1 Section 2 Description of the Existing Mt Arthur Coal Mine
2 TABLE OF CONTENTS 2 DESCRIPTION OF THE EXISTING MT ARTHUR COAL MINE MINING COAL PREPARATION PLANT AND RAIL LOADING FACILITIES TAILINGS AND COARSE REJECTS MANAGEMENT WATER SUPPLY AND WATER MANAGEMENT GENERAL INFRASTRUCTURE EDDERTON ROAD REALIGNMENTS PRODUCT COAL TRAIN MOVEMENTS WASTE MANAGEMENT REHABILITATION WORKFORCE ENVIRONMENTAL MONITORING AND MANAGEMENT COMPLAINTS RECORD KEY OPERATIONS IN THE VICINITY OF THE MT ARTHUR COAL MINE REHABILITATION WORKFORCE 2-9 LIST OF TABLES Table 2-1 Indicative Mt Arthur Open Cut Mine Mobile Fleet LIST OF FIGURES Figure 2-1 Aerial Photograph of Existing Mt Arthur Coal Mine (2012) Figure 2-2 Mt Arthur Coal Mine Existing Monitoring Sites Figure 2-3 Mt Arthur Coal Mine Complaints Record January 2002-December i
3 2 DESCRIPTION OF THE EXISTING MT ARTHUR COAL MINE This section provides a description of the existing Mt Arthur Coal Mine. A history of the development of the Mt Arthur Coal mine is provided in Section MINING Open Cut Operations Open cut mining areas at the Mt Arthur Coal Mine consist of (Figure 2-1): the Northern Open Cut (formerly known as Mt Arthur North); and the Southern Open Cut (including the former Bayswater No. 2, Bayswater No. 3 and South Pit Extension areas). Open cut mining at the Mt Arthur Coal Mine is conducted using a multi-bench multi-strip shovel and excavator operation, supported by a truck fleet to transport coal to on-site processing and transport facilities. This method provides optimal flexibility and efficiency in the staged extraction of the coal resource. Mining predominantly occurs in the Northern Open Cut, which is comprised of several sub-pits, namely Macleans Hill, Windmill, Huon, Calool and Roxburgh. The Wittingham Coal Measures are currently mined by HVEC and attain a maximum thickness of greater than 600 m in the Northern Open Cut area and contain in excess of 20 coal seams, or seam groups. Coal is currently mined from the following seam groups: Glen Munro; Woodlands Hill; Arrowfield; Bowfield; Warkworth; Mt Arthur; Piecefield; Vaux; Bayswater; Wynn; Edderton; Clanricard; Bengalla; Edinglassie; and Ramrod Creek. The approved mining rate at the Mt Arthur Coal Mine is up to 36 Mtpa of ROM coal, of which a maximum 32 Mtpa may be sourced from open cut mining. As outlined in the Consolidation Project EA the indicative mobile mining fleet for the currently approved open cut mining operations is outlined in Table 2-1. Table 2-1 Indicative Mt Arthur Open Cut Mine Mobile Fleet* Equipment Number of Items Electric Face Shovels 5 4 Excavators Trucks Graders 11 9 Bulldozers Rubber Tyre Bulldozers 8 7 Watercarts 8 7 Drills 8 7 Source: HVEC (2009). * Consistent with 2009 Consolidation Project EA. All coal mining operations and associated activities at the Mt Arthur Coal Mine are undertaken 24 hours per day, seven days a week. Figure 2-1 shows the existing/approved surface development areas. 1 Underground Operations The Mt Arthur Underground Project was approved in The Mt Arthur Underground Project comprises of longwall mining operations in five coal seams, with transport of ROM coal by conveyor for processing at the CHPP. A maximum of 8 Mtpa may be sourced from the underground mine. An underground exploration adit was completed in 2009, however, no underground coal extraction currently occurs from the Mt Arthur Underground Project. Given that the focus of the Modification is on open cut activities, the underground mine is not discussed in detail in this EA. The approved extent of the Mt Arthur Underground Project is shown on Figure Approved extent as approved in PA 09_0062. PA 09_0062 also describes the biodiversity offset and Aboriginal heritage management provisions relating to this disturbance. 2-1
4
5 2.2 COAL PREPARATION PLANT AND RAIL LOADING FACILITIES Coal Handling and Preparation Plant The CHPP is approved to process up to 36 Mtpa of ROM coal from open cut and underground operations at the Mt Arthur Coal Mine to produce saleable thermal coal for export and domestic markets. The CHPP is located approximately 2 km east of the Mt Arthur Coal Mine product coal loading facilities and is connected to these facilities via overland conveyors. The CHPP generally comprises: coal breaking, coal crushing, sizing screens, classification cyclone, dense medium cyclones and spiral separation equipment; internal bypass system to minimise washing of coal (some coal seams are of sufficient quality that ROM coal requires crushing only); conveyors, transfer stations, bins, and associated monitoring and maintenance equipment; mechanical dewatering equipment (e.g. centrifuges); CHPP building enclosed on all four sides; and a disposal system for CHPP rejects (tailings and coarse rejects). ROM Coal Pad The existing ROM pad area comprises: stockpiling of ROM coal via haul truck; reclaim of stockpiled coal using front end loaders; and two ROM coal hoppers 2 (fitted with dust suppression systems), which deliver ROM coal to conveyors for transport to the CHPP. Product Coal Handling The existing product coal handling system comprises: conveyors transporting export product coal to a rail loading facility 3 ; conveyor transporting domestic product coal to Macquarie Generation s Bayswater Power Station; and product coal stockpiles. Modifications and upgrades to this infrastructure approved under the Consolidation Project EA are ongoing. Rail Loading Facility Export product coal is loaded onto trains at the rail loading facility for transport to the Port of Newcastle via the Antiene Rail Spur and Main Northern Railway line. The rail loading facility comprises: a product coal stockpile; a transfer station; conveyors transferring from stockpile reclaim transfer station to train loading bin; rail loading bin; and a rail loop and spur, which in turn connects to the Antiene Rail Spur and on to the Main Northern Railway. The