1 WORKPLACE INDUCTION FOR CONSTRUCTION WORKPLACES INFORMATION SHEET 1 Overview This Information Sheet provides advice for persons conducting a business or undertaking (PCBUs) including builders and principal contractors on what should be included in workplace specific induction training and task specific training for construction work. A PCBU must provide the information, training and instruction necessary to protect all people from risks to their health and safety arising from the work being carried out. Workers and other people at the workplace, including visitors should be given workplace specific induction training before work starts or before they enter an operational construction zone. This will inform people about the hazards and risks they may face at the workplace, how the risks are controlled and what to do in an emergency. Why provide workplace specific induction? Any person who is to carry out construction work must complete general construction induction training to receive a general construction induction training card, commonly referred to as the White Card. This training provides people new to the construction industry with a basic knowledge of work health and safety requirements. But there is also a general duty to provide information, instruction and training. So it is a good idea to give workers and other people workplace specific induction training so they understand the health and safety matters that are particular to the construction workplace. A workplace specific induction process is also a useful way to check other things required by law are in place, for example that workers hold White Cards and plant operators have any relevant high risk work licences. Visitors to the workplace Visitors should be accompanied and supervised by fully inducted site personnel at all times while at the workplace. Where visitors to a construction workplace are likely to enter an operational construction zone unescorted they should be provided with a workplace induction on relevant hazards and risks at the workplace. What information should be provided at a workplace induction? Workplace specific inductions will vary depending on the type of construction work and the construction phase a project is going through at the time a person comes to the workplace. For example, at a less complex workplace like a single house site a workplace specific induction could include a short pre-start induction video and/or on the job training. For a large and complex civil or commercial workplace a more detailed induction would be required, for example to explain the emergency response and evacuation processes. It is recommended the following information be provided to workers and other people as required at a workplace induction: hazards and risks specific to the workplace e.g. overhead power lines near the workplace control measures for those risks e.g. no go zones for working near overhead electric lines site specific rules that must be complied with e.g. personal protective equipment (PPE) like hard hats that workers must wear and use safety documents, policies and plans specific to the workplace e.g. traffic management plans who to report incidents and hazards to and how to report them incident, emergency and evacuation procedures and associated equipment at the workplace, and the layout of the workplace including entries and exists, loading and unloading areas, location of facilities, first aid and security requirements. You should also update people when there are changes to the workplace that may affect health and safety. A sample checklist for providing workplace specific induction to workers is at Appendix A. Appendix B provides an example of the induction information that should be provided to visitors. Safe Work Australia Contact Information Phone [email protected] Web [Multi-Vol. Set] [PDF] [DOCX]
2 2 Task specific training Task specific training aims to provide information and instruction to people carrying out a particular construction activity of the risks and control measures relating to that task. For example, task specific training on how to use fall arrest equipment should be provided to a worker required to work at height. Task specific training should cover: the task to be undertaken hazards, risks and control measures involved in carrying out the task who will be involved in the task including subcontractors where relevant the Safe Work Method Statement (SWMS), job safety analyses or safe work procedures who is responsible for what including possible interactions with other activities, and relevant legal responsibilities, codes of practice or technical standards that must be followed. How should a workplace induction be carried out? The way an induction can be delivered will depend on various factors, for example the number of people being inducted, the size of the workplace and the complexity of the work health and safety matters to be discussed. Some ways induction training could be delivered are through: on the job training toolbox talks an induction video or booklet or a phone conversation web-based online interactive programs e.g. skype, or a one-off session in a classroom type setting. Where there are unusual risks associated with the workplace, for example restricted workplace access or steep terrain issues, a person who is familiar with the workplace and its risks should be involved in delivering the training. The induction training should be adapted to address potential cultural or language barriers. Should a record of workplace inductions be kept? Where possible a record should be kept of the names of people who have been trained, the training content, who conducted the training and the date training was provided. Acknowledgement of the training should be obtained from participants, for example the worker s signature on a training register. Where records are kept they may be in electronic form. Examples of how to record a tool box talk and a register of information and training provided to workers are at Appendix C and D. Further information More information can be found in the Code of Practice: Construction work on the Safe Work Australia website (
3 3 APPENDIX A - WORKPLACE SPECIFIC INDUCTION CHECKLIST This checklist provides examples of what could be covered in workplace specific induction training for workers. No Items covered Yes No N/A 1. Have you checked the competencies and qualifications of inductees? 2. Have you discussed and clearly stated the procedures for reporting incidents, injuries and hazards? 3. Have you discussed the workplace safety rules? 4. Has the person been taken through relevant safe work method statements for the tasks to be performed? 5. Is specialised equipment required and have they been trained to use the equipment? 6. Do people have the correct PPE available e.g. hard hat safety glasses safety boots long sleeve shirt, and high visibility vest? 7. Have you shown the person what to do in an emergency and identified the location of the: assembly point and evacuation route closest medical facility contact details of emergency services, and provisions for emergency communications? 8. Have you shown the person where all relevant firefighting equipment is located, for example fire extinguishers and hose reels? 9. Have you shown the person: the location of the first aid facilities and kits, and who the first aiders are and how to obtain treatment? 10. Have you shown the person where all the facilities are located including: crib sheds toilets, and drinking water? 11. Have you explained the workplace security procedures? 12. Have you introduced the person to the Health and Safety Representative? 13. Do they have any further questions or need clarification on any points or topics?
