - There is a big variety of ways and options to practise stakeholder involvement. - A stakeholder involvement culture is essential. - Often, stakeholder involvement is a key element to reach project goals.
50 Many thanks for your attention 50
The Wismut Rehabilitation Project: Present State, Outlook and Lessons Learned
IAEA-Workshop: Regional Training Course on Remedation Infrastructure Development at a Test Site, Chemnitz, Germany, 3 7 December 2012 The Wismut Rehabilitation Project: Present State, Outlook and Lessons
ABANDONMENT COST, FINANCIAL ASSURANCE AND PRESENTATION OF THE DOCUMENT. Abandonment cost :
ABANDONMENT COST, FINANCIAL ASSURANCE AND PRESENTATION OF THE DOCUMENT. Abandonment cost : Determining the cost associated with closure and accruing these costs during the life of the mining operation
Finance, Mining & Sustainability. The Gamsberg Zinc Project South Africa
Finance, Mining & Sustainability The Gamsberg Zinc Project South Africa Project Summary Discovered in 1971 Anglo American purchased 33% interest in 1974 and increased interest to 100% in 1998 Feasibility
Questionnaire for NORM service providers
Questionnaire for NORM service providers This questionnaire is intended for institutes and companies providing services relevant for NORM industries in Belgium. Its objective is to give to Belgian NORM
German Approach to Integrated Urban Development within the EU
German Approach to Integrated Urban Development within the EU - Results from previous (current) programming period (2007-2013) - Goals for the future (2014-2020) Dr Mario Kremling, isw Institute by order
RECLAMATION BONDS FROM THE SURETY PERSPECTIVE
RECLAMATION BONDS FROM THE SURETY PERSPECTIVE Presented By William T. Gorton III, Esq. Stites & Harbison, PLLC 250 West Main Street, Suite 2300 Lexington, Kentucky 40507 INTRODUCTION Financial guarantees,
The Navajo Nation Environmental Protection Agency (NNEPA) Superfund Program and Community Involvement
The Navajo Nation Environmental Protection Agency (NNEPA) Superfund Program and Community Involvement Presented By: Freida S. White, Environmental Program Supervisor NNEPA Superfund Insert Slide Title
Mine Plan of Operations Reclamation Bond Checklist
Mine Plan of Operations Reclamation Bond Checklist NOTE: This checklist is provided to assist the operator in calculating the engineering and environmental costs required to properly stabilize, reclaim,
RC-17. Alejandro V. Nader National Regulatory Authority Montevideo - Uruguay
RC-17 Radiation Protection in Waste Management and Disposal Implementing the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management Alejandro V. Nader
This Chapter was compiled by GCS (2014) as part of the EMP Consolidation for MP 30/5/1/2/2/133MR and remains pertinent.
11 ENVIRONMENTAL REHABILITATION PLAN The overall land use vision for the MR133 area is to ensure that the operations are safe, stable and non-polluting over the long-term in order to be integrated into
LABRADOR IRON MINES REPORTS QUARTERLY RESULTS
LABRADOR IRON MINES REPORTS QUARTERLY RESULTS Toronto, Ontario, August 28, 2015. Labrador Iron Mines Holdings Limited ( LIM or the Company ) today reports its operating and financial results for its first
Science, Values and Stakeholder Dialogue: NEA Experience in Fukushima. Dr Ted Lazo Radiation Protection and Radioactive Waste Management Division
Science, Values and Stakeholder Dialogue: NEA Experience in Fukushima Dr Ted Lazo Radiation Protection and Radioactive Waste Management Division International Experts Meeting on Radiation Protection after
NRC s Program for Remediating Polluted Sites J.T. Greeves, D.A. Orlando, J.T. Buckley, G.N. Gnugnoli, R.L. Johnson US Nuclear Regulatory Commission
NRC s Program for Remediating Polluted Sites J.T. Greeves, D.A. Orlando, J.T. Buckley, G.N. Gnugnoli, R.L. Johnson US Nuclear Regulatory Commission Background The U.S. Nuclear Regulatory Commission (NRC)
