Impact of Hot and Cold Aisle Containment on Data Center Temperature and Efficiency
|
|
|
- Lucas Spencer
- 9 years ago
- Views:
Transcription
1 Impact of Hot and Cold Aisle Containment on Data Center Temperature and Efficiency White Paper 135 Revision 4 by John Niemann, Kevin Brown, and Victor Avelar Executive summary Both hot-air and cold-air containment can improve the predictability and efficiency of traditional data center cooling systems. While both approaches minimize the mixing of hot and cold air, there are practical differences in implementation and operation that have significant consequences on work environment conditions, PUE, and economizer mode hours. The choice of hot-aisle containment over cold-aisle containment can save 43% in annual cooling system energy cost, corresponding to a 15% reduction in annualized PUE. This paper examines both methodologies and highlights the reasons why hot-aisle containment emerges as the preferred best practice for new data centers. by Schneider Electric White Papers are now part of the Schneider Electric white paper library produced by Schneider Electric s Data Center Science Center [email protected]
2 Introduction High energy costs and accelerated energy consumption rates have forced data center professionals to consider hot-air and cold-air containment strategies. According to Bruce Myatt of EYP Mission Critical, the separation of hot and cold air "is one of the most promising energy-efficiency measures available to new and legacy data centers today (Mission Critical, Fall 2007). In addition to energy efficiency, containment allows uniform IT inlet temperatures and eliminates hot spots typically found in traditional uncontained data centers. This paper focuses on air containment for new data centers. While hot-aisle containment is the preferred solution in all new installations and many retrofit raised floor installations, it may be difficult or expensive to implement due to low headroom or no accessible dropped ceiling plenum. Cold-aisle containment, although not optimal, may be the best feasible option in these cases. For guidance on air containment for existing data centers, see White Paper 153, Implementing Hot and Cold Air Containment in Existing Data Centers. Both hot-aisle and cold-aisle containment provide significant energy savings over traditional uncontained configurations. This paper analyzes and quantifies the energy consumption of both containment methods and concludes that hot-aisle containment can provide 43% cooling system energy savings over cold-aisle containment due mainly to increased economizer mode hours. It also concludes that new data center designs should use or provision for hotaisle containment. Efficiency benefits of containment What allows more economizer hours? The basic function of a chiller is to remove heat energy from a data center by compressing and expanding a refrigerant to keep chilled water at a set supply temperature, typically 7 C/45 F. When the outdoor temperature is about 19 F/11 C colder than the chilled water temperature, the chiller can be turned off. The cooling tower now bypasses the chiller and removes the heat directly from the data center. Increasing the chilled water supply temperature increases the number of hours that the chiller can be turned off (economizer mode hours). For example, there may be 1000 hours per year when the outdoor temperature is at least 11 C/19 F below the 7 C/45 F chilled water temperature. But if the chilled water is increased to 13 C/55 F, the economizer mode hours increase to 3,700. The containment of hot or cold air in a data center results in the following efficiency benefits. Note that a hot-aisle / cold-aisle row layout 1 is a prerequisite for either type of containment. Cooling systems can be set to a higher supply temperature (thereby saving energy and increasing cooling capacity) and still supply the load with safe operating temperatures. The temperature of the uncontained perimeter cooling systems is set much lower (i.e. approx 13 C/55 F.) than required by IT equipment, in order to prevent hot spots. Hot spots occur when heat is picked up by the cold air as it makes its way from the cooling unit to the front of the racks. Containment allows for increased cold air supply temperatures and the warmest possible return air back to the cooling unit. The benefit of higher return temperature to the cooling unit is better heat exchange across the cooling coil, increased cooling capacity, and overall higher efficiency. This effect holds true for virtually all air conditioning equipment. Some equipment may have limits on the maximum return temperature it can handle, but, in general, all cooling systems yield higher capacities with warmer return air. Elimination of hot spots. Contaiment allows cooling unit supply air to reach the front of IT equipment without mixing with hot air. This means that the temperature of the supply air at the cooling unit is the same as the IT inlet air temperature i.e., uniform IT inlet air temperatures. When no mixing occurs, the supply air temperature can be increased without risk of hot spots while still gaining economizer mode hours. Economizer mode hours are increased. When outdoor temperature is lower than indoor temperature, the cooling system compressors don t need to work to reject heat to the outdoors 2. Increasing the set point temperature on cooling systems results in a larger number of hours that the cooling system can turn off its compressors and save energy. 3 1 A rack layout where a row of racks is positioned with the rack fronts facing the rack fronts of the adjacent row. This layout forms alternating hot and cold aisles. 2 The difference between outdoor and indoor temperature must be large enough to account for inefficiencies in heat exchangers, imperfect insulation, and other losses. 3 Set points may be constrained in building-wide cooling systems shared by the data center Schneider Electric Data Center Science Center Rev 4 2
3 Humidification / dehumidification costs are reduced. By eliminating mixing between hot and cold air, the cooling system s supply air temperatures can be increased, allowing the cooling system to operate above the dewpoint temperature. When supplying air above the dewpoint, no humidity is removed from the air. If no humidity is removed, adding humidity is not required, saving energy and water. Better overall physical infrastructure utilization, which enables right-sizing which, in turn, results in equipment running at higher efficiencies. Larger oversized equipment experiences larger fixed losses 4 than right-sized equipment. However, oversizing is necessary for traditional cooling because extra fan power is required both to overcome underfloor obstructions and to pressurize the raised-floor plenum. Cold-aisle containment A cold-aisle containment system (CACS) encloses the cold aisle, allowing the rest of the data center to become a large hot-air return plenum. By containing the cold aisle, the hot and cold air streams are separated. Note that this containment method requires that the rows of racks be set up in a consistent hot-aisle / cold-aisle arrangement. Figure 1 shows the basic principle of cold-air containment in a data center with perimeter cooling units and a raised floor. Deploying CACS in this type of data center is accomplished by enclosing the tops and ends of the cold aisles, making it a convenient and cost effective retrofit for many existing data centers. For further guidance on this topic, see White Paper 153, Implementing Hot and Cold Air Containment in Existing Data Centers. Some homegrown solutions are being deployed where data center operators are taking various types of plastic curtain material suspended from the ceiling to enclose the cold aisle (Figure 2). Some vendors offer ceiling panels and end doors that mount to adjoining racks to help separate cold aisles from the warm air circulating in the room. Figure 1 Cold-aisle containment system (CACS) deployed with a room-based cooling approach HOT air free in the room Cooling unit Cold aisle Cooling unit Plastic curtains suspended from ceiling at ends of cold aisle Figure 2 Example of a homegrown cold-aisle containment system Raised floor with perforated tiles for cold air distribution 4 Fixed loss also called no-load, fixed, shunt, or tare loss is a constant loss that is independent of load. A constant speed air conditioner fan is an example of fixed loss because it runs at the same speed all the time, regardless of load. Schneider Electric Data Center Science Center Rev 4 3
