Guidance for Repowering Vessels Inspected Under 46 CFR Subchapter T
|
|
|
- Suzan Griffin
- 9 years ago
- Views:
Transcription
1 Guidance for Repowering Vessels Inspected Under 46 CFR Subchapter T Inspections Division This guide was developed to aid the Owner/Operator a Small Passenger Vessel in planning for the repowering of their vessel. It covers the most common items that need to be addressed and is not intended to be all inclusive. It is the responsibility of the owner/operator to ensure the vessel is in compliance with the regulations. Installation of new propulsion engine/s and generator engine/s will have to meet the Environmental Protection Agencies (EPA) requirements for Control of Emissions of Air Pollution, see the following website for details If replacing existing engines, generators or piping installations with the exact same equipment/materials that s reflected in the vessel s approved plans, plan review is not required; otherwise, plan review needs to be conducted by the Marine Safety Center. To avoid delays due to re-submissions, please submit plan review package through your respective geographical inspection office, whether San Juan s Inspection Division, MSD St. Thomas, RIO St. Croix or RIO Ponce. In accordance with 46 CFR (b) plan review will be required for replacement of any electrical wiring on an existing vessel (built before March 11, 1996). Several factors that need to be considered when installing new engines, reduction gears and generators are addressed in this guide. It s imperative that before the vessel goes to a yard/repair facility to start the work, you have the plans approved by the Coast Guard. This preplanning will avoid costly delays. Repowering is considered a major conversion under 46 CFR (b). All vessels will be required to submit plans using New 46 CFR Subchapter T. Regardless of whether replacing in-kind or installing new engines; you will need to schedule a series of inspections over the project s life so the installation can be verified against the approved plans. If you have any questions please feel free to contact your local Marine Inspection Office Revised: April 21, 2008 Previous editions are obsolete. Guidance for Repowering Vessels Inspected Under 46 CFR Subchapter T Page 1 of 6
2 Vessel Name: Official Number: Vessel Representative Name: Address for Response: Phone: The following information is to be recorded below or included in attachments to this checklist: Number of Units Main Engine New Installation Engine Reduction Gear Propeller Size Shaft Strut Make/Model Ratio No change Changes made (provide details) No change Changes made (provide details) Horsepower Weight Weight Copy of EPA Certification for Marine Engine attached. Number of Units Main Engine Old Installation Engine Reduction Gear Propeller Size Shaft Strut Make/Model Ratio Horsepower Weight Weight Copy of EPA Certification for Marine Engine attached. Note: Wooden vessels that are increasing horsepower or are converting from gasoline to diesel propulsion may be required to submit additional information taking in account the affects that the higher torque these engines will have on the hull structures, to prevent catastrophic hull failure. Revised: April 21, 2008 Previous editions are obsolete. Guidance for Repowering Vessels Inspected Under 46 CFR Subchapter T Page 2 of 6
3 New Number of units Generator Installation Make/Model Weight Name Plate Data (include, kw, kva, amps, power factor (PF), temperature rating, single or three phase Old Systems Plan Review: Attach explanation, diagram and/or list of materials to be used in each system for main engine and generator) Piping system All vital system piping shall be in compliance with 46 CFR Plans shall be submitted and approved for these systems. Vital systems include: Fuel, Raw water cooling, Attached pumps, (bilge/fire). Note 1: Non-metallic hoses must meet 46 CFR This is a new installation replacement in kind is not allowed. Note 2: The above referenced Code of Federal Regulations can be downloaded from Exhaust system Exhaust systems upgrades shall meet the standards of 46 CFR or as an alternative the American Boat and Yacht Council (ABYC) Project P-1. Changes in weight from exhaust renewal shall be provided in conjunction with engine weights for stability test consideration. Note 1: ABYC Project P-1 can be purchased from Note 2: The above referenced Code of Federal Regulations can be downloaded from Revised: April 21, 2008 Previous editions are obsolete. Guidance for Repowering Vessels Inspected Under 46 CFR Subchapter T Page 3 of 6
4 Electrical system (wire or cable type(s), conductor size (s), ampacity of interlock switches, new equipment, etc.) Battery cables and installation shall be in compliance with 46 CFR Conductor sizing shall be calculated from table (p) in 46 CFR , or American Boat and Yacht Council (ABYC) Project E-11, using a 10% voltage drop. Length of run shall be calculated using length from battery to starter and from engine back to battery. (Total length of circuit for DC power.) Note 1: Many of the newer engines have high amperage starters that require using two (2) 00 cables to and from the starter. Undersized cables can cause a fire hazard. Note 2: Factory supplied engine harnesses are typically not plan reviewed however, the harness must have over current protection. Over current protection should be verified. If the harness must be lengthened, or spliced for any reason, plan review will be conducted to ensure conductor size and installation is in compliance with 46 CFR Note 3: If changing the voltage of the engine starters, the weight of the batteries must be included in the weight calculations. Note 4: ABYC Project E-11 can be purchased from Note 5: MSC Guidelines E2-07(T) Electrical Plans Small Passenger Vessel (T) to assist in plan submittal attached to the end of this document. Note 6: The above referenced Code of Federal Regulations can be downloaded from Single line electrical diagram * For new generators provide at least main circuit breaker information and size/type of feeder cable from the generator to the main electrical panel - manufacturer supplied wiring harnesses need not be included. Note 1 : new regulation at 46 CFR requiring control and indicator circuits to have over current protection. Propulsion Shaft material Installed Shaft diameter Type of Shaft Material Attach calculations showing shaft size is adequate. Note 1: Note 2: Shaft material composition is vital to performing size calculation. If unknown, it is the responsibility of owner/operator to provide via data sheet from manufacturer or supplier for this information Use the calculations found in one of the following acceptable standards for determining shaft size: a. ABS Rules for Building and Class Steel Vessel Under 90 Meter (295 feet) n Length, Part 4 Vessel System and Machinery, Section 1 Propulsion Shafting, 7.1 Shaft Diameters. This standard can be downloaded from b. ABYC P-6 Propeller Shafting Systems. This standard can be purchased from Revised: April 21, 2008 Previous editions are obsolete. Guidance for Repowering Vessels Inspected Under 46 CFR Subchapter T Page 4 of 6
