1 CITY OF HOUSTON - STORM DRAINAGE SYSTEM Planning Fiscal Year Planned Appropriations Project Allocation Acquisition-Land Design 12,354 19,796 6,666 7,062 7,474 53,352 Construction 69,540 82,771 87,223 85, , ,330 Equipment Acquisition Salary Recovery Other 1,019 1,557 3,174 3,234 1,099 10,083 Source of Funds Drainage Improvement CP Series H/K-DDRSF Total Allocation 83, ,124 97,514 95, , , Street & Trfc Control & Strm Drain DDSRF 81,198 96,229 74,061 81,746 96, , PWE-W&S Syst Consolidated Constr Fd 2,077 7,895 23,453 13,823 43,089 90,337 Total Funds 83, ,124 97,514 95, , ,578 Fund 8500 Contribution to Rebuild Houston Adjustment (2,077) (7,895) (23,453) (13,823) (43,089) (90,337) Total Funds 81,198 96,229 74,061 81,746 96, ,241 1 Form D
2 Fiscal Year Planned Appropriations M-0000NA Contingencies Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year 0000NA Street & Trfc Control & Strm Drain DDSRF -10,218-1,911 6,548 3,867-4,829-6,543 Project Total -10,218-1,911 6,548 3,867-4,829-6,543 M Nottingham & Yorkshire Area Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Street & Trfc Control & Strm Drain DDSRF 12,818 12,818 Project Total 12,818 12,818 M Buffalo Bayou Detention Basin Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Street & Trfc Control & Strm Drain DDSRF 3,555 3,555 Project Total 3,555 3,555 M Sherwood Forest Area Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Street & Trfc Control & Strm Drain DDSRF 9,065 9,065 Project Total 9,065 9,065 M Rampart Street Drainage and Paving Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Street & Trfc Control & Strm Drain DDSRF 17,578 17,578 Project Total 17,578 17,578 M Southpark and Southcrest Drainage Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Street & Trfc Control & Strm Drain DDSRF 5,696 5,696 Project Total 5,696 5,696 M Airline Dr. Drainage and Paving Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Street & Trfc Control & Strm Drain DDSRF 15,453 15,453 Project Total 15,453 15,453 M Garden Oaks and Shepherd Forest Area Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Street & Trfc Control & Strm Drain DDSRF 21,011 21, PWE-W&S Syst Consolidated Constr Fd 1,011 1,011 Project Total 22,022 22,022 2
3 M Pleasantville Area Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Street & Trfc Control & Strm Drain DDSRF 10,764 10, PWE-W&S Syst Consolidated Constr Fd 1,066 1,066 Project Total 11,830 11,830 M Wirt Road Drainage and Paving Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Street & Trfc Control & Strm Drain DDSRF 5,220 5,220 Project Total 5,220 5,220 M Easthaven Blvd(Bryant to Ledge) Drainage Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Street & Trfc Control & Strm Drain DDSRF 4,663 4,663 Project Total 4,663 4,663 M Minnetex/Almeda Genoa Area Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Street & Trfc Control & Strm Drain DDSRF 6,282 6, PWE-W&S Syst Consolidated Constr Fd 2,039 2,039 Project Total 8,321 8,321 M Binglewood, Inwood Forest, & Oak Forest Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Street & Trfc Control & Strm Drain DDSRF 10,129 10,129 Project Total 10,129 10,129 M Cullen Drainage and Paving Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Street & Trfc Control & Strm Drain DDSRF 11,356 11, PWE-W&S Syst Consolidated Constr Fd 2,710 2,710 Project Total 14,066 14,066 M Scott Street Drainage and Paving Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Street & Trfc Control & Strm Drain DDSRF 9,309 9, PWE-W&S Syst Consolidated Constr Fd 1,478 1,478 Project Total 10,787 10,787 3