existing and approved rail haulage capacity is up to 27 Mtpa of product coal with a maximum of 24 rail movements per day. 2.3 TAILINGS AND COARSE REJECTS MANAGEMENT All coarse rejects produced by the CHPP is co-disposed within the overburden emplacement areas or utilised in the construction of tailings dams, stockpiles or other infrastructure (HVEC, 2009). Tailings (or fine rejects) are stored in the tailings emplacement area (Figure 2-1), which will be constructed in a series of stages up to a maximum height of 280 m AHD (HVEC, 2009). Two rejects streams (coarse and fine) are produced by the CHPP. It is estimated that on average approximately 30 percent by weight of ROM coal feed to the CHPP becomes rejects, with 19 percent by weight of ROM coal feed becoming coarse and the remainder fine. 2 3 A third ROM coal hopper is approved, however is not yet constructed. A second facility is approved, however is not yet constructed. 2-3
6 2.4 WATER SUPPLY AND WATER MANAGEMENT Water management on-site is conducted in accordance with the Site Water Management Plan (BHP Billiton, 2012a). The key elements of site water supply and management are outlined below (HVEC, 2009): Tailings water will be reclaimed for re-use in the CHPP and for dust suppression. Water recovered from the open cut and underground operations will continue to be pumped to mine water storages and will also be used in the water management system. During abnormally wet periods leading to an excess of water being generated on-site (when the volume of water being held on-site is in excess of that required to ensure water supply security and there is an increased risk of disruption to mining as a result of excess water being held in open cut pits) water will be transferred to the Environmental Dam with a view to controlled release under the Hunter River Salinity Trading Scheme (HRSTS). Runoff from haul roads, hardstand and pre-strip areas will either be directed to existing mine water storages (where feasible) or will be captured in sediment retention storages sized to trap silt and other material which easily settle. Water in the sediment dams may be used for dust suppression around the mine. Sediment dams will be generally sized in accordance with the Erosion and Sediment Control Plan (BHP Billiton, 2012b). Runoff from workshop, industrial and vehicle refuelling areas, which has the highest potential to contain elevated hydrocarbons, will continue to be captured in downslope dams and recycled within the mine water management system. Treated effluent will continue to be recycled to the Main Dam via the existing wetland. Runoff from rehabilitated and revegetated areas will continue to be directed to mine water storages or be directed to sediment retention storages prior to being allowed to drain to local drainages. These areas will be allowed to free drain as the landform becomes stable. Whites Creek Diversion Whites Creek was diverted as part of the development of the Northern Open Cut. This diversion was constructed to divert Whites Creek around the mine infrastructure area and overburden emplacement (Figure 2-1). The diversion comprises an open channel, pipe through the acoustic/visual bund north of the existing infrastructure area and culverts beneath site access roads. The channel, pipe and culverts were designed for a one in 100 year average recurrence interval rainfall event (Dames and Moore, 2000a). Low-Permeability Barrier In order to manage potential impacts on Hunter River alluvials, HVEC has committed to the installation of a low permeability barrier, as described in the excerpt below (HVEC, 2009): Mt Arthur Coal will continue to monitor hydro-geomorphological conditions and scrutinise for evidence of any groundwater ingress or endwall instability indicators as it progresses the previously approved mining towards the Hunter River Alluvials. Mining (other than that already approved in the MAN [Mt Arthur North] EIS) will not extend beyond a nominal 150 m buffer zone from the Hunter River Alluvials until agreement is reached with NOW regarding the installation of a lower permeability barrier along the point of connections of mining and the alluvium or other appropriate safeguards. Investigations in relation to the low permeability barrier to be installed south of Denman Road have commenced and consultation with NOW has been undertaken. The potential for flooding in the Northern Open Cut was studied as part of the Consolidation Project EA (HVEC, 2009). Flood bund protection will be constructed in the vicinity of Denman Road where the topography is less than the 1955 peak flood level in the Hunter River (considered representative of a one in 100 year flood event in Muswellbrook) plus 0.5 m freeboard. The detailed design was submitted with the NSW Office of Water for approval in November The flood bund will be designed to protect against a one in 1,000 year average recurrence interval rainfall event. As part of the existing operations, the Main Dam will be decommissioned, with existing pump and pipelines upgraded to compensate for this loss of on-site storage. 2-4
