1 Electrical Safety Policy Version Number: V2 Name of originator/author: Director of Estates and Facilities Name of responsible committee: Estates and Facilities Committee Name of executive lead: Chief Operating Officer Date V1 issued: December 2010 Last Reviewed: January 2014 Next Review date: January 2017 Scope: Trust wide MMHSCT Document Code: FE06 Page 1 of 12

2 Document Title / Ref: Lead Executive Director Author and Contact Number Type of Procedural Document Document Purpose Electrical Safety Policy Chief Operating Officer Document Control Sheet Director of Estates and Facilities Policy Broad Category Broad The Health and Safety at Work Act 1974 requires all those concerned with an undertaking to do all that is reasonable to ensure the Health and Safety of all those who may be affected by the work. It imposes duties on both employers and employees. Scope Trust Wide Version number V2 Consultation Health and Safety Committee, OMT, Estates Committee Approving Committee Health and Safety Approval Date January 2014 Committee Ratification and Date Lead Executive Approval Chief Operational Officer Date of Ratification- January 2014 V1 Valid from Date December 2010 Current version is valid from approval date Date of Last Review January 2014 Date of Next Review January 2017 Procedural Documents to be read in None conjunction with this document: Training Needs Analysis Impact There are Training requirements for this procedural document See item 5.6 Financial Resource Impact There are Financial resource impacts None Document Change History Changes to this document in different versions must be detailed below. Rationale for the change should also be given Version Number / Name of procedural document this supersedes Type of Change i.e. Review / Legislation / Claim / Complaint Date Details of Change and approving group or Executive Lead (if done outside of the formal revision process) V1 Review January Document reviewed and formatting changes 2014 External references used in the creation of this document: If these include monitoring duties upon the Trust for this policy the specific details should be recorded on the Monitoring and Compliance Requirements sheet Privacy Impact N/a Any issues? None Assessment submitted Fraud Proofing N/a Any issues? None submitted If not relevant to this procedural document give rationale: Page 2 of 12

3 Policy authors are asked to consider each of the nine protected characteristics under the Equality Act We expect you to demonstrate that throughout the policy process you have had regard to the aims of the Equality Duty: 1. Eliminate unlawful discrimination, harassment and victimisation and any other conduct prohibited by the Act; 2. Advance equality of opportunity between people who share a protected characteristic and people who do not share it; and 3. Foster good relations between people who share a protected characteristic and people who do not share it. Please provide a brief account of how you have done this, further work to be completed and any support you have had in considering the aims and working in compliance with the Equality Duty. If you are unclear on how to do this or would like further advice and support then you may contact quality.admin@mhsc.nhs.uk. It is the responsibility of the approving group to ensure this statement reflects the Trusts objectives and position with compliance as set out within the NHS Equality Delivery System This policy is broad and the scope is Trust wide so completes with the Trust s Equality Delivery System In line with the Trust values we may publish this document on our External Website. Is there any reason you would prefer this is not done? None It is the Authors responsibility to ensure all procedural documents comply with the Trust values If you are unclear on any of the requirements in the document control sheet then please quality.admin@mhsc.nhs.uk before proceeding Page 3 of 12

4 Monitoring and Compliance Requirements Sheet For audit, Registration and NHSLA purposes all procedural documents must have monitoring requirements or key performance indicators set by the authors, Committees or Lead Directors. This allows the Trust to routinely monitor the effectiveness and impact of their procedural documents on a regular basis. Procedural Document Title: Electrical Safety Policy Does this procedural document offer support or evidence for the Trusts registered activities and outcomes? Yes Primarily Additional Not Applicable Additional Is this an NHSLA Document? No Which Standard does this relate to? Which Criterion Not Applicable Choose an item. Choose an item. If other Monitoring requirements are necessary i.e. Health & Safety Act and you should include them here and record them in the External References section Specify where the requirement originates Minimum Requirement / Standard / Indicator to be monitored & Section of document it appears Process for monitoring Audit Audit Audit Audit Responsible Individual / Group Additional Details i.e. Section number, Code of Practice Frequency of Monitoring Yearly Yearly Yearly Yearly Responsible Group for review of results / action plan approval / implementation Comments NB: If you have selected audit you should complete the required audit registration form and standards document and submit these with your expected timescales for completing the audit to quality.admin@mhsc.nhs.uk as soon as possible and no later than 4 weeks prior to the audit commencing. The Group / Committee should also ensure the monitoring work is added to their yearly schedule of monitoring and action logs as appropriate. Page 4 of 12

5 Contents Page Section Title Page Number 1 Introduction 6 2 Purpose 6 3 Definitions 6 4 Electrical Safety Policy Duties within the Organisation Chief Executive Director of Finance and Estates Director of Estates and Facilities Designated Person Authorising Engineer Low Voltage Authorising Engineer High Voltage Authorised Person Electrical (High/Low 8 Voltage) Estates Manager/Officer Competent Person Trust Service Leads/Managers Employee Responsibilities Contractors 9 5 Electrical Safety Policy Written Scheme Low Voltage Fixed Equipment Low Voltage SwitchGear High Voltage Equipment Maintenance Standby Emergency Generators Portable Electrical Equipment User Check Formal Visual Inspections Combined Inspection and Testing Defective Equipment Modification/Repair Information, Instructions and Training Reporting of Accidents and Dangerous Occurrences 12 6 Monitoring 12 7 Distribution 12 8 Review 12 9 References 12 Have you considered using a flowchart in your document to provide easy reference for staff? If you need support in developing a flowchart contact quality.admin@mhsc.nhs.uk Page 5 of 12

6 Electrical Safety Policy 1. Introduction This Policy sets out the commitment of Manchester Mental Health and Social Care Trust (MMHSCT) to provide a safe and secure environment for service users, visitors and staff. It applies to all persons who have access to, use of, or are responsible for the maintenance of MMHSCT occupied premises. It is important that electrical systems function safely and correctly, have adequate protection and do not exceed their design limits. The assurance of safe and reliable operation can only be achieved through a regime of regular inspection and testing of such systems and equipment and the implementation of appropriate maintenance works. This Policy applies to all persons (service users, staff, members of the public and contractors) who may be affected by the use of electricity in MMHSCT occupied premises or by the use of MMHSCT s electrical equipment in these premises. It also applies to all activities associated with electricity when employees and/or contractors undertake works at MMHSCT occupied premises. 2. Purpose The Health and Safety at Work Act 1974 requires all those concerned with an undertaking to do all that is reasonable to ensure the Health and Safety of all those who may be affected by the work. It imposes duties on both employers and employees. The Electricity at Work Regulations (1989) place broad duties on employers and employees with respect to all electrical systems. Other sources of recommendations and guidance relating to electrical systems are British Standard (BS)7621 Requirements for Electrical Installations and Health Technical Memorandums (HTM s) applicable to health care premises. The combined intention of these documents is to ensure: Continued availability of supply; Integrity and safety in design; Good installation and commissioning practice; Adequate maintenance and safe systems of use. 3. Definitions Low Voltage (LV): a potential not exceeding 1000V ac or 1500V dc between conductors, or 600V ac or 900V dc between a conductor and earth. High voltage (HV): a potential normally exceeding low voltage Portable Electrical Equipment: an item of equipment which is not part of a fixed installation but is, or is intended to be, connected to a fixed installation, or a generator, by means of a flexible cable and a plug and socket. Page 6 of 12