4 Hot-aisle containment A hot-aisle containment system (HACS) encloses the hot aisle to collect the IT equipment s hot exhaust air, allowing the rest of the room to become a large cold-air supply plenum. By containing the hot aisle, the hot and cold air streams are separated. Note that this containment method requires that the rows of racks be set up in a consistent hot-aisle / cold-aisle arrangement. While Figure 3 shows the basic principle of HACS, note that there are two basic methods for containing the hot aisle row-cooled hot aisle containment and ducted hot aisle containment. Figure 4 shows an example of row-cooled, hot aisle containment that uses row-based cooling units, operating as an independent pod. Alternatively, the HACS may be ducted to a room-based computer room air handler (CRAH) or large remote air conditioning unit using a large duct located over the entire hot aisle (Figure 5). A major advantage of the ducted hot aisle containment option is the potential to use available existing economizer modes. This type of HACS design is preferred in large purpose-built data centers because of the efficiency gains through air economizer modes. Such a system may require large fabricated air plenums and/or a custom-built building to efficiently handle the large air volume. Therefore this variation of HACS is best suited for new designs or very large data centers. Note that the HACS options mentioned here are also possible with CACS, however, this paper will show that the energy savings with HACS are higher. Figure 3 Ducted hot-aisle containment system deployed with room-based cooling COLD air free in the room Hot aisle Cooling unit Cooling unit Figure 4 Example of a row-cooled hot aisle containment system operating as an independent pod (Schneider Electric EcoAisle shown) Figure 5 Ducted hot-aisle containment system ducted to a remote air conditioner The methods above contain an entire aisle; however, in cases of scattered high density racks, it may make sense to contain individual racks using a duct. With this method, a duct is mounted to the back of the rack to contain the hot exhaust air, and then is ducted into the Schneider Electric Data Center Science Center Rev 4 4
5 drop ceiling (Figure 6). For more information about this method, please see White Paper 182, The Use of Ducted Air Containment Systems in Data Centers. Figure 6 Example of ducted rack air containment method (Schneider Electric Vertical Exhaust Duct shown) Effect of containment on the work environment Regardless of the type of containment system, people still need to work inside a data center. This uncontained area must be kept at a reasonable temperature so as not to violate health and human safety regulations 5 for exceeding wet-bulb globe temperature (WBGT) 6. Note the following difference in the uncontained area: With cold-aisle containment, the uncontained area becomes the same temperature as the hot aisle shown by the red shading in Figure 7. With hot-aisle containment, the uncontained area becomes the same temperature as the cold aisle shown by the blue shading in Figure 7. Cold-aisle containment Tape library Storage Uncontained work area becomes hot aisle Non-racked equipment ingesting higher temperature air Cold aisle containment Cold aisle containment Figure 7 Uncontained work environments with cold-aisle and hot-aisle containment CRAH CRAH Cold aisle containment Hot-aisle containment Tape library Cold aisle containment Storage Uncontained work area becomes cold aisle CRAH CRAH Non-racked equipment ingesting air at same temperature as servers Hot aisle containment Hot aisle containment CRAH CRAH Hot aisle containment Hot aisle containment CRAH CRAH 5 For example BGI-579 (Germany); ISO 7243 (international); OSHA Technical Manual Section III (US) 6 OSHA (Occupational Safety & Health Administration) Technical Manual section III Chapter 4; ISO (International Organization for Standardization) 7243, Hot environments Estimation of the heat stress on working man based on WBGT index Schneider Electric Data Center Science Center Rev 4 5
6 WBGT The wet-bulb globe temperature (WBGT) is an index that measures heat stress in human work environments. WBGT = 0.7*NWB + 0.3*GT NWB is the natural wet-bulb temperature and GT is the globe temperature NWB is measured by placing a water-soaked wick over the bulb of a mercury thermometer. Evaporation reduces the temperature relative to drybulb temperature and is a direct representation of the ease with which a worker can dissipate heat by sweating. For a data center, the dry-bulb temperature can be used in place of GT without compromising accuracy. Dry-bulb refers to temperature measured using a typical analog or digital thermometer. Maximum OSHA WBGT: Continuous work: 86 F/30 C 25% work 75% rest: 90 F/32 C With CACS, high temperatures in the hot aisle cause the uncontained area to reach the same temperatures which can be problematic for IT personnel who are permanently stationed at a desk in the data center. With HACS, high temperatures in the hot aisle stay confined to the smaller hot aisle and therefore do not affect IT personnel permanently stationed in the uncontained area. Note that if IT personnel must perform work in the hot aisle of a HACS, the high temperatures in the hot aisle are mitigated by temporarily opening the aisle to let in cooler air. Furthermore, even if the hot aisle remains closed, work environment regulations are still met for two reasons: 1) workers are not permanently stationed in the hot environment (i.e. hot aisle), as is the case with CACS, and 2) most routine work takes place at the front of IT racks. Therefore given reason #1, OSHA allows for a work / rest regimen of 25% work / 75% rest in the HACS hot aisle which allows for a maximum WBGT 7 of 32.2 C/90 F. This means that the HACS hot-aisle temperature can get as high 47 C/117 F. The higher hot-aisle temperature allowed with HACS is the key difference between HACS and CACS since it allows the CRAH units to operate more efficiently. For more information on environmental work conditions see White Paper 123, Impact of High Density Hot Aisles on IT Personnel Work Conditions. In addition to human comfort, the reliable operation of IT equipment is also important. The 2011 version of ASHRAE Standard TC9.9 recommends server inlet temperatures in the range C / F. With CACS, the temperature in the uncontained area can get well above 27 C/80 F, and in cases of high-density IT equipment, above 38 C/100 F. Therefore, anyone entering the data center is typically surprised when entering such hot conditions, and tours become impractical. With CACS, people s expectations need to be adjusted so they understand that the higher temperatures are normal and not a sign of impending system breakdown. This cultural change can be challenging for workers not accustomed to entering a data center operating at higher temperatures. Furthermore, when operating a data center at elevated temperatures, special provisions must be made for non-racked IT equipment such as tape libraries and mainframes. There are two main approaches with CACS: build a separate room for non-racked equipment or bring cold air into the hot aisle, Build a separate room for non-racked equipment Placing non-racked IT equipment in a separate room provides a means for cooling this equipment while maintaining the hot aisle air temperature in the main data center. The raised floor in this room may use the same cooling units as the main data center or can be blocked off and use its own dedicated cooling unit(s). The size of this room must be estimated based on the expected amount of non-racked equipment over the life of the data center. Bring cold air into the hot aisle With CACS, non-racked IT equipment will need to have custom ducting in order to enable them to pull cold air from the contained cold aisles. Adding perforated tiles in the hot aisle will help cool this equipment but defeats the purpose of containment. In addition, electric outlets, lighting, fire suppression, and other systems in the room will need to be evaluated for suitability of operations at elevated temperatures. Analysis of CACS and HACS A theoretical analysis was performed to compare CACS and HACS with no hot or cold air leakage so as to represent the very best performance of each. Raised floor leakage is 7 The web-bulb globe temperature (WBGT) is a measure of heat stress and it heavily dependent on the relative humidity of the work environment. The maximum hot-aisle temperature of 117 F/47 C assumes a cold-aisle relative humidity of 45%. Schneider Electric Data Center Science Center Rev 4 6
