TECHNICAL SPECIFICATION OF VARIOUS EARTH WIRES FOR TRANSMISSION LINES AND SUB STATIONS
|
|
|
- Katrina Page
- 9 years ago
- Views:
Transcription
1 GUJARAT ENERGY TRANSMISSION CORPORATION LTD. Sardar Patel Vidyut Bhavan, Race Course, Vadodara: TECHNICAL SPECIFICATION OF VARIOUS EARTH WIRES FOR TRANSMISSION LINES AND SUB STATIONS GETCO/E/TS EWR019/R1 DT. 01/03/2007 SEAL OF THE BIDDER Page 1 of 32
2 SPECIAL INSTRUCTIONS TO BIDDER Please read following instructions carefully before submitting your bid. 1. All the drawings, i.e. elevation, side view, plan, cross sectional view etc., in AutoCAD format and manuals in PDF format, for offered item shall be submitted. Also the hard copies as per specification shall be submitted. 2. The bidder shall submit Quality Assurance Plan for manufacturing process and Field Quality Plan with the technical bid. 3. The bidder shall have to submit all the required type test reports for the offered item. However, in the event of partial submission or reports older than specified limit, bidder must submit his confirmation for those type test report/s to be submitted in the event of an order, without affecting delivery schedule, before commencement of supply, free of cost. In absence of this confirmation, the evaluation shall be carried out accordingly as non submission of type test reports. 4. The bidder must fill up all the point of GTP for offered item/s. Instead of indicating refer drawing, or as per IS/IEC, the exact value/s must be filled in. 5. All the points other than GTP, which are asked to confirm in technical specifications must be submitted separately with the bid. 6. The bidder is required to impart training in view of manufacture, assembly, erection, operation and maintenance for offered item, at his works, to the person/s identified by GETCO, in the event of an order, free of cost. The cost of logistics will be bear by GETCO. 7. Please note that the evaluation will be carried out on the strength of content of bid only. No further correspondence will be made. 8. The bidder shall bring out all the technical deviation/s only at the specified annexure. 9. The bidder should indicate manufacturing capacity by submitting latest updated certificate of a Chartered Engineer (CE). SEAL OF THE BIDDER Page 2 of 32
3 QUALIFYING REQUIREMENT DATA (For Supply) Bidder to satisfy all the following requirements. 1) The bidder shall be Original Equipment Manufacturer (OEM). The offered equipment have to be designed, manufactured and tested as per relevant IS/IEC with latest amendments. 2) The minimum requirement of manufacturing capacity of offered type, size and rating of equipment shall be 7 times tender / bid quantity. The bidder should indicate manufacturing capacity by submitting latest updated certificate of a Chartered Engineer (CE). 3) Equipment proposed shall be of similar or higher rating and in service for a minimum period of THREE (3) years and satisfactory performance certificate in respect of this is to be available and submitted. 4) The bidder should clearly indicate the quantity and Single Value Contract executed during last FIVE (5) years, for the offered equipment. Bidder should have executed one single contract during last five years for the quantity equivalent to tender / bid. The details are to be submitted in following format, Sr. No ITEMS SUPPLIED TO ORDER REFERENC E No. & DATE ITEM S QUANTI TY ORDER FULLY EXECUTE D. YES/NO STATUS, IF ORDER UNDER EXECUTI ON REMARK 5) Equipment offered shall have Type Test Certificates from accredited laboratory (accredited based on ISO/IEC Guide 25 / or EN by the National accredition body of the country where laboratory is located), as per IEC / IS / technical specification, Type test reports shall not be older than FIVE years and shall be valid up to the expiry of the validity of the offer. SEAL OF THE BIDDER Page 3 of 32
4 TECHNICAL SPECIFICATION FOR VARIOUS EARTH WIRES CONTENTS Clause No. Title Page No. SECTION I 1.0 Scope Standards Climatic conditions Principal Parameters General Technical Requirements Tests Inspection Quality Assurance Plan Documentation Packing and Forwarding Marking Quantity and Delivery Requirement Drawings Deviations 20 ANNEXURES I Electrical System Data 21 II Test Procedures 22 SCHEDULE Guaranteed Technical Particulars 26 SCHEDULE- A GTP For 7/ SCHEDULE B GTP For 7/ (This document is meant for exclusive purpose of bidding against this specification and shall not be transferred, reproduced or otherwise used for purposes other than that for which it is specifically issued.) SEAL OF THE BIDDER Page 4 of 32
5 1.0 SCOPE TECHNICAL SPECIFICATION FOR EARTH WIRES 1.1 This specification provides for design, manufacture, testing, inspection, packing and dispatch, to destination of Steel Cored Earth wire, of sizes 7/3.66 &7/3.15, specified herein for their satisfactory operation in various lines of various ratings and substations of the Gujarat State. The Earth wire shall be hot dip galvanized. 1.2 The Earth wire is to be used as Earth wire on single circuit and / or double circuit transmission lines of various ratings and / or sub-stations of the purchaser for protection of steel structures, equipment, etc. or the substations from lightning strokes, various types of faults, etc. 2.0 STANDARDS 2.1 The Earth wires shall conform to the following Indian / International Standards, which shall mean latest revisions, amendments / changes adopted and / or published as on the date of opening of the Tender. The list below gives only a few of the applicable Standards. Sr. Indian No. Standards 1 IS : IS : Title Specification BS: 3436 for zinc Hot dipped galvanized stay strand. International Standards Sr. No. Indian Standards Title International Standards 3 IS : 1521 Method of Ten-ISO / R 89 site testing of steel wire. 4 IS : 2629 Recommended practice for Hot dip galvanizing of Iron and Steel. 5 IS : 2633 Method of Testing uniformity of coating of Zinc coated articles. 6 IS : 4826 Galvanized coating on round steel wire. ASTM A BS : IS : 6745 Methods of determination of weight of zinc BS : 443 SEAL OF THE BIDDER Page 5 of 32
6 coating of zinc coated iron and steel articles. 8 IS : For Earth wire, Testing Of Earth wire 9 IS : 398 Testing Part IS : 1778 Wooden Drums 2.2 However, in an event where the supplier offers Earth wire conforming to standards other than the above, then the salient points of comparison between the standards adopted and the standards quoted herein shall be detailed in relevant schedule with an authenticated English version of such standards referred to. 3.0 CLIMATIC CONDITIONS i) Location : In the State of Gujarat As per Annexure-I. ii) Maximum Ambient Air Temperature. C. : 50 iii) Minimum Ambient Air Temperature. C. : 0 iv) Average daily ambient Air Temperature C. : 35 v) Maximum relative humidity. - % : 95 vi) Average rainfall per annum.(mm) : 1150 vii) Maximum altitude above mean sea level Mtrs : 1000 SEAL OF THE BIDDER Page 6 of 32
7 viii) Ceraunic level i.e. Average number of Thunder storm - Days/annum : 15 ix) Maximum wind pressure.(kg/sq. meters) : 200 Seismic level i.e. Earthquake Acceleration a) Horizontal Seismic Co-efficient (Acceleration) g (Zone 5) : 0.08 b) Vertical Seismic Co-efficient (Acceleration) g (Zone 5) : PRINCIPAL PARAMETERS The details of wires are tabulated below: - Sr. No Description Steel Earthwire 7/3.66 Earthwire 7/3.15 1) Number Of Strands 7 7 Nos. 2) Diameter Of Strand mm. I) Strands a) Nominal b) Maximum c) Minimum II) Overall Of Earth wire 3) Cross Sectional Area Of Sq. mm. a) Earth wire b) Each Strand 4) Laying Of Strands Nos. a) Center b) First Layer 5) Weight (Excl. Wt. Of Grease) Kg / Km. a) Earth wire b) Strand (At SEAL OF THE BIDDER Page 7 of 32
8 Nominal Dia.) 6) Maximum d.c. resistance in ohm, per km of the galvanized steel earth strand at 20ºC 7) Ultimate Tensile Strength Earth wire - KN a) Minimum tensile strength of strand (before stranding)n/mm.sq. b) Minimum tensile strength of strand (after stranding)n/mm.sq ) Modulus of Elasticity Kg / Sq. mm. 9) Coefficient of linear expansion - per deg. C. 10) Chemical Composition - % a) Carbon b) Manganese c) Phosphorous d) Sulphur e) Silicon 1.9 X 10^4 1.9 X 10^4 11.5x10^ Max x 0.05 Max Max ) Zinc Purity - % x10^-6 13) Length Of Lays a) First Layer i) Maximum ii) Minimum ) Elongation (Minimum) - % Before stranding 15) Oil treatment Boiled Linseed Oil SEAL OF THE BIDDER Page 8 of Boiled Linseed Oil