Minerals production in Hungary 1990-2006 (Mtons) - source: Hungarian Office for Mining and Geology
MINING In the last twenty years the mining industry experienced dramatic changes. In the fossil fuel and metallic ores sector the big state-owned mining companies collapsed and/or transformed into private
Records Retention and Disposal Schedule. Property Management
Records Retention and Disposal Schedule Property Management Version control Version Author Policy Approved By Approval Date Publication Date Review Due V 1.0 Information Governance Unit Philip Jones, Head
Green Infrastructure Case Study Template
Green Infrastructure Case Study Template The aim of the exercise is to provide information on how the elements of the Green Infrastructure Strategy are implemented at national level and to provide case
NAPCS Product List for NAICS 54162: Environmental Consulting Services
NAPCS List for NAICS : Environmental Consulting Services National 1 Environmental consulting Providing objective information, advice, and guidance to clients concerning the preservation of air, water,
OVERVIEW OF THE ASBESTOS RELIEF TRUST & KGALAGADI RELIEF TRUST
OVERVIEW OF THE ASBESTOS RELIEF TRUST & KGALAGADI RELIEF TRUST OUTCOMES OF THE NATIONAL ASBESTOS CONFERENCE 2008 Presentation to Portfolio Committee on Mineral Resources 9 May 2012 1 BACKGROUND Asbestos
About Pure Earth and the Toxic Site Identification Program
About and the Toxic Site Identification Program is a New York based not-for-profit organization that partners with governments, NGOs and community groups to solve life-threatening pollution problems in
SPIEKERMANN at a glance
at a glance Dipl.-Ing. Helmut Wanner Managing Director Prof. Dipl.-Ing. Günter Scherrer Managing Director + Partner Ownership: NET Engineering International S.p.A. / Italy Prof. Dipl.-Ing. Günter Scherrer
WORKING TOGETHER TO IMPROVE INDUSTRY PERFORMANCE
WORKING TOGETHER TO IMPROVE INDUSTRY PERFORMANCE The Challenge for the Mining and Metals Industry Minerals and metals are essential for modern living. ICMM s goal is an industry that contributes to sustainable
Summary of Credit Suisse s Sector Policies and Guidelines
ccc Summary of Credit Suisse s Sector Policies and Guidelines CONTENT INTRODUCTION SUMMARY OF FORESTRY AND AGRIBUSINESS POLICY SUMMARY OF MINING POLICY SUMMARY OF OIL AND GAS POLICY SUMMARY OF CONTROVERSIAL
Iowa Smart Planning. Legislative Guide March 2011
Iowa Smart Planning Legislative Guide March 2011 Rebuild Iowa Office Wallace State Office Building 529 East 9 th St Des Moines, IA 50319 515-242-5004 www.rio.iowa.gov Iowa Smart Planning Legislation The
Executive Summary. Water pollution in the influence area of Glencore in Espinar (Cusco, Peru)
_ EUROPEAN CENTER FOR CONSTITUTIONAL AND HUMAN RIGHTS e.v. _ ZOSSENER STR. 55-58 AUFGANG D 10961 BERLIN, GERMANY _ PHONE +49.(030).40 04 85 90 FAX +49.(030).40 04 85 92 MAIL [email protected] WEB WWW.ECCHR.EU
Status, responsibilities and missions of ANDRA (France)
Status, responsibilities and missions of ANDRA (France) Marie-Claude DUPUIS ANDRA - CEO Contents 1. Legal framework, organization and general information 2. ANDRA today: An Industrial Operator An Innovating
Presentation from the 2013 World Water Week in Stockholm
Presentation from the 2013 World Water Week in Stockholm www.worldwaterweek.org The Author(s), all rights reserved www.siwi.org Groundwater Resources Management Support Program Why is groundwater protection
Open Pit Mining Closure in Lusatia
(for LMBV by P. Radke, 2007 ) Open Pit Mining Closure in Lusatia New Landscapes and Lakes Dr. Uta Alisch Fugro Consult GmbH Minex Central Asia Forum 2015 History of Lignite Mining Lignite mining important
Waste Transfer Pricing Methodology for the disposal of higher activity waste from new nuclear power stations
Waste Transfer Pricing Methodology for the disposal of higher activity waste from new nuclear power stations December 2011 Contents Contents... i Introduction... 1 Executive Summary... 1 Background...