7 2.5 GENERAL INFRASTRUCTURE The existing and approved general infrastructure at the Mt Arthur Coal Mine: an access road located off Thomas Mitchell Drive; offices, stores, bathhouses, workshops and administration facility; a CHPP and noise bund constructed along the northern side of the CHPP; rail loop and rail spur; an electricity supply and distribution system; water reticulation systems; and water storages, retention basins and associated water management structures. 2.6 EDDERTON ROAD REALIGNMENTS The northern part of Edderton Road will be realigned in approximately The two conceptual options are shown on Figure 2-1 and include realignment of both a portion of the Edderton Road and relocation of the Denman Road and Edderton Road intersection. A southern section of Edderton Road has been approved to be realigned as part of the Bayswater No. 3 Coal Mine (Umwelt, 2008a). Although this realignment has not been constructed to date, the Mt Arthur Underground Project approval facilitates the required realignment prior to the commencement of mining in the Glen Munro seam (Umwelt, 2008a). 2.7 PRODUCT COAL TRAIN MOVEMENTS Consistent with Condition 7(b) of Schedule 2 of Project Approval 09_0062, product coal train movements are limited to 24 movements (or passbys) per day (or 12 fully laden train departures). Additional movements can be accessed in accordance with an agreement with the Drayton Coal Mine (where a copy of the agreement has been provided to the Director-General of the DP&I). 2.8 WASTE MANAGEMENT HVEC operates a total waste management system at the Mt Arthur Coal Mine which has been designed to minimise the generation of waste and maximise re-use and recycling (BHP Billiton, 2011a). This system categorises waste produced on-site, which allows for effective tracking and management of waste. Approximately 91 percent of all waste produced on-site was recycled in 2011 (BHP Billiton, 2011a). Recyclables are removed from site for separation and recovery by appropriate contractors. Waste oils and greases are held in tanks in a bunded area and removed from site by licensed contractors (HVEC, 2009). 2.9 REHABILITATION The key objectives of the Mt Arthur Coal Mine rehabilitation programme are (HVEC, 2009): achieving a land capability following the cessation of mining that is comparable to pre-mining land capability and considers stakeholders interests; allowing for sustainable post-mining land use(s) to occur; establishing a clear set of indicators to be met; increasing areas of native vegetation and available fauna habitat; improving linkages between existing areas of remnant vegetation; and increasing the average percentage of native woodland to improve habitat value (i.e. at least 30 percent of rehabilitation areas will be returned to native woodland). Section 5 provides a description of the rehabilitation principles and methodologies that apply to the existing operations WORKFORCE At the end of 2012, the total workforce at the Mt Arthur Coal Mine (HVEC employees and contractors) was approximately 2,142 (BHP Billiton, 2012c). As described in the Consolidation Project EA, the total workforce required for peak production will be approximately 2,600 employees and contractors. In addition, a workforce of approximately 240 personnel will be required during peak construction (HVEC, 2009). 2-5
8 2.11 ENVIRONMENTAL MONITORING AND MANAGEMENT Mt Arthur Coal Environmental Management Strategy HVEC has developed an Environmental Management Strategy (EMS) (BHP Billiton, 2012d) and has implemented a comprehensive EMS that provides a framework to facilitate compliance with legal and other requirements (including statutory approvals, BHP Billiton requirements and stakeholder expectations). The objectives of the EMS are to meet the requirements of the Project Approval 09_0062, and to manage and minimise the impact of the Mt Arthur Coal Mine on the surrounding environment and community, as well as providing the community with an overview of the EMS in place at Mt Arthur Coal Mine (BHP Billiton, 2012d). A number of management plans, monitoring program and strategies are sub-components of the EMS, including: Air Quality Management Plan; Air Quality Monitoring Program; Noise Management Plan; Noise Monitoring Program; Blast Management Plan; Blast Monitoring Program; Surface Water Monitoring Program; Site Water Management Plan; Site Water Balance; Erosion and Sediment Control Plan; Surface and Groundwater Response Plan; Groundwater Monitoring Program; European Heritage Management; Aboriginal Heritage Management Plan; Biodiversity Management Plan; Biodiversity Monitoring Program; Rehabilitation Management Plan; Rehabilitation Strategy; Biodiversity Offset Strategy; Blast Management Plan; and Blast Monitoring Program. The performance of the EMS and its associated plans, program and documents are reported annually in the AEMR, in accordance with the Project Approval 09_0062, and in the Annual Return in accordance with EPL Mt Arthur Coal Environmental Monitoring Program A key component of the EMS is the Environmental Monitoring Program (EMP). The EMP allows HVEC to effectively manage and measure its environmental performance through a comprehensive monitoring system. The Mt Arthur Coal Mine environmental monitoring system includes the following locations as shown on Figure 2-2: seven meteorological stations (including stations on real-time noise monitors); eight High Volume Air Samplers (HVASs), particulate matter less than 10 micrometres in size (PM 10), six real-time continuous dust monitors, 21 depositional dust gauges; four permanent continuous noise monitors, one mobile continuous noise monitor, eight quarterly attended noise monitoring locations; five blast monitors; 48 groundwater monitoring locations; and 22 surface water sampling points. EMP monitoring results are published in the AEMR and are distributed to government agencies, employees, the CCC, and the local library via the BHP Billiton website ( COMPLAINTS RECORD A summary of the HVEC complaints record from January 2002 to December 2011 is provided on Figure 2-3. As shown on Figure 2-3, the number of complaints generally decreased between 2003 and However in 2011, complaints increased sharply in comparison to the previous years to a total of 89, the highest since complaints have been recorded. During this period, there was increased blasting activity in the northern portion of the Northern Open Cut, closest to neighbouring residents, which accounts for the increase in the number of complaints related to vibration, dust and fume impacts from blasting activities. 2-6
9