9 5.0 GENERAL TECHNICAL REQUIREMENT 5.1 The Earth wire shall be suitable for being installed directly in air supported on suspension clamps (hardware) or anchored through tension clamps (hardware) at the power cross arms of single circuit, double circuit or multi circuit transmission line towers. 5.2 The Earth wire shall therefore be suitable for satisfactory operation under the tropical climatic conditions listed in the relevant clause. The applicable design particulars of the Earth wire to be used on these lines is furnished in Annexure - II. "System Particulars". 5.3 Physical constants for Galvanised steel wires Density At a temperature of 20 C, the density of galvanised steel wire is to be taken as 7.80 g/cm Co-efficient of Linear Expansion In order to obtain uniformity in calculations a value of 11.5 x 10-6 Per C may be taken as the value for the co-efficient of Linear Expansion of galvanised steel wires used for the cores of steel-reinforced aluminium conductors. 5.4 Materials Galvanised steel wire shall be drawn from high carbon steel rods produced by either acidic or basic open Earth process, electric furnace process or basic oxygen process. All the properties of the steel strands and wires shall confirm to the relevant standards The Zinc used for galvanising shall be electrolytic high grade Zinc not less than percent purity. It shall conform to and satisfy all the requirements of relevant ISS, BSS or other Standards to be specified with the due justification. Galvanising has to be done by hot dip galvanising process. Neutral grease may be applied between the layers of wires, however the weight of the same shall be specified and added to the total weight of the conductor. SEAL OF THE BIDDER Page 9 of 32
10 5.4.3 The bidder should specify the source of raw materials along with the proof of last purchases made. The GETCO may reject the tender of the Bidders whose raw material suppliers are found to be supplying any poor quality or Non standard materials, to the GETCO or any other purchaser The galvanised Earth wire after stranding operation shall be dipped in boiled linseed oil before winding it on the drum. 5.5 Freedom From Defects The wires shall be smooth and free from all imperfections such as spills, splits, slag inclusion, die marks, scratches, fittings, blow-holes, projections, looseness, overlapping of strands, chipping of layers etc. and all such other defects which may hamper the mechanical & electrical properties of the Earth wire and also the installation of the Earth wire at the site etc. Special care should be taken to keep away dirt, grit etc. during stranding. 5.6 Wire Sizes Nominal Size and Tolerances The galvanised steel wires for the stranded Earth wire covered by this standard shall have diameters specified in the clause above and shall be within the tolerances indicated therein. The diameter of the steel wires shall be measured over the zinc coating. 5.7 Joints In Wires Galvanised steel wires There shall be no joints except those in the base rod or wire before final drawing, in steel wires forming the Earth wire. 5.8 Stranding The wires used in the construction of Earth wire before and after stranding shall satisfy all the relevant requirements as per the standards indicated or any other standards with due justification The zinc used for galvanising shall be electrolytic high grade Zinc. It shall conform to and satisfy all the requirements of relevant standards indicated or any other standards with due justification. Galvanising shall be done by SEAL OF THE BIDDER Page 10 of 32
11 hot dip galvanising process. Neutral grease should be applied between the layers of wires The lay ratio of the different layers shall be within the limits given in Table above In all constructions, the successive layers shall have opposite directions of lay, the outermost layer being right-handed. The wires in each layer shall be evenly and closely stranded. 5.9 Standard Length The standard length of the earth wire shall be 2000-meter. A tolerance of +/-5% on the standard length shall be permitted. All lengths outside this limit of tolerance shall be treated as random lengths Random lengths will be accepted provided no length is less than 95% of the standard length specified and the total quantity of such random lengths shall not be more than 5% of the total quantity ordered Bidder shall also indicate the maximum single length, above the standard length, he can manufacture in the guaranteed technical particulars. This is required for special stretches like river crossing etc. The purchaser reserves the right to place orders for the above length to the extent of 50% of the total ordered quantity on the same terms and conditions applicable for the standard and special lengths during the tendency of the contract For specification of standard length mentioned in the above clause may be specified as under for Earth wire of sizes 7/3.66 and 7/3.15: Sr. No. Type of wire Standard length in Meter 1 Earth wires of various sizes * + 5% + 5% Tolerance. (*) For river crossings, special locations, if any. SEAL OF THE BIDDER Page 11 of 32
12 6.0 TESTS : 6.1 The type, acceptance, routine tests, tests any specifically demanded by the GETCO and tests during manufacture shall be carried out on the Earth wire free of cost Type tests shall mean those tests, which are to be carried out to prove the Process of manufacture and general conformity of the material to this Specification. These tests shall be carried out on samples prior to commencement of commercial production against the order. The supplier shall indicate his schedule for carrying out these tests in the activity schedule. These tests shall have to be carried out at the Government approved testing laboratory only in presence of GETCO s representative. GETCO reserves rights to specify the name of laboratory also, if so felt Acceptance Tests shall mean those tests, which are to be carried out on samples taken from each lot offered for pre-dispatch inspection, for the purposes of acceptance of that lot (all the coils of the galvanised steel stranded Earth wire which are of the same grade, diameter and construction and are manufactured under similar condition in a single group and / or at a time from the same lot of raw materials, shall mean the lot). These tests shall be carried out at the manufacturers works in presence of GETCO s representative before the dispatch of the materials to the site Routine tests shall mean those tests, which are to be carried out on each strand/spool/length of the Earth wire, continuously, to check requirements which are likely to vary during production. These tests shall be carried out by the manufacturer on each drum and shall have to furnish the reports to the GETCO s representative during his visit for acceptance tests Tests during manufacture shall mean those tests, which are to be carried out during the process of manufacture and end inspection by the supplier to ensure the desired quality of the end product to be supplied by him One sample from each of the lot offered for the acceptance test shall be taken and chemical analysis shall be carried out. The contents and values of the various contents shall be as specified in this specification. SEAL OF THE BIDDER Page 12 of 32
13 6.1.6 Samples for individual wires for tests shall be taken before stranding from not less than ten percent of the coils of steel wires. If samples are taken after stranding, they shall be obtained by cutting 1.2 meters from the outer end or inner end of the finished conductor from not more than ten percent of the finished reels The standards to which these tests will be carried out are listed against them. Where a particular test is a specific requirement of this specification, the norms and procedures of the test shall be as specified in Annexure-II or as mutually agreed to between the supplier and the purchaser in the Quality Assurance Programme For all type and acceptance tests, the acceptance values shall be the values guaranteed by the Bidder in the "Guaranteed Technical Particulars ", of his proposal or the acceptance value specified in this specification, whichever is more stringent for that particular test. 7.0 Type Tests Bidder shall submit the following Type test reports as per IS (Gr.-1100) along with Technical Bid. ON EARTH WIRE: i) Ultimate Tensile Strength on Individual Wire after stranding ii)measurement of Diameter of Wire (Cl.6.1) iii) Breaking Load of Strand Wire (Cl. 8.1) iv) Percentage Elongation Test on Individual Wire after stranding (Cl. 8.2) v) Galvanizing test (Cl. 8.5) a) Weight of Zinc coating b) Uniformity of Zinc coating vi) Wrapping Test after stranding (Cl. 8.4) vii) Chemical composition test (Cl. 4.1) a) Carbon b) Maganese(Mn) c) Silicon(Si) d) Phosphurous(P) e) Sulphur(S) viii) DC Electrical Resistance test (Cl. 8.3) ix) Torsion test after stranding (Cl. 8.6) x) Lay length & lay direction SEAL OF THE BIDDER Page 13 of 32
14 7.1.2 For the following type tests, the supplier shall offer at least three drums for selection of samples. a) UTS test on Stranded Wire : As per Annexure-II b) DC resistance test on stranded wire : --- do --- c) Ductility Test (After Stranding) : --- do --- d) Coating Test : --- do Acceptance Tests a) Visual and dimensional check on drum As per Relevant IS with latest Amendment and Annexure b) Visual check for joints, scratches etc. and - D O - lengths of Earth wire c) Dimensional check - D O - d) Check for lay ratio of various layers. - D O - e) Galvanising test on steel strands - D O - f) Torsion and elongation test on steel strands - D O - g) Breaking load test on steel strands. - D O - h) Wrap test on steel strands. - D O - i) DC resistance test on strands - D O - j) UTS test on welded joint of steel rod. - D O - k) Chemical Analysis - D O - Note : All the above test shall be carried out on steel strands after stranding only. 7.3 Routine tests a) Checks ensure that the joints are as per specifications. b) Check that there are no cuts, fins etc. on the strands. c) Check that drums are as per specification. d) All acceptance tests as mentioned in Clause 7.3 above shall be carried out on each coil. 7.4 Test During Manufacture a) Chemical analysis of Zinc used for galvanising c) Chemical analysis of steel used for making steel strands. As per Relevant IS with latest Amendment and Annexure - D O - SEAL OF THE BIDDER Page 14 of 32