5 Stability Review: 1. Vessels that had a Stability Letter based on a Simplified Stability Test: The Coast Guard Marine Safety Manual Volume IV, Chapter 6, paragraph D.4 (Evaluation of Weight Changes to Lightship) notes that any weight additions or removals must be documented to track the aggregate weight change of the vessel through its service life. If the aggregate total of these weight changes exceeds two percent of the vessel s approved lightship or the Longitudinal Center of Gravity (LCG) shifts by more than one percent of the vessel s length between perpendiculars (LBP), a new simplified stability test will be required. To determine the aggregate weight change the owner/operator must provide the documented weight of the vessel upon completion of construction and outfitted with all equipment required by 46 CFR Subchapter T, and any weight changes made though out the vessel s service life. Use Marine Technical Note (MTN) (Lightship Change Determination; Weight-Movement Calculation vs. Deadweight Survey vs. Full Stability Test) to calculate the aggregate weight change. Without documented weights a new simplified stability test must be conducted. The OCMI may send the aggregate weight changes to the Marine Safety Center to determine if the vessel s stability has been adversely affected. Note 1: Note 2: Note 3: Note 4. MTN is attached at the end of this document. If it has been determined that a new simplified stability test is required it is the vessel representative responsibility to conduct the test. This test must be witnessed by a Marine Inspector. Procedures on how to conduct a simplified stability test can be found on Sector San Juan s Port Directory Page/under Domestic Inspection at Due to website security a direct link can not be provided. A new Stability Letter must be issued prior to the vessel being issued a Certificate of Inspection 2. Vessels that have Stability Letter based on calculations: The changes in weight do to the repowering of the vessel will have to be evaluated by the MSC using Marine Technical Note (MTN) (Lightship Change Determination; Weight-Movement Calculation vs. Deadweight Survey vs. Full Stability Test) The purpose of this Marine Technical Note (MTN) is to publish the Coast Guard's long-standing policy for determining when weight changes to a vessel are significant enough to warrant requiring a new deadweight survey or a full stability test (deadweight survey and inclining), in order to reestablish accurate lightship characteristics, which includes vessel displacement and the location of the center of gravity The owner of a vessel which requires approved lightship characteristics to show compliance with Coast Guard stability requirements must advise the cognizant OCMI or Load Line assigning authority of any changes to the vessel's lightship characteristics. Detailed lists of the items to be added or removed, including weight estimates and calculations showing their effect on the vessel's lightship characteristics, must be submitted to the MSC (or ABS using the NVIC 3-97 process) for review. The owner should Revised: April 21, 2008 Previous editions are obsolete. Guidance for Repowering Vessels Inspected Under 46 CFR Subchapter T Page 5 of 6
6 include documentation of the last approved lightship characteristics that were based upon a stability test as well as any previous weight moment calculation adjustments. The MSC or ABS will then examine the information in accordance with the above policy and determine if a deadweight survey or full stability test is required. Note 1: MTN is attached at the end of this document. Note 2: NVIC 3-97 can be downloaded from: Revised: April 21, 2008 Previous editions are obsolete. Guidance for Repowering Vessels Inspected Under 46 CFR Subchapter T Page 6 of 6
7 MSC Guidelines for Review of Electrical Plans Small Passenger Vessel Procedure Number: E2-07T Revision Date: 04/16/2003 References a) Title 46 Code of Federal Regulations, Part 181 Fire Protection Equipment b) Title 46 Code of Federal Regulations, Part 182 Machinery Installation. c) Title 46 Code of Federal Regulations, Part 183 Electrical Installation. d) Title 46 Code of Federal Regulations, Subchapter J (Parts ) Electrical Engineering Disclaimer These guidelines were developed by the Marine Safety Center as an aid in the preparation and review of vessel plans and submissions. They were developed to supplement existing guidance. They are not intended to substitute or replace laws, regulations, or other official Coast Guard policy documents. The responsibility to demonstrate compliance with all applicable laws and regulations still rests with the plan submitter. The Coast Guard and the U. S. Department of Homeland Security expressly disclaim liability resulting from the use of this document. Contact Information If you have any questions or comments concerning this Guidance, please contact the Marine Safety Center by or phone. Please refer to Procedure Number: E2-07T. [email protected] Phone: (202) General Review Guidance The numbers following each item refer to a section of Title 46 of the Code of Federal Regulations. Is this a Sister Vessel? ( ) Is this vessel on file at the MSC? Please include MSC project number. Is the office that is going to inspect and grant you the COI listed on your plan review cover letter so we may copy them on correspondence? Is this submittal in response to MSC correspondence you have received? If so please reference it and include a copy of the previous correspondence. Elementary One-Line Diagram of the Power System: [ (a-4)(i-ix)] List on the plan, as applicable, the full load amps of generators or alternators and the total amp hours of battery banks. Vital loads must have two sources of power. ( ) If your vessel is equipped with two or more generators to supply ship's service power, they must either be interlocked or arranged for parallel operation. ( ) U.S. Coast Guard Marine Safety Center 1
8 MSC Guidelines for Review of Electrical Plans Small Passenger Vessel Procedure Number: E2-07T Revision Date: 04/16/2003 Are the full load amps of the panelboards used on the plan? Is the circuit breaker feeding the panel set below the panel amps? ( ) Required cable and wiring details to be included in submittal: type, temperature rating of insulation and conductor size. See (d) for acceptable cable type: IEEE-45, MIL-C-24643, UL Listed Boat Cable for cable, NEC Article 310 for wire. ( ) Ensure no wire is installed on AC systems unless it is in an enclosure. ( (a)). Are the circuit breaker, overcurrent devices and switch ratings listed? Have you listed the number of circuit breaker poles? ( ) Is the circuit breaker trip setting less than the conductor ampacity or the next standard size up? ( (d)) Are motor circuits properly protected? ( (h)(2) See NEC 2002 Edition, Table for reference.) Is the steering gear motor circuit protected against short circuit only? (all overload contacts wired for alarm only, not trip) Is instantaneous trip setting for circuit breaker listed on the plan? ( (f) / (e-f)) Does the battery charger or alternator connected provide power (volts x amps) above 2000 Watts? If so, no unprotected electrical equipment may be in space with the batteries. ( , ) If electrical equipment is located in hazardous areas, is the equipment explosion proof, ignition proof, or part of an intrinsically safe system? ( ) Semiconductor rectifier systems, if installed, must indicate proper heat removal, current limiting devices, and overcurrent protection in your one-line diagram. ( ) Dual voltage generator system must be of the grounded type and provide ground detection. ( ) Single voltage generator must be ungrounded. If grounded, is the single ground location clearly labeled in your submittal? ( ) If an ungrounded system, is ground detection evident in your submittal? ( ) Is the shore power circuit breaker setting listed on the plan? Is the shore power breaker interlocked with the generator breaker? ( ) Does AC lighting meet UL1598A or the UL standard that supercedes it? ( ) Does your emergency lighting have sufficient power capacity? ( ) Electrical Plant Load Analysis Are all electrical loads from switchboards, power distribution panels or DC load terminals (as applicable) included in your analysis? Have you included the amp rating of energy consuming devices and load usage factor for each load? Are the capacities of your storage batteries (Amp-Hours), and full load amps rating of your alternator(s) and generator(s) included in your analysis? Are they greater than the total of loads after the usage factor is applied? Are bilge pump power requirements included in your load analysis? ( (a/d)(e-8)) Have you included wire/cable lengths in your description? Have you computed the voltage drop using and determined that it is less than 10%? ( (p)) U.S. Coast Guard Marine Safety Center 2
