1 Republic of the Philippines Fisheries Resource Management Project 1 External Evaluators: Yasuhiro Kawabata and Hiroshi Aoki Sanshu Engineering Consultant Field Survey: November 2008-July Project Profile and Japan s ODA Loan Location of Project Site Reforestation of mangrove in Lingayen Bay 1.1 Background In the Philippines, which has about 7,100 islands and an extensive coast line of about 30,000 km long, fisheries is an important industry ranking 12 th in the world, providing 4% of the country s gross national product (GNP), and 5% of its employment (about 990,000 people). Fish is the people s principal source of protein and securing fish supply is inevitable from the viewpoint of food security. However, particularly in the near-shore fisheries, destruction of coastal environment and depletion of fisheries resource are recently taking place due to illegal fishing by commercial fisheries (such as fishing in near-shore or municipal waters and illegal fishing by using dynamites), overfishing, and fish habitat degradation. As a result, the local fisherfolk along the coastal lines are suffering from poverty due to decrease of fish catch, and they are forced to do destructive fishing, which, in turn more exacerbates the depletion of fish catch. On the other hand, commercial fishing vessels do the illegal fishing and overfishing in the other coastal waters in the country and in other neighboring countries. This creates a problem. In order to address the strategic policy for the fisheries sector in the Philippines, JICA (formerly OECF) provide a loan to Fisheries Sector Program, under which 1 The ex-post evaluation for this project was jointly conducted with the Philippines National Economic and Development Authority.. 1
2 supports: introduction of the concept for the coastal resource management in 12 bays and ports in the Philippines; implementation of the resource assessment; and organization and promotion of local communities. This project, based on the results of the previous project, was identified/prepared in order to further address the poverty alleviation among municipal fisherfolk and environmental protection along the coastal lines. 1.2 Objective The project objective is to alleviate poverty of fisherfolk, and to promote the environmental protection measures along the coastal lines through reversing the trend of fisheries resource depletion, and securing the people s principal source of protein by strengthening the coastal resource management and the institutional capacity at the central and local government units level in 18 priority bays in the Philippines. The location of the project site is shown in Figure 1. Figure 1 Location of the project site 1.3 Borrower/Executing Agency Government of the Republic of the Philippines/Department of Agriculture/Bureau of Fisheries and Aquatic Resources (DP/BFAR) 2
3 1.4 Outline of Loan Agreement Loan Amount/Disbursed Amount 2,428 million yen/1,496 million yen Exchange of Notes/Loan Agreement September 1998/September 1998 Terms and Conditions 1.7%/0.75%; Consultant: 0.75% -Interest Rate 30 years (10 years)/ 40 years (10 years); -Repayment Period (Grace Period) Consultant: 40 years (10 years) -Procurement General untied/partially Untied; Partially Untied Date of(disbursement)completion January 2007 Main Contractors Consultant Services Overseas Agro-Fisheries Consultants Co. Ltd.(Japan)/Pacific Rim Innovation & Management Exponent, Inc. (Philippines) Feasibility Study F/S on this project by ADB TA (October 1996) Post Evaluation Report on Fisheries Sector Program by ADB TA 2. Evaluation Results (Rating: B) 2.1 Relevance (Rating: a) Relevance at the time of appraisal Under the Medium-term Fisheries Development and Management Program ( ), the following targets were established: 1) double aquaculture productivity (from 1.2 m/t/ha/yr to 2.4 m/t/ha/yr ) 2) double priority bays/gulfs under CRM (12 to 24) 3) improve operating efficiency of the commercial fishing fleet (7% - international standards) 4) organize fishery law enforcement and provide support facilities (50% of coastal municipalities) 5) reduce post-harvest losses (5%) and promote value-added products. Particularly, from the viewpoint of coastal fisheries, establishment of strategies and implementation of the coastal resource management plan involving fisherfolk, and regulating fish catch are emphasized. The new Fisheries Code was to be enacted by the Congress by December However, the Code was approved by the Congress in February In the project areas targeted under the previous Fisheries Sector Program, the implementation of resource management activities involving local government units and fisherfolk has been anticipated. Simultaneously, expansion of the similar projects to the other bays was also expected. In addition, stricter law enforcement of illegal fishing and 3
4 review of policies for income diversification for fisherfolk was expected. Due to lack of filing system for fisheries statistical data, it is difficult to analyze the current condition of the fisheries sector correctly and plan the coastal resource management. By law enforcement of illegal fishing, it is necessary to promote small boats removed from the coastal waters go into the commercial fishing in the ocean, and to develop fish culturing business for the domestic markets from the viewpoint of food security. However, no particular future development plans have been made and thus, plans need to be developed urgently. From the above, this project is consistent with the policies and strategies of the Philippines government Relevance at the time of evaluation The basic task of the current Mid-Term Philippines Development Plan (MTPDP, ) is to fight poverty, particularly focusing on spurring economic growth and creating jobs. In Chapter 2 (Agri-business), the policy to generate 2 million new jobs is stated, through increasing the current fisheries production intensity and diversification of productivity and expanding fisheries and aquaculture production in idle-offshore and inland waters. In Chapter 3 (Environment and Natural Resources) of the MTPDP, it is stated that MTPDP continues to emphasize protection of the country s coastal and marine ecosystems in cooperation with local government units, including planning, zoning, setting standards, establishing marine sanctuaries, and strengthening marine and coastal law enforcement activities. The main objectives of the project are: i) enhancement of understanding by the coastal fisherfolk on the effective use of resources; ii) strengthening of law enforcement to the illegal fishing; and iii) stopping and holding the depletion of coastal resources, which is caused by lack of other income sources. The project addresses these outstanding issues through three project components (fisheries resource management, income diversification and capacity building /institutional strengthening). Thus, the project is consistent with the development needs. The objective of the subject project is consistent with the government development policies at the time of appraisal and at ex-post evaluation and the project is highly relevant to national development needs. 2.2 Efficiency (Rating: b) Outputs The project description and output are shown in Table 1. The project consisted of 4 4