10 100 Number of Complaints January 02 to December 02 January 03 to December 03 January 04 to December 04 January 05 to December 05 January 06 to December 06 January 07 to December 07 January 08 to December 08 January 09 to December 09 January 10 to December 10 January 11 to December Noise Blasting/Vibration Dust Lighting Spontaneous Combustion Other Total Type of Complaint Source: HVEC (2012) MT ARTHUR COAL OPEN CUT MODIFICATION FIGURE 2-3 Mt Arthur Coal Mine Complaints Record January December 2011 HVE OCM EA_Section 2_003B
11 Blasting complaints contributed almost half of the total complaints for the 2002 to 2011 period. Complaints Management All complaints are investigated and a response is provided to the complainant. To minimise potential for recurrences, observations and learnings from complaint investigations are incorporated into mine planning and environmental management as appropriate KEY OPERATIONS IN THE VICINITY OF THE MT ARTHUR COAL MINE Bengalla Coal Mine Bengalla Mining Company Pty Limited owns the existing Bengalla Coal Mine, which is an open cut coal mine located 2 km north of the Mt Arthur Coal Mine (Figures 1-2 and 2-1). Bengalla Coal Mine is approved to produce up to 10.7 Mtpa of ROM coal until the 27 June 2017 under its Development Application (DA 211/93), as modified in October Drayton Coal Mine Anglo Coal (Drayton Management) Pty Limited owns the existing Drayton Coal Mine, which is an open cut coal mine located east of the Mt Arthur Coal Mine (Figures 1-2 and 2-1). Drayton Coal Mine is approved to produce up to 8 Mtpa of ROM coal until the end of December 2017 under its Project Approval (06_0202), as modified on 17 February Mt Pleasant Coal Mine Coal and Allied Operations Pty Ltd owns the existing Mt Pleasant Coal Mine, which is an open cut coal mine located 8 km north of the Mt Arthur Coal Mine (Figure 1-2). The Mt Pleasant Coal Mine has not commenced coal production. Mt Pleasant Coal Mine is approved to produce up to 10.5 Mtpa of ROM coal until 22 December 2020 under its Development Consent (DA 92/97), as modified on 19 September Mangoola Coal Project Xstrata Mangoola Pty Limited owns the existing Mangoola Coal Project, which is an open cut coal mine located 10 km north-west of the Mt Arthur Coal Mine (Figure 1-2). Mangoola Coal Project is approved to produce up to 10.5 Mtpa of ROM for 21 years under its Project Approval (06_0014), as modified on 23 February Potential Projects The following two Major Projects/State Significant Developments are proposed in the vicinity of the Mt Arthur Coal Mine: Drayton South Coal Project Open cut and highwall mining operations extracting up to 7 Mtpa of ROM coal over 26 years. This Project was on exhibition during November and December 2012, however, was not determined at the time of writing. Bengalla Continuation Project - Open cut coal mining at up to 15 Mtpa ROM coal for 24 years continuing to utilise a dragline and truck/excavator fleet. DGRs have been provided. At the time of writing, DGRs were available for Bengalla, however, no substantial assessment (i.e. EA or Environmental Impact Statement [EIS]) was available. The Drayton South Coal Project EA has been considered in this EA with respect to cumulative issues REHABILITATION The rehabilitation concepts described for the existing Mt Arthur Coal Mine (Section 2.9) would remain for the Modification with the exception that the Saddlers Pit void would be backfilled as part of the final landform profiling for the Modification. This is discussed further in Section WORKFORCE The Modification would facilitate the continuity of employment for the existing and approved workforce consisting of approximately 2,600 employees (i.e. no additional employment would be required). Approximately 60 employees associated with the explosives facility and magazine would access the site via the new site entrance off Edderton Road, once this access is constructed and commissioned. These employees are part of the overall site employment total of 2,
MAC-ENC-MTP-041 ENVIRONMENTAL MANAGEMENT STRATEGY
ENVIRONMENTAL MANAGEMENT STRATEGY Document Owner Mike Gale, Environmental Superintendent Document Approver Rob Hayes, Environment Manager Revision History Version No Date Published Details 1.1 30 June
MT ARTHUR COAL ANNUAL ENVIRONMENTAL MANAGEMENT REPORT FY15
MT ARTHUR COAL ANNUAL ENVIRONMENTAL MANAGEMENT REPORT FY15 Page 2 of 165 Table of Contents 1 Introduction... 6 1.1 Approvals, Leases and Licences... 9 1.2 Mine Contacts... 12 1.3 Actions Required at Previous
Section 75J of the Environmental Planning & Assessment Act 1979
Project Approval Section 75J of the Environmental Planning & Assessment Act 1979 As delegate of the Minister for Planning and Infrastructure under delegation executed on 14 September 2011, the Planning
MAC-ENC-PRO-057 AIR QUALITY MONITORING PROGRAM
MAC-ENC-PRO-057 AIR QUALITY MONITORING Document Owner Donna McLaughlin, Environment Superintendent Document Approver Rob Hayes, Manager Environment Revision History Version No. Date Published Details 1.2
Coal Mine Particulate Matter Control Best Practice Management Determination
Coal Mine Particulate Matter Control Best Practice Management Determination February 2012 Bengalla Mining Company Revision Details Date Amended By A Draft Final 27/01/12 Y. Scorgie B Final 3/02/12 Y. Scorgie
MAC-ENC-PRO-062 GROUNDWATER MONITORING PROGRAM
MAC-ENC-PRO-062 GROUNDWATER MONITORING PROGRAM Document Owner Michael Gale, Superintendent Environment Analysis and Improvement Document Approver Sarah Withell, Head of Health, Safety and Environment Version
SCHEDULE 2 TO THE DEVELOPMENT PLAN OVERLAY Shown on the planning scheme map as DPO2 WAVERLEY GOLF COURSE, LYSTERFIELD VALLEY
SCHEDULE 2 TO THE DEVELOPMENT PLAN OVERLAY Shown on the planning scheme map as DPO2 WAVERLEY GOLF COURSE, LYSTERFIELD VALLEY 1.0 Conditions and requirements for permits A permit to use and develop the
This Chapter was compiled by GCS (2014) as part of the EMP Consolidation for MP 30/5/1/2/2/133MR and remains pertinent.
