CHAPTER II. RESEARCH METHODS AND MATERIALS

Size: px
Start display at page:

Download "CHAPTER II. RESEARCH METHODS AND MATERIALS"

Transcription

1 CHAPTER II. RESEARCH METHODS AND MATERIALS 2.1 Evaluation of Waterproofing Systems Two different waterproof bituminous concrete systems were examined in this research study. The first system, consistent with current timber bridge construction practice, uses a preformed waterproofing membrane placed on a preservative treated wood deck and overlaid with a bituminous concrete wearing surface (Figure-2.1). The second system consists of a treated wood deck overlaid with a base course of bituminous concrete, a waterproofing membrane, and finally, a bituminous concrete wearing surface (Figure-2.2). The second system was considered because, in spite of the use of dense graded surface asphalt concrete mixtures, the current practice of placing a waterproofing membrane directly on top of a flat and level bridge deck may lead to stripping of the asphalt cement from the aggregate due to the buildup of moisture in the asphalt concrete directly above the membrane. In addition, any water that is allowed to remain stagnant above the membrane for an extended period of time will be more prone to penetrating any membrane weaknesses and thereby potentially reduce the functional service life of the wood deck and other bridge components. The bituminous concrete base course can also be used to construct a deck cross-slope into the pavement system at the level of the waterproofing membrane to allow any water that penetrates the wearing surface to flow to the edges of the bridge deck and off the bridge without wetting other bridge members. Figure-2.1 Existing Timber Bridge Pavement Configuration 10

2 Figure-2.2 Proposed Timber Bridge Pavement Configuration The testing regime used in this research to evaluate watertightness and bond performance incorporated three parameters: three waterproofing membranes, two wood preservative treatments, and two environmental degradation conditions induced by temperature cycling in a moisture saturated condition. Control groups were also evaluated for each study parameter. Duplicate specimens were prepared and tested for each of the study parameters. A total of 160 specimens were constructed and tested as shown in the study matrix (Figure-2.3). Watertightness of each waterproof asphalt wearing surface system was determined by measuring the electrical impedance across a test specimen perpendicular to the direction of bond orientation in the pavement materials. The bond strength between each material of both paving systems was assessed using a shear test apparatus designed and built for this study. Using a constant deformation rate, load was applied to one side of the system bond line while the side opposite was held in a fixed position. Maximum sustained load by the system was recorded for each specimen along with the location of failure relative to the bond line. In addition to the laboratory constructed specimens, three drilled cores were taken from a bridge deck located on Creekside Drive in East Pennsboro Township, Pennsylvania. The deck was constructed using the new system design proposed in this research using two asphalt mixtures and a waterproofing membrane. The asphalt mixtures, membrane, and wood species incorporated 11

3 Figure-2.3 Test Matrix for Laboratory Constructed Specimens 12

4 into this bridge were different from those included in the laboratory constructed specimens. At the time the cores were taken, the bridge was approximately one year old. 2.2 Specimen Design and Materials Specimen design was based on the geometry of specimens used in ASTM D 1559 "Resistance to Plastic Flow of Bituminous Mixtures Using Marshall Apparatus". In this test, hot mix asphalt is compacted into the shape of a 4 inch diameter by 3 inch thick cylinder using a steel mold and a standardized compaction hammer. For the specimens in this research, this basic shape was subdivided into two distinct and separate cylindrical sections 1.5 inches thick to allow for the use of different materials in each lift with a waterproofing membrane placed in between (Figure- 2.4). By using this specimen configuration, the bond strength and watertightness of an entire asphalt concrete wearing system was examined. Figure 2.4 Lab Constructed Test Specimen To examine current paving practice for timber bridges, a group of specimens was constructed with a wood bottom section and a compacted surface hot-mix asphalt concrete in the top section. All wood was machined from quarter sawn nominal "2-by" southern pine lumber that was either left untreated, treated with creosote, or treated with pentachlorophenol. Untreated wood was used to establish a baseline for future research using other treatment methods, though the performance of CCA treated lumber is likely to be very similar. It should be stressed that the use of untreated wood in an actual field application is not recommended. Minimum preservative treatment retention levels were specified as 12lb/ft 3 for creosote and 0.60lb/ft 3 for pentachlorophenol in accordance with the recommendations of Ritter (1990). Assay results and 13

5 treatment parameters for the treated boards are included in Appendix-A. In the test specimens, quarter sawn lumber was chosen to simulate the grain orientation observed at the paving surface of typical glulam deck panels. The surface asphalt concrete mixture, consisting of asphalt cement and crushed limestone aggregate no larger than 0.5 inches, was manufactured to Virginia Department of Transportation specifications for mixture type SM-2AL at a local batch plant. A complete mix design is included in Appendix-B. In addition, an independent analysis of the asphalt concrete used in this study was performed by the Virginia Transportation Research Council. A copy of this analysis is also included in Appendix-C. This mixture is commonly used for secondary roads in Virginia which is where the timber bridges considered in this study are typically located. Test specimens for the waterproof asphalt concrete wearing surface system proposed in this research study consisted of a compacted base hot-mix asphalt concrete in the bottom cylindrical section and compacted surface hot-mix asphalt concrete in the top section. The base asphalt concrete mixture, consisting of asphalt cement and crushed limestone aggregate no larger than 1 inch, was manufactured to Virginia Department of Transportation specifications for mixture type BM-2 at a local batch plant. The mixture proportions are included in Appendix-B. In addition, an independent analysis of the asphalt concrete used in this study was performed by the Virginia Transportation Research Council. A copy of this analysis is included in Appendix-C. This mixture is commonly used as a base course for secondary roads. The asphalt concrete surface mixture was the same material used in the wood-asphalt specimens. Three different waterproofing membranes were employed in the laboratory specimens constructed for both systems. They included Bituthene 5000 manufactured by W.R Grace, Petrotac manufactured by Phillips Fibers Corporation, and Protectowrap M400A manufactured by the Protectowrap Company. Control specimens were constructed with no membrane between the wood and surface asphalt concrete layers to assess baseline watertightness and shear strength parameters for an unprotected system. Properties of weight per unit area and unit weight were determined using a one foot square section of each membrane and a balance capable of measuring to the nearest pounds. Thicknesses were determined by obtaining a one foot square section of each membrane, cutting it into four equal size square sections, and measuring around the entire perimeter a total of eight times (one at each corner and one at the midpoint of each side) with a micrometer capable of measuring to the nearest inch. Membrane measurement data is included in Appendix-D. Measured dimensional properties and physical observations for each membrane are included in Table-2.1. The thickest membrane was determined to be Bituthene 5000 and the thinnest was Petrotac, though the thicknesses of Petrotac and Protectowrap M400A were very similar. The densest membrane was Protectowrap M400A and the least dense was Petrotac. 14

