1 The Recent Improvement of High-Speed Railway Bridges in China Gonglian DAI Professor, Central South University, Changsha, China Gonglian DAI, born 1964, received his engineering PhD degree from Central South University in 1997 and joined department of bridge engineering from Now, he is the dean of department of bridge engineering in Central South University. The design theory and load-capacity for bridge structures is the focus of his research. Nan HU Graduate Student, Central South University, Changsha, China Nan Hu, born 1985, received his bachelor degree of engineering degree from Hunan University in He is now working at department of bridge engineering of Central South University as a graduate student. Wenshuo LIU Ph.D Student Central South University Changsha, Hunan, China [email protected] Wenshuo Liu, born in 1985, received her bachelor degree of engineering from Central South University in She is now studying at the department of bridge engineering of Central South University as a Ph.D student. Summary Based on the study of Wuhan-Guangzhou passenger Line and Beijing-Shanghai Passenger line, in this paper, the technical feature and new improvement of high-speed railway (HSR) bridges in China has been introduced from following aspects: First, two major design code (Temporary Provision for Passenger Railway Line of Km/h and Km/h) has been compared, under the current HSR bridge design specifications on the issue of main contents and technical indexes. Second, based on real projects, the technical characteristic of standard span prestressed concrete girder bridge for high-speed railway has been summarized, including layout of span, section types. Meanwhile, both ballast and non-ballast bridge has been studied on technical feature and material consumption. Third, this paper summarized substructures and foundation, and discussed the standardization of continuous beam bridge and construction diversity. Finally, the technical feature of several four-lane large bridges in high-speed railway lines has been introduced, including Tianxingzhou Bridge in Wuhan, Dashengguan Bridge in Nanjing, etc. In spite of this improvement, there are still numerous problems and challenge during designing of high-speed railway bridge. By reviewing and further research, a better solution will be found and applied in future projects. Keywords: high-speed railway; simply supported beam bridge; substructure; continuous beam, large span high-speed railway bridges; standardized design. 1. The development of high-speed railway in China Fig. 1: the operated mileages of HSR in the Fig. 2: the ratio of bridges mileage among all world(by the end of 2009) the mileage at a number of lines in China Qin-Shen Passenger Line, from Qinhuangdao to Shenyang, 200km/h, is the first two-line electrified
2 express railway, which designed and constructed by China. This line built and put into operation in 2003, was a symbol for the beginning of high-speed railway (HSR) in China. Beijing-Tianjin line with km, put into operation in August 2008, is first inter-city HSR with speed above 300 km/h and first HSR passenger line. Wuhan-Guangzhou HSR passenger line, opened at December 26, 2009, with length of 968 km, operating speed of 350 km and the maximum speed of 380 km, is currently the longest mileage, highest technical standards, fastest passenger line in China. Moreover, its 394 km/h in trial run was a milestone for HSR construction in China. After development of last decade, the HSR in China has already had longest mileages in the world, as shown in figure 1. Because of superior on speed, comfort and its continuous operating density, the requirements of civil structures for HSR are extremely strict. Compared only 20% proportion of bridges among total mileages in traditional railway, HSR bridges covered the majority length of passenger line project. At present, bridges covered nearly 50% of the total mileages in Chinese HSR lines. For instance, Beijing-Tianjin inter-city HSR reached up to 88%. The ratio of bridges mileage among all the mileage at a number of lines in China is shown in Figure 2. Therefore, in plain and dense population areas, bridges with medium or small span are usually adopted. China has fully learned technology and experience in the world, and gradually formed a system of standardized bridge design and construction. This paper will review the new development of HSR in China in recent years, including improvement of design codes, the standardized design, fabrication and erection, the standardization of substructure and the development of large-span multi-line bridges in China. 2. Current code for HSR line and bridge From 1990s, China has carried out the research on HSR technology on the basis of experience from other counties. By summing up practice in Qin-Shen passenger line, Chinese railway technology is gradually formed as follows: speed for combined passenger and freight railway is 200 km/h; HSR speed divided in two grades: 200~250 km/h and 300~350 km/h. Based on "Temporary Regulations on Beijing-Shanghai high-speed railway design" and experience in recent years," Temporary Provision for Passenger and Freight Railway Line of 200km/h", "Temporary Provision for Passenger Railway Line of Km/h " (TP ) and " Temporary Provision for Passenger Railway Line of km/h" (TP ) has been drawn up. The first one focused on traditional railway, the latter two on modes of Chinese HSR passenger-freight and passenger dedicated line, the technical indexes are shown in Table 1. The high demand on smooth of HSR is controlled by two temporary codes, while the structural design is still carried out as traditional railway bridge. As can be seen from a series of limits below, displacement control in HSR bridge design is to ensure the stability of the train and comfort of passenger. As for increased speed, the requirements of stiffness on structures are also increased (TP has a higher requirements). Table 1: the major contents and difference in TP and TP Ser Item 200~250km/h 300~350km/h Description for contents 1 design life 100 years 2 minimum plane circular curve radius 2200(4000) 4500(7000) 200(250); 300(350) km/h 3 minimum vertical curve radius 15000(20000) The same as above 4 line space 4.4(4.6) 4.8(5.0) The same as above 5 design live load model ZK Live Load (0.8UIC) 6 vertical rotatory angle of beam end 2 ( 1 ) With-ballast(non-ballast) 7 horizontal rotatory angle of beam 1 8 transverse deformation of beam L/ torsion of beam (rail vertical relative ZK static live load (static 1.5mm 1.5mm(1.2) displacement) actual operating trains) 10 deck vertical acceleration 0.35g(0.5g) f 20Hz, ballast (non-ballast) 11 vertical free vibration frequency of simply supported beam 80/L(L 20m) 120/L( 40m) 12 difference of abutment post-construction 50mm 30mm(20mm) ballast (non-ballast)