9 MSC Guidelines for Review of Electrical Plans Small Passenger Vessel Procedure Number: E2-07T Revision Date: 04/16/2003 Fire/Smoke Detection Systems Fire detection and extinguishing systems must be installed in compliance with through Is your vessel a fiber reinforced plastic (FRP) vessel constructed with general-purpose resins and fitted with a smoke detection system? ( (c-3)/76.27) Is a fixed gas fire extinguishing system installed that is capable of automatic discharge upon heat detection? ( (a)) Is your fire detection system Type Approved? (MSC approval list) Is fire detection located in the required spaces? ( (c)) Spaces that do not require detectors. ( (b-1)) Requirements for each overnight accommodation space on a vessel with overnight accommodations for passengers. ( (e)/450(a)) If there an enclosed vehicle space located on board which requires a detection system? ( (f)) Fire/Smoke detection zoning requirements. Verify that a engine-room-fire/smokedetection loop does not share a common circuit with any detectors outside of the engine room. Isolator modules can be used to isolate the engine room. Ensure the isolator module is on the approved component s list for the fire detection system. ( / ) Manual alarm system details. (76.35) U.S. Coast Guard Marine Safety Center 3
10 Date: 11 May 1995 SSIC: 16703/MSM Vol. IV Sec. 6.D.4/ 46 CFR MTN: Subj: LIGHTSHIP CHANGE DETERMINATION; WEIGHT-MOMENT CALCULATION VS. DEADWEIGHT SURVEY VS. FULL STABILITY TEST Ref: (a) Marine Safety Manual, Volume IV, section 6.D.4 (b) Navigation and Inspection Circular (NVIC) dated 4 November 1991 (c) ASTM Standard Guide F , "Standard Guide for Conducting a Stability Test (Inclining and Lightweight Survey) to Determine the Light Ship Displacement and Centers of Gravity of a Vessel." 1. PURPOSE: The purpose of this Marine Technical Note (MTN) is to publish the Coast Guard's long-standing policy for determining when weight changes to a vessel are significant enough to warrant requiring a new deadweight survey or a full stability test (deadweight survey and inclining), in order to reestablish accurate lightship characteristics, which includes vessel displacement and the location of the center of gravity. 2. DISCUSSION: a. Lightship Characteristic Changes. A vessel's lightship characteristics form the basis for performing the calculations necessary to demonstrate a vessel complies with applicable stability requirements. Accordingly, the accuracy of these characteristics is of paramount importance, both at the time of construction and throughout the vessel's service life. Changes to a vessel, through the addition, removal, or relocation of items which are included as a part of the vessel's lightship, could jeopardize the accuracy of the lightship characteristics. It is incumbent upon vessel owners and their naval architects to minimize the possible adverse affects of the weight changes. In accordance with reference (a), a complete stability test is usually required after work is completed unless weight changes are minor and do not adversely affect the vessel's stability. However, the Marine Safety Center (MSC) is given the authority to determine whether calculations alone are sufficient, based on the accuracy of the information available or based on applying acceptable penalties. Therefore, an evaluation must be made as to whether or not a vessel needs to undergo a deadweight survey or a full stability test following any change to the lightship characteristics. In making this determination, the MSC will consider the total aggregate of all weight changes that have been made since the last stability test (not just the net change).
11 This total aggregate weight change (Wtotal) is determined by summing the magnitudes of all weights added (Wa), all weights relocated (Wrl) and all weights removed (Wr) as follows: Wtotal = Wa + Wr + Wrl In applying the above formula, those items whose weight and center of gravity are known exactly through actual measurement may be excluded from the total aggregate weight change; however, such items are subject to review and approval of the MSC and acceptance and verification by the cognizant Officer in Charge, Marine Inspection (OCMI). b. Weight-moment Calculations Only Required. When the total aggregate weight change does not exceed 2% of the currently approved lightship displacement and the LCG does not shift by more than 1% of the vessel's length between perpendiculars (LBP), weight-moment calculations will generally suffice in lieu of a deadweight survey. However, if the amounts or locations of items being added or removed cannot be determined with a reasonable accuracy, then a deadweight survey will be required in order to confirm the new calculated lightship VCG. If weight-moment calculations only are used, then any future weight changes evaluated must include the total aggregate weight changes from the last stability test, not just from the approved lightship characteristics determined by these calculations. c. Deadweight Survey Only Required. In accordance with 46 CFR and the guidelines established in reference (a), a deadweight survey only will generally be required when a vessel has undergone a total aggregate weight change since the last stability test of between two and ten percent (2-10%) of its displacement, or when it's lightship LCG shifts by more than 1% of the vessel's LBP. If however, upon completion of a required deadweight survey, the results show that, when compared to the vessel's calculated lightship characteristics (anticipated based on the weightmoment calculations), there is a difference of less than 1% for the displacement or a shift in the LCG of less than 1% of the vessel's LBP, then the vessel's lightship VCG can be assumed as being the one determined by the weight-moment calculations. If on the other hand, the displacement or LCG fall outside the above tolorences, then the vessel must either undergo a full stability test or, apply an indisputably conservative penalty to the calculated lightship VCG. d. Full Stability Test Required. When the total aggregate weight changes exceed 10% of a vessel's currently approved lightship displacement, a full stability test will be required. Vessels undergoing a full stability test shall comply with the requirements and recommendations of references (b) and (c) and the guidance of paragraph (e) below. e. Stability Test Preparations. Prior to any deadweight survey or full stability test, the vessel's condition shall be as close to lightship as practicable. Total weights to add or subtract which are necessary to convert from the condition of the vessel during the test to the lightship condition should be limited to a maximum of 2% of the vessel's anticipated lightship displacement.