7 4. Electrical Safety Policy MMHSCT and its management have a duty, so far as is reasonably practicable; to ensure that there is a management regime for the proper design, installation, and operational management of electrical plant, equipment and systems. MMHSCT has a number of different arrangements in relation to the properties that they occupy. The accountability for the management of electrical systems is devolved to the organisation with overall control of the building. These can be categorised as follows: Properties managed by other organisations other NHS organisations, Local Authorities, private landlords, Properties managed by MMHSCT For Properties managed by other organisations MMHSCT has devolved the management of the electrical systems to its host organisations, under either a Service Level Agreement, Section 75 Agreement, or occupation agreement.. The Trust, however, retains a duty of care in relation to the management of the electrical systems Duties within the Organisation The Trust Board delegates overall responsibility for the management and control of electrical safety to the Chief Executive Chief Executive The Chief Executive will: Ensure compliance with statutory legislation, Approved Codes of Practice and Department of Health requirements regarding electrical safety. Ensure appropriate funds are available to carry out capital and revenue works. In addition to their management obligations the Chief Executive is the Duty Holder on whom the Electricity at Work Regulations 1989 imposes a duty relating to safety. This responsibility is delegated to the Director of Finance and Estates Director of Finance and Estates The Director of Finance and Estates delegates the management of electrical safety to the Director of Estates and Facilities Director of Estates and Facilities The Director of Estates and Facilities is the Trust s Lead for electrical safety. He/she will give assurance to the Trust Board regarding compliance with statutory legislation Designated Person The Director of Estates and Facilities will appoint a Designated Person in writing. This person shall possess adequate professional knowledge and will be responsible for devising and managing the procedures necessary to ensure that electrical safety within MMHSCT is well managed. This person is required to liaise closely with other professionals in various disciplines. He/she will be responsible for: Page 7 of 12

8 Reviewing personnel arrangements in place in Host Trust/Organisations with responsibility for maintaining electrical systems in buildings occupied by MMHSCT; Reviewing the systems and controls in place including training needs, communications, permits to work and emergency procedures in Host Trust/Organisations whose building MMHSCT occupy; Ensuring the personnel arrangements in place in MMHSCT are suitable and sufficient; Reviewing the systems and controls in place including training needs, communications and permits to work in MMHSCT; Appointing in writing an Authorising Engineer (AE) for the low voltage systems that are maintained by MMHSCT Authorising Engineer Low Voltage The Designated Person shall appoint in writing an Authorising Engineer (AE) for the low voltage system that MMHSCT retain the responsibility to manage. The Authorising Engineer will ideally be a Chartered Electrical Engineer, who is competent to advise on safety arrangements for defined low voltage electrical systems. The AE should be independent of the Trust and will also assess the suitability and appointment of all Authorised Persons - Electrical. For properties managed by other organisations the Designated Person will review the arrangements in place for the appointments of the Authorising Engineer, assuring that the appointed person(s) have the appropriate qualifications/experience Authorising Engineer High Voltage The Designated Person shall appoint an Authorising Engineer (AE) for the high voltage systems associated with buildings that MMHSCT retain the responsibility to manage. The Authorising Engineer will ideally be a Chartered Electrical Engineer, who is competent to advise on safety arrangements for defined high voltage electrical systems. The AE should be independent of the Trust and will also assess the suitability and appointment of all Authorised Persons - Electrical. For properties managed by other organisations the Designated Person will review the arrangements in place for the appointments of the Authorising Engineer, assuring that the appointed person(s) have the appropriate qualifications/experience Authorised Person Electrical (High/Low Voltage) The Authorised Persons should be appointed in writing by the Authorising Engineer to control and manage HV/LV Electrical systems including standby generator sets associated with buildings that MMHSCT retain the responsibility to manage. This will involve the practical implementation of maintaining, testing and inspecting all systems. They are to liaise with all necessary parties and provide any information to enable the Policy to be fully implemented. The Authorised Persons for high/low electrical systems are to be Senior Estates Officers or of a similar status who possess adequate knowledge, sufficient experience and have received the necessary training within this field. The Authorised Persons should be appointed in writing by the Authorising Engineer to control and manage HV/LV Electrical systems including standby generator sets associated with buildings that MMHSCT retain the responsibility to manage. Page 8 of 12

9 Estates Manager /Officer: Duties of Estates Officers/Managers who are not designated as Authorised Persons include: Liaising with Authorised Persons for the design, installation and commissioning of electrical systems and equipment. Ensuring that as fitted, schematic diagrams of all modified or new electrical systems and equipment are provided to the Authorised Persons and ensuring that copies of commissioning results, maintenance and test instructions and details of any specific hazards pertaining to the systems and equipment are also provided. Ensuring that adequate spares are provided on initial handover of schemes Competent Person Competent Persons are contractors and trades staff who have received adequate training and have sufficient experience to operate, maintain, inspect and test low voltage electrical systems in a safe and effective manner. Their duties include: Ensuring that all procedures, safe working practices, risk assessments and permits to work are followed and that written records for maintenance, inspection and test work are completed. Prompt reporting of all defects, unusual occurrences and other anomalies. Working with appropriate parties to identify hazards and reduce risks by following safe working practices. Informing users of any planned interruptions to the electrical supply. Competent Person(s) relating to properties, whose electrical systems are managed by others, under Service Level Agreements, Section 75 Agreements, or accommodation agreements, shall be appointed by the relevant managing organisation Trust Service Leads/Managers Directors/Senior Managers/Heads of Department are responsible for ensuring that all staff are made aware of and observe the requirements of this Policy Employee Responsibilities All users of electrical equipment are responsible for ensuring that appropriate maintenance and adherence to guidance is delivered by alerting authorised/authorising officers of concerns/issues arising Contractors All contractors employed by the Trust shall be competent and be responsible for ensuring that they, and any subcontractor reporting to them, carry out their activities in a way that complies with this Policy. Approval of electrical contractors to undertake work for MMHSCT shall be by the Authorised Person. All contractors used on site must be approved. Page 9 of 12