4 4 APPENDIX B - VISITOR INDUCTION CHECKLIST This checklist provides examples of what could be covered in workplace specific induction training for visitors who may enter an operational construction zone. No Items covered Yes No N/A 1. Has the visitor signed in at the site office or a record made of their presence at the workplace? 2. Have you shown the visitor what to do in an emergency including: how to contact help at the workplace, and how an emergency is raised? 3. Have you shown the visitor the location of the emergency assembly point and evacuation routes? 4. Have you shown the visitor the location of the first aid facilities/kits and how to obtain treatment or assistance? 5. Have you explained to the visitor what to do if you become separated? 6. Does the visitor have the correct PPE e.g.: hard hat safety glasses safety boots long sleeve shirt, and high visibility vest? 7. Does the visitor know how to wear the PPE correctly? 8. Have you identified the major hazards and no-go zones at the workplace? 9. Do they have any further questions or need clarification on any point?
5 5 APPENDIX C RECORD OF TOOL BOX TALK Workplace: Name of supervisor or presenter: Date: Time: PEOPLE PRESENT Name Signature Name Signature Topics discussed and feedback (The following are examples of potential subject matters: workplace specific risk assessment, specific activity training, SWMS, safety of vehicle loading and unloading, traffic management and parking, overhead electric lines, underground services, falls, safe delivery, documentation and workplace security. You can add or delete more subject matters as appropriate). Comments/Feedback
6 6 APPENDIX D WORKER TRAINING, INSTRUCTION AND INFORMATION REGISTER Name: Date employment started: Examples of training, instruction and information: general construction induction training trade or contractor licence high risk work licences work activity training load shifting equipment/manual tasks tools and equipment use of hazardous chemicals workplace-specific induction Please write clearly. Type of training, instruction or information Licence or card number (if applicable) Person providing training, instruction and information Date issued Licence or card expiry or renewal date (if applicable)
GENERAL GUIDE FOR WORKPLACE TRAFFIC MANAGEMENT
1 This General Guide provides information on how to manage traffic risks at a workplace. It is supported by specific guidance material on traffic management for shopping centres, construction workplaces,
Traffic Management Issue 1.0 Revision: v2 October 2014
Disclaimer IMPORTANT: The information in this guide is of a general nature, and should not be relied upon as individual professional advice. If necessary, legal advice should be obtained from a legal practitioner
Work Health and Safety. Seven Steps for Small Business
Work Health and Safety Seven Steps for Small Business Work health and safety (WHS) is a key management responsibility for every small business. South Australia s WHS laws took effect on 1 January 2013.