12 Liquids which are to remain on board shall be listed in the approved inclining procedure and should be consolidated so that the number of tanks involved is minimized. Tanks which contain liquids must comply with the conditions of paragraph 5.2 of reference (c). Specifically, they must either be pressed full or the shape of the tank must be such that the free surface effect can be accurately determined. 3. ACTION: a. The owner of a vessel which requires approved lightship characteristics to show compliance with Coast Guard stability requirements must advise the cognizant OCMI or Load Line assigning authority of any changes to the vessel's lightship characteristics. Detailed lists of the items to be added or removed, including weight estimates and calculations showing their effect on the vessel's lightship characteristics, must be submitted to the MSC (or ABS using the NVIC 3-84 process) for review. The owner should include documentation of the last approved lightship characteristics that were based upon a stability test as well as any previous weightmoment calculation adjustments. b. The MSC or ABS will then examine the information in accordance with the above policy and determine if a deadweight survey or full stability test is required. In making this determination, the MSC will consider the types of weight involved, the error inherent in the changes, and their effect on stability. Also included in these considerations will be the sizes and locations of the individual items being changed and the accuracy with which the weights and centers of gravity can be determined. Accordingly, a small number of large items with well defined centers of gravity will generally receive more favorable consideration than a large number of small items or items such as extensive piping systems where the accuracy and level of detail is questionable. T. H. WALSH Copy: G-MTH-3 G-MVI-1 ABS AMERICAS (Stability & Load Line Section)
United States Coast Guard COMDTPUB 16700.4 NVIC 11-83, CH-1 7 JULY 1995
United States Coast Guard COMDTPUB 16700.4 NVIC 11-83, CH-1 7 JULY 1995 NAVIGATION AND VESSEL INSPECTION CIRCULAR NO. 11-83, CH-1 Electronic Version for Distribution on the World Wide Web Subj: CH-l TO
DEPARTMENT OF TRANSPORTATION UNITED STATES COAST GUARD
DEPARTMENT OF TRANSPORTATION UNITED STATES COAST GUARD NAVIGATION AND VESSEL INSPECTION CIRCULAR NO. 1-78 US. COAST GUARD (G-MVP-5/82) WASHINGTON. D.C. 20590 PHONE:(202) 426-2240 NVIC 1-78 Subj: Automation
White Paper SolarEdge Three Phase Inverter System Design and the National Electrical Code. June 2015 Revision 1.5
White Paper SolarEdge Three Phase Inverter System Design and the National Electrical Code June 2015 Revision 1.5 Shalhevet Bar-Asher; SolarEdge Technologies, Inc. Bill Brooks, PE; Brooks Engineering LLC
HOW TO CORRECTLY CONNECT DEEP CYCLE BATTERIES AND CHOOSE THE RIGHT CABLE SIZING
HOW TO CORRECTLY CONNECT DEEP CYCLE BATTERIES AND CHOOSE THE RIGHT CABLE SIZING There are several ways to wire multiple batteries to achieve the correct battery voltage or capacity for a particular DC
Competency Framework for Marine Engineer Class 6. Competency Framework for Marine Engineer Class 6
Table of Contents (MEC 6)... 1 Function: Operate Vessel Machinery and Systems... 1 Diesel engines.... 1 Operational procedures.... 3 Operate and monitor a vessel s engines and auxiliary equipment.... 4
What are the basic electrical safety issues and remedies in solar photovoltaic installations?
What are the basic electrical safety issues and remedies in solar photovoltaic installations? Presented by: Behzad Eghtesady City of Los Angeles Department of Building and Safety Topics Covered Photovoltaic
SOLAR PV STANDARD ELECTRICAL PLAN Microinverter Systems for Single Family Dwellings
*** Provide this document to the inspector along with ALL system installation instructions *** Project Address: Scope: Standard plan for the installation of grounded microinverter solar PV systems, not
H-2 VENTILATION OF BOATS USING GASOLINE
H-2 VENTILATION OF BOATS USING GASOLINE Table of Contents 2.1 PURPOSE...1 2.2 SCOPE...1 2.3 REFERENCED ORGANIZATIONS...1 2.4 DEFINITIONS...1 2.5 REQUIREMENTS IN GENERAL...2 H-2 APPENDIX...6 H-2 VENTILATION
COMDTPUB P16721 NVIC 20-14 August 25, 2014. Subj: GUIDELINES FOR QUALIFICATION FOR HIGH-SPEED CRAFT TYPE-RATING ENDORSEMENTS
Commandant United States Coast Guard 2703 Martin Luther King Jr. Ave. SE Washington, DC 20593-7501 Staff Symbol: CG-CVC-4 Phone: (202) 372-2357 E-Mail: [email protected] NAVIGATION AND VESSEL INSPECTION
THE BOATER'S GUIDE TO SUCCESSFUL REPOWERING
THE BOATER'S GUIDE TO SUCCESSFUL REPOWERING The First In A Series Of Practical Guides For The Recreational Boater Published By: Yanmar Diesel America Corp. As A Service To The Boating Community. Are You
26 3213.13 Diesel Engine Driven Generators Page 1 of 6
Last Update: December 8, 2014 A. Description of System Consultant s Handbook Page 1 of 6 1. Provide a diesel engine driven electric generating unit, factory assembled, tested and certified to operate at
Part 0 - Classification and Surveys Classification and Surveys I-0 2016-01
Code Edition I - Ship Technology Part 0 - Classification and Surveys Classification and Surveys I-0 2016-01 Part 1 - Seagoing Ships Chapter 1 - Hull Structures I-1-1 2016-01 Chapter 1 - Hull Structures
Current Transformers
Tyco Electronics Corporation Crompton Instruments 1610 Cobb International Parkway, Unit #4 Kennesaw, GA 30152 Tel. 770-425-8903 Fax. 770-423-7194 Current Transformers Current transformers (CT's) provide
CHAPTER 2 EXAMPLES AND TABLES
CHAPTER 2 EXAMPLES AND TABLES COMMENTARY AT 210.20(A) EXCEPTION An overcurrent device that supplies continuous and noncontinuous loads must have a rating that is not less than the sum of 100 percent of
City of Riverside Building & Safety Division Phone: (951) 826-5697 www.riversideca.gov
City of Riverside Building & Safety Division Phone: (951) 826-5697 www.riversideca.gov PHOTOVOLTAIC PERMITTING GUIDELINES The information provided in this document is general and is intended only as a
ELECTRIC/DIESEL FIRE PUMP CHECK LIST