10 The ability of a contractor to safely undertake the required work shall be the prime consideration when appointment to the approved list is being considered. The following factors should be considered:- Qualifications and training of employees; Technical references from previous clients insurance cover; Safety Policy. All work undertaken by contractors on sites occupied by MMHSCT must comply with the requirements of the 17th Edition IEE Wiring Regulations BS7671. Minor Electrical Installation Works Certificates must be completed in line with the requirements of 17th Edition BS Electrical Safety Policy Written Scheme The Written Scheme in place on each site should be established and ratified by the nominated Authorised Persons. Minimum maintenance levels to be included in these schemes are outlined below: 5.1. Low Voltage Fixed Equipment The recommendations of the Department of Health s publication HTM06-02 Electrical Safety Guidance for Low Voltage Systems should be adopted as the method of achieving the legal requirements for electrical safety on low voltage systems. All low voltage equipment (e.g. ventilation systems, industrial boiler plant, lifts, industrial compressors etc.) shall be regularly inspected, serviced and tested to ensure it is maintained in a safe and serviceable condition. Test periods shall not exceed 12 months. A record of maintenance of electrical equipment shall be kept by the appropriate party and will contain details of inspections, routine servicing, and any repairs and modifications Low Voltage Switchgear The recommendations of the Department of Health s publication HTM06-02, Electrical Safety Guidance for Low Voltage Systems should be adopted as the method of achieving the legal requirements for electrical safety on low voltage systems. All low voltage switchgear will be maintained to ensure its safety and operational capability is maintained. The test period shall not exceed 5 years High Voltage Equipment Maintenance The Trust has adopted the Department of Health s publication HTM06-01 and HTM06-01 Part B, Electrical Services Supply & Distribution and its method of achieving a safe system of work on its HV systems. When establishing the maintenance regimes the Authorised Person must take into account the duty imposed on the equipment, the environmental conditions and the manufacturer s recommendations. All new high voltage work shall be fully commissioned and tested to ensure it functions correctly and to specification Standby Emergency Generators All fixed low voltage emergency generators shall be maintained, tested and fuelled to ensure their correct operation in the event of a mains failure. Each generator shall be tested on load at locally agreed periods. Page 10 of 12

11 5.5. Portable Electrical Equipment All portable electrical equipment shall be maintained in a safe condition in accordance with the requirements of the Electricity at Work Regulations This will be achieved through a combination of User Checks, Formal Visual Inspections and Combined Inspection and Testing: User Check The primary responsibility for day-to-day safety of portable equipment when in service lies with the user(s). Any person using portable electrical equipment shall, before using it, personally check that the equipment, including the flexible cable and plug top, is free from mechanical damage and that a date test label is attached and a valid date shown. Visual signs that the equipment is not in a sound condition may include:- damage (apart from light scuffing) to the cable sheath; damage to the plug, for example the casing is cracking or the pins are bent; inadequate joints, including taped joints in the cable; the outer sheath of the cable is not effectively secured where it enters the plug or the equipment. Obvious evidence would be if the coloured insulation of the internal cable cores where showing; the equipment has been subjected to conditions for which it is not suitable, eg it is wet or excessively contaminated; there is damage to the external case of the equipment or there are some loose parts or screws; there is evidence of overheating (burn marks or discoloration); These checks also apply to extension leads and associated plugs and sockets Formal Visual Inspections These inspections should be carried out by the user as part of the annual Health and Safety Inspection. This involves inspecting the casing, the connecting lead and the plug. The findings of the inspections must be recorded Combined Inspection and Testing This needs to be carried out by a competent person and involves an Earth Continuity Test, an Insulation Resistance Test and a Load Test. The maintenance regime should be appropriate for the environment and use of the equipment. On sites where there is a service level agreement in place with a Host Trust or other third party this will be at a frequency agreed locally. On sites where MMHSCT are responsible for arranging the combined inspection and testing the frequency at which tests are carried out will range between months (see HSE INDG 236) Defective Equipment Any defective equipment must not be used. Upon detection of a defect the equipment should be labelled as defective. If the defect is detected on a piece of IT equipment MMHSCT s IT department should be notified. Page 11 of 12

12 If the defect is detected on any other equipment it should be logged with the organisation that is managing the site Modification/Repair Equipment which has been modified or repaired shall be tested prior to being returned to service Information, Instructions and Training Arrangements must be made to ensure: That all employees concerned with particular work activities are adequately informed of the systems, plant and apparatus which are affected and instructed in all necessary safety procedures. So far as is reasonably practicable, that other persons who are not employees but may be affected by the work activities also receive adequate information and/or instruction Reporting of Accidents and Dangerous Occurrences Staff and contractors employed by MMHSCT must comply with the Trusts Policy on the reporting of accidents and dangerous occurrences. The Incident Reporting Procedure meets MMHSCT s legal obligations to report all accidents, injuries, dangerous occurrences and reportable diseases. Such events may involve MMHSCT employees, contractors, service users, visitors and other members of the public. 6. Monitoring MMHSCT s Estates and Facilities Department shall monitor the effectiveness of this Electrical Safety Policy. 7. Distribution Distribution of this Policy shall be managed via the Trust Intranet. 8. Review This Policy will be reviewed every 3 years or when working practices or statutory regulations change. The implementation of this Policy will be continuously monitored to ensure compliance. 9. References 1) The Health and Safety at Work Act ) The Electricity at Work Regulations ) British Standard 7621 Requirements for electrical installations 4) HTM Electrical Safety Guidance for Low Voltage Systems 5) HTM Part a Electrical Services Supply & Distribution (Design) 6) HTM Part b Electrical Services Supply & Distribution (Operational Management) 7) Maintaining Portable Electrical Equipment in Offices and Other Low Risk Environments, HSE INDG 236 8) 17th Edition IEE Wiring Regulations BS7671 Page 12 of 12

Ligature Risk Assessment Policy

Ligature Risk Assessment Policy Ligature Risk Assessment Policy Version Number: V3 Name of originator/author: Director of Estates and Facilities Name of responsible committee: Risk Committee Name of executive lead: Chief Operating Officer

More information

Control of Asbestos Policy

Control of Asbestos Policy Control of Asbestos Policy Version Number: V1D Name of originator/author: Estates Manager 0161 277 1235 Name of responsible committee: Estates and Facilities Committee Name of executive lead: Director

More information

RD SOP17 Research data management and security

RD SOP17 Research data management and security RD SOP17 Research data management and security Version Number: V2 Name of originator/author: Dr Andy Mee, R&I Manager Name of responsible committee: R&I Committee Name of executive lead: Medical Director

More information

Safe Bathing, Hot Water and Surface Temperature Policy

Safe Bathing, Hot Water and Surface Temperature Policy Safe Bathing, Hot Water and Surface Temperature Policy Version Number: V4 Name of originator/author: Health and Safety Advisor Name of responsible committee: Health and Safety Committee Name of executive

More information

LIFT MANAGEMENT. Version 01 / November 2015 Page 1 of 9 Approved by Health & Safety Committee

LIFT MANAGEMENT. Version 01 / November 2015 Page 1 of 9 Approved by Health & Safety Committee LIFT MANAGEMENT Version 01 / November 2015 Page 1 of 9 Approved by Health & Safety Committee This is a controlled document. It should not be altered in any way without the express permission of the author

More information

Asbestos Policy. Ymddiriedolaeth GIG Gwasanaethau Ambiwlans Cymru Welsh Ambulance Service (NHS) Trust. November 2007. All Staff.