4 M Wycliffe Drive (Chatterton to Melronome) Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Street & Trfc Control & Strm Drain DDSRF 207 2,644 2, PWE-W&S Syst Consolidated Constr Fd Project Total 207 3,599 3,806 M Woodshire Area Drainage and Paving Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Street & Trfc Control & Strm Drain DDSRF ,728 13, PWE-W&S Syst Consolidated Constr Fd 9,610 9,610 Project Total ,338 23,117 M Potomac & Nantucket Area Drng and Paving Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Street & Trfc Control & Strm Drain DDSRF 562 8,731 9, PWE-W&S Syst Consolidated Constr Fd 2,429 2,429 Project Total ,160 11,722 M Roosevelt, Edel Plaza, Little York Acres Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Street & Trfc Control & Strm Drain DDSRF 248 2,194 2, PWE-W&S Syst Consolidated Constr Fd Project Total 248 3,017 3,265 M Little York, Courlandt Mdws, York Mdws Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Street & Trfc Control & Strm Drain DDSRF 338 4,487 4, PWE-W&S Syst Consolidated Constr Fd 2,223 2,223 Project Total 338 6,710 7,048 M Spring Shadows (North) Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Street & Trfc Control & Strm Drain DDSRF 468 8,560 9, PWE-W&S Syst Consolidated Constr Fd Project Total 468 9,269 9,737 4
5 M Arlington Heights Area Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Street & Trfc Control & Strm Drain DDSRF 1,491 9,084 7,808 18, PWE-W&S Syst Consolidated Constr Fd 7,659 7,552 15,211 Project Total 1,491 16,743 15,360 33,594 M Gulf Terrace Sec 1, Acre Homes Area Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Street & Trfc Control & Strm Drain DDSRF ,319 9,900 Project Total ,319 9,900 M Freeway Manor: South of Edgebrook Dr. Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Street & Trfc Control & Strm Drain DDSRF ,320 10, PWE-W&S Syst Consolidated Constr Fd 4,625 4,625 Project Total ,945 15,433 M Briarmeadow Subdivision Area Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Street & Trfc Control & Strm Drain DDSRF ,260 9, PWE-W&S Syst Consolidated Constr Fd 3,071 3,071 Project Total ,331 12,446 M Freeway Manor: North of Edgebrook Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Street & Trfc Control & Strm Drain DDSRF ,329 15, PWE-W&S Syst Consolidated Constr Fd 5,239 5,239 Project Total ,568 20,511 M Melrose Park Sec 2 Area Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Street & Trfc Control & Strm Drain DDSRF 343 3,522 3,865 Project Total 343 3,522 3,865 5
6 M Winnewood Acres Area Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Street & Trfc Control & Strm Drain DDSRF 902 3,959 4, PWE-W&S Syst Consolidated Constr Fd 5,305 5,305 Project Total 902 9,264 10,166 M Magnolia Park Sec 2 Area Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Street & Trfc Control & Strm Drain DDSRF 1,881 13,719 15, PWE-W&S Syst Consolidated Constr Fd 5,596 5,596 Project Total 1,881 19,315 21,196 M Westridge and Braes Terrace Area Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Street & Trfc Control & Strm Drain DDSRF 1,711 7,104 8, PWE-W&S Syst Consolidated Constr Fd 10,460 10,460 Project Total 1,711 17,564 19,275 M Garden Oaks Area 2 Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Street & Trfc Control & Strm Drain DDSRF 1,373 16,511 17, PWE-W&S Syst Consolidated Constr Fd 1,240 1,240 Project Total 1,373 17,751 19,124 M Pinewood Village Area 2 Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Street & Trfc Control & Strm Drain DDSRF 1,381 7,852 9, PWE-W&S Syst Consolidated Constr Fd 6,323 6,323 Project Total 1,381 14,175 15,556 M Garden Oaks Area 3 Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Street & Trfc Control & Strm Drain DDSRF 1,200 17,358 18, PWE-W&S Syst Consolidated Constr Fd Project Total 1,200 17,911 19,111 6