7 typically 25-50%, while containment system leakage is typically 3-10%. The assumptions used for this analysis are included in the Appendix. The number of economizer mode hours and resulting PUE were estimated for each scenario using an economizer hour model and a data center PUE model. A traditional uncontained data center with an economizer mode was also analyzed and serves as a baseline to compare the impact of CACS and HACS. The CACS and HACS data center were both analyzed using three temperature scenarios: 1. IT inlet air temperature held constant at 27 C/80.6 F the maximum ASHARE recommended inlet air temperature 8 a. Significance for CACS no temperature limit on uncontained area (i.e. hot aisle) which affects human comfort and non-racked IT equipment b. Significance for HACS temperature in the uncontained area (i.e. cold aisle) limited to the same as IT inlet air 2. Temperature in uncontained area held constant at 27 C/80.6 F the maximum ASHARE recommended inlet air temperature a. Significance for CACS IT inlet air temperature reduced to maintain temperature in uncontained area (i.e. hot aisle) b. Significance for HACS IT inlet air temperature limited to that of the uncontained area (i.e. cold aisle) 3. Temperature in uncontained area held constant at 24 C/75 F a standard indoor design temperature 9 for human comfort a. Significance for CACS IT inlet air temperature significantly reduced to maintain temperature in uncontained area (i.e. hot aisle) b. Significance for HACS IT inlet air temperature limited to that of the uncontained area (i.e. cold aisle) Table 1 summarizes the results of the analysis, using the parameters below: IT inlet air dry-bulb temperature Uncontained area dry-bulb temperature (DB) and wet-bulb globe temperature (WBGT) Economizer mode hours the number of hours the chiller was off during the year Cubic meters per second (m 3 /s) or Cubic feet per minute (CFM) the total airflow supplied by the CRAH units as a percent of total IT equipment airflow PUE the data center industry s standard efficiency metric The first row in the table provides baseline values for an uncontained data center for comparison purposes. Scenario #1 results In this scenario, both CACS and HACS provide 6,218 hours of economizer mode and a PUE of This illustrates the point that CACS and HACS efficiency are equivalent when human comfort is ignored. However, with CACS, the temperature of the uncontained area is 41 C/106 F at 21% relative humidity which is equivalent to a WBGT of 28 C/83 F close to the maximum OSHA WBGT limit of 30 C/86 F. This is an unrealistic work environment for IT personnel and non-racked IT equipment. In reality, such a high temperature forces the 8 ASHRAE TC Thermal Guidelines for Data Processing Environments Expanded Data Center Classes and Usage Guidance, page 4 9 American Society of Heating, Refrigerating and Air-Conditioning Engineers, 2001 ASHRAE Fundamentals Handbook, page 28.5 Schneider Electric Data Center Science Center Rev 4 7
8 Table 1 introduction of cold air leakage into the uncontained area. The effect of leakage is discussed later in the Effect of air leakage on theoretical analysis subsection. Impact of controlling the uncontained area temperature for a CACS and HACS Containment type Traditional uncontained CACS Max ASHRAE IT inlet air temp and no limit on uncontained area temp HACS Max ASHRAE IT inlet air temp and no limit on uncontained area temp CACS 27 C /80.6 F max uncontained area temp HACS 27 C /80.6 F max uncontained area temp CACS 24 C /75 F max uncontained area temp IT inlet air C F 27 C 81 F 27 C 81 F Uncontained area DB WBGT 24 C 75 F 17 C 63 F Econ hours Airflow 10 PUE Comments 2, % 1.84 Baseline with 49% cold and 20% hot-air leakage 11 Scenario #1: IT inlet air temperature held constant at 27 C/80.6 F 41 C 106 F 27 C 81 F 28 C 83 F 21 C 70 F 6, % , % 1.65 WBGT only 2 C/3 F below OSHA max regulations. Includes 37% reduction in chiller power losses. This is due to the increased IT supply temperature which allows for an increased CW supply temperature. WBGT 9 C/16 F below OSHA max regulations. Includes 37% reduction in chiller power losses with increased CW supply temperature. *Note the hot-aisle temperature is 41 C/106 F. Scenario #2: Temperature in uncontained area held constant at 27 C/80.6 F 13 C 56 F 27 C 81 F 27 C 81 F 27 C 81 F 18 C 64 F 21 C 70 F 2, % 1.86 Complies with OSHA, and complies with ASHRAE. Includes 5% increase in chiller power losses. This is due to the decreased IT supply temperature which leads to a decreased CW supply temperature. 6, % 1.65 Same results as HACS in Scenario #1. Scenario #3: Temperature in uncontained area held constant at 24 C/75 F 10 C 50 F 24 C 75 F 15 C 59 F 0 100% 1.98 Acceptable work environment but worse efficiency than baseline data center in first row. Includes 15% increase in chiller power losses due to decreased IT supply temp and decreased CW supply temp. HACS 24 C /75 F max uncontained area temp 24 C 75 F 24 C 75 F 18 C 65 F 5, % 1.69 Higher efficiency, complies with OSHA, and complies with ASHRAE. Includes 28% reduction in chiller power losses with increased CW supply temp. *Note the hot-aisle temperature is 38 C/100 F. Scenario #2 results In this scenario, holding the uncontained area temperature to 27 C/80.6 F limits the CACS to 2,075 annual economizer mode hours and a 13% worse PUE compared to Scenario #1. The resulting IT inlet air temperature is 13 C/56 F. Results for the HACS do not change since the IT inlet air temperature of Scenario #1 is the same as the uncontained area temperature limit of Scenario #2. Both CACS and HACS in Scenario #2 allow for an acceptable IT inlet air temperature but not for a comfortable work environment temperature. The HACS provides 4,143 more economizer mode hours and provides 11% improvement in PUE compared to CACS. 10 Total volumetric airflow (stated as % of IT airflow) 11 Hot-air leakage occurs when hot exhaust air from servers mixes with the raised floor supply air, which increases server inlet temperature. Cold-air leakage occurs when cold air from gaps/voids in the raised floor mixes with return air, lowering return temperature and decreasing the cooling unit s efficiency. Schneider Electric Data Center Science Center Rev 4 8
9 Scenario #3 results In this scenario, the uncontained area temperature limit is lowered to 24 C/75 F for human comfort. This lower temperature results in zero annual economizer mode hours for CACS, 6% worse PUE compared to Scenario #2, and an IT inlet air temperature of 10 C/50 F. The HACS economizer mode hours drops to 5,319 and the PUE decreases to 1.69 (2% worse compared to Scenario #2). Both CACS and HACS in Scenario #3 allow for a comfortable work environment temperature and an acceptable IT inlet air temperature. The HACS provides 5,319 more economizer mode hours and provides 15% improvement in PUE compared to CACS. Table 2 breaks down and quantifies the energy consumption between CACS and HACS in Scenario #2 and #3. The energy costs are broken down by IT, power, cooling, and total data center energy consumption. The IT energy includes all IT equipment, which is held constant in this analysis at 700kW The power energy includes losses from switchgear, generator, UPS, primary and critical auxiliary devices, UPS, lighting, and critical power distribution The cooling energy includes losses from chiller, cooling tower, chilled water pumps, condenser water pumps, and perimeter CRAH units Total energy is the sum of IT, power, and cooling energy and is directly related to PUE IT energy Power energy Cooling energy Total energy Scenario #2: uncontained area held at 27 C/80.6 F PUE + Table 2 Cost breakdown between CACS and HACS for Scenario #2 and #3 CACS $735,840 $213,018 $422,874 $1,371, HACS $735,840 $211,654 $266,928 $1,214, % Savings 0% 1% 37% 11% 11% Scenario #3: uncontained area held at 24 C/75 F CACS $735,840 $213,846 $509,354 $1,459, HACS $735,840 $211,867 $292,503 $1,240, % Savings 0% 1% 43% 15% 15% = + In a typical data center, 50% loaded, the IT energy is the largest portion of the energy cost, followed by the cooling system energy cost. Table 2 shows that reducing the uncontained area temperature increases the energy use for CACS (6%) to a much greater extent than for HACS (2%). This is because, with the uncontained area temperature held constant, the chilled water set point for the CACS is always lower than the set point for the HACS. In fact, the chilled water set point penalty for CACS and the delta T across the servers are directly related. If the delta T across the servers is increased, this penalty for CACS becomes greater. Looking now at the % savings in Scenario #3, the HACS consumes 43% less cooling system energy than the CACS. The economizer mode hours, when the chiller is off, account for the majority of these savings, as shown in Figure 8. At this work environment temperature, the Schneider Electric Data Center Science Center Rev 4 9