11 ENVIRONMENTAL REHABILITATION PLAN The overall land use vision for the MR133 area is to ensure that the operations are safe, stable and non-polluting over the long-term in order to be integrated into
Expectations and Future Direction of MOP Guidelines Matthew Newton, Principal Officer Rehabilitation Standards Division of Resources & Energy
Expectations and Future Direction of MOP Guidelines Matthew Newton, Principal Officer Rehabilitation Standards Division of Resources & Energy Mine Rehab Conference 2014 Best Practice Ecological Rehabilitation
UPDATE ON MANAGEMENT OF LEGACY ENVIRONMENTAL ISSUES IN GHANA
UPDATE ON MANAGEMENT OF LEGACY ENVIRONMENTAL ISSUES IN GHANA UPDATE ON MANAGEMENT OF LEGACY ENVIRONMENTAL ISSUES IN GHANA AUGUST 2015 AngloGold Ashanti acknowledges that there are some legacy environmental
Final. Office of Environment and Heritage. June 2011
NSW Coal Mining Benchmarking Study: International Best Practice Measures to Prevent and/or Minimise Emissions of Particulate Matter from Coal Mining Prepared for Office of Environment and Heritage KE1006953
ABANDONMENT COST, FINANCIAL ASSURANCE AND PRESENTATION OF THE DOCUMENT. Abandonment cost :
ABANDONMENT COST, FINANCIAL ASSURANCE AND PRESENTATION OF THE DOCUMENT. Abandonment cost : Determining the cost associated with closure and accruing these costs during the life of the mining operation
CHAPTER 24: ENVIRONMENTAL MANAGEMENT
Central Eyre Iron Project Environmental Impact Statement CHAPTER 24: ENVIRONMENTAL MANAGEMENT CHAPTER 24 ENVIRONMENTAL MANAGEMENT COPYRIGHT Copyright Iron Road Limited, 2015 All rights reserved This document
Development proposals will require to demonstrate, according to scale, type and location, that they:-
Appendix 2 : Relevant Development Plan Policies Angus Local Plan Review 2009 Policy S1 : Development Boundaries (a) Within development boundaries proposals for new development on sites not allocated on
APPENDIX 4. Risk Tables
APPENDIX 4 Tables Preliminary Qualitative Criteria The qualitative risk assessment criteria have been developed to identify key risks to the environment, society, heritage and business reputation. The
Proposed (Concrete Cutting And Drilling) Environmental Management Plan
SAMPLE ENVIRONMENTAL MANAGEMENT PLAN This EMP is designed for (Concrete Cutting and drilling), however you may insert your business activities with only minor changes needed. This EMP should become part
Environmental management framework 24
management framework 24 24.1 Introduction issues are managed at Olympic Dam in accordance with the operation s AS/NZS ISO 14001:2004 certified environmental management system (EMS). The proposed expansion
Outlet stabilization structure
Overview of Sedimentation and Erosion Control Practices Practice no. 6.41 Outlet stabilization structure Erosion at the outlet of channels, culverts, and other structures is common, and can cause structural
INFORMATION SHEET ORDER NO. R5-2011-XXXX TRIANGLE ROCK PRODUCTS, INC. FLORIN ROAD AGGREGATE PLANT SACRAMENTO COUNTY
ORDER NO. R5-2011-XXXX INFORMATION SHEET Background Triangle Rock, Inc. (Discharger) submitted a Report of Waste Discharge (RWD) on 23 August 2010. The Discharger is expanding the mining operations at
Environmental guidelines for preparation of an Environment Management Plan
Environmental guidelines for preparation of an Environment Management Plan Environment Protection Authority MAY 2013 Australian Capital Territory, Canberra 2013 This work is copyright. Apart from any use
SURFACE REMEDIATION AND MANAGEMENT OVERVIEW
SURFACE REMEDIATION AND MANAGEMENT OVERVIEW Giant Mine Remediation Project Environmental Assessment Public Hearings September 10-14, 2012 Adrian Paradis (AANDC) Mike Nahir (AANDC) Bruce Halbert (Technical
Appendix 14 Traffic Management Plan
Appendix 14 Traffic Management Plan Toms Gully Underground Project Table of Contents 1 Purpose... 3 2 Location & Production Overview... 3 3 Operations History... 3 4 Current Traffic Management & Traffic
Basements and Deep Building Construction Policy 2014
Basements and Deep Building Construction Policy 2014 APPROVAL Council / CEO 27 October 2014 VERSION NO: Version 1.0 TRIM REF: 14/67838 REVIEW 30/10/2019 RESPONSIBLE EXECUTIVE General Manager City Assets
Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department
Land Disturbance, Erosion Control and Stormwater Management Checklist Walworth County Land Conservation Department The following checklist is designed to assist the applicant in complying with the Walworth
LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT
LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT Introduction The purpose of this Public Environmental Report (PER) is to provide the Government
1. Purpose and scope. 2. SEPA's role in hydropower and planning
Page no: 1 of 10 1. Purpose and scope 1.1 The purpose of this note is to provide guidance on the approach that we will take when dealing with hydropower development management consultations. We welcome
Exploration for natural gas
FACT SHEET NO. 42 Exploration for natural gas Quick facts QGC holds licences from the Queensland Government called Authorities to Prospect that allow us to explore in areas known as tenements We work with
KAWERAU DISTRICT COUNCIL BUSINESS DISASTER RECOVERY PLAN 2011
KAWERAU DISTRICT COUNCIL BUSINESS DISASTER RECOVERY PLAN 2011 Kawerau District Council Private Bag 1004 Ranfurly Court KAWERAU 3169 Tel (07) 306 9009 Fax (07) 323 8072 Email [email protected]
Beseck Switching Station Inspection
Page 1 of 5 Docket No. 272 Development and Management Plan Inspection The Connecticut Light and Power Company Certificate of Environmental Compatibility and Public Need for the construction of a new 345-kV
2015 AVAGO 2D SEISMIC SURVEY ENVIRONMENTAL MANAGEMENT PLAN SUMMARY
ENVIRONMENTAL MANAGEMENT PLAN SUMMARY TABLE OF CONTENTS 1. INTRODUCTION... 3 2. DESCRIPTION OF ACTIVITY... 4 3. DESCRIPTION OF THE ENVIRONMENT... 4 4. DESCRIPTION OF THE ACTIVITY IN RELATION TO THE ENVIRONMENT...