Training and Supervision FOR SCHOOLS
Training and Supervision FOR SCHOOLS Employees undertaking tasks where they have not been adequately trained can cause serious injuries or even death. > Inform and train all employees in health and safety
GHD EPCM Standard operating procedure Working at height May 2013 v1
GHD EPCM Standard operating procedure Working at height May 2013 v1 Table of contents 1. Purpose 2. Scope 3. Duty of care 4. Lifesaving rules; An overview 5. Roles and responsibilities 4.1 Operating centre
NATIONAL CODE OF PRACTICE FOR INDUCTION FOR CONSTRUCTION WORK
NATIONAL CODE OF PRACTICE FOR INDUCTION FOR CONSTRUCTION WORK CANBERRA MAY 2007 Commonwealth of Australia 2007 ISBN 1 920763 87 2 This work is copyright. You may download, display, print and reproduce
Benchmark OHS Consulting Pty Ltd Self Assessment WHS Audit Tool
Benchmark OHS Consulting Pty Ltd Self Assessment WHS Audit Tool This WHS Auditing System Tool is to be used as a self-assessment of YOUR COMPANY compliance with AS 4801 and the Work Health and Safety Act
Tremline Pty Ltd trading as The Hills Bark Blower
JSA No: Rev: 10011 Date: 10010 ABN 1 07 880 6 Website: wwwbarkblowercomau Job Number Start Time: Vehicle : Max Length Hose Date: Company Name: Product: Quantities Depth Job site address: Description of
WHS Contractor Management Procedure
Procedure Approved: 09/07/2013 Next Review: 09/07/2015 1. Overview The District council of Mount Remarkable Council is committed to engaging quality Contractors who have a sound understanding and commitment
RISK RATING SAFE WORK METHOD STATEMENT 1 HIGH 2 MEDIUM 3LOW. I approve the use of this Safe Work Method Statement: NAME: POSITION: Department Manager
RISK RATING 1 HIGH 2 MEDIUM 3LOW SAFE WORK METHOD STATEMENT Title: : Working at Height above 2trs Ref No: 1 I approve the use of this Safe Work Method Statement: NAME: POSITION: Department Manager SIGNATURE:
FALLING OBJECTS EXCESSIVE NOISE CHAINSAW & CHIPPER WORK AT HEIGHTS MANUAL HANDLING
JOB NO: PROJECT: DATE: SWMS NO: SWMS 001.1 PREPARED BY: Ian Hartley REVISED BY: Nick Bragg & Cameron McNeil ACTIVITY: TREE REMOVAL & PRUNING SIGNED BY: REVISION DATE: December 2015 MINIMUM PERSONAL PROTECTIVE
EMERGENCY PLANS FACT SHEET
EMERGENCY PLANS FACT SHEET Overview This fact sheet provides general guidance for persons conducting a business or undertaking (PCBUs) and workers on preparing and maintaining general emergency plans for
Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF)
Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF) Technical Guideline Audit and Inspection Version 2.0 February 2012 Table of Contents 1. Introduction... 3 2. Definitions... 3 3. Internal Audit... 3 3.1
Printed Copies of this Document are Uncontrolled Refer to the Portal for the Latest Version TABLE OF CONTENTS
Printed Copies of this Document are Uncontrolled Refer to the Portal for the Latest Version TABLE OF CONTENTS 1 PURPOSE 3 2 SCOPE 3 3 ABBREVIATIONS 3 4 DEFINITIONS 3 5 SPECIFIC RESPONSIBILITIES 3 5.1 Executive
Policy Number: 054 Work Health and Safety July 2015
Policy Number: 054 Work Health and Safety July 2015 TRIM Ref: TD14/318 Policy Details 1. Owner Manager, Business Operations 2. Compliance is required by Staff, contractors and volunteers 3. Approved by
SAMPLE ASSESSMENT KIT. BSB41307 Certificate IV in Marketing
SAMPLE ASSESSMENT KIT BSB41307 Certificate IV in Marketing I n c l u d e s : A s s e s s m e nt Tasks M a r k i n g G u i d e M a p p i n g A s s e s s m e nt R e c o r d T o o l ASSESSMENT TASKS BSBWHS401A
Procedure. Work Health and Safety General construction. Document number: PRO-00005. Description Process Owner Approved for issue. Rev no.