5 major components: Fisheries resource management project; Income Diversification (Micro-enterprise Development); Capacity Building and Strengthening of Institutions and Study on Future Development (commercial fisheries and aquaculture) involving 6 items (training/workshop, vehicle/boat, equipment, materials, survey/study and consulting services). Except the training program, the project was completed almost as planned. A main reason for reduction of the number of training programs and participants are that qualified NGO staff/citizens, who were originally expected to assist the project implementation were not available as planned and thus planned training program was not held. From the fact that the project has been continued by local government units by using local funds even after the original project components were completed, the reduction of output originally planned does not seem to affect the achievement of the project so much. Table 1: Project Description and Output (IICA-funded portion) Planned Actual Reason for Changes I. Fisheries Resource Management Project 1. Fisheries Resource Management 1 Fisheries Information System (PHILFIS) *consulting service: 5M/M (foreign), 60 M/M (local) *equipment: LS (105 units) 2 CRM Planning and Implementation (procurement of GIS) *consulting service: 24M/M (local) *equipment: 6 items 25 units (GIS) 3 Integrated CRM Pilot Program in Puerto Princesa *workshop/training: (8 times, 90 participants) *equipment: 9 items *study (data collection/zoning) *vehicle (4 items, 10 units) *boat (2 items, 7 vessels) *materials (seeding, fish sanctuaries) *consulting service: 36M/M (local) 4 Fisheries Legislation and Regulation *training (total 408 times, 24,300 participants) *consulting service: 36M/M (foreign), 60 M/M (local) I. Fisheries Resource Management Project 1. Fisheries Resource Management 1 Fisheries Information System (PHILFIS) *consulting service: 8.5M/M (foreign), M/M (local) *equipment: LS (105 units) : as planned 2 CRM Planning and Implementation *consulting service: 59.6M/M (local) *equipment: 6 items 25 units (GIS) : as planned 3 Integrated CRM Pilot Program in Puerto Princesa *workshop/training: (3 times, 259 participants) *equipment: almost as planned *study (data collection/zoning): as planned *vehicle as planned *boat : 0 (changed to patrol boat) *materials : as planned *consulting service: 66.9 M/M (local) 4 Fisheries Legislation and Regulation *training (total 1,966 participants, partly undertaken under other components) *consulting service: 34.6M/M A main reason for reduction of the number of training programs and participants are that qualified NGO staff/citizens, who were originally expected to assist the project implementation were not available as planned and thus planned training program was not held. 5
6 *materials (for 100 municipalities) 5 Community-based Law Enforcement *boat (2 items, 314 units) *equipment (4 items, 1,718 units) *training/seminar (total 216 times, 7,320 participants) 6 Regional Coordination and MCS Centers *vehicle (2 items, 314 units) *equipment (10 items, 190 units) *training (25 participants) 2. Income Diversification and Micro-enterprise Development 1Micro-enterprise Development *training (total 3,000 times, 46,500 participants) 3. Capacity Building and Strengthening of Institutions 1 Strengthening of Implementing Agencies *training i) overseas: total 36 training with 36 trainees (12 for overseas Masters Degrees) ii) domestic: total 910 training with 5,425 trainees *workshop i) 3 workshops with 986 times with 26,160 participants *study tour ii) 6 visits *project impact evaluation II. Study on Future Development Commercial fisheries and aquaculture: *consulting service: 42M/M (foreign), 36 M/M (local) (foreign), 55.0 M/M (local) *materials : as planned 5 Community-based Law Enforcement *boat (113 units) *equipment (17 items, 3,049 units) *training/seminar (total 3,360 participants) 6 Regional Coordination and MCS Centers *vehicle (2 items, 311 units) : as planned *equipment (14 items, 135 units) *training (undertaken under the BFAR s regular programs) 2. Income Diversification and Micro-enterprise Development 1 Micro-enterprise Development *training (total 38,000 participants) 5,000 took other programs. 3. Capacity Building and Strengthening of Institutions 1 Strengthening of Implementing Agencies *training i) overseas: total 13 training with 13 trainees (1 under Australian Masters Degrees, 7 under local Masters degrees ) ii) domestic: total 8,467 trainees (Most took other training programs simultaneously) *workshop i) 3 workshops with 10,489 participants *study tour ii) 11 visits *project impact evaluation 3 baseline study *consulting services: Experts in several fields: 224.2M/M II. Study on Future Development The study was not implemented. In the Minutes of Discussions, it is stated that the final approval of the Study will ultimately depend on the concurrence of the ICC Technical Board Project period The planned project period (for JICA portion) at time of appraisal was from September 1998 (L/A signed month) to December 2003 (programs completion date) with a total period of five years and four months. The actual period was from September 1998 to December February 2006 (programs completion date) with a total period of eight years 6
7 and four months, resulting in about a three-year delay; at 156% compared with the planned period. The main reasons for delay are as follows: 1) Originally expected qualified NGOs did not participate in the project implementation. 2) It took more time than expected to secure approval on procurement of consultants and equipment from the relevant central agencies and executing agencies. 3) Lack of technical staff of BFAR 4) It took more time to prepare the training program for staff of local government agencies. Regarding procurement, after a procurement implementation schedule was prepared, budgeting needs to be made for every fiscal year. However, actually when the budget was allocated, budget cannot be used as planned due to substantial delay of the procurement process. Thus, again budgeting must be redone. This situation has been repeated. As a result, the procurement process can not been completed, and the delivery has been always delayed Project cost The estimated total project cost at appraisal was 10,435 million yen, among which the JBIC loan amount was 2,428 million yen, the ADB loan 3,813 million yen and the local funded amount was 4,194 million yen.. The actual total project cost was 6,214 million yen and the JBIC loan disbursed was 1,496 million with the ADB loan of 2,232 million yen and the locally funded amount of 2,486 million yen. The total project cost was reduced by 40% and the JBIC loan disbursed was lower than planned by 38%. The main reason for the lowered cost (by 40%) is due to devaluation of the Philippine peso. The exchange rate at appraisal in September 1997 was US$1.00 =28.5 peso, while at completion it was US$1.00 =51.31 peso. The estimated total project cost in peso at appraisal by ADB was billion and the actual cost at completion was billion. The total project cost was increased by 11% in terms of local currency (peso). Comparing the planned with actual costs by item, substantial decrease was recorded with respect to the fisheries resource management and micro-enterprise development components. Table 2 Project Cost by Item (Planned and Actual) Unit: million yen Item Planned Actual Foreign Local Total Foreign Local Total Training/Workshop Vehicles/Boat
8 Equipment Materials Survey/Study Price contingencies Physical contingencies Consulting services (Fisheries Resource (192) 0 (192) (387) 0 (387) Management business) (Future development) (185) 0 (185) Total 1,290 1,138 2,428 1, ,496 Source 1: Planned costs from the Project Memorandum 2: Actual costs from the data submitted by BFAR referring to PCR Attachment 9 Annex 1, 2, 3. Reasons for increase/decrease are as follows: Item Training/Workshop Vehicles/Boat Equipment Materials Survey/Study Consulting services Reasons Delay of the project implementation. Integration of several training module. Lack of trainees. Partly charged to the ADB loan. Due to delay of the project implementation, procurement was incomplete. Delay of the project implementation. Repeat system was additionally purchased to connect between stations under the communications facilities. Overestimation at appraisal. Coastal resource management planning at Puerto Princesa was charged to training component, and designs of discharge management system to consulting services. Delay of contract awarding. Recruited more consultants to supplement the lack of local government staff s capability. Actual loan amount disbursed to each component (JBIC portion) is as follows: Table 3 Project Cost by Component (Planned and Actual) Unit: million yen Component Planned Actual I. Fisheries Resource Management 1, Fisheries Information System (PHILFIS) CRM Planning and Implementation Integrated CRM Pilot Program in Puerto Princesa Fisheries Legislation and Regulation Community-based Law Enforcement Regional Coordination and MCS Centers II. Income Diversification and Micro-enterprise Development Micro-enterprise Development III. Capacity Building and Strengthening of Institutions Strengthening of Implementing Agencies