3 settlement 13 uneven settlement of adjacent abutment 20mm 15mm(5mm) ballast (non-ballast) 14 creeping after track laying 20mm(10mm) ballast (non-ballast) 2.1 Live Load Mode for HSR bridge design Live load mode is one of the most important factors for HSR bridge design. At present, different countries use different modes, for example, UIC mode in Europe vs N-P mode in Japen. The chose on mode not only control the bridge deformation but the security and economic index. Considering UIC and N-P mode and special feature in of CRH train, ZK live load has been chosen in China, about 0.8 times value of UIC mode, as shown in figure 3: Fig 3: ZK standard live load and special live load 2.2 Deformation Control To meet a high demand on smooth, deformation on girder need to be strictly restricted, as shown in Table 2. Beam vertical rotatory angle should not be greater than the following limits: ballast trackθ =2.0x10-3rad,θ1+θ2=4x10-3 rad; Non-ballast track:θ=1.0x10-3 rad,θ 1 +θ 2 =2x10-3 rad. Table 2: Beam vertical rotatory angle limits Span L<24m 24m<L<80m L>80m Single-span L/1300 L/1000 L/1000 Multi-span L/1800 L/1500 L/1000 Figure 4: rotatory angle at beam end and beam deformation In order to ensure train safety, China has referred the standards in Germany. Therefore, TP set the limits of bridge torsional deformation: For a 3m-long rail, relative vertical deformation of two rails of one line should not be greater than 1.5mm under the ZK live load, and not be greater than 1.2mm under the action of actual trains. Although TP controlled horizontal and vertical displacement at the top of pier, there are not specific limits but refer to the limits in traditional railway. In TP , the interaction between beam and track has been taken into account. For example, simply supported bridge with main span of 24m, the min longitudinal stiffness of pier should be larger than 300kN/cm (abutment larger than kn/cm), or flexible adjuster for track should be set. 3. Standard simply supported bridge 3.1 The standardization of bridge span layout and design parameters Among Wuhan-Guangzhou HSR line and Beijing-Shanghai HSR line, the longest bridge had a length of 164km. 32m simply supported beam is frequently used as standard span and 24m or 40m simply beam mainly as adjusted span. At present, HSR in China generally adopted two-lanes and bridge is divided into pre-tensioned and post-tensioned beam, using the same beam section to simplify the framework. Considering specific circumstances, erection method can be in precast or
4 cast-in-place way. The precast post-tensioned simply supported beam is the most commonly used in HSR. Take the Wuhan-Guangzhou line as example, the rate simply supported beam reached about 95%, the two lanes 32m-span simply supported beam is the dominant type and 24m-span as the adjusted span. The major design parameters of several standard simple bridge are shown in table 4. Table 4: major design parameter of several most frequently used standard simple bridge Bridge Type Len gth Spa n Beam depth Wid th at top Width at bottom Beari ng spacin g vertical stiffness strand (straight/c urve) (t) steel( nonbarrier/ withbarrier)(t) 1 250km/h, precast, 24m / / / / / line spacing 4.6m 32m / / / / / km/h,in-place, 24m / / / Line spacing 4.6m 32m / / / km/h, precast, 24m / line spacing 5.0m 32m / km/h, in-place, 24m / line spacing 5.0m 32m / * 2.8/3.0 and 5.74/ 5.68 is at the middle span/ on the pier) Such bridge type had two advantages over others: the first is that box-section has larger stiffness and superb performance; the second is the erected beam can be used as the transport means, which can speed up erection of precast girder. For different sites, the different types of standard simply supported beams have been compiled into general drawings, such as ballast track and unballasted track, single lane girder or double lanes girder. 3.2 The optimization of the deck layout Figure 9: the layout in unballasted deck (before optimization in the left, after in the right) The HSR bridge deck layout not only considered enough security avoidance space, but the layout of the signal and communication facilities, because bridge width is an important economic indicators. In HSR in China, ballast track box girder has been adopted for 250km/h with line spacing of 4.6m, while unballasted track box girder has been adopted for 350km/h with line spacing of 5.0m. Referring the experience of Qin-Shen HSR, both bridge width in Wuhan-Guangzhou line and Beijing-Tianjin line is 13.4m, shown in figure 9 (at left). In order to reduce the weight, we further optimized deck layout in 2008, so that 250km/h unballasted track bridge is 11.6m, and the ballast track bridge deck is 12.2m. Also, 350km unballasted track bridge deck width changed from 13.4m to 12m, and the ballast track from 13.4m to 12.6m. Both Beijing-Shanghai line and Shijiazhuang- Wuhan line had selected this optimized section, saving numerous budge. For the erection between two tunnels, part of cantilever plate in the standard beam would be poured later as transportation of the beam is restricted by the limited space. Those left parts of cantilever plate would be poured
5 when box girder erected at the right place. The structure type of the bridge deck track also conducted a series of research and testing, gradually forming CRTS series plate unballasted track and double block unballasted track for the construction in China. 3.3 The standardized construction method for frequently-used bridge Due to 95% standard span in HSR line, the precast and span by span erection is very suitable for bridge construction in facing of short schedule. About 20km spacing, there is a plant for fabrication of girder. When the foundation is under construction, the beams was fabricating in the factory. The standardization process is good for quality and speed. 900t capacity machine and vehicle is used for transportation and erection of 32m girder. For the low span, cast-in-place method would be selected through moveable frame. The standardized method assures the speed of HSR construction. 4. The standardization and the diverse construction of the continuous beam Apart from simply supported beam as standard span, the continuous beam in HSR gradually were standardized: in the small span, same beam depth was adopted with main span of 2 24m, 3 24m, 2 32m, 3 32m, 2 40m; in medium span, variable cross-section has been adopted with the series main span of 40m, 56m, 64m, 72m, 80m, 100m, shown in table 5. For the bridge which main span is longer than 100m, is needed to be design distinctively. As a common bridge type across barriers, construction technology of continuous beam is very mature and standardized, while construction method leads to diverse way, such as cast-in-place, cantilever, launching, swing method, etc. Castin-place and cantilever are major construction method for HSR continuous beam bridge with low and medium span in China. Although cast-in-place method is easy, it requires a great number falseworks. When span is longer, the bridge should be divided into many segments. Cantilever method is not limited by terrain, but structural system would be transformed in many times. Type 250km/h, cast-inplace, ballast 350km/h, cast-inplace, nonballast 350 km/h segments cantilever nonballast Table 5: major design parameter of several most frequently used continuous beam bridge Length Span Beam depth Width at top Width at bottom Bearing spacing vertical stiffness Concrete volume (m 3 ) Strand (straight/curv e) (t) steel( nonbarrier/ withbarrier)(t) / / / /5.0 1/ / /4.35 1/ / /4.15 1/ / / / /5.0 1/ / / /5.0 1/ / / /5.0 1/ / / /5.9 1/ / / /5.9 1/ / / /5.9 1/ / / /5.8 1/ / / /5.7 1/ * 2.8/3.0 and 5.74/ 5.68 is at the middle span/ on the pier) With the construction of a large number of HSR passenger line, precast segmental bridge has been gradually popularized. This method first appeared in 1960s in Europe, which was developed from pre-fabricated cantilever method. First, the entire bridge span was divided into appropriate sections.