Asbestos Policy. Ymddiriedolaeth GIG Gwasanaethau Ambiwlans Cymru Welsh Ambulance Service (NHS) Trust. November 2007. All Staff. Appendix 1 Ymddiriedolaeth GIG Gwasanaethau Ambiwlans Cymru Welsh Ambulance Service (NHS) Trust Asbestos Policy Approved by Date Review Date Target Audience Trust Board November 2007 November 2008 All

More information

OHS Contractor Management Procedure

OHS Contractor Management Procedure The Wudinna District Council will through this procedure seek to ensure that Contractors they engage have an adequate understanding and a commitment to Occupational Health, Safety and Welfare as well as

More information

OH&S MANAGEMENT SYSTEM CHECKLIST - AS 4801:2001 (STATUS A = Acceptable; N = Not Acceptable; N/A = Not Applicable)

OH&S MANAGEMENT SYSTEM CHECKLIST - AS 4801:2001 (STATUS A = Acceptable; N = Not Acceptable; N/A = Not Applicable) OH&S MANAGEMENT SYSTEM CHECKLIST - AS 4801:2001 (STATUS A = Acceptable; N = Not Acceptable; N/A = Not Applicable) 4.1 General Requirements 4.2 OHS policy Has the organisation an established and maintained

More information

ASBESTOS CONTAINING MATERIALS POLICY

ASBESTOS CONTAINING MATERIALS POLICY ASBESTOS CONTAINING MATERIALS POLICY Document Control Version 3 Ratified by Risk Management Sub Group Date Ratified 19 December 2012 Name of Originator/Author Head of Estates and Facilities Name of Responsible

More information

Health and Safety Policy and Procedures

Health and Safety Policy and Procedures Health and Safety Policy and Procedures Health & Safety Policy & Procedures Contents s REVISION AND AMENDMENT RECORD : Summary of Change Whole Policy 4.0 05 Nov 08 Complete re-issue Whole Policy 4.1 10

More information

Corporate Health and Safety Policy

Corporate Health and Safety Policy Corporate Health and Safety Policy November 2013 Ref: HSP/V01/13 EALING COUNCIL Table of Contents PART 1: POLICY STATEMENT... 3 PART 2: ORGANISATION... 4 2.1 THE COUNCIL:... 4 2.2 ALLOCATION OF RESPONSIBILITY...

More information

SUPPLY CHAIN PREQUALIFICATION PACKAGE

SUPPLY CHAIN PREQUALIFICATION PACKAGE SUPPLY CHAIN PREQUALIFICATION PACKAGE 2015 PREQUALIFICATION AS AN APPROVED SUBCONTRACTOR / SUPPLIER In order for your company to be registered as an approved Vendor with StructureTone Limited, we require

More information

MANAGEMENT OF MEDICAL GAS CYLINDERS AND MEDICAL PIPELINE SYSTEMS (MGPS) POLICY. Senior Managers Operational Group. staff)

MANAGEMENT OF MEDICAL GAS CYLINDERS AND MEDICAL PIPELINE SYSTEMS (MGPS) POLICY. Senior Managers Operational Group. staff) MANAGEMENT OF MEDICAL GAS CYLINDERS AND MEDICAL PIPELINE SYSTEMS (MGPS) POLICY Version: 3 Ratified by: Date ratified: December 2013 Title of originator/author: Title of responsible committee/group: Senior

More information

Corporate Health and Safety Policy

Corporate Health and Safety Policy Corporate Health and Safety Policy Publication code: ED-1111-003 Contents Foreword 2 Health and Safety at Work Statement 3 1. Organisation and Responsibilities 5 1.1 The Board 5 1.2 Chief Executive 5 1.3

More information

Health and Safety Policy

Health and Safety Policy Health and Safety Policy October 2014 1 October 2014 Contents: Introduction 1. STATEMENT OF INTENT AND POLICY OBJECTIVES 2. RESPONSIBILITIES AND ACCOUNTABILITIES FOR HEALTH AND SAFETY 2.1 The Director

More information

HEALTH AND SAFETY MANAGEMENT

HEALTH AND SAFETY MANAGEMENT Health & Safety Services Unit name goes here Safety Code of Practice 2 Part A 5 th Edition, November 2015 Unit name goes here HEALTH AND SAFETY MANAGEMENT Organisation and Responsibilities University of

More information

School or service safety advisor (SSA) role

School or service safety advisor (SSA) role School or service safety advisor (SSA) role Document control information Published document name: ssa-role-gn Date issued: January 2012 Version: 1.0 School or service safety advisor (SSA) role Previous

More information

Health and Safety Policy

Health and Safety Policy Health and Safety Policy Status: Final Next Review Date: Apr 2014 Page 1 of 16 NHS England Health and Safety: Policy & Corporate Procedures Health and Safety Policy Policy & Corporate Procedures Issue

More information

ESTATES MAINTENANCE POLICY (INCLUDING PLANNED PREVENTIVE MAINTENANCE)

ESTATES MAINTENANCE POLICY (INCLUDING PLANNED PREVENTIVE MAINTENANCE) ESTATES MAINTENANCE POLICY (INCLUDING PLANNED PREVENTIVE MAINTENANCE) Version Number 2 Version Date October 2013 Policy Owner Maintenance Manger Author Director of Estates and Facilities First approval

More information

Health and Safety Policy Part 1 Policy and organisation

Health and Safety Policy Part 1 Policy and organisation Health and Safety Policy Part 1 Policy and organisation ICO H&S Policy Policy and organisation, June 2014 Page 1 of 6 1. Scope 1.1 The Health and Safety policy applies to all employees of the Information

More information

No. Name of Legislation Applicable Issues and Requirements Demonstration of Compliance 1. Health and Safety at Work Act 1974

No. Name of Legislation Applicable Issues and Requirements Demonstration of Compliance 1. Health and Safety at Work Act 1974 The Police Treatment Centres Health and Safety Legal Compliance Register No. Name of Legislation Applicable Issues and Requirements Demonstration of Compliance 1. Health and Safety at Work Act 1974 2.

More information

GUIDE TO THE MAINTENANCE, INSPECTION AND TESTING OF PORTABLE EQUIPMENT (ELECTRICAL APPLIANCES AND TOOLS) IN THE WORKPLACE

GUIDE TO THE MAINTENANCE, INSPECTION AND TESTING OF PORTABLE EQUIPMENT (ELECTRICAL APPLIANCES AND TOOLS) IN THE WORKPLACE GUIDE TO THE MAINTENANCE, INSPECTION AND TESTING OF PORTABLE EQUIPMENT (ELECTRICAL APPLIANCES AND TOOLS) IN THE WORKPLACE ET 215:2008 ELECTRO-TECHNICAL COUNCIL OF IRELAND 2008 Page 1 of 6 Published by

More information

HEALTH & SAFETY POLICY

HEALTH & SAFETY POLICY HEALTH & SAFETY POLICY 1. STATEMENT OF INTENT & POLICY OBJECTIVES The Council, as the governing body of the School, recognises and accepts the responsibilities placed on it as 'Employer' by the Health

More information

ENVIRONMENTAL POLICY & MANAGEMENT SYSTEM GUIDE

ENVIRONMENTAL POLICY & MANAGEMENT SYSTEM GUIDE ENVIRONMENTAL POLICY & MANAGEMENT SYSTEM GUIDE 1 Statement of Intent Corps Security aims to create and maintain through staff awareness, the highest level of environmental responsibility. We regard the

More information

Claims Management Policy

Claims Management Policy Claims Management Policy April 2015 Author: Responsibility: Janet Young, Governance & Risk Manager All Staff should adhere to this policy Effective Date: April 2015 Review Date: April 2017 Reviewing/Endorsing

More information

St Peter s College ELECTRICAL SAFETY. B. University Safety Office Policy Statement S4/10, Working safely with Electricity.