Liquid Effluent Treatment Plant (LETP) Land Clean-Up
Liquid Effluent Treatment Plant (LETP) Land Clean-Up Frequently Asked Questions What is proposed? Magnox Ltd is proposing to remove the redundant Liquid Effluent Treatment Plant (LETP) at Harwell and to
UPDATE ON MANAGEMENT OF LEGACY ENVIRONMENTAL ISSUES IN GHANA
UPDATE ON MANAGEMENT OF LEGACY ENVIRONMENTAL ISSUES IN GHANA UPDATE ON MANAGEMENT OF LEGACY ENVIRONMENTAL ISSUES IN GHANA AUGUST 2015 AngloGold Ashanti acknowledges that there are some legacy environmental
Capability Statement for Project Consulting
Capability Statement for Project Consulting Company Profile SAFcomm and our Associate Partners provide practical, innovative and financially viable solutions that result in optimum project outcomes to
Environmental Law Enforcement in Zimbabwe. Farai Michael Nyahwa
Environmental Law Enforcement in Zimbabwe By Farai Michael Nyahwa Presentation Breakdown Institutional Arrangement for Environmental Law Enforcement in Zimbabwe Major Environmental Issues of Concern In
183/2006 Coll. ACT of 14 th March 2006. on town and country planning and building code (Building Act)
Contents and text 183/2006 Coll. latest wording of the text 183/2006 Coll. ACT of 14 th March 2006 on town and country planning and building code (Building Act) The Parliament passed this Act of the Czech
New environmental liabilities for EU companies
New environmental liabilities for EU companies The ELD applies to all businesses that operate within the EU, even if the parent company is located outside of the EU. The ELD applies to all businesses,
RADON AND HEALTH. INFORMATION SHEET October 2002. What is radon and where does it come from?
INFORMATION SHEET October 2 FINAL RADON AND HEALTH What is radon and where does it come from? Radon is a natural radioactive gas without odour, colour or taste. It cannot be detected without special equipment.
ENVIRONMENTAL IMPACT ASSESSMENT PROCESS PROPOSED PHASE 2 EXPANSION OF THE TRANSNET IRON ORE HANDLING FACILITY, SALDANHA
ENVIRONMENTAL IMPACT ASSESSMENT PROCESS PROPOSED PHASE 2 EXPANSION OF THE TRANSNET IRON ORE HANDLING FACILITY, SALDANHA BACKGROUND INFORMATION DOCUMENT 1 BACKGROUND Transnet Limited s (Transnet) existing
Proposal for a RECOMMENDATION OF THE EUROPEAN COMMISSION
EUROPEAN COMMISSION Brussels, XXX [ ] (2013) XXX draft Proposal for a RECOMMENDATION OF THE EUROPEAN COMMISSION Providing minimum principles for the exploration and production of hydrocarbons (especially
Proposed Terms of Reference for EIA studies
1 Proposed Terms of Reference for EIA studies Base line data collection will be collected for the Post-Monsoon season 2016 (September to November 2016) in study area and 10 kms radius from project site.
A. WASTE MANAGEMENT A.1. INTRODUCTION AND GENERAL ISSUES ON HAZARDOUS WASTES AND SOLID WASTES
A. WASTE MANAGEMENT A.1. INTRODUCTION AND GENERAL ISSUES ON HAZARDOUS WASTES AND SOLID WASTES The objective of the German government s policy on waste is to achieve a recyclingbased economy that conserves
How To Understand And Understand Solid And Hazardous Waste
Learning Objectives Solid and Hazardous Wastes Gene D. Schroder PhD To understand the sources of solid and hazardous wastes. To understand methods of solid waste disposal. To evaluate the health risks
Allianz offers customers an increasing number of Green Solutions
Allianz offers customers an increasing number of Green Solutions page 1/5 Climate change is mainly caused by human-activity induced (anthropogenic) global warming and poses a major challenge to the global
SURFACE REMEDIATION AND MANAGEMENT OVERVIEW
SURFACE REMEDIATION AND MANAGEMENT OVERVIEW Giant Mine Remediation Project Environmental Assessment Public Hearings September 10-14, 2012 Adrian Paradis (AANDC) Mike Nahir (AANDC) Bruce Halbert (Technical
THE ECONOMIC DATA BASE AN INSTRUMENT SUPPORTING PREPARATION OF THE PROGRAMMES OF MEASURES IN ACCORDANCE TO THE WATER FRAMEWORK DIRECTIVE
THE ECONOMIC DATA BASE AN INSTRUMENT SUPPORTING PREPARATION OF THE PROGRAMMES OF MEASURES IN ACCORDANCE TO THE WATER FRAMEWORK DIRECTIVE J.Grela, A.Hobot Wojna, M.Owsiany, K.Szewczyk Poland RIOB MEGEVE
Ontario Mining Act Fact Sheet Mine Closure Plans Your Right to Know!