6 Then, segments were made in the factory near construction sites and transported by vehicles, and be installed in place by equipments, then strands will be tensioned. Though this method has been widely used in Europe and United States, China is still under the initial stage because of unskilled workers and backward equipments. Anyway, this method speed up construction speeds of HSR and ensure quality as well as configuration of the bridge. Meanwhile, due to its short conservation time, late loading time and less prestress loss, it suitable for large-span continuous beam in HSR. 5. Pier and infrastructure standardization 5.1 Pier standardization To speed up construction of HSR, bridge substructure should be also standardized. As for pier, five major types has been selected for superstructure: round plate piers, twin rectangular column piers, single round column piers, twin round column piers and round hollow pier. During the selection of the piers for Beijing-Shanghai line, a detailed analysis was carried out in order to coordinate box girder and harmonize the landscape. Finally, streamlined round soild pier, round hollow piers, rectangular hollow piers and twin-column piers were used. Round hollow piers and rectangular hollow piers used in Wuhan-Guangzhou line is shown in Figure 10, 11. It simplifies the appearance for the pier with no cap, and can through the rational control the proportion of the stiffness of the piers to substructure to control the economy of the substructure. Fig. 10: Round hollow piers 5.2 Based standards Apart from rock ground, the pile foundation often used for bridges in HSR with diameter of 1.0m, 1.25m or 1.5m. In general, simple beam using the bored piles of 8φ1.25m, and the continuous beams 8φ1.5m. There are two layout kinds of pier foundation: determinant and plum-type. Under normal geological conditions, for the piers condition of bridges below 20m, we can accord 8φ1.0m, 9φ1.0m, 11φ1.0m or 6φ1.25m, 8φ1.25m, 9φ1.25m to arrange the piers. For general low-level, in the economy, the small-diameter bored piles are better than the large-diameter ones. There for, we should maximize the use of small-diameter bored piles from the perspective of scattered by the force, but if the pile length exceeds 50m, we should use bored piles of larger diameter. 6. Large-span multi-line bridges Fig. 11: rectangular hollow piers Table 6: major design parameter of several large span HSR bridge in China Items Tianxingzho Dashengguan Xihuahuai Tingsi River Liangjiawan Chencun u Bridge Bridge Bridge Bridge Bridge Bridge type Cable-stayed Continuous Basket handle Continuou Steel truss arch Tied-arch bridge rigid frame bridge s beam speed 200km/h 300km/h 250km/h 350km/h 350km/h 350km/h main span/m deck width/m / /17.0
7 Live load 2-HSR line 2- I railway 6- highway 2-HSR line 2- I railway 2-light rail 2-HSR line 2-HSR line 2-HSR line 2-HSR line * 13.4/8.5 and 23.4 /17.0 is at deck top/ at deck bottom); 2- in the live load mean the number of lines. In order to meet the clearance restrictions or avoid difficult construction condition, a series of bridge with special span has been designed, including continuous rigid frame, variable cross-section continuous beam, arch, cable-stayed bridge, as shown in Table 6. Tianxingzhou Bridge in Wuhan-Guangzhou line and Dashengguan Bridge in Beijing-Shanghai line are the representations of large-span multi-line bridges. Tianxingzhou Bridge, mixture for highway and railway, is cable-stayed bridge with 1092m total length, steel truss girder, double pylons and three cable planes of fan shape, bridge design speed 200km/h. The arrangement of main bridge is m. The 756m steel truss girder is a composite structure combined high way deck and main steel truss, shown in Fig 19, for six lanes highway on the upper and four line railways on the lower. The inverted Y-shaped has been chosen in reinforced concrete main tower with a total height of 190m. Dashengguan Bridge with two navigable access adopted six-span continuous steel truss arch bridge, with main span of m. Three trusses as load-bearing structure had six railway lanes above, with total width 41m. The double continuous steel arch trus in the middle of main span had the height of 84.2m, with span ratio about 1/4 and the height of vaulted truss is 12m. The traffic volume in China is so high that large span bridge should supported multi-line load with three main trusses. In addition, there are a large number of different types of bridges, including the basket handle arch, tied arch, steel truss arch. In Wuhan-Guangzhou line, for example, the large-span continuous beam, continuous rigid frame, basket handle tied arch. Moreover, these kinds of bridges types also tend to standardized, such as basket handle arch with main span of 112m and tied arch of 140m have also been used in other lines. In this way, the speed of HSR construction in the future will much faster than ever before. 7. Summary and discussion By the summarization, we can see that there are three mainly improvements in HSR bridge of China: (1) Development on codes of HSR bridge design: Through the study of experience at domestic and international workplace, a series of temporary regulations has been gradually complied, as a catalyst in today's HSR bridge design of China. Next step, these temporary regulations will be gradually refined and improved in order to establish a set of requirements for HSR bridge design in China and other counties. (2) Standardization of design and construction. It can be seen that the standardized design and manufacturing, including the superstructure and substructure, can substantially increase the construction speed than HSR project in other counties. It lay laying a solid basis for achieving the goals for the plan of passenger line and inter-city express in Plan of Middle and Long-Term Railway Network and the "Eleventh Five-Year Plan". (3) Completion of multi-line large span bridge. Several large-span bridges for HSR passage line across the Yangtze River, Yellow River has been designed and constructed, including Tianxingzhou Bridge at Wuhan, Dashengguan Bridge at Nanjing, Zhengzhou Yellow River Bridge, Jinan Yellow River Bridge, etc. After the comparison of technical and economic, these several bridges mentioned above had steel truss structure which can provide superior stiffness. In order to meet the demands of span, heavy load and high-speed train, the design and construction of these bridges also adopted a number of new materials, detailed structural system, technology and equipment. Today, the technological improvement of design and construction in HSR bridge of China provided a valuable experience for reconcile the balance between economic issue, rapid construction and quality control for future construction. The achievements of construction in China s HSR in recent years were rooted from comprehensive study on advanced technology from other counties, such as