7 M Richmond Plaza Area 2 Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Street & Trfc Control & Strm Drain DDSRF 1,466 8,990 10, PWE-W&S Syst Consolidated Constr Fd 6,060 6,060 Project Total 1,466 15,050 16,516 M Gillette Trunk-line Improvements Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Street & Trfc Control & Strm Drain DDSRF ,362 10,200 22, PWE-W&S Syst Consolidated Constr Fd ,601 Project Total ,075 11,088 23,925 M Local Drainage Program (LDP) Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Street & Trfc Control & Strm Drain DDSRF 3,821 5,191 5,291 5,391 5,495 25,189 Project Total 3,821 5,191 5,291 5,391 5,495 25,189 M Rehab of City Owned Drainage Channels Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Street & Trfc Control & Strm Drain DDSRF 306 1,557 1,587 1,617 1,649 6,716 Project Total 306 1,557 1,587 1,617 1,649 6,716 M Roadside Drainage Improvements Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Street & Trfc Control & Strm Drain DDSRF ,000 Project Total ,000 M Pre-Engineering for Storm Water Drainage Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Street & Trfc Control & Strm Drain DDSRF 2,038 2,336 2,645 2,965 3,297 13,281 Project Total 2,038 2,336 2,645 2,965 3,297 13,281 M Storm Drainage Program Support Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Street & Trfc Control & Strm Drain DDSRF 1,529 1,557 1,587 1,617 1,649 7,939 Project Total 1,529 1,557 1,587 1,617 1,649 7,939 7
8 M Stormwater Pump Station & Flood Warning Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Street & Trfc Control & Strm Drain DDSRF 4, ,645 7,427 Project Total 4, ,645 7,427 M Mitigation Program for Capital Imp. Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Street & Trfc Control & Strm Drain DDSRF ,970 Project Total ,970 M Developer Participation Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Street & Trfc Control & Strm Drain DDSRF 1,019 1,557 3,174 3,234 1,099 10,083 Project Total 1,019 1,557 3,174 3,234 1,099 10,083 Total Appropriations: 83, ,124 97,514 95, , ,578 8
FISCAL YEAR 2014-2018 CAPITAL IMPROVEMENT PLAN WASTEWATER TREATMENT FACILITIES
FISCAL YEAR 2014-2018 CAPITAL IMPROVEMENT PLAN WASTEWATER TREATMENT FACILITIES 1 FISCAL YEAR 2014-2018 CAPITAL IMPROVEMENT PLAN Wastewater Treatment Facilities The Wastewater Treatment System (System)
TROPICAL STORM ALLISON. Prepared by: John P. Ivey, PE, CFM Halff Associates, Inc. ASCE
TROPICAL STORM ALLISON June 5-9, 5 2001 Prepared by: John P. Ivey, PE, CFM Halff Associates, Inc. ASCE Spring 2002 Meeting Arlington, Texas March 27-30, 2002 Tropical Storm Allison (TSA) The most extensive
CITY OF HIGHLAND PARK, ILLINOIS Stormwater Management Fact Sheet
CITY OF HIGHLAND PARK, ILLINOIS Stormwater Management Fact Sheet WHAT IS STORMWATER MANAGEMENT? Stormwater management is the method for channeling rainfall through pipes and sewers away from property to
Sims Bayou Federal Flood Damage Reduction Project
Sims Bayou Federal Flood Damage Reduction Project A. Gene Rushing, Jr., P.E., PMP HCFCD Project Manager January 15, 2014 Harris County s Watersheds Historical Flooding in Harris County 1929 1935 HCFCD
A Comprehensive Approach to Storm Water Asset Management Planning. City of Virginia Beach Public Works Operations
A Comprehensive Approach to Storm Water Asset Management Planning City of Virginia Beach Public Works Operations Steve McLaughlin, PE April 2016 Agenda City of Virginia Beach, VA Population: 450,000 250
Mandatory Weeping Tile Disconnection to Reduce the Impact of Basement Flooding
Mandatory Weeping Tile Disconnection to Reduce the Impact of Basement Flooding May 26, 2011 Kyle Chambers, P.Eng. Environmental and Engineering Services Department City of London [email protected] 519-661-2500
Lower Raritan Watershed Management Area Stormwater & Flooding Subcommittee Strategy Worksheet LRSW-S3C1
Strategy Name: Reduce Existing Potential for Flood Damages LRSW-S3C1. Develop and implement a program to: Minimize flood damages through the use of structural measures. Minimize flood damages through the
Drainage Analysis for the McKownville Area
Drainage Analysis for the McKownville Area Town of Guilderland Albany County, New York Prepared by: DELAWARE ENGINEERING, P.C. 28 Madison Avenue Extension Albany, New York 12203 June 2010 Town of Guilderland
CONSTRUCTION PERMIT SUBMITTAL CHECKLIST