Ontario Mining Act Fact Sheet Mine Closure Plans Your Right to Know! Part VII Rehabilitation of Mining Lands In Ontario, a mining company cannot (re)commence mining operations until a certified Closure
WNU School of Uranium Production
International Training Centre WNU School of Uranium Production Three years experience Jan Trojacek DIAMO, s.e. Straz pod Ralskem HISTORY 2004 IAEA/OECD/NEA Uranium Group meeting, Straz p. R., Czech Republic
NEWMONT GHANA GOLD LTD. AHAFO SOUTH PROJECT COMPLETION AUDIT TERMS OF REFERENCE ENVIRONMENTAL, HEALTH, AND SAFETY
NEWMONT GHANA GOLD LTD. AHAFO SOUTH PROJECT COMPLETION AUDIT TERMS OF REFERENCE ENVIRONMENTAL, HEALTH, AND SAFETY November 2009 Completion Audit November 2009 Terms of Reference Environmental, Health and
CERCLA 108(b) Rulemaking Overview
CERCLA 108(b) Rulemaking Overview 2010 ASTSWMO Hazardous Waste Managers Conference and Training Salt Lake City, Utah June 30, 2010 Statutory Language and Law Suit CERCLA Section 108 (in part) (b)(1) Beginning
MANAGEMENT STANDARD CLOSURE PLANNING
AngloGold Ashanti Limited \ Reg. No.1944/017354/06 76 Jeppe Street \ Newtown \ 2001 \ PO Box 62117 \ Marshalltown \ 2107 \ South Africa Tel +27 (0)11 637 6000 \ Fax +27 (0)11 637 6624 \ Website: www.anglogoldashanti.com
1. MASTER S DEGREE PROGRAMME IN ENVIRONMENTAL TECHNOLOGY 60 ECT credits... 2 1.1 Framework of the studies 10 ECTS... 3 1.1.1 RESEARCH PROCESS AND
1. MASTER S DEGREE PROGRAMME IN ENVIRONMENTAL TECHNOLOGY 60 ECT credits................................ 2 1.1 Framework of the studies 10 ECTS.........................................................................
GoldSim: Engineering and Environmental Simulation Software for the Mining Industry
GoldSim: Engineering and Environmental Simulation Software for the Mining Industry White Paper Abstract GoldSim is a powerful and flexible Windows-based computer program for carrying out probabilistic
www.pwc.com IEMA The Importance of Due Diligence Auditing in the transition to a Sustainable Economy Mark Thompson 9 December 2014
www.pwc.com IEMA The Importance of Due Diligence Auditing in the transition to a Sustainable Economy Mark Thompson 9 December 2014 Objectives The webinar should help you to understand: the types of transactions
MINERALS LAW OF MONGOLIA June 5, 1997 Ulaanbaatar CHAPTER ONE. General Provisions
Article 1. Purpose of the law MINERALS LAW OF MONGOLIA June 5, 1997 Ulaanbaatar CHAPTER ONE General Provisions The purpose of this law is to regulate relations with respect to exploration, mining and related
Archant London Environmental Awards
Archant London Environmental Awards Environmental Business of the Year Big Yellow Self Storage PLC Barking Central, Hertford Road, Barking, IG11 8BL Introduction Big Yellow is a local business that has
Table of International Standards Related to Human Rights at the Marlin Mine
APPENDIX E Table of International Standards Related to Human Rights at the Marlin Mine Consultation International Human Right Instruments International Good Practice Standards and Guidance GRI (G3 & MMSS)
Black Country Local Enterprise Partnership Report of the Level 1 LEED Workshop
Black Country Local Enterprise Partnership Report of the Level 1 LEED Workshop Held on 20 March 2014 at the Black Country Consortium The Deckhouse Brierley Hill, Dudley. Produced on behalf of the Black
Natural Resource Management Profile
Conducting environmental impact assessments Ensures the identification of the geographic, environmental, economic, social, and cultural scope and parameters to be used for the impact assessment study.