BUILDING NAME: DESIGNER: SCO REPRESENTATIVE: PUMP MANUF.: LOCATION: INSTALLER: DATE: OWNER NAME: INSTALLATION Certificate for flushing and hydrostatic test furnished Piping been hydrostatically tested
County of Riverside Building and Safety Department
County of Riverside Building and Safety Department Mike Lara Director Photovoltaic Permitting Guidelines The information provided in this document is general and is intended only as a guide. Each project
Fire Pump Plan Review March 2010
Fire Pump Plan Review March 2010 Date of Review: / / Permit Number: Business/Building Name: Address of Project: Designer Name: Designer s Phone: Contractor: Contractor s Phone: Occupancy Classification:
LEHI CITY POWER NET METERING STANDARDS For Customer-Owned Electric Generating Systems
LEHI CITY POWER NET METERING STANDARDS For Customer-Owned Electric Generating Systems A. General This Net Metering Standard for Customer-Owned Grid Connected Electric Generating Systems sets forth the
Evaluating Fire- and Heat-Damaged Electrical Equipment
Evaluating Fire- and Heat-Damaged Electrical Equipment www.nema.org 1 USE OF THIS PUBLICATION This publication provides information on how to evaluate electrical equipment that has been exposed to heat
UL guidelines, chapter 6.2 / 6.3 Motor Branch Circuits acc. to UL
UL guidelines, chapter 6.2 / 6.3 Motor Branch Circuits acc. to UL Definition of Terms / Explanations Overview of Basic Devices Construction Types acc. to UL 508 Self-Protected Combination Motor Controller
United States COMDTPUB P16700.4 NAVIGATION AND VESSEL INSPECTION CIRCULAR NO. 10-82, CHANGE 2
U.S. Department Commandant (G-MTH-4) Washington, DC 20593-0001 of Transportation United States Coast Guard Phone: (202) 267-2997 United States COMDTPUB P16700.4 Coast Guard NVIC 10-82, CH-2 18 SEP 1989
MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION
MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION Fire Pump Plan Review 2009 International Fire Code and NFPA 20 Date of Review / / BLD201 - Project Address: Project Name: Contractor s Business
Subj: INSPECTION AND CERTIFICATION OF VESSELS UNDER THE MARITIME SECURITY PROGRAM (MSP)
Commandant United States Coast Guard 2100 Second Street, S.W. Washington, DC 20593-0001 Staff Symbol: CG-5431 Phone: (202) 372-1224 Fax: (202) 372-1918 Email: [email protected] COMDTPUB P167004A NVIC XX-12
Short Circuit Current Calculations
Introduction Several sections of the National Electrical Code relate to proper overcurrent protection. Safe and reliable application of overcurrent protective devices based on these sections mandate that
The State Fire Marshal's Office and the VDH/Office of Licensure and Certification. Generator Testing in Nursing Facilities
Generator Testing in Nursing Facilities Introduction Recent emergencies and natural disasters have emphasized the need to ensure that nursing facilities have an adequate EPSS in place should the loss of
ELECTRICAL - WIRING DESIGN AND PROTECTION SELF INSPECTION CHECKLIST
Name of School: OPTIONAL INFORMATION Date of Inspection: Vocational Program/Course/Room: Signature of Inspector: ELECTRICAL - WIRING DESIGN AND PROTECTION SELF INSPECTION CHECKLIST Guidelines: This checklist
Residential Solar Service Agreement (RSSA) Customer Sited Solar Photovoltaic Systems
Residential Solar Service Agreement (RSSA) Customer Sited Solar Photovoltaic Systems This Agreement is made and entered into this day of, 20, ( Effective Date ) by and between the Orlando Utilities Commission
UPS Applications and VRLA Battery Sizing
TECHNICAL BULLETIN 41-7334 UPS Applications and VRLA Battery Sizing 41-7334/0213/CD www.cdtechno.com The uninterruptable power system (UPS) is used to protect critical equipment and processes from the
Circuit Breakers and Switchgear. Thomas Greer Director of Engineering TLG Services
Circuit Breakers and Switchgear Thomas Greer Director of Engineering TLG Services Presentation Outline Switchgear Definition Overcurrent Protection Devices Circuit Breaker Trip Curves and Coordination
Evaluating Water-Damaged Electrical Equipment
Evaluating Water-Damaged Electrical Equipment 1 USE OF THIS PUBLICATION This publication provides information on how to evaluate electrical equipment that has been exposed to water through flooding, fire
Evaluating Water-Damaged Electrical Equipment
Evaluating Water-Damaged Electrical www.nema.org Evaluating Water-Damaged Electrical 1 USE OF THIS PUBLICATION This publication provides information on how to evaluate electrical equipment that has been
A.1 Obligations and reporting of the gaining Society. Plans to be Submitted by the Owner to the Gaining Society
(Rev.0 July 2009) (Rev.1 June 2012) (Rev.2 Oct 2013) (Rev.3 Jan 2015) (Rev.4 July 2015) (Rev.5 Jan 2016) Procedure for Transfer of Class TABLE OF CONTENTS Procedure for Transfer of Class Application Definitions
INSPECTION AND TESTING OF EMERGENCY GENERATORS
INSPECTION AND TESTING OF EMERGENCY GENERATORS Certification requirements NFPA 101(00), Sec. 7.9.2.3 requires that emergency generators be installed, tested and maintained in accordance with NFPA 110,
NFPA 70E 2012 Rolls Out New Electrical Safety Requirements Affecting Data Centers
NFPA 70E 2012 Rolls Out New Electrical Safety Requirements Affecting Data Centers A market position paper from the experts in Business-Critical Continuity TM Executive Summary Electrocutions are the fourth
BOATBUILDER S HANDBOOK
BOATBUILDER S HANDBOOK [ REVISED NOVEMBER, 2003 ] Produced Under A Grant From The Aquatic Resources (Wallop-Breaux) Trust Fund Administered By The U.S. Coast Guard. SUBPART I ELECTRICAL SYSTEMS Revised
Voltage Drop (Single-Phase)
Voltage Drop (Single-Phase) To Find: To Find Voltage Drop Formula: 2 x K x L x I V.D. = ------------------- C.M. Variables: C.M. = Circular Mill Area (Chapter 9, Table 8) To Find Voltage Drop Percentage
How To Plan Out An Array Of Solar Panels
CITY OF DOWNEY COMMUNITY DEVELOPMENT, BUILDING AND SAFETY 11111 Brookshire Avenue Downey, CA 90241 562.904.7142 (www.downeyca.org) B SECTION 01/01/2011 EFFECTIVE DATE PHOTOVOLTAIC 032 FORM NUMBER 2013
Specifying a Variable Frequency Drive s