LAS VEGAS VALLEY STORMWATER QUALITY MANAGEMENT PROGRAM CONSTRUCTION PERMIT SUBMITTAL CHECKLIST (Applies to all Grading Site Development Building and Encroachment Permits and plans including Final Parcel
Standard Operating Procedures Storm Drain System Maintenance
s Storm Drain System Maintenance SECTIONS 1. Storm Drain System Inspections 2. Storm Drain System Cleaning 3. Storm Drain System Repairs 4. Proper Disposal of Material Storm Sewer System Cleaning Directive
KANSAS CITY WATER SERVICES FISCAL YEAR 2016 CAPITAL IMPROVEMENT PROGRAM
KANSAS CITY WATER SERVICES FISCAL YEAR 2016 CAPITAL IMPROVEMENT PROGRAM TABLE OF CONTENTS Water...Page 2 Design Professional Services... Page 3 Construction... Page 8 Wastewater...Page 12 Design Professional
Flooding Fast Facts. flooding), seismic events (tsunami) or large landslides (sometime also called tsunami).
Flooding Fast Facts What is a flood? Flooding is the unusual presence of water on land to a depth which affects normal activities. Flooding can arise from: Overflowing rivers (river flooding), Heavy rainfall
Storm Drain Inlet Protection
Source: Caltrans Construction Site Best Management Practices Manual, 2003. Description Applications Installation and Implementation Requirements Devices installed at storm drain inlets to detain and/or
ESCAMBIA COUNTY FLOOD RECOVERY: 1- YEAR ANNIVERSARY REPORT
Joy D. Blackmon, P.E. Director, County Engineer Public Works Department ESCAMBIA COUNTY FLOOD RECOVERY: 1- YEAR ANNIVERSARY REPORT EXECUTIVE SUMMARY One year after the devastating April 2014 floods hit
Proposed General Plan Update Goals, Policies, and Implementation Actions
Proposed General Plan Update Goals, Policies, and Implementation Actions The construction and maintenance of infrastructure is necessary to support existing and planned land uses and to achieve Environmental
CITY OF HOUSTON ASSISTED MULTIFAMILY PROPERTIES
CITY OF HOUSTON ASSISTED MULTIFAMILY PROPERTIES These properties are privately owned, but are required to set aside a certain number of units to be affordable for lower income persons and families. However,
Action plans for hotspot locations - Ash Study
Appendix 9 Action plans for hotspot locations - Ash Study Ash Vale North 1. Local evidence indicates the culvert could not discharge during December 2013 because the outlet was blocked on the western side
Chagrin River Watershed Partners, Inc. Cost Analysis of Low Impact Development Best Management Practices
Chagrin River Watershed Partners, Inc. Cost Analysis of Low Impact Development Best Management Practices Amy H. Brennan (440) 975-3870 www.crwp.org [email protected] Chagrin River Watershed Partners Formed
CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE
1008 STORM DRAINAGE (3/24/05) 1008.01 PURPOSE To minimize the amount of stormwater runoff resulting from development utilizing nonstructural controls where possible, maintain and improve water quality,
2007 Operating Budget 2007-2016 Capital Budget 2007 Proposed Water and Wastewater Service Rate
2007 Operating Budget 2007-2016 Capital Budget 2007 Proposed Water and Wastewater Service Rate Toronto City Council February 1 5, 2007 Multi-Year Toronto Water Business Plan was approved by Council February
GENESEE COUNTY DRAIN COMMISSIONER S OFFICE
GENESEE COUNTY DRAIN COMMISSIONER S OFFICE DIVISION OF SURFACE WATER MANAGEMENT G-4608 BEECHER ROAD, FLINT, MI 48532 PHONE (810) 732-1590 FAX (810) 732-1474 JEFFREY WRIGHT COMMISSIONER October 1, 2012
Facility Area Alzheimer's Unit Alzheimer's Certified Type of Facility Services Respite Security Medicaid. No No Nursing Home, Skilled Nursing
Houston and Southeast Texas Chapter 6055 South Loop East, Houston, Texas 77087 Helpline 713.314.1313 800.272.3900 available 24/7 www.alz.org/texas This is not a referral list. The Alzheimer's Association
Develop hazard mitigation policies and programs designed to reduce the impact of natural and human-caused hazards on people and property.