St Peter s College ELECTRICAL SAFETY. B. University Safety Office Policy Statement S4/10, Working safely with Electricity. St Peter s College ELECTRICAL SAFETY References: A. Peninsula Business Services Guidance Note 4-1, Electrical Safety. B. University Safety Office Policy Statement S4/10, Working safely with Electricity.

More information

Maintaining portable electric equipment in low-risk environments

Maintaining portable electric equipment in low-risk environments Maintaining portable electric equipment in low-risk environments Introduction This leaflet explains the simple and sensible precautions that need to be taken to prevent danger from portable or movable

More information

AFTRS Health and Safety Risk Management Policy

AFTRS Health and Safety Risk Management Policy AFTRS Health and Safety Risk Management Policy Responsible Officer Contact Officer Authorisation Director, Corporate and Student Services Head of Human Resources Chief Executive Officer Effective Date

More information

ELECTRICAL INSULATION TESTING OF HV EQUIPMENT UP TO 33kV

ELECTRICAL INSULATION TESTING OF HV EQUIPMENT UP TO 33kV 1. SCOPE This document details PowerSystems requirements for electrical testing of HV Equipment up to and including 33kV. 2. ISSUE RECORD This is a Reference document. The current version of Controlled

More information

Circuit Electrical Testing

Circuit Electrical Testing Safe Isolation Procedure Circuit Electrical Testing Site Safety Management It is essential from the outset that effective management and control of the system, apparatus and equipment used on site is achieved

More information

STRATEGIC CLEANING PLAN POLICY (In conjunction with Operational Cleaning Manual)

STRATEGIC CLEANING PLAN POLICY (In conjunction with Operational Cleaning Manual) STRATEGIC CLEANING PLAN POLICY (In conjunction with Operational Cleaning Manual) Version: 7 Ratified by: Date ratified: August 2015 Title of originator/author: Title of responsible committee/group: Senior

More information

COMMISSION REGULATION (EU)

COMMISSION REGULATION (EU) L 122/22 Official Journal of the European Union 11.5.2011 COMMISSION REGULATION (EU) No 445/2011 of 10 May 2011 on a system of certification of entities in charge of maintenance for freight wagons and

More information

Electrical safety and you

Electrical safety and you Electrical safety and you A brief guide Introduction Electricity can kill or severely injure people and cause damage to property. Every year many accidents at work involving electric shock or burns are

More information

BLOOM AND WAKE (ELECTRICAL CONTRACTORS) LIMITED QUALITY ASSURANCE MANUAL

BLOOM AND WAKE (ELECTRICAL CONTRACTORS) LIMITED QUALITY ASSURANCE MANUAL 130 Wisbech Road Outwell Wisbech Cambridgeshire PE14 8PF Tel: (01945) 772578 Fax: (01945) 773135 Copyright 2003. This Manual and the information contained herein are the property Bloom & Wake (Electrical

More information

This Guideline does not address electrical equipment in the following categories:

This Guideline does not address electrical equipment in the following categories: Policy Hierarchy link Responsible Officer Contact Officer Superseded Documents HS418 Portable Electrical Equipment Inspection, Testing and Tagging Guideline Work Health and Safety Act 2011 Work Health

More information

CONFORMED COPY. Method Statement Estates Services. Revision History. Revision Date Reviewer Status. 16 th April 2007 Project Co Final Version

CONFORMED COPY. Method Statement Estates Services. Revision History. Revision Date Reviewer Status. 16 th April 2007 Project Co Final Version CONFORMED COPY Method Statement Revision History Revision Date Reviewer Status 16 th April 2007 Project Co Final Version 1 Table of Contents 1 Objectives... 3 2 Management Supervision and Organisation

More information

CCG: IG06: Records Management Policy and Strategy

CCG: IG06: Records Management Policy and Strategy Corporate CCG: IG06: Records Management Policy and Strategy Version Number Date Issued Review Date V3 08/01/2016 01/01/2018 Prepared By: Consultation Process: Senior Governance Manager, NECS CCG Head of

More information

Houses of Parliament. Health and Safety Policy Supplement (PS1) Accident and Incident Reporting

Houses of Parliament. Health and Safety Policy Supplement (PS1) Accident and Incident Reporting Health and Safety Policy Supplement (PS1) Accident and Incident Reporting This policy supplement has been prepared by the Parliamentary Safety Risk Management team and endorsed by the Director General

More information

Maintaining portable electrical equipment

Maintaining portable electrical equipment Maintaining portable electrical equipment Do you have control over or use portable electrical equipment in the workplace? This guidance is for managers, electricians, technicians and users and gives sensible

More information

FIRST STOP SAFETY 1 PAT-IT. Portable Appliance Tester. User Manual. Issue 1.6

FIRST STOP SAFETY 1 PAT-IT. Portable Appliance Tester. User Manual. Issue 1.6 FIRST STOP 1 PAT-IT Portable Appliance Tester User Manual Issue 1.6 First Stop Safety 11 Glaisdale Road Northminster Business Park Upper Poppleton York YO26 6QT t: 01904 791050 f: 01904 780054 e: info@firststopsafety.co.uk

More information

Asbestos Policy. Planning, Performance Management and Support Services. Legacy Causeway Asbestos Policy (Ref: CHSST/04/211)

Asbestos Policy. Planning, Performance Management and Support Services. Legacy Causeway Asbestos Policy (Ref: CHSST/04/211) Asbestos Policy Reference Number: NHSCT/09/192 Responsible Directorate: Planning, Performance Management and Support Services Replaces (if appropriate): Legacy Causeway Asbestos Policy (Ref: CHSST/04/211)

More information

REPORT 4 FOR DECISION. This report will be considered in public

REPORT 4 FOR DECISION. This report will be considered in public REPORT 4 Subject: Safety Readiness for the Summer 2013 Events Programme Agenda item: Public Item 7 Report No: 4 Meeting date: 28 May 2013 Report to: Board Report of: Mark Camley, Interim Executive Director

More information

HEALTH AND SAFETY POLICY AND PROCEDURES

HEALTH AND SAFETY POLICY AND PROCEDURES HEALTH AND SAFETY POLICY AND PROCEDURES 1 Introduction 1. The Health and Safety at Work etc. Act 1974 places a legal duty on the University to prepare and revise as often as may be appropriate, a written

More information

Policy for the Management of Asbestos in the Workplace

Policy for the Management of Asbestos in the Workplace Southwark Council Management of Asbestos in the Workplace November 2011 Page 1 of 15 CONTENTS 1. INTRODUCTION... 3 2. POLICY STATEMENT... 3 3. ASBESTOS RISK CLASSIFICATION SCHEME... 5 4. SAMPLING OF ASBESTOS

More information

Does a landlord have to have an electrical inspection carried out?