Procedure Work Health and Safety General construction Document number: PRO-00005 This document is the property of Seqwater. It must not be copied or reproduced in any way whatsoever without the authority
Hazard Identification, Risk Assessment And Control Procedure
Hazard Identification, Risk Assessment And Control Procedure 1. Purpose 1.1 To ensure that there is a formal process for hazard identification, risk assessment and control to effectively manage hazards
OH&S MANAGEMENT SYSTEM CHECKLIST - AS 4801:2001 (STATUS A = Acceptable; N = Not Acceptable; N/A = Not Applicable)
OH&S MANAGEMENT SYSTEM CHECKLIST - AS 4801:2001 (STATUS A = Acceptable; N = Not Acceptable; N/A = Not Applicable) 4.1 General Requirements 4.2 OHS policy Has the organisation an established and maintained
Unit Title: Unit purpose and aim
Unit Title: Preparing and Operating Sideloader Forklifts to Lift and Transfer Loads in the Workplace Level: 2 Credit value: 16 Guided learning hours: 53 Unit expiry date: 31/10/2014 Unit purpose and aim
Guide Document for Development of WHS Management Plans
DISCLAIMER: THIS DOCUMENT IS PROVIDED AS GUIDANCE TO ASSIST CONTRACTORS IN MEETING THEIR OBLIGATIONS UNDER THE WHS LAW AND NTG CONTRACTS. NTG DOES NOT ACCEPT ANY RESPONSIBILITY FOR THE CONTENTS OF CONTRACTORS
GENERAL GUIDE FOR MANAGING CASH-IN-TRANSIT SECURITY RISKS
1 This General Guide provides information on how to manage cash-in-transit security risks. It is supported by an Information Sheet for small business. What is cash-in-transit? Cash-in-transit activities
EMERGENCY PREPAREDNESS & RESPONSE PROCEDURE
1 of 12 DOCUMENT REVISION HISTORY Revision No. Date DESCRIPTION OF CHANGES Pages Affected By 00 01/07/2003 Draft Issued For Comment All HSEQ Dept. 01 01/09/2003 Total Change First Approved Issue All HSEQ
Revision: 5. Category: Contract Management CONTENTS
PROCEDURE Title: Third Party Contractor Assessment Procedure No: P802.011 Issue: 1 Revision: 5 Operative Date: 25/07/2014 Author: R Devine Department: Company Sect./Classification: Company Category: Contract
SAFETY SIGNAGE PROCEDURE
Page 1 of 10 SAFETY SIGNAGE PROCEDURE 1.0 PURPOSE 1.1 To enable a reference to signage to meet legislative requirements and ensure in cases of emergency appropriate signage is visible. 2.0 SCOPE 2.1 This
Draft CODE OF PRACTICE MANAGING RISKS IN STEVEDORING
Draft CODE OF PRACTICE MANAGING RISKS IN STEVEDORING Draft for Public Comment This draft model Code of Practice for Managing Risks in Stevedoring supports the model Work Health and Safety (WHS) Act and
Safety and Environmental Information for External Companies Koehler Oberkirch
and al and at Work 1. Delivery, Notice, Signature After receiving the following information sheets, the team leader from every external company is required to read through them, explain them to their employees,
CONTRACTOR MANAGEMENT SYSTEM
CONTRACTOR MANAGEMENT SYSTEM NEW CONTRACTOR QUESTIONNAIRE Version 1 A Centre of Regional Excellence. December 2011 QUESTIONNAIRE TO BE RETURNED TO THE RISK MANAGEMENT SERVICE UNIT WITH SUPPORTING DOCUMENTATION
Unit Title: Unit purpose and aim
Unit Title: Preparing and Operating Telescopic Handlers to Lift and Transfer Loads in the Workplace Level: 2 Credit value: 25 Guided learning hours: 83 Unit expiry date: 31/10/2014 Unit purpose and aim
Pollution Incident Response Plan
Pollution Incident Response Plan Introduction Schmidt Quarries is committed to ensuring all aspects of our quarrying activities comply with the environmental legislative requirements in NSW. This Pollution
Health & Safety Policy For Locations Hosting Film Production Companies
Health & Safety Policy For Locations Hosting Film Production Companies Throughout this document, the location will be referred to as The Venue and the film production company as The Contractor. The following
FARM SAFETY STARTER GUIDE
Property of FARM SAFETY STARTER GUIDE Disclaimer This publication may contain occupational health and safety and workers compensation information. It may include some of your obligations under the various
Health and Safety Pre-Qualification Application Self-employed/Small businesses and Consultants
Health and Safety Pre-Qualification Application Self-employed/Small businesses and Consultants (less than five employees) 1. Business Information Company name: Address: Phone: Mobile: Email address: Number
CONTRACTOR SAFETY MANAGEMENT PROCEDURE
CONTRACTOR SAFETY MANAGEMENT PROCEDURE Version 1.0 TRIM file number Short description Relevant to Authority Responsible officer Responsible office Date introduced July 20, 2015 Date(s) modified June 11,
Measuring your capabilities in Fleet Safety Management ACC Fleet Saver
Measuring your capabilities in Fleet Safety Management ACC Fleet Saver Audit Standard 29 May 2014 Table of Contents Page 2 1. Getting Started...3 2. Critical element 1: Registered Owner Commitment to Safety