9 Sub-total 2,405 1,496 Study on Ocean Fishing and Culturing Business Total 2,590 1,496 Source 1: Planned costs from attached documents to M/D. The total amount by item and by component is different. 2: Data provided by BFAR The project cost was within the estimated cost, but the project period substantially exceeded the planned period. Thus, the efficiency is considered to be moderate. 2.3 Effectiveness (Rating: a) Reversing the trend of fisheries resource depletion According to the data of Bureau of Agricultural Statistics (BAS), 1) The country s municipal marine production was increased by 6.8% per annum during the project implementation period ( ). It increased further by 8.7% from 2005 to 2006 (after project completion). 2) Effects at the targeted bays were reported: Sogot Bay: 73% reported an increase in fish catch of 2-3 kg in San Francisco, 75% indicated an increase of 2 kg in Liloan, 47% reported an increase of 1-2 kg in Malitbog. 3) At Sapian bay: 75% noted an increase of 3kg in Sapian, 30% reported an increase of 1.5 kg in Batan, 43% noted an increase of 10 kg in Ivisan.) 4) At Honda Bay in Puerto Princesa, the fish catch of 5kg/day/person before the project (1996) increased to 8kg/day/person after the project Alleviation of poverty of fisherfolk According to the studies by BFAR and the ADB s PCR mission, 1) The economic status in project areas has improved as evident from: improved incomes from fishing, additional income from alternative livelihood projects, and increased income from wage employment in mariculture business. 2) Increase of up to 25% in household income reported in Puerto Princesa, household income more than doubled in two municipalities in Lagonoy Bay, household income in 2 barangays in Calauag increased by more than 20% and all other barangays in Quezon showed positive changes in household fishing incomes Internal rate of return (1) FIRR 9
10 Information on the financial internal rate of return (FIRR) at appraisal is not provided in the JBIC appraisal document. According to the ADB s PCR, the average FIRR of four microenterprise projects (involving seaweed culture, mud crab culture, milkfish cage culture and swine fattening) was about 20%. According to the ADB s PCR, the average FIRR (at post evaluation) of 6 microenterprises established by community groups was about 52%. Table 4 FIRR (%) Microenterprises FIRR % FIRR % Project (at appraisal) (at completion) seaweed culture milkfish deboning 44 mud crab culture grouper cage culture 53 milkfish cage culture swine fattening Average Source:ADB PCR(P76 ) (2) EIRR The economic internal rate of return (EIRR) at the appraisal stage was estimated using the total project cost and maintenance and operation costs as cost, and saved amount of fish catch due to prohibition of destructive and saved amount of fish catch due to prohibition of overfishing as benefits. EIRR upon completion was recalculated based on the same assumptions with respect to the cost, but establishment of fish sanctuaries and reserves, deduced destructive and illegal fishing, increase in fish catch, and mangrove reforestation as benefits. EIRRs at appraisal and at post evaluation are shown in Table 5. Table 5: Internal Rate of Return EIRR (%) At appraisal 21 At post evaluation The fisheries production in the project areas is increasing and the economic status of fisherfolk households has improved. Thus, it is considered that the investment was appropriate and the project satisfactorily achieved its original development objectives Qualitative impact Depending on regions, destructive/illegal fishing was reduced by 80% by strict law enforcement. Through interview surveys at Honda Bay in Palawan Island, the following 10
11 became clear. Since the fish sanctuaries have been established and its areas are being expanded, many fishermen stopped fishing activities and changed to the ecotourism business (sight-seeing of coral reef by boat and feeding to tropical fish at beach). Currently, they are enlightening the importance of ecosystem to the local people and tourists. Their income is now stable and the quality of life has been improved. On the other hand, the fish catch of fishermen, who are still engaged in fishing was increased from 5kg/day before the project (1996) to 8kg/day after the project (2005), and their quality of life has been also improved. (Faces of the Sea, Region IVB, Healing Nature with ICRM ) The concept of the integrated coastal resource management (ICRM) project implemented as a pilot project in Puerto Pricesa is shown in Figure 2. Figure 2. Concept of ICRM in Puerto Princesa Mangrove Nursery in Honda Bay Under the Integrated Coastal Resource Management program in Puerto Princesa, conservation of fisheries resources and enhancement of the quality of life fisherfolk along the coastal lines have been promoted by implementing the following environmental protection: i) reforestation in the upland areas (seeding and planting); ii) riverbank rehabilitation (erosion control), iii) reforestation along the coastal line (mangrove and nipa), iv) establishing coral reef/fish sanctuaries; and v) enhancement of trochus shell stock. Materials for riverbank rehabilitation were provided by the project, but work was implemented by local volunteers. Reforestation work in the upland and along coastal lines have been also implemented by local volunteers (more than 20,000 participants and the work has become a sort of festival, which has been regularly implemented every year. 2.4 Impact Benefits to the people in the project affected area Under the ex-post evaluation, the beneficiary surveys were undertaken by interviews in 5 bays (involving 8 local government units). Five bays include Carigara, 11
12 Davao, Lingayen, Honda and Sapian bays. The number of respondents at each bay is 60 with a total of 300 respondents. According to the classification of respondents by sex, 33% were female and 67% male. The results of interview survey are summarized as follows: 1) Increase of fish catch: 65% indicate that it was increased and about 50% of them indicate that the increase was more than 4kg/day. 2) Decreased incidence of illegal fishing activities: 74% of respondents indicate that the incident has decreased. 3) Women s participation in community activities: 74% of respondents indicated that they have participated. 4) Promotion of economic activities: 69% of respondents perceive that the activities have promoted. 5) Expansion of business chances: 60% of respondents perceive that the chances have expanded. 6) Impact on family income: 70% of respondents answer that the family income has increased. 7) Increase of live coral cover: 75% of respondents perceive that the live coral cover has increased. 8) High-valued fish reappearance: 83% of respondents perceive that the high-valued fish species had already reappeared. P Patrol boat at Lingayen Bay Micro-enterprise (Co-op) development in Batan, Sapian 12
13 2.4.2 Environmental and social impact Impact to the environment was generally satisfactory (reduction of illegal fishing, expansion of coral leaf coverage in artificial coral leaf and fish sanctuary, increase of fish catch ratio, reappearance of commercially high-value fish). Comparison of before the Project and toward the end of Project for Agoho Fish Sanctuary, and comparison of coral fish families before the project (2000) and after the project (2005) in Puerto Princesa Bay are shown in Table 7 and 8, respectively. Table 7 Comparison of before the Project and toward the end of Project for Agoho Fish Sanctuary Parameter 1994( REA ) 2004( RSA ) Live Coral Cover( %) 22.4 (poor) 36.6 (fair) Number of Fish Families Diversity (Number of 141( very h igh ) 103( very high ) fish species/1,000m2) Fish Biomass (ton/m2) 2.69 (very low) (low) Source:ADB PCR(P89 ) REA:Resource and Ecological Assessment RSA:Resources Social Assessment Table 8 Comparison of coral fish families before the project (2000) and after the project (2005) in Puerto Princesa Bay Parameter 2000(ICLARM) 2004(WPU) Number of Fish Families Diversity (Number of 770(very high) 1,172(very high) fish species/1,000 m2) Fish Biomass (kg/ha) 101 (very low) 47 (very low) Source:Report of Prof. Gonzales (2005 ) ICLARM:International Center for Living Aquatic Resource Management WPU:Western Philippines University The results indicate that the number of fish families has increased after completion of the project, but that the fish biomass has decreased. Therefore, this project has largely achieved its objectives, and effectiveness is highly satisfactory. Ecotourism business in Honda Bay 13