Does a landlord have to have an electrical inspection carried out? Bob Miller, Head of Housing Services at the University of London spoke to Vincenzo Rampulla at the National Landlords Association (NLA) about electrical and fire safety in private rented accommodation.

More information

Inspection and testing of portable electrical equipment

Inspection and testing of portable electrical equipment February 2008 Inspection and testing of portable electrical equipment This is a guidance document for Schools and Support Services. Units should use the guidance to help them develop their own local health

More information

SMS0045 Construction Health and Safety Policy and Procedures

SMS0045 Construction Health and Safety Policy and Procedures SMS0045 Construction Health and Safety Policy and Procedures March 2015 Version 8 Please note that for projects utilising a CDM Co-ordinator under the transitional arrangements of CDM 2015 (between 6 April

More information

Health and Safety Management Agreement between NHS Greater Glasgow and Clyde and The University of Glasgow

Health and Safety Management Agreement between NHS Greater Glasgow and Clyde and The University of Glasgow Health and Safety Management Agreement between NHS Greater Glasgow and Clyde and The University of Glasgow 1.0 The application of the agreement Agreed: September 2015 Review date: September 2018 NHS Greater

More information

National Archives of Australia - Administrative Functions Disposal Authority March 2010

National Archives of Australia - Administrative Functions Disposal Authority March 2010 Accidents The activities involved in dealing with mishaps causing injury or damage. Includes damage or injury to the organisation's property or member of staff incurred while coming to, at, or leaving

More information

South Norfolk Council Business Continuity Policy

South Norfolk Council Business Continuity Policy South Norfolk Council Business Continuity Policy 1 Title: Business Continuity Policy Date of Publication: TBC Version: 2 Published by: Emergency Planning Team Review date: April 2014 Document Owner: Document

More information

ASBESTOS POLICY MANAGEMENT PLAN

ASBESTOS POLICY MANAGEMENT PLAN ASBESTOS POLICY & MANAGEMENT PLAN HS20 Version V2 Approved by: Health, Safety and Security Committee Date approved: March 2011 Ratified by: Hospital Executive Committee Date ratified 24 th April 2012 Document

More information

BUSINESS CONTINUITY MANAGEMENT POLICY

BUSINESS CONTINUITY MANAGEMENT POLICY BUSINESS CONTINUITY MANAGEMENT POLICY AUTHORISED BY: DATE: Andy Buck Chief Executive March 2011 Ratifying Committee: NHS Rotherham Board Date Agreed: Issue No: NEXT REVIEW DATE: 2013 1 Lead Director John

More information

Landlords Guide to Electrical Safety in Scotland

Landlords Guide to Electrical Safety in Scotland Landlords Guide to Electrical Safety in Scotland The Landlords Guide to Electrical Safety in Scotland is produced principally for landlords. However, electrical contractors, installers and tenants may

More information

QUALIFICATION HANDBOOK

QUALIFICATION HANDBOOK QUALIFICATION HANDBOOK Level 2 and 3 NVQ Certificate in Rail Engineering Traction and Rolling Stock (7597-05/10) September 2011 Version 1.1 (September 2011) Qualification at a glance Subject area Rail

More information

Data Protection Policy

Data Protection Policy Data Protection Policy Document Ref: DPA20100608-001 Version: 1.3 Classification: UNCLASSIFIED (IL 0) Status: ISSUED Prepared By: Ian Mason Effective From: 4 th January 2011 Contact: Governance Team ICT

More information

Document Control Sheet

Document Control Sheet Policy Document Money Management Policy Lead Director: Frank Toner Lead Assistant Director: Simon White Policy Approved by: Senior Management Group Date Policy approved: February 2012 Implementation Date:

More information

OH&S Management Systems Audit Checklist (NAT, E3)

OH&S Management Systems Audit Checklist (NAT, E3) 3.1.2 3.1.1 Introduction OH&S Management Systems Audit Checklist (NAT, E3) This audit checklist is based on Element 3 (Implementation) of the National Self-Insurers OHS Audit Tool. For a full copy of the

More information

Safe management of industrial steam and hot water boilers A guide for owners, managers and supervisors of boilers, boiler houses and boiler plant

Safe management of industrial steam and hot water boilers A guide for owners, managers and supervisors of boilers, boiler houses and boiler plant Safe management of industrial steam and hot water boilers A guide for owners, managers and supervisors of boilers, boiler houses and boiler plant Health and Safety Safe management of industrial steam and

More information

Customer Installation Safety Plan. March 2015

Customer Installation Safety Plan. March 2015 Customer Installation Safety Plan March 2015 Document History Issue No. Date Approved By Summary of Changes 1 June 2014 Chief Engineer Updated and revised in line with requirement for biennial review under

More information

The Management of Asbestos containing Materials

The Management of Asbestos containing Materials The Management of Asbestos containing Materials Status Owner Approval by University Court Draft Head of Estates and Building 1 Purpose... 1 2 Scope... 3 3 Principles... 4 4 Procedure... 5 5 Accountabilities...

More information

AS/NZS 4801:2001. Safety Management Systems (SMS) Self-Assessment Checklist. Revision 1 (January 2014)

AS/NZS 4801:2001. Safety Management Systems (SMS) Self-Assessment Checklist. Revision 1 (January 2014) AS/NZS 4801:2001 Safety Management Systems (SMS) Self-Assessment Checklist This document restates the requirements of AS/NZS 4801:2001 for Safety Management Systems (SMS) and has been developed to assist

More information

GLASGOW SCHOOL OF ART OCCUPATIONAL HEALTH AND SAFETY POLICY. 1. Occupational Health and Safety Policy Statement 1

GLASGOW SCHOOL OF ART OCCUPATIONAL HEALTH AND SAFETY POLICY. 1. Occupational Health and Safety Policy Statement 1 GLASGOW SCHOOL OF ART OCCUPATIONAL HEALTH AND SAFETY POLICY CONTENTS PAGE 1. Occupational Health and Safety Policy Statement 1 2. Occupational Health and Safety Management System 2 3. Organisational Management

More information

PROJECT BRIEF Version (insert number)

PROJECT BRIEF Version (insert number) PROJECT BRIEF Version (insert number) 1 Project Name ------------------------------------------------------------------- 1.1 The Project Project Address Nature of Work Location 1.2 DCC Client for Project