Rockhampton Office Brisbane Office Tarong Site. Barron Gorge Hydro PS Kareeya Hydro PS Mica Creek PS
Business Procedure Traffic Management Document Number OHS-PROC-130 This document applies to the following sites: All Sites Rockhampton Office Brisbane Office Tarong Site Barron Gorge Hydro PS Kareeya Hydro
Temporary Worker Safety Checklist
Temporary Worker Safety Checklist The following checklists provide guidance for staffing agencies and employers that hire temporary workers regarding the steps each party should take to ensure it is meeting
WHS CONTRACTOR MANAGEMENT PROCEDURE
WHS CONTRACTOR MANAGEMENT PROCEDURE Version No: Issued 3.0 18/11/2013 15/11/2018 1. Overview The District Council of Peterborough as part of its commitment under its WHS Contractor Management policy, recognises
Safety management small business toolkit Guide
Safety management small business toolkit Guide www.worksafe.nt.gov.au Disclaimer This publication contains information regarding work health and safety. It includes some of your obligations under the Work
Contractor Environment, Health and Safety Management Plan
EHSMS10 Contractor and Supplier EHS Management Contractor Environment, Health and Safety Management Plan Purpose Guidelines Record Keeping This template provides an example to Santos Contractors of the
Safety and Environmental Information for External Companies
1. Delivery, Notice, Signature After receiving the following information sheets, the team leader from every external company is required to read through them, explain them to their employees, and after
WHS Induction Series. 36 Toolbox Talks. Contents
36 Toolbox Talks 3-5 minute toolbox talks for induction or refresher safety training. Having regular training programs that educate your workers about workplace issues has never been easier than now with
Excavation & Trenching Procedure
Excavation & Trenching 1. Overview The will ensure, as far as is reasonably practicable, that the conduct of work relating to excavation and trenching will not be harmful to the health and safety of employees
SAMPLE FORM FOR THE RISK MANAGEMENT PROCESS
SAMPLE FORM FOR THE RISK MANAGEMENT PROCESS 1 This form can help set out your risk management process for managing cash-in-transit security risks. Using this form is not mandatory you can use whatever
Occupational Health & Safety Policy Injury & Incident Reporting
Occupational Health & Safety Policy Injury & Incident Reporting Policy number 46 Version 1 Approved by board on 6 June 2014 Responsible person President Review date June 2016 Introduction Living Positive
WORKPLACE SAFETY KIT A STEP BY STEP GUIDE TO SAFETY FOR BUSINESS GUIDE 2001. WorkCover NSW Health and Safety Guide. WorkCover. Watching out for you.
WORKPLACE SAFETY KIT A STEP BY STEP GUIDE TO SAFETY FOR BUSINESS GUIDE 2001 WorkCover NSW Health and Safety Guide WorkCover. Watching out for you. Table of Contents Table of Content: How to Use the Workplace
Safety Systems Review Facilities Management Guidance and specification Version 1 2014
Safety Systems Review Facilities Management Guidance and specification Version 1 2014 Membership Training Qualifications Audit and Consultancy Policy and Opinion Awards Contents Page Safety Systems Review
This document is meant to be a starting point for any company wanting to implement the safety passport scheme for their contractors on site.
Introduction This document is meant to be a starting point for any company wanting to implement the safety passport scheme for their contractors on site. It was put together by members of the Food & Drink
QUALIFICATION HANDBOOK
QUALIFICATION HANDBOOK Level 2 and 3 NVQ Certificate in Rail Engineering Traction and Rolling Stock (7597-05/10) September 2011 Version 1.1 (September 2011) Qualification at a glance Subject area Rail
Work Health & Safety Policy Document Number: WH&S 023 003 Ver 1
Work Health & Safety Policy Document Number: WH&S 023 003 Ver 1 Approved by: Senior Leadership Team Page 1 of 7 POLICY OWNER: Human Resources PURPOSE: To ensure, so far as is reasonably practicable, that
Employee Health and Safety Induction Training Record
COMPANY NAME Employee Health and Safety Induction Training Record Employee name Job Title Department Start Date - PBS 2010/2 Employee Health & Safety Induction Training Record Page 1 of 6 INDUCTION TRAINING
OCCUPATIONAL HEALTH AND SAFETY POLICY: INCIDENT AND INJURY REPORTING ERJ 6.28.1
OCCUPATIONAL HEALTH AND SAFETY POLICY: INCIDENT AND INJURY REPORTING ERJ 6281 INTRODUCTION The Edmund Rice Justice Aotearoa New Zealand Trust recognises that the health and safety of its employees is a
SPECIFIC SAFETY OBLIGATIONS FOR CONTRACTORS ENGAGED WITH THE CITY OF BUNBURY.