10 CACS is unable to benefit from any economizer mode hours due to the low chilled water supply temperature (2.4 C/36 F). The small difference in the power system energy is due to an increase in losses across the switchgear which is caused by the extra hours of chiller operation with CACS. In comparison to the traditional uncontained baseline case, the Scenario #3 CACS consumes 25% more cooling system energy and 8% more total data center energy. In comparison to the traditional uncontained baseline case, the HACS consumes 28% less cooling system energy and 8% less total data center energy. It is clear from this analysis, that under practical work environment temperature constraints and temperate climates, hot-aisle containment provides more economizer mode hours and lower PUE compared to cold-aisle containment. This is true regardless of the type of cooling unit or heat rejection method used (i.e., perimeter vs. rowbased, chilled water vs. direct expansion). Figure 8 Breakdown of annual cooling system energy consumption for Scenario #3 Energy (kw hrs) 2,750,000 2,500,000 2,250,000 2,000,000 1,750,000 1,500,000 1,250,000 1,000, , , ,000 0 CRAH Chiller Cooling Tower CW Pumps HACS CACS Heat Rej Pumps Hot and cold air leakage Most hot exhaust air from IT equipment goes back to the CRAH where it is cooled. Hotair leakage occurs when the IT exhaust air makes its way back to the IT equipment inlets and mixes with the cold inlet air. Cold-air leakage occurs when the cold supply air from the CRAH mixes with the CRAH s hot return air without ever getting to the IT equipment inlets. Cold air leakage Hot air leakage Front IT Rack CRAH Front IT Rack Front IT Rack Effect of air leakage on theoretical analysis The analysis above considered the CACS and HACS to be completely sealed so that there is no leakage between the hot and cold air streams. This unlikely assumption allows us to calculate the maximum efficiency of the CRAH units and allows for a fair comparison between CACS and HACS. In reality, there is always cold air leakage with CACS or HACS requiring that the CRAH fan airflow be greater than the IT equipment airflow this is true even with CRAH units with variable speed fans. The balance of airflow must equal the IT equipment airflow plus the percentage of air leakage from the containment system such as a raised floor. For example, if the CRAH units supply 47 m 3 /s (100,000 CFM) of air and the IT equipment consumes 38 m 3 /s (80,000 CFM) of air, the remaining 9 m 3 /s (20,000 CFM) must make its way back to the CRAH units. Any air not used to cool IT equipment represents wasted energy. This wasted energy comes in two forms: 1) The fan energy used to move the air and 2) the pump energy used to move chilled water through the CRAH coil. Furthermore, hot/cold air mixing decreases the capacity of the CRAH unit. As more mixing occurs, more CRAH units are required to remove the same amount of heat while maintaining the appropriate IT inlet air temperature. In order to comprehend the effect of air leakage, the analysis above was repeated using various air leakage percentages. Because of the increased fan energy needed for the extra CRAH units, the energy increase for CACS was higher than for HACS. This is because more cold air mixes into the hot aisle with CACS than it does with HACS. The hot aisle in HACS is only affected by leakage from the cable cutouts at each rack; whereas the hot aisle in CACS is affected by cable cutouts at the rack, cutouts around the data center perimeter, and cutouts Schneider Electric Data Center Science Center Rev 4 10
11 under PDUs. This equates to about 50% more cold-air leakage compared to HACS. The cooling energy for HACS savings over CACS remained about the same. Comparison summary of CACS and HACS Table 3 summarizes CACS and HACS based on the characteristics discussed in this paper. The green shaded cells indicate the best choice for that particular characteristic. Table 3 Summary of cold-aisle containment vs. hot-aisle containment Characteristic CACS HACS Comment Ability to set work environment temperature to 24 C/75 F (standard indoor design temperature) No Yes With HACS, cooling set points can be set higher while still maintaining a work environment temperature of 24 C/75 F and benefiting from economizer mode hours. Increasing CACS cooling set points results in uncomfortably high data center temperatures. This promotes a negative perception when someone walks into a hot data center. Take advantage of potential economizer mode hours No Yes Acceptable temperature for non-racked equipment No Yes Ease of deployment with room cooling Yes No New data center designs No Yes The number of economizer mode hours with CACS is limited by the maximum work environment temperature in the hot aisle (the work environment) and by temperature limitations of non-racked IT equipment when not placed in a dedicated room. With CACS, the uncontained data center area becomes hot because the cold aisles are contained. Perimeter IT equipment (i.e., tape libraries) in the uncontained area should be evaluated for operation at elevated temperatures. Risk of overheating perimeter IT equipment increases with decreased cold-air leakage. CACS is preferred when retrofitting a data center with raised floor, room-level cooling with flooded return (draws its warm return air from the room). A HACS without row-based cooling or dropped ceiling would require special return ductwork. For further guidance on this topic, see White Paper 153, Implementing Hot and Cold Air Containment in Existing Data Centers. The cost to build a new data center with CACS or HACS is nearly identical. Specifying HACS for a new data center will improve the overall efficiency, work environment, and overall operating cost. Fire suppression considerations Depending upon the location of the data center, fire detection and/or fire suppression may be required inside the enclosed area of the HACS or CACS. The primary suppression mechanism is usually sprinklers, which are heat activated. Gaseous agents are usually a secondary system which can be initiated by smoke detectors. The National Fire Protection Association standard NFPA 75 does not state an opinion as to whether sprinklers or gaseous agents should be provided in a HACS or a CACS. However, NFPA 75 documents the following two requirements that could be applied to both HACS and CACS: Automated information storage system (AISS) units containing combustible media with an aggregate storage capacity of more than 0.76m^3 shall be protected within each unit by an automatic sprinkler system or a gaseous agent extinguishing system with extended discharge. This is significant because it sets a precedent for fire detection and suppression in an enclosed space in a data center. Schneider Electric Data Center Science Center Rev 4 11
12 Automatic sprinkler systems protecting ITE rooms or ITE areas shall be maintained in accordance with NFPA 25, Standard for the Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems. In practice, HACS and CACS have been successfully installed and approved with sprinklers and gaseous-agent suppression in various sites. APC Application Note 159 provides more detail on challenges and common practices for deploying fire suppression in hot-aisle contained environments. The AHJ should be contacted for specific requirements in a given location. Note that any plenum (i.e., raised floor or dropped ceiling) must be rated for air distribution. Conclusion Prevention of hot and cold air mixing is a key to all efficient data center cooling strategies. Both HACS and CACS offer improved power density and efficiency when compared with traditional cooling approaches. A hot-aisle containment system (HACS) is a more efficient approach than a cold-aisle containment system (CACS) because it allows higher hot aisle temperatures and increased chilled water temperatures which results in increased economizer mode hours and significant electrical cost savings. Cooling set points can be set higher while still maintaining a comfortable temperature in the uncontained area of the data center. The analysis in this paper shows that HACS can save 43% in the annual cooling system energy cost corresponding to 15% reduction in the annualized PUE compared to CACS while holding the uncontained data center area to 24 C/75 F. This paper concludes that all new data center designs should use HACS as the default containment strategy. In cases where containment is not initially required, the new data center design should incorporate provisions for future HACS deployment. For existing raised floor data centers with a perimeter cooling unit layout, it may be easier and less costly to implement CACS. For guidance on this topic, see White Paper 153, Implementing Hot and Cold Air Containment in Existing Data Centers. About the author John Niemann is Product Line Manager for Row and Small Systems Cooling Products at Schneider Electric, and is responsible for planning, support, and marketing for these product lines. John has led product management for all of APC s InRow cooling products since He has 12 years experience in HVAC. His career began in the commercial and industrial HVAC market where he focused on custom air handling and refrigeration systems, with expertise focused on energy recovery and filtration for critical environments. His HVAC experience spans applications engineering, development, product management, and technical sales. John is a member of ASHRAE and The Green Grid, and holds a degree in mechanical engineering from Washington University in St. Louis, Missouri. Kevin Brown is the Vice President of Data Center Global Solution Offer & Strategy at Schneider Electric. Kevin holds a BS in mechanical engineering from Cornell University. Prior to this position at Schneider Electric, Kevin served as Director of Market Development at Airxchange, a manufacturer of energy recovery ventilation products and components in the HVAC industry. Before joining Airxchange, Kevin held numerous senior management roles at Schneider Electric, including Director, Software Development Group. Victor Avelar is a Senior Research Analyst at Schneider Electric s Data Center Science Center. He is responsible for data center design and operations research, and consults with clients on risk assessment and design practices to optimize the availability and efficiency of their data center environments. Victor holds a bachelor s degree in mechanical engineering from Rensselaer Polytechnic Institute and an MBA from Babson College. He is a member of AFCOM and the American Society for Quality. Schneider Electric Data Center Science Center Rev 4 12