8 Germany, France and Japan, etc. However, since the completed mileages of China s HSR have ranked at the first place in the world, the problems encountered in the design and construction has also become the new challenge among HSR development. Therefore, the design and construction of HSR bridge in China cannot solely rely on foreign technology and experience, but improve and optimize on the basis of further learning. Therefore, by the experience in, we also need to realize the new challenges in design and construction of HSR in the future. References [1] ZHENG J. China s High-speed Railway Bridges. Beijing: Higher Education Press, [2] The Ministry of Railway of P.R. China. Temporary Provision for Passenger Railway Line of Km/h. Beijing: China Railway Publishing House, (in Chinese) [3] The Ministry of Railway of P.R. China. Temporary Provision for Passenger Railway Line of Km/h. Beijing: China Railway Publishing House, (in Chinese) [4] SUN S. L. Bridge Engineering of Beijing-Shanghai High Speed Railway. The Proceedings of 2008 China International High-Speed railway bridge technology collection. Beijing: China Railway Publishing House, [5] The Ministry of Railway of P.R. China. Code for design on reinforced and prestressed concrete structure of Railway Bridge and culvert (TB ). Beijing: China Railway Publishing House, (in Chinese) [6] NIU B. Overview of China s High-speed Railway Bridges. The 18th Conference Proceedings of the Bridge (first volumes). Beijing: People's Communications Press, [7] XU K. L., ZENG X. L. Technical Summary of Overall Design Engineering for Wuhan- Guangzhou Passenger Line Station, Technological collection for the construction of the Wuhan-Guangzhou passenger line. Southwest Jiaotong University Press, (in Chinese) [8] JING K., XU Y. Technical Summary of bridge design of Wuhan-Shaoguan belonged to Wuhan-Guangzhou Passenger Line, Technological collection for the construction of the Wuhan-Guangzhou passenger line. Southwest Jiaotong University Press, (in Chinese) [9] Nan HU. Gonglian DAI, The Introduction of High-Speed Railway Bridges in Wuhan Guangzhou Passenger Line, IABSE Symposium 2009 Bangkok, Volume96, p62.
Analysis of the Response Under Live Loads of Two New Cable Stayed Bridges Built in Mexico
Analysis of the Response Under Live Loads of Two New Cable Stayed Bridges Built in Mexico Roberto Gómez, Raul Sánchez-García, J.A. Escobar and Luis M. Arenas-García Abstract In this paper we study the
Safe & Sound Bridge Terminology
Safe & Sound Bridge Terminology Abutment A retaining wall supporting the ends of a bridge, and, in general, retaining or supporting the approach embankment. Approach The part of the bridge that carries
How To Write An Analysis System For Bridge Test
Study of Analysis System for Bridge Test Chen Ke, Lu Jian-Ming, Research Institute of Highway, 100088, Beijing, China ([email protected], [email protected]) Summary Analysis System for Bridge Test (Chinese
Optimum proportions for the design of suspension bridge
Journal of Civil Engineering (IEB), 34 (1) (26) 1-14 Optimum proportions for the design of suspension bridge Tanvir Manzur and Alamgir Habib Department of Civil Engineering Bangladesh University of Engineering
Numerical Analysis of the Moving Formwork Bracket Stress during Construction of a Curved Continuous Box Girder Bridge with Variable Width
Modern Applied Science; Vol. 9, No. 6; 2015 ISSN 1913-1844 E-ISSN 1913-1852 Published by Canadian Center of Science and Education Numerical Analysis of the Moving Formwork Bracket Stress during Construction
Design of Bridges. Introduction. 3 rd to 4 th July 2012. Lecture for SPIN Training at the University of Dar es Salaam
Design of Bridges Introduction 3 rd to 4 th July 2012 1 FUNCTION OF A BRIDGE To connect two communities which are separated by streams, river, valley, or gorge, etc. 2 EVOLUTION OF BRIDGES 1. Log Bridge
EFFECTS ON NUMBER OF CABLES FOR MODAL ANALYSIS OF CABLE-STAYED BRIDGES
EFFECTS ON NUMBER OF CABLES FOR MODAL ANALYSIS OF CABLE-STAYED BRIDGES Yang-Cheng Wang Associate Professor & Chairman Department of Civil Engineering Chinese Military Academy Feng-Shan 83000,Taiwan Republic
Value Engineering vs. Alternate Designs in Bridge Bidding
Value Engineering vs. Alternate Designs in Bridge Bidding Compares the advantages and disadvantages of alternate designs and value engineering in bidding of bridges as experienced in the State of Florida.
LOAD TESTING OF SOME NEW BRIDGES IN LATVIA
LOAD TESTING OF SOME NEW BRIDGES IN LATVIA Edmunds Akimovs, Civ.Eng., Bridge Engineer, Consulting Company Inzenierbuve, Address: Azenes st. 20, Riga, LV1048, Latvia. E-mail: [email protected] Ainars
Design of Steel Structures Prof. S.R.Satish Kumar and Prof. A.R.Santha Kumar. Fig. 7.21 some of the trusses that are used in steel bridges
7.7 Truss bridges Fig. 7.21 some of the trusses that are used in steel bridges Truss Girders, lattice girders or open web girders are efficient and economical structural systems, since the members experience
4B-2. 2. The stiffness of the floor and roof diaphragms. 3. The relative flexural and shear stiffness of the shear walls and of connections.