15 7.5 Testing Charges The testing charges for the type tests specified and as per relevant IS shall be borne by the bidder. All the suppliers irrespective of quantity allotted to them, and time when they have earlier carried out the Type Test, will have to carry out the Type Tests at their own cost at the Govt. approved NABL laboratory and GETCO will not have any bearing on this account In case of failure in any of the type test/s, the supplier is either required to modify the design of the material or repeat the particular type test three times successfully at his own expenses. The decision of the owner in this regard shall be final and binding. The GETCO at its own desecration may also cancel the order at the risk and cost of the contractor Bidder shall indicate the laboratories in which they proposed to conduct the Type tests. They shall ensure that the tests can be completed in these laboratories within the time schedule guaranteed by them in the appropriate schedule. GETCO reserves the right to specify the name of the laboratory also, if so felt The entire cost of testing for the acceptance and routine tests and tests during manufacture specified herein shall be treated as included in the quoted unit price of conductor. 7.6 Additional Tests The GETCO reserves the right of getting done any other test(s) of reasonable nature carried out at Supplier's premises, at site, or in any other place in addition to the aforesaid type, acceptance and routine tests to satisfy himself that the material comply with the specifications. In such case all the expenses will be to Suppliers account. 7.7 Sample Batch For Type Testing The Supplier shall offer at least three (3) drums for selection of samples required for conducting all the type tests as mentioned in Clause The Supplier is required to carry out all the acceptance tests successfully in the presence of Purchaser's representative before dispatch of the selected sample to the testing laboratory for type test.. SEAL OF THE BIDDER Page 15 of 32
16 7.8 Test Reports Type test reports shall be furnished in at least two (2) copies along with one original. One copy shall be returned duly certified by the Purchaser only, after which the material already inspected i.e. the materials manufactured for selection of sample for type test, shall be dispatched on receipt of Dispatch Instructions from the Chief Engineer (Project) Record of routine test reports shall be maintained by the Supplier at his works for periodic inspection by the purchasers representative Test Certificates of test during manufacture shall be maintained by the Supplier. These shall be produced for verification as and when desired by the Purchaser. 7.9 Test Facilities The following additional facilities shall be available at Supplier's works: - a) Calibration Reports from Government approved testing laboratory of various testing and measuring equipment including tensile testing machine, resistance measurement facilities, burette, thermometer, barometer etc. b) Standard resistance for calibration of resistance bridges. c) Finished Earth wire shall be checked for length verification and surface finish on separate rewinding machine at reduced speed (variable from 8 to16 meters per minute). The rewinding facilities shall have appropriate clutch system and free of vibrations, jerks etc. with transverse layering facilities. d) The bidder should have all the routine and acceptance testing facilities, in house. 8.0 INSPECTION 8.1 The Purchaser's representative shall at all times be entitled to have access to the works and all places of manufacture where Earth wire shall be manufactured and the representative shall have full facilities for unrestricted inspection of the Suppliers works raw materials and process of manufacture and conducting necessary tests as may be deemed fit, for certifying the quality of product. SEAL OF THE BIDDER Page 16 of 32
17 8.2 The Supplier shall keep the Purchaser informed in advance of the time of starting and of the progress of manufacture of Earth wire in its various stages so that arrangements can be made for inspection. 8.3 No material shall be dispatched from its point of manufacture before it has been satisfactorily inspected, tested, and necessary dispatch instructions are issued in writing, except for the cases where waiver of inspection is granted by competent authority of the GETCO, and even in this case also written dispatch instructions will be issued. Any dispatches before the issue of Dispatch Instructions in writing will be liable for rejection and nonacceptance by the consignee. 8.4 The acceptance of any quantity of material shall in no way relieve the Supplier of any of his responsibilities for meeting all requirements of the specification, and shall not prevent subsequent rejection if such material is later found to be defective. 8.5 At least 5% of the total number of drums subject to minimum of two in any lot put up for inspection, shall be selected at random to ascertain the length of wire by following method: "At the works of the manufacturer of the Earth wire, the Earth wire shall be transferred from one drum to another at the same time measuring its length with the help of a graduated pulley & Cyclometer. The difference in the average length thus obtained and as declared by the Supplier in the packing list shall be applied to all the drums if the Earth wire is found short during checking." 8.6 The sample cut of from any numbers of drums for carrying out any type of tests will be to the suppliers account. 9.0 QUALITY ASSURANCE PLAN 9.1 The bidder shall invariably furnish following information along with his offer, failing which his offer shall be rejected. i) Statement giving list of important raw materials names of sub suppliers for the raw materials, list of standards according to which the raw aterials are tested, list of tests normally carried out on raw materials in presence of supplier's representative and as routine and / or acceptance during production and on finished goods, copies of test certificates. SEAL OF THE BIDDER Page 17 of 32
18 ii) iii) Information and copies of test certificates as in (i) above in respect of bought out accessories. List of manufacturing facilities available. iv) Level of automation achieved and list of areas where manual processing exists. v) List of areas in manufacturing process, where stage inspections are normally carried out for quality control and details of such tests and inspections. vi) vii) List of testing equipment available with the Supplier for final testing of wire specified. In the case if the suppliers does not possess all the Routine and Acceptance testing facilities the tender will be rejected. The GETCO reserves the right for factory inspection to verify the facts quoted in the offer. If any of the facts are found to be misleading or incorrect the offer of that Bidder will be out rightly rejected and he may be black listed. viii) Special features provided to make it maintenance free. 9.2 The bidder shall also submit following information to the purchaser along with the technical Bid.. i) List of raw materials as well as bought out accessories, and the name of suppliers of raw materials as well as bought out accessories. ii) iii) Type test certificates of the raw material and bought out accessories. Quality assurance plan (QAP) with hold points for purchaser's inspection. 9.3 The Supplier shall submit the routine test certificates of all the bought out items, accessories etc DOCUMENTATION 10.1 Two sets of type test reports, duly approved by the Purchaser shall be submitted by the Supplier, before commencement of supply. A copy of SEAL OF THE BIDDER Page 18 of 32