6 Table-2.1 Measured Dimensional Properties and Physical Observations for Membranes Membrane Thickness (in) Weight/Unit Area Unit Weight Observations (at room temperature) Bituthene ±0.004 (lb/ft 2 ) (lb/ft 3 ) Most flexible of three membranes. Very sticky. Petrotac ±0.005 Protectowrap M400A ± Stiffest of three membranes. Similar to heavy construction felt. Least sticky Similar to Bituthene 5000 except for fibrous material present on top surface. Slightly less flexible than Bituthene. Load-strain properties were determined for each membrane using the procedure outlined in the draft of a proposed major revision to ASTM D 2523 "Standard Test Method for the Load- Strain Properties of Roofing and Waterproofing Membranes" using 1 inch by 6 inch cut specimens. Five specimens of each membrane type and orientation were tested after being conditioned for 16 hours at 73.4ºF, 50% R.H. followed by 16 hours at 0ºF, 50% R.H. The two orientations considered for each membrane were 0º and 90º relative to the longitudinal axis of the membrane roll. Each specimen was kept at 0ºF until placement into the loading apparatus and each test was completed within 10 minutes of being placed in the tensile testing machine. The deformation used to determine strain was based on the change of distance between loading grips, so any slippage is implicit in the results. A summary of load-strain properties is presented in Table-2.2 and complete test data is included in Appendix-D. For tensile load in the 0º orientation, both Bituthene 5000 and Petrotac were approximately 19% lower than Protectowrap M400A. In comparison to individual tensile loads in the 0º orientation, tensile load in the 90º orientation was 9% lower for Protectowrap M400A, 10% lower for Petrotac, and 19% lower for Bituthene Strain at maximum load was highest for Protectowrap M400A and lowest for Bituthene Loading orientation was significant to strain at maximum load only for Petrotac where the result was 30% lower for the 0º orientation. Energy at maximum load was highest for Protectowrap M400A and lowest for Bituthene For the Creekside Drive bridge, the cross-section of the bridge deck and pavement system consisted of the following (substrate to wearing surface): a creosote treated red maple glulam deck, Pennsylvania Department of Transportation asphalt concrete base mixture BC-BC, Royston 10A waterproofing membrane, and finally, Pennsylvania Department of Transportation asphalt concrete surface mixture ID-2. The cross section of this configuration is similar to the one presented in Figure

7 Table-2.2 Summary of Load-Strain Properties for Membranes Membrane Maximum Load (lbs) Strain at Maximum Load (%) Energy at Maximum Load (lbs in) Mean Std. Dev. Mean Std. Dev. Mean Std. Dev. Bituthene º º Petrotac 0º º Protectowrap M400A 0º º Assay measurements taken from the bridge deck indicate an average final creosote retention level of 15.8 lb/ft 3 in the bridge deck. The deck moisture content was 9.4% at the time of bridge construction. An independent analysis of the asphalt concrete mixtures used on this bridge was performed by the Virginia Transportation Research Council, a copy of which is included in Appendix-C Specimen Construction Specimen construction consisted of several discrete steps including: preparation of 4 inch diameter by 1.5 inch thick wood specimens, cutting 4 inch diameter circles out of membrane sheets, assembling the specimen (asphalt compaction), and constructing a perimeter seal/ponding dam Wood Preparation Nominal 2"-by-12" kiln dried southern pine was obtained directly from an eastern Virginia saw mill in 16' lengths. Each piece of lumber was ripped in half to yield two quarter sawn 2"-by- 6" boards and then cross cut into more manageable 4' lengths to allow for shipment to a preservative treatment facility and additional machining operations. 16

8 Figure 2.5 Drill Press and Hole Saw Used to Obtain Wood Cylinder Substrates After the boards were pressure treated (where applicable), 4 inch diameter by 1.5 inch thick cylinders were cut using a 4-1/8 inch O.D. hole saw attached to a drill press, see Figure-2.5. Special care was taken to avoid surface defects (i.e., knots, splits) and assay core holes when sawing the cylindrical specimens. Figure 2.6 Membrane Punch 17

9 2.2.3 Membrane Preparation To cut the 4 inch diameter circles from the membranes, a punch was fabricated using a short section of 4 inch O.D. steel tube with a sharpened edge ground against the outside perimeter (Figure-2.6). The membrane was unrolled onto a clean wood surface with the removable backing material facing upward. The punch was placed on top of the membrane and struck on top several times with a heavy hammer until the cutting edge passed cleanly through the membrane material Assembly and Compaction of Specimens Assembly of the test specimens was designed to simulate the rigors that a membrane faces during a typical bridge deck paving operation. With this in mind, asphalt concrete pavement was compacted based on ASTM D 1559 "Resistance to Plastic Flow of Bituminous Mixtures Using Marshall Apparatus". As stated earlier, this test uses a steel mold and a standardized hammer to compact hot mix asphalt into a 4 inch diameter cylinder. Initially, asphalt concrete test specimens were made in accordance with the standard test procedure to determine the theoretical maximum density for both types of asphalt concrete used in this research. Since only 1.5 inch thick lifts were needed, some preliminary specimens were compacted to determine the mass of hot mix asphalt and the number of hammer blows necessary to reach the theoretical maximum density for each pavement material. Though minimum requirements vary for in place pavement densities based on mixture type, a pavement with a density at the theoretical maximum exceeds the densities required by the Virginia Department of Transportation and most other transportation agencies. Through trial and error, it was determined that 700 grams of asphalt concrete compacted with 50 blows applied to one side yielded a 1.5 inch thick lift at the theoretical maximum density for both SM-2AL and BM-2. To begin specimen assembly, the steel molds, miscellaneous tools, and previously obtained hot mix asphalt were heated to approximately 275ºF in a large convection oven. The compaction hammer was placed on a hot plate to bring its temperature up to 275ºF. For the wood base specimens, a mold was removed from the oven, wood was placed inside at the bottom, and a membrane (if applicable) was pressed onto the wood. Surface mix asphalt concrete was then measured out to the desired mass, placed in the mold on top of the membrane, and spaded 25 times around the perimeter and 10 times in the center. At this point, the mold was fixed in the compaction machine, the temperature of the hot mix asphalt checked to be sure it exceeded 250ºF, the compaction hammer put in place, and compaction initiated. After 50 hammer blows, the mold was removed from the machine and allowed to cool for approximately 30 minutes before it was removed from the mold. For the specimens using BM-2 as the base, the mold was removed from the oven, a piece of release paper was placed in the bottom of the mold, and base mix asphalt concrete was 18

10 measured out to the desired mass and placed in the mold. Compaction of the base mix proceeded in a similar manner to that used for the surface mix. The base was allowed to cool for approximately 20 minutes, a membrane (if applicable) was placed on the base lift, and then a surface mix was added and compacted Edge Seal and Ponding Dam To reduce edge effects, a system consisting of mastic asphalt, a membrane, a PVC plastic cylinder, and a clamp was used to seal the perimeter of each specimen after cooling for at least 24 hours, see Figure-2.7. The system was devised to: allow moisture to enter and exit the specimen from the top and bottom only; allow ponding of the specimen with a 0.5% NaCl solution to saturate the surface asphalt concrete thus providing a conductive path should a leak be present in the membrane; and prevent visco-elastic creep of the asphalt concrete during high temperature environmental exposure. The top surface of each specimen was ponded for the duration of environmental exposure conditioning except for the brief period of time when watertightness and moisture content measurements were being made. In addition to the edge wrap around the system, a plastic or foil wrap (depending on temperature exposure) was fastened over each specimen to prevent the escape of moisture from the system. Application of Mastic at Section Interface Application of Containment Membrane Application of PVC Plastic Surround and Clamp Figure 2.7 Specimen Edge Seal and Ponding Dam 19