13 Resources Impact of High Density Hot Aisles on IT Personnel Work Conditions White Paper 123 Implementing Hot and Cold Air Containment in Existing Data Centers White Paper 153 The Use of Ducted Air Containment Systems in Data Centers White Paper 182 Browse all white papers whitepapers.apc.com Browse all TradeOff Tools tools.apc.com Contact us For feedback and comments about the content of this white paper: Data Center Science Center If you are a customer and have questions specific to your data center project: Contact your Schneider Electric representative at Schneider Electric. All rights reserved. Schneider Electric Data Center Science Center Rev 4 13
14 Appendix: Assumptions used in analysis The following assumptions were used in the analysis for the HACS, CACS, and uncontained traditional raised-floor data center. Data center dimensions: 36ft x 74ft x 10ft (11m x 22.6m x 3m) Data center capacity: 1,400 kw (no redundancy) Location: Chicago, Illinois, USA Average cost of electricity: $0.12 / kw hr Total IT load: 700 kw Power density: 7 kw / rack average Quantity of IT racks / cabinets: 100 Perimeter unit cooling with 24 inch (61cm) raised floor Average temperature delta across servers: 25 F/13.9 C Server inlet air at 45% relative humidity Raised floor cold-air leakage with uncontained: 40% Hot-air leakage with uncontained: 20% Raised floor cold-air leakage with CACS: 0% Raised floor cold-air leakage with HACS: 0% CRAH coil effectiveness: Economizer heat exchanger effectiveness: 0.7 Design chilled water delta-t: 12 F / 6.7 C Chiller plant dedicated to data center Chiller COP: 4 at 50% load Chilled water plant load: 49-52% dependent on scenario Minimum tower water temperature: 40 F/4.4 C limited by basin heater to prevent freezing Cooling tower design range: 10 F/5.6 C Constant speed IT equipment fans (variable speed fans increase IT power consumption as IT inlet air temperature increases beyond a set threshold) 100% sensible cooling (i.e., no dehumidification and humidification is required) Schneider Electric Data Center Science Center Rev 4 14
Hot-Aisle vs. Cold-Aisle Containment for Data Centers
Hot-Aisle vs. Cold-Aisle Containment for Data Centers White Paper 135 Revision 1 by John Niemann, Kevin Brown, and Victor Avelar > Executive summary Both hot-air and cold-air containment can improve the
Power and Cooling Guidelines for Deploying IT in Colocation Data Centers
Power and Cooling Guidelines for Deploying IT in Colocation Data Centers White Paper 173 Revision 0 by Paul Lin and Victor Avelar Executive summary Some prospective colocation data center tenants view
How Row-based Data Center Cooling Works
How Row-based Data Center Cooling Works White Paper 208 Revision 0 by Paul Lin and Victor Avelar Executive summary Row-based data center cooling is normally regarded as a cold air supply architecture that
IMPROVING DATA CENTER EFFICIENCY AND CAPACITY WITH AISLE CONTAINMENT
DATA CENTER RESOURCES WHITE PAPER IMPROVING DATA CENTER EFFICIENCY AND CAPACITY WITH AISLE CONTAINMENT BY: STEVE HAMBRUCH EXECUTIVE SUMMARY Data centers have experienced explosive growth in the last decade.
Free Cooling in Data Centers. John Speck, RCDD, DCDC JFC Solutions
Free Cooling in Data Centers John Speck, RCDD, DCDC JFC Solutions Why this topic Many data center projects or retrofits do not have a comprehensive analyses of systems power consumption completed in the
Data Center Design Guide featuring Water-Side Economizer Solutions. with Dynamic Economizer Cooling
Data Center Design Guide featuring Water-Side Economizer Solutions with Dynamic Economizer Cooling Presenter: Jason Koo, P.Eng Sr. Field Applications Engineer STULZ Air Technology Systems jkoo@stulz ats.com
Dealing with Thermal Issues in Data Center Universal Aisle Containment
Dealing with Thermal Issues in Data Center Universal Aisle Containment Daniele Tordin BICSI RCDD Technical System Engineer - Panduit Europe [email protected] AGENDA Business Drivers Challenges
Guidance for Calculation of Efficiency (PUE) in Data Centers
Guidance for Calculation of Efficiency (PUE) in Data Centers White Paper 158 Revision 3 by Victor Avelar Executive summary Before data center infrastructure efficiency can be benchmarked using PUE or other
APC APPLICATION NOTE #112
#112 Best Practices for Deploying the InfraStruXure InRow SC By David Roden Abstract The InfraStruXure InRow SC (ACSC100 and ACSC101) is a self-contained air conditioner for server rooms and wiring closets.
Guidance for Calculation of Efficiency (PUE) in Data Centers
Guidance for Calculation of Efficiency (PUE) in Data Centers White Paper 158 Revision 1 by Victor Avelar > Executive summary Before data center infrastructure efficiency can be benchmarked using PUE or
Cooling Audit for Identifying Potential Cooling Problems in Data Centers
Cooling Audit for Identifying Potential Cooling Problems in Data Centers By Kevin Dunlap White Paper #40 Revision 2 Executive Summary The compaction of information technology equipment and simultaneous
Improving Data Center Energy Efficiency Through Environmental Optimization
Improving Data Center Energy Efficiency Through Environmental Optimization How Fine-Tuning Humidity, Airflows, and Temperature Dramatically Cuts Cooling Costs William Seeber Stephen Seeber Mid Atlantic
CURBING THE COST OF DATA CENTER COOLING. Charles B. Kensky, PE, LEED AP BD+C, CEA Executive Vice President Bala Consulting Engineers
CURBING THE COST OF DATA CENTER COOLING Charles B. Kensky, PE, LEED AP BD+C, CEA Executive Vice President Bala Consulting Engineers OVERVIEW Compare Cooling Strategies in Free- Standing and In-Building
Verizon SMARTS Data Center Design Phase 1 Conceptual Study Report Ms. Leah Zabarenko Verizon Business 2606A Carsins Run Road Aberdeen, MD 21001
Verizon SMARTS Data Center Design Phase 1 Conceptual Study Report Ms. Leah Zabarenko Verizon Business 2606A Carsins Run Road Aberdeen, MD 21001 Presented by: Liberty Engineering, LLP 1609 Connecticut Avenue
Analysis of data centre cooling energy efficiency
Analysis of data centre cooling energy efficiency An analysis of the distribution of energy overheads in the data centre and the relationship between economiser hours and chiller efficiency Liam Newcombe
Energy Efficiency Opportunities in Federal High Performance Computing Data Centers
Energy Efficiency Opportunities in Federal High Performance Computing Data Centers Prepared for the U.S. Department of Energy Federal Energy Management Program By Lawrence Berkeley National Laboratory
Benefits of Cold Aisle Containment During Cooling Failure
Benefits of Cold Aisle Containment During Cooling Failure Introduction Data centers are mission-critical facilities that require constant operation because they are at the core of the customer-business
DataCenter 2020: hot aisle and cold aisle containment efficiencies reveal no significant differences
DataCenter 2020: hot aisle and cold aisle containment efficiencies reveal no significant differences November 2011 Powered by DataCenter 2020: hot aisle and cold aisle containment efficiencies reveal no
AisleLok Modular Containment vs. Legacy Containment: A Comparative CFD Study of IT Inlet Temperatures and Fan Energy Savings
WH I TE PAPE R AisleLok Modular Containment vs. : A Comparative CFD Study of IT Inlet Temperatures and Fan Energy Savings By Bruce Long, Upsite Technologies, Inc. Lars Strong, P.E., Upsite Technologies,
Managing Data Centre Heat Issues
Managing Data Centre Heat Issues Victor Banuelos Field Applications Engineer Chatsworth Products, Inc. 2010 Managing Data Centre Heat Issues Thermal trends in the data centre Hot Aisle / Cold Aisle design
Education Evolution: Scalable Server Rooms George Lantouris Client Relationship Manager (Education) May 2009
Education Evolution: Scalable Server Rooms George Lantouris Client Relationship Manager (Education) May 2009 Agenda Overview - Network Critical Physical Infrastructure Cooling issues in the Server Room
AIR-SITE GROUP. White Paper. Green Equipment Room Practices
AIR-SITE GROUP White Paper Green Equipment Room Practices www.air-site.com Common practices to build a green equipment room 1 Introduction Air-Site (www.air-site.com) is a leading international provider
Energy Impact of Increased Server Inlet Temperature
Energy Impact of Increased Server Inlet Temperature By: David Moss, Dell, Inc. John H. Bean, Jr., APC White Paper #138 Executive Summary The quest for efficiency improvement raises questions regarding
BICSInews. plus. july/august 2012. + Industrial-grade Infrastructure. + I Say Bonding, You Say Grounding + Data Center Containment.