14 2.5 Sustainability (Rating: b) Executing agency (Department of Agriculture: DA) DA through Bureau of Fisheries and Aquatic Resources (BFAR) was the executing agency. However, local government units (LGUs) in the project areas participated in the project. The operation and maintenance of the project is undertaken by BFAR, the BFAR Regional offices and LGU s Agriculture offices. Responsibilities of each office are shown in Table 9. Table 9 Institutional Arrangements for Operation and Maintenance Relevant agencies BFAR Headquarter BFAR Regional Offices Municipal Agriculture Office Source: PCR Main functions Responsible for the maintenance and operation of hardware and software to ensure that PHILFIS as a system is functioning well. Provides technical assistance, back-up support and training to PHILFIS at the BFAR Regional Offices and LGUs. Responsible for the maintenance and operation of hardware and software to ensure that PHILFIS at the BFAR Regional Offices is functioning well. Responsible for the maintenance and operation of the telecommunications system at the regional level. Responsible for the maintenance and operation of the telecommunications system at the LGU level. Supervise the maintenance and operation of patrol boats. The following agencies are operating and maintaining the equipment except the fisheries information system under this project. Table 10 Agencies responsible for operation and maintenance equipment other than the fisheries information system Responsible agencies Municipal Agriculture Office Municipal Agriculture Office Mayors office Municipal AgricultureOffice Regional Fisheries Information Management Center Regional Fisheries Information Management Center Source: PCR Item Equipment for illegal fishing watch Vehicles and motorbike Tecommunication system Workstation installed at LGUs Workstation and communication system at BFAR regional offices Information and communication system at BFAR Headquarter Operation and maintenance system 14
15 The number of staff in charge of operation and maintenance at each unit is shown in Table 11. Table 11 Number of staff in charge of operation and maintenance Item Fisheries Information System Law Enforcement Equipment Telecommunications Equipment Note:as of July 2007 Source: PCR Number of staff BFAR Headquarter:12 BFAR Regional Offices:6 regions 20 staff LGUs:about 18 municipalities, 34 staff LGUs:18 municipalities 277 staff BFAR Regional Offices:6 regions, 45 staff LGUs:about 30 municipalities 633 staff BFAR consistently allocates a substantial annual budget for FIMC operations. Partner LGUs have integrated into their regular work plans the maintenance of project equipment and facilities and the monitoring of FRMP-initiated projects. In Quezon province for instance, the 11 municipalities have allocated a total of at least Peso 8 million to sustain project initiatives. Many of the Information Education Campaign materials produced by the project (FLET manuals, audio-visual productions) are being used by BFSAR and LGUs under their regular programs. Under their regular CRM programs, the BFAR Regional Offices have continued efficiently using the various systems developed and promoted by FRMP Technical capacity At Honda, Sapian, Carigara and Lingayen bays where field inspections were conducted, the coastal resource management program has been enacted as an ordinance and thus the budget is allocated to the program. Technical training for the staff working at LGUs, fisherfolk and NGO staff has been continuously provided Financial status The annual budget (2007) for operation and maintenance is shown in Table 12. Table 12 Annual budget for operation and maintenance (2007) Item Annual budget (peso) Fisheries Information System(under BFAR) 4,024,800 Workstation (25 municipalities) 27,875 (average) Telecommunications (24 municipalities) 39,737 (average) FLET support(17 municipalites) 55,763 (average) Transportation and other equipment (22 28,681 (average) municipalities) Note:Allocations under municipalities do not include salaries and 15
16 incentives for personnel FLET: Fisheries Law Enforcement Team. In LGUs where the project has been continued such as Puerto Pricesa, the government units purchase materials (such as seeds) and pays labor costs for growing. But, actual tree planting is undertaken under the special program by citizens, fisherfolk volunteers. At Batan, Sapian bay, every year about 50,000 peso is allocated to the program. The budget is spent for maintenance cost for fish sanctuaries, fuel for boar, planting of mangrove trees, and assistance for community activities. At the Lingayen Bay area, about 600,000 peso has been spent for the coastal resource management program every year Operation and Maintenance status Regarding the Fisheries Information System, the maintenance cost is high, particularly with the initial investment cost of software, and it has been proposed to be transformed into a regular unit of BFAR with sufficient annual budget allocation. Two of 11 repeaters were damaged by typhoon, and are not functioning. Since the first batch of 22 patrol boats had the high costs of operations and maintenance, the type of other boats procured later was changed taking into consideration the local conditions so that the LGUs could afford from their budget. Several boats are not operating since they were damaged by typhoons. In the three to four years following the completion of the three interchanges, no major structural failures have been observed. From the field visual inspection, it was confirmed that the pavement surface condition was satisfactory. However, as the need for major rehabilitation works arises in the future, there is a possibility that the financial resources will be insufficient. As such, the financing plan and implementation schedule for major rehabilitation works should be formulated well in advance. (confirmed at Lingayen) In Puerto Pricesa, where a CRM pilot program was implemented, even after the project was completed, the project focusing on training has been continued under the same project name, and the project sites have been expanded to other barangays. Puerto Princesa city currently spends at least 3 million peso for the project every year. Its budget is used for procurement of seeds (about 10,000 seeds) for the San Jose mangrove nursery, and about 1 million peso is spent for growing mangrove trees. About 7,000 10,000 trees are planted at the upland nursery in Saint Lourdes (one of seven nurseries in the city). The area of fish sanctuaries has been expanded since then. 16
17 3. Feedback 3.1 Conclusion In light of the above, this project is evaluated to be satisfactory. 3.2 Lessons learned 1) In the LGUs which participated in this project, the coastal resource management program has been integrated into the development plan of each LGUs and project objectives were somehow achieved. However, the readiness to continue the program (sustainability of the project) differs from LGU to LGU. From this experience, since continued BFAR s technical assistance (promotion, training and monitoring) and administrative guidance is needed even after the project completion, it is most important to select a LGU who indicates ownership of the project and willingness to continue the project even after the project completion during a project preparation/processing stage. 2) Due to lengthy procurement process for equipment/materials and consulting services, a few subcomponents were not implemented. It is essential at the project preparation stage: i) to provide training to staff of relevant executing agencies on domestic/jica s procurement process and procedures; and ii) to prepare a detailed procurement implementation plan and share this information with all the relevant project executing agencies. 3).Since the selection of equipment (such as patrol boats) was made without detailed consultation on operation manners with the end-users at the operation stage, it was difficult to properly maintain and operate some equipment. Later, specifications for some equipment were downgraded to fit into local conditions. At the appraisal stage, it is essential to select the efficient model taking into consideration the operation manner (usage) and sustainability of the equipment in the local conditions. 3.3 Recommendations None. 17