More information

Maintenance Strategy 2015 Owner: Kevin Bullimore Head of Infrastructure Next review 2020

Maintenance Strategy 2015 Owner: Kevin Bullimore Head of Infrastructure Next review 2020 Maintenance Strategy 2015 Owner: Kevin Bullimore Head of Infrastructure Next review 2020 Page 1 of 7 Maintenance Strategy Introduction The requirement for maintenance of premises, plant and equipment arises

More information

Project Management. Advice on the provision of Local Decontamination Units (LDUs) Decontamination Services

Project Management. Advice on the provision of Local Decontamination Units (LDUs) Decontamination Services Advice on the provision of Local Decontamination Units (LDUs) Decontamination Services January 2010 Contents Project Management Page Local Decontamination Units (LDUs) Construction Project Management...3

More information

Mentorship of Pre-registration Nurses (learning

Mentorship of Pre-registration Nurses (learning Lead Executive Click here to enter text. Mentorship of Pre-registration Nurses (learning and assessment in clinical practice) Policy Version Number: V4 Name of originator/author: Practice Education Facilitator

More information

NZQA registered unit standard 15848 version 6 Page 1 of 5. Demonstrate and apply knowledge of safeguards for use with portable electrical appliances

NZQA registered unit standard 15848 version 6 Page 1 of 5. Demonstrate and apply knowledge of safeguards for use with portable electrical appliances Page 1 of 5 Title Demonstrate and apply knowledge of safeguards for use with portable electrical appliances Level 2 Credits 3 Purpose This unit standard covers knowledge of safeguards used in conjunction

More information

Excavation & Trenching Procedure

Excavation & Trenching Procedure Excavation & Trenching 1. Overview The will ensure, as far as is reasonably practicable, that the conduct of work relating to excavation and trenching will not be harmful to the health and safety of employees

More information

Health and Safety Policy

Health and Safety Policy Health & Safety Policy 1.Introduction Health and safety is the concern of everyone within Escape Community Arts (Escape). This policy is intended to provide a practical framework for the implementation

More information

INDEX 1.0 HEALTH, SAFETY & ENVIRONMENT 1.1 INTRODUCTION 1.2 OBJECTIVES 1.3 HEALTH, SAFETY & ENVIRONMENT STATEMENT 1.4 ENVIRONMENTAL STATEMENT

INDEX 1.0 HEALTH, SAFETY & ENVIRONMENT 1.1 INTRODUCTION 1.2 OBJECTIVES 1.3 HEALTH, SAFETY & ENVIRONMENT STATEMENT 1.4 ENVIRONMENTAL STATEMENT INDEX 1.0 HEALTH, SAFETY & ENVIRONMENT 1.1 INTRODUCTION 1.2 OBJECTIVES 1.3 HEALTH, SAFETY & ENVIRONMENT STATEMENT 1.4 ENVIRONMENTAL STATEMENT 2.0 HEALTH, SAFETY & ENVIRONMENT MANUAL 2.1 HAZARD MANAGEMENT

More information

Revised Scheme of Service for Occupational Health and Safety Personnel

Revised Scheme of Service for Occupational Health and Safety Personnel REPUBLIC OF KENYA Revised Scheme of Service for Personnel February, 2007 ISSUED BY THE PERMANENT SECRETARY, MINISTRY OF STATE FOR PUBLIC SERVICE OFFICE OF THE PRESIDENT NAIROBI REVISED SCHEME OF SERVICE

More information

The Designated Persons Roles and responsibilities

The Designated Persons Roles and responsibilities The Designated Persons Roles and responsibilities Richard Knight C Eng, MCIBSE, MIHEEM CPA Solutions Ltd Session 1 The need for Electrical systems designated staff To provide a safe comfortable working

More information

Method Statement Switchboard Services

Method Statement Switchboard Services CONFORMED COPY Method Statement Revision History Revision Date Reviewer Status 23 March 2007 Project Co Final Version 1 Table of Contents 1 Objectives... 3 2 Management Supervision and Organisation Structure...

More information

CCG CO11 Moving and Handling Policy

CCG CO11 Moving and Handling Policy Corporate CCG CO11 Moving and Handling Policy Version Number Date Issued Review Date V2 06/11/2015 01/10/2017 Prepared By: Consultation Process: Formally Approved: 05/11/2015 Governance Manager, North

More information

BRO Roles & Responsibilities Form Page 1 of 9

BRO Roles & Responsibilities Form Page 1 of 9 BRO Roles & Responsibilities Form Page 1 of 9 This document must identify the (s) and/or the person delegated to undertake the duties listed below. These duties are required by legislation and/or Council

More information

Service Level Agreement/Specification

Service Level Agreement/Specification Service Level Agreement/Specification For Maintenance and Associated Risk Management Services at New College Campus and Associated properties May 2007 INDEX 1. SCOPE 2. MAINTENANCE SERVICE LEVELS a. Staffing

More information

The Types of Standard 2 Guidance on the Standards 2 Changes to Legislation 2

The Types of Standard 2 Guidance on the Standards 2 Changes to Legislation 2 CONTENTS INTRODUCTION 2 The Types of Standard 2 Guidance on the Standards 2 Changes to Legislation 2 SCOTTISH CORE STANDARDS FOR ACCREDITED LANDLORDS 3 1 Communication with the Tenant 3 2 Equality Issues,

More information

Benchmark OHS Consulting Pty Ltd Self Assessment WHS Audit Tool

Benchmark OHS Consulting Pty Ltd Self Assessment WHS Audit Tool Benchmark OHS Consulting Pty Ltd Self Assessment WHS Audit Tool This WHS Auditing System Tool is to be used as a self-assessment of YOUR COMPANY compliance with AS 4801 and the Work Health and Safety Act

More information

Guideline: Medical supervision of Diabetes Registered Nurse Prescribing 2014

Guideline: Medical supervision of Diabetes Registered Nurse Prescribing 2014 Guideline: Medical supervision of Diabetes Registered Nurse Prescribing 2014 The Nursing Council of New Zealand has adapted this Guideline which was developed by the New Zealand Society for the Study of

More information

How To Manage Risk In Ancient Health Trust

How To Manage Risk In Ancient Health Trust SharePoint Location Non-clinical Policies and Guidelines SharePoint Index Directory 3.0 Corporate Sub Area 3.1 Risk and Health & Safety Documents Key words (for search purposes) Risk, Risk Management,

More information

UNIVERSITY OF LEICESTER ESTATES & FACILITIES MANAGEMENT DIVISION ASBESTOS MANAGEMENT PLAN

UNIVERSITY OF LEICESTER ESTATES & FACILITIES MANAGEMENT DIVISION ASBESTOS MANAGEMENT PLAN UNIVERSITY OF LEICESTER ESTATES & FACILITIES MANAGEMENT DIVISION ASBESTOS MANAGEMENT PLAN Revision Date Nature of Revision Prepared by Approved by 0.2 Jul 2013 Initial draft for comment Jon Fahie 0.3 Sep