Specifying a Variable Frequency Drive s Put on by Bruce Reeves and Jeremy Gonzales Dykman Electrical Covering the Western US For all of your VFD and Soft Start and Motor Needs How To Specify a Variable
DELAWARE STATE FIRE MARSHAL FIRE ALARM SYSTEM CERTIFICATE OF INSTALLATION
Phone System Owner Phone System Engineered by: of Record Drawings: of System Manuals: of Test Reports: System Installer 1. GENERAL INFORMATION Phone Delaware License No: Certificate Holder No. System Supplier
IMO REQUIREMENTS FROM JULY 2015 TO JULY 2018 INCLUSIVE
STATUTORY UPDATE No. 05, 2015 / JUNE Update available View No. 12/2016 IMO REQUIREMENTS FROM JULY 2015 TO JULY 2018 INCLUSIVE Keeping updated on new and retroactive requirements from IMO/ ILO can be a
Buck - Boost Transformers
Buck - Boost Transformers Contents Buck - Boost Transformers - Terms & Definitions... 48 Buck - Boost Transformers - Sizing... 50 Quick Reference Chart - 08, 0, 40 Volts Single & Three Phase... 5 Single
Evaluating Water-Damaged Electrical Equipment
Evaluating Water-Damaged Electrical Equipment 1 USE OF THIS PUBLICATION This publication provides information on how to evaluate electrical equipment that has been exposed to water through flooding, fire
UNIVERSITY OF WASHINGTON Facilities Services Design Guide. Electrical. Switchboards. Basis of Design. Design Evaluation
Basis of Design This section applies to the design relating to low voltage switchboards. Design Criteria UW Class N1 facilities main switchboards shall be rear accessible. The main, tie and feeder breakers
Underground Storage Tanks
Underground Storage Tanks An Informational and Guidance Document for the University Community. Please contact Yale Environmental Health and Safety for latest Regulatory Requirements. A typical UST installation
Sentron Series Circuit Breakers
Sentron Series Circuit Breakers Siemens Sentron Series circuit breakers are available in nine frame sizes: ED, FD, JD, LD, LMD, MD, ND, PD, and RD. Sentron Series circuit breakers have a wide range of
OWNER S MANUAL FORCE 10 MARINE COMPANY 23080 HAMILTON ROAD RICHMOND, BC CANADA V6V 1C9 TEL: (604) 522-0233 FAX: (604) 522-9608
Electric Water Heater OWNER S MANUAL FORCE 10 MARINE COMPANY 23080 HAMILTON ROAD RICHMOND, BC CANADA V6V 1C9 TEL: (604) 522-0233 FAX: (604) 522-9608 If your water Heater is Damaged or you have questions
101 BASICS SERIES LEARNING MODULE 3: FUNDAMENTALS OF ELECTRICAL DISTRIBUTION. Cutler-Hammer
101 BASICS SERIES LEARNING MODULE 3: FUNDAMENTALS OF ELECTRICAL DISTRIBUTION Cutler-Hammer WELCOME Welcome to Module 3, Fundamentals of Electrical Distribution. If you have successfully completed Module
FIRE ALARM AND DETECTION SYSTEMS SECTION 16721
PART 1 - GENERAL 1.01 WORK INCLUDED FIRE ALARM AND DETECTION SYSTEMS SECTION 16721 A. Provide a complete fully addressable, power limited, fire detection and evacuation system. The system shall be connected
POLK STATE COLLEGE CHILLER PLANT EVALUATION WINTER HAVEN, FLORIDA APRIL 2, 2014. C arastro & A ssociates, C&A# 5747
POLK STATE COLLEGE WINTER HAVEN, FLORIDA CHILLER PLANT EVALUATION APRIL 2, 2014 C&A# 5747 C arastro & A ssociates, c o n s u l t i n g e n g i n e e r s inc. 2609 W. De Leon Street, Tampa, Florida 33609
MISCELLANEOUS ELECTRICAL JOBS REQUIRING PERMITS
MISCELLANEOUS ELECTRICAL JOBS REQUIRING PERMITS 01. SAFETY INSPECTION of service equipment at FPL Power Source 02. Construction GFI power outlets (Temp Pole for Construction) 03. 90 day temporary power
FIRE ALARM SYSTEM. A. Shop drawings shall be submitted as follows: 1. Manufacturer's published literature. for aspproval.
Polk School District Specifications for the New Fire Alarm in the Existing Building Eastside Elementary School FIRE ALARM SYSTEM 1.01 SUBMITTALS A. Shop drawings shall be submitted as follows: 1. Manufacturer's
PART 8: FIELD WIRING. n WARNING NOTICE. Boiler Manual
PART 8: FIELD WIRING A. INSTALLATION MUST COMPLY WITH: 1. National Electrical Code and any other national, state, provincial or local codes or regulations. 2. In Canada, CSA C22.1 Canadian Electrical Code
Bussmann. All-In-One Module. Bussmann Power Module Switch. How to configure Part Numbers: Step 1: Select Switch Amperage 1
How to configure Part Numbers: Step : Select Switch Amperage Power Module Switch Rating (Amps) Power Module Switch Catalog No. 30 3 60 6 00 200 2 400 4 Step 2: Select Options Needed 5 Bussmann Power Module
Ethanol Vehicle and Infrastructure Codes and Standards Citations
Ethanol Vehicle and Infrastructure Codes and Standards Citations This document lists codes and standards typically used for U.S. ethanol vehicle and infrastructure projects. To determine which codes and
Unified requirements for systems with voltages above 1 kv up to 15 kv
(1991) (Rev.1 May 2001) (Rev.2 July 2003) (Rev.3 Feb 2015) Unified requirements for systems with voltages above 1 kv up to 15 kv 1. General 1.1 Field of application The following requirements apply to
SHORE POWER. Safely Connecting Ships to Shore SAFETY QUALITY INNOVATION VALUE CUSTOMER SERVICE
SHORE POWER Safely Connecting Ships to Shore SHIP-TO-SHORE SOLUTIONS FOR MILITARY & COMMERCIAL APPLICATIONS SAFETY QUALITY INNOVATION VALUE CUSTOMER SERVICE ESL Power Systems, Inc. ESL has established
EXPRESS PERMITS (No Plan Check Required)
EXPRESS PERMITS (No Plan Check Required) Following are the lists of different types of construction for which an express permit can be issued. Express permits can be issued where work does not require
Solar Water Heating and Photovoltaic Electrical Systems Installed on One or Two Family Dwellings
Solar Water Heating and Photovoltaic Electrical Systems Installed on One or Two Family Dwellings I. BACKGROUND As awareness of renewable energy and green building options increases, solar energy systems
Section 14. Forklift Safety Contents 14.1 Operator Safety
Section 14. Forklift Safety Contents 14.1 Operator Safety... 14-1 14.2 Inspection and Maintenance... 14-2 14.3 Handling the Load... 14-3 14.4 Fueling Liquefied Petroleum (LP) Gas Forklifts... 14-3 14.5
ENGINEERING REPORT. XYZ Corporation 100 Anyplace Drive Chicago, Illinois 60613