18 Comparison of the Planned and Actual Figures Component Planned Actual I. Fisheries Resource Management Project 2.Income Diversification and Micro-enterprise Development 3. Capacity Building and Strengthening of 1. Fisheries Resource Management 1 Fisheries Information System (PHILFIS) *consulting service: 5M/M (foreign), 60 M/M (local) *equipment: LS (105 units) 2 CRM Planning and Implementation (procurement of GIS) *consulting service: 24M/M (local) *equipment: 6 items 25 units (GIS) 3 Integrated CRM Pilot Program in Puerto Princesa *workshop/training: (8 times, 90 participants) *equipment: 9 items *study (data collection/zoning) *vehicle (4 items, 10 units) *boat (2 items, 7 vessels) *materials (seeding, fish sanctuaries) *consulting service: 36M/M (local) 4 Fisheries Legislation and Regulation *training (total 408 times, 24,300 participants) *consulting service: 36M/M (foreign), 60 M/M (local) *materials (for 100 municipalities) 5 Community-based Law Enforcement *boat (2 items, 314 units) *equipment (4 items, 1,718 units) *training/seminar (total 216 times, 7,320 participants) 6 Regional Coordination and MCS Centers *vehicle (2 items, 314 units) *equipment (10 items, 190 units) *training (25 participants) 1Micro-enterprise Development *training (total 3,000 times, 46,500 participants) 1 Strengthening of Implementing Agencies 1. Fisheries Resource Management 1 Fisheries Information System (PHILFIS) *consulting service: 8.5M/M (foreign), M/M (local) *equipment: LS (105 units) : as planned 2 CRM Planning and Implementation *consulting service: 59.6M/M (local) *equipment: 6 items 25 units (GIS) : as planned 3 Integrated CRM Pilot Program in Puerto Princesa *workshop/training: (3 times, 259 participants) *equipment: almost as planned *study (data collection/zoning): as planned *vehicle as planned *boat : 0 (changed to patrol boat) *materials : as planned *consulting service: 66.9 M/M (local) 4 Fisheries Legislation and Regulation *training (total 1,966 participants, partly undertaken under other components) *consulting service: 34.6M/M (foreign), 55.0 M/M (local) *materials : as planned 5 Community-based Law Enforcement *boat (113 units) *equipment (17 items, 3,049 units) *training/seminar (total 3,360 participants) 6 Regional Coordination and MCS Centers *vehicle (2 items, 311 units) : as planned *equipment (14 items, 135 units) *training (undertaken under the BFAR s regular programs) 1 Micro-enterprise Development *training (total 38,000 participants) 5,000 took other programs. 1 Strengthening of Implementing Agencies 18
19 Institutions II. Study on Future Development *training i) overseas: total 36 training with 36 trainees (12 for overseas Masters Degrees) ii) domestic: total 910 training with 5,425 trainees *workshop i) 3 workshops with 986 times with 26,160 participants *study tour ii) 6 visits *project impact evaluation Commercial fisheries and aquaculture: *consulting service: 42M/M (foreign), 36 M/M (local) *training i) overseas: total 13 training with 13 trainees (1 under Australian Masters Degrees, 7 under local Masters degrees ) ii) domestic: total 8,467 trainees (Most took other training programs simultaneously) *workshop i) 3 workshops with 10,489 participants *study tour ii) 11 visits *project impact evaluation 3 baseline study *consulting services: Experts in several fields: 224.2M/M The study was not implemented. Term Project costs Foreign currency Local currency Total Yen loan September 1998 (L/A) December 2003 (project completion: 5 years 4 months 1,867 million yen 8,568 million yen 10,435 million yen 2,428 million yen September 1998 (L/A) December 2006 (project completion: 8 years 4 months 1,714 million yen 4,700 million yen 6,414 million yen 1,496 million yen 19
Coastal Resilience through Integrated Coastal Management. Alan T. White Indian Ocean Tsunami Warning System Program
Coastal Resilience through Integrated Coastal Management Alan T. White Indian Ocean Tsunami Warning System Program The coastal zone:an endangered environment Overexploitation and destruction Unplanned
PHI: Integrated Coastal Resources Management
Project Administration Memorandum Project Number: 33276 Loan Number: 2311-PHI Grant Number: 0071-PHI September 2007 PHI: Integrated Coastal Resources Management The project administration memorandum is
How To Help Oceans
The World Bank & the Ocean A Healthy & Productive Ocean to Help Reduce Poverty Why oceans matter to the World Bank NUTRITION Seafood provides 16% of the world s animal protein 1 billion people in developing
SECTOR ASSESSMENT (SUMMARY): AGRICULTURE AND NATURAL RESOURCES 1
Country Operations Business Plan: Philippines, 2013 2015 SECTOR ASSESSMENT (SUMMARY): AGRICULTURE AND NATURAL RESOURCES 1 A. Sector Performance, Problems, and Opportunities 1. Sector importance and growth
How To Manage Coastal Wetlands In Pangasinan
A Case of Sustainable Use and Management of Coastal Wetlands Bani, Pangasinan Area: 86.27 Has Bearing: True Scale: 1:10,000 LEGEND: Boundary of Bani Mangrove River/Creek Guard House Board Walk Bani is
Mu Koh Chang Coral Reef Demonstration Site: Lessons Learned and Challenges
Mu Koh Chang Coral Reef Demonstration Site: Lessons Learned and Challenges Thamasak Yeemin, Sittiporn Pengsakun, Chaipichit Saenghaisuk, Wanlaya Klinthong, Makamas Sutthacheep Marine Biodiversity Research
The Philippines Leyte-Bohol Interconnection Project
The Philippines Leyte-Bohol Interconnection Project External Evaluator: Toshiyuki Katagiri, Tomomi Ito (The Japan Economic Research Institute) Field Survey: November 2006, February 2007 1. Project Profile
Coral Reef Rehabilitation and Management Program- Coral Triangle Initiative (COREMAP-CTI) (P127813)
Public Disclosure Copy EAST ASIA AND PACIFIC Indonesia Environment Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 2 ARCHIVED on 03-Feb-2015 ISR17440 Implementing Agencies: Ministry
Jessica C. M~HOZ' INTRODUCTION
RESOURCE MANAGEMENT STRATEGIES FOR CARIGARA BAY, PHILIPPINES Jessica C. M~HOZ' ABSTRACT Carigara Bay is one of the bays covered by the Coastal Resource Management Component of the Fisheries Sector Programme
1. Name of the Project 2. Necessity and Relevance of JBIC s Assistance
Ex-ante Evaluation 1. Name of the Project Country: India Project: Goa Water Supply and Sewerage Project (Loan Agreement: 09/14/2007; Loan Amount: 22,806 million yen; Borrower: The President of India )
Demonstration Site Concept
The Sustainable Financing and Management of Eastern Caribbean Marine Ecosystems Project Demonstration Site Concept Woburn Clarkes Court Bay Marine Protected Area Improving Water Quality in Marine Protected
Baguio. Manila. Project site. Cebu City. Philippines. Davao
Philippines Metro Manila LRT Line 1 Capacity Expansion Project External Evaluator: Atsushi Fujino (KRI International Corp.) Field Survey: September 2004 1. Project Profile and Japan s ODA Loan Baguio Manila
COMMITTEE ON FISHERIES
May 2016 COFI/2016/Inf.15 E COMMITTEE ON FISHERIES Thirty-second Session Rome, 11-15 July 2016 ADVANCING KNOWLEDGE ON RIGHTS-BASED APPROACHES FOR FISHERIES: A GLOBAL WORK PROGRAMME FOR ENHANCING FOOD SECURITY
New JICA Guidelines for Project Evaluation First Edition. Japan International Cooperation Agency (JICA) Evaluation Department
New JICA Guidelines for Project Evaluation First Edition Japan International Cooperation Agency (JICA) Evaluation Department June 2010 Contents 1 OVERVIEW OF AID EVALUATION AND JICA'S PROJECT EVALUATION...