19 acceptance and routine test certificates, duly approved by the purchaser shall accompany the dispatch consignment The manufacturing of the earth wire wire only shall be strictly in accordance with the GTP/approved drawings and no deviation shall be permitted without the written approval of the Purchaser. All manufacturing and fabrication works in connection with the conductor prior to the approval of the drawing shall be at supplier's risk Approval of drawing etc. by the purchaser shall not relieve the Supplier of his responsibility and liability for ensuring correctness and correct interpretation of the latest revision of applicable standards, rules and codes of practices. The earth wire shall conform in all respects to high standards of engineering, design, workmanship and latest revisions of relevant standards at the time of ordering and purchaser shall have the power to reject any work or material which in his judgment is not in full accordance therewith PACKING & FORWARDING 11.1 The Earth wire shall be supplied in non-returnable strong wooden drums provided with lagging of adequate strength, and displacement during transit, storage and subsequent handling and stringing operations in the field. The drums shall generally confirm to IS: except otherwise specified hereinafter The drums shall be suitable for wheel mounting and for jetting off the Earth wire under a minimum controlled tension of the order of 5 kn The bidder should submit the proposed drum drawings along with the bid. However, the same shall be in line with the requirements as stated herein. After placement of the Letter of Award, the Supplier shall submit four copies of fully dimensioned drawing of the drum, for Purchaser's approval before taking up manufacturing of earth wire and or drums. After getting approval from the Purchaser, Supplier shall submit 6 more copies of the approved drawing to Purchaser for further distribution and field use at Purchaser's end All wooden components shall be manufactured out of seasoned soft wood free from defects that may materially weaken the component parts of the drums. Preservative treatment for anti-termite/anti-fungus (Aldrime / Aldruse) etc. shall be applied to the entire drum with preservatives of a quality which is not harmful to the Earth wire or to the persons using or storing the same. SEAL OF THE BIDDER Page 19 of 32
20 11.5 The flanges shall be of three-ply construction with each ply at right angles to the other and nailed together. The nails shall be driven from the inside face flange, punched and then clenched on the outer face. The tolerance in thickness of each ply shall be +3 mm only. There shall be at least 3 nails per plank of ply with maximum nail spacing of 75 mm. Where a slot is cut in the flange to receive the inner end of the earth wire, the entrance shall be in the line with the periphery of the barrel The wooden battens used for making the barrel of the Earth wire shall be of Segmental type. These shall be nailed to the barrel supports with at least Two Nails. The battens shall be closely butted and shall provide a round Barrel ith smooth external surface. The edges of the battens shall be rounded Or hamfered to avoid damage to the Earth wire Barrel studs shall be used for construction of drums. The flanges shall be holed and the barrel supports slotted to receive them. The barrel studs shall be threaded over a length on either end, sufficient to accommodate washers, spindle plates and nuts for fixing flanges at the required spacing. Barrel studs should be tack welded with the nuts after tightening Normally, the nuts on the studs shall stand proud of the flanges. All the nails used on the inner surface of the flanges and the drum barrel shall be countersunk. The ends of barrel shall generally be flushed with the top of the nuts The complete drum including inner cheek of the flanges and drum barrel surface shall be painted with bitumen based paint Before reeling, card board or double corrugated or thick bituminised waterproof bamboo paper shall be secured to the drum barrel and inside of flanges or the drum by means of a suitable commercial adhesive material. The paper should be dried before use. Medium grade Kraft paper shall be used in between the layers of the Earth wire. After reeling the Earth wire, the exposed surface of the outer layer of Earth wire shall be wrapped with thin polythene sheet across the flanges to preserve the Earth wire from dirt, grit and damage during transportation and handling and also to prevent ingress of rain water during storage / transport A minimum space of 125 mm shall be provided between the inner surface of the external protective layer and outer layer of the 7/3.66 Earth wire, however 75 mm shall be acceptable for all other Earth wires. SEAL OF THE BIDDER Page 20 of 32
21 11.12 Each batten shall be securely nailed across grains as far as possible to the Flange edges with at least 2 nails per end. The length of the nails shall not be less than twice the thickness of the battens. The nail shall not protrude Above the general surface and shall not have exposed sharp edges or allow the battens to be released due to corrosion Outside the protective layer, there shall be minimum of two binder consisting of hoop iron/galvanised steel wire. Each protective layer shall have two recess to accommodate the binders The Earth wire ends shall be properly sealed and secured with the help of U-nails on one side of the flanges. The end securing shall be done by taking out at least 500 mm. of steel core on either ends and sealing it with U-nails Wire at three locations at the most 75 mm apart or less covered with PVC adhesive tape so as to avoid loosening of layers in transit and handling Only one length of Earth wire shall be wound on each drum. Earth/Stay wire Length 1 7/ % % 2 7/ % % Drum Size Flange Dia (A) Barral Dia (B) Travers (W) Noof Rod Thickness (T) Drawing to be submitted as per requirement = = 150 Drawing to be submitted as per requirement = = If any bidder wishes to supply the Earth wire in the steel drums the same will be acceptable, however free of cost Marking Each drum shall have the following information stenciled on it in indelible ink along with other essential data: a) Contract/Award letter / order number b) Name and address of consignee c) Manufacturer's name and address d) Drum Number e) Size of Earth wire SEAL OF THE BIDDER Page 21 of 32
22 f) Length of Earth wire in meters g) Gross weight of drum with Earth wire h) Weight of empty drum with lagging i) Arrow marking for unwinding DRAWINGS 13.1 All the bidders have to submit the drawings for the drums to be utilized for packing of the Earth wire, for the lengths specified in this Tender Specification All the bidders have to submit the Sectional view drawings for the Earth wire DEVIATIONS 14.1 Any deviation to this tender Specification will be out rightly rejected. All the Bidders have to submit this specification duly authenticated without any alterations, additions etc. on each page along with the Technical Bid. Any offer without this will be out rightly rejected. SEAL OF THE BIDDER Page 22 of 32
23 A) Electrical System Data : ANNEXURE-I SYSTEM PARTICULARS 7/3.66 7/3.15 a) System Voltage (KV rms) /132/66 b) Max. Voltage KV rms) /145/72.5 c) Lightning impulse withstand voltage (dry & /650/ 350 wet) (KVP) d) Power Frequency withstand voltage (wet) (KV /275/140 rms) e) Short circuit level (KA) 40 40/40/25 f) Switching Surge withstand voltage (wet) KVP g) Frequency Hz I) Normal II) Maximum III) Minimum h) Number Of Circuits Single / Double i) Normal Span m /300/260 j) Wind Span m /330/285 k) Weight Span m I) Maximum II) Minimum l) Factor Of Safety (At Every Day Temp. & No Wind) /450/ /-100/ SEAL OF THE BIDDER Page 23 of 32
24 ANNEXURE - II TEST PROCEDURES (EARTH WIRE) 1.0 UTS TEST ON STRANDED EARTHWIRE Circles perpendicular to the axis of the Earth wire shall be marked at two places on a sample of Earth wire of minimum 5 m length suitably compressed with dead end clamps at either end. The load shall be increased at a steady rate up to 50% of the UTS and held for one minute, the circles drawn shall not be distorted due to Relative movement of strands. Thereafter the load shall be increased at a steady rate to 100% of the UTS and held for one minute. The applied load shall then be increased until the failing load is reached and the value recorded. 2.0 RESISTANCE TEST ON STRANDED EARTHWIRE On Earth wire sample of minimum 5m length two contact clamps shall be fixed with a pre-determined bolt torque. The resistance shall be measured by a kelvin double bridge by placing the clamps initially at zero meter and subsequently one meter apart. The test shall be repeated at least five times and the average value shall be recorded. The value obtained shall be corrected to the value at 20 deg. C as per Clause No of IS : / 1989, read with the latest amendment. The resistance corrected at 20 deg. C shall conform to the requirements of this specification. 3.0 CHEMICAL ANALYSIS OF ZINC Samples taken from the zinc ingots shall be chemically / spectrographically analysed. The same shall be in conformity to the requirements stated in this specification. 4.0 CHEMICAL ANALYSIS OF STEEL Samples taken from the steel ingots/coils/strands shall be chemically / spectrographically analysed. The same shall be in conformity to the requirements stated in this specification. 5.0 VISUAL AND DIMENSIONAL CHECK ON DRUMS SEAL OF THE BIDDER Page 24 of 32