6.0 Mitigation Strategy Introduction A mitigation strategy provides participating counties and municipalities in the H-GAC planning area with the basis for action. Based on the findings of the Risk Assessment
SFPUC s Vision A Multi-Billion Dollar Investment To Secure The Health and Economic Stability of the City of San Francisco
SFPUC s Vision A Multi-Billion Dollar Investment To Secure The Health and Economic Stability of the City of San Francisco Emilio Cruz AGM, Infrastructure Agenda + San Francisco s Sewer System + San Francisco
PART 2 NEW ORLEANS DRAINAGE CANALS
PART 2 NEW ORLEANS DRAINAGE CANALS The Old Basin drainage canal was excavated in the 1790s.. This shows the systems of drainage ditches and canals established by 1829, leading to Bayou St. John. Cross
Why should communities invest in resiliency? What are the steps communities can take to become more resilient?
Community Preparedness for Flood Resiliency Nina Peek, AICP New York Planning Federation Board of Directors Senior Technical Director AKRF, Inc. Focus of Today s Presentation Why should communities invest
SECTION 108 - INLETS 108.1 INLET LOCATIONS
Greene County Design Standards -Adopted April 5, 1999 SECTION 108 - INLETS SECTION 108 - INLETS 108.1 INLET LOCATIONS 108.2 INLET INTERCEPTION CAPACITIES 108.2.1 Clogging Factors 108.3 INTERCEPTION AND
1. It would create hazardous effects of storm water run-off. 3. It would increase hazardous driving conditions on the public road.
SECTION 6: REQUIREMENTS FOR A DRIVEWAY CONNECTION A. Required information. The application shall be accompanied by a sketch of the proposed driveway which at a minimum shall indicate: 1. Geometric information
HAWKE S BAY REGIONAL COUNCIL Job Description
Position Title: Responsible to: Responsible for: Salary Range: Job Context: Asset Engineer HAWKE S BAY REGIONAL COUNCIL Job Description Manager Engineering N/A Progress above the Estimated Market Value
MARYLAND AVENUE BACKUPS DURING AUGUST 31, 2014 STORM EVENT COMMUNITY OUTREACH
MARYLAND AVENUE BACKUPS DURING AUGUST 31, 2014 STORM EVENT COMMUNITY OUTREACH MARYLAND AVENUE BACKUPS COMMUNITY OUTREACH MEETING AGENDA Introductions History of PWSA Actions August 31 Storm Impacts Short
HOW DOES THIS SERVICE CONTRIBUTE TO THE QUALITY OF LIFE IN THE CITY OF LONDON?