main type of locomotive in use, but over half of those had surpassed their durable lifespan. China Afghanistan Project Sites Nepal
Pakistan Diesel Electric Locomotives Rehabilitation Project (1) and Diesel Electric Locomotives Production Project (2) External Evaluator: Hajime Sonoda Field Survey: September 2004 1 Project Profile and
REQUEST FOR PROPOSAL (RFP) For Consultancy Services
National Environment & Planning Agency 10 & 11 Caledonia Avenue, Kingston 5, Jamaica W.I. Tel: (876) 754-7540 Fax: (876) 754-7595-6, toll free help-line: 1-888-991-5005 Website: http://www.nepa.gov.jm
Philippines Special Economic Zones Environment Management Project
Ex-Post Monitoring of Completed ODA Loan Project Philippines Special Economic Zones Environment Management Project External Monitoring Consultants: Kazunori Honda / Toyo Tanaka Nakamoto&Associates Co.,
AUDITOR GENERAL'S REPORT TO THE MINISTRY OF ENVIRONMENT AND ENERGY ON THE MALDIVES ENVIRONMENTAL MANAGEMENT PROJECT
Contents AUDITOR GENERAL'S REPORT TO THE MINISTRY OF ENVIRONMENT AND ENERGY ON THE MALDIVES ENVIRONMENTAL MANAGEMENT PROJECT 2 Management's responsibility for the financial statements 2 Auditors' Responsibilities
Mainstreaming CRM in Local Governance: CRMP Experience
Mainstreaming CRM in Local Governance: CRMP Experience CRMP is a technical assistance project of the Department of Environment and Natural Resources, funded by the United States Agency for International
WILDLIFE LAW ENFORCEMENT AND GOVERNANCE IN THE PHILIPPINES
WILDLIFE LAW ENFORCEMENT AND GOVERNANCE IN THE PHILIPPINES By Antonio C. Manila Protected Areas & Wildlife Bureau DENR, Diliman, Quezon City, Philippines TOPICS FOR DISCUSSIONS: 1. Updates on Philippine
SECTOR ASSESSMENT (SUMMARY): MICRO, SMALL AND MEDIUM-SIZED ENTERPRISE DEVELOPMENT 1 Sector Road Map 1. Sector Performance, Problems, and Opportunities
Small Business and Entrepreneurship Development Project (RRP UZB 42007-014) SECTOR ASSESSMENT (SUMMARY): MICRO, SMALL AND MEDIUM-SIZED ENTERPRISE DEVELOPMENT 1 Sector Road Map 1. Sector Performance, Problems,
Linking Mid-term Rehabilitation to Long-term Sustainability:
19 T H A I L A N D Linking Mid-term Rehabilitation to Long-term Sustainability: Baan Tha Klang Fishing Community Co-op Shop GENERAL INFORMATION Country: Thailand Location: Ranong Province, Suksamran District
SECTOR ASSESSMENT (SUMMARY): CLIMATE CHANGE. 1. Sector Performance, Problems, and Opportunities
Climate Resilience Sector Project (RRP TON 46351) Sector Road Map SECTOR ASSESSMENT (SUMMARY): CLIMATE CHANGE 1. Sector Performance, Problems, and Opportunities 1. Tonga is being affected by climate change,
Yemen Aden Telephone Network System Expansion Project. Report date: March 2001 Field survey: August 2000 1. Project Profile and Japan s ODA Loan
Yemen Aden Telephone Network System Expansion Project Report date: March 2001 Field survey: August 2000 1. Project Profile and Japan s ODA Loan Project site Site map: Aden, the Republic of Yemen Installed
The need to ban fish aggregating devices (FADs) to save juvenile baby tunas. Greenpeace uncovers trade in juvenile tuna in General Santos Fish Port
The need to ban fish aggregating devices (FADs) to save juvenile baby tunas 2 December 2014 Quezon City, Philippines Greenpeace uncovers trade in juvenile tuna in General Santos Fish Port Introduction
Japan s s Contribution to Promoting Sustainable Management of the World s Forests
Japan s s Contribution to Promoting Sustainable Management of the World s Forests Satoshi Akahori ([email protected]) Forestry Agency, MAFF Japan August, 2006 Forest Area in Japan Forest area:
Coral Triangle Initiative (CTI) on Coral Reefs, Fisheries and Food Securities
2008/MRCWG/022 Agenda Item: 10 Coral Triangle Initiative (CTI) on Coral Reefs, Fisheries and Food Securities Purpose: Information Submitted by: Indonesia 21 st Marine Resource Conservation Working Group
Prevention Pollution by Garbage from Ships in China. E Hailiang Deputy Director Maritime Safety Administration People s s Republic of China
Prevention Pollution by Garbage from Ships in China E Hailiang Deputy Director Maritime Safety Administration People s s Republic of China 1 General Ship source garbage has been identified as one of the
BUSINESS PLAN NOVA SCOTIA FISHERIES AND AQUACULTURE LOAN BOARD
BUSINESS PLAN NOVA SCOTIA FISHERIES AND AQUACULTURE LOAN BOARD TABLE OF CONTENTS Message from the Minister, Associate Deputy Minister and Board.......................3 Mission Statement...4 Corporate Mandate...4
Training programs of SEAFDEC Aquaculture Department
Training programs of SEAFDEC Aquaculture Department Honculada-Primavera, Jurgenne Date published: 1988 To cite this document : Honculada-Primavera, J. (1988). Training programs of SEAFDEC Aquaculture Department.