More information

Direct Slips, Trips and Falls Policy

Direct Slips, Trips and Falls Policy Direct Slips, Trips and Falls Policy Direct Slips, Trips and Falls Policy Version: 2.0 Ratified by: Date ratified: Name and Title of originator/author(s): Steve Duncan Estates & Facilities Manager Name

More information

employed to ensure the continuing reliability of critical systems.

employed to ensure the continuing reliability of critical systems. 4 Regulations 1989, Regulation 4, places a duty on employers to provide safe systems for their workers: Regulation 4 of the Electricity at Work Regulations 1989 Systems, work activities and protective

More information

ANSTO NUCLEAR MEDICINE Mo99 FACILITY CONSTRUCTION LICENCE SAFETY MANAGEMENT PLAN

ANSTO NUCLEAR MEDICINE Mo99 FACILITY CONSTRUCTION LICENCE SAFETY MANAGEMENT PLAN ANSTO Nuclear Medicine Facility Construction Licence Application Document ANM-Mo99-C-LA-D2 rev 0 ANSTO NUCLEAR MEDICINE Mo99 FACILITY CONSTRUCTION LICENCE SAFETY MANAGEMENT PLAN Prepared By Australian

More information

Asbestos Policy ASBESTOS POLICY. Version 2 / Jun 2015 Page 1 of 11 Asbestos Policy

Asbestos Policy ASBESTOS POLICY. Version 2 / Jun 2015 Page 1 of 11 Asbestos Policy ASBESTOS POLICY Version 2 / Jun 2015 Page 1 of 11 Asbestos Policy This is a controlled document. It should not be altered in any way without the express permission of the author or their representative.

More information

For the Design, Installation, Commissioning & Maintenance of Fixed Gaseous Fire Suppression Systems

For the Design, Installation, Commissioning & Maintenance of Fixed Gaseous Fire Suppression Systems BAFE Scheme: SP203-3 Version 1: July 2008 Amendment No: 1 Fire Protection Industry Scheme, Reference SP203 Part 3 For the Design, Installation, Commissioning & Maintenance of Fixed Gaseous Fire Suppression

More information

The Electrical Safety Regulation (pre and post 1 January 2014)

The Electrical Safety Regulation (pre and post 1 January 2014) The Electrical Safety Regulation (pre and post 1 January 2014) The following table provides an overview comparison between the Electrical Safety Regulation 2002 (the ESR 2002) current as at 1 July 2013

More information

CCG CO11 Moving and Handling Policy

CCG CO11 Moving and Handling Policy Corporate CCG CO11 Moving and Handling Policy Version Number Date Issued Review Date V1: 28/02/2013 04/03/2013 31/08/2014 Prepared By: Consultation Process: Formally Approved: Information Governance Advisor

More information

ROYAL HOLLOWAY, UNIVERSITY OF LONDON

ROYAL HOLLOWAY, UNIVERSITY OF LONDON ROYAL HOLLOWAY, UNIVERSITY OF LONDON ASBESTOS MANAGEMENT POLICY (Version 2) This Policy defines the College s arrangements for the management of asbestos and the measures to be taken for the protection

More information

Safety & Environmental Protection Services Guidance Note

Safety & Environmental Protection Services Guidance Note Safety & Environmental Protection Services Guidance Note A STEP-BY-STEP GUIDE TO VISUAL INSPECTION OF ELECTRICAL EQUIPMENT Why Inspect? The Health and Safety at Work etc Act 1974 and the Electricity at

More information

CONTRACTOR SAFETY MANAGEMENT PROCEDURE

CONTRACTOR SAFETY MANAGEMENT PROCEDURE CONTRACTOR SAFETY MANAGEMENT PROCEDURE Version 1.0 TRIM file number Short description Relevant to Authority Responsible officer Responsible office Date introduced July 20, 2015 Date(s) modified June 11,

More information

SafetyMAP Initial Level User Guide

SafetyMAP Initial Level User Guide SafetyMAP Initial Level User Guide Initial Level User Guide 4th Edition Introduction This User Guide has been produced to support SafetyMAP: Auditing Health and Safety Management Systems, 4 th Edition

More information

Policy Number: 054 Work Health and Safety July 2015

Policy Number: 054 Work Health and Safety July 2015 Policy Number: 054 Work Health and Safety July 2015 TRIM Ref: TD14/318 Policy Details 1. Owner Manager, Business Operations 2. Compliance is required by Staff, contractors and volunteers 3. Approved by

More information

Code of Practice. for Inspecting and Certifying Buildings and Works. Building Control Regulations 2014

Code of Practice. for Inspecting and Certifying Buildings and Works. Building Control Regulations 2014 for Inspecting and Certifying Buildings and Works Building Control Regulations 2014 February, 2014 Table of Contents 1. Introduction 1 1.1 Status and Purpose of Code 1 1.2 Overview of Code 1 1.3 Application

More information

WORKPLACE HEALTH AND SAFETY AUDITING GUIDELINES

WORKPLACE HEALTH AND SAFETY AUDITING GUIDELINES WHS UNIT WORKPLACE HEALTH AND SAFETY AUDITING GUIDELINES Contents 1 Purpose... 1 2 Scope... 1 3 Definitions... 1 4 Responsibilities... 1 4.1 WHS Unit... 1 4.2 Auditor(s)... 1 4.3 Managers of Faculties

More information

Waste Management Policy

Waste Management Policy HEALTH AND SAFETY ISSUES Waste Management Policy Policy No: 39 Date of issue: October 1998 Review Dates: August 2001, December 2003, July 2008 Date to be Reviewed: July 2010 Page 1 of 13 Date of Issue:

More information

Specification Essential Desirable

Specification Essential Desirable High Standards High Expectations Learning through Partnership Person Specification: Facilities Manager It is expected that the successful candidate will satisfy the following specification Specification

More information

FREQUENTLY ASKED QUESTIONS TESTING AND TAGGING OF ELECTRICAL EQUIPMENT

FREQUENTLY ASKED QUESTIONS TESTING AND TAGGING OF ELECTRICAL EQUIPMENT FREQUENTLY ASKED QUESTIONS TESTING AND TAGGING OF ELECTRICAL EQUIPMENT HAS THE LAW CHANGED REGARDING TESTING AND TAGGING OF ELECTRICAL EQUIPMENT? Yes, Simplified safety regulations for electrical equipment

More information

Pollution Incident Response Plan

Pollution Incident Response Plan Pollution Incident Response Plan Introduction Schmidt Quarries is committed to ensuring all aspects of our quarrying activities comply with the environmental legislative requirements in NSW. This Pollution

More information

Policy for the Management of Alert Notices Generated via the DH Central Alert System (CAS)

Policy for the Management of Alert Notices Generated via the DH Central Alert System (CAS) Policy for the Management of Alert Notices Generated via the DH Central Alert System (CAS) Version Number: V4 Name of originator/author: Risk Manager Name of responsible committee: Risk Committee Name

More information