Shear Walls Buildings that use shear walls as the lateral force-resisting system can be designed to provide a safe, serviceable, and economical solution for wind and earthquake resistance. Shear walls
NUMERICAL ANALYSIS OF A HORIZONTALLY CURVED BRIDGE MODEL
10NCEE Tenth U.S. National Conference on Earthquake Engineering Frontiers of Earthquake Engineering July 21-25, 2014 Anchorage, Alaska NUMERICAL ANALYSIS OF A HORIZONTALLY CURVED BRIDGE MODEL K. Kinoshita
Overhang Bracket Loading. Deck Issues: Design Perspective
Deck Issues: Design Perspective Overhang Bracket Loading Deck overhangs and screed rails are generally supported on cantilever brackets during the deck pour These brackets produce an overturning couple
US 51 Ohio River Bridge Engineering and Environmental Study
US 51 Ohio River Bridge Engineering and Environmental Study ITEM NOS. 1-100.00 & 1-1140.00 Prepared by: Michael Baker Jr., Inc. 9750 Ormsby Station Rd Louisville, KY 40223 August 16, 2013 Table of Contents
Beam bridges are the oldest known bridges and tend to be the simplest to design and build. Roughly half of all bridges
Beam Bridges Beam bridges are the oldest known bridges and tend to be the simplest to design and build. Roughly half of all bridges in the United States are beam bridges. They consist of vertical s and
Truss. are both simple and A Matsuo Example continuous trusses. The
Girder Bridge A girder bridge is perhaps the most common and most basic bridge. A log across a creek is an example of a girder bridge in its simplest form. In modern steel girder bridges, the two most
Elevated Roads for Sri Lanka
Elevated Roads for Sri Lanka M.T.R. Jayasinghe (Senior Professor, Structural Engineering, University of Moratuwa) Senior Professor M.T.R. Jayasinghe is a Professor of Structural Engineering, University
Steel and composite bridges in Germany State of the Art
Steel and composite bridges in Germany State of the Art Univ.-Prof. Dr.-Ing. G. Hanswille Institute for Steel and Composite Structures University of Wuppertal Germany Univ.-Prof. em. Dr.-Ing. Dr. h.c.
REPAIR AND STRENGTHENING OF HISTORICAL CONCRETE BRIDGE OVER VENTA RIVER IN LATVIA
1 REPAIR AND STRENGTHENING OF HISTORICAL CONCRETE BRIDGE OVER VENTA RIVER IN LATVIA Verners Straupe, M.sc.eng., Rudolfs Gruberts, dipl. eng. JS Celuprojekts, Murjanu St. 7a, Riga, LV 1024, Latvia e-mail:
Field Damage Inspection and Static Load Test Analysis of Jiamusi Highway Prestressed Concrete Bridge in China
Advanced Materials Research Vols. 163-167 (2011) pp 1147-1156 Online available since 2010/Dec/06 at www.scientific.net (2011) Trans Tech Publications, Switzerland doi:10.4028/www.scientific.net/amr.163-167.1147
National Council of Examiners for Engineering and Surveying. Principles and Practice of Engineering Structural Examination
Structural Effective Beginning with the April 2011 The structural engineering exam is a breadth and exam examination offered in two components on successive days. The 8-hour Vertical Forces (Gravity/Other)
SEISMIC DESIGN. Various building codes consider the following categories for the analysis and design for earthquake loading:
SEISMIC DESIGN Various building codes consider the following categories for the analysis and design for earthquake loading: 1. Seismic Performance Category (SPC), varies from A to E, depending on how the
REHABILITATION OF THE FIGUEIRA DA FOZ BRIDGE
REHABILITATION OF THE FIGUEIRA DA FOZ BRIDGE A.Rito Proponte, Lda, Lisbon, Portugal J. Appleton A2P Consult, Lda, Lisbon, Portugal ABSTRACT: The Figueira da Foz Bridge includes a 405 m long cable stayed
HONG KONG ZHUHAI MACAO LINK
Available online at www.sciencedirect.com Procedia Engineering 14 (2011) 1485 1492 The Twelfth East Asia-Pacific Conference on Structural Engineering and Construction HONG KONG ZHUHAI MACAO LINK N.HUSSAIN
Settlement of Precast Culverts Under High Fills; The Influence of Construction Sequence and Structural Effects of Longitudinal Strains
Settlement of Precast Culverts Under High Fills; The Influence of Construction Sequence and Structural Effects of Longitudinal Strains Doug Jenkins 1, Chris Lawson 2 1 Interactive Design Services, 2 Reinforced
China Railways Development, Financing and Challenges
China Railways Development, Financing and Challenges Zhang, Jianping Depart. of Development & Planning Ministry of Railway, P. R. China March 31, 2006 Transport Forum, World Bank 1. Current Situation of
FEBRUARY 2014 LRFD BRIDGE DESIGN 4-1
FEBRUARY 2014 LRFD BRIDGE DESIGN 4-1 4. STRUCTURAL ANALYSIS AND EVALUATION The analysis of bridges and structures is a mixture of science and engineering judgment. In most cases, use simple models with
Bridge Type Selection
Bridge Type Selection The major consideration for bridge type selection for bridges on the State Aid system is initial cost. Future maintenance costs, construction time, and location are considered when
KOSCIUSZKO BRIDGE PROJECT BRIDGE PRIMER
KOSCIUSZKO BRIDGE PROJECT BRIDGE PRIMER The New York State Department of Transportation (NYSDOT) is preparing an Environmental Impact Statement (EIS) to evaluate alternatives for the rehabilitation or
Brandangersundet Bridge A slender and light network arch
Brandangersundet Bridge A slender and light network arch Rolf Magne Larssen Dr. ing./ Ph.D. Dr. ing A. Aas-Jakobsen AS Oslo, Norway [email protected] Rolf Magne Larssen, born 1958, received his Ph.D. in structural
Structural Analysis of the Sutong Bridge Dorian Janjic