Alan White The Nature Conservancy
The Coral Triangle Region, The Coral Triangle Initiative, and the Development of the Six Country Marine Protected Area System Alan White The Nature Conservancy The Coral Triangle Initiative Coral Triangle
(1) State of Disaster and Issues Stemming from Tropical Storm Ondoy and Typhoon Pepeng
Japanese ODA Loan Ex-ante Evaluation 1. Name of the Project Country: Republic of the Philippines Project: Post Ondoy and Pepeng Short-Term Infrastructure Rehabilitation Project Loan Agreement: May 26,
THE CORAL TRIANGLE INITIATIVE (CTI) ON CORAL REEFS, FISHERIES AND FOOD SECURITY. 1st Sulu Sulawesi Sea (SSS) Conference 18-19 November 2015
THE CORAL TRIANGLE INITIATIVE (CTI) ON CORAL REEFS, FISHERIES AND FOOD SECURITY 1st Sulu Sulawesi Sea (SSS) Conference 18-19 November 2015 1 Introduction to CTI PRESENTATION OUTLINE State of the CTI Marine
Chapter 3 Data Interpretation and Reporting Evaluation
Chapter 3 Data Interpretation and Reporting Evaluation Results This chapter explains how to interpret data and how to bring together evaluation results. Tips! - Evaluation does not end with data collection
Coral Cay Conservation Member s report on activities to ICRI
Members ReportICRI GM Japan/Palau (3) 2007/MR/[Coral Cay Conservation] INTERNATIONAL CORAL REEF INITIATIVE (ICRI) General Meeting Tokyo, Japan, April 23 rd -24 th, 2007 Coral Cay Conservation Member s
The Kingdom of Thailand: Capacity Building for the Neighbouring Countries Economic Development Cooperation Agency
Technical Assistance Report Project Number: 40137 December 2006 The Kingdom of Thailand: Capacity Building for the Neighbouring Countries Economic Development Cooperation Agency The views expressed herein
The CRM Cycle. CRM plan preparation and adoption. Issue identification and baseline assessment. Action plan and project implementation
The CRM Cycle Issue identification and baseline assessment CRM plan preparation and adoption Action plan and project implementation Information management, education and outreach Local legislation Regulation
Philippines: ECO-TOWN FRAMEWORK
Green Growth Initiatives in the Philippines: Demonstration of the ECO-TOWN FRAMEWORK Republic Act 9729 Climate Change Act of 2009 Acknowledge that local government units are the frontline agencies in the
INTENDED NATIONALLY DETERMINED CONTRIBUTIONS (INDCs)
UNITED REPUBLIC OF TANZANIA INTENDED NATIONALLY DETERMINED CONTRIBUTIONS (INDCs) 1. Introduction The United Republic of Tanzania, which comprises of Tanzania Mainland and Zanzibar, brings forth her Intended
Northern Territory Fisheries Resource Sharing Framework
Northern Territory Fisheries Resource Sharing Framework Page 1 of 11 Introduction Fishing is important in the Northern Territory (Territory). Coastal Aboriginal people recognise sea country out to the
MPA Baseline Program. Annual Progress Report
MPA Baseline Program Annual Progress Report Principal Investigators please use this form to submit your MPA Baseline Program project annual report, including an update on activities completed over the
Eco-tourism and Biodiversity Conservation and Protection Management of Olango Island Wildlife Sanctuary By: Reginaldo G. Bueno
Eco-tourism and Biodiversity Conservation and Protection Management of Olango Island Wildlife Sanctuary By: Reginaldo G. Bueno Introduction Olango Island Wildlife Sanctuary (OIWS) was proclaimed as protected
Contents & Topics. UNITAR Yamao 2009. Lessons learned through Development of Participatory and Decentralized Management
Greater Role of Local Government and People s Participation on Coastal Resource Management for Attaining Food Security Lessons learned through Development of Participatory and Decentralized Management
U.S. Coast Guard. America s Maritime Guardian
U.S. Coast Guard America s Maritime Guardian Nov. 2009 A few armed vessels, judiciously stationed at the entrances of our ports, might at a small expense be made useful sentinels of the laws. Alexander
Ex-Ante Evaluation (for Japanese ODA Loan)
Japanese ODA Loan Ex-Ante Evaluation (for Japanese ODA Loan) 1. Name of the Project Country: The Democratic Socialist Republic of Sri Lanka Project: New Bridge Construction Project over the Kelani River
Global Environment Facility GEF OPERATIONAL PROGRAM #13 ON CONSERVATION AND SUSTAINABLE USE OF BIOLOGICAL DIVERSITY IMPORTANT TO AGRICULTURE
Global Environment Facility GEF OPERATIONAL PROGRAM #13 ON CONSERVATION AND SUSTAINABLE USE OF BIOLOGICAL DIVERSITY IMPORTANT TO AGRICULTURE CONTENTS Introduction..1 Convention Guidance... 2 Agricultural
Position Statement regarding Offshore Wind Proposals on Lake Huron. Lake Huron Centre for Coastal Conservation
Position Statement regarding Offshore Wind Proposals on Lake Huron Lake Huron Centre for Coastal Conservation June 2010 Lake Huron Centre for Coastal Conservation (LHCCC) Corporate Position related to:
Importance of Coral Triangle to Food Security and Livelihoods
U.S. Support, Challenges and Opportunities Most Diverse Ecological Complexes on Earth Cooperation the Key: Regional Conservation s Amazon Congo Basin Importance of Food Security and Livelihoods 363 million
CBO. Federal Funding for Homeland Security: An Update. What Is Homeland Security?
CBO A series of issue summaries from the Congressional Budget Office JULY 20, 2005 Federal Funding for Homeland Security: An Update The terrorist attacks of September 11, 2001, heightened Congressional
Creating governable EBM and MPA networks: An analytic framework and empirical results from the Philippines
Creating governable EBM and MPA networks: An analytic framework and empirical results from the Philippines Patrick Christie Associate Professor SMA and JSIS Pew Fellow in Marine Conservation University
5 Year Strategic Plan
Mid Atlantic Fishery Management Council 5 Year Strategic Plan 2014 2018 DRAFT 5/31/2013 Table of Contents Table of Contents... 1 Introduction... 2 The Mid Atlantic Fishery Management Council... 2 Rationale
How To Help The Republic Of The Maldives
Technical Assistance Report Project Number: 47150 Capacity Development Technical Assistance (CDTA) December 2013 Republic of the Maldives: Enhancing Tax Administration Capacity (Financed by the Japan Fund
Sindh Coastal Communities Development Project
Sindh Coastal Communities Development Project International Union for Conservation of Nature, Pakistan Contents 1. Introduction 1 2. Mangrove plantation and restoration 2 2.1. Community mangrove plantation
no-entry only research and monitoring activities no-take zones incorporates other non-extractive uses
Seaflower Biosphere Reserve Country: COLUMBIA Project Overview Columbia declared the archipelago of San Andres, Old Providence, and Santa Catalina a biosphere reserve called the Seaflower Biosphere Reserve.
National Marine Sanctuaries Act
Please note: This text is from the fourth edition of Federal Historic Preservation Laws, published in 2006 by the National Center for Cultural Resources, National Park Service, Department of the Interior.
Presentation Outline
Indonesian MPA s: : An overview, with case study on Bunaken National Park Co-Management Meity Mongdong Natural Resources Management Program, North Sulawesi Presentation Outline Overview of Indonesian MPA
ROLE AND CONTRIBUTION OF MEN AND WOMEN IN MANGROVE REHABILITATION IN REGION VI, PHILIPPINES
ROLE AND CONTRIBUTION OF MEN AND WOMEN IN MANGROVE REHABILITATION IN REGION VI, PHILIPPINES Josephine Savaris*, Alice Joan Ferrer**, Rosalie Joven*, Rodney Golbeque*, and Basilio Bajoyo* *CMRP-Zoological
Summary of Evaluation Result
Summary of Evaluation Result 1. Outline of the Project Country: Socialist Republic of Vietnam Issue/ Sector: Natural Environment Project Title: the project on the Villager Support for Sustainable Forest
MACROECONOMIC AND FISCAL ASSESSMENT
Public Sector Financial Management Program (RRP SAM 46384) A. BACKGROUND MACROECONOMIC AND FISCAL ASSESSMENT 1. Samoa is composed of about 10 islands, 4 inhabited, and several uninhabited islets situated
Ex-Post Monitoring Report Trans-Island Highway Construction Project (I) (II) in Papua New Guinea
Ex-Post Monitoring Report Trans-Island Highway Construction Project (I) (II) in Papua New Guinea Evaluator:Atsushi Hashimoto (Maenam Advisory) Field Survey: June 2008 1. Outline of the Project and Japan
Marine Stewardship Council
Marine Stewardship Council MSC Fishery Standard Principles and Criteria for Sustainable Fishing Version 1.1 1 st May 2010 Committees responsible for this Standard This standard is intended to be used on
MPA NETWORKS MODULE 2 2.1 INTRODUCTION TO MPA NETWORKS. Advantages of Networks 2.2 TYPES OF MPA NETWORKS. Social Networks. Ecological Networks
2.1 INTRODUCTION TO MPA NETWORKS Advantages of Networks 2.2 TYPES OF MPA NETWORKS Social Networks Ecological Networks Management-based Networks Case Study: A Regional Approach to MPA Development in West
Summary. Cooperation scheme: Technical Cooperation Project Division in charge: JICA Laos Office
Summary I. Outline of the Project Country: Lao PDR Project title: Project for the Upgrading IT Education (Information Technology Bridging Course) Issue/Sector: Higher Education / IT Cooperation scheme:
MADAGASCAR REPORT MADAGASCAR FISHERIES DATA MANAGEMENT
44 MADAGASCAR REPORT MADAGASCAR FISHERIES DATA MANAGEMENT Total production statistics have various sources, particularly from logbook, from activities report, from evaluations and projections. It is 120
Laos Project Site. China. Thailand. Vietnam. Cambodia Ho Chi Minh. Malaysia
Socialist Republic of Vietnam Pha Lai Thermal Power Plant Project (I) (IV) External Evaluators: The Japan Economic Research Institute Koki Hagiu, Yumi Ito Field Survey: November 27, February March 28 1.