25 The drums shall visually and dimensionally checked to ensure that they conform to the requirements of this specification. 6.0 VISUAL CHECK FOR JOINTS, SCRATCHES ETC. Earth wire drums shall be rewound in the presence of the inspecting officer. The inspector shall visually check the scratches, joints, etc. and that the Earth/Stay wire generally conform to the requirements of the specification. 7.0 DIMENSIONAL CHECK OF STEEL STRANDS The individual strands shall be dimensionally checked to ensure that they conform to the requirements to this specification. 8.0 CHECK FOR LAY-RATIOS OF OUTER LAYER The lay-ratios of outer layer shall be checked to ensure that they conform to the requirements of this specification. SEAL OF THE BIDDER Page 25 of 32
26 9.0 GALVANISING TEST The test Procedure shall be as specified in relevant IS. The material shall conform to the requirements of this specification TORSION AND ELONGATION TESTS ON STEEL STRANDS The test procedures shall be as per the relevant IS In torsion test, the number of compete twists before fracture shall not be less than 18 on a length equal to 100 times the standard diameter of the strand. In case test sample length is less or more than 100 times the standard diameter of the strand, the minimum number of twist will be proportionate to the length and if number comes in the fraction then it will be rounded off to next higher whole number. In elongation test, the elongation of the strand shall not be less than 4% for a gauge length of 200 mm. SEAL OF THE BIDDER Page 26 of 32
27 GUJARAT ENERGY TRANSMISSION CORPORATION LTD. Sardar Patel Vidyut Bhavan, Race Course, Vadodara : GUARANTEED TECHNICAL PARTICULARS FOR EARTHWIRE SEAL OF THE BIDDER Page 27 of 32
28 SCHEDULE - A GURANTEED TECHNICAL PARTICULARS OF 7/3.66 EarthWire The Guaranteed Technical particulars furnished below shall be duly attested by the Bidder. Any correction / alterations in this GTP will lead to out right rejection of the Bid. Sr. Description No 1) Number Of Strands Nos. 7 2) Diameter Of Strand mm. I) Strands a) Nominal b) Maximum c) Minimum II) Overall Of Earthwire 3) Cross Sectional Area Of Sq. mm. a) Total b) Each Strand 4) Laying Of Strands Nos. c) Center b) First Layer 5) Weight (Excl. Wt. Of Grease) Kg / Km. a) Whole Earthwire b) Stand (At Nominal Dia.) 6) Ultimate Tensile Strength Earth wire - KN a) Minimum tensile strength of strand (before stranding)n/mm.sq. b) Minimum tensile strength of strand (after stranding)n/mm.sq. Steel ) Modulus of Elasticity Kg / Sq. Cm X 10^4 8) Coefficient of linear expansion - per deg. C. 11.5x10^-6 9) Chemical Composition - % f) Carbon 0.55 Max. g) Manganese h) Phosphorous Max SEAL OF THE BIDDER Page 28 of 32
29 i) Sulphur Max j) Silicon ) Zinc a) Purity - % i) Zinc Min ii) Lead Max iii) Cadmium Max iv) Iron Max v) Total Impurities 0.05Max b) Quality 99.95% pure 11) Length Of Lays a) First Layer i) Maximum ii)minimum ) Joint Not Allowed 13) Standard Length Mtrs ) Oil Treatment Boiled Linseed Oil 15) Weight Of Zinc Coating Gm / Sq. Mtr. a) Before Stranding b) After Stranding ) Galvanising Process Hot Dip 17) Elongation (Minimum After Stranding) - % 4 18) Maximum d.c. resistance in ohm, per km of the galvanized steel earth strand at 20ºC ) Drawings Of Drum (With All Details) 3 Ply as per GETCO spec. 20) Details of Manufacturers of Steel Wire Rods To be submitted by Bidder 21) Standard Drum Length Mtr. a) Normal b) Special River Crossing Etc SEAL OF THE BIDDER Page 29 of 32
30 Signature of the Bidder : Name : Designation : Date : Authorised common rubber Stamp / seal of the bidder : SEAL OF THE BIDDER Page 30 of 32
31 SCHEDULE - B GURANTEED TECHNICAL PARTICULARS OF 7/3.15 Earthwire The Guaranteed Technical particulars furnished below shall be duly attested by the Bidder. Any correction / alterations in this GTP will lead to out right rejection of the Bid. Sr.No Description Steel 1) Number Of Strands Nos. 7 2) Diameter Of Strand mm. I) Strands a) Nominal b) Maximum c) Minimum II) Overall Of Earth wire ) Cross Sectional Area Of Sq. mm. a) Total b) Each Strand 4) Laying Of Strands Nos. a) Center b) First Layer 5) Weight (Excl. Wt. Of Grease) Kg / Km. a) Whole Earth wire b) Stand (At Nominal Dia.) 6) Ultimate Tensile Strength Earth wire - KN a) Minimum tensile strength of strand (before stranding)n/mm.sq. b) Minimum tensile strength of strand (after stranding)n/mm.sq ) Modulus of Elasticity Kg / Sq. Cm X 10^4 8) Coefficient of linear expansion - per deg. C. 11.5x10^-6 9) Chemical Composition - % a) Carbon b) Manganese c) Phosphorous d) Sulphur e) Silicon 0.55 Max Max Max SEAL OF THE BIDDER Page 31 of 32
32 10) Zinc a) Purity - % i) Zinc Min. ii) Lead Max. iii) Cadmium Max. iv) Iron Max. v) Total Impurities b) Quality 11) Length Of Lays a) First Layer i) Maximum ii)minimum Max 99.95% pure ) Joint Not Allowed 13) Standard Length Mtrs ) Oil Treatment Boiled Linseed Oil 15) Weight Of Zinc Coating Gm / Sq. Mtr. a) Before Stranding b) After Stranding ) Galvanising Process Hot Dip 17) Elongation (Minimum After Stranding) - % 4 18) Maximum d.c. resistance in ohm, per km of 3.41 the galvanized steel earth strand at 20ºC 19) Drawings Of Drum (With All Details) 3 ply as per GETCO spec. 20) Details of Manufacturers of Steel Wire Rods To be submitted by Bidder 21)) Standard Drum Length Mtr. a) Normal b) Special River Crossing Etc Signature of the Bidder : Name : Designation : Date : Authorised common rubber Stamp / seal of the bidder : SEAL OF THE BIDDER Page 32 of 32
UGVCL/SP/591/11KV HT AB CABLE
TECHNICAL SPECIFICATION FOR 11KV AERIAL BUNCHED CABLES FOR OVERHEAD LINES (CROSSED LINKED POLYTHENE DRY GAS CURED) 1. SCOPE This specification covers requirements of XLPE insulated, 11 KV Aerial Bunched
SCHEDULE ' A' TECHNICAL SPECIFICATION FOR 11/22/33KV H.T.XLPE POWER CABLE FOR DISTRIBUTION NETWORK IN MAHARASHTRA (SPECIFICATION NO.
SCHEDULE ' A' TECHNICAL SPECIFICATION FOR 11/22/33KV H.T.XLPE POWER CABLE FOR DISTRIBUTION NETWORK IN MAHARASHTRA (SPECIFICATION NO.MM/I/HTXLPE/2006) MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
TECHNICAL SPECIFICATION FOR HIGH TENSION LINE HARDWARE AND ACCESSORIES FOR ACSR PANTHER & WOLF CONDUCTOR
TECHNICAL SPECIFICATION FOR HIGH TENSION LINE HARDWARE AND ACCESSORIES FOR ACSR PANTHER & WOLF CONDUCTOR 1.1.0 SCOPE : This specification covers design, manufacture, testing at manufacture s works before
CLAMPS CONNECTORS & EQUIPOTENTIAL RING
CLAMPS CONNECTORS & EQUIPOTENTIAL RING March 2015 Engineering Department WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED Regd. Office: VidyutBhawan, Block DJ, Sector-II, Bidhannagar, Kolkata
SCHEDULE ' A ' TECHNICAL SPECIFICATION FOR SINGLE CORE,UNARMOURED L.T.XLPE POWER CABLE FOR DISTRIBUTION NETWORK IN MAHARASHTRA
SCHEDULE ' A ' TECHNICAL SPECIFICATION FOR SINGLE CORE,UNARMOURED L.T.XLPE POWER CABLE FOR DISTRIBUTION NETWORK IN MAHARASHTRA (SPECIFICATION NO.MM/I/ 1 X C-UA- LTXLPE/2006) MAHARASHTRA STATE ELECTRICITY
TECHNICAL SPECIFICATION OF 11 / 22 KV XLPE POWER CABLE FOR SUB-STATION
GUJARAT ENERGY TRANSMISSION CORPORATION LTD. Sardar Patel Vidyut Bhavan, Race Course, Vadodara 390 007 TECHNICAL SPECIFICATION OF 11 / 22 KV XLPE POWER CABLE FOR SUB-STATION GETCO/E/TS PCBL025/RO DT.07-03-2008
LOW VOLTAGE RING TYPE MEASURING CURRENT TRANSFORMERS
Specification for LOW VOLTAGE RING TYPE MEASURING CURRENT TRANSFORMERS CEYLON ELECTRICITY BOARD SRI LANKA Specification for LOW VOLTAGE RING TYPE MEASURING CURRENT TRANSFORMERS CEB Standard 027: 1998 CEYLON
COATING & WRAPPING OF UNDERGROUND PIPING
CONSTRUCTION STANDARD SPECIFICATION DOCUMENT NO :SEC-PJ-000-SPC-PI-008 TOTAL PAGES : 8 Page 1 of 8 CONTENTS 1. SCOPE 2. DEFINITION 3. CODES AND STANDARDS 4. MATERIALS Page 2 of 8 1. SCOPE This specification
SPECIFICATIONS FOR 220KV CAPACITOR VOLTAGE TRANSFORMER. The equipment is required for 220KV system. The system data is given as under:
REQUIREMENT : The equipment offered shall be highly reliable suitable to operate satisfactorily in hot humid and polluted climate. The equipments offered shall work satisfactorily within temperature range
SAFETY FENCES, SAFETY BARRIERS AND PEDESTRIAN GUARDRAILS
SERIES NG 400 SAFETY FENCES, SAFETY BARRIERS AND PEDESTRIAN GUARDRAILS Contents Clause Title Page NG 401 Performance Criteria for Safety Fences and Safety Barriers 2 NG 402 Components for Safety Fences
22 kv ISOLATORS & ISOLATOR CUM EARTHING SWITCHES
GUJARAT ENERGY TRANSMISSION CORPORATION LTD. SARADAR PATEL VIDYUT BHAVAN, RACE COURSE, BARODA 390 007. TECHNICAL SPECIFICATION FOR 22 kv ISOLATORS & ISOLATOR CUM EARTHING SWITCHES GETCO/E/022TS ISO/R1
T A B L E T 1 T E S T S A N D I N S P E C T I O N C A B L E P C U T A N D P C U T - A
T A B L E T 1 1 of 7 Tests & Inspection Cable PCUT & PCUT-A (Table T1) T E S T S A N D I N S P E C T I O N C A B L E P C U T A N D P C U T - A No. Test Scale MOC Requirements G 20:10:001:01 Defined Test
TECHNICAL SPECIFICATIONS OF 66 KV 1C 300 SQ.MM. XLPE POWER CABLE FOR UNDER GROUND LINE
GUJARAT ENERGY TRANSMISSION CORPORATION LTD. Sardar Patel Vidyut Bhavan, Race Course, Vadodara: 390 007 TECHNICAL SPECIFICATIONS OF 66 KV 1C 300 SQ.MM. XLPE POWER CABLE FOR UNDER GROUND LINE GETCO/E /TS
SERIES NG 1800 STRUCTURAL STEELWORK
MANUAL OF CONTRACT DOCUMENTS FOR HIGHWAY WORKS VOLUME 2 NOTES FOR GUIDANCE ON THE SPECIFICATION FOR HIGHWAY WORKS SERIES NG 1800 STRUCTURAL STEELWORK Contents Clause Title Page NG 1800 (08/14) General
TECHNICAL SPECIFICATION FOR PROJECTION WELDING MACHINE (Qty. 2 Nos.)