11 2.3 Obtaining Creekside Drive Bridge Deck Cores Three cores were sawn from the bridge constructed using the system design proposed in this research at the locations presented in Figure-2.8. The specimens were obtained using a water cooled 4 inch I.D. diamond core saw as shown in Figure-2.9. For two of the three specimens taken, the core drill penetrated the full depth of the asphalt paving system at which point the core sample immediately broke loose from the treated wood deck indicating that no bond existed between the wood and base asphalt mixture. On the third sample, the base asphalt cracked and broke loose approximately 2 inches before the core drill reached the wood deck, but beyond the waterproofing membrane. The measured depth of surface and base asphalt for each sample is listed in Table-2.3. After each core sample was removed, the resulting hole in the bridge deck was patched using a cold mix patching asphalt. Special care was taken to replace the removed membrane with a new piece at the same height as the existing membrane. Once the raw core samples were returned to the laboratory, four inch diameter by three inch thick cylindrical test specimens were prepared by trimming the base asphalt layer to a height of 1.5 inches using a water cooled diamond blade saw. The surface layer for each sample was approximately 1.5 inches as paved, so no trimming was necessary. Once the standard specimens were prepared, they were sealed in the manner described in Section Table-2.3 Asphalt Lift Thicknesses for Creekside Drive Bridge Core Samples Specimen Surface Asphalt Base Asphalt Thickness (in.) Number Thickness (in.) BRA.1 1-3/8" to 1-1/2" 4-7/8"to 5" BRA.2 1-3/8" to 1-1/2" 2-1/2" to 2-3/4" (Broken While Coring) BRA.3 1-3/8" to 1-1/2" 4-1/4" to 4-1/2" 2.4 Environmental Degradation Exposure Cycling Where applicable, each specimen was exposed to temperature cycle ranges of 0 to 40ºF or 90 to 140ºF in accordance with cycle rates described in ASTM C 666 "Standard Test Method for Resistance of Concrete to Rapid Freezing and Thawing". These two ranges were chosen to simulate the temperature effects of cold weather and warm weather climates in the United States. An ASTM C 666 rapid freeze thaw chamber utilizing mechanically controlled refrigeration and heating units was used to achieve the desired cold temperature exposure cycles, see Figure One complete cold temperature cycle was considered to be the change in temperature at the center of an asphalt-asphalt control specimen starting at 40ºF, decreasing to 0ºF, and returning to 40ºF. The internal temperature of an asphaltwood control specimen was monitored in conjunction with the asphalt-asphalt control 20

12 Figure 2.8 Bridge Core Locations Figure 2.9 Water Cooled Core Saw Setup on Creekside Drive Bridge 21

13 specimen and temperature data from both was recorded using thermocouples attached to a data acquisition system. For the warm temperature exposure cycles, an electronically controlled convection oven was employed, see Figure One complete warm temperature cycle was considered to be the change in temperature at the center of an asphalt-asphalt control specimen starting at 90ºF, increasing to 140ºF, and returning to 90ºF. As in the cold temperature chamber, the internal temperature of an asphalt-wood control specimen was also monitored. Data from both controls was recorded using thermocouples attached to a data acquisition system. The length of each exposure cycle in both chambers was typically 4-6 hours. The cycle length was primarily determined by the thermal properties of the asphalt-asphalt control specimen and chamber loading (i.e., the number of specimens in the chamber). 2.5 Watertightness Test and Procedures Watertightness of each waterproof asphalt wearing surface system was assessed by measuring the electrical impedance across a test specimen perpendicular to the direction of bond orientation in the pavement materials. Electrical impedance was measured with a meter using a 12 Volt, 97.4 Hertz square wave alternating current power supply. The maximum measurable impedance with this test instrument is 1.1 MΩ. Test electrodes were fabricated using 12 gauge copper wire embedded in sponges wetted with a 0.5% sodium chloride electrolyte solution. A concrete block weighing pounds was placed on the top sponge to provide a consistent pressure on the electrodes for each test. The complete test apparatus is shown in Figure All watertightness tests were conducted at ambient temperature (65ºF) and where applicable, measurements were taken after seven days of ponding with a 0.5% sodium chloride solution, and after 100 and 200 environmental degradation exposure cycles. After exposure to environmental exposure cycling, each specimen was allowed to stabilize to room temperature for a 24 hour period prior to testing. Watertightness tests were performed on the three bridge core samples after they were ponded for seven days with a 0.5% NaCl solution. Prior to watertightness testing, the edge seal clamp on each specimen was tightened to help eliminate any conductive path if leaking occurred. 2.6 System Bond Test and Procedures The bond strength between each material of the paving systems was assessed using a shear test apparatus in which load was applied at a constant strain rate parallel to the direction of bond (Figure-2.13). Load was applied on one side of the system bond line while the side opposite was held in a fixed position. Fabrication drawings for the bond strength test apparatus are presented in Appendix-E. System bond strength tests were performed at 0, 100, and 200 environmental degradation exposure cycles. 22

14 Figure 2.10 Low-Temperature Cycling Chamber Figure 2.11 High-Temperature Cycling Chamber 23

15 The bond test strain rate was 0.1 inches/minute and all system bond tests were conducted at an ambient temperature of 72ºF. Shear load and deformation were recorded for each specimen. The location of failure relative to the bond line and maximum sustained load were also observed and recorded. The load caused by the weight of the test fixture is added to the dial load for all reported results. For the three bridge core samples, system bond strength measurements were taken immediately after the watertightness tests were performed. Figure 2.12 Impedance Test Apparatus 24

16 Figure 2.13 Bond Test Apparatus 25

Apr 17, 2000 LAB MANUAL 1811.0

Apr 17, 2000 LAB MANUAL 1811.0 Apr 17, 2000 LAB MANUAL 1811.0 1811 BULK SPECIFIC GRAVITY (GMB) AND DENSITY OF COMPACTED BITUMINOUS SPECIMENS USING PARAFFIN OR PARAFILM ASTM Designation D 1188 (MN/DOT Modified) 1811.1 SCOPE This test

More information

COMPACTING BITUMINOUS SPECIMENS USING THE SUPERPAVE GYRATORY COMPACTOR (SGC)

COMPACTING BITUMINOUS SPECIMENS USING THE SUPERPAVE GYRATORY COMPACTOR (SGC) Test Procedure for COMPACTING BITUMINOUS SPECIMENS USING THE SUPERPAVE TxDOT Designation: Tex-241-F Effective Date: December 2015 1. SCOPE 1.1 Use this test method to: compact cylindrical specimens of

More information

STANDARD REQUIREMENTS FOR BONDING OR MECHANICAL ATTACHMENT OF INSULATION PANELS AND MECHANICAL ATTACHMENT OF ANCHOR AND/OR BASE SHEETS TO SUBSTRATES

STANDARD REQUIREMENTS FOR BONDING OR MECHANICAL ATTACHMENT OF INSULATION PANELS AND MECHANICAL ATTACHMENT OF ANCHOR AND/OR BASE SHEETS TO SUBSTRATES ROOFING APPLICATION STANDARD (RAS) No. 117 STANDARD REQUIREMENTS FOR BONDING OR MECHANICAL ATTACHMENT OF INSULATION PANELS AND MECHANICAL ATTACHMENT OF ANCHOR AND/OR BASE SHEETS TO SUBSTRATES Scope 1.1.

More information

TEST REPORT. Rendered to: DEXERDRY. For: Deck Weatherproofing System Installed with AZEK Deck Boards

TEST REPORT. Rendered to: DEXERDRY. For: Deck Weatherproofing System Installed with AZEK Deck Boards TEST REPORT Rendered to: DEXERDRY For: Deck Weatherproofing System Installed with AZEK Deck Boards Report No.: E8122.01-119-19 Revision 1: 08/18/15 Report Date: 08/14/15 Test Record Retention Date: 07/16/19

More information

Field Density Determination of Asphalt Concrete by the Coring Method

Field Density Determination of Asphalt Concrete by the Coring Method Field Density Determination of Asphalt Concrete by the Coring Method 1. Scope: This procedure is for determining the density of in place asphalt concrete pavement. 2. Apparatus: 2.1 Scale or balance having

More information

HAMBURG WHEEL-TRACKING TEST

HAMBURG WHEEL-TRACKING TEST Test Procedure for HAMBURG WHEEL-TRACKING TEST TxDOT Designation: Tex-242-F Effective Date: September 2014 1. SCOPE 1.1 This test method determines the premature failure susceptibility of bituminous mixtures

More information

SURFACE TREATMENT BOND TEST

SURFACE TREATMENT BOND TEST Test Procedure for SURFACE TREATMENT BOND TEST Effective Date: March 2011 Published: February 2012 1. SCOPE 1.1. This test procedure is used to determine the bond strength characteristics of the interfaces

More information

IHSS-N1 WELDED HONEYCOMB CORE SPECIFICATION. Generated: Sergiy Papyshev Engineering. Approved: Don Prysi Manufacturing. Approved: Merzuk Ramic Quality