BICSInews m a g a z i n e july/august 2012 Volume 33, Number 4 plus + Industrial-grade Infrastructure and Equipment + I Say Bonding, You Say Grounding + Data Center Containment & design deployment The
How To Improve Energy Efficiency Through Raising Inlet Temperatures
Data Center Operating Cost Savings Realized by Air Flow Management and Increased Rack Inlet Temperatures William Seeber Stephen Seeber Mid Atlantic Infrared Services, Inc. 5309 Mohican Road Bethesda, MD
Cooling Strategies for IT Wiring Closets and Small Rooms
Cooling Strategies for IT Wiring Closets and Small Rooms White Paper 68 Revision 1 by Neil Rasmussen and Brian Standley > Executive summary Cooling for IT wiring closets is rarely planned and typically
Combining Cold Aisle Containment with Intelligent Control to Optimize Data Center Cooling Efficiency
A White Paper from the Experts in Business-Critical Continuity TM Combining Cold Aisle Containment with Intelligent Control to Optimize Data Center Cooling Efficiency Executive Summary Energy efficiency
APC APPLICATION NOTE #92
#92 Best Practices for Designing Data Centers with the InfraStruXure InRow RC By John Niemann Abstract The InfraStruXure InRow RC is designed to provide cooling at the row and rack level of a data center
Elements of Energy Efficiency in Data Centre Cooling Architecture
Elements of Energy Efficiency in Data Centre Cooling Architecture Energy Efficient Data Center Cooling 1 STULZ Group of Companies Turnover 2006 Plastics Technology 400 Mio A/C Technology 200 Mio Total
White Paper. Data Center Containment Cooling Strategies. Abstract WHITE PAPER EC9001. Geist Updated August 2010
White Paper Data Center Containment Cooling Strategies WHITE PAPER EC9001 Geist Updated August 2010 Abstract Deployment of high density IT equipment into data center infrastructure is now a common occurrence
The Different Types of Air Conditioning Equipment for IT Environments
The Different Types of Air Conditioning Equipment for IT Environments By Tony Evans White Paper #59 Executive Summary Cooling equipment for an IT environment can be implemented in 10 basic configurations.
Enclosure and Airflow Management Solution
Enclosure and Airflow Management Solution CFD Analysis Report Des Plaines, Illinois December 22, 2013 Matt Koukl- DECP Mission Critical Systems Affiliated Engineers, Inc. Contents Executive Summary...
Data Center Temperature Rise During a Cooling System Outage
Data Center Temperature Rise During a Cooling System Outage White Paper 179 Revision 1 By Paul Lin Simon Zhang Jim VanGilder > Executive summary The data center architecture and its IT load significantly
Element D Services Heating, Ventilating, and Air Conditioning
PART 1 - GENERAL 1.01 OVERVIEW A. This section supplements Design Guideline Element D3041 on air handling distribution with specific criteria for projects involving design of a Data Center spaces B. Refer
Environmental Data Center Management and Monitoring
2013 Raritan Inc. Table of Contents Introduction Page 3 Sensor Design Considerations Page 3 Temperature and Humidity Sensors Page 4 Airflow Sensor Page 6 Differential Air Pressure Sensor Page 6 Water Sensor
International Telecommunication Union SERIES L: CONSTRUCTION, INSTALLATION AND PROTECTION OF TELECOMMUNICATION CABLES IN PUBLIC NETWORKS
International Telecommunication Union ITU-T TELECOMMUNICATION STANDARDIZATION SECTOR OF ITU Technical Paper (13 December 2013) SERIES L: CONSTRUCTION, INSTALLATION AND PROTECTION OF TELECOMMUNICATION CABLES
Benefits of. Air Flow Management. Data Center
Benefits of Passive Air Flow Management in the Data Center Learning Objectives At the end of this program, participants will be able to: Readily identify if opportunities i where networking equipment
DOE FEMP First Thursday Seminar. Learner Guide. Core Competency Areas Addressed in the Training. Energy/Sustainability Managers and Facility Managers
DOE FEMP First Thursday Seminar Achieving Energy Efficient Data Centers with New ASHRAE Thermal Guidelines Learner Guide Core Competency Areas Addressed in the Training Energy/Sustainability Managers and
Data Center Technology: Physical Infrastructure
Data Center Technology: Physical Infrastructure IT Trends Affecting New Technologies and Energy Efficiency Imperatives in the Data Center Hisham Elzahhar Regional Enterprise & System Manager, Schneider
Power and Cooling for Ultra-High Density Racks and Blade Servers
Power and Cooling for Ultra-High Density Racks and Blade Servers White Paper #46 Introduction The Problem Average rack in a typical data center is under 2 kw Dense deployment of blade servers (10-20 kw
Rittal White Paper 507: Understanding Data Center Cooling Energy Usage & Reduction Methods By: Daniel Kennedy
Rittal White Paper 507: Understanding Data Center Cooling Energy Usage & Reduction Methods By: Daniel Kennedy Executive Summary Data center energy usage has risen dramatically over the past decade and
Improving Rack Cooling Performance Using Airflow Management Blanking Panels
Improving Rack Cooling Performance Using Airflow Management Blanking Panels White Paper 44 Revision 4 by Neil Rasmussen > Executive summary Unused vertical space in open frame racks and rack enclosures
GUIDE TO ICT SERVER ROOM ENERGY EFFICIENCY. Public Sector ICT Special Working Group
GUIDE TO ICT SERVER ROOM ENERGY EFFICIENCY Public Sector ICT Special Working Group SERVER ROOM ENERGY EFFICIENCY This guide is one of a suite of documents that aims to provide guidance on ICT energy efficiency.