TECHNICAL SPECIFICATION FOR PROJECTION WELDING MACHINE (Qty. 2 Nos.) 1. Requirement: Two (02) Nos. DC Type, 3 phase, 3 wire Projection Welding Machine is required for welding of ventilation M.S. / Stainless
TECHNICAL SPECIFICATIONS & SPECIAL CONDITIONS OF CONTRACT FOR ELECTRICAL WORKS CHAPTER 1 SPECIAL CONDITIONS OF CONTRACT
TECHNICAL SPECIFICATIONS & SPECIAL CONDITIONS OF CONTRACT FOR ELECTRICAL WORKS CHAPTER 1 SPECIAL CONDITIONS OF CONTRACT 1.1 General 1.1.1 These Special Conditions of Contract supplement the General Instructions.
TECHNICAL SPECIFICATIONS OF 66 KV 1C 630 SQ.MM. XLPE POWER CABLE FOR UNDER GROUND LINE
GUJARAT ENERGY TRANSMISSION CORPORATION LTD. Sardar Patel Vidyut Bhavan, Race Course, Vadodara: 390 007 TECHNICAL SPECIFICATIONS OF 66 KV 1C 630 SQ.MM. XLPE POWER CABLE FOR UNDER GROUND LINE GETCO/E/TS
HINDUSTAN PETROLEUM CORPORATION LIMITED ENGINEERING & PROJECTS GRESHAM ASSURANCE HOUSE, 2 ND FLOOR, A-1595(3) 1-A, SIR P M ROAD, FORT MUMBAI-400 001
NEW POL DEPOT AT HINDUSTAN PETROLEUM CORPORATION LIMITED ENGINEERING & S GRESHAM ASSURANCE HOUSE, 2 ND FLOOR, A-1595(3) 1-A, SIR P M ROAD, FORT MUMBAI-400 001 TECHNICAL SPECIFICATION OF XLPE, FRLS LT CABLES
SPECIFICATIONS FOR TENDER NO: PSNR/SCP/VKS/E 1635 ANNEXURE I TECHNICAL SPECIFICATIONS FOR LIGHTING HIGH MAST
TECHNICAL SPECIFICATIONS FOR LIGHTING HIGH MAST ANNEXURE I Sl.No. Description for BHEL Requirement Offered Deviation Scope of supply, erection and commissioning: 1 The scope of this specification covers
22 kv OUT DOOR VACUUM CIRCUIT BREAKER
GUJARAT ENERGY TRANSMISSION CORPORATION LTD. SARADAR PATEL VIDYUT BHAVAN, RACE COURSE, BARODA 390 007. TECHNICAL SPECIFICATION FOR 22 kv OUT DOOR VACUUM CIRCUIT BREAKER Getco/Engg/TechSpec/22kV/O/D VCB/R1/Nov07
Acceptance Codes APPENDIX - A. Acceptance Criteria
1111 Receipt of a satisfactory Test Report from WSDOT Materials Laboratory is required indicating the lot (or lots) or batch of material meets the requirement of the specifications under which it is listed.
CEG/GP/1534/257/RFQ27016/ [01] Technical specification for NB 350 CB pipe :
[01] Technical specification for NB 350 CB pipe : Size :- NB 350 Plain End, ID 336 MM, OD 406 mm, Length - 5.3 meters +/- 25 mm Outer shell : Rolled and welded from 5 mm thick carbon steel coil / plates
Schedule-4(A3) Page 1 of 5. Specification No.: JPL/KWTL/A3 (Package-A3) To: Bidder's Name & Address
Specification : JPL/KWTL/A3 (Package-A3) Page 1 of 5 Tower Package (Package-A3) for 400 kv D/C (Quad Bundle) Karcham Wangtoo Abdullapur Line Part III associated with Karcham Wangtoo HEP Transmission System
60.12. Depend-O-Lok FxE Expansion Coupling. System No. Submitted By Spec Sect Para Location Date Approved Date. DEPEND-O-LOK FxE EXPANSION COUPLING
60.1 D-O-L FxE expansion couplings are a bolted, split-sleeve design that provides for expansion and contraction at the coupled joint. These couplings are furnished with restraint rings that, when affixed
PPS-PPQ-BT-PIAS RESIN INSULATORS FOR OIL INSULATED ELECTRICAL MACHINES
PPS-PPQ-BT-PIAS RESIN INSULATORS FOR OIL INSULATED ELECTRICAL MACHINES BUSHING WITH PLUG CONNECTION WITH OUTER CONE PPS CHARACTERISTICS The PPS bushing can be used as a fixed section for the entry of medium
Contents. All Rights Reserved
Electricity Specification 400C8 Issue 6 October 2015 LV Service Cables Contents 1 Scope 2 Definitions 3 General Requirements for Approvals and Assurance 4 Conditions of Installation 5 Conditions of Operation
SERIES ASM NEOPRENE/EPMD FLANGED SINGLE SPHERE CONNECTOR CONNECTORS. Pressures to 225 PSIG (15.51 barg) Temperatures to 230ºF (110ºC)
APPLICATIONS Process Industry Weak Acids Alkalies Compressed Air Pulp & Paper MODELS ASM - Flanged Connection OPTIONS Control Rods Oil & Gas Water & Waste Pump suction & discharge Sea water Chemical lines
PRESENTATION ON REPAIR AND REHABILITATION OF BUILDINGS DAMAGED IN EARTHQUAKE. By H P Gupta & D K Gupta
PRESENTATION ON REPAIR AND REHABILITATION OF BUILDINGS DAMAGED IN EARTHQUAKE By H P Gupta & D K Gupta DIFFERENT TYPES OF DAMAGES 1.Minor cracks 0.5 to 5 mm wide in load or non-load bearing walls 2.Major
Naue GmbH&Co.KG. Quality Control and. Quality Assurance. Manual. For Geomembranes
Naue GmbH&Co.KG Quality Control and Quality Assurance Manual For Geomembranes July 2004 V.O TABLE OF CONTENTS 1. Introduction 2. Quality Assurance and Control 2.1 General 2.2 Quality management acc. to
CERTIFICATE NAME OF PRODUCT MANUFACTURER PRODUCT DESCRIPTION CERTIFICATION PROCEDURE. No VTT C-6044-10 Date of issue 11.10.2010, Updated July 1, 2011
CERTIFICATE NAME OF PRODUCT No VTT C-6044-10 Date of issue 11.10.2010, Updated July 1, 2011 H-CONTROL REFLEX+ reflective insulating vapour control layer for roof and wall applications MANUFACTURER ACTIS
CONTRACT SPECIFICATIONS - SEISMIC ISOLATION BEARINGS
CONTRACT SPECIFICATIONS - SEISMIC ISOLATION BEARINGS 1.0 DESIGN 1.1 Scope of Work 1.1.1 This work shall consist of furnishing Isolation Bearings and installing Isolation Bearing Assemblies at the locations
3.1.1 Full Type Tests & Routine Tests according to Clause 8 2 & 8 3. 4.0 Instructions For Installation, Operation & Maintenance
SPECIFICATION FOR LOW VOLTAGE SWITCHBOARD SEN I N D E X Description 10 STANDARD TECHNICAL REQUIREMENTS 11 Standards 12 General Operating Conditions 13 General Description Of Switchboard 131 Structure 132
Rollers. from the UK s largest roller manufacturer. Quality Performance Reliability
Rollers from the UK s largest roller manufacturer Quality Performance Reliability 42 Index Gravity Rollers Light to Medium Duty 4 Heavy Duty 5 Plastic Rollers 6 Stainless Steel Rollers 7 Grooved Rollers
Specification N : NPS - 63/8. Underground Power Cable Covers
Page No. 1 of 13 Specification N : NPS - 63/8 Underground Power Cable Covers Replaces specification N : NPS - 63/7 Prepared by : A. Lavian Approved by : Dr. N. Grinberg May 2016 Haifa- Israel Page No.
CHAIN-LINK FENCES BID SPECIFICATIONS DESCRIPTION
CHAIN-LINK FENCES BID SPECIFICATIONS DESCRIPTION 1 This item shall consist of furnishing and erecting Chain-Link fence in accordance with these specifications and the details shown on the plans and in
James M. Pleasants Company
James M. Pleasants Company SUBMITTAL DATA GAINESVILLE MECHANICAL DECEMBER 20, 2013 PROJECT: GSU: J-183 HUMANITIES LAW BLDG. QUOTE NO:12116 ENGINEER: STEVENS & WILKINSON GASKETED PLATE HEAT EXCHANGER Tag:
Two most common lock nut groups: 1-Prevailing Torque Type Lock Nuts:
Two most common lock nut groups: 1. PREVAILING TORQUE a design feature of the lock nut produces friction between threads of mated components thereby increasing the force needed to tighten as well as loosen
SECTION 02845 GUARDRAILS
SECTION 02845 GUARDRAILS PART 1 - GENERAL 1.01 SCOPE OF WORK A. Furnish all labor, materials, equipment and incidentals necessary and repair, replace or install all types of guardrails as specified herein
WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED. (A Govt of West Bengal Enterprise)
WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED (A Govt of West Bengal Enterprise) Office of the Chief Engineer (Procurement) Regd. Office: Vidyut Bhavan (10 TH Floor), Block- B, Bidhannagar,
Mounting Instructions. Torque Transducer. A0329 3.2 en
Mounting Instructions Torque Transducer T5 T5 Contents 3 Page Safety instructions.............................................. 4 1 Measuring characteristics..................................... 7 2 Mounting.....................................................