Structural Analysis of the Sutong Bridge Dorian Janjic Summary The SuTong cable-stayed bridge is the Primary Fairway Bridge of the Suzhou-Nantong Yangtze River Bridge Project. It will be the most important
Challenging Skew: Higgins Road Steel I-Girder Bridge over I-90 OTEC 2015 - October 27, 2015 Session 26
2014 HDR Architecture, 2014 2014 HDR, HDR, Inc., all all rights reserved. Challenging Skew: Higgins Road Steel I-Girder Bridge over I-90 OTEC 2015 - October 27, 2015 Session 26 Brandon Chavel, PhD, P.E.,
1,045 m length of the Deh Cho Bridge
Innovative Design Features: Lightweight truss: The principles of lightweight design led to a saving of 25% in the use of structural steel. State of the art deck system: Designed as a four-way slab, it
Bridging Your Innovations to Realities
Graphic User Interface Graphic User Interface Modeling Features Bridge Applications Segmental Bridges Cable Bridges Analysis Features Result Evaluation Design Features 02 07 13 17 28 34 43 48 2 User Interface
Analysis of the Interstate 10 Twin Bridge s Collapse During Hurricane Katrina
Analysis of the Interstate 0 Twin Bridge s Collapse During Hurricane Katrina By Genda Chen, Emitt C. Witt III, David Hoffman, Ronaldo Luna, and Adam Sevi The Interstate 0 Twin Span Bridge over Lake Pontchartrain
1.2 Advantages and Types of Prestressing
1.2 Advantages and Types of Prestressing This section covers the following topics. Definitions Advantages of Prestressing Limitations of Prestressing Types of Prestressing 1.2.1 Definitions The terms commonly
Railway Research and Technology in China Today
Railway Research and Technology in China Today Lan Wang China Academy of Railway Sciences 1 INTRODUCTION The railway as the backbone of integrative traffic transportation system in China is main artery
Reinforced Concrete Slab Design Using the Empirical Method
Reinforced Concrete Slab Design Using the Empirical Method BridgeSight Solutions for the AASHTO LRFD Bridge Design Specifications BridgeSight Software TM Creators of effective and reliable solutions for
SEISMIC UPGRADE OF OAK STREET BRIDGE WITH GFRP
13 th World Conference on Earthquake Engineering Vancouver, B.C., Canada August 1-6, 2004 Paper No. 3279 SEISMIC UPGRADE OF OAK STREET BRIDGE WITH GFRP Yuming DING 1, Bruce HAMERSLEY 2 SUMMARY Vancouver
TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE
TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE TECHNICAL SPECIFICATION PART 8000 - PRECAST CONCRETE TABLE OF CONTENTS Item Number Page 8100 PRECAST CONCRETE CONSTRUCTION - GENERAL 8-3 8101 General
The Follo Line Project
The Follo Line Project Longest. UrbAN. Complex. Faster. 2015/1 Norwegian National Rail Administration the follo line project 1 2 the follo line project The project The Follo Line Project is currently the
Remote Monitoring of Soil Pressures on Bridge Footings
More Info at Open Access Database www.ndt.net/?id=18252 Remote Monitoring of Soil Pressures on Bridge Footings Michael DAVIDSON 1, Zhihui ZHU 2, Issam HARIK 3, Charlie SUN 4, Kevin SANDEFUR 5 1 Bridge
Draft Table of Contents. Building Code Requirements for Structural Concrete and Commentary ACI 318-14
Draft Table of Contents Building Code Requirements for Structural Concrete and Commentary ACI 318-14 BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE (ACI 318 14) Chapter 1 General 1.1 Scope of ACI 318
9.3 Two-way Slabs (Part I)
9.3 Two-way Slabs (Part I) This section covers the following topics. Introduction Analysis and Design Features in Modeling and Analysis Distribution of Moments to Strips 9.3.1 Introduction The slabs are
Quality Control and Quality Assurance Guide
Quality Control and Quality Assurance Guide Bridge Division, Design Section October 2013 Table of Contents Chapter 1 About this Guide... 3 Chapter 2 Goals and Objectives... 5 Chapter 3 Participants...
(1) Minami Nagamachi and Naka Nagamachi viaducts between Shiraishi Zao and Sendai Stations on the Tohoku Shinkansen line
Report by the First Joint Survey Team of the JSCE Concrete and Structural Engineering Committees on the damage caused by the Great East Japan Earthquake April 5, 2011 (First Report) 1. Survey team members
The unit costs are based on the trend line of the 3 low bids for the average quantity.
Page 1 of 8 COST ESTIMATE GENERAL INSTRUCTIONS The unit costs are based on the trend line of the 3 low bids for the average quantity. Apply the Unit Costs to ordinary structures. Unit Costs should generally
New Troja Bridge in Prague Concept and Structural Analysis of Steel Parts
Available online at www.sciencedirect.com Procedia Engineering 00 (2012) 000 000 www.elsevier.com/locate/procedia Steel Structures and Bridges 2012 New Troja Bridge in Prague Concept and Structural Analysis
Source: Port Mann Bridge Plans Unveiled Today, CBC News, February 4, 2009.
Total project cost $2.5 billion (Canadian) Financed by tolls about $3 each direction. Total project length 37 km (McGill St in Vancouver to 216 th in Langley) The new Port Mann bridge 10 lanes (existing
Granger Bay Boulevard and Green Point Roundabout
Granger Bay Boulevard and Green Point Roundabout INTRODUCTION Aurecon was appointed for the design and construction supervision of the Granger Bay Boulevard and Green Point roundabout that provides access
The Rehabilitation Alternative Huey P. Long Bridge Case Study. Bruce E. Peterson, P.E. Project Manager Modjeski and Masters, Inc.