IHSS-N1 WELDED HONEYCOMB CORE SPECIFICATION. Generated: Sergiy Papyshev Engineering. Approved: Don Prysi Manufacturing. Approved: Merzuk Ramic Quality IHSS-N1 WELDED HONEYCOMB CORE SPECIFICATION Generated: Sergiy Papyshev Engineering Approved: Don Prysi Manufacturing Approved: Merzuk Ramic Quality Approved: Steven Barnett Administrative DATE DATE DATE

More information

PART E SPECIFICATIONS

PART E SPECIFICATIONS PART E SPECIFICATIONS Page 1 of 5 PART E - SPECIFICATIONS GENERAL E1. APPLICABLE SPECIFICATIONS, STANDARD DETAILS AND DRAWINGS E1.1 The City of Winnipeg Works and Operations Division Standard Construction

More information

High Performance PSA in Sheet Membrane in Water Protection

High Performance PSA in Sheet Membrane in Water Protection High Performance PSA in Sheet Membrane in Water Protection Xia Cao, Senior R&D Chemist, W. R. Grace, Cambridge MA 02140 Jyoti Seth, Strategic Program Leader, W. R. Grace, Cambridge MA 02140 Concrete is

More information

Treatment of a surface or structure to resist the passage of water in the absence of hydrostatic pressure. presence of hydrostatic pressure.

Treatment of a surface or structure to resist the passage of water in the absence of hydrostatic pressure. presence of hydrostatic pressure. Recommend Approval: Team Leader Date Division Chief Date Approved: Director Date Maryland Department of Transportation State Highway Administration Office of Materials Technology MARYLAND STANDARD METHOD

More information

Lab 1 Concrete Proportioning, Mixing, and Testing

Lab 1 Concrete Proportioning, Mixing, and Testing Lab 1 Concrete Proportioning, Mixing, and Testing Supplemental Lab manual Objectives Concepts Background Experimental Procedure Report Requirements Discussion Prepared By Mutlu Ozer Objectives Students

More information

Asphalt Shingle Application Requirements

Asphalt Shingle Application Requirements Alberta Allied Roofing Association Asphalt Shingle Application Requirements Section 1 Roof Decks 1.1 General Asphalt Shingles are not permitted to be installed directly over rigid insulation. When Asphalt

More information

SECTION 02845 GUARDRAILS

SECTION 02845 GUARDRAILS SECTION 02845 GUARDRAILS PART 1 - GENERAL 1.01 SCOPE OF WORK A. Furnish all labor, materials, equipment and incidentals necessary and repair, replace or install all types of guardrails as specified herein

More information

HIGHWAYS DEPARTMENT GUIDANCE NOTES ON THE USE OF WATERPROOFING MEMBRANES ON CONCRETE BRIDGE DECKS

HIGHWAYS DEPARTMENT GUIDANCE NOTES ON THE USE OF WATERPROOFING MEMBRANES ON CONCRETE BRIDGE DECKS HIGHWAYS DEPARTMENT GUIDANCE NOTES ON THE USE OF WATERPROOFING MEMBRANES ON CONCRETE BRIDGE DECKS Research & Development Division RD/GN/033 June 2008 THE USE OF WATERPROOFING MEMBRANES ON CONCRETE BRIDGE

More information

Shingle Installation Guide

Shingle Installation Guide Shingle Installation Guide Getting Started Dedicated to improving the environment, NewTech manufactures roofing tiles that are composed of up to 90% recycled post-industrial plastic. The manufacture of

More information

WATERPROOFING FOR CONCRETE STRUCTURES

WATERPROOFING FOR CONCRETE STRUCTURES MANUAL OF CONTRACT DOCUMENTS FOR ROAD WORKS VOLUME 1 SPECIFICATION FOR ROAD WORKS SERIES 2000 WATERPROOFING FOR CONCRETE STRUCTURES Contents Clause Title Page 2001 General 2 2002 Protection of Bridge Deck

More information

INTERIM ADVICE NOTE 96 /07 Revision 1 GUIDANCE ON IMPLEMENTING RESULTS OF RESEARCH ON BRIDGE DECK WATERPROOFING

INTERIM ADVICE NOTE 96 /07 Revision 1 GUIDANCE ON IMPLEMENTING RESULTS OF RESEARCH ON BRIDGE DECK WATERPROOFING Interim Advice Note 96/07 INTERIM ADVICE NOTE 96 /07 Revision 1 GUIDANCE ON IMPLEMENTING RESULTS OF RESEARCH ON BRIDGE DECK WATERPROOFING Summary This interim advice note provides guidance on improving

More information

WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12

WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12 WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12 87 88 GOOD INDUSTRY PRACTICES 12 WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12.1 BACKGROUND Most roofs in Singapore are constructed using reinforced

More information

LP OSB Sheathing & Structural 1 Sheathing

LP OSB Sheathing & Structural 1 Sheathing Rated OSB Sheathing Roof Panels Span Ratings Max. Live Load Thickness Span Rating for Roofs (lbs)** 3/8" 24/0 30 7/16" 24/16 40 15/32" 32/16 70 1/2" 32/16 70 19/32" 40/20 130 23/32" 48/24 175 1-1/8" 48

More information

SECTION 311 PLACEMENT AND CONSTRUCTION OF CEMENT TREATED SUBGRADESOIL CEMENT BASE COURSE

SECTION 311 PLACEMENT AND CONSTRUCTION OF CEMENT TREATED SUBGRADESOIL CEMENT BASE COURSE PLACEMENT AND CONSTRUCTION OF CEMENT TREATED SUBGRADESOIL CEMENT BASE COURSE 311.1 DESCRIPTION: This item shall consist of a cement treated subgrade base course composed of a mixture of local soil, portland

More information

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS While its use is not required, this checklist has been prepared to provide the field inspector a summary

More information

C. Section 014510 TESTING LABORATORY SERVICE.

C. Section 014510 TESTING LABORATORY SERVICE. SECTION 014500 QUALITY CONTROL PART 1 GENERAL 1.01 RELATED REQUIREMENTS A. Drawings and General Provisions of Contract, including General and Special Conditions and other Division 1 Specification Sections,

More information

The entire document shall be read and understood before proceeding with a test. ISTA 3B 2013 - Page 1 of 35

The entire document shall be read and understood before proceeding with a test. ISTA 3B 2013 - Page 1 of 35 Packaged-Products for Less-Than-Truckload (LTL) Shipment ISTA 3 Series General Simulation Performance Test PROCEDURE VERSION DATE Last TECHNICAL Change: NOVEMBER 2012 Last EDITORIAL Change: JANUARY 2013

More information

METHOD OF TEST FOR UNIT WEIGHT OF FRESH CONCRETE

METHOD OF TEST FOR UNIT WEIGHT OF FRESH CONCRETE STATE OF CALIFORNIA BUSINESS, TRANSPORTATION AND HOUSING AGENCY DEPARTMENT OF TRANSPORTATION DIVISION OF ENGINEERING SERVICES Transportation Laboratory 5900 Folsom Blvd. Sacramento, California 95819-4612

More information

Your guide to home maintenance. Flat Roofs

Your guide to home maintenance. Flat Roofs Your guide to home maintenance Flat Roofs Your guide to home maintenance is a series of information leaflets that gives you all the information you need to keep your home in tiptop condition. Flat Roofs

More information

SPECIAL NOTE FOR ASPHALT WATERPROOFING MIX FOR BRIDGE-DECK OVERLAYS AND ADJACENT APPROACHES

SPECIAL NOTE FOR ASPHALT WATERPROOFING MIX FOR BRIDGE-DECK OVERLAYS AND ADJACENT APPROACHES SPECIAL NOTE FOR ASPHALT WATERPROOFING MIX FOR BRIDGE-DECK OVERLAYS AND ADJACENT APPROACHES 1. DESCRIPTION. Asphalt Waterproofing Mix (AWM) is a highly elastomeric, polymermodified, impermeable asphalt