Service: Program: 3.4. Wastewater Removal & Storm Water Management Environmental Services HOW DOES THIS SERVICE CONTRIBUTE TO THE QUALITY OF LIFE IN THE CITY OF LONDON? The desired population results in
THE CITY OF MEMPHIS, TENNESSEE ACTION PLAN FOR DISASTER RECOVERY
THE CITY OF MEMPHIS, TENNESSEE ACTION PLAN FOR DISASTER RECOVERY DRAFT FOR PUBLIC REVIEW Proposed Uses of Supplemental CDBG Disaster Recovery Grant Funding Authorized by the Supplemental Appropriations
Barre City City-wide Policy and Program Options
Barre City (VERI Land Use Regulations Update policies allowing fill in flood hazard areas. RPC, DEC River Management, VLCT, Allowing landowners to elevate buildings using fill may help protect an individual
OWOW Proposition 84, Round 2 Master Project List
OWOW Proposition 84, Round 2 Master List Name s Recommended for Prop 84 Round 2 Funding 1 2071 Inland Empire Utilities Agency 2 2068 USDA Forest Service San Bernardino National Forest Wineville Regional
Flood Protection in Garland Past, Present, and Future. Presented by: R. Lyle Jenkins, P.E., CFM City of Garland, Texas
Flood Protection in Garland Past, Present, and Future Presented by: R. Lyle Jenkins, P.E., CFM City of Garland, Texas A few facts about Garland: Originally incorporated in 1891 Population 226,876 (2010
Harris County Archives Houston, Texas
Harris County Archives Houston, Texas Finding Aid BOND CERTIFICATION RECORDS MC017 (1894 1949) Size: 11 cubic feet Restrictions on Access: None Restrictions on Use: None Acquisition: Sent to Harris County
Storm water strategy of Turku City Citywater Storm water expert meeting 11.12.2014 Turku
Storm water strategy of Turku City Citywater Storm water expert meeting 11.12.2014 Turku 17.12.2014 Olli-Pekka Mäki 1 Background of storm water strategy Strategy is based on Baltic Sea Challenge Action
Federal Triangle Stormwater Working Group Federal Triangle Floodproofing Seminar BUILDING STRONG SM
Federal Triangle Stormwater Working Group Federal Triangle Floodproofing Seminar Initial Risk Flood Risk = Probability of Flooding x Consequences Zoning Building Codes Outreach Evacuation Planning Risk
Sample DEQ Plan Submitter s Checklist for Stormwater Management Plans
APPENDIX IV Version: February 2, 2015 Sample DEQ Plan Submitter s Checklist for Stormwater Management Plans Please fill in all blanks and please reference the plan sheets/pages where the information may
Whitefish Bay Private Property Program. June 6 th, 2011 Village Board Meeting Presented by Joan B. Hawley, P.E.
Whitefish Bay Private Property Program June 6 th, 2011 Village Board Meeting Presented by Joan B. Hawley, P.E. Private Property Program Elements Ordinance Revisions Downspouts Foundation Drain (FD) Disconnection
CITY OF DANA POINT AGENDA REPORT BRAD FOWLER, DIRECTOR OF PUBLIC WORKS AND ENGINEERING SERVICES
03/09/05 Page 1 Item #11 CITY OF DANA POINT AGENDA REPORT Reviewed By: DH X CM X CA DATE: MARCH 9, 2005 TO: FROM CITY MANAGER/CITY COUNCIL BRAD FOWLER, DIRECTOR OF PUBLIC WORKS AND ENGINEERING SERVICES
Swannanoa River Flood Risk Management Study
Swannanoa River Flood Risk Management Study Measures Evaluated to Reduce Future Flood Damages City of Asheville U.S. Army Corps of Engineers Flooding History Part of the 132 square mile Swannanoa River
Hospital and Nursing Home Locations
H02 MEDICAL CENTER OF TRINITY WEST PASCO 5400 SCHOOL RD NEW PORT RICHEY (727) 845-9180 H01 ALL CHILDRENS HOSPITAL 501 6TH AV S SAINT PETERSBURG (727) 767-7280 H17 BARDMOOR EMERGENCY CENTER 8839 BRYAN DAIRY
Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. CIVL 1112 Detention Ponds - Part 1 1/12
CIVL 1112 - Part 1 1/12 The water cycle, also known as the hydrologic cycle, describes the continuous movement of water on, above and below the surface of the Earth. The water cycle, also known as the
Historic Flood Impact on the Nashville Drinking Water System. Scott Potter, Director Metro Water Services, Nashville, TN
Historic Flood Impact on the Nashville Drinking Water System Scott Potter, Director Metro Water Services, Nashville, TN Historic Event = 13.53 /48 Hours May 1 6.32 of Rain = 3rd greatest one-day rainfall
CASE STUDY. City of Grand Rapids Stormwater Asset Management Program. City of Grand Rapids. By the Numbers
United States Environmental Protection Agency CASE STUDY City of Grand Rapids Stormwater Asset Management Program Overview With increasing pressure to meet water quality targets, address population growth,
HB2 (Act 24) of the 2013 R.S. (Jefferson)
1 of 8 (Act 24) of the 2013 R.S. () = State Bond Commission P = Priority Means of Explanation included at end of report IEB = Interim Emergency Board Blue highlight: Indicates project with an IEB Priority
Selection of Stormwater Treatment Facilities For Maximum Extent Practicable Treatment Effectiveness in Compliance with NPDES Provision C.