The Philippines WAVES pilot ecosystem accounts
The Philippines WAVES pilot ecosystem accounts Developed by: Lars Hein on the basis of the Pilot Ecosystem Accounts developed by the National teams. Date: October 2015 Wealth Accounting and the Valuation
Vietnam's Experiences in Strengthening. Procurement and Public Financial Management Systems. in Harmonization, Alignment and Capacity Development
Vietnam's Experiences in Strengthening Procurement and Public Financial Management Systems in Harmonization, Alignment and Capacity Development Mr. Chairman, Ladies and gentlemen, Dr. Duong Duc Ung Director
1. Project Profile and Japan s ODA Loan
Sri Lanka Transmission and Grid Substation Development Project 1. Project Profile and Japan s ODA Loan Report Date: September 2002 Field Survey: July/August 2001 Site Map: Sri Lanka Site Photo: Matara
The Batanes Protected Area Act (DOT)
CONGRESS OF THE PHILIPPINES SIXTEENTH CONGRESS Third Regular Session } HOUSE OF REPRESENTATIVES H. No. 6152 BY REPRESENTATIVES ABAD, RELAMPAGOS, ALVAREZ (F.), CAGAS, LANETE, ABUEG, DIMAPORO (I.), FORTUN,
Strategic Plan: Marine Living Resources Fund 2014-2019
Strategic Plan: Marine Living Resources Fund 2014-2019 All our natural living marine resources and our marine environment belong to all the people of South Africa. Marine Living Resources Act, 1998 2 3
Human Impacts on the World Ocean
This website would like to remind you: Your browser (Safari 7) is out of date. Update your browser for more security, comfort and the best experience on this site. lesson Human Impacts on the World Ocean
Fisheries in Crisis and Conflict in the Coral Triangle
Fisheries in Crisis and Conflict in the Coral Triangle Reflections on the Live Reef Fish Trade and The Coral Triangle Initiative Charles Barber Environmental Advisor Office of Environment and Science Policy
Republic of Tajikistan: Dushanbe-Kyrgyz Border Rehabilitation Project (Phase I)
Validation Report Reference Number: PCV: TAJ 2011-40 Project Number: 34569 Loan Number: 2062-TAJ December 2011 Republic of Tajikistan: Dushanbe-Kyrgyz Border Rehabilitation Project (Phase I) Independent
Resource Management Accomplishments FY 2014
Resource Management Accomplishments FY 2014 Sea turtle nest protection - Over 3,700 sea turtle nests were covered with wire mesh screens to protect them from being predated. Data on each sea turtle activity
SUSTAINABLE FISHERIES DEVELOPMENT GHANA
SUSTAINABLE FISHERIES DEVELOPMENT GHANA GENERAL INFORMATION Purpose Establishment of a commercial and sustainable supply chain of fresh tuna loins to the EU market Country Ghana Sector Agriculture Contribution
Kyrgyz Republic: Women s Entrepreneurship Development Project
Kyrgyz Republic: Women s Entrepreneurship Development Project Project Name Project Number 46010-001 Country Project Status Project Type / Modality of Assistance Source of Funding / Amount Women s Entrepreneurship
Data Collection on Tuna Fisheries in Thailand: The transition of the old practice to the modern technology development
Data Collection on Tuna Fisheries in Thailand: The transition of the old practice to the modern technology development Sampan Panjarat Andaman Sea Fisheries Research and Development Center (Phuket) 77
6 STEP 6 - PREPARING THE ACTION PLAN 2
CONTENTS 6 STEP 6 - PREPARING THE ACTION PLAN 2 6.1 USER GUIDE TO THIS STEP 2 6.2 KEY MESSAGES OF THIS STEP 4 6.3 PREPARING THE ACTION PLAN 5 6.4 PRE-FEASIBILITY STUDY 8 6.5 PREPARING AN INVESTMENT PLAN
China Protected Areas Leadership Alliance Project
Strengthening Leadership Capacity for Effective Management of China s Protected Areas Executive Summary The (CPALAP) is a multi-year initiative launched in 2008 under a partnership between the China State
Appendix A. The Marine Life Protection Act (MLPA)
Appendix A. The Marine Life Protection Act (MLPA) THE PEOPLE OF THE STATE OF CALIFORNIA DO ENACT AS FOLLOWS: SECTION 1. Chapter 10.5 (commencing with Section 2850) is added to Division 3 of the Fish and
EVOLUTION OF NATIONAL STATISTICAL SYSTEM OF CAMBODIA
COUNTRY PAPER - CAMBODIA for the A Seminar commemorating the 60th Anniversary of the United Nations Statistical Commission United Nations, New York, 23 February 2007 EVOLUTION OF NATIONAL STATISTICAL SYSTEM
Assessing adaptation options for climate change: A guide for coastal communities in the Coral Triangle of the Pacific 5. Social Network Analysis
Assessing adaptation options for climate change: A guide for coastal communities in the Coral Triangle of the Pacific 5. Social Network Analysis Scoping Identifying options Evaluation of options Planning
International Monitoring, Control, and Surveillance (IMCS) Network: Building Capacity to Combat Illegal, Unreported, and Unregulated (IUU) Fishing
International Monitoring, Control, and Surveillance (IMCS) Network: Building Capacity to Combat Illegal, Unreported, and Unregulated (IUU) Fishing Marcel Kroese Director: IMCS Network Training & Liaison
Michigan Wetlands. Department of Environmental Quality
Department of Environmental Quality Wetlands are a significant component of Michigan s landscape, covering roughly 5.5 million acres, or 15 percent of the land area of the state. This represents about
Pakse Urban Environmental Improvement Project (RRP LAO 43316)
FINANCIAL ANALYSIS 1. Financial viability was assessed for solid waste management (SWM) improvements, which is the project s only revenue-earning subcomponent. 1 A financial sustainability analysis was