More information

ROOFING APPLICATION STANDARD (RAS) No. 150 PRESCRIPTIVE BUR REQUIREMENTS

ROOFING APPLICATION STANDARD (RAS) No. 150 PRESCRIPTIVE BUR REQUIREMENTS ROOFING APPLICATION STANDARD (RAS) No. 150 PRESCRIPTIVE BUR REQUIREMENTS 1. 2. 3. 3.0 Scope 1.1 This application standard shall be used where the authority having jurisdiction has adopted its use, and

More information

Tex-421-A, Splitting Tensile Strength of Cylindrical Concrete Specimens

Tex-421-A, Splitting Tensile Strength of Cylindrical Concrete Specimens Contents: Section 1 Overview...2 Section 2 Apparatus...3 Section 3 Test Specimens...4 Section 4 Procedure...5 Texas Department of Transportation 1 08/99 06/08 Section 1 Overview Effective dates: August

More information

UX-30 PERFORMANCE TESTING SUMMARY REPORT Revision 0

UX-30 PERFORMANCE TESTING SUMMARY REPORT Revision 0 UX-30 PERFORMANCE TESTING SUMMARY REPORT Revision 0 Prepared By: Patrick L. Paquin, EnergySolutions Date Reviewed By: Mirza I. Baig, EnergySolutions Date Approved By: Thomas F. Dougherty, Columbiana Hi

More information

TEST REPORT. Rendered to: HOMELAND VINYL PRODUCTS, INC. For:

TEST REPORT. Rendered to: HOMELAND VINYL PRODUCTS, INC. For: TEST REPORT Rendered to: HOMELAND VINYL PRODUCTS, INC. For: PRODUCT: Gorilla Column PVC Porch Post System with PVC Base / Cap Plates, PVC Bushings and 2-3/8 in Diameter and 3-1/2 in Diameter Galvanized

More information

CHAPTER 6 ASPHALT ROLL ROOFING

CHAPTER 6 ASPHALT ROLL ROOFING CHAPTER 6 ASPHALT ROLL ROOFING Section I. DESCRIPTION AND GENERAL DISCUSSION 6.1.1 General 6.1.3 Mineral-Surfaced Asphalt roll roofing is roofing in sheet form Mineral-surfaced roll roofing is composed

More information

COMMERCIAL BUILDING APPLICATIONS

COMMERCIAL BUILDING APPLICATIONS EXPANDED POLYSTYRENE FOR COMMERCIAL BUILDING APPLICATIONS www.falconfoam.com Commercial Building Ap Expanded Polystyrene Insulation Falcon Foam leads the commercial building industry with products that

More information

Pavement Patching Repair for AC and PCC Pavement Surfaces. Vern Thompson www.crafco.com

Pavement Patching Repair for AC and PCC Pavement Surfaces. Vern Thompson www.crafco.com Pavement Patching Repair for AC and PCC Pavement Surfaces Vern Thompson www.crafco.com Overview and Objective New Methods For Pavement Patching-Overview What are they How they are applied New Methods Secti

More information

R=Required by Lab S=May be subcontracted IEC SYSTEM FOR CONFORMITY TESTING AND CERTIFICATION OF ELECTRICAL EQUIPMENT COMMITTEE OF TESTING LABORATORIES

R=Required by Lab S=May be subcontracted IEC SYSTEM FOR CONFORMITY TESTING AND CERTIFICATION OF ELECTRICAL EQUIPMENT COMMITTEE OF TESTING LABORATORIES IEC SYSTEM FO CONFOMITY TESTING AND CETIFICATION OF ELECTICAL EQUIPMENT COMMITTEE OF TESTING LABOATOIES TESTING AND MEASUING EQUIPMENT/ALLOWED SUBCONTACTING Power cables with extruded insulation and their

More information

SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION 623.10 CONCRETE BONDING COMPOUND.

SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION 623.10 CONCRETE BONDING COMPOUND. SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION 623.10 CONCRETE BONDING COMPOUND. 623.10.1 Description. This work shall consist of preparing the surface,

More information

Reflectex TM Reflective Concrete Interlayer Geotextile INSTALLATION GUIDELINES

Reflectex TM Reflective Concrete Interlayer Geotextile INSTALLATION GUIDELINES Reflectex TM Reflective Concrete Interlayer Geotextile INSTALLATION GUIDELINES Page 1 Table of Contents WHAT IS REFLECTEX TM?... 2 STORAGE AND HANDLING... 3 SITE PREPARATION... 3 PREPARATION OF EXISTING

More information

SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 16 BRIDGE DECK WATERPROOFING. 16.1 General...16-1. 16.2 Materials...16-1. 16.3 Equipment...

SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 16 BRIDGE DECK WATERPROOFING. 16.1 General...16-1. 16.2 Materials...16-1. 16.3 Equipment... SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 16 BRIDGE DECK WATERPROOFING TABLE OF CONTENTS 16.1 General...16-1 16.2 Materials...16-1 16.3 Equipment...16-1 16.4 Installation...16-2 16.4.1 Traffic Restrictions...16-2

More information

Re-Cover Board-3. Insulation for Above the Deck ROOF WALL SPECIALTY

Re-Cover Board-3. Insulation for Above the Deck ROOF WALL SPECIALTY Insulation for Above the Deck WALL SPECIALTY PRODUCT DESCRIPTION Rmax Re-Cover Board-3 is an energy-efficient thermal insulation board composed of a closed-cell polyisocyanurate (polyiso) foam core bonded

More information

Naue GmbH&Co.KG. Quality Control and. Quality Assurance. Manual. For Geomembranes

Naue GmbH&Co.KG. Quality Control and. Quality Assurance. Manual. For Geomembranes Naue GmbH&Co.KG Quality Control and Quality Assurance Manual For Geomembranes July 2004 V.O TABLE OF CONTENTS 1. Introduction 2. Quality Assurance and Control 2.1 General 2.2 Quality management acc. to

More information

Chapter 3 Pre-Installation, Foundations and Piers

Chapter 3 Pre-Installation, Foundations and Piers Chapter 3 Pre-Installation, Foundations and Piers 3-1 Pre-Installation Establishes the minimum requirements for the siting, design, materials, access, and installation of manufactured dwellings, accessory

More information

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 11/5/13)

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 11/5/13) Page 1 of 7 STONE STRONG SYSTEMS SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised ) PART 1: GENERAL 1.01 Description A. Work includes furnishing and installing precast modular blocks

More information

CITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN 55110 Fax: 651-429-8503. Re-Roofing: Asphalt Shingles

CITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN 55110 Fax: 651-429-8503. Re-Roofing: Asphalt Shingles CITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN 55110 Fax: 651-429-8503 Re-Roofing: Asphalt Shingles This is a summary of the standard requirements based on the

More information

PREMIUM LAMINATED ASPHALT SHINGLES Dallas, TX Tuscaloosa, AL Phillipsburg, KS

PREMIUM LAMINATED ASPHALT SHINGLES Dallas, TX Tuscaloosa, AL Phillipsburg, KS Application Instructions for THESE ARE THE MANUFACTURER S APPLICATION INSTRUCTIONS FOR THE ROOFING CONDITIONS DESCRIBED. TAMKO BUILDING PRODUCTS, INC. ASSUMES NO RESPONSIBILITY FOR LEAKS OR OTHER ROOFING

More information

PRE INSTALLATION MANUAL

PRE INSTALLATION MANUAL REINFORCED CONCRETE PIPE PRE INSTALLATION INSPECTION & REPAIR MANUAL Kentucky Transportation Cabinet Kentucky Department of Highways Division of Materials 1227 Wilkinson Boulevard Frankfort, KY 40601 (502)