The Rehabilitation Alternative Huey P. Long Bridge Case Study Bruce E. Peterson, P.E. Project Manager Modjeski and Masters, Inc. March 22, 2010 Replacement vs. Rehabilitation Project Background Introduction
EXECUTIVE SUMMARY CHAPTER 6
EXECUTIVE SUMMARY CHAPTER 6 This Bridge Development Report was prepared to document the decision process and recommendations for constructing a bridge carrying Maitland Boulevard (eastbound) over I-4 as
Chapter Forty-seven. RURAL TWO-LANE/MULTILANE STATE HIGHWAYS (New Construction/Reconstruction) BUREAU OF DESIGN AND ENVIRONMENT MANUAL
Chapter Forty-seven RURAL TWO-LANE/MULTILANE STATE HIGHWAYS (New Construction/Reconstruction) BUREAU OF DESIGN AND ENVIRONMENT MANUAL Illinois RURAL TWO-LANE/MULTILANE STATE HIGHWAYS December 2009 2 Illinois
Peer Review Scope of Work
1.0 PROJECT OVERVIEW The St. Croix River Crossing Project has been developed in response to traffic congestion, operation deficiencies, safety concerns, and structural deficiencies of the Stillwater Lift
Statics of Structural Supports
Statics of Structural Supports TYPES OF FORCES External Forces actions of other bodies on the structure under consideration. Internal Forces forces and couples exerted on a member or portion of the structure
REPAIR AND RETROFIT OF BRIDGES DAMAGED BY THE 2010 CHILE MAULE EARTHQUAKE
Proceedings of the International Symposium on Engineering Lessons Learned from the 2011 Great East Japan Earthquake, March 1-4, 2012, Tokyo, Japan REPAIR AND RETROFIT OF BRIDGES DAMAGED BY THE 2010 CHILE
Evaluation and Field Load Testing of Timber Railroad Bridge
Transportation Research Record 1696 Paper No. 5B0112 323 Evaluation and Field Load Testing of Timber Railroad Bridge Terry J. Wipf, Michael A. Ritter, and Douglas L. Wood Several spans of a 60-year-old
CTCS Chinese Train Control System
CTCS Chinese Train Control System B. Ning, T. Tang, K. Qiu, C. Gao & Q. Wang Department of Control Engineering, School of Electronics and Information Engineering, Northern Jiaotong University, P. R. China
DESIGN OF PRESTRESSED BARRIER CABLE SYSTEMS
8601 North Black Canyon Highway Suite 103 Phoenix, AZ 8501 For Professionals Engaged in Post-Tensioning Design Issue 14 December 004 DESIGN OF PRESTRESSED BARRIER CABLE SYSTEMS by James D. Rogers 1 1.0
Cable-Stayed Bridge as an Alternative for Medium and Short Span Bridges
Cable-Stayed Bridge as an Alternative for Medium and Short Span Bridges Azita Azarnejad, CH2M HILL Ken McWhinnie, CH2M HILL Gamil Tadros, Speco Engineering Jiri Strasky, Jiri Strasky Consulting Engineer
APPENDIX H DESIGN CRITERIA FOR NCHRP 12-79 PROJECT NEW BRIDGE DESIGNS
APPENDIX H DESIGN CRITERIA FOR NCHRP 12-79 PROJECT NEW BRIDGE DESIGNS This appendix summarizes the criteria applied for the design of new hypothetical bridges considered in NCHRP 12-79 s Task 7 parametric
SECOND PENANG BRIDGE PROJECT
INTRODUCTION PROJECT PARTICULARS Jambatan Kedua (JKSB), a wholly-owned company of the Minister of Finance, Incorporated (MoF Inc.) was appointed as the concessionaire for the Second Penang Bridge Project
Structural Analysis of the Sutong Bridge
Structural Analysis of the Sutong Bridge Dorian Janjic VP Bridge Engineering Software Bentley Systems, Incorporated 685 Stockton Drive Exton, PA 19341 USA www.bentley.com/brim Summary The Sutong cable-stayed
Chapter 3 Pre-Installation, Foundations and Piers
Chapter 3 Pre-Installation, Foundations and Piers 3-1 Pre-Installation Establishes the minimum requirements for the siting, design, materials, access, and installation of manufactured dwellings, accessory
Index 20010 Series Prestressed Florida-I Beams (Rev. 07/12)
Index 20010 Series Prestressed Florida-I Beams (Rev. 07/12) Design Criteria AASHTO LRFD Bridge Design Specifications, 6th Edition; Structures Detailing Manual (SDM); Structures Design Guidelines (SDG)
3 Tappan Zee Bridge Rehabilitation Options
3 Tappan Zee Bridge Rehabilitation Options 3.1 Introduction This chapter describes possible options that rehabilitate and enhance the existing Tappan Zee Bridge. Four Rehabilitation Options have been developed:
CHAPTER 9 LONG TERM MONITORING AT THE ROUTE 351 BRIDGE
CHAPTER 9 LONG TERM MONITORING AT THE ROUTE 351 BRIDGE 9.1 INTRODUCTION An important reason that composite piles have not gained wide acceptance in the civil engineering practice is the lack of a long
Rehabilitation of the Red Bank Road Bridge over Hoover Reservoir. Presented By: Doug Stachler, P.E.
Rehabilitation of the Red Bank Road Bridge over Hoover Reservoir Presented By: Doug Stachler, P.E. Project Organization Owner Delaware County Engineers Office Design Consultant CH2M HILL Contractor Double
Structural Performance of Highway Bridges under Given Foundation Settlements
ASEE 2014 Zone I Conference, April 3-5, 2014, University of Bridgeport, Bridgeport, CT, USA. Structural Performance of Highway Bridges under Given Foundation Settlements Zhan Su*; Qian Wang, PhD, PE, Assistant
AISI CHEMICAL COMPOSITION LIMITS: Nonresulphurized Carbon Steels
AISI CHEMICAL COMPOSITION LIMITS: Nonresulphurized Carbon Steels AISI No. 1008 1010 1012 1015 1016 1017 1018 1019 1020 1021 1022 1023 1024 10 1026 1027 1029 10 1035 1036 1037 1038 1039 10 1041 1042 1043
How To Calculate Tunnel Longitudinal Structure
Calculation and Analysis of Tunnel Longitudinal Structure under Effect of Uneven Settlement of Weak Layer 1,2 Li Zhong, 2Chen Si-yang, 3Yan Pei-wu, 1Zhu Yan-peng School of Civil Engineering, Lanzhou University
3.1 Historical Considerations
3. Recommended Scope of Bridge improvements 3.1 Historical Considerations In the fall of 2000, an outside consultant, Fraser Design, suggested that the existing 4 th St. Bridge is potentially eligible
BNG CONSULTANTS / BNG VINA
Rev.07 BNG CONSULTANTS / BNG VINA Since 1996 2012 English BNG CONSULTANTS Co., Ltd. www.bng.co.kr Engineering - Design Review - On-site Technical Support - Construction Stage Analysis Construction Research
Department of Main Roads Chapter 22. Chapter 22. Bridges and Retaining Walls. June 2006 i
Chapter Bridges and Retaining Walls i Manual Contents Chapter 1 Framework of the Road Planning and Design Manual Chapter 2 Design Philosophy Chapter 3 Road Planning and Design Fundamentals Chapter 4 Application