COUNCIL DIRECTIVE 2013/51/EURATOM
L 296/12 Official Journal of the European Union 7.11.2013 DIRECTIVES COUNCIL DIRECTIVE 2013/51/EURATOM of 22 October 2013 laying down requirements for the protection of the health of the general public
Policy measures for the prevention and minimization of hazardous wastes
WASTE AND WASTE MANAGEMENT PROGRESS AND ACHEIVEMENTS Policy measures for the prevention and minimization of hazardous wastes 1. At the international level, Mongolia joined The Basel Convention on the Control
the sale of mercury to natives. According to Ofosu-Mensah the law was passed by the colonial
Index of Laws Mining Laws The Mercury Ordinance, 1933 The Mercury Ordinance was proclaimed by the government of the Gold Coast colony, banning the sale of mercury to natives. According to Ofosu-Mensah
Federal Facility Cleanup. Reggie Cheatham, Director Federal Facilities Restoration and Reuse Office
Federal Facility Cleanup Reggie Cheatham, Director Federal Facilities Restoration and Reuse Office NAS Best Practices Workshop January 9, 2014 Overview of Presentation Facts about Federal Facility Cleanup
APPLICATIO Training & Management GmbH. Frauenthal 8 20149 Hamburg Germany Tel.: +49 (0)40 220 86 68 Fax: +49 (0)40 220 86 46
APPLICATIO Training & Management GmbH Frauenthal 8 20149 Hamburg Germany Tel.: +49 (0)40 220 86 68 Fax: +49 (0)40 220 86 46 www.applicatio.com [email protected] Initiatives, Awards, Responsibility: APPLICATIO
Designed and produced by geo-graphicsdesign.com DP 300 3/02
Designed and produced by geo-graphicsdesign.com DP 300 3/02 Guidance for Developers and Regulators Purpose This booklet is produced on behalf of the North East Scotland Flooding Advisory Group and is intended
Xtract Resources Plc (AIM:XTR) Chepica Gold Mine: Quarterly Results Presentation
Xtract Resources Plc (AIM:XTR) Chepica Gold Mine: Quarterly Results Presentation London 3 February 2016 Aerial view of Chepica Gold Mine Taken with Phantom 3 Professional Drone 2 We are xtracting significant
Trip to Pulacayo. Pulacayo - Paca
Disclaimer This Presentation contains forward-looking information as defined under applicable securities law in Canada. Forward-looking information can be identified by the use of words such as "anticipated",
CREATING A GREEN FUTURE THROUGH WATER REMEDIATION
CREATING A GREEN FUTURE THROUGH WATER REMEDIATION Cornerstone Principles for Conducting Business Active Treatment Systems, Inc. goes to great lengths to instill in every employee the importance of ethical
UK RESPONSE PLAN AND RADIOACTIVE INCIDENT MONITORING NETWORK (RIMNET) 3: BRIEFING NOTE
UK RESPONSE PLAN AND RADIOACTIVE INCIDENT MONITORING NETWORK (RIMNET) 3: BRIEFING NOTE 1. What is the UK Response Plan? The UK Response Plan is the UK Government's national contingency plan for dealing
Kevitsa Mine a Big Ni Cu PGE Mine in Central Finnish Lapland
Kevitsa Mine a Big Ni Cu PGE Mine in Central Finnish Lapland Krister Söderholm Kevitsa Mining/FirstQuantum MineralsLtd Ltd. Cautionary Note Concerning Forward-Looking Statements Some of the statements
City of Valdosta Land Development Regulations. Table of Contents
TITLE 1 ADMINISTRATION Chapter 102 General Provisions 102-1 Title 102-2 Purpose 102-3 Authority 102-4 Jurisdiction 102-5 Application of Ordinance 102-6 Relationship to Existing Ordinances 102-7 Powers
INTERNATIONAL ATOMIC ENERGY AGENCY WAGRAMERSTRASSE 5, P.O. BOX 100, A-1400 VIENNA, AUSTRIA FACSIMILE: (+43 1) 26007, TELEPHONE: (+43 1) 2600
INTERNATIONAL ATOMIC ENERGY AGENCY WAGRAMERSTRASSE 5, P.O. BOX 100, A-1400 VIENNA, AUSTRIA FACSIMILE: (+43 1) 26007, TELEPHONE: (+43 1) 2600 - CRAFT - The International Project on COMPLIMENTARY SAFETY
A Guide to the Management of Tailings Facilities. Second Edition, 2011
A Guide to the Management of Tailings Facilities Second Edition, 2011 A Guide to the Management of Tailings Facilities 2011 Mining Association of Canada 1105-350 Sparks Street Ottawa, Ontario K1R 7S8 www.mining.ca
Carson River Mercury Superfund Site Management Strategies and Goals. May 2011
Carson River Mercury Superfund Site Management Strategies and Goals May 2011 Staff at NDEP Responsible for CRMS Jeff Collins - Supervisor Over 21 years experience as environmental consultant working on
Case study from Ukraine
Case study from Ukraine Uranium Mining Facilities at the Pridneprovsky Chemical Plant Rodolfo Avila Outline Overview of the situation Monitoring programs Examples of monitoring results Modelling work Examples
The obligation to conserve the heritage of the twentieth century is as important as our duty to conserve the significant heritage of previous eras.