More information

HIGH PERFORMANCE PRE-APPLIED SYSTEM FOR BLIND SIDE & BELOW GRADE WATERPROOFING APPLICATIONS

HIGH PERFORMANCE PRE-APPLIED SYSTEM FOR BLIND SIDE & BELOW GRADE WATERPROOFING APPLICATIONS BSW HIGH PERFORMANCE PRE-APPLIED SYSTEM FOR BLIND SIDE & BELOW GRADE WATERPROOFING APPLICATIONS BSW is a fully reinforced Pre-Applied system membrane designed for horizontal and vertical external blind-side

More information

DETERMINING ASPHALT CONTENT FROM ASPHALT PAVING MIXTURES BY THE IGNITION METHOD

DETERMINING ASPHALT CONTENT FROM ASPHALT PAVING MIXTURES BY THE IGNITION METHOD Test Procedure for DETERMINING ASPHALT CONTENT FROM ASPHALT PAVING MIXTURES BY THE IGNITION METHOD TxDOT Designation: Tex-236-F Effective Date: March 2016 1. SCOPE 1.1 Use this test method to determine

More information

Chapter 7: Pavement Rehabilitation 7-1 Asphalt Pavement Overlays 7-1 Surface Preparation Methods 7-2 Concrete Pavement Preparation 7-3 Recycling

Chapter 7: Pavement Rehabilitation 7-1 Asphalt Pavement Overlays 7-1 Surface Preparation Methods 7-2 Concrete Pavement Preparation 7-3 Recycling 7-1 Asphalt Pavement Overlays 7-1 Surface Preparation Methods 7-2 Concrete Pavement Preparation 7-3 Recycling Asphalt Pavements 7-7 Chapter 7 Pavement Rehabilitation Pavement rehabilitation can be accomplished

More information

RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000

RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000 RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000 SECTION R905 REQUIREMENTS FOR ROOF COVERINGS R905.1 Roof covering application. Roof coverings

More information

APPENDIX B. I. Background Information

APPENDIX B. I. Background Information APPENDIX B GUIDELINES FOR IDENTIFYING AND REPAIRING LOCALIZED AREAS OF DISTRESS IN AC PAVEMENTS PRIOR TO CAPITAL PREVENTIVE MAINTENANCE OR REHABILITATION REPAIRS I. Background Information A. AC Pavement

More information

1.02 DESCRIPTION A. This Section specifies furnishing and installing Cast in Place Detectable/Tactile Warning Surface tiles where indicated.

1.02 DESCRIPTION A. This Section specifies furnishing and installing Cast in Place Detectable/Tactile Warning Surface tiles where indicated. CAST IN PLACE DETECTABLE/TACTILE WARNING SURFACE TILE PART 1 GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Special Conditions and Division 1 Specifications

More information

APPENDIX C MOISTURE GUIDELINES & MOISTURE TESTING

APPENDIX C MOISTURE GUIDELINES & MOISTURE TESTING APPENDIX C MOISTURE GUIDELINES & MOISTURE TESTING Appendix C Moisture Guidelines Determining moisture content is an essential part of quality control within the flooring installation process. Flooring

More information

International Greenhouse Company

International Greenhouse Company Greenhouse Foundation Design As with any building, a good solid foundation is crucial for the long term durability and functionality of your greenhouse. A weak foundation will cause your greenhouse to

More information

NEW ELECTRICAL SUBSTATION Building 300 SECTION 07 53 23 ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING WORK

NEW ELECTRICAL SUBSTATION Building 300 SECTION 07 53 23 ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING WORK ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING WORK PART 1 GENERAL 1.1 REFERENCES The publications listed below form a part of this specification to the extent referenced. The publications are referred to within

More information

Rudder Repair and refinish

Rudder Repair and refinish Rudder Repair and refinish Montgomery 23 Dauntless The before photograph A receipt found inside the boat showed a previous owner had enlisted a boat yard to perform maintenance on the rudder by shortening

More information

Solid shape molding is not desired in injection molding due to following reasons.

Solid shape molding is not desired in injection molding due to following reasons. PLASTICS PART DESIGN and MOULDABILITY Injection molding is popular manufacturing method because of its high-speed production capability. Performance of plastics part is limited by its properties which

More information

Roofing Systems. There are many different systems, each with it's own special requirements and benefits. Browse through all the options below.

Roofing Systems. There are many different systems, each with it's own special requirements and benefits. Browse through all the options below. Roofing Systems There are many different systems, each with it's own special requirements and benefits. Browse through all the options below. BUR (Built-Up Roofing) Built-Up-Roofing, BUR is a roof that

More information

SOIL-LIME TESTING. Test Procedure for. TxDOT Designation: Tex-121-E 1. SCOPE 2. APPARATUS 3. MATERIALS TXDOT DESIGNATION: TEX-121-E

SOIL-LIME TESTING. Test Procedure for. TxDOT Designation: Tex-121-E 1. SCOPE 2. APPARATUS 3. MATERIALS TXDOT DESIGNATION: TEX-121-E Test Procedure for SOIL-LIME TESTING TxDOT Designation: Tex-121-E Effective Date: August 2002 1. SCOPE 1.1 This method consists of three parts. 1.1.1 Part I determines the unconfined compressive strength

More information

NFRC 102-2010 THERMAL PERFORMANCE TEST REPORT. Rendered to: CR LAURENCE CO., INC. SERIES/MODEL: 7500 Concealed Vent TYPE: Projecting (Awning)

NFRC 102-2010 THERMAL PERFORMANCE TEST REPORT. Rendered to: CR LAURENCE CO., INC. SERIES/MODEL: 7500 Concealed Vent TYPE: Projecting (Awning) NFRC 102-2010 THERMAL PERFORMANCE TEST REPORT Rendered to: CR LAURENCE CO., INC. SERIES/MODEL: 7500 Concealed Vent TYPE: Projecting (Awning) Summary of Results Standardized Thermal Transmittance (U-Factor)

More information

CHESTERFLEX ROOF WATERPROOFING MEMBRANES

CHESTERFLEX ROOF WATERPROOFING MEMBRANES CI/SfB (47) Ln2 Chesterfelt Ltd CHESTERFLEX ROOF WATERPROOFING MEMBRANES Certificate No 94/3062 DETAIL SHEET 2 Product THIS DETAIL SHEET RELATES TO CHESTERFLEX ROOF WATERPROOFING MEMBRANES, POLYESTER REINFORCED

More information

WET/DAMP BASEMENTS ANSWER: BASEMENT WALLS AND FLOORS CAN BECOME WET BY A LEAK, CAPILLARY SUCTION OR CONDENSATION.

WET/DAMP BASEMENTS ANSWER: BASEMENT WALLS AND FLOORS CAN BECOME WET BY A LEAK, CAPILLARY SUCTION OR CONDENSATION. WET/DAMP BASEMENTS PROBLEM. IS THIS BASEMENT LEAKING OR COULD WE HAVE ANOTHER PROBLEM? Water line arching up on wall in corners of basement. Water collecting on concrete floor starting in corners. ANSWER:

More information

Example Specification for Concrete using Current Building Code Requirements

Example Specification for Concrete using Current Building Code Requirements Example Specification for Concrete using Current Building Code Requirements DISCLAIMER: This specification is an example that accompanies a seminar titled The P2P Initiative: Performance-based Specs for

More information

Construction Specifications for Keyhole Pavement Coring and Reinstatement

Construction Specifications for Keyhole Pavement Coring and Reinstatement F I N A L Construction Specifications for Keyhole Pavement Coring and Reinstatement Gas Technology Institute 1700 S. Mount Prospect Rd. Des Plaines, Illinois 60018 www.gastechnology.org Version 13 October

More information

CORROSION ENGINEERING RESIN-BASED POLYMER CONCRETES AND GROUTS

CORROSION ENGINEERING RESIN-BASED POLYMER CONCRETES AND GROUTS AN ERGONARMOR COMPANY TECHNICAL INFORMATION SPECIFICATION FOR INSTALLATION 07/11 SUPERSEDES 04/00 PAGE 1 OF 6 CORROSION ENGINEERING RESIN-BASED POLYMER CONCRETES AND GROUTS 1. SCOPE 1.1 This specification

More information

The AASHO Road Test site (which eventually became part of I-80) at Ottawa, Illinois, was typical of northern climates (see Table 1).