1ZSC000563-AAC en, Rev. 7. Resin impregnated paper bushing, oil to air, type GSB Technical guide
1ZSC000563-AAC en, Rev. 7 Resin impregnated paper bushing, oil to air, type GSB Technical guide Original instruction The information provided in this document is intended to be general and does not cover
Mechanical Installation
Page -1-1. INTRODUCTION AND PURPOSE 1.1. This specification covers the installation, testing and precommissioning of mechanical equipment. Work is to be performed in conjunction with the manufacturer s
PivotLoc Ladder Systems
N25 ACCESS AND SAFETY EQUIPMENT SPECIFICATION CLAUSES PivotLoc Ladder Systems To be read with The Main Contract Preliminaries, General Conditions, Sub-Contract Preliminaries. MINIMUM CONTRACTOR STANDARD
RAILWAY CATENARY SYSTEMS. Components and Systems for the Electrification of Railway Lines. ibemo
Connectors, Clamps, Compensating Devices, Insulators and Safety Equipment for Overhead Catenary Lines RAILWAY CATENARY SYSTEMS Components and Systems for the Electrification of Railway Lines. Welcome to
Chapter 2 Basis of design and materials
Chapter 2 Basis of design and materials 2.1 Structural action It is necessary to start a design by deciding on the type and layout of structure to be used. Tentative sizes must be allocated to each structural
Metal Pressfitting Pipe Systems
VdS Guidelines for water extinguishing systems VdS 2100-26-3en Requirements and test methods Part 3: Additional provisions for Pipe Systems made of galvanized steel VdS 2100-26-3en : 2012-04 (01) Publishing
DELHI METRO RAIL CORPORATION LIMITED. (A Joint Venture of Govt. of India & GNCTD) MASS RAPID TRANSPORT SYSTEM PHASE III. Contract: - CE -16 VOLUME-6
DELHI METRO RAIL CORPORATION LIMITED (A Joint Venture of Govt. of India & GNCTD) MASS RAPID TRANSPORT SYSTEM PHASE III TURNKEY PROJECT OF DESIGN, SUPPLY, LAYING, JOINTING, TESTING AND COMMISSIONING OF
The Contractor shall furnish and install all shielded power cable suitable for use on this project.
Section 16122 PRIMARY POWER CABLES PART 1 GENERAL: WORK INCLUDED The Contractor shall furnish and install all shielded power cable suitable for use on this project. RELATED WORK Section 16020: Tests SUBMITTALS
SECTION 26 05 49 VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS
SECTION 26 05 49 VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes seismic restraints and other earthquake-damage-reduction measures for electrical
Dubai Municipality Standard DMS 1: Part 5: 2004
Specification for precast concrete blocks Part 5: Normal-weight concrete-polystyrene sandwich masonry blocks Issue Date Revision Revision Description Prepared by Approved by Authorized by 19/12/2004 Issue
Gulf Cable & Electrical Ind. Co.
CONTENTS INTRODUCTION PRODUCT RANGE I PRODUCT DATA TABLES XLPE INSULATED 600/1000V CABLES Two Core Cables CU/XLPE/PVC/LC/PVC/SWA/PVC 1 Three Core Cables CU/XLPE/PVC/LC/PVC/SWA/PVC 2 Four Core Cables CU/XLPE/PVC/LC/PVC/SWA/PVC
GUARDRAIL POST STEEL
GUARDRAIL POST STEEL Guardrail posts meeting materials certification are evaluated and checked for: 1. Dimensional acceptance 2. Physical test results a. Chemical b. Physical 3. Galvanized or painted coating
AIRPORT SECURITY FENCING. A. American Society for Testing and Materials (ASTM):
SECTION 02832 AIRPORT SECURITY FENCING PART 1-GENERAL 1.1 SUMMARY A. Section includes: Construct airport security chain-link fence and gate at specified areas and conforming lines, grades, details indicated
POLYURETHANE LINING AND COATING ON PIPE RAW WATER
POLYURETHANE LINING AND COATING ON PIPE RAW WATER PART 1 -- GENERAL 1.1 THE REQUIREMENT A. The CONTRACTOR shall provide pipe coating, complete and in place, in accordance with the Contract Documents. 1.2
produces and delivers products worldwide can provide the optimal are dedicated to supplying you with superior advice and global support.
www.ppcinsulators.com The very Best. The very Best. That s what we deliver. ong od Insulators Only a company that develops, produces and delivers products worldwide can provide the optimal solution for
SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS
SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS PART 1 GENERAL 1.01 SECTION INCLUDES A. The requirements for pipe material and installation in sewer and drainage collection systems. All materials
Installation guide for the SafeLine type anchorage device. Tested in compliance with EN 795: 1996. No.: SE-...
Installation guide for the SafeLine type anchorage device Tested in compliance with EN 795: 1996 No.: SE-... Version: 09.10.2008 SE 67 Subject to technical alterations! Contents 1. General information
Section 3 - Evaluation and Qualification Criteria
Páge 1 of 13 This Section contains all the criteria that the Employer shall use to evaluate bids and qualify Bidders. In accordance with ITB 34 and ITB 35, no other methods, criteria and factors shall
European Technical Approval ETA-12/0500
ETA-Danmark A/S Kollegievej 6 DK-2920 Charlottenlund Tel. +45 72 24 59 00 Fax +45 72 24 59 04 Internet www.etadanmark.dk Authorised and notified according to Article 10 of the Council Directive 89/106/EEC
Bolting Galvanized Steel
Bolting Galvanized Steel This chapter gives information on the characteristics, advantages and economics of bolted galvanized structures and zinc coated fasteners, and offers comment on bolting procedures
European Technical Assessment ETA-10/0153 of 10/06/2015
ETA-Danmark A/S Göteborg Plads 1 DK-2150 Nordhavn Tel. +45 72 24 59 00 Fax +45 72 24 59 04 Internet ww.etadanmark.dk Authorised and notified according to Article 29 of the Regulation (EU) No 305/2011 of
Specification for Rotary Drill Stem Elements
Addendum 1 March 2007 Effective Date: September 1, 2007 Specification for Rotary Drill Stem Elements ANSI/API SPECIFICATION 7-1 FIRST EDITION, MARCH 2006 EFFECTIVE DATE: SEPTEMBER 2006 ISO 10424-1:2004
Guidelines for Earthquake Bracing of Residential Water Heaters
Guidelines for Earthquake Bracing of Residential Water Heaters Department of General Services Division of the State Architect 1102 Q Street, Suite 5100 Sacramento, CA 95814 Phone: (916) 324-7099 Fax: (916)
IHSS-N1 WELDED HONEYCOMB CORE SPECIFICATION. Generated: Sergiy Papyshev Engineering. Approved: Don Prysi Manufacturing. Approved: Merzuk Ramic Quality
IHSS-N1 WELDED HONEYCOMB CORE SPECIFICATION Generated: Sergiy Papyshev Engineering Approved: Don Prysi Manufacturing Approved: Merzuk Ramic Quality Approved: Steven Barnett Administrative DATE DATE DATE
SECTION 03400 PRECAST CONCRETE STRUCTURES
SECTION 03400 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for precast concrete structures, including fabrication and erection. 1.02 REFERENCE STANDARDS A. American Society for
BRIDGE FIELD PAINTING, REPAINTING, 412 AND PAINT RESIDUE CONTAINMENT. A. Field Painting, Bridge Repainting and Residue Containment:
412.1 DESCRIPTION BRIDGE FIELD PAINTING, REPAINTING, 412 This specification contains the requirements for the removal, containment, and disposal of existing paint on steel surfaces, preparing the steel
TECHNICAL SPECIFICATION FOR 200, 315 & 630 KVA, 11/0.433 KV DRY-TYPE (VPI) DISTRIBUTION TRANSFORMERS (INDOOR AND OUTDOOR)
TECHNICAL SPECIFICATION FOR 200, 315 & 630 KVA, 11/0.433 KV DRY-TYPE (VPI) DISTRIBUTION TRANSFORMERS (INDOOR AND OUTDOOR) (SPECIFICATION NO. DIST/MM-II/03/2005) MAHARASHTRA STATE ELECTRICITY DISTRIBUTION
09/07/07 GLASSFIBER REINFORCED CEMENT (GRC) C. S. I. Spec 03500 Master Spec. 03 49 00 Page 1
C. S. I. Spec 03500 Page 1 PART 1 - GENERAL 1.01 SUMMARY:.01 Provide special glassfiber reinforced cement (GRC) shapes in accordance with the requirements of the contract documents..02 The installing contractor
Puddle Flange. FRANK Puddle Flange
Puddle Flange FRANK Puddle Flange The problem Problems keep on occurring when connecting pipes during construction work. Pipes laid in the ground must be introduced into concrete walls or shafts. In many
Connection Solutions
Connection Solutions DESIGN BUILD SYSTEM Connection Solutions for Cold formed Steel Construction Complies with; AS/NZS 4600:2005 AISI S100:2007 AS/NZ 1397 ASTM A653 DESIGN & BUILD SYSTEM FRAMECAD Construction
33.6W Power over Ethernet Waterproof Adapter PoE Plus Single Port Injector for Outdoor Application
33.6W Power over Ethernet Waterproof Adapter PoE Plus Single Port Injector for Outdoor Application Features Compliant with the IEEE802.3at Standard -40 to +60 C Temperature Range Diagnostic LEDs Full Protection
SECTION 08332 COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here)
SECTION 08332 COILING COUNTER DOORS Display hidden notes to specifier. (Don't know how? Click Here) PART 1 GENERAL 1.1 SECTION INCLUDES A. Coiling Metal Counter Doors. B. Coiling Counter Fire Doors. 1.2
Transformer oil cooler ALFA A02
A02 Transformer oil cooler ALFA Transformer oil cooler ALFA The transformer oil cooler ALFA is used to cool power transformers by means of forced air and oil flow. The oil in the cooler is circulated using
SECTION 15 AIR RELEASE VALVE ASSEMBLIES. 15-1 General
SECTION 15 AIR RELEASE VALVE ASSEMBLIES 15-1.01 Scope 15-1 General This section describes the requirements for furnishing and installing Air Release Valve Assemblies of the size and type shown on the plans,