Donald P. Freitas Program Manager Selection of Stormwater Treatment Facilities For Maximum Extent Practicable Treatment Effectiveness in Compliance with NPDES Provision C.3 The following types of facilities,
CHAPTER 17: STORM SEWER STANDARDS. 17.00 Introduction. 17.01 Administration. 17.02 Standards 17.1
CHAPTER 17: STORM SEWER STANDARDS 17.00 Introduction 17.01 Administration 17.02 Standards 17.1 17.00 INTRODUCTION The purpose of this chapter is to provide guidance for the design and construction of storm
Flood Risk Management
Flood Risk Management Value of Flood Risk Management Every year floods sweep through communities across the United States taking lives, destroying property, shutting down businesses, harming the environment
Flood Risk Management
Flood Risk Management Value of Flood Risk Management Value to Individuals and Communities Every year floods sweep through communities across the United States taking lives, destroying property, shutting
JULY 24, 2009 WEST-END FLOODING INVESTIGATION ACTION PLAN. Presentation to Insurance Companies 19 January 2012
JULY 24, 2009 WEST-END FLOODING INVESTIGATION ACTION PLAN Presentation to Insurance Companies 19 January 2012 Topics of Discussion Investigation Levels of Service Cause of Flooding Analysis Undertaken
Implementing Green Infrastructure in Atlanta
City of Atlanta Mayor Kasim Reed Department of Watershed Management Implementing Green Infrastructure in Atlanta SESWA Southeast Regional Stormwater Seminar April 9, 2014 Jo Ann J. Macrina, P.E. Commissioner
Alzheimer's Certified Unit
Houston and Southeast Texas Chapter 6055 South Loop East., Houston, TX 77087 Helpline 713.314.1313 800.272.3900 available 24/7 www.alz.org/texas This is not a referral list. The Association does not endorse
How To Write A Flood Emergency Response Plan For Texamona University
Title: TTUHSC-El Paso Campus Flood Emergency Response Plan (FERP) Policy Number: 10.12 Regulation: Reference: Original Approval Date: Revised Date: Next Review Date: 09-09-2011 01-23-2013 01/2014 Policy
$255,000. 5302 & 5314 Hershe St., Houston, TX 77020. Price/Unit: $10,625. Price/Sq. Ft.: $14.17. Terms: All Cash. Proforma Cap Rate: 10.