The AASHO Road Test site (which eventually became part of I-80) at Ottawa, Illinois, was typical of northern climates (see Table 1). Página 1 de 12 AASHO Road Test The AASHO Road Test, a $27 million (1960 dollars) investment and the largest road experiment of its time, was conceived and sponsored by the American Association of State

More information

LABORATORY DETERMINATION OF CALIFORNIA BEARING RATIO

LABORATORY DETERMINATION OF CALIFORNIA BEARING RATIO LABORATORY DETERMINATION OF CALIFORNIA BEARING RATIO STANDARD IS: 2720 (Part 16) 1979. DEFINITION California bearing ratio is the ratio of force per unit area required to penetrate in to a soil mass with

More information

MINIMUM QUALITY CONTROL PLAN FOR FIELD PLACEMENT OF LATEX MODIFIED MORTAR OR CONCRETE WEARING SURFACE

MINIMUM QUALITY CONTROL PLAN FOR FIELD PLACEMENT OF LATEX MODIFIED MORTAR OR CONCRETE WEARING SURFACE CS-1042 (8-13) www.dot.state.pa.us MINIMUM QUALITY CONTROL PLAN FOR FIELD PLACEMENT OF LATEX MODIFIED MORTAR OR CONCRETE WEARING SURFACE State Route (SR) Section County ECMS# Prime/Sub Contractor Latex

More information

INSTALLATION RECOMMENDATIONS. Outdoor Rubber Tiles

INSTALLATION RECOMMENDATIONS. Outdoor Rubber Tiles INSTALLATION RECOMMENDATIONS Outdoor Rubber Tiles Prior to Installation: The Outdoor Rubber Tiles and accessory transition pieces intended for this installation have been shipped to you via a freight carrier

More information

Air-Conditioning, Heating, and Refrigeration Institute. Sheet Metal and Air-Conditioning Contractors National Association

Air-Conditioning, Heating, and Refrigeration Institute. Sheet Metal and Air-Conditioning Contractors National Association Air-Conditioning, Heating, and Refrigeration Institute Sheet Metal and Air-Conditioning Contractors National Association GUIDELINE B-1997 ACKNOWLEDGEMENT These guidelines for Roof Mounted Outdoor Air-

More information

CERTIFICATE NAME OF PRODUCT MANUFACTURER PRODUCT DESCRIPTION CERTIFICATION PROCEDURE. No VTT C-6044-10 Date of issue 11.10.2010, Updated July 1, 2011

CERTIFICATE NAME OF PRODUCT MANUFACTURER PRODUCT DESCRIPTION CERTIFICATION PROCEDURE. No VTT C-6044-10 Date of issue 11.10.2010, Updated July 1, 2011 CERTIFICATE NAME OF PRODUCT No VTT C-6044-10 Date of issue 11.10.2010, Updated July 1, 2011 H-CONTROL REFLEX+ reflective insulating vapour control layer for roof and wall applications MANUFACTURER ACTIS

More information

UL 580 TEST REPORT. Rendered to: ARMSTRONG WORLD INDUSTRIES. SERIES/MODEL: MW Vector PRODUCT TYPE: Ceiling System, 3' OC

UL 580 TEST REPORT. Rendered to: ARMSTRONG WORLD INDUSTRIES. SERIES/MODEL: MW Vector PRODUCT TYPE: Ceiling System, 3' OC UL 580 TEST REPORT Rendered to: ARMSTRONG WORLD INDUSTRIES SERIES/MODEL: MW Vector PRODUCT TYPE: Ceiling System, 3' OC Report No.: Test Dates: 12/14/09 Through: 12/22/09 Report Date: 03/12/10 Expiration

More information

CHAPTER I. INTRODUCTION

CHAPTER I. INTRODUCTION CHAPTER I. INTRODUCTION 1.1 Background There is a national need to develop asphalt wearing surfaces for modern timber bridges that are not only skid resistant, but also limit the transport of moisture

More information

NOTE: FOR PROJECTS REQUIRING CONTRACTOR MIX DESIGN, THE DESIGN PROCEDURES ARE SPECIFIED IN THE SPECIAL PROVISIONS OF THE CONTRACT.

NOTE: FOR PROJECTS REQUIRING CONTRACTOR MIX DESIGN, THE DESIGN PROCEDURES ARE SPECIFIED IN THE SPECIAL PROVISIONS OF THE CONTRACT. September 1, 2003 CONCRETE MANUAL 5-694.300 MIX DESIGN 5-694.300 NOTE: FOR PROJECTS REQUIRING CONTRACTOR MIX DESIGN, THE DESIGN PROCEDURES ARE SPECIFIED IN THE SPECIAL PROVISIONS OF THE CONTRACT. 5-694.301

More information

Rehabilitation Strategies for Bonded Concrete Overlays of Asphalt Pavements

Rehabilitation Strategies for Bonded Concrete Overlays of Asphalt Pavements University of Pittsburgh Rehabilitation Strategies for Bonded Concrete Overlays of Asphalt Pavements Authors: J. M Vandenbossche S. Sachs August 2013 1. Introduction Bonded concrete overlays of asphalt

More information

Specification Guidelines: Allan Block Modular Retaining Wall Systems

Specification Guidelines: Allan Block Modular Retaining Wall Systems Specification Guidelines: Allan Block Modular Retaining Wall Systems The following specifications provide Allan Block Corporation's typical requirements and recommendations. At the engineer of record's

More information

SECTION 02630 STORM DRAINAGE SYSTEM

SECTION 02630 STORM DRAINAGE SYSTEM SECTION 02630 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for storm drainage systems including modifications and connections to existing storm drainage systems. 1.02 REFERENCE

More information

Standard Test Procedures Manual

Standard Test Procedures Manual STP 206-4 Standard Test Procedures Manual Section: 1. SCOPE 1.1. Description of Test This method describes the procedure for determining the liquid limit, plastic limit and the plasticity index of coarse-grained

More information

HERITAGE WOODGATE LAMINATED ASPHALT SHINGLES Dallas, TX

HERITAGE WOODGATE LAMINATED ASPHALT SHINGLES Dallas, TX Application Instructions for THESE ARE THE MANUFACTURER S APPLICATION INSTRUCTIONS FOR THE ROOFING CONDITIONS DESCRIBED. TAMKO BUILDING PRODUCTS, INC. ASSUMES NO RESPONSIBILITY FOR LEAKS OR OTHER ROOFING

More information

INSTALLATION GUIDE. americanwick.com 800.242.WICK (9425)

INSTALLATION GUIDE. americanwick.com 800.242.WICK (9425) INSTALLATION GUIDE americanwick.com 800.242.WICK (9425) American Wick Drain SITEDRAIN prefabricated drainage products may be installed in a variety of civil construction applications including: retaining

More information

CONSTANT HEAD AND FALLING HEAD PERMEABILITY TEST

CONSTANT HEAD AND FALLING HEAD PERMEABILITY TEST CONSTANT HEAD AND FALLING HEAD PERMEABILITY TEST 1 Permeability is a measure of the ease in which water can flow through a soil volume. It is one of the most important geotechnical parameters. However,

More information

TEST REPORT. Rendered to: LMT-Mercer Group, Inc. For: PRODUCT: 4" x 4" and 5" x 5" PVC Porch Posts with Aluminum Reinforcing

TEST REPORT. Rendered to: LMT-Mercer Group, Inc. For: PRODUCT: 4 x 4 and 5 x 5 PVC Porch Posts with Aluminum Reinforcing TEST REPORT Rendered to: LMT-Mercer Group, Inc. For: PRODUCT: 4" x 4" and 5" x 5" PVC Porch Posts with Aluminum Reinforcing Report No.: Report Date: 01/28/14 Test Record Retention Date: 12/20/17 130 Derry

More information

FORM DESIGN. easy to work with, and generally available.