SUSTAINABLE URBAN DRAINAGE SYSTEMS
overflow can lead into a permeable conveyance system to increase further the benefit and reduce the need for pipe systems. Pollutant removal rates have been shown to be high, with some pollutants being
Environmental Guidelines for Preparation of an Environmental Management Plan
2013 Environmental Guidelines for Preparation of an Environmental Management Plan Environmental Management Division Environmental Protection Agency 3/13/2013 ENVIRONMENTAL GUIDELINES FOR PREPARATION OF
Guideline: Works that interfere with water in a watercourse watercourse diversions. September 2014
Guideline: Works that interfere with water in a watercourse watercourse diversions September 2014 This publication has been compiled by the Department of Natural Resources and Mines. State of Queensland,
Type of Sewer Systems. Solomon Seyoum
Type of Sewer Systems Solomon Seyoum 0 Learning objectives Upon completion of this lecture, the participants will be able to differentiate between types of sewer systems and discuss different aspects of
Monitoring Program Waste
Procedure Document No. 2792 Document Title Monitoring Program Waste Area HSE Issue Date Major Process Environment Sub Process Authoriser Darryl Cuzzubbo Asset President Version Number 14 TABLE OF CONTENTS
PLANNING & REGULATION COMMITTEE 16 JANUARY 2012
Division(s): Sutton Courtenay & Harwell Contact Officer: John Duncalfe ([email protected]) Tel: 01865 815356 PLANNING & REGULATION COMMITTEE 16 JANUARY 2012 TO CRUSH, SCREEN, BLEND AND STOCK
3.4 DRAINAGE PLAN. 3.4.1 Characteristics of Existing Drainages. 3.4.2 Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN
3.4 DRAINAGE PLAN This section describes the existing onsite drainage characteristics and improvements proposed within this Specific Plan. Following this description, drainage plan development standards
Environmental Construction Operations Plan (ECO Plan) Framework
ALBERTA INFRASTRUCTURE AND TRANSPORTATION Environmental Construction Operations Plan (ECO Plan) Framework COPYRIGHT, MAY 2005 THE CROWN IN RIGHT OF THE PROVINCE OF ALBERTA, AS REPRESENTED BY THE MINISTER
Section 25.2 provides an overview of the area of influence and reviews legal and other requirements relevant to closure (1).
25 Mine Closure 25.1 Introduction This chapter of the Simandou Mine SEIA addresses the closure of the Simandou Mine, including the cessation of operations, decommissioning of plant and equipment, rehabilitation
A. Describe the existing drainage patterns on-site as shown on Map I, including any potential flooding and erosion problems.
19. STORMWATER MANAGEMENT A. Describe the existing drainage patterns on-site as shown on Map I, including any potential flooding and erosion problems. The majority of the approximately ±500 acre Property
Water Resource Management Plan
J.4 Water Resource Management Plan WATER RESOURCE MANAGEMENT PLAN New Acland Coal Mine Stage 3 Project JANUARY 2014 Page 1 Contents 1. Introduction 1 1.1. Purpose 1 1.2. Scope 1 1.3. The revised Project
INDEPENDENT ENVIRONMENTAL AUDIT REPORT. Bulga Surface Operations
INDEPENDENT ENVIRONMENTAL AUDIT REPORT May 2013 Bulga Surface Operations Report REPORT TITLE: Report CLIENT: Bulga Surface Operations Revision Number Report Date Report Author Reviewer Draft 23 January
1 INTRODUCTION. Kayenta Complex Page 9 December 2011 Cumulative Hydrologic Impact Assessment
1 INTRODUCTION The Office of Surface Mining Reclamation and Enforcement (OSMRE) is the regulatory authority for coal mining operations under the Surface Mining Reclamation and Control Act of 1977 that
Prattsville Berm Removal Project. 1.0 Project Location
Prattsville Berm Removal Project 1.0 Project Location The project site is located between the New York State Route 23 Bridge over the Schoharie Creek and the Schoharie Reservoir. The restoration plan encompassed
Temporary Batch Plants
Categories EC SE TC WE NS WM Erosion Control Sediment Control Tracking Control Wind Erosion Control Non-Stormwater Management Control Waste Management and Materials Pollution Control Legend: Primary Category
WEST LONDON PIPELINE AND STORAGE LIMITED AND UNITED KINGDOM OIL PIPELINES LIMITED
WEST LONDON PIPELINE AND STORAGE LIMITED AND UNITED KINGDOM OIL PIPELINES LIMITED WLPS BUNCEFIELD REBUILD Flood Risk Assessment Green Lane Hemel Hempstead Hertfordshire HP2 7HZ September 2009 Prepared
Recommendations for future developments
C Recommendations for future developments C.1 Reducing flood risk through site layout and design C.1.1 C.1.2 Flood risk should be considered at an early stage in deciding the layout and design of a site
REPUBLIC OF BOTSWANA GUIDELINES FOR PREPARING ENVIRONMENTAL IMPACT ASSESSMENT REPORTS FOR MINING PROJECTS
REPUBLIC OF BOTSWANA GUIDELINES FOR PREPARING ENVIRONMENTAL IMPACT ASSESSMENT REPORTS FOR MINING PROJECTS Volume No. 1 September 2003 PREFACE This document has been prepared along the EIA Guidelines of
NEWMONT GHANA GOLD LTD. AHAFO SOUTH PROJECT COMPLETION AUDIT TERMS OF REFERENCE ENVIRONMENTAL, HEALTH, AND SAFETY
NEWMONT GHANA GOLD LTD. AHAFO SOUTH PROJECT COMPLETION AUDIT TERMS OF REFERENCE ENVIRONMENTAL, HEALTH, AND SAFETY November 2009 Completion Audit November 2009 Terms of Reference Environmental, Health and
Floodplain Connectivity in Restoration Design
Floodplain Connectivity in Restoration Design 2015 Symposium on Restoration in a Contaminated Environment: Lessons Learned and Challenges in Moving Forward Part II April 2015 Karin Boyd Applied Geomorphology,