ENGINEERING REPORT XYZ Corporation 100 Anyplace Drive Chicago, Illinois 60613 PERFORMED BY: MIDWEST ELECTRICAL CONSULTANTS, INC 18055 UPLAND DRIVE TINLEY PARK, ILLINOIS 60487 (708) 444-0001 fax: 444-0003
Oil and Coolant Circulating Heating System. Model - OCSM
Oil and Coolant Circulating Heating System Model - OCSM Installation & Operation Manual 216280-000 REV 2 Identifying Your System The HOTSTART heating system is designed to heat fluids for use in marine
STEEL VESSELS UNDER 90 METERS (295 FEET) IN LENGTH 2012
RULES FOR BUILDING AND CLASSING STEEL VESSELS UNDER 90 METERS (295 FEET) IN LENGTH 2012 NOTICES AND GENERAL INFORMATION American Bureau of Shipping Incorporated by Act of Legislature of the State of New
FAIRBANKS NIJHUIS FIRE PUMPS. www.fairbanksnijhuis.com
FAIRBANKS NIJHUIS FIRE PUMPS www.fairbanksnijhuis.com FAIRBANKS NIJHUIS Long established as a leading fire pump manufacturer, Fairbanks Nijhuis offers a broad range of horizontal and vertical split case,
IMPLEMENTING THE NEW ELECTRICAL SAFETY REQUIREMENTS
IMPLEMENTING THE NEW ELECTRICAL SAFETY REQUIREMENTS Paul A Zoubek, CSP, CIH Occupational Services, Inc. San Diego, CA 619-861 861-0612 [email protected] OCCUPATIONAL SERVICES, INC. BACKGROUND Update Update
Power Plant Electrical Distribution Systems
PDH Course E184 Power Plant Electrical Distribution Systems Gary W Castleberry, PE 2008 PDH Center 2410 Dakota Lakes Drive Herndon, VA 20171-2995 Phone: 703-478-6833 Fax: 703-481-9535 www.pdhcenter.com
Mike Holt s Illustrated Guide to. Rule 220.87, Articles 445, 700, 701, and 702. Based on the 2011 NEC
Mike Holt s Illustrated Guide to NEC Requirements for Generators and Standby Power Systems Rule 220.87, Articles 445, 700, 701, and 702 Based on the 2011 NEC Extracted from Mike Holt s Illustrated Guides
BASIC NEC CODE RULES AND DESIGN PRACTICE
BASIC NEC CODE RULES AND DESIGN PRACTICE Wire Ampacity and Size Circuit Breaker Size 1. Maximum loading for any branch circuit is 80% of rating of circuit for ampacity of wire for any load. NEC 220-2,
All work must conform to the National Electric Code, latest edition, and all other applicable codes and regulations.
DIVISION 16 ELECTRICAL SECTION 16100 - ELECTRICAL PART 1 - GENERAL SCOPE All electrical work as shown on the drawings and as necessary to provide a complete electrical system. Include primary service,
CLASSIFICATION NOTES
CLASSIFICATION NOTES Type Approval, Installation and Testing of Water Level Detectors on Bulk Carriers and Single Hold Cargo Ships other than Bulk Carriers General Information This edition of the classification
Ontario Electrical Safety Code 25 th Edition/ 2012
Ontario Electrical Safety Code 25 th Edition/ 2012 Ted Olechna Director, Codes and Standard Chief Engineer 1 What I Will Cover ESA s role is as the regulator Highlight of 2012 Code changes The Code and
Rotary Phase Converters
FACTS from Ronk Electrical Industries, Inc. Bulletin 11981 Rotary Phase Converters ROTOVERTER Pat. No. 3,670,238 ROTO-CON Pat. No. 4,158,225 What are the ROTO-CON and ROTOVERTER power converters? The ROTO-CON
Inverter / Charger Installation General Operations and AC and DC Connections
Inverter / Charger Installation General Operations and AC and DC Connections The Inverter is just one piece. Sometimes, a tendency is to mount the inverter and batteries, and make it work It is better
Building Permit Application
Building Permit Application Administrative Use Only PARENT PERMIT NUMBER (Required if part of another project) PERMITTEE: PERMITTEE ADDRESS: E-MAIL ADDRESS: ARCHITECT/ENGINEER: PHONE: PHONE: ARCHITECT/ENGINEER
Ontario Fire Code SECTION 5.13 DIP TANKS. Illustrated Commentary. Office of the Ontario Fire Marshal
Ontario Fire Code SECTION 5.13 DIP TANKS Illustrated Commentary Office of the Ontario Fire Marshal Dip Tanks Illustrated Commentary 1 5.13.1. Location 5.13.1.1. Dip tank operations involving flammable
SPECIFICATIONS FOR THE INSTALLATION OF FIRE ALARM SYSTEMS, SPRINKLER SYSTEMS, AND MASTER BOXES IN THE POQUONNOCK BRIDGE FIRE DISTRICT
SPECIFICATIONS FOR THE INSTALLATION OF FIRE ALARM SYSTEMS, SPRINKLER SYSTEMS, AND MASTER BOXES IN THE POQUONNOCK BRIDGE FIRE DISTRICT The purpose of these specifications is to insure that there are minimum
GROWTH MANAGEMENT DEPARTMENT 201 SE 3 rd ST, (Second Floor), Ocala, FL 34471 (352) 629-8421; FAX: (352) 629-8264
BUILDING CODE GUIDELINES FOR ELECTRICAL INSPECTIONS Building Code compliance is the obligation of design professionals and/or contractors. Plan Review and Inspection Guidelines are intended to be used
GENERATOR SELECTION. a. Three phase - 120/208V, 3 phase, 4W wye; 277/408, 3 phase, 4W wye; * 120/240V 3 phase, 4W Delta
GENERATOR SELECTION Generators must be sized to handle their load based on the continuous KW, kilowatt load, and KVA, kilovoltamp load, and the worst case starting load KW + KVA. They must be derated for
Fire Alarm System Plans Submittal Guidelines For New and Existing Systems
Fire Alarm System Plans Submittal Guidelines For New and Existing Systems SCOPE The Temecula Fire Prevention Bureau (TFPB) has established the following requirements for the submittal of all fire alarms,
ELECTRICAL GUIDELINES FOR SINGLE-FAMILY HOME OWNERS:
ELECTRICAL GUIDELINES FOR SINGLE-FAMILY HOME OWNERS: Chapter 12 of the Burlington Code of ordinances allows owner occupants of single family homes to do their own wiring if they choose. If you choose to
TAMARAC FIRE RESCUE INSTRUCTIONS FOR FIRE ALARM PRE-SUBMITTAL CHECKLIST
TAMARAC FIRE RESCUE INSTRUCTIONS FOR FIRE ALARM PRE-SUBMITTAL CHECKLIST In order to provide a comprehensive plan review in a timely manner, and to insure the design and installation of fire alarm systems
Laws and price drive interest in LNG as marine fuel
Laws and price drive interest in LNG as marine fuel The use of LNG as a marine fuel is one of the hottest topics in shipping. This growing interest is driven by legislation and price. By Henrique Pestana
P 602. This generator set has been designed to meet ISO 8528 regulation. This generator set is manufactured in facilities certified to ISO 9001.