A. The CONTRACTOR shall provide pipe coating, complete and in place, in accordance with the Contract Documents.
POLYURETHANE COATING ON STEEL PIPE PART 1 -- GENERAL 1.1 THE REQUIREMENT A. The CONTRACTOR shall provide pipe coating, complete and in place, in accordance with the Contract Documents. 1.2 REFERENCE SPECIFICATIONS,
Outdoor 33.6W Dual Port Passive Power-over-Ethernet Midspan For External Security Cameras and Wireless Access Points
Outdoor 33.6W Dual Port Passive Power-over-Ethernet Midspan For External Security Cameras and Wireless Access Points Features SELV Compliant No Detection Passive Injector Gigabit Compatible Full Protection
1ZSE 2750-105 en, Rev. 8. Transformer bushings, type GOE and GOE(2) Technical guide
1ZSE 2750-105 en, Rev. 8 Transformer bushings, type GOE and GOE(2) Technical guide Original instruction The information provided in this document is intended to be general and does not cover all possible
Policy on Water Heater Installations Policy No. UPC 510-1-94 Effective: September 1, 1995 Revised: February 10, 1996
CITY OF SAN JOSE BUILDING DIVISION POLICY Policy on Water Heater Installations Policy No. UPC 510-1-94 Effective: September 1, 1995 Revised: February 10, 1996 All new and replacement water heaters installed
Precision Miniature Load Cell. Models 8431, 8432 with Overload Protection
w Technical Product Information Precision Miniature Load Cell with Overload Protection 1. Introduction The load cells in the model 8431 and 8432 series are primarily designed for the measurement of force
ENGINEERING SPECIFICATION PULTRUDED DYNARAIL FIBERGLASS LADDER & LADDER CAGES
ENGINEERING SPECIFICATION PULTRUDED DYNARAIL FIBERGLASS LADDER & LADDER CAGES PART 1 - GENERAL 1.1 SCOPE OF WORK SECTION 06610 FIBERGLASS REINFORCED PLASTICS (FRP) FABRICATIONS PULTRUDED SQUARE TUBE LADDER
Explosion proof enclosures
1 of 7 Explosion proof enclosures DE8 C 2 of 7 The Ex d enclosures are rugged and designed for harsh environment like: Oil and gas industry Chemical industry Pharmaceutical industry Agribusiness Without
Machine devices, jig devices
Machine devices, jig devices 853 K0697 Rolled thread studs DIN 6379 Material: Tempered steel. KIPP Rolled thread studs DIN 6379 Order No. D L B1 B2 Approx. weight g Surface finish: Thread rolled. Class
Embedded Parts Introduction - Anchors
In the plant construction or process plants such as chemical, petrochemical, gas or power plants various disciplines are brought into contact and built on each other. Civil, mechanical, electro technical
SFI SPECIFICATION 61.1 EFFECTIVE: FEBRUARY 26, 2014
SFI SPECIFICATION 61.1 EFFECTIVE: FEBRUARY 26, 2014 PRODUCT: Turbochargers 1.0 GENERAL INFORMATION 1.1 This SFI Specification establishes uniform test procedures and minimum standards for evaluating and
Guidelines for Earthquake Bracing Residential Water Heaters
Guidelines for Earthquake Bracing Residential Water Heaters Department of General Services Division of the State Architect In accordance with the Health and Safety Code Section 19215, the Division of the
TELESCOPE Motorized Lighting Suspension
TELESCOPE Motorized Lighting Suspension Mod. 8400 FEATURES The De Sisti TELESCOPE is a single point suspension specifically designed to provide rigidity and stabilization of all moving parts. It can extend
INVITATION FOR TENDER FOR SUPPLY OF EQUIPMENT
INVITATION FOR TENDER FOR SUPPLY OF EQUIPMENT Sealed tender offers are invited in two separate sealed covers (Technical and Commercial offers) from eligible manufacturers/suppliers or their direct Indian
RAUFOSS EXPLOSIVE COMPRESSION FITTINGS
INSTRUCTION MANUAL FOR RAUFOSS EXPLOSIVE COMPRESSION FITTINGS Box 7 2831 Raufoss Norway Tlf.: +47 61 15 17 87 Fax: +47 61 15 25 56 25 January 2013, rev 2 Available on www.vpmetall.no Page 1 CONTENTS GENERAL
AutoLink Three-Phase Sectionalizer Specifications. Scope. General. Applicable Standards. Operating principle
Scope This specification stipulates the minimum requirements for mechanically linked three-phase electronic sectionalizers, for use on outdoor medium voltage overhead lines of 15, 27, and 38 kv. Electronic
North American Stainless
North American Stainless Flat Products Stainless Steel Grade Sheet 310S (S31008)/ EN 1.4845 Introduction: SS310 is a highly alloyed austenitic stainless steel designed for elevated-temperature service.
TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE
TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE TECHNICAL SPECIFICATION PART 8000 - PRECAST CONCRETE TABLE OF CONTENTS Item Number Page 8100 PRECAST CONCRETE CONSTRUCTION - GENERAL 8-3 8101 General
Detailing of Reinforcment in Concrete Structures
Chapter 8 Detailing of Reinforcment in Concrete Structures 8.1 Scope Provisions of Sec. 8.1 and 8.2 of Chapter 8 shall apply for detailing of reinforcement in reinforced concrete members, in general. For
Reproduced with the permission of the American Welding Society (AWS), Miami, Florida - 09/15/2011. 7. Stud Welding
7. Stud Welding 7.1 Scope Section 7 contains general requirements for welding steel studs to steel (see 7.2.7 and 1.2.2 for approved steels). In addition, it stipulates specific requirements for the following:
Chapter 3 Pre-Installation, Foundations and Piers
Chapter 3 Pre-Installation, Foundations and Piers 3-1 Pre-Installation Establishes the minimum requirements for the siting, design, materials, access, and installation of manufactured dwellings, accessory
PAAM COMMERCIAL PRIVATE LIMITED
METAL PACKAGING We at Paam Group have been providing vast range of packaging products to our customers based on their preferences, needs and specifications. We provide all the materials required in metal
Non-destructive testing of steel forgings - Part 2: Penetrant testing (BS EN 10228-2:1998)
Non-destructive testing of steel forgings - Part 2: Penetrant testing (BS EN 10228-2:1998) 1 Scope This part of EN 10228 describes the method and acceptance criteria to be used for the penetrant testing
NORSOK Compact Flange Installation and Assembly Procedure
NORSOK Compact Flange Installation and Assembly Procedure Hytorc Norway www.hytorc.no P.Nødland. Page 2 INTRODUCTION Scope The following main operations are covered in this section: Assembly/disassembly
FIELD ACCEPTANCE OF FIELD WELDING GUIDE
Page 1 of 17 Oklahoma DOT Materials & Testing January 14, 2004 Publication: GFA-FW (Updated to reference current Structural Materials Branch of the ODOT Materials Division URL 07/06/2016) FIELD ACCEPTANCE
SIMRAD SD10 Sailboat Drive
INSTALLATION MANUAL SIMRAD SD10 Sailboat Drive 20222683/A English Simrad SD10 Sailboat Drive About this document Rev. A First issue 2007 Navico AS. All rights reserved. No part of this work covered by