Basic principles of steel structures. Dr. Xianzhong ZHAO [email protected]
Basic principles of steel structures Dr. Xianzhong ZHAO [email protected] 1 Lecture Questionnaire (1) Language preferred ( C = in Chinese, E = in English) NO. Oral Presentation Writing on the blackboard
After reading this lesson you will be able to: 12.3 IMPORTANCE OF ROOF 12.4 TYPES OF ROOF IN A HOUSE
86 :: Certificate in Construction Supervision (CIVIL) 12 ROOF 12.1 INTRODUCTION The structure provided to cover the house surface (floor) is known as roof. For different situation and requirement, it is
Informational Workshop Public Meeting Kanawha Falls Bridge Project
Informational Workshop Public Meeting Kanawha Falls Project WV Department of Transportation Division of Highways in Cooperation with the Federal Highway Administration State Project S310-13-0.02 00 Federal
Cable-Stayed Bridge Uses New Post-Tensioning System
Stretching over the Ohio River Cable-Stayed Bridge Uses New Post-Tensioning System By William B. Caroland, PE, and Jorge M. Suarez, PE Located approximately 2.8 miles downstream from the suspension bridge
SAFETY FENCES, SAFETY BARRIERS AND PEDESTRIAN GUARDRAILS
SERIES NG 400 SAFETY FENCES, SAFETY BARRIERS AND PEDESTRIAN GUARDRAILS Contents Clause Title Page NG 401 Performance Criteria for Safety Fences and Safety Barriers 2 NG 402 Components for Safety Fences
Virginia Approach Spans
Virginia Concrete Conference 2009 Woodrow Virginia Approach Spans David Tackoor, HNTB Formerly of URS Corp for Potomac Crossing Consultants Woodrow 1 Second Severn Crossing 2 Medway Crossing (Channel Tunnel
Risk - Based Inspection Frequencies
Risk - Based Inspection Frequencies Glenn A. Washer, PhD University of Missouri Columbia, MO April 23, 2013 Northwest Bridge Inspector s Conference 1 NCHRP 12-82 Developing Reliability Based Bridge Inspection
June 2007 CHAPTER 7 - CULVERTS 7.0 CHAPTER 7 - CULVERTS 7.1 GENERAL
7.0 7.1 GENERAL For the purpose of this manual, culverts are defined as structures that are completely surrounded by soil and located below the surface of the roadway parallel to the general direction
Scope of EN 1090-1 Clarification Document
Scope of EN 1090-1 Clarification Document This document has been submitted to the European Commission as the UK view on the scope of EN 1090-1. After discussions, including with the European Technical
GUIDELINES FOR UTILITY INSTALLATIONS Part 1 - Wire Lines and Communications Cables
Engineering Department SEPTEMBER, 2007 GUIDELINES FOR UTILITY INSTALLATIONS Part 1 - Wire Lines and Communications Cables General Requirements This section applies to all public and private utilities,
FOUNDATION DESIGN. Instructional Materials Complementing FEMA 451, Design Examples
FOUNDATION DESIGN Proportioning elements for: Transfer of seismic forces Strength and stiffness Shallow and deep foundations Elastic and plastic analysis Foundation Design 14-1 Load Path and Transfer to
INCREASE OF DURABILITY AND LIFETIME OF EXISTING BRIDGES. PIARC TC 4.4 EXPERIENCE.
INCREASE OF DURABILITY AND LIFETIME OF EXISTING BRIDGES. PIARC TC 4.4 EXPERIENCE. M.Sc. Gediminas Viršilas Head of Bridge Division, Lithuanian Road Administration Working group 2 of PIARC Technical Committee
BRIDGE RESTORATION AND LANDSLIDE CORRECTION USING STRUCTURAL PIER AND GRADE BEAM
BRIDGE RESTORATION AND LANDSLIDE CORRECTION USING STRUCTURAL PIER AND GRADE BEAM Swaminathan Srinivasan, P.E., M.ASCE H.C. Nutting/Terracon David Tomley, P.E., M.ASCE KZF Design Delivering Success for
ROTATED-ELLIPSE ARCH PEDESTRIAN BRIDGE FOR THE CALGARY WEST LIGHT RAIL TRANSIT EXTENSION PROJECT
ROTATED-ELLIPSE ARCH PEDESTRIAN BRIDGE FOR THE CALGARY WEST LIGHT RAIL TRANSIT EXTENSION PROJECT Edmund Ho, P.Eng. MMM Group Limited, Canada Monty Knaus, P.Eng. MMM Group Limited, Canada Paper prepared
A COMPUTER ANALYSIS OF THE VINCENT THOMAS SUSPENSION BRIDGE
A COMPUTER ANALYSIS OF THE VINCENT THOMAS SUSPENSION BRIDGE 81 Raymond W. Wolfe Hany J. Farran A COMPUTER ANALYSIS OF THE VINCENT THOMAS SUSPENSION BRIDGE Civil Engineering Civil Engineering Given the
Quality and the Bridge Engineer
Quality and the Bridge Engineer Shane R. Beabes, P.E. Rio-Antirio Bridge in Greece Joint ASHE / SEI General Meeting September 16, 2014 Introduction Agenda Quality Management System Client Requirements
Fifteen years experience of design, production and assembling of prestressed Bridge decks in Timber
Fifteen years experience of design, production and assembling of pre-stressed Bridge decks in Timber P. Jacobsson 1 Fifteen years experience of design, production and assembling of prestressed Bridge decks
INTRODUCTION TO BEAMS
CHAPTER Structural Steel Design LRFD Method INTRODUCTION TO BEAMS Third Edition A. J. Clark School of Engineering Department of Civil and Environmental Engineering Part II Structural Steel Design and Analysis
Technical Analysis and High-End Structural Design
Capability Statement (Infrastructure & Buildings) Services ABES provides design and sub-consulting services in Australia and internationally. We are able to provide our services in a wide range of applications
Engineers at Liftech designed the structure of the first container crane and have designed and reviewed thousands of container cranes since.
Engineers at Liftech designed the structure of the first container crane and have designed and reviewed thousands of container cranes since. Liftech is the structural review engineer of record for most
2015 ODOT Bridge Design Conference May 12, 2014. DeJong Rd Bridge High- Seismic Zone Case Study: Bridge Rehab vs. Replacement.
2015 ODOT Bridge Design Conference May 12, 2014 DeJong Rd Bridge High- Seismic Zone Case Study: Bridge Rehab vs. Replacement Mary Ann Triska 2015 HDR, all rights reserved. Presentation Outline Project
The Development of Practical Asset Management System for an Urban Expressway Network
The Development of Practical Asset Management System for an Urban Expressway Network Motohiko Nishibayashi, Hanshin Expressway Company Limited 1. Introduction Hanshin Expressway is an urban expressway
IH-635 MANAGED LANES PROJECT, SEG. 3.2
IH-635 MANAGED LANES PROJECT, SEG. 3.2 Location: Dallas, Texas Owner: Texas Department of Transportation Client: Ferrovial Agroman Construction Cost: $1 Billion Construction Completion Date: December,