Data Centre Cooling Air Performance Metrics
Data Centre Cooling Air Performance Metrics Sophia Flucker CEng MIMechE Ing Dr Robert Tozer MSc MBA PhD CEng MCIBSE MASHRAE Operational Intelligence Ltd. [email protected] Abstract Data centre energy consumption
Raised Floors vs Hard Floors for Data Center Applications
Raised Floors vs Hard Floors for Data Center Applications White Paper 19 Revision 3 by Neil Rasmussen Executive summary Raised floors were once a standard feature of data centers, but over time a steadily
Unified Physical Infrastructure (UPI) Strategies for Thermal Management
Unified Physical Infrastructure (UPI) Strategies for Thermal Management The Importance of Air Sealing Grommets to Improving Smart www.panduit.com WP-04 August 2008 Introduction One of the core issues affecting
How To Calculate Total Cooling Requirements For Data Center
Calculating Total Cooling Requirements for Data Centers White Paper 25 Revision 3 by Neil Rasmussen > Executive summary This document describes how to estimate heat output from information technology (IT)
Energy Performance Optimization of Server Room HVAC System
International Journal of Thermal Technologies E-ISSN 2277 4114 2 INPRESSCO, All Rights Reserved Available at http://inpressco.com/category/ijtt/ Research Article Manoj Jadhav * and Pramod Chaudhari Department
Data Center Temperature Rise During a Cooling System Outage
Data Center Temperature Rise During a Cooling System Outage White Paper 179 Revision 0 By Paul Lin Simon Zhang Jim VanGilder > Executive summary The data center architecture and its IT load significantly
Engineers Ireland Cost of Data Centre Operation/Ownership. 14 th March, 2013 Robert Bath Digital Realty
Engineers Ireland Cost of Data Centre Operation/Ownership 14 th March, 2013 Robert Bath Digital Realty Total Cost of Operation (TCO) Rental TCO - 10 Year Lease Term Power Cooling Connectivity Costs 26%
Choosing Close-Coupled IT Cooling Solutions
W H I T E P A P E R Choosing Close-Coupled IT Cooling Solutions Smart Strategies for Small to Mid-Size Data Centers Executive Summary As high-density IT equipment becomes the new normal, the amount of
BRUNS-PAK Presents MARK S. EVANKO, Principal
BRUNS-PAK Presents MARK S. EVANKO, Principal Data Centers of the Future and the Impact of High Density Computing on Facility Infrastructures - Trends, Air-Flow, Green/LEED, Cost, and Schedule Considerations
STULZ Water-Side Economizer Solutions
STULZ Water-Side Economizer Solutions with STULZ Dynamic Economizer Cooling Optimized Cap-Ex and Minimized Op-Ex STULZ Data Center Design Guide Authors: Jason Derrick PE, David Joy Date: June 11, 2014
DATA CENTER COOLING INNOVATIVE COOLING TECHNOLOGIES FOR YOUR DATA CENTER
DATA CENTER COOLING INNOVATIVE COOLING TECHNOLOGIES FOR YOUR DATA CENTER DATA CENTERS 2009 IT Emissions = Aviation Industry Emissions Nations Largest Commercial Consumers of Electric Power Greenpeace estimates
Data Center 2020: Delivering high density in the Data Center; efficiently and reliably
Data Center 2020: Delivering high density in the Data Center; efficiently and reliably March 2011 Powered by Data Center 2020: Delivering high density in the Data Center; efficiently and reliably Review:
Cooling Capacity Factor (CCF) Reveals Stranded Capacity and Data Center Cost Savings
WHITE PAPER Cooling Capacity Factor (CCF) Reveals Stranded Capacity and Data Center Cost Savings By Lars Strong, P.E., Upsite Technologies, Inc. Kenneth G. Brill, Upsite Technologies, Inc. 505.798.0200
Cisco Data Center Facilities Assessment Service
Cisco Data Center Facilities Assessment Service Increase the availability, capacity, and life of your data center facility. Service Overview Data centers must respond to changing business needs, environmental
Implementing Energy Efficient Data Centers
Implementing Energy Efficient Data Centers By Neil Rasmussen White Paper #114 Executive Summary Electricity usage costs have become an increasing fraction of the total cost of ownership (TCO) for data
Hot Air Isolation Cools High-Density Data Centers By: Ian Seaton, Technology Marketing Manager, Chatsworth Products, Inc.
Business Management Magazine Winter 2008 Hot Air Isolation Cools High-Density Data Centers By: Ian Seaton, Technology Marketing Manager, Chatsworth Products, Inc. Contrary to some beliefs, air is quite
- White Paper - Data Centre Cooling. Best Practice
- White Paper - Data Centre Cooling Best Practice Release 2, April 2008 Contents INTRODUCTION... 3 1. AIR FLOW LEAKAGE... 3 2. PERFORATED TILES: NUMBER AND OPENING FACTOR... 4 3. PERFORATED TILES: WITH
Digital Realty Data Center Solutions Digital Chicago Datacampus Franklin Park, Illinois Owner: Digital Realty Trust Engineer of Record: ESD Architect
Digital Realty Data Center Solutions Digital Chicago Datacampus Franklin Park, Illinois Owner: Digital Realty Trust Engineer of Record: ESD Architect of Record: SPARCH Project Overview The project is
Green Data Centre Design
Green Data Centre Design A Holistic Approach Stantec Consulting Ltd. Aleks Milojkovic, P.Eng., RCDD, LEED AP Tommy Chiu, EIT, RCDD, LEED AP STANDARDS ENERGY EQUIPMENT MATERIALS EXAMPLES CONCLUSION STANDARDS
Cooling Strategies for IT Wiring Closets and Small Rooms
Cooling Strategies for IT Wiring Closets and Small Rooms By Neil Rasmussen Brian Standley White Paper #68 Executive Summary Cooling for IT wiring closets is rarely planned and typically only implemented
QUALITATIVE ANALYSIS OF COOLING ARCHITECTURES FOR DATA CENTERS
WHITE PAPER #30 QUALITATIVE ANALYSIS OF COOLING ARCHITECTURES FOR DATA CENTERS EDITOR: Bob Blough, Emerson Network Power CONTRIBUTORS: John Bean, APC by Schneider Electric Robb Jones, Chatsworth Products
Economizer Fundamentals: Smart Approaches to Energy-Efficient Free-Cooling for Data Centers
A White Paper from the Experts in Business-Critical Continuity TM Economizer Fundamentals: Smart Approaches to Energy-Efficient Free-Cooling for Data Centers Executive Summary The strategic business importance
Economizer Modes of Data Center Cooling Systems
Economizer Modes of Data Center Cooling Systems White Paper 132 Revision 0 by John Niemann John Bean Victor Avelar > Executive summary In certain climates, some cooling systems can save over 70% in annual
White Paper #10. Energy Efficiency in Computer Data Centers
s.doty 06-2015 White Paper #10 Energy Efficiency in Computer Data Centers Computer Data Centers use a lot of electricity in a small space, commonly ten times or more energy per SF compared to a regular
Improving Data Center Efficiency with Rack or Row Cooling Devices:
Improving Data Center Efficiency with Rack or Row Cooling Devices: Results of Chill-Off 2 Comparative Testing Introduction In new data center designs, capacity provisioning for ever-higher power densities
How To Run A Data Center Efficiently
A White Paper from the Experts in Business-Critical Continuity TM Data Center Cooling Assessments What They Can Do for You Executive Summary Managing data centers and IT facilities is becoming increasingly
High Density Data Centers Fraught with Peril. Richard A. Greco, Principal EYP Mission Critical Facilities, Inc.