, APARTMENTS FOR SALE A 24 UNIT CLASS D GARDEN APARTMENT COMMUNITY $255,000 Price/Unit: Price/Sq. Ft.: Terms: Proforma Cap Rate: $10,625 $14.17 All Cash 10.00% Recent Foreclosure by a Conduit Special Servicer
Engineering. 2006 2007 2007 2008 2008 2008 Major Service Actual Budget Projected Request Executive Adopted
Engineering Agency Number: 53 Budget Function: Public Works and Transportation The Engineering Division is responsible for the design, supervision and inspection of all street, highway, sidewalk and bike
Utility Water and Sewer Project Experience
- Southside 17 th Street 20 Water Main Relocation, Norfolk, 24 ½ Street Drainage Improvements, Beach, 36 SFM Designation for Providence Road/Blakley Square, HRSD, Beach, Annual Sewer System Replacement
Appendix F: Bergen County Letters of Intent
Appendix F: Letters of Intent Appendix F: Letters of Intent Multi Jurisdictional All hazards Mitigation Plan Update 2014 Page F 1 LOI s Submitted Under Hurricane Sandy DR 4086 Applicant Name Type Title
DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS
DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS Phase I MS4 permits require continuous updating of the stormwater system inventory owned and operated by the MS4. They also include inspection
Stormwater Management Functional Servicing Report
Stormwater Management Functional Servicing Report Part of Lot 12, Concession 10 Township of Cavan Monaghan Ian Cameron Rural Subdivision Engage Project No. 14016 Engage Engineering Ltd. January 7, 2015
Chapter 2.0 Alternatives Considered
Chapter 2.0 Alternatives Considered University Corridor Chapter 2 Alternatives Considered CHAPTER 2.0 - ALTERNATIVES CONSIDERED This chapter provides an overview of the screening process, a description
APPLICATION PROCESS FOR LAND DISTURBING PERMIT
PREFACE: APPLICATION PROCESS FOR LAND DISTURBING PERMIT The property owner, developer and designated planners and engineers shall review the general development plans and detailed plans of the Local Issuing
CASFM Stormwater Quality Field Trip June 23rd, 2011
CASFM Stormwater Quality Field Trip June 23rd, 2011 The 2011 CASFM Stormwater field trip included 42 attendees coming from as far south as Colorado Springs up to the Denver area and another 12 who joined
READ THIS FIRST. Check here if you believe that fats, oils and/or grease (FOG) caused or contributed to the SSO. Date: Time: Title:
READ THIS FIRST In the event of a Sanitary Sewer Overflow Check here if you believe that fats, oils and/or grease (FOG) caused or contributed to the SSO Address: Date: 1 st : Open this envelope. Instructions
BANGKOK FLOOD PROTECTION SYSTEM Bangkok Metropolitan Administration (BMA)
BANGKOK FLOOD PROTECTION SYSTEM Bangkok Metropolitan Administration (BMA) Catchment area of Chao Phraya River is 160,000 sq.km. or about 1/3 of the country The Chao Phraya River flows passing through Bangkok
Exhibit A-7.III. Water Quality Management Plan (WQMP) Checklist
Exhibit A-7.III Water Quality Management Plan (WQMP) Checklist Water Quality Management Plan Checklist The purpose of this checklist is to provide a format for uniform, comprehensive, and welldocumented
LICENSED CARE FACILITIES FOR ADULTS IN FORSYTH COUNTY JANUARY, 2012. Hines Family Care Home I FCL-034-024 727-1308 2224 Manchester St.
LICENSED CARE FACILITIES FOR ADULTS IN FORSYTH COUNTY JANUARY, 2012 Hines Family Care Home I FCL-034-024 727-1308 2224 Manchester St. Holly Haven (AIDS ONLY) FCL- 034-034 725-3555 127 South Popular St.
HYDROLOGIC/HYDRAULIC MODELING OF WESTMINSTER WATERSHED ORANGE COUNTY, CALIFORNIA
HYDROLOGIC/HYDRAULIC MODELING OF WESTMINSTER WATERSHED ORANGE COUNTY, CALIFORNIA James Chieh, Ph.D., P.E., Senior Hydraulic Engineer, USACE, Los Angeles, California, [email protected]; Jay Pak,
Home Drainage & Causes of Basement Flooding. Water
Home Drainage & Causes of Basement Flooding Understanding Drainage There are two separate sewer systems Eavestroughs & Downspout Road Property Line Floor Drain Catch basin Access Cover Weeping Tile House
Lansdowne Stormwater UPDATE
Lansdowne Stormwater UPDATE August 22, 2012 Ann Arbor Footing Drain Disconnection Stormwater Review Presentation Agenda Welcome and introductions Background on stormwater and sanitary sewer issues Footing
3.4 DRAINAGE PLAN. 3.4.1 Characteristics of Existing Drainages. 3.4.2 Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN
3.4 DRAINAGE PLAN This section describes the existing onsite drainage characteristics and improvements proposed within this Specific Plan. Following this description, drainage plan development standards
Recommendations for future developments
C Recommendations for future developments C.1 Reducing flood risk through site layout and design C.1.1 C.1.2 Flood risk should be considered at an early stage in deciding the layout and design of a site