SPECIFIC SAFETY OBLIGATIONS FOR CONTRACTORS ENGAGED WITH THE CITY OF BUNBURY. The City of Bunbury acknowledges that it has a Duty of Care obligation under the Occupational Safety and Health Act 1984 (Section
WORKPLACE HEALTH AND SAFETY AUDITING GUIDELINES
WHS UNIT WORKPLACE HEALTH AND SAFETY AUDITING GUIDELINES Contents 1 Purpose... 1 2 Scope... 1 3 Definitions... 1 4 Responsibilities... 1 4.1 WHS Unit... 1 4.2 Auditor(s)... 1 4.3 Managers of Faculties
WHS Policies and Procedures Package
WHS Policies and Procedures Package The following is an extract to highlight the style and layout of this publication, as well as a snapshot of the content. Some samples may not be included in their entirety
Procedure: OHS CONTRACTOR MANAGEMENT
Procedure: OHS CONTRACTOR MANAGEMENT. Purpose This procedure outlines the occupational health and safety (OHS) requirements for the management of contractors engaged to perform tasks or services for Greater
Work Health and Safety Management Plan
Work Health and Safety Management Plan Controlled COPY No. 1 Issue No. 1.0 Date: 01 Jan 2013 This is a controlled document. Only registered holders of controlled copies will receive updates Wo Document
Risk Assessment Tool (example only)
HAZARD IDENTIFICATION & RISK ASSESSMENT TOOL Hazard identification You have an obligation to identify, assess and control any foreseeable hazards that may result as a consequence of your actions. If it
Communication of Health and Safety Policy and Information
Modules 1 4 1. Communication of Health and Safety Policy and Information 2. Allocation of Responsibility/Accountability for Health and Safety 3. Purchasing Controls 4. Contractors Communication of Health
Contractor Safety Management
1.0 Introduction Memorial University will ensure that a diligent contractor management process is established. This procedure establishes requirements for contract administration and oversight of contractor
Working for business. Workplace Safety Discount Application With employees
Working for business Workplace Safety Discount Application With employees What is the Workplace Safety Discount? Workplace Safety Discount provides a framework for building successful and sustainable workplace
Health and Safety Policy Part 1 Policy and organisation
Health and Safety Policy Part 1 Policy and organisation ICO H&S Policy Policy and organisation, June 2014 Page 1 of 6 1. Scope 1.1 The Health and Safety policy applies to all employees of the Information
SAFETY AND ENVIRONMENTAL INFORMATION FOR EXTERNAL COMPANIES. Koehler Kehl
1. Delivery, Notice, Signature After receiving the following information sheets, the team leader from every external company is required to read through them, explain them to their employees, and after
OH&S Management Systems Audit Checklist (NAT, E3)
3.1.2 3.1.1 Introduction OH&S Management Systems Audit Checklist (NAT, E3) This audit checklist is based on Element 3 (Implementation) of the National Self-Insurers OHS Audit Tool. For a full copy of the
OHS Training Guidelines
1. Introduction... 2 2. Legislative Requirements... 2 3. Definitions... 2 4. Responsibilities... 2 4.1. Senior Executive, Deans and Directors... 2 4.2. Management of Academic/Administrative Units... 3
Construction and Civil Work Management
STANDARD LME-12:001901 Uen Rev A Contents 1 Introduction... 3 2 Definitions... 3 3 Requirements... 4 3.1 General... 4 3.2 Responsibilities... 4 3.3 OHS Safety Plan... 5 3.4 Start of Construction Phase...