High Density Data Centers Fraught with Peril Richard A. Greco, Principal EYP Mission Critical Facilities, Inc. Microprocessors Trends Reprinted with the permission of The Uptime Institute from a white
Unified Physical Infrastructure SM (UPI) Strategies for Smart Data Centers
Unified Physical Infrastructure SM (UPI) Strategies for Smart Data Centers Deploying a Vertical Exhaust System www.panduit.com WP-09 September 2009 Introduction Business management applications and rich
Top 5 Trends in Data Center Energy Efficiency
Top 5 Trends in Data Center Energy Efficiency By Todd Boucher, Principal Leading Edge Design Group 603.632.4507 @ledesigngroup Copyright 2012 Leading Edge Design Group www.ledesigngroup.com 1 In 2007,
Optimum Climate Control For Datacenter - Case Study. T. Prabu March 17 th 2009
Optimum Climate Control For Datacenter - Case Study T. Prabu March 17 th 2009 Agenda 2 About EDEC (Emerson) Facility Data Center Details Design Considerations & Challenges Layout Design CFD Analysis Of
Rack Hygiene. Data Center White Paper. Executive Summary
Data Center White Paper Rack Hygiene April 14, 2011 Ed Eacueo Data Center Manager Executive Summary This paper describes the concept of Rack Hygiene, which positions the rack as an airflow management device,
Creating Data Center Efficiencies Using Closed-Loop Design Brent Goren, Data Center Consultant
RESEARCH UNDERWRITER WHITE PAPER LEAN, CLEAN & GREEN Wright Line Creating Data Center Efficiencies Using Closed-Loop Design Brent Goren, Data Center Consultant Currently 60 percent of the cool air that
Liquid Cooling Solutions for DATA CENTERS - R.M.IYENGAR BLUESTAR LIMITED.
Liquid Cooling Solutions for DATA CENTERS - R.M.IYENGAR BLUESTAR LIMITED. Presentation Goals & Outline Power Density Where we have been- where we are now - where we are going Limitations of Air Cooling
Center Thermal Management Can Live Together
Network Management age e and Data Center Thermal Management Can Live Together Ian Seaton Chatsworth Products, Inc. Benefits of Hot Air Isolation 1. Eliminates reliance on thermostat 2. Eliminates hot spots
Recommendation For Incorporating Data Center Specific Sustainability Best Practices into EO13514 Implementation
Recommendation For Incorporating Data Center Specific Sustainability Best Practices into EO13514 Implementation Version 1.0 - November, 2011 Incorporating Data Center-Specific Sustainability Measures into
Data Center Power Consumption
Data Center Power Consumption A new look at a growing problem Fact - Data center power density up 10x in the last 10 years 2.1 kw/rack (1992); 14 kw/rack (2007) Racks are not fully populated due to power/cooling
Cooling Small Server Rooms Can Be. - Jim Magallanes Computer Room Uptime: www.cruptime.com Uptime Racks: www.uptimeracks.com
Cooling Small Server Rooms Can Be Inexpensive, Efficient and Easy - Jim Magallanes Computer Room Uptime: www.cruptime.com Uptime Racks: www.uptimeracks.com Server Rooms Description & Heat Problem Trends
Presentation Outline. Common Terms / Concepts HVAC Building Blocks. Links. Plant Level Building Blocks. Air Distribution Building Blocks
Presentation Outline Common Terms / Concepts HVAC Building Blocks Plant Level Building Blocks Description / Application Data Green opportunities Selection Criteria Air Distribution Building Blocks same
Data Center Components Overview
Data Center Components Overview Power Power Outside Transformer Takes grid power and transforms it from 113KV to 480V Utility (grid) power Supply of high voltage power to the Data Center Electrical Room
Cooling Capacity Factor (CCF) Reveals Stranded Capacity and Data Center Cost Savings
WHITE PAPER Cooling Capacity Factor (CCF) Reveals Stranded Capacity and Data Center Cost Savings By Kenneth G. Brill, Upsite Technologies, Inc. Lars Strong, P.E., Upsite Technologies, Inc. 505.798.0200
Improving Rack Cooling Performance Using Airflow Management Blanking Panels
Improving Rack Cooling Performance Using Airflow Management Blanking Panels By Neil Rasmussen White Paper #44 Revision 3 Executive Summary Unused vertical space in open frame racks and rack enclosures
How To Improve Energy Efficiency In A Data Center
Google s Green Data Centers: Network POP Case Study Table of Contents Introduction... 2 Best practices: Measuring. performance, optimizing air flow,. and turning up the thermostat... 2...Best Practice
Using CFD for optimal thermal management and cooling design in data centers
www.siemens.com/datacenters Using CFD for optimal thermal management and cooling design in data centers Introduction As the power density of IT equipment within a rack increases and energy costs rise,
The Efficient Enterprise. Juan Carlos Londoño Data Center Projects Engineer APC by Schneider Electric
Ee The Efficient Enterprise Juan Carlos Londoño Data Center Projects Engineer APC by Schneider Electric Keystrokes Kilowatts Heat OUT Electricity IN Need for bandwidth exploding Going hyperbolic! 30,000
HVAC Systems: Overview
HVAC Systems: Overview Michael J. Brandemuehl, Ph.D, P.E. University of Colorado Boulder, CO, USA Overview System Description Secondary HVAC Systems Air distribution Room diffusers and air terminals Duct
Case Study: Innovative Energy Efficiency Approaches in NOAA s Environmental Security Computing Center in Fairmont, West Virginia
Case Study: Innovative Energy Efficiency Approaches in NOAA s Environmental Security Computing Center in Fairmont, West Virginia Prepared for the U.S. Department of Energy s Federal Energy Management Program
How to Build a Data Centre Cooling Budget. Ian Cathcart
How to Build a Data Centre Cooling Budget Ian Cathcart Chatsworth Products Topics We ll Cover Availability objectives Space and Load planning Equipment and design options Using CFD to evaluate options
Data center upgrade proposal. (phase one)
Data center upgrade proposal (phase one) Executive Summary Great Lakes began a recent dialogue with a customer regarding current operations and the potential for performance improvement within the The
Energy Efficiency Best Practice Guide Data Centre and IT Facilities
2 Energy Efficiency Best Practice Guide Data Centre and IT Facilities Best Practice Guide Pumping Systems Contents Medium-sized data centres energy efficiency 3 1 Introduction 4 2 The business benefits
The Pros and Cons of Modular Systems
The Pros and Cons of Modular Systems Kevin Brown, Vice President Global Data Center Offer Schneider Electric Schneider Electric 1 Foundational BUSINESS OVERVIEW Rev 2 Desired characteristics of pre-fabricated
Data Center Industry Leaders Reach Agreement on Guiding Principles for Energy Efficiency Metrics
On January 13, 2010, 7x24 Exchange Chairman Robert Cassiliano and Vice President David Schirmacher met in Washington, DC with representatives from the EPA, the DOE and 7 leading industry organizations
Containment Solutions
Containment Solutions Improve cooling efficiency Separate hot and cold air streams Configured to meet density requirements Suitable for commercial and SCEC endorsed cabinets Available for retrofit to SRA
Ten Steps to Solving Cooling Problems Caused by High- Density Server Deployment
Ten Steps to Solving Cooling Problems Caused by High- Density Server Deployment By Peter Hannaford White Paper #42 Revision 1 Executive Summary High-density servers present a significant cooling challenge.
Data Realty Colocation Data Center Ignition Park, South Bend, IN. Owner: Data Realty Engineer: ESD Architect: BSA LifeStructures
Data Realty Colocation Data Center Ignition Park, South Bend, IN Owner: Data Realty Engineer: ESD Architect: BSA LifeStructures Project Overview Data Realty is a data center service provider for middle
The New Data Center Cooling Paradigm The Tiered Approach
Product Footprint - Heat Density Trends The New Data Center Cooling Paradigm The Tiered Approach Lennart Ståhl Amdahl, Cisco, Compaq, Cray, Dell, EMC, HP, IBM, Intel, Lucent, Motorola, Nokia, Nortel, Sun,