The ICOMOS International Scientific Committee for Twentieth Century Heritage (ISC 20C) is developing guidelines for the conservation of heritage sites of the twentieth century during 2011 2012. As a contribution
Antamina Closure Plan: A Top Level Practice. Eng. Antonio Mendoza, M.Sc., MBA Environmental Manager 2010
Antamina Closure Plan: A Top Level Practice Eng. Antonio Mendoza, M.Sc., MBA Environmental Manager 2010 Content Evolution of Environmental Regulation Closure Process Antamina Closure Evolution of Environmental
The company is listed on the Australian Securities Exchange (ASX code: ILU) and employs approximately 850 people, the majority in Australia.
Iluka Resources Limited Murray Basin Operations Radiation Management Plan and Radioactive Waste Management Plan Overview 2014 Purpose In accordance with legislative requirements, Iluka Resources conducts
Case Study: Zinc International
Case Study: Zinc International Sustainability in New Project Management Gamsberg, South Africa Sustainability in Mine Closure Lisheen, Ireland 1 July 2015 Deshnee Naidoo CEO, Zinc International Introduction
Working Paper Research Unit Global Issues Stiftung Wissenschaft und Politik German Institute for International and Security Affairs.
Working Paper Research Unit Global Issues Stiftung Wissenschaft und Politik German Institute for International and Security Affairs Friedemann Müller Paper presented at KAS CFIE CFISAE AHK International
CREATE. ENHANCE. SUSTAIN.
CREATE. ENHANCE. SUSTAIN. AECOM SHORT PROFILE About AECOM CREATE. ENHANCE. SUSTAIN. AECOM is a premier fully integrated provider of architectural, engineering, environmental- and construction services
Radioactive Contamination Uranium Legacy in CA
Radioactive Contamination Uranium Legacy in CA NATO SfP Project 981742 Brussels 2008 1 Brussels 2008 2 International Cooperation NATO SfP Project (since 2006) in Co-Operation with: ENVSEC (Environmental
Reclamation Plants, Separation Facilities & Stationary Treatment Facilities
RAILROAD COMMISSION OF TEXAS Reclamation Plants, Separation Facilities & Stationary Treatment Facilities Grant Chambless, P.G. Manager, Environmental Permits & Support Oil & Gas Division 1 Disclaimer These
LIFE ORIENTATION DOCUMENT
LIFE ORIENTATION DOCUMENT The European Union provides funding and grants for a broad range of projects and programmes covering areas such as education, health, consumer protection, environmental protection,
Origins and causes of river basin sediment degradation and available remediation and mitigation options. Feedback from the Riskbase workshop
Origins and causes of river basin sediment degradation and available remediation and mitigation options Feedback from the Riskbase workshop Corinne Merly 1, Olivier Cerdan 1, Laurence Gourcy 1 Emmanuelle
WORK BREAKDOWN STRUCTURE FOR A TYPICAL MINE
WORK BREAKDOWN STRUCTURE FOR A TYPICAL MINE LEGEND [GeoMine] = Technology Sites [Exploration-Geology-Reserves] = Edumine Courses [GEOCHEMISTRY] = State-of-the-Art Review (SOAR) 1 EXPLORATION [GEOMINE]
Regulation for Establishing the Internal Control System of an Investment Management Company
Unofficial translation Riga, 11 November 2011 Regulation No. 246 (Minutes No. 43 of the meeting of the Board of the Financial and Capital Market Commission, item 8) Regulation for Establishing the Internal
Upper Workings. Waste Rock. Adit. Millsite
Hydraulic Adit Plug Closure World s Fair Mine, Patagonia, Arizona Region 3 Coronado NF Mine Design, Operations & Closure Conference May 1-5, 2011 Allan Kirk Matt Wetter Nathan Stormzand Eli Curiel, USFS
Geographic Information System Tools for Management of US DOE Sites 14125
Geographic Information System Tools for Management of US DOE Sites 14125 John Montgomery*, Cliff Carpenter*, Leonard Turton**, Steve Pawel** *US DOE, Office of Legacy Management **S.M. Stoller Corporation