This generator set has been designed to meet ISO 88 regulation. This generator set is manufactured in facilities certified to ISO 900. This generator set is available with CE certification. Enclosed product
Simplified Guide To Understanding Short-Circuit Current Rating FIND IT, FIX IT, FORGET IT
Simplified Guide To Understanding Short-Circuit Current Rating FIND IT, FIX IT, FORGET IT Are You Ready For The New SCCR Marking Requirements? What Is A Short-Circuit Current Rating (SCCR)? SCCRs on components
..OR How To Protect your 3-Phase Equipment Investment with 3-Phase Monitors from Time Mark...
..OR How To Protect your 3-Phase Equipment Investment with 3-Phase Monitors from Time Mark... TIME MARK CORPORATION 11440 EAST PINE STREET TULSA, OK 74116 USA tel 918 438-1220 fax 918 437-7584 www.time-mark.com
CHECKING AND TESTING ELECTRICAL INSTALLING WORK
CHECKING AND TESTING ELECTRICAL INSTALLING WORK Department of Consumer and Employment Protection Energy Safety Preface It is a requirement of the Electricity (Licensing) Regulations 1991 that all electrical
Listed are common requirements that apply to existing solar installations when altered, added to or reconfigured.
SOLAR ALTERATIONS REQUIREMENTS August 2015 These requirements address typical alterations to solar installations; they cannot address every scenario. In Victoria, an alteration to a solar installation
NATIONAL FIRE ALARM AND SIGNALING CODE
GAP.11.1.1.0 A Publication of Global Asset Protection Services LLC NATIONAL FIRE ALARM AND SIGNALING CODE INTRODUCTION National Fire Protection Association (NFPA) documents describe a level of fire protection
SWITCHGEAR Section 16. SECTION INCLUDES This Section includes service and distribution switchboards rated 600 V and less.
PART 1 - GENERAL SECTION INCLUDES This Section includes service and distribution switchboards rated 600 V and less. RELATED SECTIONS Division 16 Section "Basic Electrical Materials and Methods" for general
BOWL ASSEMBLY SELECTION Select impeller in exactly the same manner as for lineshaft type pump. Note comments under WELL SIZE.
SUBMERSIBLE PUMP selection A submersible pump consists of the following basic elements: < Bowl Assembly < Motor < Cable < Drop Pipe < Surface Plate (with)(without) discharge elbow DATA REQUIRED FOR SELECTION
MARKEL AMERICAN INSURANCE COMPANY POWERBOAT SELF SURVEY EVALUATION FORM
Our records reflect that a Condition and Value survey is due for your boat. A Condition and Value survey performed by a competent marine surveyor is the best way to determine if there are any defects or
National Craft Assessment and Certification Program S P E C I F I C A T I O N S
National Craft Assessment and Certification Program S P E C I F I C A T I O N S INDUSTRIAL ELECTRICIAN V4 ELEC26_O4 Released September 2013 Focus Statement An Industrial Electrician must be able to interpret
City of San Diego Residential Photovoltaic Systems Inspection Guidelines
City of San Diego Residential Photovoltaic Systems Inspection Guidelines The purpose of inspections by DSD staff is to ensure compliance with the California Electrical Code (CEC), other applicable codes
2011/2008/2005 NATIONAL ELECTRICAL CODE SOLAR PV CODE COMPLIANCE REFERENCE
2011/2008/2005 NATIONAL ELECTRICAL CODE SOLAR PV CODE COMPLIANCE REFERENCE PAGE 1 OF 5 This Reference provides a very comprehensive list of aspects of a solar PV installation that could be reviewed, clarifying
Electrical Grounding. Appendix C
Appendix C Electrical Grounding Low-Voltage Equipment Grounding The most frequently cited Office of Safety and Health Administration (OSHA) electrical violation is improper occupational grounding of equipment
Instruction Manual for Operating Panel 301 and 302
Instruction Manual for Operating Panel 301 and 30 Edition: 1/006 Edition: 1/006 Contents 1 Introduction and Overview........................ 5 1.1 Panel 301 Controls........................................
Electrical Shore Connections / Cold Ironing
STANDARD FOR CERTIFICATION No. 2.25 Electrical Shore Connections / Cold Ironing JULY 2014 The electronic pdf version of this document found through http://www.dnv.com is the officially binding version
rpsa FIRE PROTECTION ENGINEERS
R.P. SCHIFILITI ASSOCIATES, INC. P.O. Box 297 Reading, Massachusetts 01867-0497 USA 781.944.9300 Fax / Data 781.942.7500 Telephone Sample Fire Alarm System Calculations 1. A fire alarm manufacturer specifies
MCC Ratings. Voltage Rating
MCC Ratings In addition to the various ratings of individual components used in motor control centers, the overall ratings of the motor control center must also be considered. Voltage Rating Motor control
DC GROUND FAULT DETECTION PROVIDED FOR UNINTERRUPTIBLE POWER SUPPLIES
DC GROUND FAULT DETECTION PROVIDED FOR UNINTERRUPTIBLE POWER SUPPLIES Edward P. Rafter, P. E. Principal Tier IV Consulting Group Lee s Summit, Missouri 64064 INTRODUCTION There are concerns among owners