Section 2 Hazard Assessment and Risk Control Table of Contents
Section 2 Hazard Assessment and Risk Control Table of Contents 2.1 INTRODUCTION... 2 Class A Hazard... 3 Class B Hazard... 3 Class C Hazard... 3 Class D Hazard... 3 2.2 HAZARD ASSESSMENT... 4 2.2.1 Hazard
EMERGENCY MANAGEMENT PROCEDURE
EMERGENCY MANAGEMENT PROCEDURE STANDARD OPERATING PROCEDURES (SOP) INTRODUCTION All organisations involved in the Venue Management industry must have policies and procedures that aim to protect the health
Work Permits. A Health and Safety Guideline for Your Workplace. When is a Work Permit Needed? What is a Work Permit? Why use a Work Permit?
A Health and Safety Guideline for Your Workplace What is a Work Permit? A work permit is a written form used to authorize jobs that expose workers to serious hazards. It identifies the work to be done,
Induction & Orientation of Educators, Students & Volunteers
1 Induction & Orientation of Educators, Students & Volunteers Purpose It is a requirement of the Education and Care Services National Regulations that staffing arrangements are documented in policy. To
Level 2 Certificate in Warehousing and Storage Skills (QCF)
Level 2 Certificate in Warehousing and Storage Skills (QCF) Qualification Handbook www.cityandguilds.com September 2010 Version 1.1 Level 2 Certificate 1016-02 QAN 501/1082/2 About City & Guilds City &
WHS CONTRACTOR MANAGEMENT PROCEDURE
MANAGEMENT PROCEDURE 1. OVERVIEW The Flinders Ranges Council as part of its commitment under its WHS Contractor Management Policy, recognises its obligation to: Ensure, so far as is reasonably practicable,
Event Planning Guidance Notes EVENT PLANNING GUIDANCE NOTES
EVENT PLANNING GUIDANCE NOTES 1 Event Planning Guidance Notes Important issues This documentation is not a full and authoritative statement of the law, statutory guidance or best practice in planning,
SAFETY MANAGEMENT TOOLKIT. Safety Management Toolkit 1
SAFETY MANAGEMENT TOOLKIT Safety Management Toolkit 1 Safety Management Toolkit Please note This information is for guidance only and is not to be taken as an expression of the law. It should be read
CJ s health and Safety Law poster is displayed in the staff lobby.
Introduction has a responsibility to ensure that Health and Safety of all it employees while at work. We aim to fulfil these responsibilities by taking steps to work in accordance with relevant Health
1.1. EMERGENCY PROCEDURE On discovering a fire or being informed of an emergency;
Fire Action Plan FIRE ACTION PLAN SEStran aims to provide and maintain safe & healthy working conditions, equipment and systems of work for all our employees, and to provide such information, training
SAFE WORK PROCEDURE SWP 015 WORKING AT HEIGHT SEPTEMBER 2013 DOC. NO. D13/248399
Operation Brief Description of Activity Limitations MORELAND CITY COUNCIL Operations Centre 7-9 Walter Street Hadfield Vic 3046 Tel: 8311 4300 Working at height Approved by the Walter Street OHS committee
Contractor Safety Program Office of Environmental Health and Safety University of Toronto
Office of Environmental Health and Safety Table of Contents Overview... 3 Program Objectives... 3 University Health and Safety Policy... 4 Environmental, Health and Safety Mission Statement... 4 Roles
RISK PROFILING AND RISK REDUCING ACTIONS FOR WORK PLACEMENT
RISK PROFILING AND RISK REDUCING ACTIONS FOR WORK PLACEMENT Factors Risk Profile Indications Possible specific actions to reduce risk Work Work with hazards that have potential to cause permanent injury
Measuring your capabilities in Workplace Safety Management
Working with business Measuring your capabilities in Workplace Safety Management ACC Workplace Safety Management Practices Audit Standards Contents Section 1 Audit standards for ACC s Workplace Safety
WORK HEALTH AND SAFETY
WORK HEALTH AND SAFETY SCOPE POLICY Work Health and Safety System Work Health and Safety Objectives Roles and Responsibilities Executive Responsibilities Manager Responsibilities Worker Responsibilities
1.0 APPOINTMENTS 2.0 FIRE RISK ASSESSMENTS
Fire Risk assessment 1.0 APPOINTMENTS 1.1 Responsible Person. In compliance with the Regulatory Reform (Fire Safety) Order 2005 (FSO) the School s Head, Mrs J M Miles is appointed as the Responsible Person
EVENT MANAGEMENT. Examine the costs (budget) Define your goals Consider what evaluation methods you will incorporate. - Manpower.