HUNTER WATER CORPORATION Review of Environmental Factors Guidance Notes EG0041
HUNTER WATER CORPORATION Review of Environmental Factors Guidance Notes EG0041 January 2014 Document control Document controller: Manager Environment & Sustainability Document number: EG0041 Rev Date Description
ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS
ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS PREPARED BY: DEPARTMENT OF ENVIRONMENT AND LANDS INDUSTRIAL ENVIRONMENTAL ENGINEERING DIVISION APRIL 16, 1992 - TABLE OF
Stormwater harvesting
Stormwater harvesting How to collect and re-use stormwater from Sydney Water s stormwater system Most of the stormwater pipes and channels in the Sydney metropolitan area are the responsibility of local
Environmental Protection Act 1994 Environmental Authority (MIN101017310) Non Code Compliant Level 1 Mining Project
Permit 1 Environmental Protection Act 1994 Environmental Authority (MIN101017310) Non Code Compliant Level 1 Mining Project Environmental Authority (Mining Lease) Non Code Compliant Level 1 Mining Project
UVDB empowered by Achilles
UVDB empowered by Achilles DISAB Centurion: High Performance Wet/Dry Materials Handling Unit DISAB Centurion: High performance vacuum tanker that will vacuum dry or wet material The DISAB can vacuum material
Water Mains Rehabilitation Framework (NI) Northern Ireland Water
PROJECT: CLIENT: MAIN CONTRACTOR: Water Mains Rehabilitation Framework (NI) Northern Ireland Water Farrans Background Northern Ireland Water manages a water mains infrastructure that supplies 625 million
Final Environmental Impact Assessment of Smt. Singam Bhavani Laterite Mining ADDITIONAL STUDIES
ADDITIONAL STUDIES 7.0 DISASTER MANAGEMENT PLAN It is presumed that the proposed mining process would be designed and engineered with all possible safety measures and standard code of practices. In spite
SITE-SPECIFIC BEST MANAGEMENT PRACTICES (BMP) PLAN REVIEW CHECKLIST
This checklist may be used by applicants for encroachment permits, and contractors in development of Site- Specific BMP Plans for projects. plan reviewers will use this checklist to review the Site-Specific
CONSTRUCTION SEQUENCE & PROGRAMME
CONSTRUCTION SEQUENCE & PROGRAMME 2 CONTENTS 1.0 Introduction 7 2.0 Key activities 8 2.1 Airport related activities 2.2 Construction of new roads and accesses 2.3 Earthworks zone a 2.4 Earthworks zone
1 Introduction. 1.1 Key objective. 1.2 Why the South Esk
1 Introduction 1.1 Key objective The aim of this study is to identify and assess possible options for improving the quality of the river channel and habitats in the River South Esk catchment whilst helping
2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited
(IV) Proposed Terms of Reference for EIA Studies Project Category Project Proponent Location Paraspani Thermal Power Plant (2x800 MW) Coal based Thermal Power Project A [1(d) Thermal Power Plant 500 MW]
ecologia KOOLAN ISLAND IRON ORE MINE AND PORT FACILITY Conceptual Closure Plan E N V I R O N M E N T
Photos at least 1 up to 3 project/survey specific to completely fill the white box, DO NOT CHANGE SIZE OF WHITE BOX KOOLAN ISLAND IRON ORE MINE AND PORT FACILITY E N V I R O N M E N T Document Status Rev
TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN
1. GENERAL TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN The main objective of the EIA study is to assess the positive and negative impacts likely to accrue
DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES. Run-off Analysis Methods
DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES Run-off Analysis Methods This document sets forth the minimum design, technical criteria and specifications for the
Bulga Complex Pollution Incident Response Management Plan
for Bulga Complex Pollution Incident Response Management Document Table of Contents 1 Heading 1... Error! Bookmark not defined.3 1.1 Heading 2... 6 1.1.1 Heading 3... Error! Bookmark not defined.3 1.1.1.1
City of Paso Robles Community Development Department Construction Site Storm Water Quality Requirements
City of Paso Robles Community Development Department Construction Site Storm Water Quality Requirements Overview of the City s Construction Storm Water Program The City of Paso Robles is committed to protecting
Introduction. The vision of the West Yorkshire Combined Authority (WYCA) Flood Risk Partnership
WYCA SuDS Guidance Introduction As part of the government s continuing commitment to protect people and property from flood risk, the Department for Communities and Local Government and the Department
Scope 1 describes direct greenhouse gas emissions from sources that are owned by or under the direct control of the reporting entity;
10 Greenhouse Gas Assessment 10.1 Introduction This chapter presents an assessment of the potential greenhouse gas emissions associated with the Simandou Mine and evaluates the significance of these in
SITE-SPECIFIC BEST MANAGEMENT PRACTICES (SSBMP) PLAN/STORM WATER POLLUTION PREVENTION PLAN (SWPPP) REVIEW CHECKLIST
This checklist may be used by applicants for encroachment permits, and contractors in development of Site Specific Best Management Practice (SSBMP) Plans or Storm Water Pollution Prevention Plans (SWPPP)
Ontario Mining Act Fact Sheet Mine Closure Plans Your Right to Know!