FORM DESIGN. easy to work with, and generally available. Forms play a major role in concrete construction. They give the plastic concrete its shape and hold it until it hardens. Forms protect the concrete, assist in curing it, and support any reinforcing rods

More information

A. This Section includes rubberized asphalt sheet membrane waterproofing systems.

A. This Section includes rubberized asphalt sheet membrane waterproofing systems. SECTION 07110 SHEET MEMBRANE WATERPROOFING PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

Testing and appraisal of Lucobit polymer effect as an additive on asphalt mixture performance

Testing and appraisal of Lucobit polymer effect as an additive on asphalt mixture performance Abstract Testing and appraisal of polymer effect as an additive on asphalt mixture performance Hamid Sabbagh mollahosseini*,golazin Yadollahi**, Ershad Amoosoltani*** *, ***Executive of Engineering and

More information

Section 300 Base Courses

Section 300 Base Courses Table of Contents 1. Importance of Base Courses... 300-1 2. Types of Bases... 300-3 A. Cement Treated Permeable Base Course... 300-3 B. Bituminous Concrete Base Courses... 300-6 C. Superpave Asphalt HMA

More information

1997 Uniform Administrative Code Amendment for Earthen Material and Straw Bale Structures Tucson/Pima County, Arizona

1997 Uniform Administrative Code Amendment for Earthen Material and Straw Bale Structures Tucson/Pima County, Arizona for Earthen Material and Straw Bale Structures SECTION 70 - GENERAL "APPENDIX CHAPTER 7 - EARTHEN MATERIAL STRUCTURES 70. Purpose. The purpose of this chapter is to establish minimum standards of safety

More information

Essential Performance Attributes of Preapplied waterproofing

Essential Performance Attributes of Preapplied waterproofing Essential Performance Attributes of Preapplied waterproofing Craig Boucher, LEED AP Grace Construction Products 62 Whittemore Ave., Cambridge, MA 02140 Phone: 617-498-4429 Fax: 617-498-4419 E-mail: craig.boucher@grace.com

More information

METHOD A7 THE DETERMINATION OF THE MAXIMUM DRY DENSITY AND OPTIMUM MOISTURE CONTENT OF GRAVEL, SOIL AND SAND

METHOD A7 THE DETERMINATION OF THE MAXIMUM DRY DENSITY AND OPTIMUM MOISTURE CONTENT OF GRAVEL, SOIL AND SAND SCOPE METHOD A7 THE DETERMINATION OF THE MAXIMUM DRY DENSITY AND OPTIMUM MOISTURE CONTENT OF GRAVEL, SOIL AND SAND Definition The maximum dry density and optimum moisture content, as defined below, is

More information

THE DETERMINATION OF THE MAXIMUM DRY DENSITY AND OPTIMUM MOISTURE CONTENT OF MATERIALS USING THE VIBRATORY HAMMER COMPACTION

THE DETERMINATION OF THE MAXIMUM DRY DENSITY AND OPTIMUM MOISTURE CONTENT OF MATERIALS USING THE VIBRATORY HAMMER COMPACTION THE DETERMINATION OF THE MAXIMUM DRY DENSITY AND OPTIMUM MOISTURE CONTENT OF MATERIALS USING THE VIBRATORY HAMMER COMPACTION 1. SCOPE The maximum dry density and optimum moisture content, as defined below,

More information

AISI CHEMICAL COMPOSITION LIMITS: Nonresulphurized Carbon Steels

AISI CHEMICAL COMPOSITION LIMITS: Nonresulphurized Carbon Steels AISI CHEMICAL COMPOSITION LIMITS: Nonresulphurized Carbon Steels AISI No. 1008 1010 1012 1015 1016 1017 1018 1019 1020 1021 1022 1023 1024 10 1026 1027 1029 10 1035 1036 1037 1038 1039 10 1041 1042 1043

More information

COMMENTARY TO AG:PT/T251 - BALL PENETRATION TEST

COMMENTARY TO AG:PT/T251 - BALL PENETRATION TEST COMMENTARY TO AG:PT/T251 - BALL PENETRATION TEST PREFACE This test method is an update of the method originally prepared by the Bituminous Surfacings Research Reference Group on behalf of Austroads. FOREWORD

More information

738-B-297 POLYMERIC CONCRETE BRIDGE DECK OVERLAY. (Adopted 02-20-14)

738-B-297 POLYMERIC CONCRETE BRIDGE DECK OVERLAY. (Adopted 02-20-14) POLYMERIC CONCRETE BRIDGE DECK OVERLAY (Adopted 02-20-14) Description The polymeric concrete bridge deck overlay shall consist of an epoxy polymer that acts together with special aggregate to form an overlay

More information

PERMEABILITY TEST. To determine the coefficient of permeability of a soil using constant head method.

PERMEABILITY TEST. To determine the coefficient of permeability of a soil using constant head method. PERMEABILITY TEST A. CONSTANT HEAD OBJECTIVE To determine the coefficient of permeability of a soil using constant head method. need and Scope The knowledge of this property is much useful in solving problems

More information

Formwork for Concrete

Formwork for Concrete UNIVERSITY OF WASHINGTON DEPARTMENT OF CONSTRUCTION MANAGEMENT CM 420 TEMPORARY STRUCTURES Winter Quarter 2007 Professor Kamran M. Nemati Formwork for Concrete Horizontal Formwork Design and Formwork Design

More information

WESTERN COOL ROOF SYSTEMS Sustainable - Energy Efficient FLUID APPLIED REINFORCED ROOF SYSTEM

WESTERN COOL ROOF SYSTEMS Sustainable - Energy Efficient FLUID APPLIED REINFORCED ROOF SYSTEM WESTERN COOL ROOF SYSTEMS Sustainable - Energy Efficient FLUID APPLIED REINFORCED ROOF SYSTEM SPECIFICATION NO. SMAA-2P-8xE UPGRADE SMOOTH SURFACE / CAP SHEET / SINGLE PLY 2 PLY POLYESTER REINFORCED ACRYLIC

More information

Specification for Rotary Drill Stem Elements

Specification for Rotary Drill Stem Elements Addendum 1 March 2007 Effective Date: September 1, 2007 Specification for Rotary Drill Stem Elements ANSI/API SPECIFICATION 7-1 FIRST EDITION, MARCH 2006 EFFECTIVE DATE: SEPTEMBER 2006 ISO 10424-1:2004

More information

September 3, 2009. Ric Boyd, Public Works Director Ketchikan Gateway Borough 344 Front St. Ketchikan, AK 99901

September 3, 2009. Ric Boyd, Public Works Director Ketchikan Gateway Borough 344 Front St. Ketchikan, AK 99901 September 3, 2009 Ric Boyd, Public Works Director Ketchikan Gateway Borough 344 Front St. Ketchikan, AK 99901 RE: Ketchikan Gateway Borough Gateway Recreation Center Roof Observations and Intrusive Inspections

More information

Waterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries

Waterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries Waterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries Introduction Wastewater of petrochemical industries and refineries contains high amounts of emulsified aliphatic or

More information

KWANG SING ENGINEERING PTE LTD

KWANG SING ENGINEERING PTE LTD KWANG SING ENGINEERING PTE LTD 1. INTRODUCTION This report represents the soil investigation works at Aljunied Road / Geylang East Central. The objective of the soil investigation is to obtain soil parameters

More information

Installation PowerPoint for Grasscrete Formers

Installation PowerPoint for Grasscrete Formers Installation PowerPoint for Grasscrete Formers 1 This document describes the two single-use tools utilized to create the Grasscrete product. The original Former is a vacuum formed light gauge plastic mold

More information