EVENT MANAGEMENT Introduction Many sport and recreation clubs are responsible for co-ordinating and delivering one-off and ongoing programs and events ranging from a social function at the local club to
WHS CONTRACTOR MANAGEMENT PROCEDURE
1. Overview The Port Augusta City Council as part of its commitment under its WHS Contractor Management policy, recognises its obligation to: Ensure, so far as is reasonably practicable, the health and
Fire Policy and Procedures. Cañada Blanch Spanish School
Fire Policy and Procedures Cañada Blanch Spanish School SUMMARY 1. Introduction (p. 3) 2. Roles and responsibilities (p. 3) -- Headteacher -- Fire Team -- All staff -- Contractors 3. Fire procedures (p.
Risk Assessment / Safety Checklist
Risk Assessment / Safety Checklist For Events USC has a duty to provide a safe and healthy environment for those visiting USC to the extent that it is reasonably practical. To ensure USC provides a safe
WHS Contractor Management Procedure
Wudinna District Council 1. Overview Wudinna District Council as part of its commitment under its Policy recognises its obligation to: Ensure, so far as is reasonably practicable, the health and safety
THE UNIVERSITY OF SHEFFIELD WORK AT HEIGHT POLICY
THE UNIVERSITY OF SHEFFIELD WORK AT HEIGHT POLICY CONTENTS Page No 1 INTRODUCTION 2 2 LEGISLATION 2 3 HIERARCHY OF CONTROL 2 4 WORK AT HEIGHT POLICY 3 5 ROLES AND RESPONSIBILITIES 3 6 RISK ASSESSMENTS
CORPORATE PROCUREMENT UNIT SITE & SECURITY PROCEDURES BOSTON SPA VERSION 9 SEPT12
SITE PROCEDURES BSPA VERSION 9 PAGE 1 OF 9 CONTENTS PAGE 1. GENERAL INFORMATION 3 2. ACCESS 3 3. SECURITY 3 4. VEHICLE PARKING 4 5. PERMITS TO WORK 4 6. DELIVERY, UNLOADING AND STORAGE 4 7. HOURS OF WORK
Safety and Health Office WORKPLACE SAFETY CHECKLIST
Location: Date: Inspected by: Safety and Health Office WORKPLACE SAFETY CHECKLIST WORK ENVIRONMENT Ventilation Removal of fumes and dust Temperature and humidity control Noise levels Vibration Lighting
RTC - HB004202 SAFETY & SECURITY FEATURES
SAFETY & SECURITY FEATURES 1. GUEST ROOM PROVISIONS External locks Secondary locking device for entry and connecting doors Entry door viewer Self-closing entry door In room safes or central safety deposit
Pollution Incident Response Management Plan (PIRMP)
Pollution Incident Response Management Plan (PIRMP) For NSW Ports For Construction of Berth 103 Stage 2 Extension WATERWAY CONSTRUCTIONS PTY LTD ABN 74 061 311 395 Po Box 290, Annandale NSW 2038 TELEPHONE:
POLICY ON HEALTH AND SAFETY (GENERAL)
POLICY ON HEALTH AND SAFETY (GENERAL) General Statement It is the policy of Serenity Homecare Limited to ensure, so far as is reasonably practicable, the health, safety and welfare of its employees and
TRAFFIC MANAGEMENT IN WORKPLACES
TRAFFIC MANAGEMENT IN WORKPLACES Code of Practice TABLE OF CONTENTS FOREWORD... 3 SCOPE AND APPLICATION... 3 1. INTRODUCTION... 4 1.1 The meaning of key terms... 4 1.2 Who has health and safety duties
Information Sheet. What is a Workplace Transport Risk Assessment?
Workplace Transport Safety Risk Assessment Information Sheet This information sheet provides basic information on conducting a workplace transport risk assessment. The information is aimed at employers,
After ensuring the safety of our people and care for the environment, Flagstaff s Strategic intent will be:
This document is to be read in conjunction with Group Policies, Procedures and Guidelines as well any applied Agreement, Award or Industrial Relations Instrument(s) currently applied by the Flagstaff Group
Health and Safety Policy
Health and Safety Policy Status: Final Next Review Date: Apr 2014 Page 1 of 16 NHS England Health and Safety: Policy & Corporate Procedures Health and Safety Policy Policy & Corporate Procedures Issue