Ontario Mining Act Fact Sheet Mine Closure Plans Your Right to Know! Part VII Rehabilitation of Mining Lands In Ontario, a mining company cannot (re)commence mining operations until a certified Closure
Pollution Incident Response Plan
Pollution Incident Response Plan Introduction Schmidt Quarries is committed to ensuring all aspects of our quarrying activities comply with the environmental legislative requirements in NSW. This Pollution
CIVIL AND MINING CONTRACTORS
ALLIANCE CONTRACTING COMPANY PROFILE CIVIL AND MINING CONTRACTORS our people are our advantage 2 Introduction Alliance Contracting is a civil and mining contracting company operating throughout Western
London Borough of Waltham Forest LOCAL FLOOD RISK MANAGEMENT STRATEGY. Summary Document
LOCAL FLOOD RISK MANAGEMENT STRATEGY Summary Document October 2013 Local Flood Risk Management Strategy Summary 1 Introduction 2 Partner responsibilities 3 What do we know about flooding in the borough?
Sustainable Drainage Systems (SUDS) A guide for developers
Sustainable Drainage Systems (SUDS) A guide for developers We are the Environment Agency. It s our job to look after your environment and make it a better place for you, and for future generations. Your
Compliance Noise Monitoring
Monitoring Byron Centre The Manse Road Myocum HEALTH SCIENCE ENVIROMENTAL EDUCATION ENVIRONMENTAL AUDITOR Monitoring Byron Centre The Manse Road Myocum Prepared for: Byron Shire Council Version 1.0 Date:
ENVIRONMENTAL IMPACT ASSESSMENT PROCESS FOR THE PROPOSED NEW COAL-FIRED POWER STATION IN THE LEPHALALE AREA, LIMPOPO PROVINCE
ENVIRONMENTAL IMPACT ASSESSMENT PROCESS FOR THE PROPOSED NEW COAL-FIRED POWER STATION IN THE LEPHALALE AREA, LIMPOPO PROVINCE FOCUS GROUP MEETING 10 MARCH 2006 09:30 KUMBA RESOURCES OFFICES, PRETORIA DRAFT
Sustainable Resource Management Ltd
6.0 Predicted nvironmental Impacts 6. Stages and Impacts Considered An nvironmental Impact Analysis has been carried out whereby all the possible environmental, socio economic and health & safety aspects
Appendix A1. Register of legal and other requirements
Appendix A1 Register of legal and other requirements 1 Table 1 Legal register Act Activity / General Environmental Planning and Assessment Act 1979 All Comply with the terms Minister for Planning and Infrastructure
ARTHURS SEAT REDEVELOPMENT. Construction of New Gondola System Lower and Upper Station Buildings CONSTRUCTION & ENVIRONMENTAL MANAGEMENT PLAN
ARTHURS SEAT REDEVELOPMENT Construction of New Gondola System Lower and Upper Station Buildings CONSTRUCTION & ENVIRONMENTAL MANAGEMENT PLAN Approval and Authorisation Name Job Title Rev Date Ben George
Construction Site Draina e
ProPECC PN 1/94 ENVIRONMENTAL PROTECTION DEPARTMENT PRACTICE NOTE FOR PROFESSIONAL PERSONS Construction Site Draina e Introduction The purpose of this practice note is to provide some basic environmental
Proposed Terms of Reference for EIA studies
1 Proposed Terms of Reference for EIA studies Base line data collection will be collected for the Post-Monsoon season 2016 (September to November 2016) in study area and 10 kms radius from project site.
Storm Water Management Requirements for Construction Projects Less than One Acre
Storm Water Management Requirements for Construction Projects Less than One Acre Purpose: UC Irvine s Phase II Small MS4 Storm Water Permit requires construction projects less than one acre in size to
DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS
DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS Phase I MS4 permits require continuous updating of the stormwater system inventory owned and operated by the MS4. They also include inspection
Types of Mining - Expert Table
See page 6 Minerals Downunder Teacher Guide (2002) - Activity 4a Types of Mining - Expert Table How to Jigsaw Information 1. Divide the class into Home Groups of five for the five different types of mining
ENVIRONMENTAL IMPACT ASSESSMENT PROCESS PROPOSED PHASE 2 EXPANSION OF THE TRANSNET IRON ORE HANDLING FACILITY, SALDANHA
ENVIRONMENTAL IMPACT ASSESSMENT PROCESS PROPOSED PHASE 2 EXPANSION OF THE TRANSNET IRON ORE HANDLING FACILITY, SALDANHA BACKGROUND INFORMATION DOCUMENT 1 BACKGROUND Transnet Limited s (Transnet) existing
Project Details- Minor Minerals (Other Than Sand)
Project - Minor Minerals (Other Than Sand) Sr. ABOUT THE PROPOSAL 1. Name of Lease Holder M/s. KARMANBHAI JODHABHAI RABARI (Partner) 2. Location address Mr. Karmanbhai Jodhabhai Rabari Survey No- 194 Paikee,
Project Details-Minor Minerals (Other Than Sand)
Project Details-Minor Minerals (Other Than Sand) Sr. No. Details Particulars ABOUT THE PROPOSAL 1. Name Of lease Holder M/s. Kirtikumar Samji Sengani 23 0'27.43"N 69 24'10.21"E 2. Location address Survey
HYDROCARBON SPILLS PROCEDURE SIG-ENV-PR003
Page: 1 of 6 PROCEDURE SIG-ENV-PR003 Revision Approved Date Description 1 AV 01/04/99 New EP 2 AV 07/06/00 Revision of EP 3 AV 04/04/03 Revision of EP 4 Stuart Roseby DRAFT 5 Stuart Roseby 25/07/2005 Approved
R8000 NEW AIR COMBAT CAPABILITY (NACC) FACILITIES PROJECT, RAAF BASE WILLIAMTOWN
LEND LEASE BUILDING PTY LIMITED ABN 97 000 098 162 R8000 NEW AIR COMBAT CAPABILITY (NACC) FACILITIES PROJECT, RAAF BASE WILLIAMTOWN HAZARDOUS SUBSTANCES DANGEROUS GOODS MANAGEMENT PLAN 3/12/2015 Revision